WO2018034470A1 - 동영상 기반 건물 시공 및 유지보수 통합 관리 방법 - Google Patents

동영상 기반 건물 시공 및 유지보수 통합 관리 방법 Download PDF

Info

Publication number
WO2018034470A1
WO2018034470A1 PCT/KR2017/008830 KR2017008830W WO2018034470A1 WO 2018034470 A1 WO2018034470 A1 WO 2018034470A1 KR 2017008830 W KR2017008830 W KR 2017008830W WO 2018034470 A1 WO2018034470 A1 WO 2018034470A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
video
maintenance
information
building
Prior art date
Application number
PCT/KR2017/008830
Other languages
English (en)
French (fr)
Inventor
김영대
Original Assignee
대성산업 주식회사
유한회사 영컨설팅
김영대
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대성산업 주식회사, 유한회사 영컨설팅, 김영대 filed Critical 대성산업 주식회사
Priority to CN201780002424.3A priority Critical patent/CN109716381A/zh
Priority to RU2018101448A priority patent/RU2695416C1/ru
Priority to EP17821456.5A priority patent/EP3506192A4/en
Priority to US15/744,607 priority patent/US11354759B2/en
Priority to JP2018502007A priority patent/JP6616883B2/ja
Publication of WO2018034470A1 publication Critical patent/WO2018034470A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/451Execution arrangements for user interfaces
    • G06F9/453Help systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/163Real estate management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N13/00Stereoscopic video systems; Multi-view video systems; Details thereof
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N13/00Stereoscopic video systems; Multi-view video systems; Details thereof
    • H04N13/10Processing, recording or transmission of stereoscopic or multi-view image signals
    • H04N13/106Processing image signals
    • H04N13/161Encoding, multiplexing or demultiplexing different image signal components
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/76Television signal recording
    • H04N5/91Television signal processing therefor
    • H04N5/93Regeneration of the television signal or of selected parts thereof
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/181Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a plurality of remote sources

Definitions

  • the present invention relates to a video-based building construction and maintenance integrated management method, and more specifically, to produce a series of processes from the building construction stage to the completion, maintenance as a video to register in the building management server, the building owner or It is configured to be checked by the tenant, so that transparent management of the building is possible by fundamentally blocking inadequate construction and inadequate maintenance that may occur in the construction stage, and thus building a video-based building and providing reliability to the building owner or tenant.
  • Maintenance integrated management method is configured to be checked by the tenant, so that transparent management of the building is possible by fundamentally blocking inadequate construction and inadequate maintenance that may occur in the construction stage, and thus building a video-based building and providing reliability to the building owner or tenant.
  • the construction industry is a labor-intensive industry, and as a result, various types of construction work and a large number of workforces are carried out at the same time, so that the systematic and effective management and operation of the workforce and the safety management of such manpower
  • the number of managers is relatively small compared to the number of workers in the field, and in the case of outdoor work, there are areas where the control and management of the site managers are restricted, making it difficult to efficiently and accurately manage the workforce of the construction site.
  • safety accidents and inefficient manpower management of construction workers have caused problems such as an increase in overall construction cost, a decrease in productivity, an unexpected safety accident, and an extension of construction period.
  • the client in order to proceed with construction at the construction site, the client establishes a construction plan, designs it through on-site due diligence, and accumulates to calculate the construction cost (estimated price) according to the design. After the bidding is announced according to the order plan, the site description, design, and buyer's requirements are understood and integrated to calculate the bid price.If the bid is successful after the bidding, a contract is concluded between the client and the orderer. The client will supervise the construction. The overall management of the materials used at the construction site during the construction process, that is, whether the construction materials arrived at the designated place at the construction site at the correct time or the quantity and Logistics information on the overall construction materials, such as quality match, cannot be checked in real time at the head office. There is a problem in that it leads to bad construction, including the use of low-cost construction materials of poor quality by the malicious actions of the illegal trading of site manager.
  • the open patent is a building integrated management method, comprising: a customer service reception step (S10) for receiving a service application content from a customer; A diagnosis step (S20) of diagnosing a situation of a building or a building (site) requested by the customer; A quotation calculation step (S30) of calculating a quotation when it is determined that a repair or replacement of a building, a building, or an internal facility is necessary based on the site diagnosis information; An ordering step (S40) for processing the corresponding data in order to order the calculated quotation; Repairing or replacing a building, a building, or an internal facility according to the ordering step (S50); After completion of the repair or replacement of the building, building or repair of the internal equipment, the work completion report step (S60) to report the work result to the customer; It is characterized by including.
  • the patent discloses a variety of equipment installed inside the building or building in 3D image to quickly and easily grasp the exact type and specifications of the equipment to reduce the working time of the diagnosis and problem solving team and to the customer own building or Although it is configured to recognize the information of the building accurately and easily, there is still a problem that it is difficult to identify the unfaithful maintenance of the site workers because there is no way to check the progress of the maintenance.
  • the present invention has been made to solve the above-described problems, the object of the present invention is to produce a series of processes from the building construction stage to the completion of maintenance, as a video to register in the building management server, and check the landlord or tenant In this way, it is possible to transparently manage buildings by fundamentally blocking inadequate construction and inadequate maintenance that can occur during the construction stage, thus integrating video-based building construction and maintenance that can provide reliability to the owner or tenant. It is to provide a management method.
  • the construction manual registration for the construction process procedure corresponding to the construction site for each construction site is registered construction manual in the building management server
  • the construction video recording step of shooting a public photographing situation as a video by executing an application installed on the worker terminal of the construction site, and uploading the construction video recording video taken at the construction video recording step to the building management server
  • a construction inspection step of confirming whether or not the construction is completed according to the construction instructions manual registered in the construction manual registration step by checking the construction video uploaded through the construction video uploading step using a manager terminal.
  • a maintenance process registration step including a maintenance inspection step of checking whether the maintenance progress video uploaded through the upload step is checked whether the maintenance process is completed according to the maintenance manual registered in the maintenance manual registration step; And a manpower information registration step of registering manpower information for a site worker who has undergone construction or maintenance work through the construction process registration step or maintenance process registration step.
  • the repair process is configured to include, further comprising, when selecting a specific coordinates of the respective area coordinates It is characterized in that it is configured to check the document execution process, maintenance progress process, maintenance history and personnel information of the worker as a document or video.
  • the manager terminal After confirming the video information on the construction or maintenance work carried out by the site workers, characterized in that configured to register the evaluation scores of the site workers who performed the construction or maintenance work together.
  • the administrator terminal is configured to generate a video construction manual that can be used in a similar construction site by extracting a specific section from the video information progressed to work as a manual, and then store it in the building management server, the video construction manual
  • the site worker conducting the construction can check the video construction manual through the worker terminal and refer to the construction progress. It is characterized in that it is configured to.
  • the manager terminal sets a section corresponding to the work that was not carried out according to the manual of the video recorded in the construction video recording step and stores it in the building management server, and the building management server is constructed as a site worker terminal that performed the work It is configured to notify the line stop and corrective command, the building management server deducts in real time the evaluation score of the field worker who did not work according to the manual in the manpower information database recorded personnel information, and the predetermined site worker If the evaluation score is lower than the standard value, after sending out the construction exclusion order to the corresponding worker terminal, the manpower with the highest evaluation score among the searched personnel is searched by searching for manpower that can be applied to the construction site among the manpower information stored in the manpower information DB It is characterized in that it is configured to recommend to the administrator terminal.
  • a series of processes from the building construction stage to the completion and maintenance are produced as a video, registered in the building management server, and configured to be confirmed by the building owner or the occupant, thereby occurring in the construction stage. Since it is possible to transparently manage the building by blocking insolvent construction and unfaithful maintenance, there is an advantage that can provide reliability to the building owner or occupants.
  • FIG. 1 is a system configuration diagram for the integrated management of video-based building construction and maintenance according to an embodiment of the present invention.
  • FIG. 2 is a flow chart of a video-based building construction and maintenance integrated management method according to a preferred embodiment of the present invention.
  • FIG. 3 is a flowchart of a construction process registration step of a video-based building construction and maintenance integrated management method according to an embodiment of the present invention.
  • FIG. 4 is a flowchart of a maintenance process registration step of a video-based building construction and maintenance integrated management method according to an embodiment of the present invention.
  • FIG. 5 is an explanatory view showing a process for whether or not to perform a public photograph according to the manual of the video-based building construction and maintenance integrated management method according to an embodiment of the present invention.
  • 6 and 7 are explanatory diagrams showing a matching state of the building integration information matched on the 3D screen of the video-based building construction and maintenance integrated management method according to a preferred embodiment of the present invention.
  • FIG. 8 is an explanatory view showing a driving screen of an application installed in a worker terminal of a video-based building construction and maintenance integrated management method according to an embodiment of the present invention.
  • FIG. 9 is an explanatory diagram showing a process of registering a video by driving an application installed in a worker terminal of a video-based building construction and maintenance integrated management method according to a preferred embodiment of the present invention.
  • a video-based building construction and maintenance integrated management system includes a worker terminal 100, an administrator terminal 200, and a building management server 300.
  • the worker terminal 100 refers to a terminal carried by a worker carrying out construction at a construction site or carrying out maintenance at a maintenance site.
  • the worker terminal 100 is configured to upload the construction progress information carried out at the construction site or the maintenance progress information carried out at the maintenance site through the application installed on the worker terminal 100 to the building management server 300 As the information on each progress, video information, picture information, document information, recording information, and the like may be formed.
  • the worker terminal 100 is characterized in that it is configured to transmit the construction progress or maintenance progress to the building management server 300 to shoot a video, public photographing travel information or maintenance as a video Report production by field workers is based on progress information, enabling fact-based transparent site management.
  • the site information display unit 10 for displaying the site information, such as the contact information and site location information, including the contact person photographs;
  • a voice registration unit 50 and a job information display unit 60 for checking registered video information, photo information, document information, and recording information are displayed.
  • the video item, photo item, and document item displayed on the job information display unit 60 are displayed. It is possible to check each data by selecting any one of the recording items.
  • FIG. 9 first, when a field worker executes an application of the worker terminal 100 and selects the video registration unit 20 displayed on the main screen of the application, a person in charge window displaying the person in charge of registering the video is displayed. (21), an on-site selection window (22) for selecting a site location, a content input window (23) for inputting contents of a public photograph row situation, and a reference input window (24) for describing other notes.
  • an on-site selection window for selecting a site location
  • a content input window for inputting contents of a public photograph row situation
  • a reference input window for describing other notes
  • the operator selects any one of the camera button 26 or the import button 27, it is possible to attach a public photograph row situation as a video.
  • a video recording screen capable of capturing the current public photograph row situation in real time is output, and video recording is in progress.
  • the file attachment window is displayed. The video attachment is made at 25.
  • the public information line information including the video information is transmitted to the field management server 300, the field management server 300 If there is an error in the information transmitted in the), it is possible to proceed with the correction or deletion operation by selecting the edit button (29).
  • the manager terminal 200 is a terminal carried by a manager who manages a construction progress or a maintenance progress, and the manager terminal 200 is configured as a mobile owned by an administrator so that it can be freely used regardless of a place. In addition, it may be configured in the form of a PC so that the administrator can easily proceed with the operation such as video editing.
  • the manager terminal 200 is capable of reproducing video information photographed from the worker terminal 100 provided from the building management server 300 to check whether the corresponding work has been performed according to the manual.
  • a specific section is extracted from the video information to generate a video construction manual that can be used at a similar construction site, and then stored in the building management server 300.
  • the corresponding section is set to the building. Store in the management server (300).
  • the manager terminal 200 checks the video information captured from the worker terminal 100 in order to secure excellent personnel that can be put into a similar site later, and registers the evaluation score of the site worker in the building management server 300. .
  • the building management server 300 stores a plurality of construction site information, the worker information and the manager information for managing the construction site located in the plurality of construction sites to carry out the work, the worker and the manager to share the construction site information
  • the building management server 300 has a manual for the construction instructions corresponding to the construction site for each construction site, and the worker of the construction site is photographed through the worker terminal 100
  • Stored video information, manuals for maintenance such as regular inspection of facilities / equipment, emergency repair or maintenance work, and maintenance video information taken by the operator at the maintenance site through the operator terminal 100 are stored. It is characteristic.
  • the building management server 300 enables the administrator to check whether the on-site worker proceeded according to the manual through the construction manual, construction video information, maintenance manual, maintenance video information.
  • CA construction assurance
  • QA quality assurance
  • SA safety assurance
  • the building management server 300 by registering the construction manual according to the site situation to the building management server 300 so that the field workers can train, learn the manual, it is possible to guide the work according to the manual at all times, It is possible to block bad construction at the source.
  • the worker of the construction site executes the application installed on the worker terminal 100 to shoot a public photograph row situation as a video (S120).
  • the video photographed in the construction video recording step (S120) is uploaded to the building management server 300 from the worker terminal (100) (S130) is to be stored, through the video information stored in the building management server 300 It is possible to check whether the field worker has performed the work according to the manual.
  • the plurality of video information stored in the building management server 300 is configured such that any one or more of photo information, document information, and recording information related to each video information is linked so that the related data can be checked together when selecting a specific video. It is preferable to be configured to.
  • the manager terminal 200 checks whether the construction process is completed according to the construction instruction manual registered in the manual registration step S110 by checking the construction video uploaded through the construction video uploading step S130.
  • the construction video information is configured to be displayed together.
  • the maintenance manual for the maintenance work is registered in the building management server 300 (S210) is made in the maintenance process in the same way as the construction process registration step as described above, due to this, regular inspection of the facility / equipment During the maintenance, such as emergency repair or maintenance work, it is possible to train (training) and learn the maintenance manual in the field workers, it is possible to guide the maintenance work according to the manual at all times.
  • the maintenance worker is configured to shoot the maintenance progress in a moving picture (S220) by running the application installed on the operator terminal 100 in the field, the maintenance video shooting
  • the video photographed in step S220 is uploaded to the building management server 300 from the worker terminal 100 (S230) and is made to be stored, the site worker manual through the video information stored in the building management server 300 As it is possible to check whether the operation has proceeded (S240), it is possible to block unfaithful maintenance at source.
  • the administrator checks whether the operation was made based on the manual through the construction video information that is reproduced by playing the construction video (S500) registered using the administrator terminal (200) S505), if the work is progressed according to the manual, it is possible to use the video as a training material at a similar construction site later.
  • the manager terminal 200 generates a video construction manual by extracting a specific section for use as educational material from the video information of the work progress according to the manual (S510), and among the coordinates of each area on the 3D screen It is stored in the building management server 300 in association with the coordinates (S515).
  • the construction site name or construction name is stored together so that the video construction manual associated with the corresponding coordinates can be easily found by searching the construction site name or construction name when a similar construction site occurs in the future. It is preferable.
  • the video construction manual may extract a specific section for use as educational material from the video information in which the work is progressed according to the manual, and separately produce a guide video based on the manual for field workers to refer to. It would be possible.
  • the Video Construction Manual which can be used as the guide video, is a video shot of the standard construction or sample construction related to the specific work and construction of a specific site, and is currently in progress based on the video construction manual. In conjunction with photographs and video (Video Construction Record On Manual) taken for critical process points, quality control is available during the process. These video construction manuals allow simple and easy delivery of complex site process descriptions to field workers, are portable and can be played back any number of times.
  • the present invention can provide a template that is a tool for delivering specific field facts in addition to the image delivery of the video construction manual in conjunction with the video construction manual.
  • the template means a means for helping the video construction manual to be a tool for accurate quantitative and qualitative management of facts and sites.
  • the template associated with the video construction manual consists of extracting the detailed information of the manual necessary for the specific work and construction of a specific site and arranging it according to the process sequence.
  • CC construction check
  • QC quality check
  • SC safety check
  • PC purchasing check
  • CC construction check
  • QC quality check
  • SC safety check
  • PC purchasing check
  • it includes the inspection, import, disbursement, on-site management method of the materials, the record of the expected amount and actual amount of input of important materials, and the management of personnel information of skilled workers and sample construction and demonstration management of skilled workers. It can include the evaluation and management of skilled workers by process, management of performance against work schedule of daily workload such as daily workload, total workload, progress schedule, and total personnel.
  • the medium-term management of the medium-term input, driver's experience, and medium-term usage fee includes the contents of connection management before and after the work.
  • the section corresponding to the work that did not proceed according to the manual of the construction video information is stored in the building management server 300 (520), as described above, proceeding according to the manual If the work section that is not stored is stored in the building management server (300) to the site worker terminal 100 that has performed the operation notification of the correction command with a line stop command (S525), the site where the work proceeded The evaluation score of the worker is subtracted (S530).
  • the above line stop situation is different from the video construction manual, if the work method is different from the basic manual, if important materials or consumables are used differently from the basic manual, and the construction is different from the design, There may be cases where the site does not match the design and needs to be reconstructed before proceeding with the redesign.
  • the manpower information registration step (S300) when registering the manpower information through the manpower information registration step (S300) in order to secure excellent personnel that can be put into a similar site later, construction or maintenance carried out by the field worker through the manager terminal 200 After checking the video information on the maintenance work, it is configured to register the evaluation scores of the site workers who have undergone the construction or maintenance work together. Comprehensive evaluation of the time required to complete the work or attitudes of work is performed to manage the manpower to be put into the construction site later, it becomes possible to compete between the field workers and efficient manpower management.
  • the building management server 300 compares the evaluation standard value of the site worker with the predetermined evaluation score of the worker, the evaluation score of the worker If it is lower (S535), after transmitting the command to exclude the construction to the worker terminal (100) (S540), among the personnel searched by searching for personnel available for input to the construction site of the personnel information stored in the personnel information DB (S545), By highly recommending the manpower with a high evaluation score to the manager terminal (S555), it is possible to smoothly conduct the public due to unfaithful manpower replacement.
  • in the present invention is configured as a 3D screen implemented in a three-dimensional virtual space inside the building, to form coordinates for each area (a, b, c, d) through the spatial division
  • FIG. 6 when a specific layer is selected, a 3D screen divided into a plurality of areas (a, b, c, and d) is displayed as shown in FIG. 7, where (c) is selected. , (c) Construction and maintenance details for the area are displayed in a pop-up window.
  • the construction details displayed in the pop-up window include detailed drawings, construction dates, construction documents, construction images, construction videos, other related documents, worker information, etc.
  • Maintenance details include maintenance facility / equipment name, maintenance date, maintenance It may include documents, maintenance images, maintenance videos, other related documents, worker information, etc., and it is configured to display information according to each item selected.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Software Systems (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Human Computer Interaction (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 동영상 기반 건물 시공 및 유지보수 통합 관리 방법에 관한 것으로서, 건물시공단계부터 완공 후, 유지보수까지의 일련의 과정을 동영상으로 제작하여 건물관리서버에 등록하고, 이를 건물주 또는 입주자가 확인할 수 있도록 구성함으로써, 시공단계에서 발생할 수 있는 부실공사 및 불성실한 유지보수를 원천적으로 차단하여 건물의 투명한 관리가 가능하게 되므로, 건물주 또는 입주자에게 신뢰성을 제공할 수 있는 것이 특징이다.

Description

동영상 기반 건물 시공 및 유지보수 통합 관리 방법
본 발명은 동영상 기반 건물 시공 및 유지보수 통합 관리 방법에 관한 것으로서, 더 상세하게는 건물시공단계부터 완공 후, 유지보수까지의 일련의 과정을 동영상으로 제작하여 건물관리서버에 등록하고, 이를 건물주 또는 입주자가 확인할 수 있도록 구성함으로써, 시공단계에서 발생할 수 있는 부실공사 및 불성실한 유지보수를 원천적으로 차단하여 건물의 투명한 관리가 가능하게 되므로, 건물주 또는 입주자에게 신뢰성을 제공할 수 있는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법에 관한 것이다.
일반적으로 건설, 영업, 구매, 납품, 인테리어, 시설관리 등의 각 현장에서는 현장 담당자들에 의해 각 상황별로 업무 프로세스가 진행되는데, 현장 담당자들이 경험 미숙, 도면 오해 등 현장 지식이 부족하여 원활한 업무 진행이 이루어지지 않거나, 협력회사의 악의적인 행동에 의해 보고서를 허위로 작성하는 등의 문제가 발생하고 있으며, 따라서, 효율적으로 현장 관리가 이루어지지 못하고 있다.
특히, 건설산업은 노동집약적인 산업으로서, 다양한 공사의 종류와 수많은 작업 인력이 투입되어 동시에 여러 작업이 진행되므로 투입되는 인력에 대한 체계적이며 효과적인 관리와 운용, 그리고 이러한 투입인력에 대한 확실한 안전관리가 무엇보다도 중요한데, 이러한 현장 작업자들의 수에 비해서 상대적으로 관리자의 수가 극히 적고, 실외 작업시 현장 관리자의 통제와 관리가 제한되는 영역이 발생하게 되어 건설 현장의 인력에 대한 효율적이고 정확한 관리가 이루어지는 것이 어려우며, 이러한 건설 현장 인력에 대한 안전사고나 비효율적인 인력관리는 전체적인 공사비의 상승과 생산성의 저하, 예상 못한 안전사고의 발생 그리고 공사기간의 연장 등의 문제점을 발생시키고 있다.
한편, 건설 현장에서 공사 진행을 위해서는 발주자는 공사계획을 수립한 후 현장실사를 거쳐 설계를 하고, 설계에 따라 공사비용(예정가격)을 산출하기 위한 적산을 하여 입찰공고를 진행하게 되며, 수주자는 수주계획에 따라 입찰공고를 본 후 현장설명과 설계도 및 발주자의 요구사항을 이해하고 적산하여 입찰가격을 산정하며, 입찰 후 낙찰되면 발주자와 수주자사이에 계약이 체결되고, 수주자는 계약에 따라 시공하고 발주자는 공사를 감독하게 되는데, 공사 시공과정에서 건설 현장에서 사용되는 자재에 대한 전반적인 관리, 즉 건설자재의 주문 내용에 따라 건설자재가 공사 현장의 지정 장소에 정확한 시간에 도착하였는지, 또는 수량 및 품질이 일치하는지 등의 전반적인 건설자재에 대한 물류 정보를 본사에서 실시간으로 체크할 수 없기 때문에 현장 책임자의 불법적인 거래에 따른 악의적인 행동에 의해 품질이 떨어지는 저가의 건설 자재를 사용하는 등 부실공사를 초래하게 되는 문제점이 있었다.
또한, 건설 현장 책임자가 실제 공사 실적보다 부풀려서 공사현황을 보고함에 따라 본사 관리자가 공사현황을 정확하게 파악하는 것이 어려울 뿐만 아니라, 협력사의 피해를 초래하게 되는 문제점이 있었다.
한편, 건물 공사가 완료된 이후에는 건물의 시설관리, 설비관리 등의 유지보수가 이루어지게 되는데, 현장 작업자의 불성실한 유지보수에 의해 완벽한 유지보수가 이루어지지 않아 건물주 또는 입주자에게 많은 피해가 발생하고 있으며, 이로 인하여, 잦은 유지보수에 따른 건물주 또는 입주자의 비용부담을 초래하게 되는 문제점이 있었다.
상기와 같은 문제점을 해결하고자 건물통합관리를 위한 '건물통합관리 시스템 및 이에 의한 건물통합관리 방법'이 공개특허 제10-2015-0110985호(이하, '공개특허'라 함.)에 개시되어 있다.
상기 공개특허는 건물통합관리 방법으로서, 고객으로부터 서비스 신청 내용을 접수받는 고객 서비스 접수단계(S10)와; 고객이 신청한 건물 또는 건축물(현장)의 상황을 진단하는 진단단계(S20)와; 현장 진단 정보를 기준으로 건물, 건축물의 보수 또는 내부 설비의 수리나 교체가 필요하다고 판단되는 경우에 견적사항을 산출하는 견적산출단계(S30)와; 산출된 견적사항을 발주하기 위하여 해당 데이터를 처리하기 위한 발주단계(S40)와; 발주사항에 따라 건물, 건축물의 보수 또는 내부 설비의 수리나 교체 작업단계(S50)와; 건물, 건축물의 보수 또는 내부 설비의 수리나 교체 작업 완료 후, 고객에 작업결과를 보고하게 되는 작업완료 보고단계(S60); 를 포함하는 것이 특징이다.
상기 공개특허는 건물 또는 건축물 내부에 설치된 각종 설비를 3D 이미지로 구현하여 해당 설비의 정확한 종류와 제원 등을 신속하고 용이하게 파악하여 진단 및 문제해결팀의 작업시간을 단축하고 고객에게는 자신의 건물 또는 건축물의 정보를 정확하고 용이하게 인지할 수 있도록 구성되는 것이나, 유지보수의 진행과정을 확인할 수 있는 방법이 제공되지 않기 때문에 여전히 현장 작업자의 불성실한 유지보수를 파악하는 것이 어려운 문제점이 있었다.
또한, 건물 시공단계에서 발생할 수 있는 부실공사를 차단하기 위한 방법이 제공되지 못함에 따라 건물의 투명한 관리가 용이하지 않은 문제점이 있었다.
본 발명은 상술한 문제점을 해결하고자 안출된 것으로서, 본 발명의 목적은 건물시공단계부터 완공 후, 유지보수까지의 일련의 과정을 동영상으로 제작하여 건물관리서버에 등록하고, 이를 건물주 또는 입주자가 확인할 수 있도록 구성함으로써, 시공단계에서 발생할 수 있는 부실공사 및 불성실한 유지보수를 원천적으로 차단하여 건물의 투명한 관리가 가능하게 되므로, 건물주 또는 입주자에게 신뢰성을 제공하는 것이 가능한 동영상 기반 건물 시공 및 유지보수 통합 관리 방법을 제공하는 것이다.
또한, 시공 및 유지보수 과정에서 얻은 관련 데이터, 경험, 지식, 노하우(Know-How)를 정리하여 데이터베이스(Database)를 구축하고 이를 바탕으로 향후 유사현장에서 시공 및 유지보수 작업시 적용하는 것이 가능한 동영상 기반 건물 시공 및 유지보수 통합 관리 방법을 제공하는 것이다.
상기와 같은 문제점을 해결하기 위하여 본 발명에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법은, 건설 현장별로 건설 현장에 부합되는 공사진행절차에 대한 공사지침 매뉴얼이 건물관리서버에 등록되는 공사매뉴얼등록단계와, 건설 현장의 작업자 단말기에 설치된 어플리케이션을 실행하여 공사진행상황을 동영상으로 촬영하는 공사동영상촬영단계와, 상기 공사동영상촬영단계에서 촬영되는 공사진행 동영상을 상기 건물관리서버로 업로드하는 공사동영상업로드단계와, 관리자 단말기를 이용해 상기 공사동영상업로드단계를 통해 업로드되는 공사진행 동영상을 확인하여 상기 공사매뉴얼등록단계에서 등록된 공사지침 매뉴얼대로 공사 진행이 완료되었는지 여부를 확인하는 공사검수단계를 포함하는 시공과정등록단계; 및 시설/장비의 정기점검, 긴급수리 또는 보수공사와 같은 유지보수에 대한 유지보수 매뉴얼이 건물관리서버에 등록되는 유지보수매뉴얼등록단계와, 유지보수 현장의 작업자 단말기에 설치된 어플리케이션을 실행하여 유지보수 진행상황을 동영상으로 촬영하는 유지보수동영상촬영단계와, 상기 유지보수동영상촬영단계에서 촬영되는 유지보수진행 동영상을 상기 건물관리서버로 업로드하는 유지보수동영상업로드단계와, 관리자 단말기를 이용해 상기 유지보수동영상업로드단계를 통해 업로드되는 유지보수진행 동영상을 확인하여 상기 유지보수매뉴얼등록단계에서 등록된 유지보수 매뉴얼대로 유지보수 진행이 완료되었는지 여부를 확인하는 유지보수검수단계를 포함하는 유지보수과정등록단계; 및 상기 시공과정등록단계 또는 유지보수과정등록단계를 통해 공사 또는 유지보수 작업을 진행한 현장 작업자에 대한 인력 정보를 등록하는 인력정보등록단계;를 포함하는 것을 특징으로 한다.
또한, 건물 내부를 3차원 가상공간으로 구현한 3D 화면으로 구성하여, 공간분할을 통한 각 영역별 좌표를 형성하고, 각 영역별 좌표와 연계하여 시공과정이 촬영된 동영상정보, 시공내역정보, 유지보수 과정이 촬영된 동영상정보, 유지보수 내역정보 및 현장 작업자의 인력정보를 각각 매칭시켜 저장하는 건물통합정보 매칭단계;를 더 포함하여 구성되되, 상기 각 영역별 좌표 중 특정 좌표를 선택시 해당 좌표에 대한 공사진행과정, 유지보수진행과정, 유지보수내역 및 작업자의 인력정보를 문서 또는 동영상으로 확인할 수 있도록 구성되는 것을 특징으로 한다.
또한, 상기 인력정보등록단계를 통해 인력 정보를 등록시에는 현장 작업자의 소속, 연락처, 나이, 경력 중 어느 하나 이상을 포함하여 등록하되, 추후 유사 현장에 투입 가능한 우수 인력 확보를 위하여, 상기 관리자 단말기를 통해 현장 작업자가 진행한 공사 또는 유지보수 작업에 대한 동영상 정보를 확인한 후, 해당 공사 또는 유지보수 작업을 진행한 현장 작업자의 평가점수를 함께 등록하도록 구성되는 것을 특징으로 한다.
또한, 상기 관리자 단말기는 매뉴얼대로 작업진행이 이루어진 동영상 정보에서 특정 구간을 추출하여 유사 공사현장에서 사용 가능한 비디오 시공 매뉴얼로 생성한 후, 이를 상기 건물관리서버에 저장하도록 구성되되, 상기 비디오 시공 매뉴얼을 건물 내부를 3차원 가상공간으로 구현한 3D 화면상의 각 영역별 좌표 중 해당좌표와 연계하여 저장함으로써, 공사를 진행하는 현장 작업자가 작업자 단말기를 통해 상기 비디오 시공 매뉴얼을 확인하며 공사 진행에 참조할 수 있도록 구성되는 것을 특징으로 한다.
또한, 상기 관리자 단말기는 공사동영상촬영단계에서 촬영된 동영상 중 매뉴얼대로 진행되지 않은 작업에 해당하는 구간을 설정하여 건물관리서버에 저장하며, 상기 건물관리서버에서는 해당 작업을 진행한 현장 작업자 단말기로 공사중지(Line Stop) 및 시정 명령을 통보하도록 구성되되, 상기 건물관리서버는 인력정보가 기록된 인력정보DB에서 매뉴얼대로 작업을 진행하지 않은 현장 작업자의 평가점수를 실시간으로 차감하고, 기설정된 현장 작업자 평가점수의 기준값보다 낮을 경우, 해당 작업자 단말기로 공사제외 명령을 전송한 후, 상기 인력정보DB에 저장된 인력 정보 중 해당 공사 현장에 투입 가능한 인력을 검색하여 검색된 인력 중, 평가점수가 높은 인력을 우선으로 관리자 단말기로 추천하도록 구성되는 것을 특징으로 한다.
이상 상술한 바와 같이 본 발명에 따르면 건물시공단계부터 완공 후, 유지보수까지의 일련의 과정을 동영상으로 제작하여 건물관리서버에 등록하고, 이를 건물주 또는 입주자가 확인할 수 있도록 구성함으로써, 시공단계에서 발생할 수 있는 부실공사 및 불성실한 유지보수를 원천적으로 차단하여 건물의 투명한 관리가 가능하게 되므로, 건물주 또는 입주자에게 신뢰성을 제공할 수 있는 장점이 있다.
또한, 시공 및 유지보수 과정에서 얻은 관련 데이터, 경험, 지식, 노하우(Know-How)를 정리하여 데이터베이스(Database)를 구축하고 이를 바탕으로 향후 유사현장에서 시공 및 유지보수 작업시 적용할 수 있는 장점이 있다.
도 1은 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리를 위한 시스템 구성도.
도 2는 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 흐름도.
도 3은 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 시공과정 등록단계의 흐름도.
도 4는 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 유지보수과정 등록단계의 흐름도.
도 5는 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 매뉴얼에 따른 공사진행여부에 대한 처리과정을 보인 설명도.
도 6 및 7은 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 3D 화면상에 매칭된 건물통합정보 확인상태를 보인 설명도.
도 8은 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 작업자 단말기에 설치된 어플리케이션의 구동화면을 보인 설명도.
도 9는 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법의 작업자 단말기에 설치된 어플리케이션을 구동하여 동영상을 등록하는 과정을 보인 설명도.
이하, 도면을 참조하여 본 발명을 상세히 설명하기로 한다. 각 도면에 제시된 동일한 참조부호는 동일한 부재를 나타낸다.
도 1은 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리를 위한 시스템 구성도이다. 먼저, 도 1을 참조하면, 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 시스템은 작업자 단말기(100), 관리자 단말기(200), 건물관리서버(300)가 포함되는데, 본 발명에서 작업자 단말기(100)라 함은 건설 현장에서 공사를 진행하거나, 유지보수 현장에서 유지보수를 진행하는 작업자가 휴대하는 단말기를 통칭한다.
상기 작업자 단말기(100)는 작업자 단말기(100)에 설치된 어플리케이션을 통해 건설 현장에서 진행되는 공사 진행상황 정보 또는 유지보수 현장에서 진행되는 유지보수 진행상황 정보를 건물관리서버(300)로 업로드 하도록 구성되는 것으로서, 각각의 진행상황에 대한 정보는 동영상 정보, 사진 정보, 문서 정보, 녹음 정보 등으로 이루어질 수 있다.
본 발명에 있어서, 상기 작업자 단말기(100)는 공사 진행상황 또는 유지보수 진행상황을 동영상으로 촬영하여 건물관리서버(300)로 전송하도록 구성되는 것이 특징으로서, 동영상으로 촬영된 공사진행정보 또는 유지보수 진행정보를 기반으로 현장 작업자에 의한 보고서 작성이 이루어지게 됨으로써, 사실 기반의 투명한 현장 관리가 가능하게 한다.
상기 작업자 단말기(100)에 설치된 어플리케이션을 실행하게 되면, 도 8에 도시된 바와 같이, 메인 화면에, 담당자 사진을 포함한 담당자 정보 및 현장 위치정보 등의 현장정보를 표시하는 현장정보 표시부(10)와, 동영상 정보를 등록할 수 있는 동영상등록부(20)와, 사진 정보를 등록할 수 있는 사진등록부(30)와, 문서 정보를 등록할 수 있는 문서등록부(40)와, 음성 정보를 등록할 수 있는 음성등록부(50) 및 등록된 동영상 정보, 사진 정보, 문서 정보 및 녹음 정보를 확인할 수 있는 작업정보 표시부(60)가 표시되는데, 작업정보 표시부(60)에 표시되는 동영상 항목, 사진 항목, 문서 항목, 녹음 항목 중 어느 하나를 선택하여 각각의 데이터를 확인하는 것이 가능하다.
이하에서는 도 9를 참조하여 작업자 단말기(100)를 이용한 동영상 등록 과정을 설명하기로 한다. 도 9를 참조하면, 먼저, 현장 작업자가 작업자 단말기(100)의 어플리케이션을 실행하여 어플리케이션의 메인 화면에 표시되는 동영상등록부(20)를 선택하게 되면, 해당 동영상을 등록하는 담당자 정보가 표시되는 담당자표시창(21)과, 현장위치를 선택 가능한 현장선택창(22)과, 공사진행상황에 대한 내용을 입력하는 내용입력창(23)과, 기타 참고사항을 기재하는 참고사항입력창(24)이 표시되는데, 해당 화면에서 작업자가 카메라버튼(26) 또는 불러오기버튼(27) 중 어느 하나를 선택함에 따라 공사진행상황을 동영상으로 첨부하는 것이 가능하다.
작업자가 카메라버튼(26)을 선택시에는 현재 공사진행상황을 실시간으로 동영상으로 촬영 가능한 동영상 촬영 화면이 출력되어 동영상 촬영이 진행되는데, 동영상 촬영이 완료된 후, 동영상 저장을 선택하게 되면, 파일첨부창(25)에 동영상 첨부가 이루어지게 된다.
또한, 작업자가 불러오기버튼(27)을 선택시에는 작업자 단말기(100)에 기저장된 공사진행상황 동영상을 호출하여 파일첨부창(25)에 첨부하는 것이 가능하다.
상기와 같은 과정을 통해 각 항목에 대한 입력을 완료한 후, 최종 저장버튼(28)을 선택하게 되면, 동영상 정보를 포함한 공사진행정보가 현장관리서버(300)로 전송되는데, 현장관리서버(300)로 전송한 정보의 오류가 있는 경우, 편집버튼(29)을 선택하여 수정 또는 삭제 작업을 진행하는 것이 가능하다.
상기 관리자 단말기(200)는 공사 진행상황 또는 유지보수 진행상황을 관리하는 관리자가 휴대하는 단말기로서, 상기 관리자 단말기(200)는 장소에 구애받지 않고 자유롭게 사용하는 것이 가능하도록 관리자가 소유한 모바일로 구성될 수 있으며, 관리자가 동영상 편집 등의 작업을 용이하게 진행하는 것이 가능하도록 PC형태로 구성될 수 있다.
상기 관리자 단말기(200)는 건물관리서버(300)로부터 제공되는 작업자 단말기(100)로부터 촬영된 동영상 정보를 재생하여 해당 작업이 매뉴얼대로 진행되었는지 여부를 확인하는 것을 가능하게 하는데, 매뉴얼대로 작업진행이 이루어진 경우에는 동영상 정보에서 특정 구간을 추출하여 유사 공사현장에서 사용 가능한 비디오 시공 매뉴얼을 생성한 후, 이를 건물관리서버(300)에 저장하며, 매뉴얼대로 진행되지 않은 작업에 대해서는 해당 구간을 설정하여 건물관리서버(300)에 저장한다.
또한, 상기 관리자 단말기(200)는 추후, 유사 현장에 투입 가능한 우수 인력 확보를 위하여 작업자 단말기(100)로부터 촬영된 동영상 정보를 확인한 후, 현장 작업자의 평가점수를 건물관리서버(300)에 등록한다.
상기 건물관리서버(300)는 다수의 건설 현장 정보와, 상기 다수의 건설 현장에 위치하여 작업을 진행하는 작업자 정보 및 건설 현장을 관리하는 관리자 정보가 저장되며, 작업자와 관리자가 건설 현장 정보를 공유할 수 있는 인터페이스를 제공하는 것으로서, 본 발명에 있어서, 상기 건물관리서버(300)에는 건설 현장별로 건설 현장에 부합되는 공사지침에 대한 매뉴얼과, 건설 현장의 작업자가 작업자 단말기(100)를 통해 촬영한 공사 동영상 정보와, 시설/장비의 정기점검, 긴급수리 또는 보수공사와 같은 유지보수에 대한 매뉴얼과 및 유지보수 현장의 작업자가 작업자 단말기(100)를 통해 촬영한 유지보수 동영상 정보가 저장되는 것이 특징이다.
상기 건물관리서버(300)는 공사지침 매뉴얼, 공사 동영상 정보, 유지보수 매뉴얼, 유지보수 동영상 정보를 통해 현장 작업자가 매뉴얼대로 작업을 진행했는지에 대해 관리자가 확인하는 것을 가능하게 한다.
한편, 상기 건물관리서버(300)에 매뉴얼 등록시에는 아래의 표 1과 같이, 시공보증(CA, 'Construction Assurance'), 품질보증(QA, 'Quality Assurance'), 안전보증(SA, 'Safety Assurance'), 구매보증(PA, 'Procurement Assurance')으로 구분하여 각각의 매뉴얼이 등록되는 것이 바람직하다.
상기와 같이 4가지 방식을 통한 각각의 매뉴얼이 등록되면, 현장 작업자를 포함한 근로자들은 등록된 각각의 매뉴얼에 대해 근로자 자신의 단말기를 통해 반복적으로 트레이닝(Training)하여 숙지하게 되며, 관리자는 근로자들의 학습상태점검을 포함하여 실제 매뉴얼대로 현장 작업이 이루어졌는지를 점검하게 되는데, 이때, 점검은 시공체크(CC, 'Construction Check'), 품질체크(QC, 'Quality Check'), 안전체크(SC, 'Safety Check') 등으로 구분하여 점검을 진행하는 것이 바람직하다.
만약, 관리자 점검 과정에서 개선할 사항이 발생할 경우, 매뉴얼을 포함한 학습방법 등을 개선하는 과정을 통해 효율적인 업무처리가 가능하게 된다.
Figure PCTKR2017008830-appb-T000001
즉, 본 발명은 시공보증, 품질보증, 안전보증, 구매보증의 4가지 보증을 위하여 각각의 매뉴얼(Manual)등록, 교육(Training), 점검(Check), 개선(Improvement)의 4가지 행동(4 Ways Assurance & 4 Actions)이 수반되도록 함으로써, 효율적인 현장 관리가 가능하게 되는 것이다.
이하에서는 도 2 내지 5를 참조하여 본 발명의 바람직한 실시예에 따른 동영상 기반 건물 시공 및 유지보수 통합 관리 방법을 설명하기로 한다.
도 2를 참조하면, 건설 현장의 공사 시작부터 공사 완료까지의 전체 시공 과정이 건물관리서버(300)에 등록(S100)이 이루어지고, 완공 이후에는 시설/장비의 정기점검, 긴급수리 또는 보수공사와 같은 유지보수과정이 건물관리서버(300)에 등록(S200)이 이루어지며, 상기 시공과정등록단계(S100) 또는 유지보수과정등록단계(S200)를 통해 공사 또는 유지보수 작업을 진행한 현장 작업자의 소속, 연락처, 나이, 경력 중 어느 하나 이상을 포함한 인력 정보의 등록(S300)이 이루어져 건물통합 관리가 가능하게 되는데, 본 발명에 있어서, 시공과정 등록단계에서는 도 3에 도시된 바와 같이, 건설 현장에 부합되는 공사지침에 대한 공사매뉴얼이 건물관리서버(300)에 등록(S110)되는 것이 특징이다.
일반적으로 건설 현장에서는 각 공사종류별로 공사지침이 있음에도 불구하고 작업자의 현장 경험 등에 의해 공사지침을 지키지 않고 작업이 이루어지는 경우가 많으며, 이로 인하여, 부실공사의 문제가 빈번히 발생하고 있다.
본 발명에서는 현장상황에 따른 공사매뉴얼을 건물관리서버(300)에 등록하여 현장 작업자들이 매뉴얼을 교육(Training), 학습할 수 있도록 구성함으로써, 항상 매뉴얼에 따른 작업이 진행되도록 가이드할 수 있게 되므로, 부실공사를 원천적으로 차단하는 것이 가능하게 된다.
다음으로, 공사 진행 과정에서 건설 현장의 작업자가 작업자 단말기(100)에 설치된 어플리케이션을 실행하여 공사진행상황을 동영상으로 촬영(S120)한다.
상기 공사동영상촬영단계(S120)에서 촬영되는 동영상은 작업자 단말기(100)로부터 건물관리서버(300)에 업로드(S130)되어 저장이 이루어지게 되는데, 건물관리서버(300)에 저장되는 동영상 정보를 통해 현장 작업자가 매뉴얼대로 작업을 진행했는지에 대한 확인이 가능하게 된다.
상기 건물관리서버(300)에 저장되는 다수의 동영상 정보는 각각의 동영상 정보와 관련된 사진 정보, 문서 정보, 녹음 정보 중 어느 하나 이상이 링크되도록 구성되어 특정 동영상을 선택시 이와 관련된 자료를 함께 확인할 수 있도록 구성되는 것이 바람직하다.
마지막으로, 상기 공사동영상업로드단계(S130)를 통해 업로드되는 공사진행 동영상을 확인하여 상기 매뉴얼등록단계(S110)에서 등록된 공사지침 매뉴얼에 따라 공사 진행이 완료되었는지의 여부를 관리자 단말기(200)를 통해 확인(S140)하게 되는데, 상기와 같이, 공사진행상황 동영상을 확인시에는 관리자가 매뉴얼에 입각하여 작업이 이루어졌는지의 여부를 확인하는 것이 용이하도록 상기 매뉴얼등록단계(S110)에서 등록된 매뉴얼과 함께 공사동영상 정보가 디스플레이되도록 구성되는 것이 바람직하다.
한편, 상기와 같은 시공과정등록단계와 동일하게 유지보수 과정에서도 유지보수 공사에 대한 유지보수 매뉴얼이 건물관리서버(300)에 등록(S210)이 이루어지게 되는데, 이로 인하여, 시설/장비의 정기점검, 긴급수리 또는 보수공사와 같은 유지보수시 유지보수 매뉴얼을 현장 작업자들이 교육(Training), 학습하는 것이 가능하게 되므로, 항상 매뉴얼에 따른 유지보수 작업이 진행되도록 가이드할 수 있게 된다.
또한, 본 발명에 있어서, 유지보수 진행 과정에서 현장의 작업자가 작업자 단말기(100)에 설치된 어플리케이션을 실행하여 유지보수 진행상황을 동영상으로 촬영(S220)하도록 구성되는 것이 특징으로서, 상기 유지보수동영상촬영단계(S220)에서 촬영되는 동영상은 작업자 단말기(100)로부터 건물관리서버(300)에 업로드(S230)되어 저장이 이루어지게 되는데, 건물관리서버(300)에 저장되는 동영상 정보를 통해 현장 작업자가 매뉴얼대로 작업을 진행했는지에 대한 확인(S240)이 가능하게 되므로, 불성실한 유지보수를 원천적으로 차단하는 것이 가능하게 된다.
한편, 도 5에 도시된 바와 같이, 관리자는 관리자 단말기(200)를 이용하여 등록된 공사 동영상을 재생(S500)하여 재생되는 공사 동영상 정보를 통해 매뉴얼에 입각하여 작업이 이루어졌는지의 여부를 확인(S505)하게 되는데, 만약, 매뉴얼대로 작업진행이 이루어진 경우에는 해당 동영상을 추후 유사 공사현장에서 교육자료로 사용하는 것이 가능하다. 이를 위하여, 상기 관리자 단말기(200)는 매뉴얼대로 작업진행이 이루어진 동영상 정보에서 교육자료로 사용하기 위한 특정 구간을 추출하여 비디오 시공 매뉴얼을 생성(S510)한 후, 이를 3D 화면상의 각 영역별 좌표 중 해당 좌표와 연계하여 건물관리서버(300)에 저장(S515)하게 된다.
상기와 같이, 비디오 시공 매뉴얼을 특정 좌표와 연계하여 저장시에는 추후 유사 공사 현장 발생시 공사현장명 또는 공사명으로 검색하여 해당 좌표와 연계된 비디오 시공 매뉴얼을 쉽게 찾을 수 있도록 공사현장명 또는 공사명을 함께 저장하는 것이 바람직하다.
상기 비디오 시공 매뉴얼은 전술한 바와 같이, 매뉴얼대로 작업진행이 이루어진 동영상 정보에서 교육자료로 사용하기 위한 특정 구간을 추출하는 것도 가능하며, 현장 작업자들이 참조할 수 있도록 매뉴얼에 입각한 가이드 동영상을 별도로 제작하는 것도 가능할 것이다.
상기 가이드 동영상으로 사용 가능한 비디오 시공 매뉴얼(Video Construction Manual)은 특정 현장의 특정 작업, 공사의 시공과 관련하여 본공사 전 표준 또는 표본 시공을 비디오로 촬영한 것으로서, 비디오 시공 매뉴얼을 기준으로 실제 공정 진행 중 중요 공정 포인트에 대해 촬영한 사진, 비디오(Video Construction Record On Manual)와 연계하여 공정 진행 중 품질관리를 가능하게 한다. 이러한 비디오 시공 매뉴얼은 현장 작업자에게 복잡한 현장의 공정 설명을 단순하고 쉽게 전달하는 것이 가능하고, 휴대 운반이 가능하며 횟수에 관계없이 재생이 가능하다.
한편, 본 발명은 상기 비디오 시공 매뉴얼과 연계하여 비디오 시공 매뉴얼의 Image 전달에 추가하여 구체적인 현장 사실 관계를 전달하는 도구인 템플릿을 제공하는 것이 가능하다.
본 발명에 있어서, 템플릿이란 비디오 시공 매뉴얼을 사실과 현장의 정확한 정량적, 정성적 관리의 도구가 되도록 도와주는 수단을 의미한다.
비디오 시공 매뉴얼과 연계된 템플릿은 특정 현장의 특정한 작업, 공사에 필요한 매뉴얼 상세 정보를 발췌하여 공정순서에 따라서 정리한 내용으로 구성된다.
또한, CC(시공체크), QC(품질체크), SC(안전체크), PC(구매체크) 관련 점검 장소, 점검 위치, 점검 시간, 정량적/정성적 평가방법, 도구, 검사방법, On-line Stop이 발생한 경우와 On-line Stop한 공정의 개선 내역 확인에 대한 정리와 방법 결정에 관한 내용을 포함할 수 있다.
또한, CC(시공체크), QC(품질체크), SC(안전체크), PC(구매체크) 관련 중요한 검사방법과 도구, 의부기관에 의뢰 등에 대한 발주자, 설계사무소, 협력회사, 숙련공, 시공사의 사전 협의 및 합의 사항을 포함할 수 있다.
또한, 자재의 검수, 반입, 불출, 현장 관리 방법, 중요 소요 자재의 투입 예상량과 실제 투입량에 대한 기록을 포함하며, 숙련공의 관리와 인력관리 관련 숙련공의 인력정보관리, 숙련공의 샘플 시공과 시연 관리, 숙련공의 공정별 평가 및 관리, 1일 작업량, 전체 작업량, 진행 Schedule, 총인력 등 작업물량의 계획 대비 실적 관리에 관한 내용을 포함할 수 있다.
또한, 투입 중기 종류, 운전기사 경력, 중기 사용료에 관한 중기 사용 관리 내용을 포함하며, 전,후 공종의 상호 협력 방법, 간섭사항 조정 방법, 중기 사용 협조 방법, 방해 요인 사전, 사후 조정 방법에 관한 전,후 공종 연결관리 내용을 포함할 수 있다.
한편, 매뉴얼대로 진행되지 않은 작업이 존재할 경우에는 공사 동영상 정보 중 매뉴얼대로 진행되지 않은 작업에 해당하는 구간을 설정하여 건물관리서버(300)에 저장(520)하게 되는데, 상기와 같이, 매뉴얼대로 진행되지 않은 작업 구간이 저장되면 건물관리서버(300)에서는 해당 작업을 진행한 현장 작업자 단말기(100)로 공사중지(Line Stop) 명령과 함께 시정 명령을 통보(S525)하고, 해당 작업을 진행한 현장 작업자의 평가점수를 차감(S530)한다.
상기와 같은 공사중지(Line Stop) 상황은 비디오 시공 매뉴얼과 다르게 작업된 경우, 작업 방법이 기본 매뉴얼과 다른 경우, 중요자재 또는 소모재료를 기본 매뉴얼과 다르게 사용한 경우, 설계와 상이하게 시공된 경우, 현장이 설계와 맞지 않아 재설계를 진행한 후 시공해야 하는 경우 등이 있을 수 있다.
한편, 본 발명에 있어서, 상기 인력정보등록단계(S300)를 통해 인력 정보를 등록시에는 추후 유사 현장에 투입 가능한 우수 인력 확보를 위하여, 상기 관리자 단말기(200)를 통해 현장 작업자가 진행한 공사 또는 유지보수 작업에 대한 동영상 정보를 확인한 후, 해당 공사 또는 유지보수 작업을 진행한 현장 작업자의 평가점수를 함께 등록하도록 구성되는 것이 특징으로서, 작업 동영상 정보를 기초로 매뉴얼에 입각한 작업진행여부, 최종 작업완료 소요시간 또는 작업태도 등을 종합적으로 평가한 평가점수를 통해 추후 공사 현장에 투입할 인력 관리가 이루어지게 됨으로써, 현장 작업자들간의 경쟁심을 일으켜 효율적인 인력 관리가 가능하게 된다.
다음으로, 매뉴얼대로 작업을 진행하지 않은 작업자의 평가점수가 차감되면, 건물관리서버(300)에서 기설정된 현장 작업자의 평가기준값과 해당 작업자의 평가점수를 비교하게 되는데, 해당 작업자의 평가점수가 기준값보다 낮을 경우(S535), 해당 작업자 단말기(100)로 공사제외 명령을 전송(S540)한 후, 인력정보DB에 저장된 인력 정보 중 해당 공사 현장에 투입 가능한 인력을 검색(S545)하여 검색된 인력 중, 평가점수가 높은 인력을 우선으로 관리자 단말기로 추천(S555)함으로써, 불성실한 인력 교체에 따른 원활한 공사진행이 가능하게 된다.
한편, 도 6 및 7에 도시된 바와 같이, 본 발명에서는 건물 내부를 3차원 가상공간으로 구현한 3D 화면으로 구성하여, 공간분할을 통한 각 영역(a,b,c,d)별 좌표를 형성하고, 각 영역별 좌표와 연계하여 시공과정이 촬영된 동영상정보, 시공내역정보, 유지보수 과정이 촬영된 동영상정보, 유지보수 내역정보 및 현장 작업자의 인력정보를 각각 매칭(S400)시켜 시공내역 및 유지보수내역을 확인할 수 있도록 구성되는 것이 특징이다.
예를 들어, 도 6과 같이, 특정 층을 선택하게 되면, 도 7과 같이 다수의 영역(a,b,c,d)으로 분할된 3D 화면이 표시되는데, 여기서 (c)영역을 선택하게 되면, (c)영역에 대한 시공내역 및 유지보수내역이 팝업창으로 표시된다.
팝업창에 표시되는 시공내역은 상세도면, 공사일자, 공사문서, 공사이미지, 공사동영상, 기타관련서류, 작업자정보 등을 포함하며, 유지보수내역은 유지보수 시설/장비명, 유지보수일자, 유지보수문서, 유지보수이미지, 유지보수동영상, 기타관련서류, 작업자정보 등을 포함할 수 있으며, 각 항목을 선택시 그에 따른 정보가 표시되도록 구성된다.
상기와 같이, 각 영역별로 연계된 시공내역 및 유지보수내역이 표시됨으로써, 건물주 또는 입주자가 이를 확인하는 것이 가능하게 되므로, 건물의 하자여부 및 관리 상태를 투명하게 공개함으로써, 건물주 또는 입주자에게 신뢰성을 제공할 수 있게 되는 것이다.
도면과 명세서에서 최적 실시 예들이 개시되었다. 여기서 특정한 용어들이 사용되었으나, 이는 단지 본 발명을 설명하기 위한 목적에서 사용된 것이지 의미한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것은 아니다. 그러므로 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시 예가 가능하다는 점을 이해할 것이다. 따라서 본 발명의 진정한 기술적 보호범위는 첨부된 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.

Claims (6)

  1. 건설 현장별로 건설 현장에 부합되는 공사진행절차에 대한 공사지침 매뉴얼이 건물관리서버에 등록되는 공사매뉴얼등록단계와, 건설 현장의 작업자 단말기에 설치된 어플리케이션을 실행하여 공사진행상황을 동영상으로 촬영하는 공사동영상촬영단계와, 상기 공사동영상촬영단계에서 촬영되는 공사진행 동영상을 상기 건물관리서버로 업로드하는 공사동영상업로드단계와, 관리자 단말기를 이용해 상기 공사동영상업로드단계를 통해 업로드되는 공사진행 동영상을 확인하여 상기 공사매뉴얼등록단계에서 등록된 공사지침 매뉴얼대로 공사 진행이 완료되었는지 여부를 확인하는 공사검수단계를 포함하는 시공과정등록단계; 및
    시설/장비의 정기점검, 긴급수리 또는 보수공사와 같은 유지보수에 대한 유지보수 매뉴얼이 건물관리서버에 등록되는 유지보수매뉴얼등록단계와, 유지보수 현장의 작업자 단말기에 설치된 어플리케이션을 실행하여 유지보수 진행상황을 동영상으로 촬영하는 유지보수동영상촬영단계와, 상기 유지보수동영상촬영단계에서 촬영되는 유지보수진행 동영상을 상기 건물관리서버로 업로드하는 유지보수동영상업로드단계와, 관리자 단말기를 이용해 상기 유지보수동영상업로드단계를 통해 업로드되는 유지보수진행 동영상을 확인하여 상기 유지보수매뉴얼등록단계에서 등록된 유지보수 매뉴얼대로 유지보수 진행이 완료되었는지 여부를 확인하는 유지보수검수단계를 포함하는 유지보수과정등록단계; 및
    상기 시공과정등록단계 또는 유지보수과정등록단계를 통해 공사 또는 유지보수 작업을 진행한 현장 작업자에 대한 인력 정보를 등록하는 인력정보등록단계;를 포함하는 것을 특징으로 하는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법.
  2. 청구항 1에 있어서,
    건물 내부를 3차원 가상공간으로 구현한 3D 화면으로 구성하여, 공간분할을 통한 각 영역별 좌표를 형성하고, 각 영역별 좌표와 연계하여 시공과정이 촬영된 동영상정보, 시공내역정보, 유지보수 과정이 촬영된 동영상정보, 유지보수 내역정보 및 현장 작업자의 인력정보를 각각 매칭시켜 저장하는 건물통합정보 매칭단계;를 더 포함하여 구성되되,
    상기 각 영역별 좌표 중 특정 좌표를 선택시 해당 좌표에 대한 공사진행과정, 시공내역, 유지보수진행과정, 유지보수내역 및 작업자의 인력정보를 문서 또는 동영상으로 확인할 수 있도록 구성되는 것을 특징으로 하는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법.
  3. 청구항 2에 있어서,
    상기 인력정보등록단계를 통해 인력 정보를 등록시에는 현장 작업자의 소속, 연락처, 나이, 경력 중 어느 하나 이상을 포함하여 등록하되, 추후 유사 현장에 투입 가능한 우수 인력 확보를 위하여, 상기 관리자 단말기를 통해 현장 작업자가 진행한 공사 또는 유지보수 작업에 대한 동영상 정보를 확인한 후, 해당 공사 또는 유지보수 작업을 진행한 현장 작업자의 평가점수를 함께 등록하도록 구성되는 것을 특징으로 하는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법.
  4. 청구항 3에 있어서,
    상기 관리자 단말기는 매뉴얼대로 작업진행이 이루어진 동영상 정보에서 특정 구간을 추출하여 유사 공사현장에서 사용 가능한 비디오 시공 매뉴얼로 생성한 후, 이를 상기 건물관리서버에 저장하도록 구성되되, 상기 비디오 시공 매뉴얼을 건물 내부를 3차원 가상공간으로 구현한 3D 화면상의 각 영역별 좌표 중 해당좌표와 연계하여 저장함으로써, 공사를 진행하는 현장 작업자가 작업자 단말기를 통해 상기 비디오 시공 매뉴얼을 확인하며 공사 진행에 참조할 수 있도록 구성되는 것을 특징으로 하는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법.
  5. 청구항 3에 있어서,
    상기 비디오 시공 매뉴얼은 특정 현장의 특정 작업, 공사의 시공과 관련하여 본 공사 전 표준 또는 표본 시공을 비디오로 사전 제작되도록 구성되되, 현장 공정에 대한 현장 작업자의 이해도를 높히도록 비디오 시공 매뉴얼을 통해서 확인하기 어려운 추가 정보인 템플릿을 포함하여 제작되는 것을 특징으로 하는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법.
  6. 청구항 3에 있어서,
    상기 관리자 단말기는 공사동영상촬영단계에서 촬영된 동영상 중 매뉴얼대로 진행되지 않은 작업에 해당하는 구간을 설정하여 건물관리서버에 저장하며, 상기 건물관리서버에서는 해당 작업을 진행한 현장 작업자 단말기로 공사중지(Line Stop) 및 시정 명령을 통보하도록 구성되되,
    상기 건물관리서버는 인력정보가 기록된 인력정보DB에서 매뉴얼대로 작업을 진행하지 않은 현장 작업자의 평가점수를 실시간으로 차감하고, 기설정된 현장 작업자 평가점수의 기준값보다 낮을 경우, 해당 작업자 단말기로 공사제외 명령을 전송한 후, 상기 인력정보DB에 저장된 인력 정보 중 해당 공사 현장에 투입 가능한 인력을 검색하여 검색된 인력 중, 평가점수가 높은 인력을 우선으로 관리자 단말기로 추천하도록 구성되는 것을 특징으로 하는 동영상 기반 건물 시공 및 유지보수 통합 관리 방법.
PCT/KR2017/008830 2016-08-16 2017-08-14 동영상 기반 건물 시공 및 유지보수 통합 관리 방법 WO2018034470A1 (ko)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201780002424.3A CN109716381A (zh) 2016-08-16 2017-08-14 基于视频的建筑施工及维护统合管理方法
RU2018101448A RU2695416C1 (ru) 2016-08-16 2017-08-14 Способ комплексного управления, в том числе, строительством и обслуживанием здания на основе видеоизображения
EP17821456.5A EP3506192A4 (en) 2016-08-16 2017-08-14 INTEGRATED VIDEO-BASED MANAGEMENT METHOD FOR CONSTRUCTION AND MAINTENANCE OF BUILDINGS
US15/744,607 US11354759B2 (en) 2016-08-16 2017-08-14 Method for integrated management including building construction and maintenance of based on video
JP2018502007A JP6616883B2 (ja) 2016-08-16 2017-08-14 動映像基盤の建物施工及び維持保守の統合管理方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020160103653A KR101798097B1 (ko) 2016-08-16 2016-08-16 동영상 기반 건물 시공 및 유지보수 통합 관리 방법
KR10-2016-0103653 2016-08-16

Publications (1)

Publication Number Publication Date
WO2018034470A1 true WO2018034470A1 (ko) 2018-02-22

Family

ID=60806878

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2017/008830 WO2018034470A1 (ko) 2016-08-16 2017-08-14 동영상 기반 건물 시공 및 유지보수 통합 관리 방법

Country Status (7)

Country Link
US (1) US11354759B2 (ko)
EP (1) EP3506192A4 (ko)
JP (1) JP6616883B2 (ko)
KR (1) KR101798097B1 (ko)
CN (1) CN109716381A (ko)
RU (1) RU2695416C1 (ko)
WO (1) WO2018034470A1 (ko)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017154758A1 (ja) * 2016-03-09 2017-09-14 日本電気株式会社 情報処理システム及び情報処理方法、サーバ装置、クライアント、並びにコンピュータ・プログラムが格納された記録媒体
KR102025895B1 (ko) * 2017-12-18 2019-09-26 김영대 동영상 기반의 설비운영 및 오버홀에 대한 통합 관리 방법
KR102033778B1 (ko) * 2017-12-18 2019-10-17 김영대 동영상 기반의 제조 및 a/s 통합 관리 방법
US11580876B2 (en) * 2018-03-28 2023-02-14 Kalpit Jain Methods and systems for automatic creation of in-application software guides based on machine learning and user tagging
KR101942043B1 (ko) * 2018-07-23 2019-01-24 박명수 인력 및 건설 공사 중개 시스템 및 그 방법
KR101947100B1 (ko) 2018-08-13 2019-02-12 대일전기 주식회사 다른 관리 시스템과 연계되는 실시간 변전설비 안전관리 시스템
US11301683B2 (en) * 2018-10-10 2022-04-12 Autodesk, Inc. Architecture, engineering and construction (AEC) construction safety risk analysis system and method for interactive visualization and capture
CN110322024A (zh) * 2019-06-21 2019-10-11 上海翊视皓瞳信息科技有限公司 一种基于穿戴设备的工作指导系统及方法
AU2020344689A1 (en) * 2019-09-11 2022-04-28 REQpay Inc. Construction management method, system, computer readable medium, computer architecture, computer-implemented instructions, input-processing-output, graphical user interfaces, databases and file management
US20210004591A1 (en) * 2019-09-14 2021-01-07 Ron Zass Sequence of events monitoring in construction sites
KR102367965B1 (ko) * 2019-11-22 2022-02-25 주식회사 코이노 인지인자를 이용한 증강현실 기반 원격 가이던스 시스템 및 그 방법
CN111080491A (zh) * 2019-12-12 2020-04-28 成都阳帆网络科技有限公司 一种基于视频识别的施工现场检查系统及方法
KR102202114B1 (ko) * 2020-04-08 2021-01-11 김석 스마트 공사 관리 시스템
KR102358510B1 (ko) * 2020-07-13 2022-02-07 홍대범 건설 관련 서비스 중개 제공 장치 및 방법
KR102235036B1 (ko) * 2020-08-14 2021-04-01 주식회사 이도 건설 현장 안전 관리 시스템
RU2745283C1 (ru) * 2020-08-28 2021-03-23 Общество с ограниченной ответственностью «ТН-ГРУПП» Автоматизированная система управления продажами материальных услуг
CN112163832A (zh) * 2020-09-25 2021-01-01 中铁一局集团电务工程有限公司 一种在线安全质量管理方法、装置、移动终端及存储介质
CN112381378A (zh) * 2020-11-10 2021-02-19 湖北福泰建筑装饰工程有限公司 一种适用于建筑装饰构件的数字化监控方法
CN112288310A (zh) * 2020-11-11 2021-01-29 鼎旺天成科技(青岛)有限公司 一种施工工序管理的可视化施工管控系统的实现方法
CN113469492A (zh) * 2021-05-19 2021-10-01 徐州工业职业技术学院 一种装配式多极化绿色建筑系统
KR102398841B1 (ko) * 2021-10-12 2022-05-17 주식회사 스마트인사이드에이아이 영상 분석에 기반하여 건설 현장의 위험을 판단하기 위한 방법 및 시스템
KR102598143B1 (ko) * 2023-03-02 2023-11-03 주식회사 파이브디위드 내역 신뢰성 검토 방법
CN116633990B (zh) * 2023-06-25 2023-10-27 广东中信信息科技有限公司 一种基于云计算的远程信息数字化监管系统及方法
CN116485164B (zh) * 2023-06-25 2023-12-15 深圳市睿拓新科技有限公司 一种基于bim的电气施工任务分配管理系统及方法
CN117079362A (zh) * 2023-08-18 2023-11-17 威海市助邦自动化技术有限公司 一种工地施工进度信息数据采集设备及其采集方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001290866A (ja) * 2000-04-05 2001-10-19 Iida Sangyo:Kk 施工進捗状況管理照会システム
JP2007034712A (ja) * 2005-07-27 2007-02-08 Nec Fielding Ltd 保守支援システム、保守支援方法、及び、保守支援プログラム
KR20080085938A (ko) * 2007-03-02 2008-09-25 한성열 인터넷을 통한 현장일보 작성으로 관리되는 공사비정산방법
KR101354688B1 (ko) * 2013-07-05 2014-01-27 한국건설기술연구원 공사현장 감리 시스템 및 감리 방법
KR101375971B1 (ko) * 2013-04-24 2014-03-18 이형섭 시공 현장의 실시간 관리 장치
KR20150110985A (ko) 2014-03-24 2015-10-05 남종우 건물통합관리 시스템 및 이에 의한 건물통합관리 방법

Family Cites Families (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001344440A (ja) * 2000-03-31 2001-12-14 Hitachi Ltd 住宅用昇降機の通信網販売システム及び販売方法
JP2002073730A (ja) * 2000-09-05 2002-03-12 Jutaku Shizai Ryutsu Center:Kk 建築物の施工状況確認方法
JP2002132860A (ja) * 2000-10-23 2002-05-10 Pc Network Plaza:Kk 工事進捗状況管理方法
JP4727068B2 (ja) * 2001-05-29 2011-07-20 株式会社トプコン 施工監視システム、施工管理方法
JP2002358344A (ja) * 2001-05-31 2002-12-13 Csk Corp 工事情報管理システム、工事情報処理装置、工事情報処理方法、および、プログラム
US20050021449A1 (en) * 2003-07-25 2005-01-27 Thomas Sweeney Methods and systems for online management of construction assets
JP2005275982A (ja) * 2004-03-25 2005-10-06 Health Suerte Japan:Kk 建築管理システム、建築管理サーバ、及び建築管理プログラム
EP2408193A3 (en) * 2004-04-16 2014-01-15 James A. Aman Visible and non-visible light sensing camera for videoing and object tracking
US20060044307A1 (en) * 2004-08-24 2006-03-02 Kyuman Song System and method for visually representing project metrics on 3-dimensional building models
JP2006113625A (ja) * 2004-10-12 2006-04-27 Sekisui House Ltd 建築物の是正指示管理方法
JP4661512B2 (ja) * 2004-11-05 2011-03-30 株式会社日立製作所 遠隔メンテナンスシステム,モニタリングセンター計算機及びメンテナンス指示方法
JP2006245822A (ja) * 2005-03-01 2006-09-14 Konica Minolta Holdings Inc 画像配信システム
JP2006252241A (ja) * 2005-03-11 2006-09-21 Miharu Joho Center:Kk 住宅建築情報システム。
JP2006277549A (ja) 2005-03-30 2006-10-12 Toshiba Corp 現場作業認証管理システム
JP2006338561A (ja) * 2005-06-03 2006-12-14 Hibara Corporation:Kk 工事進捗状況管理システム
WO2007022279A2 (en) 2005-08-17 2007-02-22 Permanent Solution Industries Inc. Dynamic total asset management system (tams) and method for managing building facility services
US7567844B2 (en) 2006-03-17 2009-07-28 Honeywell International Inc. Building management system
US8195723B2 (en) * 2008-07-11 2012-06-05 Turner Construction Company Document management system for building maintenance and operational documents
CN201540484U (zh) * 2009-12-01 2010-08-04 华北电网有限公司 基建工程现场施工状态管理系统
JP5069764B2 (ja) * 2010-02-25 2012-11-07 ギアヌーヴ株式会社 工事現場管理システム及びサーバ
CN102884532B (zh) * 2010-03-09 2022-06-10 欧特克公司 用于以建筑信息建模进行施工现场管理和操作的系统和方法
US20120066019A1 (en) * 2010-07-07 2012-03-15 Dunmow Systems Corporation Construction control system
JP5548572B2 (ja) * 2010-09-29 2014-07-16 株式会社日立製作所 作業管理システム。
US9342928B2 (en) 2011-06-29 2016-05-17 Honeywell International Inc. Systems and methods for presenting building information
US9070216B2 (en) * 2011-12-14 2015-06-30 The Board Of Trustees Of The University Of Illinois Four-dimensional augmented reality models for interactive visualization and automated construction progress monitoring
US20130253968A1 (en) * 2012-03-26 2013-09-26 David Frederick Martinez Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
US20130335413A1 (en) * 2012-06-13 2013-12-19 National Chiao Tung University System and method for estimating construction duration
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
US20140278638A1 (en) 2013-03-12 2014-09-18 Springshot, Inc. Workforce productivity tool
RU2557649C2 (ru) * 2013-05-16 2015-07-27 Открытое Акционерное Общество "Российские Железные Дороги" Интеграционный информационный комплекс руководителя
US10372839B2 (en) * 2013-12-16 2019-08-06 Latista Technologies, Inc. Project management system providing optimized interaction with digital models
WO2015125066A1 (en) * 2014-02-19 2015-08-27 Fieldbit Ltd. System and method for facilitating equipment maintenance using smartglasses
US9852238B2 (en) * 2014-04-24 2017-12-26 The Board Of Trustees Of The University Of Illinois 4D vizualization of building design and construction modeling with photographs
CN104008446B (zh) * 2014-05-19 2018-01-23 成吉祥 建筑施工信息交互方法及系统
JP6468828B2 (ja) 2014-12-12 2019-02-13 三菱電機ビルテクノサービス株式会社 設備管理支援装置及びプログラム
EP3223208A1 (en) * 2016-03-22 2017-09-27 Hexagon Technology Center GmbH Self control
US10706185B2 (en) * 2016-04-26 2020-07-07 Arizona Board Of Regents On Behalf Of Arizona State University Systems and methods for automated spatial change detection and control of buildings and construction sites using three-dimensional laser scanning data
EP3285213A1 (en) * 2016-08-16 2018-02-21 Hexagon Technology Center GmbH Lod work package

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001290866A (ja) * 2000-04-05 2001-10-19 Iida Sangyo:Kk 施工進捗状況管理照会システム
JP2007034712A (ja) * 2005-07-27 2007-02-08 Nec Fielding Ltd 保守支援システム、保守支援方法、及び、保守支援プログラム
KR20080085938A (ko) * 2007-03-02 2008-09-25 한성열 인터넷을 통한 현장일보 작성으로 관리되는 공사비정산방법
KR101375971B1 (ko) * 2013-04-24 2014-03-18 이형섭 시공 현장의 실시간 관리 장치
KR101354688B1 (ko) * 2013-07-05 2014-01-27 한국건설기술연구원 공사현장 감리 시스템 및 감리 방법
KR20150110985A (ko) 2014-03-24 2015-10-05 남종우 건물통합관리 시스템 및 이에 의한 건물통합관리 방법

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3506192A4

Also Published As

Publication number Publication date
EP3506192A1 (en) 2019-07-03
KR101798097B1 (ko) 2017-11-16
CN109716381A (zh) 2019-05-03
US11354759B2 (en) 2022-06-07
JP6616883B2 (ja) 2019-12-04
JP2018533097A (ja) 2018-11-08
US20190026843A1 (en) 2019-01-24
RU2695416C1 (ru) 2019-07-23
EP3506192A4 (en) 2020-03-18

Similar Documents

Publication Publication Date Title
WO2018034470A1 (ko) 동영상 기반 건물 시공 및 유지보수 통합 관리 방법
WO2017018562A1 (ko) 모바일을 이용한 현장 관리 방법
CN111814240B (zh) 一种基于bim技术的公路工程农民工管理系统
US9589243B2 (en) Field management and mobile inspection
KR101422352B1 (ko) 건설현장의 하자관리시스템 및 방법
JP2011227811A (ja) 作業管理システム及び作業管理方法
CN106920049A (zh) 一种基于bim网络技术的建筑工程管理系统平台
WO2020060181A2 (ko) 인적 자원 정보 활용 시스템 및 그 운영 방법
CN106548428A (zh) 一种验房方法、验房师端、用户端和验房系统
JP2012022551A (ja) 建物3dテクスチャモデル処理電子情報処理装置
CN109767374A (zh) 一种房屋征收平台
US20150339937A1 (en) Methods and systems for testing with test booklets and electronic devices
JP2021144710A (ja) 安全管理システム
KR101155555B1 (ko) 모바일 현장 행정시스템
JP4252196B2 (ja) 施工検査システム、施工検査情報表示装置、および建築物の施工検査方法
KR20190073242A (ko) 동영상 기반의 설비운영 및 오버홀에 대한 통합 관리 방법
KR102285541B1 (ko) 온라인을 통한 건축심의 관련 분야 전문가들의 사전 자문 중개 플랫폼 서비스 시스템
JP7368937B2 (ja) 設備管理システム
KR20160066222A (ko) 모바일기기를 이용한 건축물 유지관리 점검방법
CN111061967A (zh) 一种基于位置搜索的可视化方法和装置
US20220067660A1 (en) Systems and methods for intermediating services or projects related to home improvement
KR102033778B1 (ko) 동영상 기반의 제조 및 a/s 통합 관리 방법
TWI773037B (zh) 品質檢測系統及其方法
JP7161809B1 (ja) 点検支援装置、点検支援システム、点検支援方法、及びプログラム
JP2005190463A (ja) ネットワークを介して各種建築構造物の竣工検査の表示システム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018502007

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17821456

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE