WO2016143069A1 - 遠隔作業支援システム - Google Patents

遠隔作業支援システム Download PDF

Info

Publication number
WO2016143069A1
WO2016143069A1 PCT/JP2015/057017 JP2015057017W WO2016143069A1 WO 2016143069 A1 WO2016143069 A1 WO 2016143069A1 JP 2015057017 W JP2015057017 W JP 2015057017W WO 2016143069 A1 WO2016143069 A1 WO 2016143069A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
unit
work plan
information
worker
Prior art date
Application number
PCT/JP2015/057017
Other languages
English (en)
French (fr)
Inventor
奥村 誠司
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2017504484A priority Critical patent/JP6157774B2/ja
Priority to CN201580077545.5A priority patent/CN107430713B/zh
Priority to PCT/JP2015/057017 priority patent/WO2016143069A1/ja
Publication of WO2016143069A1 publication Critical patent/WO2016143069A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Definitions

  • the present invention relates to a remote work support system that develops a work plan for workers and supports the work.
  • the worker's work plan is generally formulated daily or weekly by the project leader based on the production plan or inspection plan.
  • the work plan is managed by filling in a dedicated form or registering it in a work management system.
  • the work leader presents a work plan and gives work instructions to each worker.
  • the project leader prints a work plan sheet for each worker and distributes it to each worker, or each worker checks the monitor screen of the work management system. The method was taken.
  • the method of printing the work plan sheet incurs printing costs.
  • the method in which each worker confirms the work plan with the work management system is that the worker occupies the monitor screen to confirm the work plan. It takes time to develop a work plan.
  • the above problem is that the worker goes to the site with a portable terminal, accesses the work management system via the network, downloads work plan information to the portable terminal, and works while displaying the work plan on the portable terminal.
  • Patent Document 1 proposes a system that prevents unauthorized download of work plan information by authenticating a mobile terminal using a non-contact IC (Integrated Circuit) chip attached to the mobile terminal.
  • work progress can be managed by feeding back a work result to a work management system using a non-contact IC chip at the end of the work.
  • each worker can obtain a work plan for each work target apparatus or work time, but cannot obtain a work plan for each worker.
  • the present invention has been made in view of the above, and an object thereof is to obtain a remote work support system in which each worker can obtain a work plan for each worker.
  • the present invention stores an entire work plan storage unit that stores work plan information indicating a work plan for each worker, and stores the work plan information in the entire work plan storage unit.
  • a work management server comprising: a work plan input unit that performs the work plan search unit that retrieves the work plan information of the requested worker from the work plan information stored in the entire work plan storage unit.
  • the present invention provides an authentication device short-range wireless communication unit that exchanges information by wireless communication, and a command from information received by the authentication device short-range wireless communication unit.
  • An authentication device includes a work plan requesting unit that acquires work plan information of the requested worker from the work management server. Further, in order to solve the above-described problems and achieve the object, the present invention provides a work plan storage unit that stores work plan information, and a terminal short distance that exchanges information with the authentication device short range wireless communication unit through wireless communication.
  • Information including a work plan acquisition command for requesting work plan information of a worker from the authentication device via the terminal short-range wireless communication unit when entering the short-range wireless communication range of the wireless communication unit and the authentication device short-range wireless communication unit
  • a work plan acquisition unit that acquires the work plan information of the requested worker from the authentication device and stores it in the work plan storage unit, and a terminal that displays the work plan indicated by the work plan information acquired by the work plan acquisition unit
  • a portable terminal provided with a display portion.
  • the remote work support system according to the present invention has an effect that each worker can obtain a work plan for each worker.
  • FIG. 1 is a diagram illustrating functional configurations of a work management server, an authentication device, and a mobile terminal of a remote work support system according to a first embodiment;
  • FIG. 1 is a diagram illustrating a hardware configuration of an information processing device that realizes an authentication device of a remote operation support system according to a first embodiment;
  • the flowchart which shows the flow of operation
  • the figure which shows an example of the work progress confirmation screen which the work progress confirmation part of the remote operation assistance system concerning Embodiment 1 provides to a project leader.
  • FIG. 1 The figure which shows the function structure of the work management server of the remote work assistance system concerning Embodiment 2, an authentication apparatus, a display, and a portable terminal.
  • FIG. The figure which shows an example of the work plan display screen in the terminal display part of the remote work assistance system concerning Embodiment 2.
  • FIG. The flowchart which shows the flow of operation
  • FIG. 1 The flowchart which shows the flow of operation
  • FIG. 1 The flowchart which shows the flow of operation
  • FIG. 1 is a diagram showing a configuration of a remote operation support system according to the first exemplary embodiment of the present invention.
  • a remote work support system 900 includes a work management server 100 that manages work plans of all workers, a short-range wireless communication function called NFC (Near Field Communication), and RFID (Radio Frequency Identification). ), And a portable terminal 140 that is equipped with a short-range wireless communication function of the same type as the authentication device 120 and is carried by the worker.
  • the work management server 100 and the authentication device 120 are connected via a network such as Ethernet (registered trademark).
  • a plurality of authentication devices 120 may be installed, and can be installed at the entrance / exit of the work area and the work target device.
  • FIG. 2 is a diagram illustrating a functional configuration of a work management server, an authentication apparatus, and a mobile terminal of the remote work support system according to the first embodiment.
  • the work management server 100 includes a work plan input unit 101 that receives an operation for inputting a work plan by a project leader, an all work plan storage unit 102 that stores work plan information indicating a work plan for each worker, and an all work plan storage. From the work plan information stored in the unit 102, the work plan search unit 103 for searching for the work plan information of the requested worker, and the work progress information from the authentication device 120 are received and stored in the all work plan storage unit 102.
  • FIG. 3 is a diagram illustrating a hardware configuration of the information processing apparatus that implements the work management server of the remote work support system according to the first embodiment.
  • the information processing apparatus 10 includes an arithmetic device 11 that executes a program, a memory 12 that the arithmetic device 11 uses as a work area, an input device 13 that receives a user input operation, a display device 14 that displays information, and an authentication device 120. And a storage device 16 for storing information.
  • a general-purpose computer terminal can be applied to the information processing apparatus 10.
  • the information processing apparatus 10 is a work management server 100 when the arithmetic unit 11 executes software using the memory 12 as a work area. That is, the work plan input unit 101 shown in FIG. 2 causes the arithmetic unit 11 to execute software having a user interface capable of inputting work plan information or software for reading a table-format electronic file storing work plan information. Realized.
  • the entire work plan storage unit 102 is realized by the storage device 16.
  • the work plan search unit 103, the work progress confirmation unit 104, and the work progress input unit 105 search for information in the storage device 16 that realizes the entire work plan storage unit 102, and install software having a function of reading and writing information to the arithmetic unit 11. Is realized by executing.
  • a plurality of arithmetic devices and a plurality of memories may cooperate to execute the above function.
  • the authentication device 120 illustrated in FIG. 2 includes an authentication device short-range wireless communication unit 123 that performs short-range wireless communication with the mobile terminal 140, a work plan request unit 121 that requests a work plan from the work management server 100, An authentication device communication command analysis unit 122 that extracts a command from information received by the authentication device short-range wireless communication unit 123; and work progress information received from the portable terminal 140 through the authentication device short-range wireless communication unit 123 is sent to the work management server 100. And a work progress report unit 124 for outputting.
  • a non-contact type IC chip reader / writer can be applied to the authentication device 120.
  • FIG. 4 is a diagram illustrating a hardware configuration of the information processing apparatus that realizes the authentication apparatus of the remote operation support system according to the first embodiment.
  • the information processing device 20 includes an arithmetic device 21 that executes a program, a memory 22 that the arithmetic device 21 uses for a work area, an antenna 23 for short-distance wireless communication, and a communication device 24 for communication with the work management server 100. And a storage device 25 for storing firmware.
  • the information processing apparatus 20 is the authentication apparatus 120 when the arithmetic unit 21 uses the memory 22 as a work area and executes software. That is, the work plan request unit 121, the authentication device communication command analysis unit 122, and the work progress report unit 124 illustrated in FIG. 2 are realized by the arithmetic device 21 executing the firmware stored in the storage device 25.
  • the authentication device short-range wireless communication unit 123 is realized using the arithmetic device 21 and the antenna 23. A plurality of arithmetic devices and a plurality of memories may cooperate to execute the above function.
  • a wearable terminal and a terminal short-range wireless communication unit 141 that performs short-range wireless communication with the authentication device 120, and an authentication device 120 using the terminal short-range wireless communication unit 141.
  • a work plan acquisition unit 142 that acquires work plan information from the work plan storage unit 143, a work process management unit 144 that exchanges work progress information with the authentication device 120 using the terminal short-range wireless communication unit 141,
  • a timer 145 that generates time information of the current time
  • a terminal display unit 146 that displays work plan information
  • an identifier that stores a terminal identifier that is a terminal-specific number or a worker identifier that is a number unique to the owned worker
  • a storage unit 147 that stores a terminal identifier that is a terminal-specific number or a worker identifier that is a number unique to the owned worker
  • FIG. 5 is a diagram illustrating a hardware configuration of the information processing apparatus that realizes the mobile terminal of the remote operation support system according to the first embodiment.
  • the information processing device 30 includes an arithmetic device 31 that executes a program, a memory 32 that the arithmetic device 31 uses as a work area, an input device 33 that accepts user input operations, a display device 34 that displays information, and a short-range wireless
  • a non-contact IC chip 35 for communication, a storage device 36 for storing information, and a real-time clock and high-precision event timer 37 for measuring time are provided.
  • the information processing apparatus 30 becomes the portable terminal 140 when the arithmetic unit 31 uses the memory 32 as a work area and executes software. That is, the work plan acquisition unit 142 and the work process management unit 144 illustrated in FIG. 2 are realized by the arithmetic device 31 executing the firmware stored in the storage device 36. A plurality of arithmetic devices and a plurality of memories may cooperate to execute the above function.
  • the terminal short-range wireless communication unit 141 is realized using the arithmetic device 31 and the non-contact IC chip 35.
  • the terminal display unit 146 is realized by the display device 34.
  • the timer 145 is realized by a real time clock and a high precision event timer 37.
  • the work plan storage unit 143 is realized by the storage device 36.
  • FIG. 6 is a diagram of an example of worker information of the remote work support system according to the first embodiment.
  • the worker information 200 is stored in advance in the entire work plan storage unit 102 through the work plan input unit 101 by the project leader.
  • the worker information 200 includes items of a worker identifier 201 which is a number unique to the worker, a worker name 202 which is the name of the worker, and a terminal identifier 203 which is a number unique to the mobile terminal 140 owned by the worker. Have.
  • the work progress confirmation unit 104 displays the progress state
  • the worker name 202 can be displayed together with the progress state being displayed. This makes it easier for project leaders to know who the person is.
  • FIG. 7 is a diagram of an example of work plan information of the remote work support system according to the first embodiment.
  • the work plan information 300 is information that the project leader registers in the entire work plan storage unit 102 using the work plan input unit 101 in advance.
  • the work plan information 300 is information in which the worker identifier 301 and the work plan 302 are associated with each other.
  • the work plan 302 includes items of work execution date 303, work start time 304, work end time 305, work summary 306, work details 307, work target device 308, and work progress 309 for each worker.
  • the work plan 302 may be associated with a terminal identifier instead of the worker identifier 301.
  • the work plan 302 associated with the worker identifier 301 “P0000001” includes the work schedule from December 1 to December 5, and the scheduled start time and scheduled end time of each work. Are written in the work start time 304 and the work end time 305.
  • the work summary 306 work items to be displayed on the mobile terminal 140 are written in text.
  • the work details 307 contain more detailed information than the work summary 306.
  • the work detail information may be managed by a file different from the work plan information 300, and a file name as link information of another file may be stored in the work details 307.
  • the work target device 308 is a device on which work is performed, and a plurality of work target devices 308 may exist.
  • the work progress 309 stores the progress status of each work item. Since the worker identifier 301 “P0000001” is associated with the worker name 202 “worker A” in the worker information 200 shown in FIG. 6, the work plan information 300 shown in FIG. The work plan information of the worker A.
  • the work plan 302 may be a day unit, a week or a month unit, and is planned in an arbitrary number of days.
  • the work plan 302 is formulated by the project leader based on the production plan and inspection plan and the skills possessed by each worker, and the entire work plan storage unit 102 of the work management server 100 is used using the work plan input unit 101 before the plan execution date. Registered in
  • FIG. 8 is a flowchart showing a flow of operation of the mobile terminal when the worker acquires and displays his work plan information on his mobile terminal in the remote work support system according to the first embodiment.
  • FIG. 9 is a flowchart showing an operation flow of the authentication apparatus when the worker acquires and displays his / her work plan information on his / her portable terminal in the remote work support system according to the first embodiment.
  • FIG. 10 is a flowchart showing an operation flow of the work management server when the worker acquires and displays his work plan information on his mobile terminal in the remote work support system according to the first embodiment.
  • step S ⁇ b> 11 the mobile terminal 140 confirms whether the work plan acquisition unit 142 has entered the short-range wireless communication range of the authentication device 120.
  • step S ⁇ b> 21 the authentication device 120 confirms whether the portable terminal 140 has entered the short-range wireless communication possible range.
  • the answer is Yes in Step S11 and Step S21, and the authentication device short-range wireless communication unit 123 and the terminal short-range wireless communication unit 141 communicate with each other in Step S12 and Step S22.
  • a worker brings his / her mobile terminal 140 close to the authentication device 120 when going to work or entering a work area.
  • the work plan acquisition unit 142 sends a work plan acquisition command to which a parameter including the worker identifier of the worker or the terminal identifier of the portable terminal 140 owned by the worker is given to the terminal It transmits to the authentication device 120 via the short-range wireless communication unit 141.
  • the worker identifier or the terminal identifier is stored in advance in the identifier storage unit 147 of the mobile terminal 140.
  • step S23 the authentication device communication command analysis unit 122 receives and analyzes the command from the portable terminal 140 and recognizes that it is a work plan acquisition command.
  • step S24 the work plan request unit 121 of the authentication device 120 instructs the work plan search unit 103 of the work management server 100 to perform the work associated with the worker identifier or terminal identifier in the parameter given to the work plan acquisition command. Request acquisition of plan 302.
  • step S31 the work plan search unit 103 searches the work plan 302 associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command from the worker information 200 of the all work plan storage unit 102. Search for.
  • step S ⁇ b> 32 the work plan search unit 103 checks whether the worker information 200 includes information associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command. If there is no information associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command in the worker information 200, No in step S32, the work plan search unit 103 performs the work in step S34. The work plan request unit 121 is notified that the plan acquisition has failed.
  • step S32 if there is information associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command in the worker information 200, Yes is made in step S32, and the work plan search unit 103 is made in step S33. Reads out the work plan information 300 and transmits it to the work plan request unit 121.
  • the work plan search unit 103 extracts only the work plan information on the day when the work plan acquisition request is received from the work plan of a certain worker, and transmits it to the work plan request unit 121.
  • step S25 the work plan request unit 121 transmits the information received from the work management server 100 to the portable terminal 140 as response data of the work plan acquisition command. That is, the mobile terminal 140 notifies the mobile terminal 140 that the work plan information sent from the work management server 100 to the authentication device 120 in step S33 or the work plan sent from the work management server 100 to the authentication device 120 in step S34 failed. Send to.
  • the work plan request unit 121 may provide all information of the work plan information 300 to the work plan acquisition unit 142, or only the work execution date 303, the work start time 304, the work end time 305, and the work summary 306. As described above, only part of the information may be provided to the work plan acquisition unit 142.
  • the work plan requesting unit 121 provides only a part of the work plan information 300 to the work plan acquisition unit 142, information on the same items specified in advance in common for all workers may be provided. The items to be provided may be specified for each worker, registered in the worker information 200, and the items to be provided for each worker may be changed.
  • step S14 the work plan acquisition unit 142 determines whether the information received in response to the work plan acquisition command is work plan information. If the information received in response to the work plan acquisition command is work plan information, the result is Yes in step S14 and the process proceeds to step S15. If the information received in response to the work plan acquisition command is not work plan information, No is returned in step S14, and the process is terminated.
  • step S15 the work plan acquisition unit 142 stores the acquired work plan information in the work plan storage unit 143.
  • step S ⁇ b> 16 the work plan acquisition unit 142 displays the acquired work plan information on the terminal display unit 146.
  • FIG. 11 is a diagram illustrating a display example of work plan information on the terminal display unit of the portable terminal of the remote work support system according to the first embodiment.
  • the terminal display unit 146 displays work plan information for the worker A on December 2nd.
  • the current time 401 is always displayed, and the current work item 402 and the next work item 403 are displayed.
  • a completion button 404 is displayed next to the current work item 402.
  • the mobile terminal 140 is a wearable terminal, and generally has a small screen size. Therefore, instead of displaying all information, the mobile terminal 140 is simple so that the worker can understand the work contents at a glance. Display. If a worker holds a notebook computer terminal or tablet terminal in his / her hand, the efficiency of the work deteriorates. However, if the portable terminal 140 is a wristwatch-type or eyeglass-type wearable terminal, both hands will be free. Work can be supported without reducing efficiency. In addition, if the mobile terminal 140 is a wearable terminal, it is small and inexpensive, so it is easy for each worker to hold.
  • each worker can confirm only his / her work plan anytime and anywhere by the portable terminal 140 that is a wearable terminal having an RFID function and the work management server 100 that manages the work plan for each worker. Therefore, efficient work can be realized.
  • FIG. 12 is a flowchart showing an operation flow of the mobile terminal when the work plan information is displayed on the terminal display unit and the work progress information of the worker is updated by the work management server in the remote work support system according to the first embodiment. It is.
  • FIG. 13 is a flowchart showing an operation flow of the authentication apparatus when the work plan information is displayed on the terminal display unit in the remote work support system according to the first embodiment, and the work progress information of the worker is updated by the work management server.
  • FIG. 14 shows a flow of operations of the work management server when the work plan information is displayed on the terminal display unit in the remote work support system according to the first embodiment and the work progress information of the worker is updated by the work management server. It is a flowchart.
  • step S ⁇ b> 111 the work process management unit 144 confirms whether an operation of pressing the completion button 404 has been performed. If an operation of pressing the completion button 404 is performed, Yes is made in step S111, and in step S112, the work process management unit 144 displays the progress status of the current work item of the work plan information in the work plan storage unit 143. Set it to “Done”.
  • step S ⁇ b> 113 the work process management unit 144 acquires time information of the current time managed by the timer 145 built in the mobile terminal 140.
  • step S114 the work process management unit 144 searches the work plan storage unit 143 for the current work item and the next work item.
  • the work process management unit 144 displays the current work item and the next work item on the terminal display unit 146.
  • step S111 the work process management unit 144 in step S116, the time information of the current time Is obtained from the timer 145.
  • step S115 or step S116 the work process management unit 144 determines whether there is a delay in the work. The determination as to whether or not there is a delay in the work is based on the work start time 304 and work end time 305 of the work plan information 300 stored in the work plan storage unit 143 and the current time acquired from the timer 145 in step S113 or step S116. This is done by comparing the time information with the time.
  • step S117 If there is a delay in the work, Yes is made in step S117, and in step S118, the work process management unit 144 blinks the current work item 402 displayed on the terminal display unit 146 or changes the display color. This warns workers of work delays.
  • FIG. 15 is a diagram illustrating an example of a work plan display screen of the remote work support system according to the first embodiment.
  • FIG. 16 is a diagram showing an example of the work plan display screen of the remote work support system according to the first embodiment, and shows the work plan display screen 400 after the completion button 404 of FIG. 15 is pressed.
  • the work process management unit 144 sets the progress status of the current work item in the work plan storage unit 143 to “completed”.
  • the work item corresponding to the current time is displayed on the terminal display unit 146. That is, in FIG. 16, “Assembly of product A” displayed in the column of the next work item 403 in FIG. 15 is displayed in the column of the current work item 402 and, based on the work plan information 300, In the column of the next work item 403, “inspection before start of apparatus B” is displayed.
  • step S119 the work process management unit 144 confirms whether or not the authentication apparatus 120 has entered the short-range wireless communication range.
  • the authentication device 120 confirms whether the portable terminal 140 has entered the short-range wireless communication possible range.
  • the answer is Yes in Step S119 and Step S131, and the authentication device short-range wireless communication unit 123 and the terminal short-range wireless communication unit 141 communicate with each other in Step S120 and Step S132. To start. If it is not within the short-range wireless communication range of the authentication device 120, No in step S119, and the process proceeds to step S111.
  • step S121 the work process management unit 144 of the mobile terminal 140 extracts the progress status of each work item in the work plan storage unit 143.
  • step S122 the work process management unit 144 adds a work plan update command to which a parameter including the progress state of each extracted work item and the worker identifier or the terminal identifier of the portable terminal 140 owned by the worker is assigned. Is transmitted to the authentication device 120 using the terminal short-range wireless communication unit 141.
  • Whether the work terminal acquisition command or the work plan update command is transmitted when the mobile terminal 140 enters the short-range wireless communicable range of the authentication device short-range wireless communication unit 123 depends on whether the work plan acquisition command or the work plan update command is transmitted. Can be determined based on whether or not work plan information is stored.
  • step S133 the authentication device communication command analysis unit 122 receives and analyzes the command from the mobile terminal 140, and recognizes that it is a work plan update command.
  • step S134 the work progress report unit 124 requests the work progress input unit 105 of the work management server 100 to update the work plan associated with the worker identifier or the terminal identifier of the mobile terminal 140 owned by the worker. .
  • step S141 the work progress input unit 105 updates the work progress 309 of the work plan information 300 associated with the worker identifier or terminal identifier of the entire work plan storage unit 102 to the progress state indicated by the parameter.
  • the project leader can confirm the work progress of each worker by the work progress confirmation unit 104 of the work management server 100.
  • the work progress confirmation unit 104 is realized by software that the work management server 100 starts on a computer.
  • the work progress confirmation unit 104 can be realized by a viewer that displays work plan information stored in the entire work plan storage unit 102.
  • FIG. 17 is a diagram illustrating an example of a work progress confirmation screen provided to the project leader by the work progress confirmation unit of the remote work support system according to the first embodiment.
  • the work progress confirmation screen 700 displays a work progress state 702 in addition to the current time 701.
  • an operator name 703, work contents 704, scheduled work end time 705, and work progress 706 are displayed in a table format.
  • the work progress state 702 is displayed in a table format, but may be displayed in a graphical format using a graph.
  • the project leader uses the portable terminal 140, which is a wearable terminal having an RFID function, and the work management server 100 that manages a work plan for each worker. Since the work progress can be confirmed, it is possible to issue an instruction suitable for each worker, issue an indication individually for each worker, and grasp the skill of the worker.
  • each worker can acquire and display only his / her work plan on the mobile terminal 140. Since only the own work plan is acquired in the portable terminal 140, the communication amount in the short-range wireless communication can be reduced as compared with the case of acquiring the work plans of all workers. Moreover, even if the portable terminal 140 is a wearable terminal with a small screen, it can be displayed easily by acquiring only its own work plan in the portable terminal 140.
  • FIG. FIG. 18 is a diagram showing a configuration of a remote operation support system according to the second exemplary embodiment of the present invention.
  • the remote operation support system 910 according to the second embodiment is configured to further include a display 160 having a short-range wireless communication function of the same type as the portable terminal 140.
  • the display device 160 is connected to the work management server 110 via a network such as Ethernet (registered trademark).
  • the display device 160 can be configured by connecting an operation terminal or a liquid crystal monitor to a programmable logic controller.
  • a plurality of displays 160 can be installed on the production line or the work target device.
  • FIG. 19 is a diagram illustrating a functional configuration of a work management server, an authentication device, a display, and a mobile terminal of the remote work support system according to the second embodiment.
  • the work management server 110 is different from the work management server 100 of the first embodiment in that it further includes a work manual storage unit 106 and a manual search unit 107.
  • the authentication device 120 and the mobile terminal 140 are the same as those in the first embodiment.
  • the work manual is a document file that describes the operation method of the apparatus in detail, and the work manual storage unit 106 is a recording medium such as a hard disk or a flash memory.
  • the display 160 includes a display near field wireless communication unit 163 that exchanges information with the terminal near field wireless communication unit 141 by wireless communication, and a display device communication that extracts a command from information received by the display near field wireless communication unit 163. If the command analysis unit 162 and the display device communication command analysis unit 162 extract the detailed work plan acquisition command, the work management server 110 requests the work plan information of the worker, and the work management server 110 receives the work of the worker.
  • the work management server 110 is requested to request a work manual for a specific device, and the work management server 110 The manual acquisition unit 164 that acquires the work manual of the device from the work and the work acquired by the detailed work plan request unit 161 And a display unit display unit 165 for displaying the acquired work manual image information and the manual acquisition unit 164.
  • FIG. 20 is a diagram illustrating a hardware configuration of the information processing apparatus that implements the display of the remote operation support system according to the second embodiment.
  • the information processing device 40 stores information, an arithmetic device 41 that executes a program, a memory 42 that the arithmetic device 41 uses as a work area, a display device 44 that displays information, an antenna 45 for short-range wireless communication, and information. And a storage device 46.
  • a programmable display provided with an antenna for short-range wireless communication can be applied.
  • a combination of a programmable logic controller, a liquid crystal monitor, and a non-contact IC chip reader / writer may be applied to the information processing apparatus 40. That is, the information processing apparatus 40 is not limited to an integrated apparatus, and can be configured by combining a plurality of apparatuses.
  • the information processing device 40 is a display device 160 when the arithmetic device 41 uses the memory 42 as a work area and executes software. That is, the detailed work plan request unit 161, the display device communication command analysis unit 162, and the manual acquisition unit 164 illustrated in FIG. 19 are realized by the computing device 41 executing the firmware stored in the storage device 46. A plurality of arithmetic devices and a plurality of memories may cooperate to execute the above function.
  • the display short-range wireless communication unit 163 is realized using the arithmetic device 41 and the antenna 45.
  • the display device display unit 165 is realized by the display device 44.
  • the operation in which the worker acquires his / her work plan information from the work management server 110 to the portable terminal 140 via the authentication device 120 and stores it in the work plan storage unit 143 is as described in the first embodiment.
  • FIG. 21 is a diagram illustrating an example of a work plan display screen in the terminal display unit of the remote work support system according to the second embodiment.
  • a manual button 405 is included in the work plan display screen 400 displayed on the terminal display unit 146.
  • FIG. 22 is a flowchart showing an operation flow of the mobile terminal when displaying the work plan information or the work manual on the display in the remote work support system according to the second embodiment.
  • FIG. 23 is a flowchart illustrating an operation flow of the display when the work plan information or the work manual is displayed on the display in the remote operation support system according to the second embodiment.
  • FIG. 24 is a flowchart illustrating an operation flow of the work management server when displaying the work plan information or the work manual on the display in the remote work support system according to the second embodiment.
  • step S ⁇ b> 211 the work plan acquisition unit 142 of the mobile terminal 140 confirms whether or not the short-range wireless communication range of the display device 160 has been entered.
  • step S ⁇ b> 221 the display device 160 confirms whether the mobile terminal 140 has entered the short-range wireless communication possible range.
  • Yes is made in step S211 and step S221, and the terminal short-range wireless communication unit 141 and the display short-range wireless communication unit 163 communicate with each other in steps S212 and S222.
  • step S213 the work process management unit 144 confirms whether an operation of pressing the manual button 405 is performed. If an operation of pressing the manual button 405 has been performed, Yes is made in step S213, and in step S214, the work process management unit 144 displays a manual acquisition command to which a parameter including the device identifier of the current work target device is added. To the device 160. On the other hand, if the operation of pressing the manual button 405 has not been performed, No is determined in step S213, and in step S215, the work process management unit 144 passes the terminal identifier or the portable terminal 140 through the terminal short-range wireless communication unit 141. A work plan acquisition command to which a parameter including a terminal identifier is attached is transmitted to the display device 160.
  • step S223 the display device communication command analysis unit 162 receives and analyzes a command from the mobile terminal 140. If the command received from the portable terminal 140 is a work plan acquisition command, “Yes” is determined in step S224, and in step S225, the detailed work plan request unit 161 sends a worker identifier to the work plan search unit 103 of the work management server 110. Alternatively, the acquisition of a work plan associated with the terminal identifier of the mobile terminal 140 is requested. If the command received from the portable terminal 140 is a manual acquisition command, No is returned in step S224, and in step S226, the manual acquisition unit 164 notifies the manual search unit 107 of the work management server 110 of the device identifier of the current work target device. Request work manual associated with.
  • step S231 the work plan search unit 103 confirms whether the display unit 160 has requested acquisition of work plan information. If acquisition of work plan information is requested from the display device 160, the result of step S231 is Yes.
  • step S232 the work plan search unit 103 searches for work from the worker information 200 in the all work plan storage unit 102. The work plan 302 associated with the worker identifier or the terminal identifier in the parameter assigned to the plan acquisition command is searched.
  • step S233 the work plan search unit 103 checks whether the worker information 200 includes information associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command.
  • step S233 If there is no information associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command in the worker information 200, No is determined in step S233, and the work plan search unit 103 performs the work in step S235. The detailed work plan request unit 161 is notified that the plan acquisition has failed. On the other hand, if there is information associated with the worker identifier or the terminal identifier in the parameter assigned to the work plan acquisition command in the worker information 200, Yes is made in step S233, and the work plan search unit 103 is made in step S234. Reads out the work plan information 300 and transmits it to the detailed work plan request unit 161.
  • step S231 If the acquisition of work plan information has not been requested from the display device 160, the result in step S231 is No, and in step S236, the manual search unit 107 searches the work manual storage unit 106 for the work manual associated with the device identifier. Search for. In step S237, the manual search unit 107 transmits the work manual read from the work manual storage unit 106 to the manual acquisition unit 164.
  • step S227 the display unit 160 displays the information received from the work management server 110 on the display unit display unit 165.
  • FIG. 25 is a diagram illustrating an example of a detailed work plan display screen in the display unit of the remote work support system according to the second embodiment.
  • the detailed work plan display screen 800 includes a worker name 801, a date 802, a work plan 803, a work start time 804, a work end time 805, a work summary 806, work details 807, a work target device 808, a work progress 809, and a current time. 810 is displayed. That is, all items of the work plan information 300 are displayed on the detailed work plan information display screen 800. Since the display unit 165 has a larger screen than the terminal display unit 146 of the portable terminal 140 that is a wearable terminal, it displays work plan information including information that reduces the visibility when displayed on the terminal display unit 146. it can.
  • the configuration described in the above embodiment shows an example of the contents of the present invention, and can be combined with another known technique, and can be combined with other configurations without departing from the gist of the present invention. It is also possible to omit or change the part.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 作業員ごとの作業計画を示す作業計画情報を格納する全作業計画格納部(102)に格納された作業計画情報の中から、要求された作業員の作業計画情報を検索する作業計画検索部(103)を備えた作業管理サーバ(100)と、作業計画取得コマンドを受信したならば、作業管理サーバ(100)に対し作業員の作業計画情報を要求して取得する作業計画要求部(121)を備えた認証装置(120)と、作業計画情報を格納する作業計画格納部(143)と、近距離無線で認証装置(120)に作業員の作業計画情報を要求する作業計画取得コマンドを送信し、要求した作業員の作業計画情報を認証装置(120)から取得して作業計画格納部(143)に格納する作業計画取得部(142)と、作業計画取得部(142)が取得した作業員の作業計画情報が示す作業計画を表示する端末表示部(146)とを備えた携帯端末(140)とを有する。

Description

遠隔作業支援システム
 本発明は、作業員に作業計画を展開して作業の支援を図る遠隔作業支援システムに関する。
 作業員の作業計画は、生産計画又は点検計画に基づいて、プロジェクトリーダによって日単位又は週単位で策定されることが一般的である。作業計画は、専用の用紙に記入したり、作業管理システムに登録したりして管理される。また、一日の初め又は週初め若しくは作業工程の変更時には、プロジェクトリーダから各作業員に対し作業計画の提示及び作業指示が行われる。
 従来、作業員への作業計画を展開するにあたって、プロジェクトリーダが作業員ごとの作業計画用紙を印刷して各作業員に配布したり、各作業員が作業管理システムのモニタ画面を確認したりする方法がとられていた。
 上記の方法のうち、作業計画用紙を印刷する方法は、印刷コストが発生する。また、各作業員が作業管理システムで作業計画を確認する方法は、作業計画の確認のために作業員がモニタ画面を占有してしまうため、作業員の人数が多い職場では、作業員全員に作業計画を展開するのに時間を要する。
 上記問題は、作業者が携帯端末を所持して現場に出向き、作業管理システムにネットワーク経由でアクセスして作業計画情報を携帯端末にダウンロードし、携帯端末に作業計画を表示しながら作業を行うことで作業の効率化を図る遠隔作業支援システムによって解決が図られている。
 また、特許文献1には、携帯端末付属の非接触IC(Integrated Circuit)チップを利用して携帯端末を認証することで、作業計画情報の不正なダウンロードを防止するシステムが提案されている。特許文献1では、作業終了時に非接触ICチップを利用して作業結果を作業管理システムにフィードバックさせることで、作業進捗の管理を可能にしている。
特開2010-186438号公報
 ところで、特許文献1では、各作業員は作業対象の装置ごと又は作業時間ごとの作業計画を入手することができるが、作業員ごとの作業計画を入手することができない。
 本発明は、上記に鑑みてなされたものであって、各作業員が作業員ごとの作業計画を入手可能な遠隔作業支援システムを得ることを目的とする。
 上述した課題を解決し、目的を達成するために、本発明は、作業員ごとの作業計画を示す作業計画情報を格納する全作業計画格納部と、作業計画情報を全作業計画格納部に格納する作業計画入力部と、全作業計画格納部に格納された作業計画情報の中から、要求された作業員の作業計画情報を検索する作業計画検索部とを備えた作業管理サーバを有する。また、上述した課題を解決し、目的を達成するために、本発明は、無線通信で情報をやり取りする認証装置近距離無線通信部と、認証装置近距離無線通信部で受信した情報からコマンドを抽出する認証装置通信コマンド解析部と、認証装置通信コマンド解析部が作業計画取得コマンドを抽出したならば、作業管理サーバに対し作業計画取得コマンドによって指定された作業員の作業計画情報を要求し、要求した作業員の作業計画情報を作業管理サーバから取得する作業計画要求部とを備えた認証装置を有する。また、上述した課題を解決し、目的を達成するために、本発明は、作業計画情報を格納する作業計画格納部と、無線通信で認証装置近距離無線通信部と情報をやり取りする端末近距離無線通信部と、認証装置近距離無線通信部の近距離無線通信可能範囲に入ると、端末近距離無線通信部経由で認証装置に作業員の作業計画情報を要求する作業計画取得コマンドを含む情報を送信し、要求した作業員の作業計画情報を認証装置から取得して作業計画格納部に格納する作業計画取得部と、作業計画取得部が取得した作業計画情報が示す作業計画を表示する端末表示部とを備えた携帯端末とを有する。
 本発明にかかる遠隔作業支援システムは、各作業員が作業員ごとの作業計画を入手可能であるという効果を奏する。
本発明の実施の形態1にかかる遠隔作業支援システムの構成を示す図 実施の形態1にかかる遠隔作業支援システムの作業管理サーバ、認証装置及び携帯端末の機能構成を示す図 実施の形態1にかかる遠隔作業支援システムの作業管理サーバを実現する情報処理装置のハードウェア構成を示す図 実施の形態1にかかる遠隔作業支援システムの認証装置を実現する情報処理装置のハードウェア構成を示す図 実施の形態1にかかる遠隔作業支援システムの携帯端末を実現する情報処理装置のハードウェア構成を示す図 実施の形態1にかかる遠隔作業支援システムの作業員情報の一例を示す図 実施の形態1にかかる遠隔作業支援システムの作業計画情報の一例を示す図 実施の形態1にかかる遠隔作業支援システムで作業員が自分の作業計画情報を自分の携帯端末に取得及び表示する際の携帯端末の動作の流れを示すフローチャート 実施の形態1にかかる遠隔作業支援システムで作業員が自分の作業計画情報を自分の携帯端末に取得及び表示する際の認証装置の動作の流れを示すフローチャート 実施の形態1にかかる遠隔作業支援システムで作業員が自分の作業計画情報を自分の携帯端末に取得及び表示する際の作業管理サーバの動作の流れを示すフローチャート 実施の形態1にかかる遠隔作業支援システムの携帯端末の端末表示部での作業計画情報の表示例を示す図 実施の形態1にかかる遠隔作業支援システムで端末表示部に作業計画情報を表示し、作業管理サーバで作業員の作業進捗情報を更新する際の携帯端末の動作の流れを示すフローチャート 実施の形態1にかかる遠隔作業支援システムで端末表示部に作業計画情報を表示し、作業管理サーバで作業員の作業進捗情報を更新する際の認証装置の動作の流れを示すフローチャート 実施の形態1にかかる遠隔作業支援システムで端末表示部に作業計画情報を表示し、作業管理サーバで作業員の作業進捗情報を更新する際の作業管理サーバの動作の流れを示すフローチャート 実施の形態1にかかる遠隔作業支援システムの作業計画表示画面の一例を示す図 実施の形態1にかかる遠隔作業支援システムの作業計画表示画面の一例を示す図 実施の形態1にかかる遠隔作業支援システムの作業進捗確認部がプロジェクトリーダに提供する作業進捗確認画面の一例を示す図 本発明の実施の形態2にかかる遠隔作業支援システムの構成を示す図 実施の形態2にかかる遠隔作業支援システムの作業管理サーバ、認証装置、表示器及び携帯端末の機能構成を示す図 実施の形態2にかかる遠隔作業支援システムの表示器を実現する情報処理装置のハードウェア構成を示す図 実施の形態2にかかる遠隔作業支援システムの端末表示部における作業計画表示画面の一例を示す図 実施の形態2にかかる遠隔作業支援システムで表示器に作業計画情報又は作業マニュアルを表示する際の携帯端末の動作の流れを示すフローチャート 実施の形態2にかかる遠隔作業支援システムで表示器に作業計画情報又は作業マニュアルを表示する際の表示器の動作の流れを示すフローチャート 実施の形態2にかかる遠隔作業支援システムで表示器に作業計画情報又は作業マニュアルを表示する際の作業管理サーバの動作の流れを示すフローチャート 実施の形態2にかかる遠隔作業支援システムの表示器表示部における詳細作業計画表示画面の一例を示す図
 以下に、本発明の実施の形態にかかる遠隔作業支援システムを図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。
実施の形態1.
 図1は、本発明の実施の形態1にかかる遠隔作業支援システムの構成を示す図である。実施の形態にかかる遠隔作業支援システム900は、全作業員の作業計画を管理する作業管理サーバ100と、NFC(Near Field Communication)と称される近距離無線通信機能を備え、RFID(Radio Frequency Identification)による作業員及び機器の認証が可能な認証装置120と、認証装置120と同種の近距離無線通信機能を備え、作業員によって携帯される携帯端末140とを備える。作業管理サーバ100と認証装置120とは、イーサネット(登録商標)のようなネットワークで接続されている。認証装置120は、複数設置してもよく、作業エリアの出入り口及び作業対象装置に設置可能である。
 図2は、実施の形態1にかかる遠隔作業支援システムの作業管理サーバ、認証装置及び携帯端末の機能構成を示す図である。作業管理サーバ100は、プロジェクトリーダによる作業計画を入力する操作を受け付ける作業計画入力部101と、作業員ごとの作業計画を示す作業計画情報を格納する全作業計画格納部102と、全作業計画格納部102に格納された作業計画情報の中から、要求された作業員の作業計画情報を検索する作業計画検索部103と、認証装置120から作業進捗情報を受け取って全作業計画格納部102に格納する作業進捗入力部105と、作業進捗情報を表示する作業進捗確認部104とを有する。
 図3は、実施の形態1にかかる遠隔作業支援システムの作業管理サーバを実現する情報処理装置のハードウェア構成を示す図である。情報処理装置10は、プログラムを実行する演算装置11と、演算装置11がワークエリアに用いるメモリ12と、ユーザの入力操作を受け付ける入力装置13と、情報を表示する表示装置14と、認証装置120との通信用の通信装置15と、情報を記憶する記憶装置16とを備える。情報処理装置10には、汎用のコンピュータ端末を適用可能である。
 情報処理装置10は、演算装置11がメモリ12をワークエリアに用いて、ソフトウェアを実行することによって作業管理サーバ100となっている。すなわち、図2に示した作業計画入力部101は、作業計画情報を入力可能なユーザインタフェースを持つソフトウェア又は作業計画情報を保存した表形式の電子ファイルを読み込むソフトウェアを演算装置11が実行することによって実現される。全作業計画格納部102は、記憶装置16によって実現される。作業計画検索部103、作業進捗確認部104及び作業進捗入力部105は、全作業計画格納部102を実現する記憶装置16内の情報を検索し、情報を読み書きする機能を持つソフトウェアを演算装置11が実行することによって実現される。また、複数の演算装置及び複数のメモリが連携して上記機能を実行してもよい。
 図2に示した認証装置120は、携帯端末140との間で近距離無線通信を行う認証装置近距離無線通信部123と、作業管理サーバ100に作業計画を要求する作業計画要求部121と、認証装置近距離無線通信部123で受信した情報からコマンドを抽出する認証装置通信コマンド解析部122と、認証装置近距離無線通信部123を通じて携帯端末140から受け取った作業進捗情報を作業管理サーバ100へ出力する作業進捗報告部124とを有する。認証装置120には、非接触型ICチップリーダライタを適用可能である。
 図4は、実施の形態1にかかる遠隔作業支援システムの認証装置を実現する情報処理装置のハードウェア構成を示す図である。情報処理装置20は、プログラムを実行する演算装置21と、演算装置21がワークエリアに用いるメモリ22と、近距離無線通信用のアンテナ23と、作業管理サーバ100との通信用の通信装置24と、ファームウェアを記憶する記憶装置25とを備える。
 情報処理装置20は、演算装置21がメモリ22をワークエリアに用いて、ソフトウェアを実行することによって認証装置120となっている。すなわち、図2に示した作業計画要求部121、認証装置通信コマンド解析部122及び作業進捗報告部124は、演算装置21が記憶装置25に記憶されたファームウェアを実行することによって実現される。認証装置近距離無線通信部123は、演算装置21とアンテナ23とを用いて実現される。また、複数の演算装置及び複数のメモリが連携して上記機能を実行してもよい。
 図2に示した携帯端末140は、ウェアラブル端末であり、認証装置120との間で近距離無線通信を行う端末近距離無線通信部141と、端末近距離無線通信部141を用いて認証装置120から作業計画情報を取得し、作業計画格納部143に格納する作業計画取得部142と、端末近距離無線通信部141を用いて認証装置120と作業進捗情報をやりとりする作業工程管理部144と、現在時刻の時刻情報を生成するタイマ145と、作業計画情報を表示する端末表示部146と、端末固有の番号である端末識別子または所有する作業員に固有の番号である作業員識別子を格納する識別子格納部147とを有する。
 図5は、実施の形態1にかかる遠隔作業支援システムの携帯端末を実現する情報処理装置のハードウェア構成を示す図である。情報処理装置30は、プログラムを実行する演算装置31と、演算装置31がワークエリアに用いるメモリ32と、ユーザの入力操作を受け付ける入力装置33と、情報を表示する表示装置34と、近距離無線通信用の非接触ICチップ35と、情報を記憶する記憶装置36と、時間を計測するリアルタイムクロック及び高精度イベントタイマ37とを備える。
 情報処理装置30は、演算装置31がメモリ32をワークエリアに用いて、ソフトウェアを実行することによって携帯端末140となっている。すなわち、図2に示した作業計画取得部142及び作業工程管理部144は、演算装置31が記憶装置36に記憶されたファームウェアを実行することによって実現される。また、複数の演算装置及び複数のメモリが連携して上記機能を実行してもよい。端末近距離無線通信部141は、演算装置31と非接触ICチップ35とを用いて実現される。端末表示部146は、表示装置34によって実現される。タイマ145は、リアルタイムクロック及び高精度イベントタイマ37によって実現される。作業計画格納部143は、記憶装置36によって実現される。
 作業管理サーバ100には、作業員の情報をまとめた作業員情報を登録しても良い。図6は、実施の形態1にかかる遠隔作業支援システムの作業員情報の一例を示す図である。作業員情報200は、プロジェクトリーダにより作業計画入力部101を通じて事前に全作業計画格納部102に格納される。作業員情報200は、作業員に固有の番号である作業員識別子201、作業員の氏名である作業員名202及び作業員が所有する携帯端末140に固有の番号である端末識別子203の項目を有する。作業員情報200を作業管理サーバ100に登録しておくことにより、作業進捗確認部104が進捗状態を表示する際に、作業員名202を合わせて表示することができ、表示されている進捗状態が誰のものであるかを、プロジェクトリーダが把握しやすくなる。
 図7は、実施の形態1にかかる遠隔作業支援システムの作業計画情報の一例を示す図である。作業計画情報300は、プロジェクトリーダが事前に作業計画入力部101を用いて全作業計画格納部102に登録しておく情報である。作業計画情報300は、作業員識別子301と作業計画302とを関連づけた情報である。作業計画302は、各作業員の作業実施日303、作業開始時刻304、作業終了時刻305、作業概要306、作業詳細307、作業対象装置308及び作業進捗309の各項目を有する。なお、作業計画302には、作業員識別子301の代わりに端末識別子を関連づけてもよい。
 図7では、「P0000001」という作業員識別子301が関連づけられた作業計画302には、12月1日から12月5日の作業スケジュールが含まれており、各作業の開始予定時刻及び終了予定時刻は、作業開始時刻304及び作業終了時刻305に記されている。作業概要306には、携帯端末140に表示する作業項目が文章で記されている。作業詳細307には、作業概要306よりも詳細な情報が記されている。なお、作業詳細情報を作業計画情報300とは別のファイルで管理し、作業詳細307には別ファイルのリンク情報とするファイル名を格納してもよい。作業対象装置308は、作業を行う対象の装置であり、複数存在しても構わない。作業進捗309には、各作業項目の進捗状態が格納される。なお、「P0000001」という作業員識別子301は、図6に示した作業員情報200では、「作業員A」という作業員名202に関連づけられていることから、図7に示す作業計画情報300は、作業員Aの作業計画情報である。
 作業計画302は、1日単位でもよいし1週間又は1ヶ月単位でもよく、任意の日数単位で計画される。作業計画302は、生産計画及び点検計画と各作業員の保有技量とに基づいてプロジェクトリーダによって策定され、計画実行日前に作業計画入力部101を用いて作業管理サーバ100の全作業計画格納部102に登録される。
 次に、作業員が自分の作業計画情報を自分の携帯端末140に取得及び表示する処理について説明する。図8は、実施の形態1にかかる遠隔作業支援システムで作業員が自分の作業計画情報を自分の携帯端末に取得及び表示する際の携帯端末の動作の流れを示すフローチャートである。図9は、実施の形態1にかかる遠隔作業支援システムで作業員が自分の作業計画情報を自分の携帯端末に取得及び表示する際の認証装置の動作の流れを示すフローチャートである。図10は、実施の形態1にかかる遠隔作業支援システムで作業員が自分の作業計画情報を自分の携帯端末に取得及び表示する際の作業管理サーバの動作の流れを示すフローチャートである。
 ステップS11で、携帯端末140は、作業計画取得部142は、認証装置120の近距離無線通信可能範囲に入ったか否かを確認する。また、ステップS21で、認証装置120は、近距離無線通信可能範囲に携帯端末140が入ったかを確認する。作業員が携帯端末140を認証装置120に近づけると、ステップS11及びステップS21でYesとなり、ステップS12及びステップS22で、認証装置近距離無線通信部123と端末近距離無線通信部141とが互いに通信を開始する。一例を挙げると、作業員は、出勤時又は作業エリア入室時に、自分の携帯端末140を認証装置120に近づける。
 通信が開始されたのち、ステップS13で、作業計画取得部142は、作業員の作業員識別子又は作業員が所有する携帯端末140の端末識別子を含むパラメータが付与された作業計画取得コマンドを、端末近距離無線通信部141経由で認証装置120に対して送信する。作業員識別子又は端末識別子は、携帯端末140の識別子格納部147に予め格納されている。
 ステップS23で、認証装置通信コマンド解析部122は、携帯端末140からのコマンドを受信及び解析して作業計画取得コマンドであることを認識する。ステップS24で、認証装置120の作業計画要求部121は、作業管理サーバ100の作業計画検索部103に対し、作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた作業計画302の取得を要求する。
 ステップS31で、作業計画検索部103は、全作業計画格納部102の作業員情報200の中から、作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた作業計画302を検索する。ステップS32で、作業計画検索部103は、作業員情報200の中に作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた情報があったかを確認する。作業員情報200の中に作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた情報が無ければ、ステップS32でNoとなり、作業計画検索部103は、ステップS34で作業計画の取得に失敗したことを作業計画要求部121に通知する。一方、作業員情報200の中に作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた情報があれば、ステップS32でYesとなり、ステップS33で、作業計画検索部103は、作業計画情報300を読み出し、作業計画要求部121に送信する。
 作業計画検索部103は、ある作業員の作業計画の中から作業計画取得要求を受けた日の作業計画情報だけを抽出して作業計画要求部121に送信する。
 図7の例では、作業員Aが12月2日の出勤時に自分の携帯端末140を認証装置120に近づけると、作業員Aの携帯端末140は、作業員Aの12月2日の作業計画情報だけを取得できる。
 ステップS25で、作業計画要求部121は、作業管理サーバ100から受信した情報を、作業計画取得コマンドの応答データにして携帯端末140へ送信する。すなわち、ステップS33で作業管理サーバ100から認証装置120に送られた作業計画情報又はステップS34で作業管理サーバ100から認証装置120に送られた作業計画の取得に失敗したことの通知を携帯端末140へ送信する。
 なお、作業計画要求部121は、作業計画情報300の全ての情報を作業計画取得部142に提供してもよいし、作業実施日303、作業開始時刻304、作業終了時刻305及び作業概要306だけのように、一部の情報だけを作業計画取得部142に提供してもよい。作業計画要求部121が作業計画情報300の一部の情報だけを作業計画取得部142に提供する場合は、全作業員に共通して予め指定された同じ項目の情報を提供してもよいし、提供する項目を作業員ごとに指定して作業員情報200に登録して、作業員ごとに提供する項目を変えてもよい。
 ステップS14で、作業計画取得部142は、作業計画取得コマンドに対する応答で受信した情報が作業計画情報であるかを判断する。作業計画取得コマンドに対する応答で受信した情報が作業計画情報であれば、ステップS14でYesとなりステップS15に進む。作業計画取得コマンドに対する応答で受信した情報が作業計画情報でなければ、ステップS14でNoとなり、処理を終了する。
 ステップS15で、作業計画取得部142は、取得した作業計画情報を作業計画格納部143に格納する。そして、ステップS16で、作業計画取得部142は、取得した作業計画情報を端末表示部146に表示する。
 図11は、実施の形態1にかかる遠隔作業支援システムの携帯端末の端末表示部での作業計画情報の表示例を示す図である。端末表示部146には、作業員Aの12月2日の作業計画情報が表示されている。端末表示部146の作業計画表示画面400には、現在時刻401を常時表示し、現在の作業項目402と次の作業項目403とを表示する。端末表示部146の画面サイズが大きく余裕がある場合には、さらに多くの作業項目を表示しても構わない。また、現在の作業項目402の横には、完了ボタン404を表示する。
 実施の形態1では、携帯端末140はウェアラブル端末であり、一般的には画面サイズが小さいため、全ての情報を表示するのではなく、作業員が一見して作業内容を理解できるようにシンプルな表示にする。ノート型コンピュータ端末又はタブレット端末を作業員が手に持って作業すると、作業の効率を悪化させてしまうが、携帯端末140が腕時計型又はめがね型のウェアラブル端末であれば、両手が空くため、作業効率を落とさずに作業支援することができる。また、携帯端末140がウェアラブル端末であれば、小型かつ安価であるため、作業員一人一人に持たせやすい。
 実施の形態1では、RFID機能を備えたウェアラブル端末である携帯端末140と、作業員ごとに作業計画を管理する作業管理サーバ100とにより、各作業員が自分の作業計画のみをいつでもどこでも確認できるため、効率のよい作業を実現できる。
 次に、端末表示部146における作業計画情報の表示方法と、作業管理サーバ100の作業員の作業進捗情報を更新する方法とについて説明する。図12は、実施の形態1にかかる遠隔作業支援システムで端末表示部に作業計画情報を表示し、作業管理サーバで作業員の作業進捗情報を更新する際の携帯端末の動作の流れを示すフローチャートである。図13は、実施の形態1にかかる遠隔作業支援システムで端末表示部に作業計画情報を表示し、作業管理サーバで作業員の作業進捗情報を更新する際の認証装置の動作の流れを示すフローチャートである。図14は、実施の形態1にかかる遠隔作業支援システムで端末表示部に作業計画情報を表示し、作業管理サーバで作業員の作業進捗情報を更新する際の作業管理サーバの動作の流れを示すフローチャートである。
 作業員は、現在の作業項目の作業が完了したら、自分の携帯端末140の端末表示部146に表示されている完了ボタン404を押下する操作を行う。ステップS111で、作業工程管理部144は、完了ボタン404を押下する操作が行われたかを確認する。完了ボタン404を押下する操作が行われたならば、ステップS111でYesとなり、ステップS112で、作業工程管理部144は、作業計画格納部143内の作業計画情報の現在の作業項目の進捗状態を「済」にする。そして、ステップS113で、作業工程管理部144は、携帯端末140に内蔵されているタイマ145が管理している現在時刻の時刻情報を取得する。その後、ステップS114で、作業工程管理部144は、現在の作業項目及び次の作業項目を作業計画格納部143から検索する。そして、ステップS115で、作業工程管理部144は、現在の作業項目及び次の作業項目を端末表示部146に表示する。
 作業員が現在の作業項目を完了しておらず、完了ボタン404を押下する操作が行われていない場合は、ステップS111でNoとなり、ステップS116で作業工程管理部144は、現在時刻の時刻情報をタイマ145から取得する。ステップS115又はステップS116ののち、ステップS117で、作業工程管理部144は、作業に遅延が生じているか否かを判断する。作業に遅延が生じているか否かの判断は、作業計画格納部143に格納されている作業計画情報300の作業開始時刻304及び作業終了時刻305とステップS113又はステップS116でタイマ145から取得した現在時刻の時刻情報とを比較することによって行う。
 作業に遅延が発生しているならば、ステップS117でYesとなり、ステップS118で作業工程管理部144は、端末表示部146に表示されている現在の作業項目402を点滅させたり表示色を変えたりすることで、作業員に対して作業遅延を警告する。
 図15は、実施の形態1にかかる遠隔作業支援システムの作業計画表示画面の一例を示す図である。図16は、実施の形態1にかかる遠隔作業支援システムの作業計画表示画面の一例を示す図であり、図15の完了ボタン404が押下された後の作業計画表示画面400を示している。作業員が現在の作業項目402を完了させ、完了ボタン404を押下する操作を行うと、作業工程管理部144が作業計画格納部143内の現在の作業項目の進捗状態を「済」とすることにより、現在時刻に対応した作業項目が端末表示部146に表示される。すなわち、図16においては、図15で次の作業項目403の欄に表示されていた「製品Aの組立て」が現在の作業項目402の欄に表示されるとともに、作業計画情報300に基づいて、次の作業項目403の欄には「装置Bの開始前点検」が表示されている。
 ステップS119で、作業工程管理部144は、認証装置120の近距離無線通信可能範囲に入ったかを確認する。また、ステップS131で、認証装置120は、近距離無線通信可能範囲に携帯端末140が入ったかを確認する。作業員が携帯端末140を認証装置120に近づけると、ステップS119及びステップS131でYesとなり、ステップS120及びステップS132で、認証装置近距離無線通信部123と端末近距離無線通信部141とが互いに通信を開始する。認証装置120の近距離無線通信可能範囲に入っていなければ、ステップS119でNoとなり、ステップS111に進む。
 通信開始後、ステップS121で、携帯端末140の作業工程管理部144は、作業計画格納部143の各作業項目の進捗状態を抽出する。そして、ステップS122で、作業工程管理部144は、抽出した各作業項目の進捗状態と、作業員識別子又は作業員が所有する携帯端末140の端末識別子とを含むパラメータが付与された作業計画更新コマンドを、端末近距離無線通信部141を用いて認証装置120へ送信する。
 なお、認証装置近距離無線通信部123の近距離無線通信可能範囲に携帯端末140が入った際に、作業計画取得コマンドを送信するか作業計画更新コマンドを送信するかは、作業計画格納部143に作業計画情報が格納されているか否かに基づいて決定することができる。
 ステップS133で、認証装置通信コマンド解析部122は、携帯端末140からのコマンドを受信及び解析し、作業計画更新コマンドであることを認識する。ステップS134で、作業進捗報告部124は、作業管理サーバ100の作業進捗入力部105に対して作業員識別子又は作業員が所有する携帯端末140の端末識別子に関連づけられた作業計画の更新を要求する。
 ステップS141で、作業進捗入力部105は、全作業計画格納部102の作業員識別子又は端末識別子に関連づけされた作業計画情報300の作業進捗309を、パラメータに示される進捗状態に更新する。
 プロジェクトリーダは、作業管理サーバ100の作業進捗確認部104により、各作業員の作業進捗を確認することができる。作業進捗確認部104は、作業管理サーバ100がコンピュータ上で起動するソフトウェアによって実現される。作業進捗確認部104は、全作業計画格納部102に格納された作業計画情報を表示するビューワによって実現可能である。
 図17は、実施の形態1にかかる遠隔作業支援システムの作業進捗確認部がプロジェクトリーダに提供する作業進捗確認画面の一例を示す図である。作業進捗確認画面700には、現在時刻701に加え、作業進捗状態702が表示される。作業進捗状態702は、作業者名703、作業内容704、作業終了予定時刻705及び作業進捗706が表形式で表示されている。なお、図17では、作業進捗状態702を表形式で表示しているが、グラフを使用してグラフィカルな形式で表示してもよい。
 上記のように、実施の形態1によれば、RFID機能を備えたウェアラブル端末である携帯端末140と、作業員ごとに作業計画を管理する作業管理サーバ100とにより、プロジェクトリーダが各作業員の作業進捗を確認することができるため、作業員ごとに適した指示を出したり、作業員ごとに指摘を個別に出したり、作業員の技量を把握したりすることができる。
 実施の形態1にかかる遠隔作業支援システム900によれば、各作業員は自分の作業計画だけを携帯端末140に取得して表示できる。携帯端末140に自分の作業計画のみを取得するため、全作業員の作業計画を取得する場合と比較して近距離無線通信での通信量を低減できる。また、携帯端末140に自分の作業計画のみを取得することにより、携帯端末140が画面の小さいウェアラブル端末であっても、見やすく表示することができる。
実施の形態2.
 図18は、本発明の実施の形態2にかかる遠隔作業支援システムの構成を示す図である。実施の形態2にかかる遠隔作業支援システム910は、携帯端末140と同種の近距離無線通信機能を有する表示器160をさらに有して構成される。表示器160は、イーサネット(登録商標)のようなネットワークによって作業管理サーバ110に接続されている。表示器160は、操作用端末又は液晶モニタをプログラマブルロジックコントローラに接続して構成可能である。表示器160は、生産ライン又は作業対象装置に複数設置可能である。
 図19は、実施の形態2にかかる遠隔作業支援システムの作業管理サーバ、認証装置、表示器及び携帯端末の機能構成を示す図である。作業管理サーバ110は、実施の形態1の作業管理サーバ100と比較すると、作業マニュアル格納部106及びマニュアル検索部107を更に有する点で相違している。認証装置120及び携帯端末140は、実施の形態1と同様である。作業マニュアルは、装置の操作方法を詳細に記したドキュメントファイルであり、作業マニュアル格納部106は、ハードディスク又はフラッシュメモリのような記録媒体である。表示器160は、無線通信で端末近距離無線通信部141と情報をやり取りする表示器近距離無線通信部163と、表示器近距離無線通信部163で受信した情報からコマンドを抽出する表示器通信コマンド解析部162と、表示器通信コマンド解析部162が詳細作業計画取得コマンドを抽出したならば、作業管理サーバ110に対し作業員の作業計画情報を要求し、作業管理サーバ110から作業員の作業計画情報を取得する詳細作業計画要求部161と、表示器通信コマンド解析部162がマニュアル取得コマンドを抽出したならば、作業管理サーバ110に対し特定の装置の作業マニュアルを要求し、作業管理サーバ110から装置の作業マニュアルを取得するマニュアル取得部164と、詳細作業計画要求部161が取得した作業計画情報及びマニュアル取得部164で取得した作業マニュアルを表示する表示器表示部165とを備える。
 図20は、実施の形態2にかかる遠隔作業支援システムの表示器を実現する情報処理装置のハードウェア構成を示す図である。情報処理装置40は、プログラムを実行する演算装置41と、演算装置41がワークエリアに用いるメモリ42と、情報を表示する表示装置44と、近距離無線通信用のアンテナ45と、情報を記憶する記憶装置46とを備える。情報処理装置40は、近距離無線通信用のアンテナを設けたプログラマブル表示器を適用可能である。また、プログラマブルロジックコントローラと、液晶モニタと、非接触ICチップリーダライタとを組み合わせたものを情報処理装置40に適用してもよい。すなわち、情報処理装置40は、一体型の装置に限られることはなく、複数の装置を組み合わせて構成することもできる。
 情報処理装置40は、演算装置41がメモリ42をワークエリアに用いて、ソフトウェアを実行することによって表示器160となっている。すなわち、図19に示した詳細作業計画要求部161、表示器通信コマンド解析部162及びマニュアル取得部164は、演算装置41が記憶装置46に記憶されたファームウェアを実行することによって実現される。また、複数の演算装置及び複数のメモリが連携して上記機能を実行してもよい。表示器近距離無線通信部163は、演算装置41とアンテナ45とを用いて実現される。表示器表示部165は、表示装置44によって実現される。
 作業員が自分の作業計画情報を認証装置120経由で作業管理サーバ110から携帯端末140に取得し、作業計画格納部143に格納する動作は実施の形態1において説明した通りである。
 図21は、実施の形態2にかかる遠隔作業支援システムの端末表示部における作業計画表示画面の一例を示す図である。実施の形態2では、端末表示部146に表示する作業計画表示画面400に、マニュアルボタン405が含まれている。
 図22は、実施の形態2にかかる遠隔作業支援システムで表示器に作業計画情報又は作業マニュアルを表示する際の携帯端末の動作の流れを示すフローチャートである。図23は、実施の形態2にかかる遠隔作業支援システムで表示器に作業計画情報又は作業マニュアルを表示する際の表示器の動作の流れを示すフローチャートである。図24は、実施の形態2にかかる遠隔作業支援システムで表示器に作業計画情報又は作業マニュアルを表示する際の作業管理サーバの動作の流れを示すフローチャートである。ステップS211で、携帯端末140の作業計画取得部142は、表示器160の近距離無線通信可能範囲に入ったか否かを確認する。また、ステップS221で、表示器160は、近距離無線通信可能範囲に携帯端末140が入ったかを確認する。作業員が携帯端末140を表示器160に近づけると、ステップS211及びステップS221でYesとなり、ステップS212及びステップS222で、端末近距離無線通信部141と表示器近距離無線通信部163とが互いに通信を開始する。
 通信が開始されると、ステップS213で、作業工程管理部144は、マニュアルボタン405を押下する操作が行われているかを確認する。マニュアルボタン405を押下する操作が行われていれば、ステップS213でYesとなり、ステップS214で、作業工程管理部144は、現在の作業対象装置の装置識別子を含むパラメータを付与したマニュアル取得コマンドを表示器160に送信する。一方、マニュアルボタン405を押下する操作が行われていなければ、ステップS213でNoとなり、ステップS215で、作業工程管理部144は、端末近距離無線通信部141を通じて、作業員識別子又は携帯端末140の端末識別子を含むパラメータを付与した作業計画取得コマンドを表示器160に送信する。
 ステップS223において、表示器通信コマンド解析部162は、携帯端末140からのコマンドを受信及び解析する。携帯端末140から受信したコマンドが作業計画取得コマンドであれば、ステップS224でYesとなり、ステップS225で、詳細作業計画要求部161は、作業管理サーバ110の作業計画検索部103に対し、作業員識別子又は携帯端末140の端末識別子に関連付けられた作業計画の取得を要求する。携帯端末140から受信したコマンドがマニュアル取得コマンドであれば、ステップS224でNoとなり、ステップS226でマニュアル取得部164は、作業管理サーバ110のマニュアル検索部107に対し、現在の作業対象装置の装置識別子に関連付けられた作業マニュアルの取得を要求する。
 ステップS231で、作業計画検索部103は、表示器160から作業計画情報の取得を要求されたかを確認する。表示器160から作業計画情報の取得を要求されたのであれば、ステップS231でYesとなり、ステップS232で、作業計画検索部103は、全作業計画格納部102の作業員情報200の中から、作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた作業計画302を検索する。ステップS233で、作業計画検索部103は、作業員情報200の中に作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた情報があったかを確認する。作業員情報200の中に作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた情報が無ければ、ステップS233でNoとなり、作業計画検索部103は、ステップS235で作業計画の取得に失敗したことを詳細作業計画要求部161に通知する。一方、作業員情報200の中に作業計画取得コマンドに付与されたパラメータ内の作業員識別子又は端末識別子に関連付けられた情報があれば、ステップS233でYesとなり、ステップS234で、作業計画検索部103は、作業計画情報300を読み出し、詳細作業計画要求部161に送信する。
 表示器160から作業計画情報の取得を要求されたのでなければ、ステップS231でNoとなり、ステップS236で、マニュアル検索部107は、作業マニュアル格納部106の中から、装置識別子に関連づけられた作業マニュアルを検索する。そして、ステップS237でマニュアル検索部107は、作業マニュアル格納部106から読み出した作業マニュアルを、マニュアル取得部164に送信する。
 ステップS227で、表示器160は、作業管理サーバ110から受信した情報を表示器表示部165に表示する。
 上記の処理により、表示器表示部165には、携帯端末140の端末表示部146には表示しきれない詳細な情報が表示される。図25は、実施の形態2にかかる遠隔作業支援システムの表示器表示部における詳細作業計画表示画面の一例を示す図である。詳細作業計画表示画面800には、作業員名801、日付802、作業計画803、作業開始時刻804、作業終了時刻805、作業概要806、作業詳細807、作業対象装置808、作業進捗809及び現在時刻810が表示されている。すなわち、作業計画情報300の全ての項目が詳細作業計画情報の表示画面800に表示されている。表示器表示部165は、ウェアラブル端末である携帯端末140の端末表示部146よりも大画面であるため、端末表示部146で表示すると視認性が低下してしまう情報も含めて作業計画情報を表示できる。
 上記のように、実施の形態2では、作業員の現在の作業に関連する情報であるが小さい画面では見にくい詳細な作業計画情報及び作業マニュアルを、携帯端末140を表示器160に近づけるだけで表示器表示部165に表示できる。したがって、慣れない作業をする場合、又は作業内容を忘れてしまった場合でも、作業員は作業を補う情報を簡単に見ることができ、作業の効率化を図り、ヒューマンエラーを防止することができる。
 以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。
 10,20,30,40 情報処理装置、11,21,31,41 演算装置、12,22,32,42 メモリ、13,33 入力装置、14,34,44 表示装置、15,24 通信装置、16,25,36,46 記憶装置、23,45 アンテナ、35 非接触ICチップ、37 リアルタイムクロック及び高精度イベントタイマ、100 作業管理サーバ、101 作業計画入力部、102 全作業計画格納部、103 作業計画検索部、104 作業進捗確認部、105 作業進捗入力部、106 作業マニュアル格納部、107 マニュアル検索部、120 認証装置、121 作業計画要求部、122 認証装置通信コマンド解析部、123 認証装置近距離無線通信部、124 作業進捗報告部、140 携帯端末、141 端末近距離無線通信部、142 作業計画取得部、143 作業計画格納部、144 作業工程管理部、145 タイマ、146 端末表示部、147 識別子格納部、160 表示器、161 詳細作業計画取得部、162 表示器通信コマンド解析部、163 表示器近距離無線通信部、164 マニュアル取得部、165 表示器表示部、200 作業員情報、201,301 作業員識別子、202,801 作業員名、203 端末識別子、300 作業計画情報、302,803 作業計画、303 作業実施日、304,804 作業開始時刻、305,805 作業終了時刻、306,806 作業概要、307,807 作業詳細、308,808 作業対象装置、309,809 作業進捗、400 作業計画表示画面、401,810 現在時刻、402 現在の作業項目、403 次の作業項目、404 完了ボタン、405 マニュアルボタン、800 詳細作業計画表示画面、802 日付、900,910 遠隔作業支援システム。

Claims (6)

  1.  作業員ごとの作業計画を示す作業計画情報を格納する全作業計画格納部と、前記作業計画情報を前記全作業計画格納部に格納する作業計画入力部と、前記全作業計画格納部に格納された作業計画情報の中から、要求された作業員の作業計画情報を検索する作業計画検索部とを備えた作業管理サーバと、
     無線通信で情報をやり取りする認証装置近距離無線通信部と、前記認証装置近距離無線通信部で受信した情報からコマンドを抽出する認証装置通信コマンド解析部と、前記認証装置通信コマンド解析部が作業計画取得コマンドを抽出したならば、前記作業管理サーバに対し前記作業計画取得コマンドによって指定された作業員の作業計画情報を要求し、要求した作業員の作業計画情報を前記作業管理サーバから取得する作業計画要求部とを備えた認証装置と、
     前記作業計画情報を格納する作業計画格納部と、無線通信で前記認証装置近距離無線通信部と情報をやり取りする端末近距離無線通信部と、前記認証装置近距離無線通信部の近距離無線通信可能範囲に入ると、前記端末近距離無線通信部経由で前記認証装置に作業員の作業計画情報を要求する前記作業計画取得コマンドを含む情報を送信し、要求した作業員の前記作業計画情報を前記認証装置から取得して前記作業計画格納部に格納する作業計画取得部と、前記作業計画取得部が取得した前記作業計画情報が示す作業計画を表示する端末表示部とを備えた携帯端末とを有することを特徴とする遠隔作業支援システム。
  2.  前記携帯端末は、
     現在時刻の時刻情報を生成するタイマと、
     前記時刻情報と前記作業計画格納部に格納された前記作業計画情報とに基づいて、作業の指示及び遅れ警告を前記端末表示部に表示する作業工程管理部とを備えることを特徴とする請求項1に記載の遠隔作業支援システム。
  3.  前記携帯端末は、
     前記認証装置近距離無線通信部の近距離無線通信可能範囲に入ったら、前記作業員の作業進捗情報を通知する作業計画更新コマンドを含む情報を前記端末近距離無線通信部経由で前記認証装置に送信する前記作業工程管理部を備え、
     前記認証装置は、
     前記認証装置通信コマンド解析部が作業計画更新コマンドを抽出したならば、前記作業管理サーバに対し前記作業員の作業計画情報の更新を要求する作業進捗報告部を備え、
     前記作業管理サーバは、
     前記作業進捗報告部から作業進捗情報を受信したならば、前記全作業計画格納部に格納された前記作業計画情報のうち受信した作業進捗情報に対応する前記作業計画情報を更新する作業進捗入力部と、
     前記全作業計画格納部に格納された更新後の作業計画情報を表示する作業進捗確認部とを備えることを特徴とする請求項1又は2に記載の遠隔作業支援システム。
  4.  無線通信で前記端末近距離無線通信部と情報をやり取りする表示器近距離無線通信部と、
     前記表示器近距離無線通信部で受信した情報からコマンドを抽出する表示器通信コマンド解析部と、
     前記表示器通信コマンド解析部が詳細作業計画取得コマンドを抽出したならば、前記作業管理サーバに対し前記作業員の作業計画情報を要求し、前記作業管理サーバから前記作業員の作業計画情報を取得する詳細作業計画要求部と、
     前記詳細作業計画要求部が取得した作業計画情報を表示する表示器表示部とを備えた表示器をさらに有し、
     前記作業計画取得部は、
     前記携帯端末が、前記表示器近距離無線通信部の近距離無線通信可能範囲に入ったら、前記作業員の作業計画情報を要求する詳細作業計画取得コマンドを含む情報を前記端末近距離無線通信部経由で前記表示器に送信することを特徴とする請求項1又は2に記載の遠隔作業支援システム。
  5.  無線通信で前記端末近距離無線通信部と情報をやり取りする表示器近距離無線通信部と、
     前記表示器近距離無線通信部で受信した情報からコマンドを抽出する表示器通信コマンド解析部と、
     前記表示器通信コマンド解析部がマニュアル取得コマンドを抽出したならば、前記作業管理サーバに対し特定の装置の作業マニュアルを要求し、前記作業管理サーバから前記装置の作業マニュアルを取得するマニュアル取得部と、
     前記マニュアル取得部で取得した作業マニュアルを表示する表示器表示部とを備えた表示器を有し、
     前記作業管理サーバは、
     装置の点検及び操作の方法を示す作業マニュアルを格納する作業マニュアル格納部と、
     前記作業マニュアル格納部に格納された作業マニュアルから要求された装置の作業マニュアルを検索するマニュアル検索部とを備え、
     前記携帯端末は、
     前記表示器近距離無線通信部の近距離無線通信可能範囲に入ったならば、前記端末近距離無線通信部経由で現在の作業で作業員が使用する装置の作業マニュアルを要求する前記マニュアル取得コマンドを前記表示器に送信する作業工程管理部を備えることを特徴とする請求項1に記載の遠隔作業支援システム。
  6.  前記携帯端末は、現在時刻の時刻情報を生成するタイマを備え、
     前記作業工程管理部は、前記時刻情報と前記作業計画格納部に格納された前記作業計画情報とに基づいて、作業の指示及び遅れ警告を前記端末表示部に表示することを特徴とする請求項5に記載の遠隔作業支援システム。
PCT/JP2015/057017 2015-03-10 2015-03-10 遠隔作業支援システム WO2016143069A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2017504484A JP6157774B2 (ja) 2015-03-10 2015-03-10 遠隔作業支援システム
CN201580077545.5A CN107430713B (zh) 2015-03-10 2015-03-10 远程作业辅助系统
PCT/JP2015/057017 WO2016143069A1 (ja) 2015-03-10 2015-03-10 遠隔作業支援システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/057017 WO2016143069A1 (ja) 2015-03-10 2015-03-10 遠隔作業支援システム

Publications (1)

Publication Number Publication Date
WO2016143069A1 true WO2016143069A1 (ja) 2016-09-15

Family

ID=56878675

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/057017 WO2016143069A1 (ja) 2015-03-10 2015-03-10 遠隔作業支援システム

Country Status (3)

Country Link
JP (1) JP6157774B2 (ja)
CN (1) CN107430713B (ja)
WO (1) WO2016143069A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019149108A (ja) * 2018-02-28 2019-09-05 エヌ・ティ・ティ・コミュニケーションズ株式会社 工程管理システム、工程管理方法、及びプログラム
JP2020135098A (ja) * 2019-02-14 2020-08-31 三機工業株式会社 施工管理システムおよび施工管理方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113272747A (zh) * 2019-01-09 2021-08-17 松下知识产权经营株式会社 工序管理系统、工序管理方法和程序
TWI754131B (zh) * 2019-02-27 2022-02-01 鉅祥企業股份有限公司 工序管理系統及工序管理方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002328716A (ja) * 2001-05-07 2002-11-15 Komatsu Ltd 作業管理システム
JP2003006298A (ja) * 2001-06-21 2003-01-10 Matsushita Electric Works Ltd 倉庫内作業指示方法及びシステム
JP2012003721A (ja) * 2010-06-21 2012-01-05 Toshiba It & Control Systems Corp 作業指示表示及び実績収集システムとその方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955788A (zh) * 2014-04-18 2014-07-30 佛山市南海绿电再生能源有限公司 一种用于垃圾中转运输作业的调度系统及其操作方法
CN104240022A (zh) * 2014-09-04 2014-12-24 奇瑞重工股份有限公司 农机车载终端以及农机调度方法、系统和服务器

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002328716A (ja) * 2001-05-07 2002-11-15 Komatsu Ltd 作業管理システム
JP2003006298A (ja) * 2001-06-21 2003-01-10 Matsushita Electric Works Ltd 倉庫内作業指示方法及びシステム
JP2012003721A (ja) * 2010-06-21 2012-01-05 Toshiba It & Control Systems Corp 作業指示表示及び実績収集システムとその方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019149108A (ja) * 2018-02-28 2019-09-05 エヌ・ティ・ティ・コミュニケーションズ株式会社 工程管理システム、工程管理方法、及びプログラム
JP2020135098A (ja) * 2019-02-14 2020-08-31 三機工業株式会社 施工管理システムおよび施工管理方法
JP7373907B2 (ja) 2019-02-14 2023-11-06 三機工業株式会社 施工管理システムおよび施工管理方法

Also Published As

Publication number Publication date
CN107430713B (zh) 2019-03-26
JPWO2016143069A1 (ja) 2017-04-27
CN107430713A (zh) 2017-12-01
JP6157774B2 (ja) 2017-07-05

Similar Documents

Publication Publication Date Title
AU2021201311B2 (en) Method and system for monitoring operation of instruments using a transceiver over a communication network
JP6157774B2 (ja) 遠隔作業支援システム
JP5092800B2 (ja) フィールド機器管理装置
EP3073632B1 (en) Trace-data recording system, trace-data recording server, trace-data recording method, program, and information storage medium
US7568164B2 (en) Service providing system and service providing device that provides a specific service in response to user authority determination based on positional relationships of virtual objects
JP5302290B2 (ja) 看護支援システム
TWI638330B (zh) Information processing device, information processing method, program and recording medium
JP6689041B2 (ja) 金型管理システム
JP2017004279A (ja) 情報収集システム、情報収集端末装置、情報収集サーバ装置、及び情報収集方法
JP2014220726A (ja) 検針システム
JP2018081713A (ja) 情報収集システム、情報収集端末装置、情報収集サーバ装置、及び情報収集方法
CN103324651A (zh) 信息处理装置、信息处理系统及信息处理方法
JP2005280473A (ja) 車両の検査管理システム
JP2008204339A (ja) 作業状況管理システム
EP3886112A1 (en) Method and devices for tracking laboratory resources
JP2020098436A (ja) 携帯端末装置、情報管理システム、および、ユーザ端末プログラム
JP6235837B2 (ja) 作業支援システムとその方法
EP3929843A1 (en) Harmonizing data
CN110757451B (zh) 一种机器人控制方法及装置
JP2008217092A (ja) 電子バリュー管理システム、電子バリュー管理装置、携帯端末、及びコンピュータプログラム
JP6318700B2 (ja) 情報処理システム、その制御方法、及びプログラム
JP3191736U (ja) サービス支援システム
JP2020095676A (ja) 管理装置、管理方法、管理プログラム
WO2015162769A1 (ja) プログラマブルロジックコントローラ
JP2002216012A (ja) 情報取得装置、情報管理装置および情報提供システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15884561

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017504484

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15884561

Country of ref document: EP

Kind code of ref document: A1