WO2019155585A1 - 電動機の制御装置およびケーブル断線検出方法 - Google Patents

電動機の制御装置およびケーブル断線検出方法 Download PDF

Info

Publication number
WO2019155585A1
WO2019155585A1 PCT/JP2018/004475 JP2018004475W WO2019155585A1 WO 2019155585 A1 WO2019155585 A1 WO 2019155585A1 JP 2018004475 W JP2018004475 W JP 2018004475W WO 2019155585 A1 WO2019155585 A1 WO 2019155585A1
Authority
WO
WIPO (PCT)
Prior art keywords
value
phase
disconnection
current
calculation
Prior art date
Application number
PCT/JP2018/004475
Other languages
English (en)
French (fr)
Inventor
智久 正田
益崇 渡邉
良雅 西島
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2018/004475 priority Critical patent/WO2019155585A1/ja
Priority to JP2019570228A priority patent/JP6899932B2/ja
Priority to US16/958,811 priority patent/US11264928B2/en
Priority to CN201880088293.XA priority patent/CN111670539B/zh
Priority to DE112018007041.7T priority patent/DE112018007041T5/de
Publication of WO2019155585A1 publication Critical patent/WO2019155585A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P29/00Arrangements for regulating or controlling electric motors, appropriate for both AC and DC motors
    • H02P29/02Providing protection against overload without automatic interruption of supply
    • H02P29/024Detecting a fault condition, e.g. short circuit, locked rotor, open circuit or loss of load
    • H02P29/0243Detecting a fault condition, e.g. short circuit, locked rotor, open circuit or loss of load the fault being a broken phase
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P21/00Arrangements or methods for the control of electric machines by vector control, e.g. by control of field orientation
    • H02P21/22Current control, e.g. using a current control loop
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P21/00Arrangements or methods for the control of electric machines by vector control, e.g. by control of field orientation
    • H02P21/14Estimation or adaptation of machine parameters, e.g. flux, current or voltage
    • H02P21/18Estimation of position or speed
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P27/00Arrangements or methods for the control of AC motors characterised by the kind of supply voltage
    • H02P27/04Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage
    • H02P27/06Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage using dc to ac converters or inverters
    • H02P27/08Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage using dc to ac converters or inverters with pulse width modulation
    • H02P27/12Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage using dc to ac converters or inverters with pulse width modulation pulsing by guiding the flux vector, current vector or voltage vector on a circle or a closed curve, e.g. for direct torque control

Definitions

  • the present invention relates to a motor control device and a cable disconnection detection method for detecting disconnection of a power connection line connecting an electric motor and a power converter.
  • Patent Document 1 compares a phase current flowing through an electric motor with a determination value in order to determine disconnection. For this reason, for example, in the case of a low current, it may be difficult to detect the disconnection of the power connection line by setting the determination value.
  • the present invention has been made in consideration of the above problems, and an object of the present invention is to provide a motor control device and a cable disconnection detection method capable of detecting a disconnection of a power connection line connecting a motor and a power converter with high accuracy. Is to provide.
  • the motor control device controls the switching element provided in the inverter that converts the DC power supplied from the DC power source into AC power in accordance with a torque command given from the outside, thereby controlling the motor.
  • a controller for an electric motor comprising a controller for controlling AC power to be supplied and a current sensor for detecting a phase current flowing in an AC cable connecting the electric motor and an inverter, the controller being detected by the current sensor.
  • the phase current is acquired as the phase current detection value
  • the command current to the motor is calculated as the phase current command value based on the torque command
  • the transition result of the difference value between the phase current command value and the phase current detection value in each phase From the above, it has a disconnection detection part which performs the disconnection detection process which determines the presence or absence of the disconnection of AC cable for every phase.
  • the cable disconnection detection method performs switching control on a switching element provided in an inverter that converts DC power supplied from a DC power source into AC power in response to a torque command given from the outside.
  • a cable disconnection detection method executed by a controller in a motor control device comprising: a controller that controls AC power supplied to the motor; and a current sensor that detects a phase current flowing in an AC cable connecting the motor and the inverter.
  • a storage step in which a determination threshold used for determining whether or not the AC cable is disconnected and the number of disconnection determinations are stored in the storage unit in advance, and a phase current detected by the current sensor is detected as a phase current.
  • Detection value acquisition step to acquire as a value and a torque command A command value calculation step for calculating a command current to the motor as a phase current command value, and for each phase, a difference value between the phase current detection value and the phase current command value is calculated for each calculation cycle, and a calculation start point
  • the integration step for repeatedly calculating the integrated value corresponding to the period by integrating the absolute values of the difference values calculated in a plurality of calculation cycles included in the period from the calculation end point to the calculation end point, and the previous value of the integrated value
  • the ratio with the current value is calculated, and the state where the ratio is higher than the determination threshold value stored in the storage unit continues for the number of disconnection determinations stored in the storage unit, so that it is determined that the AC cable has been disconnected.
  • a disconnection determination step for calculating a command current to the motor as a phase current command value, and for each phase, a difference value between the phase current detection value and the phase current command value is calculated for each calculation cycle, and a calculation start point
  • the disconnection of the power connection line is detected based on the transition result of the difference value between the current command value of the motor and the detected current value.
  • Embodiment 1 of this invention it is a whole block diagram which shows the control apparatus of the electric motor containing the power converter device which concerns on Embodiment 1 of this invention. It is a functional block diagram of MCU applied to the control apparatus of the electric motor which concerns on Embodiment 1 of this invention.
  • Embodiment 1 of this invention it is a flowchart which shows the main flow of the AC cable disconnection detection process performed by the disconnection detection part.
  • it is a flowchart which shows the flow of the AC cable disconnection detection calculation process performed by the disconnection detection part.
  • Embodiment 1 of this invention it is a flowchart which shows the flow of the detection electric current calculation process performed by the disconnection detection part.
  • Embodiment 1 of this invention it is a flowchart which shows the flow of the disconnection determination calculation process performed by the disconnection detection part. It is a timing chart which shows the operation
  • FIG. 1 is an overall configuration diagram showing a control device for an electric motor including a power conversion device according to Embodiment 1 of the present invention.
  • the motor control device shown in FIG. 1 includes a motor control unit 1, a battery 2, a motor 4, a rotation angle sensor 5, and a power conversion device 30.
  • the motor control unit 1 is a controller that executes arithmetic processing related to drive control of the power converter, and is hereinafter referred to as “MCU”.
  • the battery 2 is a power source that supplies DC power.
  • the power conversion device 30 is a converter that is provided in parallel to the battery 2 and converts DC power from the battery 2 into AC power, and is hereinafter referred to as an “inverter”.
  • the electric motor 4 is driven to rotate by generating a driving force by the AC power supplied from the inverter 30.
  • the electric motor 4 is connected to a wheel (not shown) via a power transmission mechanism (not shown).
  • the rotation angle sensor 5 outputs a rotation angle signal according to the rotation of the electric motor 4.
  • the inverter 30 includes a switching element that converts DC power from the battery 2 into AC power supplied to the electric motor 4 in accordance with a switching signal output from the MCU 1.
  • the switching elements are U phase upper switching element 3Q1, U phase lower switching element 3Q2, V phase upper switching element 3Q3, V phase lower switching element 3Q4, W phase upper switching element 3Q5, W phase lower side.
  • the switching element 3Q6 is used.
  • U-phase upper diode element 3D1 U-phase lower diode element 3D2, V-phase upper diode element 3D3, V-phase lower diode element 3D4, W-phase upper diode element 3D5, W
  • the phase lower diode elements 3D6 are connected to each other.
  • the inverter 30 further includes a smoothing capacitor 31 that smoothes the DC voltage supplied from the battery 2 and a voltage sensor 32 that detects the supplied DC voltage value.
  • one end of three coils of the U phase, the V phase, and the W phase is connected to a neutral point.
  • the other ends of the three coils of the U phase, the V phase, and the W phase are connected to an intermediate point of the switching element of each phase.
  • a U-phase current sensor 33, a V-phase current sensor 34, and a W-phase current sensor 35 are attached to an AC cable corresponding to a power connection line that connects the inverter 30 and the electric motor 4.
  • FIG. 2 is a functional block diagram of the MCU 1 applied to the motor control device according to Embodiment 1 of the present invention.
  • the MCU 1 illustrated in FIG. 2 has a function of generating a switching signal to control the inverter 30 and a function of detecting disconnection of the AC cable. Each function will be described in detail below.
  • the vehicle control unit 100 that is mounted on the vehicle and controls the operation of the vehicle reads an accelerator opening signal and a brake depression signal that indicate a driver's operation, and outputs a command torque Ttar to the MCU 1.
  • the vehicle control unit is referred to as “VEH-CU”.
  • the command current calculation unit 11 receives the command torque Ttar calculated by the VEH-CU 100 and the rotation speed Nm calculated by the rotation angle processing unit 12 described later.
  • the command current calculation unit 11 calculates a d-axis command current Idtar and a q-axis command current Iqtar from a torque-current map stored in advance in a ROM (not shown) in the MCU 1.
  • the d-axis command current Idtar and the q-axis command current Iqtar calculated by the command current calculation unit 11 are input to the command voltage calculation unit 14.
  • the rotation angle processing unit 12 calculates the rotation speed Nm and the electrical angle ⁇ of the motor 4 based on the rotation angle signal output from the rotation angle sensor 5 installed in the motor 4.
  • the rotation speed Nm calculated by the rotation angle processing unit 12 is input to the command current calculation unit 11 and the disconnection detection unit 17.
  • the electrical angle ⁇ calculated by the rotation angle processing unit 12 is input to the detected current 3-phase / 2-phase converter 13, the command voltage 2-phase / 3-phase converter 15, and the disconnection detector 17.
  • the detected current three-phase / 2-phase converter 13 is a current sensor (U-phase current sensor 33, V-phase current sensor 34, W-phase current sensor) attached to an AC cable connecting the inverter 30 and the motor 4. 35) and the electrical angle ⁇ calculated by the rotation angle processing unit 12 are received. Then, the detected current 3-phase / 2-phase converter 13 converts the three-phase detected current into a d-axis current Idact and a q-axis current Iqact using the electrical angle ⁇ . The d-axis current Idact and the q-axis current Iqact converted by the detected current three-phase / 2-phase converter 13 are input to the command voltage calculator 14.
  • the command voltage calculation unit 14 includes a d-axis command current Idtar and a q-axis command current Iqtar calculated by the command current calculation unit 11, and a d-axis current Idact and q-axis converted by the detected current three-phase / two-phase conversion unit 13.
  • the current Iqact is received.
  • the command voltage calculation unit 14 executes current feedback control based on a deviation between the d-axis command current Idtar and the d-axis current Idact and a deviation between the q-axis command current Iqtar and the q-axis current Iqact, so that d
  • the axis command voltage Vdtar and the q-axis command voltage Vqtar are calculated.
  • the command voltage 2-phase / 3-phase conversion unit 15 receives the d-axis command voltage Vdtar and the q-axis command voltage Vqtar calculated by the command voltage calculation unit 14 and the electrical angle ⁇ calculated by the rotation angle processing unit 12. . Then, the command voltage 2-phase / 3-phase converter 15 performs a U-phase command voltage Vutar and a V-phase command, which are command voltages for each phase, based on the d-axis command voltage Vdtar, the q-axis command voltage Vqtar, and the electrical angle ⁇ . The voltage Vvtar and the W-phase command voltage Vwtar are calculated. The command voltage of each phase calculated by the command voltage 2-phase / 3-phase converter 15 is input to the switching signal generator 16.
  • the switching signal generation unit 16 uses the U-phase command voltage Vutar, the V-phase command voltage Vvtar, the W-phase command voltage Vwtar calculated by the command voltage 2-phase / 3-phase conversion unit 15, and the detection voltage detected by the voltage sensor 32. Receive. Based on these received signals, switching signal generator 16 generates a switching signal for switching control of switching elements 3Q1 to 3Q6 of inverter 30.
  • the switching signal generated by the switching signal generator 16 is input to the inverter 30.
  • the MCU 1 supplies the AC power corresponding to the command torque Ttar to the motor 4 by operating the switching elements 3Q1 to 3Q6 in the inverter 30 by switching control based on the switching signal. To do.
  • the disconnection detection unit 17 includes a command torque Ttar calculated by the VEH-CU 100, a d-axis command current Idtar and a q-axis command current Iqtar calculated by the command current calculation unit 11, and an electric power calculated by the rotation angle processing unit 12.
  • the angle ⁇ , the rotational speed Nm, and the U-phase current Iuact, the V-phase current Ivact, and the W-phase current Iwact that are detection currents of the respective phases of the electric motor 4 are received.
  • the disconnection detector 17 detects disconnection of the AC cable connecting the inverter 30 and the electric motor 4 based on these received signals.
  • the disconnection detection process executed by the disconnection detection unit 17 is a main technical feature of the present invention. Therefore, the disconnection detection process will be described in detail with reference to FIGS.
  • FIG. 3 is a flowchart showing a main flow of AC cable disconnection detection processing executed by the disconnection detection unit 17 in Embodiment 1 of the present invention. Note that the flowchart shown in FIG. 3 shows arithmetic processing performed in the MCU 1 at a constant cycle.
  • a specific example of the fixed period is, for example, a 10 ms period.
  • step S101 the disconnection detection unit 17 detects that the U-phase current sensor 33, the V-phase current sensor 34, and the W-phase current sensor 35 attached to the AC cable connecting the inverter 30 and the electric motor 4 have not failed. It is determined whether or not it is in a state.
  • the disconnection detection process is performed based on the value of the current flowing through the motor 4. Therefore, if any one of the current sensors 33 to 35 of each phase has a failure, the disconnection detection process in the first embodiment cannot be executed correctly and an erroneous determination may be made. . Therefore, the disconnection detection unit 17 confirms in step S101 that the current sensors 33 to 35 of each phase are in a state where no failure has occurred.
  • step S101 that is, if no failure has occurred in the current sensors 33 to 35 of each phase, the process proceeds to step S102.
  • step S102 the disconnection detection of the AC cable is not performed, and the series of processes ends.
  • the disconnection detection unit 17 determines whether or not the rotation angle sensor 5 is in a failure-free state.
  • AC cable disconnection detection processing is performed using the electrical angle ⁇ of the electric motor 4. Therefore, when the electrical angle ⁇ cannot be calculated, the AC cable disconnection detection process cannot be executed. Therefore, the disconnection detection unit 17 confirms in step S102 that the rotation angle sensor 5 is in a failure-free state.
  • step S102 that is, if no failure has occurred in the rotation angle sensor 5
  • the process proceeds to step S103.
  • the disconnection detection of the AC cable is not performed, and the series of processes ends.
  • the disconnection detection unit 17 determines whether or not the disconnection of the AC cable is in an undetected state. This determination is performed in order to avoid the disconnection detection process being performed again after the AC cable disconnection has already been detected. Specifically, when a disconnection detection information F_discon described later is 0, the disconnection detection unit 17 performs a Yes determination.
  • step S103 determines whether the disconnection of the AC cable has been detected. If YES in step S103, that is, if no disconnection of the AC cable has been detected, the process proceeds to step S104. On the other hand, in the case of No determination, that is, when the disconnection of the AC cable has already been detected, the disconnection detection of the AC cable is not performed, and the series of processes ends.
  • the disconnection detection unit 17 performs an AC cable disconnection detection calculation.
  • the specific processing content of this AC cable disconnection detection calculation corresponds to the flowchart shown in FIG. Although the detailed description of FIG. 4 will be described later, when the disconnection detection unit 17 detects that the AC cable is disconnected, the disconnection detection information F_discon is set to 1, and the AC cable is not disconnected. When this is detected, 0 is set in the disconnection detection information F_discon.
  • the disconnection detection unit 17 When the process proceeds to step S106 because the disconnection of the AC cable has been detected, the disconnection detection unit 17 outputs a disconnection detection signal to the switching signal generation unit 16 as the disconnection detection process, and ends the series of processes. .
  • the switching signal generation unit 16 When the switching signal generation unit 16 receives the disconnection detection signal from the disconnection detection unit 17, for example, the switching signal generation unit 16 can execute processing such as driving stop of the switching element.
  • FIG. 4 is a flowchart showing the flow of the AC cable disconnection detection calculation process executed by the disconnection detection unit 17 in the first embodiment of the present invention. More specifically, the flowchart in FIG. 4 corresponds to a specific series of processes executed in step S104 in FIG.
  • step S201 the disconnection detector 17 determines the magnitude of the rotational speed Nm.
  • the current flowing in each phase crosses 0A. Therefore, depending on the stop position of the motor 4, that is, the electrical angle at the time of stop, there is a phase in which no current flows.
  • step S201 avoids erroneous detection of a disconnection when there is a phase in which no current flows.
  • step S201 the disconnection detector 17 determines whether or not the absolute value of the rotational speed Nm of the electric motor 4 is greater than the rotational speed determination value Nm_ts.
  • the rotation speed determination value Nm_ts is set in advance to 50 r / min.
  • step S201 determines whether the relationship
  • step S202 the disconnection detector 17 determines the magnitude of the command torque Ttar.
  • the command torque Ttar is 0 Nm, no current flows through the electric motor 4. Therefore, it is not necessary to detect disconnection of the AC cable. Therefore, the determination in step S202 is provided.
  • step S202 the disconnection detection unit 17 determines whether or not the absolute value of the command torque Ttar is greater than the command torque determination value Ttar_ts.
  • the command torque determination value Ttar_ts is set in advance to 10 Nm.
  • step S202 determines whether the relationship
  • the disconnection detection unit 17 performs detection current calculation.
  • the specific processing content of this detection current calculation corresponds to the flowchart shown in FIG. Although the detailed description of FIG. 5 will be described later, when the disconnection detection unit 17 determines that the condition for enabling the disconnection determination is satisfied, the disconnection determination permission flag det_jdg is set to 1, and the disconnection determination is performed. When it is determined that the possible condition is not satisfied, the disconnection determination permission flag det_jdg is set to 0.
  • step S203 the process proceeds to step S204, and the disconnection detection unit 17 determines whether or not a condition capable of determining disconnection is satisfied. This determination is performed using the disconnection determination permission flag det_jdg described above.
  • the disconnection determination permission flag det_jdg 1 indicates Yes. It becomes determination and it progresses to step S205.
  • the series of processes in FIG. 4 ends, the process returns to the process in FIG. 3, and the processes after step S105 are performed.
  • the disconnection detection unit 17 performs a disconnection determination calculation.
  • the specific processing content of this disconnection determination calculation corresponds to the flowchart shown in FIG. Although the detailed description of FIG. 6 will be described later, the disconnection detection unit 17 sets 1 in the disconnection detection information F_discon when the disconnection is detected, and disconnection detection information F_discon when no disconnection is detected. Set to 0.
  • step S201 or step S202 to step S206 the disconnection detection unit 17 initializes various information used for disconnection detection. Then, the series of processes shown in FIG. 4 ends, and the process returns to the process shown in FIG.
  • FIG. 5 is a flowchart showing a flow of detection current calculation processing executed by the disconnection detection unit 17 in Embodiment 1 of the present invention. More specifically, the flowchart of FIG. 5 corresponds to a specific series of processes executed in step S203 in FIG. Note that the detected current calculation process in FIG. 5 is performed for each phase, and is performed at a cycle of, for example, 100 ⁇ sec as an earlier cycle than the process of FIG.
  • step S301 the disconnection detection unit 17 performs the 0 A crossing determination of the command current Itar_x (x: U, V, W) of each phase.
  • the disconnection detector 17 calculates a command current for each phase using the d-axis command current Idtar, the q-axis command current Iqtar, and the electrical angle ⁇ . Further, the disconnection detection unit 17 uses the previous value Itar_x (n-1) (x: U, V, W) and the current value Itar_x (n) (x: U, V, W) of the command current of each phase. Then, the 0A crossing determination is performed.
  • the disconnection detection unit 17 determines that a crossing of 0A has occurred for each phase when the following expression holds. Itar_x (n ⁇ 1) ⁇ 0, and Itar_x (n) ⁇ 0 (x: U, V, W)
  • step S301 If the disconnection detection unit 17 determines in step S301 that the command current Itar_x (x: U, V, W) has crossed 0 A in the current cycle, the determination is Yes and the process proceeds to step S302. On the other hand, in the case of No determination, the process proceeds to step S320.
  • the disconnection detection unit 17 updates the current difference integrated value (previous value) Icad_x (n ⁇ 1) (x: U, V, W), and the process proceeds to step S318.
  • the disconnection detection unit 17 determines the current difference as an absolute value of the difference between the command current Itar_x (x: U, V, W) of each phase and the detected current Iact_x (x: U, V, W).
  • the value Idiff_x (x: U, V, W) is calculated.
  • the disconnection detection unit 17 calculates the current difference integrated value Icad_x (n) (x: U, V, W) using the following formula, and ends the series of processes.
  • Icad_x (n) Icad_x (n ⁇ 1) + Idiff_x (n)
  • the disconnection detection unit 17 determines whether or not the three-phase zero straddling counter F_stc is zero.
  • the three-phase zero crossing counter F_stc is a counter that is counted up every period when any of the currents flowing through the respective phases crosses 0A.
  • the 3-phase 0 straddling counter operates cyclically in the range of 0 to 3.
  • step S302 if the determination is Yes, that is, if the three-phase zero crossing counter F_stc is zero, the condition that the current flowing through the motor 4 crosses 0 A is first satisfied after the AC cable disconnection detection calculation in FIG. 4 is started. Become. Therefore, in the case of Yes determination in step S302, the process proceeds to step S303, where the disconnection detecting unit 17 counts up the three-phase zero crossing counter F_stc to 1, and proceeds to step S308.
  • step S302 determines whether or not the 3-phase 0 crossing counter F_stc is 1. To do.
  • step S304 if the determination is Yes, that is, if the 3-phase 0 crossing counter F_stc is 1, the process proceeds to step S305, and the disconnection detection unit 17 counts up the 3-phase 0 crossing counter F_stc to 2, and then proceeds to step S308.
  • step S304 determines whether the three-phase zero crossing counter F_stc is two. To do.
  • step S306 if the determination is Yes, that is, if the 3-phase 0 crossing counter F_stc is 2, the process proceeds to step S307, and the disconnection detection unit 17 counts up the 3-phase 0 crossing counter F_stc to 3, and then proceeds to step S308.
  • the disconnection detection unit 17 determines whether the zero crossing information F_sta_x (x: U, V, W) of each phase is zero.
  • This zero crossing information F_sta_x (x: U, V, W) is a counter that is counted up every time it passes through step S309 or step S312 described later, and operates cyclically in the range of 1 and 2. Obviously.
  • step S308 the process proceeds to step S309, and the disconnection detection unit 17 updates the 0 crossing information F_sta_x (x: U, V, W) to 1, and then proceeds to step S310.
  • step S310 the disconnection detection unit 17 updates the current difference accumulated store value Icad_x1 (x: U, V, W) by the following expression, and proceeds to step S314.
  • Icad_x1 Idiff_x (n) (x: U, V, W)
  • step S311 the process proceeds to step S309, and the disconnection detection unit 17 updates the zero crossing information F_sta_x (x: U, V, W) to 1, and then performs the process of step S310 described above. And proceed to step S314.
  • the disconnection detection unit 17 performs determination based on the two current difference integration store values Icad_x1 and Icad_x2 (x: U, V, W). This determination is to determine whether or not a condition for starting a disconnection determination calculation described later is satisfied. Specifically, the disconnection detection unit 17 determines whether or not the calculation of the current difference integrated store values Icad_x1 and Icad_x2 (x: U, V, W) based on the command of each phase (U, V, W) and the detected current value is completed. Is determined based on whether or not the condition of the following equation is satisfied. Icad_x1> 0 and Icad_x2> 0 (x: U, V, W)
  • step S314 If YES in step S314, that is, if the condition of the above equation is satisfied and the calculation of the current difference accumulated store values Icad_x1 and Icad_x2 (x: U, V, W) of each phase is completed, the process proceeds to step S315. move on.
  • step S315 the disconnection detection unit 17 sets the disconnection determination permission flag det_jdg to 1, and the process proceeds to step S317.
  • step S314 determines whether the condition according to the above formula is not satisfied and the calculation of the current difference accumulated store values Icad_x1 and Icad_x2 (x: U, V, W) of each phase is not completed.
  • the process proceeds to step S316.
  • step S316 the disconnection detection unit 17 sets the disconnection determination permission flag det_jdg to 0, and the process proceeds to step S317.
  • the disconnection detection unit 17 initializes the current difference integrated value Icad_x (n) (x: U, V, W) to 0, and the process proceeds to step S318.
  • the disconnection detection unit 17 calculates the absolute difference between the command current Itar_x (x: U, V, W) of each phase and the detection current Iact_x (x: U, V, W).
  • a current difference value Idiff_x (x: U, V, W) is calculated as a value, and the process proceeds to step S319.
  • step S319 the disconnection detection unit 17 calculates the current difference value (Idiff_x (Idiff_x (n)) calculated in step S318 to the current difference integrated value (previous value) Icad_x (n-1) (x: U, V, W) as described above. n) By adding (x: U, V, W), the current difference integrated value (current value) Icad_x (n) (x: U, V, W) is calculated, and the series of processes ends.
  • FIG. 6 is a flowchart showing the flow of the disconnection determination calculation process executed by the disconnection detector 17 in the first embodiment of the present invention. More specifically, the flowchart of FIG. 6 corresponds to a specific series of processes executed in step S205 in FIG.
  • step S401 the disconnection detecting unit 17 reads the current difference accumulated store values Icad_x1, Icad_x2 (x: U, V, W), and proceeds to step S402.
  • step S ⁇ b> 402 the disconnection detection unit 17 determines the zero crossing information F_sta_x (x: U, V, W) of each phase. This determination is performed in order to determine an arithmetic expression used for a ratio calculation of a current difference integrated value described later.
  • step S402 the disconnection detection unit 17 determines whether or not the current value of the zero crossing information F_sta_x (x: U, V, W) is 2 and the previous value is 1. In the case of Yes determination in step S402, the process proceeds to step S403.
  • the current difference integration store value Icad_x1 (x: U, V, W) becomes the previous value, and thus the disconnection detection unit 17 uses the following equation to calculate the current difference integration ratio ⁇ Icad_x ( x: U, V, W) is calculated, and the process proceeds to step S406.
  • ⁇ Icad_x
  • step S404 the disconnection detection unit 17 determines whether or not the current value of the 0 crossing information F_sta_x (x: U, V, W) is 1 and the previous value is 2. If YES in step S404, the process proceeds to step S405.
  • the current difference integration store value Icad_x2 (x: U, V, W) becomes the previous value, and thus the disconnection detection unit 17 uses the following equation to calculate the current difference integration ratio ⁇ Icad_x ( x: U, V, W) is calculated, and the process proceeds to step S406.
  • ⁇ Icad_x
  • step S406 the disconnection detection unit 17 determines whether or not the current difference integration ratio ⁇ Icad_x (x: U, V, W) calculated in the previous step S403 or step S405 is greater than the determination value ⁇ . .
  • the command current Itar_x (x: U, V, W) is an ideal value
  • the detection current Iact_x (x: U, V, W) is an actual current that flows by PWM control or the like. Therefore, even if the AC cable is not disconnected, a certain amount of difference occurs between the command current and the detected current. Therefore, in order to avoid erroneous determination of AC cable disconnection, the determination in step S406 is provided.
  • the determination value ⁇ of the current difference integration ratio used in step S406 is set to a value that is not erroneously determined by the disconnection detection unit 17 even when the maximum current change of the electric motor 4 occurs.
  • the determination value ⁇ is set to 1.1 so that disconnection detection is not determined up to 1.1 times the current difference integration ratio calculated in steps S403 and S404.
  • step S406 that is, if the current difference integration ratio ⁇ Icad_x (x: U, V, W) of each phase is larger than the determination value ⁇ , the process proceeds to step S407, and the disconnection detection unit 17 performs the integration ratio abnormality counter. Count up Ccad (n) by one.
  • the integration ratio abnormality counter Ccad (n) is a total value of the determination of the current difference integration ratio ⁇ Icad_x (x: U, V, W) of each phase in step S406.
  • the process proceeds to step S409.
  • step S409 the disconnection detection unit 17 determines whether or not the integrated ratio abnormality counter Ccad (n) is equal to or greater than the determination value ⁇ .
  • the integration ratio abnormality counter Ccad (n) is a value obtained by summing the abnormality of each phase. Accordingly, in step S409, the disconnection detection unit 17 determines that the AC cable disconnection occurs when the integration ratio abnormality counter Ccad (n) corresponding to the abnormal state combined with each phase is equal to or greater than a predetermined determination value ⁇ . Is determined.
  • the determination value ⁇ is set to 6, for example, corresponding to 2 periods of each phase.
  • step S409 if the cumulative ratio abnormality counter Ccad (n) is greater than or equal to the determination value ⁇ , the determination is Yes and the process proceeds to step S410.
  • step S410 the disconnection detection unit 17 sets the disconnection detection information F_discon to 1, and ends the series of processes in FIG.
  • step S411 if it is determined in step S409 that the cumulative ratio abnormality counter Ccad (n) is less than the determination value ⁇ , the determination is No and the process proceeds to step S411.
  • step S406 determines whether the current difference integration ratio ⁇ Icad_x (x: U, V, W) of each phase is equal to or less than the determination value ⁇ . If the determination in step S406 is No, that is, if the current difference integration ratio ⁇ Icad_x (x: U, V, W) of each phase is equal to or less than the determination value ⁇ , the process proceeds to step S408. In step S408, the disconnection detection unit 17 proceeds to step S411 without updating the integration ratio abnormality counter Ccad (n).
  • the disconnection detection part 17 sets the disconnection detection information F_discon to 0, and complete
  • FIG. 7 is a timing chart showing the operation of AC cable break detection in the first embodiment of the present invention.
  • the horizontal axis indicates time, and the vertical axis indicates the following values in order from the top.
  • x represents U, V, and W.
  • the absolute value (A) of the command torque Ttar changes to be larger than the command torque determination value Ttar_ts, and then the absolute value (B) of the rotation speed Nm is higher than the rotation speed determination value Nm_ts. growing.
  • the detection current calculation routine described with reference to FIG. 5 is started.
  • the calculation of the V-phase current difference value Idiff_v (F) is a difference value obtained by subtracting the V-phase command current Itar_v (D) from the V-phase detection current Iact_v (E). When the AC cable is not disconnected, the difference value is , Very small. When the V-phase current difference value Idiff_v (F) is calculated, the V-phase current difference integrated value Icad_v (G) is then calculated.
  • the three-phase zero crossing counter F_stc (H) changes every time the zero crossing determination for each phase is established in step S301 in FIG.
  • the three-phase zero crossing counter F_stc (H) changes to the number of phases of the electric motor 4 and returns to 1 after reaching the number of phases.
  • the three-phase zero crossing counter F_stc (H) is initialized when the rotational speed determination at Step S201 in FIG. 4 is No or when the command torque determination at Step S202 in FIG. 4 is No. 0.
  • the 0 crossing information F_sta_x (I) also changes when the command current Itar_x (D) of each phase crosses 0A. However, the 0 crossing information F_sta_x (I) takes a value of 1 or 2 when the x-phase command current Itar_x crosses 0A. Further, the zero crossing information F_sta_x (I) is initialized to 0 when the rotational speed determination at Step S201 in FIG. 4 is No determination or when the command torque determination at Step S202 in FIG. 4 is No determination. Become.
  • the V-phase command current Itar_v (D) again crosses 0A, and the command current crossing over 0 determination is established in step S301 in FIG.
  • the other phase (W phase, U phase) also crosses 0A once, and the command current 0 stride determination is established in step S301 of FIG. Therefore, since the 3-phase 0 crossing counter F_stc (H) is 3, the 3-phase 0 crossing counter changes from 3 to 1 at time T3.
  • the V-phase 0 crossing information F_sta_v (I) changes from 1 to 2.
  • the V-phase current difference integrated value Icad_v (G) calculated from time T2 is stored as the current difference integrated store value Icad_v2 (K) and then initialized to 0.
  • V-phase 0 crossing information F_sta_v (I) changes from 2 to 1
  • the value of the current difference integrated value Icad_v (G) is set to 0 after being stored as the current difference integrated store value Icad_v1 (K). It is initialized. Further, the same calculation as that of the V phase is performed for the W phase and the U phase which are the other phases.
  • the current difference integration ratio ⁇ Icad_u (L) is calculated using the mathematical formula described in step S405. Since the calculated value of the current difference integration ratio ⁇ Icad_u (L) is equal to or greater than the determination value ⁇ , the integration ratio abnormality counter Ccad (M) is incremented by one.
  • the current difference integration ratio ⁇ Icad_v (L) is calculated using the mathematical formula described in step S403, and is compared with the determination value ⁇ . Since the V-phase current difference integration ratio ⁇ Icad_v (L) is also larger than the determination value ⁇ , the integration ratio abnormality counter Ccad (M) is incremented by one.
  • the W-phase command current Itar_w (D) crosses 0A, and the W-phase 0 crossing information F_sta_w (I) changes from 1 to 2. Therefore, the current difference integration ratio ⁇ Icad_w (L) is calculated using the mathematical formula described in step S403, and compared with the determination value ⁇ , in the same manner as the V-phase calculation described above. Since the W-phase current difference integration ratio ⁇ Icad_w (L) is also larger than the determination value ⁇ , the integration ratio abnormality counter Ccad (M) is incremented by one.
  • the W-phase command current Itar_w (D) crosses 0A, and the current difference integration ratio ⁇ Icad_w (L) is calculated. Then, the calculated current difference integration ratio ⁇ Icad_w (L) becomes larger than the determination value ⁇ , and the integration ratio abnormality counter Ccad (M) is counted up. Furthermore, the disconnection detection information F_discon (O) is established when the cumulative ratio abnormality counter Ccad (M) is equal to or greater than the determination value ⁇ , and is set to 1.
  • the disconnection detection of the AC cable is performed based on the transition result of the difference value between the current command value of the motor and the current detection value.
  • the disconnection detection unit calculates a difference value between the phase current detection value and the phase current command value for each calculation cycle, and based on an integrated value of the difference values calculated over a plurality of calculation cycles. Thus, it has a function of detecting whether or not the AC cable is disconnected.
  • the disconnection detection unit uses the timing when each of the phase current command values crosses 0 A as the calculation start point of each phase, and the phase of the phase where the calculation is started after one cycle or half cycle of the electrical angle. It has a function of calculating the integrated value with the time when the current command value crosses 0A as the calculation end point.
  • the disconnection detection unit according to the present invention is disconnected when the rotation speed is equal to or less than a preset rotation speed determination value or when the torque command is equal to or less than a preset torque command determination value. It has a function that does not execute the detection process.
  • disconnection detection of the AC cable can be reliably performed while avoiding disconnection detection processing in a state that causes erroneous determination of disconnection detection, such as when the rotation of the motor is stopped.
  • disconnection detection of the current flowing through each phase of the motor is performed for one electrical angle cycle.
  • the present invention is not limited to such disconnection detection. As shown in FIG. 7, the current flowing through each phase crosses 0 A every half cycle of the electrical angle. Therefore, it is also possible to detect disconnection of the AC cable in 1/2 cycle.
  • the determination value for detecting disconnection of the AC cable is a fixed value based on the phase current flowing through each phase of the motor.
  • the present invention is not limited to the case where a fixed determination value is used. It is also possible to variably set the determination value according to the rotation speed of the electric motor.
  • 1 MCU motor control unit
  • 2 battery 4 motor
  • 5 rotation angle sensor 11 command current calculation unit
  • 12 rotation angle processing unit 13 detection current 3-phase / 2-phase conversion unit
  • 14 command voltage calculation unit 15 command Voltage 2-phase / 3-phase converter
  • 16 switching signal generator 17 disconnection detector
  • 30 inverter power converter
  • 33 U-phase current sensor 34 V-phase current sensor, 35 W-phase current sensor.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Ac Motors In General (AREA)
  • Control Of Electric Motors In General (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本発明に係る電動機の制御装置は、トルク指令に応じて電力変換を行うインバータをスイッチング制御することで、電動機に供給する交流電力を制御するコントローラーと、電動機とインバータとを接続するACケーブルに流れる相電流を検出する電流センサとを備え、コントローラーは、電流センサで検出された相電流を相電流検出値として取得し、トルク指令に基づいて電動機への相電流指令値を算出し、それぞれの相における相電流指令値と相電流検出値との差分値の遷移結果から、相ごとにACケーブルの断線の有無を判定する断線検出部を有する。

Description

電動機の制御装置およびケーブル断線検出方法
 本発明は、電動機と電力変換装置とを連結する電力接続線の断線を検出する電動機の制御装置およびケーブル断線検出方法に関するものである。
 近年、二酸化炭素の排出低減、あるいは燃費向上を目的として、内燃機関と電動機を搭載した車両、いわゆるハイブリッド車両、あるいは電動機のみを搭載して走行する電気車両が普及している。電動機を搭載したこれらの電動車両には、電動機のほかに、直流電力を出力する蓄電装置、蓄電装置からの直流電力を交流電力に変換して電動機に電力を供給する電力変換装置が搭載されている。
 このような電動車両において、電動機と電力変換装置とを連結する電力接続線に断線あるいは短絡が発生した場合には、電動機が正常に動作することができなくなるとともに、電力変換装置および電動機に過大な電流が流れるおそれがある。この結果、電動機および電力変換装置の故障を引き起こす可能性がある。また、電動機が正常に動作しないため、意図しない車両振動が発生し、運転者および同乗者を不快にさせるおそれがある。
 上記のような問題を解決するため、電動機と電力変換装置とを連結する電力接続線の断線を検出する従来技術がある(例えば、特許文献1参照)。
特許第5910460号公報
 しかしながら、従来技術には、以下のような課題がある。特許文献1は、断線の判定を行うために、電動機に流れる相電流と判定値とを比較している。このため、例えば、低電流の場合などでは、その判定値の設定によって、電力接続線の断線検出が困難となる可能性がある。
 また、特許文献1は、相電流による判定と相電流の変化速度による判定とに基づき、電力接続線の断線検出を行っている。しかしながら、交流電動機の場合、特定の回転角度で停止していると、電流が流れない相が存在する。このため、電流が流れない相が断線していなくても、相電流および相電流の変化速度がともにゼロであることから、断線検出を誤判定するおそれがある。
 本発明は、上記課題を考慮したものであり、その目的は、電動機と電力変換装置とを連結する電力接続線の断線を高精度に検出することができる電動機の制御装置およびケーブル断線検出方法を提供することである。
 本発明に係る電動機の制御装置は、外部から与えられるトルク指令に応じて、直流電源から供給される直流電力を交流電力に変換するインバータに設けられたスイッチング素子をスイッチング制御することで、電動機に供給する交流電力を制御するコントローラーと、電動機とインバータとを接続するACケーブルに流れる相電流を検出する電流センサと、を備えた電動機の制御装置であって、コントローラーは、電流センサで検出された相電流を相電流検出値として取得し、トルク指令に基づいて電動機への指令電流を相電流指令値として算出し、それぞれの相における相電流指令値と相電流検出値との差分値の遷移結果から、相ごとにACケーブルの断線の有無を判定する断線検出処理を実行する断線検出部を有するものである。
 また、本発明に係るケーブル断線検出方法は、外部から与えられるトルク指令に応じて、直流電源から供給される直流電力を交流電力に変換するインバータに設けられたスイッチング素子をスイッチング制御することで、電動機に供給する交流電力を制御するコントローラーと、電動機とインバータとを接続するACケーブルに流れる相電流を検出する電流センサと、を備えた電動機の制御装置において、コントローラーによって実行されるケーブル断線検出方法であって、コントローラーにおいて、ACケーブルの断線の有無を判定するために用いる判定閾値および断線判定回数をあらかじめ記憶部に記憶させておく記憶ステップと、電流センサで検出された相電流を相電流検出値として取得する検出値取得ステップと、トルク指令に基づいて、電動機への指令電流を相電流指令値として算出する指令値算出ステップと、それぞれの相において、相電流検出値と相電流指令値との差分値を演算周期毎に算出し、演算開始点から演算終了点までの期間に含まれる複数の演算周期で算出したそれぞれの差分値の絶対値を積算することで、期間に対応した積算値を繰り返し算出する積算ステップと、積算値の前回値と今回値との比率を算出し、比率が記憶部に記憶された判定閾値よりも高い状態が、記憶部に記憶された断線判定回数だけ継続することで、ACケーブルの断線が発生したと判定する断線判定ステップと、を有するものである。
 本発明によれば、電動機の電流指令値と電流検出値との差分値の遷移結果に基づいて電力接続線の断線検出を行う構成を有している。この結果、電動機と電力変換装置とを連結する電力接続線の断線を高精度に検出することができる電動機の制御装置およびケーブル断線検出方法を得ることができる。
本発明の実施の形態1に係る電力変換装置を含む電動機の制御装置を示す全体構成図である。 本発明の実施の形態1に係る電動機の制御装置に適用されるMCUの機能ブロック図である。 本発明の実施の形態1において、断線検出部により実行されるACケーブル断線検出処理のメインの流れを示すフローチャートである。 本発明の実施の形態1において、断線検出部により実行されるACケーブル断線検出演算処理の流れを示すフローチャートである。 本発明の実施の形態1において、断線検出部により実行される検出電流演算処理の流れを示すフローチャートである。 本発明の実施の形態1において、断線検出部により実行される断線判定演算処理の流れを示すフローチャートである。 本発明の実施の形態1におけるACケーブル断線検出の動作を示すタイミングチャートである。
 以下、本発明の電動機の制御装置およびケーブル断線検出方法に係る好適な実施の形態について、図面を用いて説明する。
 図1は、本発明の実施の形態1に係る電力変換装置を含む電動機の制御装置を示す全体構成図である。図1に示した電動機の制御装置は、モータコントロールユニット1、バッテリ2、電動機4、回転角度センサ5、および電力変換装置30を備えて構成されている。
 モータコントロールユニット1は、電力変換部の駆動制御に関する演算処理を実行するコントローラーであり、以下、「MCU」と称す。バッテリ2は、直流電力を供給する電源である。電力変換装置30は、バッテリ2に並列に設けられ、バッテリ2からの直流電力を交流電力に変換する変換器であり、以下、「インバータ」と称す。
 電動機4は、インバータ30から供給される交流電力によって駆動力が発生し、回転駆動する。なお、電動機4は、図示しない動力伝達機構を介して、図示しない車輪に接続されている。回転角度センサ5は、電動機4の回転に応じて、回転角度信号を出力する。
 インバータ30は、MCU1から出力されたスイッチング信号に応じて、バッテリ2からの直流電力を電動機4へ供給する交流電力に変換するスイッチング素子を備えている。具体的には、スイッチング素子は、U相上側スイッチング素子3Q1、U相下側スイッチング素子3Q2、V相上側スイッチング素子3Q3、V相下側スイッチング素子3Q4、W相上側スイッチング素子3Q5、W相下側スイッチング素子3Q6で構成されている。
 さらに、各スイッチング素子には、逆並列に、U相上側ダイオード素子3D1、U相下側ダイオード素子3D2、V相上側ダイオード素子3D3、V相下側ダイオード素子3D4、W相上側ダイオード素子3D5、W相下側ダイオード素子3D6がそれぞれ接続されている。
 また、インバータ30は、バッテリ2から供給される直流電圧を平滑化する平滑コンデンサ31と、供給される直流電圧値を検出する電圧センサ32とをさらに備えている。
 電動機4は、U相、V相、W相の3つのコイルの一端が中性点に接続されている。一方、U相、V相、W相の3つのコイルの他端は、各相のスイッチング素子の中間点に接続されている。また、インバータ30と電動機4とを接続する電力接続線に相当するACケーブルには、U相電流センサ33、V相電流センサ34、W相電流センサ35が取り付けられている。
 図2は、本発明の実施の形態1に係る電動機の制御装置に適用されるMCU1の機能ブロック図である。図2に示したMCU1は、スイッチング信号を生成してインバータ30を制御する機能と、ACケーブルの断線検出を行う機能とを有している。各機能について、以下に詳細に説明する。
 車両に搭載され、車両の運行制御を行う車両コントロールユニット100は、運転者の動作を示すアクセル開度信号およびブレーキ踏込信号を読み込み、MCU1に対して指令トルクTtarを出力する。なお、以下の説明では、車両コントロールユニットのことを、「VEH-CU」と称す。
 指令電流演算部11は、VEH-CU100で演算された指令トルクTtarと、後述する回転角度処理部12で演算された回転速度Nmとを受信する。そして、指令電流演算部11は、MCU1内の図示しないROMにあらかじめ保存されているトルク-電流マップから、d軸指令電流Idtar、q軸指令電流Iqtarを演算する。指令電流演算部11により演算されたd軸指令電流Idtarおよびq軸指令電流Iqtarは、指令電圧演算部14に入力される。
 回転角度処理部12は、電動機4に設置された回転角度センサ5から出力される回転角度信号に基づき、電動機4の回転速度Nmおよび電気角θを演算する。回転角度処理部12により演算された回転速度Nmは、指令電流演算部11、および断線検出部17に入力される。一方、回転角度処理部12により演算された電気角θは、検出電流3相/2相変換部13、指令電圧2相/3相変換部15、および断線検出部17に入力される。
 検出電流3相/2相変換部13は、インバータ30と電動機4とを接続するACケーブルに取り付けられている各相の電流センサ(U相電流センサ33、V相電流センサ34、W相電流センサ35)による検出電流、および回転角度処理部12で演算された電気角θを受信する。そして、検出電流3相/2相変換部13は、電気角θを用いて、3相の検出電流をd軸電流Idactとq軸電流Iqactに座標変換する。検出電流3相/2相変換部13により変換されたd軸電流Idactとq軸電流Iqactは、指令電圧演算部14に入力される。
 指令電圧演算部14は、指令電流演算部11により演算されたd軸指令電流Idtar、q軸指令電流Iqtarと、検出電流3相/2相変換部13により変換されたd軸電流Idact、q軸電流Iqactとを受信する。そして、指令電圧演算部14は、d軸指令電流Idtarとd軸電流Idactとの偏差、およびq軸指令電流Iqtarとq軸電流Iqactとの偏差に基づいた電流フィードバック制御を実行することにより、d軸指令電圧Vdtarとq軸指令電圧Vqtarを演算する。
 指令電圧2相/3相変換部15は、指令電圧演算部14により演算されたd軸指令電圧Vdtar、q軸指令電圧Vqtarと、回転角度処理部12により演算された電気角θとを受信する。そして、指令電圧2相/3相変換部15は、d軸指令電圧Vdtar、q軸指令電圧Vqtar、および電気角θに基づいて、各相の指令電圧であるU相指令電圧Vutar、V相指令電圧Vvtar、W相指令電圧Vwtarを演算する。指令電圧2相/3相変換部15により演算された各相の指令電圧は、スイッチング信号生成部16に入力される。
 スイッチング信号生成部16は、指令電圧2相/3相変換部15により演算されたU相指令電圧Vutar、V相指令電圧Vvtar、W相指令電圧Vwtar、および電圧センサ32により検出された検出電圧を受信する。そして、スイッチング信号生成部16は、受信したこれらの信号に基づいて、インバータ30の各スイッチング素子3Q1~3Q6をスイッチング制御するためのスイッチング信号を生成する。
 スイッチング信号生成部16により生成されたスイッチング信号は、インバータ30に入力される。このような一連動作により、MCU1は、スイッチング信号に基づくスイッチング制御により、インバータ30内の各スイッチング素子3Q1~3Q6を動作させることで、電動機4に対して、指令トルクTtarに応じた交流電力を供給する。
 断線検出部17は、VEH-CU100で演算された指令トルクTtarと、指令電流演算部11で演算されたd軸指令電流Idtar、q軸指令電流Iqtarと、回転角度処理部12で演算された電気角θ、回転速度Nmと、電動機4の各相の検出電流であるU相電流Iuact、V相電流Ivact、W相電流Iwactを受信する。
 そして、断線検出部17は、受信したこれらの信号に基づいて、インバータ30と電動機4とを接続するACケーブルの断線検出を行う。この断線検出部17により実行される断線検出処理は、本発明の主要な技術的特徴である。そこで、この断線検出処理について、図3から図6を参照しながら詳細に説明する。
 図3は、本発明の実施の形態1において、断線検出部17により実行されるACケーブル断線検出処理のメインの流れを示すフローチャートである。なお、この図3に示したフローチャートは、MCU1にて一定周期で行われる演算処理を示している。一定周期の具体例は、例えば、10ms周期である。
 まず、ステップS101において、断線検出部17は、インバータ30と電動機4とを接続するACケーブルに取り付けられているU相電流センサ33、V相電流センサ34、W相電流センサ35が、故障未発生状態であるか否かを判定する。
 本実施の形態1では、電動機4に流れる電流値に基づいて、断線検出処理が行われる。従って、各相の電流センサ33~35のいずれか1つでも故障が発生している場合には、本実施の形態1における断線検出処理が正しく実行できず、誤判定を行ってしまうおそれがある。そこで、断線検出部17は、ステップS101において、各相の電流センサ33~35が、故障未発生状態であることを確認する。
 ステップS101でYes判定の場合、つまり各相の電流センサ33~35に故障が発生していない場合には、ステップS102へ進む。一方、No判定の場合には、ACケーブルの断線検出は行われずに、一連処理が終了となる。
 ステップS102に進んだ場合には、断線検出部17は、回転角度センサ5が故障未発生状態であるか否かを判定する。本実施の形態1では、電動機4の電気角θを用いてACケーブルの断線検出処理が行われる。従って、電気角θが演算できない場合には、ACケーブルの断線検出処理を実行することができない。従って、断線検出部17は、ステップS102において、回転角度センサ5が、故障未発生状態であることを確認する。
 ステップS102でYes判定の場合、つまり回転角度センサ5に故障が発生していない場合には、ステップS103へ進む。一方、No判定の場合には、ACケーブルの断線検出は行われずに、一連処理が終了となる。
 ステップS103に進んだ場合には、断線検出部17は、ACケーブルの断線を未検出状態であるか否かを判定する。この判定は、ACケーブル断線をすでに検出した後に、断線検出処理が再度実行されてしまうことを回避するために実行される。具体的には、後述する断線検出情報F_disconが0の場合には、断線検出部17は、Yes判定を行う。
 ステップS103でYes判定の場合、つまりACケーブルの断線が未検出の場合には、ステップS104へ進む。一方、No判定の場合、つまりACケーブルの断線がすでに検出されている場合には、ACケーブルの断線検出は行われずに、一連処理が終了となる。
 ステップS104に進んだ場合には、断線検出部17は、ACケーブル断線検出演算を行う。このACケーブル断線検出演算の具体的な処理内容は、図4に示すフローチャートに相当する。この図4の詳細説明は、後述するが、断線検出部17は、ACケーブルが断線していることを検出した場合には、断線検出情報F_disconに1を設定し、ACケーブルが断線していないことを検出した場合には、断線検出情報F_disconに0を設定する。
 ステップS104でACケーブル断線検出演算が完了すると、ステップS105に進み、断線検出部17は、ACケーブル断線を検出したか否かを判定する。この判定は、前述した断線検出情報F_disconを用いて行われる。断線検出部17により断線検出されている場合、つまり断線検出情報F_discon=1の場合には、Yes判定となってステップS106に進み、No判定の場合には、一連処理が終了となる。
 ACケーブルの断線を検出したことでステップS106に進んだ場合には、断線検出部17は、断線検出処理として、スイッチング信号生成部16に対して、断線検出信号を出力し、一連処理を終了する。
 スイッチング信号生成部16は、断線検出部17から断線検出信号を受信した場合には、例えば、スイッチング素子の駆動停止などの処理を実行することができる。
 次に、図4に示すACケーブル断線検出演算のフローチャートについて説明する。図4は、本発明の実施の形態1において、断線検出部17により実行されるACケーブル断線検出演算処理の流れを示すフローチャートである。より具体的には、この図4のフローチャートは、図3中のステップS104において実行される具体的な一連処理を示したものに相当する。
 ステップS201において、断線検出部17は、回転速度Nmの大きさを判定する。図1に示している電動機4は、交流電流が流れるため、各相に流れる電流は、0Aを跨ぐこととなる。従って、電動機4の停止位置、すなわち、停止時の電気角によっては、電流が流れない相が存在する。
 そのため、ステップS201による回転速度の判定を行うことで、電流が流れない相が存在する際に断線であると誤検出してしまうことを回避している。
 具体的には、ステップS201において、断線検出部17は、電動機4の回転速度Nmの絶対値が、回転速度判定値Nm_tsより大きいか否かを判定している。ここで、回転速度判定値Nm_tsは、一例として、50r/minがあらかじめ設定されている。
 ステップS201でYes判定、つまり、|Nm|>Nm_tsの関係が成立する場合には、ステップS202へ進む。一方、No判定、つまり、|Nm|>Nm_tsの関係が成立しない場合には、ステップS206に進む。
 ステップS202に進んだ場合には、断線検出部17は、指令トルクTtarの大きさを判定する。指令トルクTtarが0Nmの場合には、電動機4に電流が流れないこととなる。従って、ACケーブルの断線検出を行う必要がない。そのため、ステップS202の判定が設けられている。
 具体的には、ステップS202において、断線検出部17は、指令トルクTtarの絶対値が、指令トルク判定値Ttar_tsより大きいか否かを判定している。ここで、指令トルク判定値Ttar_tsは、一例として、10Nmがあらかじめ設定されている。
 ステップS202でYes判定、つまり、|Ttar|>Ttar_tsの関係が成立する場合には、ステップS203へ進む。一方、No判定、つまり、|Ttar|>Ttar_tsの関係が成立しない場合には、ステップS206に進む。
 ステップS203に進んだ場合には、断線検出部17は、検出電流演算を行う。この検出電流演算の具体的な処理内容は、図5に示すフローチャートに相当する。この図5の詳細説明は、後述するが、断線検出部17は、断線判定が可能な条件が成立していると判定した場合には、断線判定許可フラグdet_jdgに1を設定し、断線判定が可能な条件が成立していないと判定した場合には、断線判定許可フラグdet_jdgに0を設定する。
 ステップS203で検出電流演算が完了すると、ステップS204に進み、断線検出部17は、断線判定が可能な条件が成立しているか否かを判定する。この判定は、前述した断線判定許可フラグdet_jdgを用いて行われる。断線検出部17により、断線判定に用いる情報の演算が完了しており、断線判定が可能な条件が成立していると判定されたことで、断線判定許可フラグdet_jdg=1の場合には、Yes判定となって、ステップS205に進む。一方、断線判定に用いる情報の演算が完了しておらず、No判定の場合には、図4の一連処理が終了し、図3の処理に戻り、ステップS105以降の処理が行われる。
 ステップS205に進んだ場合には、断線検出部17は、断線判定演算を行う。この断線判定演算の具体的な処理内容は、図6に示すフローチャートに相当する。この図6の詳細説明は、後述するが、断線検出部17は、断線を検出した場合には、断線検出情報F_disconに1を設定し、断線を検出しなかった場合には、断線検出情報F_disconに0を設定する。
 また、ステップS201あるいはステップS202からステップS206に進んだ場合には、断線検出部17は、断線検出で使用する様々な情報を初期化する。そして、図4の一連処理が終了し、図3の処理に戻り、ステップS105以降の処理が行われる。
 次に、図5に示す検出電流演算のフローチャートについて説明する。図5は、本発明の実施の形態1において、断線検出部17により実行される検出電流演算処理の流れを示すフローチャートである。より具体的には、この図5のフローチャートは、図4中のステップS203において実行される具体的な一連処理を示したものに相当する。なお、この図5における検出電流演算処理は、相ごとに行われ、図3の処理より早い周期として、例えば100μsec周期で行われる。
 ステップS301において、断線検出部17は、各相の指令電流Itar_x(x:U、V、W)の0A跨ぎ判定を行う。断線検出部17は、d軸指令電流Idtar、q軸指令電流Iqtar、および電気角θを用いて各相の指令電流を算出する。さらに、断線検出部17は、各相の指令電流の前回値Itar_x(n-1)(x:U、V、W)と今回値Itar_x(n)(x:U、V、W)とを用いて、0A跨ぎ判定を行う。
 より具体的には、断線検出部17は、それぞれの相に関して、下式が成立する場合には、0A跨ぎが発生したと判定する。
  Itar_x(n-1)<0、かつ、
  Itar_x(n)≧0  (x:U、V、W)
 断線検出部17により、ステップS301で、今回の周期で指令電流Itar_x(x:U、V、W)が0Aを跨いだと判定された場合には、Yes判定となって、ステップS302に進む。一方、No判定の場合には、ステップS320に進む。
 ステップS320に進んだ場合には、断線検出部17は、電流差分積算値(前回値)Icad_x(n-1)(x:U、V、W)を更新して、ステップS318に進む。そして、ステップS318において、断線検出部17は、各相の指令電流Itar_x(x:U、V、W)と検出電流Iact_x(x:U、V、W)との差分の絶対値として、電流差分値Idiff_x(x:U、V、W)を算出する。その後、ステップS319において、断線検出部17は、下式を用いて、電流差分積算値Icad_x(n)(x:U、V、W)を演算して、一連処理を終了する。
  Icad_x(n)=Icad_x(n-1)
             +Idiff_x(n)
 先のステップS301からステップS302に進んだ場合には、断線検出部17は、3相0跨ぎカウンタF_stcが0であるか否かを判定する。この3相0跨ぎカウンタF_stcは、各相に流れる電流のいずれかが0Aを跨いだ周期ごとにカウントアップされるカウンタである。本実施の形態1のように、電動機4の相の数が3の場合には、0から3の範囲で3相0跨ぎカウンタがサイクリックに動作することとなる。
 ステップS302において、Yes判定、つまり3相0跨ぎカウンタF_stcが0の場合には、図4によるACケーブル断線検出演算を開始後に、電動機4に流れる電流が0Aを跨ぐ条件が最初に成立したことになる。そこで、ステップS302において、Yes判定の場合には、ステップS303に進み、断線検出部17は、3相0跨ぎカウンタF_stcを1にカウントアップし、ステップS308に進む。
 一方、ステップS302において、No判定、つまり3相0跨ぎカウンタF_stcが0以外の場合には、ステップS304に進み、断線検出部17は、3相0跨ぎカウンタF_stcが1であるか否かを判定する。
 ステップS304において、Yes判定、つまり3相0跨ぎカウンタF_stcが1の場合には、ステップS305に進み、断線検出部17は、3相0跨ぎカウンタF_stcを2にカウントアップし、ステップS308に進む。
 一方、ステップS304において、No判定、つまり3相0跨ぎカウンタF_stcが1以外の場合には、ステップS306に進み、断線検出部17は、3相0跨ぎカウンタF_stcが2であるか否かを判定する。
 ステップS306において、Yes判定、つまり3相0跨ぎカウンタF_stcが2の場合には、ステップS307に進み、断線検出部17は、3相0跨ぎカウンタF_stcを3にカウントアップし、ステップS308に進む。
 一方、ステップS306において、No判定の場合には、3相全てで0跨ぎを検出済みであり、3相0跨ぎカウンタF_stc=3の場合に相当するので、ステップS303に進み、断線検出部17は、3相0跨ぎカウンタF_stcを1に戻して、ステップS308に進む。
 ステップS308に進んだ場合には、断線検出部17は、各相の0跨ぎ情報F_sta_x(x:U、V、W)が0であるか否かを判定する。この0跨ぎ情報F_sta_x(x:U、V、W)は、後述するステップS309あるいはステップS312を通過するごとにカウントアップされるカウンタであり、1と2の範囲で、サイクリックに動作することとなる。
 ステップS308において、Yes判定の場合には、ステップS309に進み、断線検出部17は、0跨ぎ情報F_sta_x(x:U、V、W)を1に更新して、ステップS310に進む。そして、ステップS310において、断線検出部17は、電流差分積算ストア値Icad_x1(x:U、V、W)を下式により更新し、ステップS314に進む。
  Icad_x1=Idiff_x(n) (x:U、V、W)
 一方、先のステップS308でNo判定の場合には、ステップS311に進み、断線検出部17は、0跨ぎ情報F_sta_x(x:U、V、W)が1であるか否かを判定する。ステップS311において、Yes判定の場合には、ステップS312に進み、断線検出部17は、0跨ぎ情報F_sta_x(x:U、V、W)を2に更新して、ステップS313に進む。そして、ステップS313において、断線検出部17は、電流差分積算ストア値Icad_x2(x:U、V、W)を下式により更新し、ステップS314に進む。
  Icad_x2=Idiff_x(n) (x:U、V、W)
 一方、ステップS311において、No判定の場合には、ステップS309に進み、断線検出部17は、0跨ぎ情報F_sta_x(x:U、V、W)を1に更新した後、上述したステップS310の処理を行い、ステップS314に進む。
 ステップS314に進んだ場合には、断線検出部17は、2つの電流差分積算ストア値Icad_x1、Icad_x2(x:U、V、W)に基づく判定を行う。この判定は、後述する断線判定演算を開始する条件が成立したか否かを判定するものである。具体的には、断線検出部17は、各相(U、V、W)の指令、検出電流値に基づく電流差分積算ストア値Icad_x1、Icad_x2(x:U、V、W)の演算の完了有無を、下式による条件が成立しているか否かに基づいて判定する。
  Icad_x1>0、かつ、Icad_x2>0 (x:U、V、W)
 ステップS314でYes判定、つまり、上式による条件が成立し、各相の電流差分積算ストア値Icad_x1、Icad_x2(x:U、V、W)の演算が完了している場合には、ステップS315に進む。そして、ステップS315において、断線検出部17は、断線判定許可フラグdet_jdgを1に設定して、ステップS317に進む。
 一方、ステップS314でNo判定、つまり、上式による条件が成立せず、各相の電流差分積算ストア値Icad_x1、Icad_x2(x:U、V、W)の演算が完了していない場合には、ステップS316に進む。そして、ステップS316において、断線検出部17は、断線判定許可フラグdet_jdgを0に設定して、ステップS317に進む。
 ステップS317に進むと、断線検出部17は、電流差分積算値Icad_x(n)(x:U、V、W)を0に初期化にし、ステップS318に進む。そして、ステップS318において、断線検出部17は、前述したように、各相の指令電流Itar_x(x:U、V、W)と検出電流Iact_x(x:U、V、W)との差分の絶対値として、電流差分値Idiff_x(x:U、V、W)を算出して、ステップS319に進む。
 そして。ステップS319において、断線検出部17は、前述したように、電流差分積算値(前回値)Icad_x(n-1)(x:U、V、W)にステップS318で演算した電流差分値(Idiff_x(n)(x:U、V、W)を加算することで、電流差分積算値(今回値)Icad_x(n)(x:U、V、W)を演算して、一連処理を終了する。
 次に、図6に示す断線判定演算のフローチャートについて説明する。図6は、本発明の実施の形態1において、断線検出部17により実行される断線判定演算処理の流れを示すフローチャートである。より具体的には、この図6のフローチャートは、図4中のステップS205において実行される具体的な一連処理を示したものに相当する。
 ステップS401において、断線検出部17は、電流差分積算ストア値Icad_x1、Icad_x2(x:U、V、W)を読み込み、ステップS402に進む。そして、ステップS402において、断線検出部17は、各相の0跨ぎ情報F_sta_x(x:U、V、W)の判定を行う。この判定は、後述する電流差分積算値の比率演算に用いる演算式を決定するために行われる。
 ステップS402において、断線検出部17は、0跨ぎ情報F_sta_x(x:U、V、W)の今回値が2であり、かつ、前回値が1であるか否かを判定する。ステップS402において、Yes判定の場合には、ステップS403に進む。ステップS403に進んだ場合には、電流差分積算ストア値のIcad_x1(x:U、V、W)が前回値となるので、断線検出部17は、下式を用いて、電流差分積算比率ΔIcad_x(x:U、V、W)を演算し、ステップS406に進む。
  ΔIcad_x
   =|Icad_x2|/|Icad_x1|(x:U、V、W)
 一方、ステップS402において、No判定の場合には、ステップS404に進む。そして、ステップS404において、断線検出部17は、0跨ぎ情報F_sta_x(x:U、V、W)の今回値が1であり、かつ、前回値が2であるか否かを判定する。ステップS404において、Yes判定の場合には、ステップS405に進む。ステップS405に進んだ場合には、電流差分積算ストア値のIcad_x2(x:U、V、W)が前回値となるので、断線検出部17は、下式を用いて、電流差分積算比率ΔIcad_x(x:U、V、W)を演算し、ステップS406に進む。
  ΔIcad_x
   =|Icad_x1|/|Icad_x2|(x:U、V、W)
 ステップS406に進むと、断線検出部17は、先のステップS403またはステップS405で演算した電流差分積算比率ΔIcad_x(x:U、V、W)が、判定値αよりも大きいか否かを判定する。
 電力変換装置30と電動機4とを接続するACケーブルに断線が発生していない場合には、各相の指令電流Itar_x(x:U、V、W)と検出電流Iact_x(x:U、V、W)との間に大きな差異は発生しない。しかしながら、ACケーブルが断線した場合には、電流検出が不可となり、検出電流が0Aとなるため、指令電流と検出電流との間に差異が発生する。
 ただし、指令電流Itar_x(x:U、V、W)は、理想値であり、検出電流Iact_x(x:U、V、W)は、PWM制御などによって流れる実際の電流である。従って、ACケーブルに断線が発生していない場合であっても、指令電流と検出電流との間には、ある程度の差異が発生する。そのため、ACケーブル断線の誤判定を回避するために、ステップS406の判定が設けられている。
 このステップS406において用いられる電流差分積算比率の判定値αは、電動機4の最大電流変化が発生しても、断線検出部17によって誤判定されないような値に設定されている。例えば、この判定値αは、ステップS403、ステップS404で演算される電流差分積算比率の1.1倍までは、断線検出と判定しないように、1.1が設定されている。
 ステップS406でYes判定、つまり、各相の電流差分積算比率ΔIcad_x(x:U、V、W)が判定値αより大きい場合には、ステップS407に進み、断線検出部17は、積算比率異常カウンタCcad(n)を1だけカウントアップする。
 なお、この積算比率異常カウンタCcad(n)は、ステップS406における各相の電流差分積算比率ΔIcad_x(x:U、V、W)の判定の合計値である。ステップS407における積算比率異常カウンタCcad(n)の演算が終了すると、ステップS409に進む。
 ステップS409に進むと、断線検出部17は、積算比率異常カウンタCcad(n)が判定値β以上であるか否かを判定する。前述したように、積算比率異常カウンタCcad(n)は、各相の異常を合計した値である。従って、断線検出部17は、ステップS409において、各相合わせた異常状態に相当する積算比率異常カウンタCcad(n)が、あらかじめ設定した回数である判定値β以上となった場合に、ACケーブル断線と判定する。判定値βは、例えば、各相2周期分に相当する6に設定されている。
 ステップS409において、積算比率異常カウンタCcad(n)が判定値β以上である場合には、Yes判定となり、ステップS410に進む。そして、ステップS410において、断線検出部17は、断線検出情報F_disconを1に設定して、図6の一連処理を終了する。一方、ステップS409において、積算比率異常カウンタCcad(n)が判定値β未満の場合には、No判定となり、ステップS411に進む。
 また、先のステップS406でNo判定、つまり、各相の電流差分積算比率ΔIcad_x(x:U、V、W)が判定値α以下の場合には、ステップS408に進む。そして、ステップS408において、断線検出部17は、積算比率異常カウンタCcad(n)を更新せずに、ステップS411に進む。
 そして、ステップS408またはステップS409からステップS411に進んだ場合には、断線検出部17は、断線検出情報F_disconを0に設定して、図6の一連処理を終了する。
 また、先のステップS404において、No判定の場合には、断線判定演算を実施することなしに、図6の一連処理を終了する。
 次に、本実施の形態1における電動機の制御装置における断線検出処理について、タイムチャートを用いて説明する。図7は、本発明の実施の形態1におけるACケーブル断線検出の動作を示すタイミングチャートである。図7において、横軸は、時間を示し、縦軸は、上から順に、以下の値を示している。なお、xは、U、V、Wを示している。
  (A)指令トルクTtarの絶対値
  (B)回転速度Nmの絶対値
  (C)電気角θ
  (D)指令電流Itar_x
  (E)検出電流Iact_x
  (F)電流差分値Idiff_x
  (G)電流差分積算値Icad_x
  (H)3相0跨ぎカウンタF_stc
  (I)0跨ぎ情報F_sta_x
  (J)電流差分積算ストア値Icad_x1
  (K)電流差分積算ストア値Icad_x2
  (L)電流差分積算比率ΔIcad_x
  (M)積算比率異常カウンタCcad
  (N)断線判定許可フラグdet_jdg
  (O)断線検出情報F_discon
 まず、時刻T1において、指令トルクTtarの絶対値(A)が変化して、指令トルク判定値Ttar_tsよりも大きくなり、その後、回転速度Nmの絶対値(B)が、回転速度判定値Nm_tsよりも大きくなる。これにより、図5を用いて説明した検出電流演算ルーチンが開始される。
 次に、時刻T2で、V相指令電流Itar_v(D)が0Aを跨ぐことで、3相0跨ぎカウンタF_stc(H)が1だけカウントアップされるとともに、V相の0跨ぎ情報F_sta_v(I)も1だけカウントアップされ、V相電流差分値Idiff_v(F)の演算が開始される。
 このV相電流差分値Idiff_v(F)の演算は、V相検出電流Iact_v(E)からV相指令電流Itar_v(D)を減算した差分値であり、ACケーブルが非断線時には、その差分値は、極めて小さくなる。V相電流差分値Idiff_v(F)が演算されると、続いて、V相電流差分積算値Icad_v(G)が演算される。
 その後、W相指令電流Itar_wが0Aを跨ぐと、3相0跨ぎカウンタF_stc(H)が1だけカウントアップ(F_stc(H)=2)され、U相指令電流Itar_uも0Aを跨ぐと、3相0跨ぎカウンタF_stc(H)が1だけカウントアップ(F_stc(H)=3)される。この結果、W相に関しても、V相同等の電流演算が開始される。
 この3相0跨ぎカウンタF_stc(H)は、図5のステップS301において各相の0跨ぎ判定が成立するたびに変化する。3相0跨ぎカウンタF_stc(H)は、電動機4の相の数まで変化し、相の数となった後は、1に戻る。また、3相0跨ぎカウンタF_stc(H)は、図4のステップS201における回転速度判定がNo判定の場合、あるいは図4のステップS202における指令トルク判定がNo判定の場合には、初期化されて0となる。
 また、0跨ぎ情報F_sta_x(I)も、各相の指令電流Itar_x(D)が0Aを跨ぐと変化する。ただし、この0跨ぎ情報F_sta_x(I)は、x相指令電流Itar_xが0Aを跨ぐことで、1または2の値をとる。また、0跨ぎ情報F_sta_x(I)は、図4のステップS201における回転速度判定がNo判定の場合、あるいは図4のステップS202における指令トルク判定がNo判定の場合には、初期化されて0となる。
 時刻T3になると、V相指令電流Itar_v(D)が再度、0Aを跨ぎ、図5のステップS301において、指令電流0跨ぎ判定が成立する。時刻T3の時点では、他相(W相、U相)も一度は0Aを跨いでおり、図5のステップS301において指令電流0跨ぎ判定が成立している。従って、3相0跨ぎカウンタF_stc(H)は、3であるから、時刻T3においては、3相0跨ぎカウンタが3から1に変化する。
 また、時刻T3において、V相の0跨ぎ情報F_sta_v(I)が1から2に変化する。そして、時刻T2から演算していたV相電流差分積算値Icad_v(G)は、電流差分積算ストア値Icad_v2(K)としてストアされた後に、0に初期化される。
 次に、時刻T4の直前において、V相指令電流Itar_v(D)が0Aを再び跨ぎ、図5のステップS301において指令電流0跨ぎ判定が成立した場合には、3相0跨ぎカウンタF_stc(H)は、時刻T3のときと同様に、3から1に変化する。
 ただし、V相の0跨ぎ情報F_sta_v(I)が2から1に変化するとともに、電流差分積算値Icad_v(G)の値は、電流差分積算ストア値Icad_v1(K)としてストアされた後に、0に初期化される。また、他相であるW相、U相も、V相と同様の演算が実行される。
 時刻T4で、U相のACケーブルが断線すると、3相検出電流Iact_u(E)は、0Aとなるが、指令電流Itar_u(D)は、0Aにならない。このため、電流差分値Idiff_u(F)が急変し、電流差分積算値Icad_u(G)の増加量も大きくなる。また、U相の影響を受けて、他相であるV相、W相の検出電流Iact_v、Iact_w(E)の変化量も多くなり、電流差分積算値Icad_v、Icad_w(G)の増加量が大きくなる。
 U相電流の2回目の積算演算が完了する時刻T5になると、全相(U、V、W)の積算演算が、2回以上演算できている。従って、時刻T5になると、断線判定許可フラグdet_jdg(N)が成立して、図6を用いて説明した断線判定演算ルーチンが開始され、0跨ぎ情報F_sta_x(x:U、V、W)に基づき、電流差分積算比率ΔIcad_x(L)が演算される。
 図7では、断線判定許可フラグdet_jdg(N)が成立した時刻T5の時点では、U相の0跨ぎ情報F_sta_u(I)が変化しているタイミングに相当する。従って、電流差分積算比率ΔIcad_x(L)の演算には、U相の演算情報を用いる。
 時刻T5において、U相の0跨ぎ情報F_sta_u(I)は、2から1へ変化している。そこで、ステップS405で説明した数式を用いて電流差分積算比率ΔIcad_u(L)が演算される。そして、演算されたこの電流差分積算比率ΔIcad_u(L)の値は、判定値α以上であるから、積算比率異常カウンタCcad(M)が1だけカウントアップされる。
 そして、時刻T6で、V相指令電流Itar_v(D)が0Aを跨ぐと、V相の0跨ぎ情報F_sta_v(I)は、1から2に変化する。そこで、ステップS403で説明した数式を用いて電流差分積算比率ΔIcad_v(L)が演算され、判定値αとの比較が行われる。V相の電流差分積算比率ΔIcad_v(L)も、判定値αより大きいので、積算比率異常カウンタCcad(M)が1だけカウントアップされる。
 続いて、W相指令電流Itar_w(D)が0Aを跨ぎ、W相の0跨ぎ情報F_sta_w(I)が1から2へ変化する。そこで、先述したV相演算と同等に、ステップS403で説明した数式を用いて電流差分積算比率ΔIcad_w(L)が演算され、判定値αとの比較が行われる。W相の電流差分積算比率ΔIcad_w(L)も、判定値αより大きいので、積算比率異常カウンタCcad(M)が1だけカウントアップされる。
 このように、断線判定許可フラグdet_jdg(N)が成立した以降では、各相の指令電流Itar_x(x:U、V、W)(D)が0Aを跨ぐごとに、各相の0跨ぎ情報F_sta_x(x:U、V、W)(I)が変化する。そして、各相の0跨ぎ情報F_sta_x(x:U、V、W)(I)の変化に基づき、ステップS403で説明した数式またはステップS405で説明した数式を用いて、順次、電流差分積算比率ΔIcad_x(x:U、V、W)(L)が演算され、判定値αと比較され、積算比率異常カウンタCcad(M)がウントアップされる。
 そして、時刻T7において、W相指令電流Itar_w(D)が0Aを跨ぎ、電流差分積算比率ΔIcad_w(L)が算出される。そして、算出された電流差分積算比率ΔIcad_w(L)が判定値αよりも大きくなって、積算比率異常カウンタCcad(M)がカウントアップされる。さらに、積算比率異常カウンタCcad(M)が判定値β以上となることで、断線検出情報F_discon(O)が成立し、1に設定される。
 以上のように、実施の形態1によれば、電動機の電流指令値と電流検出値との差分値の遷移結果に基づいてACケーブルの断線検出を行う構成を有している。このような構成を有することで、インバータと電動機とを接続するACケーブルに断線が発生した場合にも、速やかに断線を検出することが可能となる。
 さらに、断線検出された際には、インバータを構成するスイッチング素子を直ちに駆動停止させることができ、電動機の異常な動作が継続されてしまう状態を防止することができる。また、車両に搭載された電動機が異常な動作を継続しないことで、車両振動を発生させることを抑制でき、運転者および同乗者を不快にさせるおそれがない。
 また、本発明に係る断線検出部は、相電流検出値と相電流指令値との差分値を演算周期毎に算出するとともに、複数の演算周期に渡って算出された差分値の積算値に基づいて、ACケーブルの断線の有無を検出する機能を有している。
 また、本発明に係る断線検出部は、相電流指令値のそれぞれが0Aを跨ぐ時期を各相の演算開始点とし、電気角が1周期後または1/2周期後に演算を開始した相の相電流指令値が0Aを跨ぐ時期を演算終了点として、積算値を算出する機能を有している。
 また、本発明に係る断線検出部は、回転速度が、あらかじめ設定された回転速度判定値以下である場合、あるいは、トルク指令が、あらかじめ設定されたトルク指令判定値以下である場合には、断線検出処理を実行しない機能を有している。
 このような機能を備えることで、断線を検出するための相電流の判定値を設定する必要がなく、1周期または1/2周期間における積算値の演算結果に基づいて、迅速に断線検出処理を実行することができる。さらに、電動機の回転停止時など、断線検出の誤判定を招くような状態での断線検出処理を回避しつつ、ACケーブルの断線検出を確実に行うことができる。
 なお、本実施の形態では、電動機の各相を流れる電流の断線検出を、電気角の1周期分で行う場合について説明した。しかしながら、本発明は、このような断線検出に限定されるものではない。図7に示すように、各相を流れる電流は、電気角の1/2周期ごとに0Aを跨ぐ。従って、1/2周期分でACケーブルの断線検出を行うことも可能である。
 また、本実施の形態1では、電動機の各相を流れる相電流に基づき、ACケーブルの断線検出を行うための判定値を固定値とする場合について説明した。しかしながら、本発明は、固定の判定値を用いる場合に限定されるものではない。電動機の回転速度に応じて、判定値を可変設定することも可能である。
 また、本実施の形態1では、ACケーブルの断線判定を相ごとの電流差分積算値を用いる場合について説明した。しかしながら、本発明は、U相電流+V相電流+W相電流=0となる3相電流和の定理を用いて、断線判定を行うようにしてもよい。
 1 MCU(モータコントロールユニット)、2 バッテリ、4 電動機、5 回転角度センサ、11 指令電流演算部、12 回転角度処理部、13 検出電流3相/2相変換部、14 指令電圧演算部、15 指令電圧2相/3相変換部、16 スイッチング信号生成部、17 断線検出部、30 インバータ(電力変換装置)、33 U相電流センサ、34 V相電流センサ、35 W相電流センサ。

Claims (8)

  1.  外部から与えられるトルク指令に応じて、直流電源から供給される直流電力を交流電力に変換するインバータに設けられたスイッチング素子をスイッチング制御することで、電動機に供給する前記交流電力を制御するコントローラーと、
     前記電動機と前記インバータとを接続するACケーブルに流れる相電流を検出する電流センサと、
     を備えた電動機の制御装置であって、
     前記コントローラーは、
      前記電流センサで検出された前記相電流を相電流検出値として取得し、前記トルク指令に基づいて前記電動機への指令電流を相電流指令値として算出し、それぞれの相における前記相電流指令値と前記相電流検出値との差分値の遷移結果から、相ごとに前記ACケーブルの断線の有無を判定する断線検出処理を実行する断線検出部を有する
     電動機の制御装置。
  2.  前記断線検出部は、
     前記相電流検出値と前記相電流指令値との差分値を演算周期毎に算出するとともに、複数の演算周期に渡って算出された差分値の積算値に基づいて、前記ACケーブルの断線の有無を検出する
     請求項1に記載の電動機の制御装置。
  3.  前記電動機の回転角度を検出する回転角度センサをさらに備え、
     前記コントローラーは、前記電動機の回転角度から前記電動機の電気角および回転速度を算出する回転角度処理部をさらに有し、
     前記断線検出部は、前記相電流指令値のそれぞれが0Aを跨ぐ時期を各相の演算開始点とし、前記電気角が1周期後または1/2周期後に演算を開始した相の相電流指令値が0Aを跨ぐ時期を演算終了点として、前記演算開始点から前記演算終了点までの期間に含まれる複数の演算周期で前記積算値を算出する
     請求項2に記載の電動機の制御装置。
  4.  前記断線検出部は、前記回転角度処理部により算出された前記回転速度の絶対値が、あらかじめ設定された回転速度判定値以下である場合には、前記断線検出処理を実行せず、前記断線検出処理により算出された演算結果を初期化する
     請求項3に記載の電動機の制御装置。
  5.  前記断線検出部は、前記演算開始点から前記演算終了点までの期間に含まれる前記複数の演算周期で前記積算値を算出することを繰り返し実行し、前記積算値の前回値と今回値との比率を算出し、前記比率があらかじめ設定された判定閾値よりも高い状態が、あらかじめ決められた断線判定回数だけ継続することで、前記ACケーブルの断線が発生したと判定する
     請求項3または4に記載の電動機の制御装置。
  6.  前記断線検出部は、前記トルク指令の絶対値が、あらかじめ設定されたトルク指令判定値以下である場合には、前記断線検出処理を実行せず、前記断線検出処理により算出された演算結果を初期化する
     請求項1から5のいずれか1項に記載の電動機の制御装置。
  7.  前記コントローラーは、前記断線検出部により前記ACケーブルの断線が検出された場合には、前記スイッチング素子を駆動停止させるようにスイッチング制御する
     請求項1から6のいずれか1項に記載の電動機の制御装置。
  8.  外部から与えられるトルク指令に応じて、直流電源から供給される直流電力を交流電力に変換するインバータに設けられたスイッチング素子をスイッチング制御することで、電動機に供給する前記交流電力を制御するコントローラーと、
     前記電動機と前記インバータとを接続するACケーブルに流れる相電流を検出する電流センサと、
     を備えた電動機の制御装置において、前記コントローラーによって実行されるケーブル断線検出方法であって、
     前記コントローラーにおいて、
      前記ACケーブルの断線の有無を判定するために用いる判定閾値および断線判定回数をあらかじめ記憶部に記憶させておく記憶ステップと、
      前記電流センサで検出された前記相電流を相電流検出値として取得する検出値取得ステップと、
      前記トルク指令に基づいて、前記電動機への指令電流を相電流指令値として算出する指令値算出ステップと、
      それぞれの相において、前記相電流検出値と前記相電流指令値との差分値を演算周期毎に算出し、前記差分値を演算開始点から演算終了点までの期間に含まれる複数の演算周期で算出したそれぞれの差分値を積算することで、前記期間に対応した積算値を繰り返し算出する積算ステップと、
      前記積算値の前回値と今回値との比率を算出し、前記比率が前記記憶部に記憶された前記判定閾値よりも高い状態が、前記記憶部に記憶された前記断線判定回数だけ継続することで、前記ACケーブルの断線が発生したと判定する断線判定ステップと、
     を有するケーブル断線検出方法。
PCT/JP2018/004475 2018-02-08 2018-02-08 電動機の制御装置およびケーブル断線検出方法 WO2019155585A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PCT/JP2018/004475 WO2019155585A1 (ja) 2018-02-08 2018-02-08 電動機の制御装置およびケーブル断線検出方法
JP2019570228A JP6899932B2 (ja) 2018-02-08 2018-02-08 電動機の制御装置およびケーブル断線検出方法
US16/958,811 US11264928B2 (en) 2018-02-08 2018-02-08 Control device for electric motor and cable disconnection detection method
CN201880088293.XA CN111670539B (zh) 2018-02-08 2018-02-08 电动机的控制装置及电缆断线检测方法
DE112018007041.7T DE112018007041T5 (de) 2018-02-08 2018-02-08 Steuervorrichtung für einen Elektromotor und Verfahren zur Erkennung einer Kabeltrennung

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/004475 WO2019155585A1 (ja) 2018-02-08 2018-02-08 電動機の制御装置およびケーブル断線検出方法

Publications (1)

Publication Number Publication Date
WO2019155585A1 true WO2019155585A1 (ja) 2019-08-15

Family

ID=67548210

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/004475 WO2019155585A1 (ja) 2018-02-08 2018-02-08 電動機の制御装置およびケーブル断線検出方法

Country Status (5)

Country Link
US (1) US11264928B2 (ja)
JP (1) JP6899932B2 (ja)
CN (1) CN111670539B (ja)
DE (1) DE112018007041T5 (ja)
WO (1) WO2019155585A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102402805B1 (ko) * 2021-10-21 2022-05-30 지엠비코리아 주식회사 모터 고정자의 단선 감지방법

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113036720B (zh) * 2021-03-15 2023-02-28 广东拓斯达科技股份有限公司 一种电机缺相检测方法
CN113960384B (zh) * 2021-09-16 2024-04-19 佛山市顺德区美的电子科技有限公司 一种缺相检测方法、装置、存储介质及家用设备

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000177610A (ja) * 1998-12-15 2000-06-27 Toyoda Mach Works Ltd モータ制御装置
JP3541675B2 (ja) * 1998-05-12 2004-07-14 トヨタ自動車株式会社 電気自動車用電動機の制御装置
JP2005147672A (ja) * 2003-11-11 2005-06-09 Meidensha Corp 断線検出装置
WO2014013614A1 (ja) * 2012-07-20 2014-01-23 三菱電機株式会社 制御装置
JP2015119532A (ja) * 2013-12-17 2015-06-25 株式会社デンソー モータ異常検出装置
JP2015216730A (ja) * 2014-05-08 2015-12-03 ファナック株式会社 モータの動力線断線、またはモータ用電力変換装置のパワー素子異常を検出するモータ制御装置

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4289458B2 (ja) * 2004-09-07 2009-07-01 三菱電機株式会社 電動パワーステアリング制御装置
EP1873002B1 (en) * 2005-04-01 2012-09-12 Mitsubishi Denki Kabushiki Kaisha Electric car control device
US7759888B2 (en) * 2005-04-15 2010-07-20 Hitachi, Ltd. AC motor controller
JP2007049801A (ja) * 2005-08-09 2007-02-22 Nachi Fujikoshi Corp モータ駆動用インバータ装置
JP4631936B2 (ja) * 2008-06-18 2011-02-16 トヨタ自動車株式会社 動力出力装置およびその制御方法並びに車両
JP5454042B2 (ja) * 2009-09-24 2014-03-26 株式会社明電舎 系統連系発電システム
JP5760830B2 (ja) * 2011-08-09 2015-08-12 株式会社デンソー 3相回転機の制御装置
JP5910460B2 (ja) 2012-10-26 2016-04-27 株式会社デンソー 断線検出装置
JP5955209B2 (ja) * 2012-12-17 2016-07-20 本田技研工業株式会社 電力変換システムの故障検知装置
JP6365112B2 (ja) * 2014-08-20 2018-08-01 株式会社デンソー 車載電動機用の制御装置
US10232875B2 (en) * 2014-09-04 2019-03-19 Nsk Ltd. Motor control unit, failure detecting method, and electric power steering apparatus and vehicle equipped with the same
JP6589492B2 (ja) * 2015-09-16 2019-10-16 富士電機株式会社 インバータ制御装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3541675B2 (ja) * 1998-05-12 2004-07-14 トヨタ自動車株式会社 電気自動車用電動機の制御装置
JP2000177610A (ja) * 1998-12-15 2000-06-27 Toyoda Mach Works Ltd モータ制御装置
JP2005147672A (ja) * 2003-11-11 2005-06-09 Meidensha Corp 断線検出装置
WO2014013614A1 (ja) * 2012-07-20 2014-01-23 三菱電機株式会社 制御装置
JP2015119532A (ja) * 2013-12-17 2015-06-25 株式会社デンソー モータ異常検出装置
JP2015216730A (ja) * 2014-05-08 2015-12-03 ファナック株式会社 モータの動力線断線、またはモータ用電力変換装置のパワー素子異常を検出するモータ制御装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102402805B1 (ko) * 2021-10-21 2022-05-30 지엠비코리아 주식회사 모터 고정자의 단선 감지방법

Also Published As

Publication number Publication date
JPWO2019155585A1 (ja) 2020-07-27
US11264928B2 (en) 2022-03-01
US20210075355A1 (en) 2021-03-11
DE112018007041T5 (de) 2020-10-22
CN111670539B (zh) 2023-06-23
CN111670539A (zh) 2020-09-15
JP6899932B2 (ja) 2021-07-07

Similar Documents

Publication Publication Date Title
US9154064B2 (en) Control device for AC motor
EP2953261B1 (en) Synchronous motor control device for electric automobile
EP2725705B1 (en) Motor control device and electric power steering device using same
EP3651339B1 (en) Inverter device and electric power steering device
EP2566046B1 (en) Motor control apparatus
US20060055243A1 (en) Control-motor system
WO2019155585A1 (ja) 電動機の制御装置およびケーブル断線検出方法
US8957616B2 (en) Control device for AC motor
JP6159659B2 (ja) 電力変換器の制御装置及び電気車
US9252699B2 (en) Control device and control method for vehicular rotating electric machine
US11005405B2 (en) Rotating-electric-machine control apparatus and electric power steering control apparatus equipped with the rotating-electric-machine control apparatus
US20190089275A1 (en) Drive device
JP6217299B2 (ja) モータ制御システム
JP2018148611A (ja) モータ制御装置
JP2010035396A (ja) バッテリ電流抑制方法及びバッテリ電流抑制制御装置
JP6269328B2 (ja) 同期モータの制御装置、及び、これを備える車両制御システム
US9276517B2 (en) Control device of AC motor
JP2013219843A (ja) 電気自動車
JP2010239812A (ja) 電源装置
US11699971B2 (en) Electric vehicle and diagnosis method for electric vehicle
JP5605311B2 (ja) 回転機の制御装置
JP2015023611A (ja) 電動車両
US20130187578A1 (en) Vehicle, and control method for vehicle
JP2022079256A (ja) 電気自動車
KR20140141502A (ko) 모터 제어 장치 및 그것을 구비한 건설 기계

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18904963

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019570228

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 18904963

Country of ref document: EP

Kind code of ref document: A1