WO2016117257A1 - 電力系統監視制御システム - Google Patents

電力系統監視制御システム Download PDF

Info

Publication number
WO2016117257A1
WO2016117257A1 PCT/JP2015/085486 JP2015085486W WO2016117257A1 WO 2016117257 A1 WO2016117257 A1 WO 2016117257A1 JP 2015085486 W JP2015085486 W JP 2015085486W WO 2016117257 A1 WO2016117257 A1 WO 2016117257A1
Authority
WO
WIPO (PCT)
Prior art keywords
monitoring
control
information
authority
power
Prior art date
Application number
PCT/JP2015/085486
Other languages
English (en)
French (fr)
Inventor
稲垣 淳一
ビエットホアー レー
眞稔 島田
寿臣 新宮
和郎 沢崎
浩二 伴
洋一 巴
Original Assignee
株式会社 東芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝 filed Critical 株式会社 東芝
Publication of WO2016117257A1 publication Critical patent/WO2016117257A1/ja
Priority to PH12017501325A priority Critical patent/PH12017501325A1/en

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Definitions

  • This relates to a power system monitoring and control system that can be operated flexibly in a wide area integrated environment.
  • a power system monitoring and control system divides a power facility arranged in an electric station or the like according to a region or a voltage class, and provides a plurality of monitoring control bases for monitoring and controlling the power facility such as a control station. Assign jurisdiction. For this reason, only the power equipment under the jurisdiction of a specific monitoring control base is monitored and controlled, and the monitoring control bases are in an independent state. However, in recent power system monitoring and control systems, it has become possible to integrate independent monitoring and control bases by wide area IP (Internet Protocol) network technology.
  • IP Internet Protocol
  • Patent Document 1 various wide-area distributed systems that are operated in a wide-area integrated environment have also been developed in power system monitoring and control systems.
  • the monitoring information of the power equipment is grasped at the plurality of monitoring control bases, and the control of the power equipment from the plurality of monitoring control bases is performed, thereby efficiently controlling the jurisdiction of the monitoring control base with respect to the power equipment.
  • An object of the present invention is to provide a power system monitoring and control system that can be changed and can be operated dynamically and flexibly.
  • an embodiment of the present invention receives a plurality of electric stations where power equipment for transmitting monitoring information and receiving control information is arranged, and receives monitoring information for the power equipment and controls information. And a monitoring control device for transmitting and receiving monitoring information and control information of the power equipment via a wide area network to the power management equipment and the monitoring control base.
  • the monitoring control base comprises the following components.
  • a monitoring flag setting unit that sets a monitoring flag that associates the power equipment with each monitoring control base.
  • a monitoring information receiving unit that receives monitoring information of the power equipment from the monitoring control device.
  • a monitoring information determination unit that determines whether the monitoring information needs to be output based on whether or not the monitoring flag is set for the power equipment that is the transmission source of the monitoring information.
  • a monitoring information output unit that outputs the monitoring information at the monitoring control base based on the determination result of the monitoring information determination unit.
  • a control flag setting unit that sets a control flag that associates the power equipment with each monitoring control base.
  • a control information input unit for inputting control information of the power equipment.
  • a control information determination unit that determines whether or not transmission of the control information is necessary depending on whether or not the control flag is set for the power facility that is the transmission destination of the control information.
  • a control information transmission unit that transmits the control information from the monitoring control base to the power facility based on a determination result of the control information determination unit.
  • the block diagram which shows the structure of 1st Embodiment The block diagram which shows the structure of the console of 1st Embodiment.
  • the block diagram which shows the structure of the monitoring control apparatus of 1st Embodiment The block diagram which shows the structure of the console of 2nd Embodiment.
  • the block diagram which shows the structure of the console of 3rd Embodiment The block diagram which shows the structure of the console of 4th Embodiment.
  • the block diagram which shows the structure of the console of 5th Embodiment The figure which shows the example of a display of the monitor of 6th Embodiment.
  • the block diagram which shows the structure of the console of 6th Embodiment The figure which shows the example of a display of the monitor of 7th Embodiment.
  • FIG. 1 is a block diagram showing the configuration of the system of the first embodiment
  • FIG. 2 is a block diagram showing the configuration of the console in the first embodiment
  • FIG. 3 shows the configuration of the monitoring control device in the first embodiment. It is a block diagram.
  • the power system supervisory control system includes four supervisory control bases 1 to 4, two wide area network networks 5 and 7, a supervisory control device 6, and an electrical station 8 to a substation. 11 is provided. Power facilities 12 to 14 are disposed at the electrical station 8, power facilities 15 to 18 are disposed at the electrical station 9, power facilities 19 and 20 are disposed at the electrical station 10, and power facilities 21 are disposed at the electrical station 11. To 23 are arranged. An operation console 24 and a system monitoring panel 25 are installed in each of the supervisory control bases 1 to 4.
  • the console 24 has an input device such as a keyboard on which an operator performs input processing, and the control information of the power equipment 12 to 23 to be controlled is input by these input devices. .
  • the console 24 has a display panel for outputting and displaying monitoring information of any of the power facilities 12 to 23.
  • the system monitoring board 25 is used by an operator or the like to monitor a change in the state of the power system, and has a display device.
  • the monitoring information of the power facilities 12 to 23 output and displayed on the display panel by the console 24 and the control information of the power facilities 12 to 23 input by the input device will be described.
  • the monitoring information of the power facilities 12 to 23 is information representing the state change of each power facility 12 to 23, and is transmitted from the power facilities 12 to 23.
  • the monitoring information is transmitted and received in the power system monitoring and control system as shown by the solid arrows in FIG. That is, the monitoring information is transmitted from the power facilities 12 to 23 of the electric stations 8 to 11 to the console 24 of the supervisory control bases 1 to 4 via the wide area network 7, the monitoring control device 6 and the wide area network 5. Sent.
  • the monitoring information of the power facilities 12 to 23 output and displayed on the display panel of the console 24 is not the monitoring information of all the power facilities 12 to 23, but the power facilities 12 to 23 whose output is permitted by the monitoring authority described later. It is limited only to the monitoring information. For example, if the console 24 of the supervisory control base 1 is authorized to monitor only the power equipment 12, only the monitoring information of the power equipment 12 is displayed on the display panel of the console 24 of the supervisory control base 1. Will be displayed.
  • the monitoring information of the power facilities 12 to 23 is output and displayed on the display device of the system monitoring panel 25 in addition to the display panel of the console 24.
  • the display mode of the monitoring information can be selected as appropriate as long as it represents a change in the state of the power facilities 12 to 23.
  • As a display mode of the monitoring information for example, an alarm or a message for calling attention is displayed with flicker or the like.
  • the control information of the power facilities 12 to 23 is a control command for the power facilities 12 to 23, for example.
  • the flow of control information is indicated by rough dotted arrows in FIG. 1 in the power system monitoring control system. That is, the control information is sent from the supervisory control bases 1 to 4 to the power facilities 12 to 23 of the electric stations 8 to 11 via the wide area network 5, the monitoring control device 6, and the wide area network 7.
  • the control information of the power facilities 12 to 23 input from the console 24 is sent only to the power facilities 12 to 23 that are permitted to be transmitted by the control authority described later. For example, if the console 24 of the supervisory control base 1 is authorized to control only the power equipment 12, the control information from the console 24 of the supervisory control base 1 is transmitted only to the power equipment 12. Will be.
  • the monitoring authority regarding the output of the monitoring information of the power facilities 12 to 23 and the control authority regarding the transmission of the control information of the power facilities 12 to 23 will be described.
  • the monitoring authority of the power facilities 12 to 23 is an authority to output only the monitoring information of the power facilities 12 to 23 associated with the monitoring control bases 1 to 4 at each of the monitoring control bases 1 to 4.
  • the monitoring authority is an authority that defines which of the monitoring control bases 1 to 4 monitors which of the power facilities 12 to 23 of the electric stations 8 to 11.
  • the control authority of the power facilities 12 to 23 is an authority to transmit control information to the power facilities 12 to 23 associated with the monitoring control bases 1 to 4 from the monitoring control bases 1 to 4.
  • the control authority is an authority that defines which of the monitoring control bases 1 to 4 controls which of the power facilities 12 to 23 of the electric stations 8 to 11.
  • Information regarding the monitoring authority and the control authority of these power facilities 12 to 23 is stored in the monitoring authority data file 109 and the control authority data file 106 shown in FIG. Further, the monitoring authority and the control authority of the power facilities 12 to 23 can be changed by the change input means 104 provided on the console 24, and the information related to the changed monitoring authority and the control authority is changed to the monitoring authority change information and control. This is called authority change information.
  • the thin dotted arrows shown in FIG. 1 indicate the flow of such monitoring authority change information and control authority change information (hereinafter referred to as “monitoring / control authority change information”). Instead of being sent to the supervisory control device 6 via 5, the supervisory control bases 1 to 4 exchange with each other.
  • the monitoring flag is a data storage area indicating “authorized” with respect to the output of monitoring information of the power equipment 12 to 23, and the monitoring control base that monitors the power equipment 12 to 23 by setting this area. Is confirmed. For example, when the contents of the monitoring authority data file (shown in FIG. 2) is a data table, the monitoring flag is indicated by “1” in the data table (see Table 1 described later).
  • control flag that associates the power equipment 12 to 23 with each of the monitoring control bases 1 to 4 is set.
  • the control flag is a data storage area indicating “authorized” with respect to transmission of control information of the power facilities 12 to 23, and the monitoring control base that controls the power facilities 12 to 23 by setting the control flag. Is confirmed.
  • the control flag is also indicated by “1” in the data table (see Table 2 described later).
  • the monitoring flag and control flag setting unit as described above includes a monitoring / control authority change input unit 104 for inputting monitoring authority and control authority change information of the power facilities 12 to 23, and It comprises monitoring / control authority changing means 107 (both shown in FIG. 2) for changing the monitoring authority and the control authority based on the input change information of each authority. That is, the monitoring flag and the control flag are set when the operator performs an input operation using the monitoring / control authority change input unit 104.
  • the power facilities 12 to 23 installed in the electric stations 8 to 11 are facilities for changing the configuration of the power system using a transformer, a switch, or the like.
  • the wide area networks 5 and 7 use IP (Internet Protocol) to monitor information (solid arrows in FIG. 1) indicating the state changes of the power facilities 12 to 23 and control information for the power facilities 12 to 23 (coarse in FIG. 1). It carries a dotted arrow).
  • the supervisory control device 6 connects the supervisory control bases 1 to 4 and the electric stations 8 to 11 via the wide area network networks 5 and 7, and monitors the power facilities 12 to 23 between the wide area network networks 5 and 7. It is a device that exchanges information and control information.
  • the configuration of the console 24 at the supervisory control bases 1 to 4 will be described with reference to FIG.
  • the configuration of the console 24 is common to the supervisory control bases 1 to 4.
  • FIG. 2 the structure of the console 24 of the supervisory control base 1 is shown.
  • the console 24 is provided with two each of input means, output means, reception means, transmission means, authority data file, and information determination means, and is provided with one authority change means.
  • the two input means in the console 24 are the control information input means 102 for the operator to input the control information of the power facilities 12 to 23, and the operator input the change information for the monitoring authority and the change information for the control authority.
  • These input means include an input device such as a keyboard connected to the console 24.
  • Two output means in the console 24 are an error information output means 101 and a monitoring information output means 103.
  • the error information output means 101 outputs and displays error information indicating that the local site does not have control authority or that the input control information is not transmitted on the display panel of the console 24 and the display device of the system monitoring panel 25.
  • the monitoring information output means 103 outputs the monitoring information of the power facilities 12 to 23 to the display panel of the console 24 and the display device of the system monitoring panel 25 according to the determination of the monitoring information determination means 108 described later.
  • the two transmission means in the console 24 are a control information transmission means 110 and a monitoring / control authority change information transmission means 112.
  • the control information transmission unit 110 transmits the control information of the power facilities 12 to 23 to the wide area network 5 according to the determination of the control information determination unit 105 described later.
  • the monitoring / control authority change information transmitting unit 112 sends power facilities 12 to 23 to other monitoring control bases other than the own base (for example, if the monitoring control base 1 is the local base, the other bases are the monitoring control bases 2 to 4). Monitoring / control authority change information is sent.
  • the two authority data files in the console 24 are a monitoring authority data file 109 that stores monitoring authority as data, and a control authority data file 106 that stores control authority as data. These data files 109 and 106 receive monitoring / control authority change information from the monitoring / control authority changing means 107 and send the input monitoring / control authority change information to the monitoring / control authority change information transmitting means 112.
  • the two receiving means in the console 24 are a monitoring information receiving means 111 and a monitoring / control authority change information receiving means 113.
  • the monitoring information receiving unit 111 receives monitoring information of the power facilities 12 to 23 from the monitoring control device 6 via the wide area network 5.
  • the monitoring / control authority change information receiving unit 113 receives from each monitoring control base other than its own base (for example, if the monitoring control base 1 is its own base, the other bases are the monitoring control bases 2 to 4). Receives the sent monitoring / control authority change information.
  • the two information determining means in the console 24 are the monitoring information determining means 108 and the control information determining means 105. Based on the monitoring authority data file 109, the monitoring information determination means 108 determines whether or not the monitoring information received by the monitoring information receiving means 111 needs to be output depending on whether or not there is monitoring authority for the power equipment that is the transmission source of the monitoring information. If it is determined that there is a monitoring authority and the output is “necessary”, the monitoring information is sent to the monitoring information output means 103.
  • the control information determination means 105 is based on the control authority data 106 and has control authority over the power equipment to which the control information is transmitted. Thus, it is determined whether or not the control information transmission unit 110 needs to transmit the control information. If the control authority is present and the transmission is “necessary”, the control information is transmitted to the control information transmission unit 110. Further, if the determination result is “No” for transmission, the control information determination unit 105 transmits error information (indicated by a one-dot chain line in FIG. 2) to the error information output unit 101. As described above, the error information is information indicating that the local site has no control authority or that the input control information is not transmitted.
  • the monitoring / control authority changing unit 107 is activated by inputting change information from the monitoring / control authority changing input unit 104.
  • the monitoring / control authority changing unit 107 is also activated when the monitoring / control authority changing information receiving unit 113 receives monitoring authority or control authority change information from another monitoring control base.
  • the activated monitoring / control authority changing unit 107 is configured to monitor or control authority data file 109 or control authority data file 106 according to the monitoring / control authority changing information from the monitoring / control authority changing input unit 104 or the monitoring / control authority changing information receiving unit 113. Make changes to.
  • the monitoring control device 6 includes a control information receiving unit 201, a monitoring information transmitting unit 202, a control information transmitting unit 203, and a monitoring information receiving unit 204.
  • the control information receiving means 201 receives control information from the monitoring control bases 1 to 4 via the wide area network 5.
  • the control information transmitting unit 203 transmits the control information received by the control information receiving unit 201 to the power facilities 12 to 23 of the electric stations 8 to 11 through the wide area network 7.
  • the monitoring information receiving means 204 receives monitoring information of the power facilities 12 to 23 from the power facilities 12 to 23 of the electric stations 8 to 11 via the wide area network 7.
  • the monitoring information transmitting unit 202 transmits the monitoring information of the power facilities 12 to 23 received by the monitoring information receiving unit 204 to the monitoring information receiving unit 111 of the console 24 of the monitoring control bases 1 to 4 via the wide area network 5. To do.
  • Tables 1 and 3 show examples of the monitoring authority that is the contents of the monitoring authority data file 109.
  • Examples of the control authority that is the contents of the control authority data file 106 are shown in Tables 2 and 4.
  • Tables 1 and 3 are monitoring authority data tables that define which of the monitoring control bases 1 to 4 monitors which of the power facilities 12 to 23 of the electric stations 8 to 11.
  • Tables 2 and 4 are control authority data tables that define which of the monitoring control bases 1 to 4 controls which of the power facilities 12 to 23 of the electric stations 8 to 11.
  • “0” indicates “no authority” for monitoring or control and indicates that monitoring or control is not performed at the monitoring control base.
  • “1” indicates that monitoring or control is performed at the monitoring control base as “authorized” for monitoring or control.
  • each of the bases 1 to 4 corresponds to the power facilities 12 to 23 in the electric stations 8 to 11.
  • the supervisory control base 1 has the authority to monitor and control the power facilities 12 to 14 in the electric station 8
  • the supervisory control base 2 has the authority to monitor and control the power facilities 15 to 18 in the electric power station 9
  • the supervisory control base 3 has the authority to monitor and control the power facilities 19 to 20 in the electric station 10
  • the supervisory control base 4 has the authority to monitor and control the power facilities 21 to 23 in the electric station 11.
  • the monitoring authority and the control authority of the monitoring control base 1 are changed from the states of Table 1 and Table 2,
  • the supervisory control base 1 has the authority to monitor and control the power facilities 13 to 14 (that is, from the state of Tables 1 and 2, the authority to monitor and control the power facility 12 in the electric station 8 is removed)
  • the supervisory control base 2 has the authority to monitor and control the power facilities 12 and 15 to 18 (that is, from the state of Tables 1 and 2, the authority to monitor and control the power facilities 12 in the electric station 8 is added. That ’s true).
  • the monitoring control is performed as follows. For example, when the state of the power equipment 12 belonging to the electric station 8 changes, the power equipment 12 transmits monitoring information indicating the state change to the monitoring control device 6 via the wide area network 7 (see FIG. 1). As shown in FIG. 3, the monitoring control device 6 receives the monitoring information by the monitoring information receiving unit 204 and sends it to the monitoring information transmitting unit 202. The monitoring information transmitting unit 202 transmits the monitoring information of the power equipment 12 to all the monitoring control bases 1 to 4 via the wide area network 5.
  • the monitoring information receiving unit 111 receives the monitoring information of the power equipment 12 and sends this monitoring information to the monitoring information determining unit 108.
  • the monitoring information determination unit 108 determines whether or not the received monitoring information of the power equipment 12 needs to be output to the monitoring information output unit 103 based on the monitoring authority data file 109.
  • the monitoring authority for the power equipment 12 of the monitoring control base 1 is “1: authority”. Therefore, the monitoring information determination unit 108 determines whether or not the output to the monitoring information output unit 103 is “necessary”, that is, the monitoring information of the power equipment 12 is output, and the monitoring information determination unit 108 monitors the received power equipment 12. Information is sent to the monitoring information output means 103.
  • the monitoring information output means 103 outputs the monitoring information of the power equipment 12 to the display panel of the console 24 and the display device of the system monitoring board 25 based on the determination result of the monitoring information determination means 108.
  • the console 24 of the monitoring control bases 2 to 4 receives the monitoring information of the power equipment 12 by the monitoring information receiving means 111 and sends it to the monitoring information determining means 108.
  • the monitoring information determination unit 108 determines whether or not the received monitoring information of the power equipment 12 needs to be output to the monitoring information output unit 103 based on the monitoring authority data file 109.
  • the monitoring information determination unit 108 determines whether the output to the monitoring information output unit 103 is “No”, that is, power It is determined that the monitoring information of the facility 12 is not output, and the monitoring information of the power facility 12 is not transmitted to the monitoring information output unit 103. For this reason, the monitoring information output means 103 does not output the monitoring information of the power equipment 12 to the display panel of the console 24 or the display device of the system monitoring board 25.
  • control information input means 102 As shown in FIG. 2, when the operator inputs control information for the power equipment 12 using the control information input means 102 of the console 24 at the monitoring control base 1, the control information input means 102 12 control information is sent to the control information determination means 105.
  • the control information determination unit 105 determines whether or not the input control information of the power equipment 12 needs to be transmitted to the power equipment 12 based on the control authority data file 106.
  • the control authority for the power equipment 12 of the monitoring control base 1 is “1: authority”. Therefore, the control information determination unit 105 determines whether transmission to the power equipment 12 is necessary or not, that is, determines that the control information of the power equipment 12 is to be transmitted, and the control information determination unit 105 transmits the control information of the power equipment 12 to the control information. Send to means 110.
  • the control information transmission unit 110 transmits the control information of the power equipment 12 to the wide area network 5 based on the determination result of the control information determination unit 105.
  • the monitoring control device 6 receives the control information of the power equipment 12 by the control information receiving unit 201 and sends it to the control information transmitting unit 203. Furthermore, the control information transmission means 203 transmits the control information of the power equipment 12 to the power equipment 12 via the wide area network 7 (see FIG. 1).
  • the power equipment 12 performs control according to the received control information.
  • control information determination means 105 determines whether or not the input control information of the power equipment 12 needs to be transmitted to the power equipment 12 based on the control authority data file 106.
  • the control information determination unit 105 determines the necessity of transmission to the power equipment 12 as “No”. Therefore, the control information determination unit 105 does not transmit the control information of the power equipment 12 to the control information transmission unit 110. At this time, the control information determination unit 105 sends error information to the error information output unit 101.
  • the error information output unit 101 outputs error information based on the determination result of the control information determination unit 105, and indicates that there is no control authority or that control information is not transmitted as an error on the display panel and system monitoring of the console 24. The output is displayed on the display device of the panel 25.
  • the contents of the monitoring authority data file 109 are those shown in Table 1, but the operator uses the monitoring / control authority change input means 104 of the console 24 of the monitoring control base 1 to monitor the monitoring authority data file. Assume that 109 is changed from Table 1 to Table 3. At this time, the monitoring / control authority change input means 104 sends monitoring authority change information to the monitoring / control authority change means 107.
  • the monitoring / control authority changing means 107 changes the monitoring authority data file 109 as shown in Table 3 based on the monitoring authority change information.
  • Table 3 regarding the monitoring authority, the association between the supervisory control base 1 and the power equipment 12 is changed, and the monitoring authority of the power equipment 12 that the monitoring control base 1 has is transferred to the monitoring control base 2.
  • the monitoring / control authority changing unit 107 changes the monitoring authority data file 109 to Table 3 and then sends monitoring authority change information to the monitoring / control change information transmitting unit 112.
  • the monitoring / control authority change information transmitting unit 112 transmits the monitoring authority change information to the console 24 of the monitoring control bases 2 to 4.
  • the monitoring / control authority change information receiving means 113 receives the monitoring authority change information and transmits it to the monitoring / control authority changing means 107.
  • the monitoring / control authority changing means 107 changes the monitoring authority data file 109 as shown in Table 3 based on the monitoring authority change information. After changing the monitoring authority of the power facilities 12 to 23, only the monitoring information of the power facilities 12 to 23 for which the monitoring authority is set is output according to the changed monitoring authority.
  • the monitoring / control authority changing means 107 changes the control authority data file 106 as shown in Table 4 based on the control authority change information.
  • Table 4 regarding the control authority, the association between the supervisory control base 1 and the power equipment 12 is changed, and the control authority of the power equipment 12 possessed by the supervisory control base 1 is transferred to the monitor control base 2.
  • the monitoring / control authority changing means 107 changes the control authority data file 106 as shown in Table 4 based on the control authority change information.
  • the monitoring / control authority changing unit 107 changes the control authority data file 106 to Table 4 and then sends control authority change information to the monitoring / control change information transmitting unit 112.
  • the monitoring / control authority change information transmission unit 112 transmits the control authority change information to the console 24 of the monitoring control bases 2 to 4.
  • the monitoring / control authority change information receiving means 113 receives the control authority change information and sends it to the monitoring / control authority changing means 107.
  • the monitoring / control authority changing means 107 changes the control authority data file 106 as shown in Table 4 based on the control authority change information. After the control authority of the power facilities 12 to 23 is changed, only the control information of the power facilities 12 to 23 for which the control authority is set is transmitted according to the changed control authority.
  • the operator uses the monitoring / control authority changing means 107 of the console 24 of the supervisory control bases 1 to 4 to grant the monitoring authority and the control authority for the power facilities 12 to 23. Can be changed. That is, it is possible to freely change the monitoring target and the control target of the power facilities 12 to 23 under the jurisdiction of the monitoring control bases 1 to 4. Therefore, even in the event of a large-scale disaster or emergency, even if one of the supervisory control bases 1 to 4 falls into a situation where it cannot be used, the authority to monitor the power equipment that was supervised and controlled by the supervisory control base that has become unusable And control authority can be transferred.
  • the first embodiment it is possible to operate with high flexibility by fully utilizing the wide area integrated environment, and it is possible to improve the efficiency and reliability of the system.
  • FIG. 4 is a block diagram showing the configuration of the console in the second embodiment.
  • the second embodiment is characterized in that the monitoring flag setting unit is configured to set the monitoring flag so that a plurality of monitoring control bases are overlapped for one power facility.
  • the monitoring authority when the monitoring flag is set so that a plurality of monitoring control bases are overlapped for one electric power facility is referred to as a plurality of monitoring authorities.
  • the console 24 includes In place of the monitoring / control authority change input means 104, a plurality of monitoring authority change input means 301 includes: Instead of the monitoring / control authority changing means 107, a plurality of monitoring limit changing means 302 is provided. Instead of the monitoring authority data file 109, a plurality of monitoring authority data files 303 are In place of the monitoring / control authority change information transmitting means 112, a plurality of monitoring authority change information transmitting means 304 includes: In place of the monitoring / control authority change information receiving means 113, a plurality of monitoring authority change information receiving means 305 is provided.
  • the multiple monitoring authority change input means 301 inputs an input operation to allow a plurality of monitoring control bases 1 to 4 to be “with monitoring authority” for one power facility 12 to 23 when the operator performs an input operation. .
  • a plurality of monitoring control bases are overlapped and “with monitoring authority” are in a state of “with multiple monitoring authority”.
  • the multiple monitoring authority change means 302 is activated by the multiple monitoring authority change input means 301 and changes the multiple monitoring authority data file 303.
  • the multi-monitoring authority changing unit 302 is activated when the multi-monitoring authority change information receiving unit 305 receives the multi-monitoring authority change information from another monitoring control base, and changes the multi-monitoring authority data file 303.
  • the multiple monitoring authority change information transmission unit 304 transmits multiple monitoring authority change information based on the changed multiple monitoring authority data file 303.
  • the multiple monitoring authority change information receiving unit 305 receives multiple monitoring authority change information from another monitoring control base.
  • Table 5 shows an example of the multiple monitoring authority that is the contents of the multiple monitoring authority data file 303.
  • Table 5 is similar to Tables 1 and 3 above, which monitoring control base among the monitoring control bases 1 to 4 monitors which power equipment regarding the state change of the power equipment 12 to 23 of the electric stations 8 to 11.
  • This is a data table that defines Table 5 allows a plurality of monitoring control bases to be “with monitoring authority” for one power facility. In the case of “0”, “no authority” is not monitored. In the case of “1”, monitoring is performed as “authorized”. That is, “1: authorized” is set as the monitoring flag.
  • the contents of the multiple monitoring authority data file 303 are initially in the state shown in Table 1 above.
  • Table 1 In the state of Table 1, in the multiple monitoring authority data file 303, only one monitoring control base 1 to 4 has “monitoring authority” for one power facility 12 to 23. In this case, the state is not “with multiple monitoring authority”.
  • the operator inputs the change information of the multiple monitoring authority using the multiple monitoring authority change input means 301 for the purpose of changing the multiple monitoring authority data file 303 from the contents of Table 1 to Table 5.
  • the multiple monitoring authority change input unit 301 sends the multiple monitoring authority change information to the multiple monitoring authority change unit 302.
  • the multiple monitoring authority changing means 302 changes the multiple monitoring authority data file 303 as shown in Table 5 based on the change information of the multiple monitoring authority.
  • the multi-monitoring authority changing unit 302 changes the multi-monitoring authority data file 303 and then sends the multi-monitoring authority change information transmission unit 304 to the multi-monitoring authority change information transmitting unit 304.
  • the multiple monitoring authority change information transmitting unit 304 transmits the multiple monitoring authority change information to the console 24 of the monitoring control bases 2 to 4.
  • the multiple monitoring authority change information receiving unit 305 receives the multiple monitoring authority change information and sends it to the multiple monitoring authority changing unit 302. Then, the multiple monitoring authority change means 302 of the console 24 of the monitoring control bases 2 to 4 changes the multiple monitoring authority data 303 as shown in Table 5 based on the received multiple monitoring authority change information.
  • the power equipment 12 transmits monitoring information indicating the state change to the monitoring control device 6 via the wide area network 7.
  • the monitoring control device 6 receives the monitoring information of the power equipment 12 by the multiple monitoring information receiving unit 305 and sends it to the multiple monitoring information transmitting unit 302.
  • the plural monitoring information transmitting means 302 transmits the monitoring information of the power equipment 12 to the console 24 of the monitoring control bases 1 to 4 via the wide area network 5.
  • the console 24 of the monitoring control bases 1 to 4 receives the monitoring information of the power equipment 12 by the monitoring information receiving means 111 and transmits it to the monitoring information determining means 108.
  • the monitoring information determination unit 108 determines whether or not the received monitoring information of the power equipment 12 needs to be output to the monitoring information output unit 103 based on a plurality of monitoring authority data files 303 (see Table 5 for the contents of the monitoring authority data). judge.
  • the monitoring information determination unit 108 determines that the output to the monitoring information output unit 103 is “necessary”, and the monitoring information determination unit 108 outputs the monitoring information to the monitoring information.
  • the monitoring information output unit 103 outputs the monitoring information of the power equipment 12 to the display panel of the console 24 and the display device of the system monitoring panel 25 based on the determination result of the monitoring information determination unit 108.
  • the console 24 of the monitoring control bases 3 and 4 receives the monitoring information of the power equipment 12 by the monitoring information receiving means 111 and transmits it to the monitoring information determining means 108.
  • the monitoring information determination unit 108 determines whether the monitoring information output unit 103 needs to output the received monitoring information of the power equipment 12 based on the multiple monitoring authority data file 303 (see Table 5 for the contents of the monitoring authority data). Determine.
  • the monitoring authority for the power equipment 12 of the monitoring control bases 3 and 4 is “0: no authority”. Therefore, the monitoring information determination unit 108 determines whether or not the output to the monitoring information output unit 103 is necessary, and the monitoring information determination unit 108 does not send the monitoring information to the monitoring information output unit 103.
  • the monitoring information output unit 103 does not output the monitoring information of the power equipment 12 based on the determination result of the monitoring information determination unit 108.
  • the monitoring for the power equipment 12 as described above is the same for the power equipment 13 and 14.
  • the second embodiment has the following unique effects in addition to the effects of the first embodiment. That is, in the second embodiment, by setting the multiple monitoring authority data file 303 as shown in Table 5, it is possible to monitor the power facilities 12 to 14 from the two monitoring control bases 1 and 2. . According to the second embodiment as described above, a plurality of monitoring control bases can acquire monitoring information of the same power equipment, and in the operation of stopping the interconnection equipment related to the plurality of monitoring control bases, the operation procedure And execution status can be shared. Therefore, information linkage between the monitoring control bases is facilitated, and the efficiency of the system is further improved.
  • the third embodiment is characterized in that the control flag setting unit is configured to set the control flag so that a plurality of monitoring control bases are overlapped for one power facility.
  • the control authority when the control flag is set so that a plurality of monitoring control bases are overlapped with respect to one electric power facility is referred to as “multiple control authority”.
  • the console 24 includes In place of the monitoring / control authority change input means 104, a plurality of control authority change input means 311 includes: In place of the monitoring / control authority changing means 107, a plural control limit changing means 312 is provided. Instead of the monitoring authority data file 109, a plurality of control authority data files 401 are In place of the monitoring / control authority change information transmitting means 112, a plurality of control authority change information transmitting means 314 is provided. In place of the monitoring / control authority change information receiving means 113, a plurality of control authority change information receiving means 315 is provided.
  • the multiple control authority change input means 311 inputs an input operation to allow a plurality of supervisory control bases 1 to 4 to be “with control authority” for one power facility 12 to 23 when the operator performs an input operation. .
  • a plurality of monitoring control bases overlap with “with control authority” is a state of “with multiple control authority”.
  • the multiple control authority change unit 312 is activated by the multiple control authority change input unit 311 and changes the multiple control authority data file 401.
  • the plural control authority changing unit 312 is activated when the plural control authority changing information receiving unit 315 receives the plural control authority changing information, and changes the plural control authority data file 401.
  • the multiple control authority change information transmission unit 314 transmits multiple control authority change information based on the changed multiple control authority data file 401.
  • the multiple control authority change information receiving means 315 receives multiple control authority change information from the other monitoring control bases 2 to 4.
  • control information is input by the control authority input means 102 of the monitoring control base 2 having the control authority for the power equipment 12 during the control of the power equipment 12 having the control authority in the monitoring control base 1.
  • control information determination unit 105 of the monitoring control base 2 determines that the necessity of transmitting control information to the power equipment 12 is “No” as long as the power control equipment 12 is controlled at the monitoring control base 1. It is like that.
  • control of the power equipment 12 is not performed at the supervisory control base 1, and control information to the power equipment 12 is input by the control authority input means 102 of the supervisory control base 2 having control authority over the power equipment 12.
  • the control information determination unit 105 of the monitoring control base 2 confirms that the power equipment 12 is not controlled at the monitoring control base 1, and then the control information to the power equipment 12 is transmitted. The necessity of transmission is determined as “necessary”.
  • Table 6 shows an example of the multiple control authority that is the contents of the multiple control authority data file 401.
  • Table 6 is data that defines which of the monitoring control bases 1 to 4 controls which power equipment for the power equipments 12 to 23 of the electric stations 8 to 11 as in Tables 2 and 4 above. It is a table.
  • Table 6 allows a plurality of monitoring control bases to be “with control authority” for one power facility. In the case of “0”, the control is not performed as “no authority”. In the case of “1”, control is performed as “authorized”. That is, “1: authorized” is set as the control flag.
  • the operator inputs the change information of the multiple control authority using the multiple control authority change input means 311 for the purpose of changing the multiple control authority data file 401 from the contents of Table 2 to Table 6. Assume that you have operated. In other words, for the power facilities 12 to 14, it is assumed that the two monitoring control bases 1 and 2 are changed to be “with control authority” to be in the state of “with multiple control authority”.
  • the multiple control authority change input unit 311 sends the multiple control authority change information to the multiple control authority change unit 312.
  • the multiple control authority changing means 312 changes the multiple control authority data file 401 as shown in Table 6 based on the change information of the multiple control authority. After changing the multiple control authority data file 401, the multiple control authority changing unit 312 sends the multiple control authority change information to the multiple control authority change information transmitting unit 314.
  • the plural control authority change information transmitting means 314 transmits plural control authority change information to the console 24 of the monitoring control bases 2 to 4.
  • the multiple control authority change information receiving unit 315 receives the multiple control authority change information and sends it to the multiple control authority change unit 312. Then, the plural control authority changing means 312 of the console 24 of the supervisory control bases 2 to 4 changes the plural control authority data file 401 as shown in Table 6 based on the received plural control authority change information.
  • control information of the power equipment 12 is determined as control information.
  • the control information determination unit 105 determines whether or not transmission of the received control information to the power equipment 12 is necessary based on the multiple control authority data file 401.
  • control information determination unit 105 determines whether the output to the control information transmission unit 110 is “necessary” and sends the control information of the power equipment 12 to the control information output / transmission unit 110.
  • the control information transmission unit 110 transmits the control information of the power equipment 12 to the monitoring control device 6 via the wide area network 5 based on the determination result of the control information determination unit 105.
  • the monitoring control device 6 receives the control information of the power equipment 12 by the control information receiving means 201 and sends it to the control information transmitting means 203.
  • the control information transmission means 203 transmits the control information of the power equipment 12 to the power equipment 12 belonging to the electric station 8 via the wide area network 5.
  • the power facility 12 performs control based on the control information received from the monitoring control base 1.
  • control information determination means 105 of the monitoring control base 2 receives this control information. .
  • the control information determination means 105 of the supervisory control base 2 does not The necessity of transmission of the control information is determined as “No”.
  • the supervisory control point 1 having the final responsibility performs final control.
  • the control information determination unit 105 of the monitoring control base 2 transmits the error information to the error information output unit 101 without transmitting the control information to the control information transmission unit 110.
  • the error information output unit 101 outputs error information to the display panel of the console 24 and the display device of the system monitoring board 25 based on the determination result of the control information determination unit 105.
  • the control information determination means 105 of the monitoring control base 2 Receives this control information. Then, after confirming that the control information determination unit 105 does not control the power equipment 12 at the monitoring control base 1, it is determined that transmission of control information to the power equipment 12 is necessary. For this reason, the control information determination unit 105 of the monitoring control base 2 sends the control information to the control information transmission unit 110.
  • control information determination unit 105 determines whether transmission to the power equipment 12 is necessary based on the multiple control authority data file 401 for the received control information of the power equipment 12. From Table 6, since the control authority for the power equipment 12 of the grid monitoring control base 2 is “1: authority”, the control information determination unit 105 determines that the transmission of control information to the power equipment 12 is “necessary”. The control information determination unit 105 transmits the control information of the power equipment 12 to the control information transmission unit 110.
  • the control information transmission unit 110 transmits the control information of the power equipment 12 to the monitoring control device 6 via the wide area network 5 based on the determination result of the control information determination unit 105.
  • the monitoring control device 6 receives the control information by the control information receiving means 201 and sends it to the control information transmitting means 203.
  • the control information transmission means 203 transmits the control information of the power equipment 12 to the power equipment 12 belonging to the electric station 8 via the wide area network 7.
  • the power facility 12 performs control based on the control information from the monitoring control base 2.
  • the control related to the power equipment 12 is the same for the power equipment 13 and 14.
  • the third embodiment has the following unique effects in addition to the effects of the first embodiment. That is, in the third embodiment, by setting the multiple control authority data file 401 as shown in Table 6, the power facilities 12 to 14 can be controlled from the two monitoring control bases 1 and 2. It becomes. Therefore, according to the third embodiment, voltage reactive power control and the like regarding the same power facility can be performed from a plurality of monitoring control bases without being aware of the jurisdiction system for each monitoring control base depending on the connection state of the power system. Can do. Therefore, the flexibility of system operation can be further increased.
  • the feature of the fourth embodiment is that the authority changing means for the monitoring authority or the control authority is configured to change the monitoring authority or the control authority in a batch for each power equipment grouped in advance.
  • a plurality of power facilities are registered as one group, and a monitoring authority or a control authority granted in units of registered groups is referred to as a group monitoring authority or a group control authority.
  • grouping electric power equipment grouping is performed based on attribute information of the electric power equipment such as the installation location of the electric power equipment, connection equipment, and management organization.
  • the operation console 24 of the monitoring control base 1 shown in FIG. 6 includes the operation console 24 described in FIG. Instead of the monitoring authority data file 109, a group monitoring authority data file 504 Instead of the control authority data file 106, a group control authority data file 502 is In place of the monitoring / control authority change input means 104, a group monitoring / control authority change input means 501 Instead of the monitoring / control authority changing means 107, a group monitoring / control authority changing means 503 In place of the monitoring / control authority change information receiving means 113, a group monitoring / control authority change information receiving means 506 includes: In place of the monitoring / control authority change information transmission means 112, a group monitoring / control authority change information transmission means 505 is provided.
  • the group monitoring / control authority change input means 501 is used by the operator to connect a plurality of power facilities via the console 24.
  • a group of three power facilities 12 to 14 included in the electric power station 8 A group of four power facilities 15 to 18 included in the electric power station 9
  • Two power facilities 19 and 20 included in the electric power station 10 are grouped into one group,
  • Three power facilities 21 to 23 included in the electric station 11 are registered as one group.
  • the group monitoring / control authority change input means 501 changes the monitoring authority and the control authority of the electric power facility
  • the group monitoring / control authority change input means 501 inputs to allow the change in a group unit.
  • the power authority monitoring authority and control authority change information that is changed in units of groups will be referred to as group monitoring / control authority change information.
  • the group monitoring / control authority changing unit 503 is activated by inputting change information from the group monitoring / control authority changing input unit 501, and based on the group monitoring / control authority changing information, the group monitoring authority data file 504 and the group control are controlled.
  • the authority data file 502 is changed.
  • the group monitoring / control authority changing unit 503 is activated when the group monitoring / control authority changing information receiving unit 506 receives the group monitoring / control authority changing information from another monitoring control base, and the group monitoring / control authority changing unit 503 is activated. Based on the change information, the group monitoring authority data file 504 and the group control authority data file 502 are changed.
  • the group monitoring authority data file 504 inputs group monitoring authority change information from the group monitoring / control authority changing means 503, and the group control authority data file 502 inputs group control authority changing information from the group monitoring / control authority changing means 503. Then, these pieces of change information are sent to the group monitoring / control authority change information transmission means 505.
  • the group monitoring / control authority change information transmission unit 505 transmits group monitoring / authority change change information to other monitoring control bases other than its own base. To do.
  • the group monitoring / control authority change information receiving unit 506 receives group monitoring / control authority change information from the other monitoring control bases 2-4.
  • Tables 7 and 8 show examples of the group monitoring authority that is the contents of the group monitoring authority data file 504.
  • Tables 7 and 8 are data tables that define which of the monitoring control bases 1 to 4 monitors the state change of the power facilities 12 to 23 of the electric stations 8 to 11. Power facilities are grouped by electric station.
  • each of the electric stations 8 to 11 is registered as one group, and the power facilities 12 to 23 included in each of the electric stations 8 to 11 are collectively grouped, that is, for each electric station. Monitoring authority will be changed.
  • the monitoring and control base 1 monitors only the power facilities 12 to 14 included in the electric station 8
  • the monitoring control base 2 monitors only the power facilities 15 to 18 included in the electric station 9
  • the monitoring control base 3 Monitors only the power facilities 19 and 20 included in the electric station 10
  • the monitoring control base 4 monitors only the power facilities 21 to 23 included in the electric station 11.
  • the operator takes an operation of changing the monitoring authority data from Table 7 to Table 8.
  • the group monitoring / control authority change input means 501 displays the change information of the group monitoring authority. This is sent to the monitoring / control authority changing means 503. Based on the received group monitoring authority change information, the group monitoring / control authority changing means 503 changes the group monitoring authority data file 504 as shown in Table 8 to change the group authority of the monitoring control base 1 and the group monitoring authority of the monitoring control base 2. To do.
  • the monitoring control base 2 monitors only the power facilities 12 to 14 included in the electric station 8
  • the monitoring control base 1 monitors only the power facilities 15 to 18 included in the electric station 8.
  • the monitoring target of the monitoring control bases 3 and 4 is not changed.
  • the group monitoring / control authority changing information transmitting unit 505 transmits the group monitoring authority changing information to the console 24 of the monitoring control bases 2 to 4 which are other bases.
  • the group monitoring / control authority change information receiving unit 506 receives the group monitoring authority change information and transmits it to the group monitoring / control authority changing unit 503.
  • the group monitoring / control authority changing unit 503 changes the group monitoring authority data file 504 as shown in Table 8 based on the received group monitoring authority change information.
  • power facilities are grouped according to attribute information such as installation locations, connection facilities, and management organizations of the power facilities 12 to 23, and monitoring authority and Control authority can be changed.
  • attribute information such as installation locations, connection facilities, and management organizations of the power facilities 12 to 23, and monitoring authority and Control authority can be changed.
  • monitoring authority or control authority changing means changes monitoring authority or control authority in units of preset patterns.
  • the portion described as “group” on the console 24 of the fourth embodiment is changed to “pattern”.
  • the “group” is a group of electric power facilities that collectively changes the entire flag for each electric station or the like.
  • the “pattern” means that, for example, when a disaster, normal time, maintenance time, etc. are set in advance as separate independent scenes and the scene is switched by an external command, This is a change situation when the entire flag corresponding to the scene is changed at once. In other words, in the case of “group”, only the target that needs to be changed is determined and the change value is selected as appropriate, whereas in the case of “pattern”, the change target and the change value are set in advance.
  • the monitoring authority or control authority granted on a pattern basis is called pattern monitoring authority or pattern control authority.
  • the patterns set in the monitoring authority or the control authority are, for example, a plurality of cases where an arbitrary monitoring control base is damaged in advance, and a combination pattern of the backup operation status of the monitoring control base for each assumed case. and so on.
  • the console 24 includes Instead of the group monitoring authority data file 504, a pattern monitoring authority data file 604 is Instead of the group control authority data file 502, a pattern control authority data file 602 In place of the group monitoring / control authority change input means 501, a pattern monitoring / control authority change input means 601 includes: Instead of the group monitoring / control authority changing means 503, the pattern monitoring / control authority changing means 603 In place of the group monitoring / control authority change information receiving means 506, a pattern monitoring / control authority change information receiving means 606 includes: Instead of the group monitoring / control authority change information transmitting means 505, a pattern monitoring / control authority change information transmitting means 605 is provided.
  • the pattern monitoring / control authority change input means 601 is used by the operator to register the setting values of the monitoring authority and the setting values of the control authority in advance as a plurality of patterns via the console 24 and change them in pattern units. Enter to allow that.
  • the pattern monitoring authority and pattern control authority change information is referred to as pattern monitoring / control authority change information.
  • the pattern monitoring / control authority changing unit 603 is activated by the pattern monitoring / control authority changing input unit 601 and changes the pattern monitoring authority data file 604 and the pattern control authority data file 602 based on the pattern monitoring / control authority change information. .
  • the pattern monitoring / control authority changing means 603 is activated when the pattern monitoring / control authority changing information receiving means 606 receives the pattern monitoring / control authority changing information from another monitoring control base, and the pattern monitoring / control authority changing means 603 is activated. Based on the change information, the pattern monitoring authority data file 604 and the pattern control authority data file 602 are changed.
  • the pattern monitoring authority data file 604 inputs pattern monitoring authority change information from the pattern monitoring / control authority changing means 603, and the pattern control authority data file 602 inputs pattern control authority changing information from the group monitoring / control authority changing means 603. Then, the change information is sent to the pattern monitoring / control authority change information transmission means 605.
  • the pattern monitoring / control authority change information transmission unit 605 transmits pattern monitoring / authority change change information to other monitoring control bases based on the pattern monitoring authority data file 604 and the pattern authority data file 602.
  • the pattern monitoring / control authority change information receiving unit 606 receives pattern monitoring / control authority change information from other monitoring control bases.
  • Table 9 shows an example of the pattern control authority that is the contents of the pattern control authority data file 602.
  • Table 9 is a data table that defines which of the monitoring control bases 1 to 4 controls which of the power facilities 12 to 23 of the electric stations 8 to 11, and the control authority for each power facility is shown in Table 9.
  • the pattern is changed in units of preset patterns.
  • the contents of the pattern control authority data file 602 in the console 24 of the monitoring control base 1 are initially in the state shown in Table 2 above.
  • the operator takes an operation to change the control authority from the state of Table 2 to the state of Table 9 registered in advance as a pattern.
  • the operator uses the console 24 to input pattern control authority change information using the pattern monitoring / control authority change input means 603.
  • the pattern monitoring / control authority change input means 603 sends the pattern control authority change information to the pattern monitoring / control authority change means 603.
  • the pattern monitoring / control authority changing means 603 changes the pattern control authority data file 602 from Table 2 to Table 9 based on the received group control authority change information. That is, the supervisory control base 1 controls both the power equipment 12 to 14 included in the electric station 8 and the power equipment 15 to 18 included in the electric station 9, and the supervisory control base 2 controls the power equipment included in the electric station 9. 15 to 18 are not controlled. The control targets of the monitoring control bases 3 and 4 are not changed. After the pattern control authority data file 602 is changed, the pattern monitoring / control authority change information transmission unit 605 transmits the pattern control authority change information to the console 24 of the monitoring control bases 2 to 4.
  • the pattern monitoring / control authority change information receiving means 606 receives the pattern control authority change information and transmits it to the pattern monitoring / control authority changing means 603.
  • the pattern monitoring / control authority changing means 603 changes the pattern control authority data file 602 as shown in Table 9 based on the received pattern control authority change information.
  • FIG. 8 is a diagram showing a display example of the monitor of the sixth embodiment
  • FIG. 9 is a block diagram showing the configuration of the console in the sixth embodiment.
  • the sixth embodiment is characterized in that a monitor 701 is provided on the console 24 to switch and display the system state of the plurality of monitoring control bases 1 to 4.
  • the monitor 701 has a display panel that also serves as input means such as a touch panel, as shown in FIG. .
  • the monitor 701 is a component that plays the role of the monitoring information output means 103 and the monitoring / control authority change input means 104, so that the operator inputs the monitoring jurisdiction definition and monitoring authority change information using a touch panel or the like. It has become.
  • the monitoring jurisdiction definition and the monitoring authority change information are referred to as monitoring jurisdiction definition / monitoring authority change information.
  • the supervisory jurisdiction definition is to define which supervisory control base of the supervisory control bases 1 to 4 is the monitoring range, and any of the base names of the supervisory control bases 1 to 4 is the monitor 701. By displaying on a part of the display screen, the monitoring range is shown. In the display example shown in FIG. 8, a monitoring jurisdiction display area 702 is provided at the left corner of the monitor 701. If the jurisdiction of the monitoring control base 4 is defined as a monitoring range, monitoring is performed as shown in FIG. “Monitoring control base 4” is output and displayed in the jurisdiction display area 702. If the jurisdiction of the monitoring control base 3 is defined as a monitoring range, “monitoring control base 3” is output and displayed in the monitoring jurisdiction display area 702 as shown in FIG.
  • the monitor 701 is connected with a monitoring jurisdiction definition / monitoring authority changing means 705.
  • the monitor 701 sends monitoring jurisdiction definition and monitoring authority change information input by the operator to the monitoring jurisdiction definition / monitoring authority changing means 705.
  • the monitoring jurisdiction definition / monitoring authority changing means 705 is activated by inputting monitoring jurisdiction definition / monitoring authority changing information from the monitor 701.
  • the activated monitoring jurisdiction definition / monitoring authority changing means 705 changes the monitoring jurisdiction definition data file 704 and the monitoring authority data file 109 according to the monitoring jurisdiction definition / monitoring authority change information from the monitor 701.
  • the monitoring jurisdiction definition data file 704 inputs the changed monitoring jurisdiction definition from the monitoring jurisdiction definition / monitoring authority changing means 705 and sends the changed monitoring jurisdiction definition to the monitoring information determining means 708.
  • the monitoring information determination unit 708 determines whether the monitoring information received by the monitoring information receiving unit 111 needs to be output to the monitor 701 based on the monitoring jurisdiction definition data file 704 and the monitoring authority data file 109, and outputs the monitoring information. If it is determined as “necessary”, the received monitoring information is sent to the monitor 701.
  • Tables 10 and 11 show examples of the monitoring jurisdiction definition that is the contents of the monitoring jurisdiction definition data file 704.
  • Tables 10 and 11 are data tables that define which of the power system monitoring and control bases 1 to 4 is to be monitored.
  • "0" indicates that the monitoring range is not set as "no jurisdiction target”.
  • “1” indicates that the jurisdiction of the monitoring range is “with jurisdiction”.
  • the contents of the monitoring jurisdiction definition data file 704 shown in Table 10 are “with jurisdiction” only for the monitoring control base 4, and the contents of the monitoring jurisdiction definition data file 704 shown in Table 11 are only for the monitoring control base 3. “There is jurisdiction”.
  • the monitor 701 when the monitor 701 outputs and displays “monitoring control base 4” in the monitoring jurisdiction display area 702 on the display screen, the monitoring jurisdiction shown in Table 10 is received after the monitoring information is received by the monitoring information reception processing unit 111. Based on the data related to the monitoring jurisdiction definition in the definition data file 704, the received monitoring information of the power equipment in the monitoring jurisdiction is output to the monitor 701.
  • the monitor 701 displays “monitoring control base 3” in the monitoring jurisdiction display area 702.
  • the monitoring information determination unit 708 monitors the received monitoring information in the monitoring jurisdiction based on the data related to the monitoring jurisdiction definition in the monitoring jurisdiction definition data file 704. Output to.
  • the monitor 701 of the console 24 switches and displays the system state of the plurality of monitoring control bases 1 to 4 so that the power equipment within the jurisdiction from one console 24 is displayed.
  • the monitor 701 of the console 24 switches and displays the system state of the plurality of monitoring control bases 1 to 4 so that the power equipment within the jurisdiction from one console 24 is displayed.
  • the jurisdiction of the power equipment is not fixedly captured and flexible system operation is possible as compared with the conventional power system monitoring control system.
  • monitoring and control of power equipment under the jurisdiction of the stopped monitoring and control base is performed from the available monitoring and control base. be able to.
  • the system can be operated continuously, the system efficiency is not lowered, and excellent reliability can be exhibited.
  • FIG. 10 is a diagram showing a display example of the monitor according to the seventh embodiment
  • FIG. 11 is a block diagram showing the configuration of the console in the seventh embodiment.
  • the seventh embodiment is characterized by a display configuration on the monitor 701, as in the sixth embodiment.
  • the monitor 701 of the console 24 includes “monitoring control base 1”, “monitoring control base 2”, “monitoring control base 3”, and “monitoring control base 4”.
  • the base display switching units 801 to 804 for switching the display and the system diagrams 805 to 808 showing the state of the power system managed by each base are output and displayed.
  • a system diagram 805 under the supervision of the supervisory control base 1 (shown in (a))
  • a system diagram 806 under the control of the monitoring control base 2 (shown in (b))
  • a system diagram 807 under the control of the monitoring control base 3 (shown in (c))
  • a system diagram 808 under the control of the monitoring control base 4 (shown in (d))
  • the base display switching units 801 to 804 display rectangular display areas arranged in the horizontal direction, and the system diagrams 805 to 808 are displayed below them.
  • the site display switching units 801 to 804 are input selection means such as a touch panel on the monitor 701. When the operator selects each display area by touching, the site display switching units 801 to 804 change display colors. Then, the display mode is displayed indicating that the operator has selected. Further, simultaneously with the display switching of the base display switching units 801 to 804, the display of the system diagrams 805 to 808 is switched according to the selected base. Further, the base display switching units 801 to 804 also display monitoring information such as the status of the power system and equipment managed by each base, as well as the output display of the system diagrams 805 to 808 that each base has jurisdiction over.
  • FIG. 10 For example, when the operator selects the base display switching unit 804, a display indicating that the part has been selected is displayed, and at the same time, the system diagram 805 of the monitoring control base 4 and the power system and equipment managed by the monitoring control base 4 The monitoring information such as the state of is displayed on the monitor 701.
  • the selected site display switching units 801 to 803 shift to a display form indicating that they have been selected.
  • System diagrams 806 to 808 of the monitoring control bases 1 to 3 that are not under the jurisdiction are displayed (see FIG. 10).
  • the monitoring control base 4 can monitor the power system and power facilities under the control of the monitoring control bases 1 to 3.
  • the system diagrams 805 to 808 of the monitoring control bases 1 to 4 can be switched and displayed from one console 24.
  • each monitoring control base 1 to 4 can easily share each monitoring information, and business cooperation between the monitoring control bases 1 to 4 is also possible. .
  • a highly flexible backup operation is possible, and the efficiency of the system is further improved.
  • FIG. 12 is a diagram illustrating a display example of the monitor according to the eighth embodiment
  • FIG. 13 is a block diagram illustrating a configuration of an operation console according to the eighth embodiment.
  • the eighth embodiment is also characterized by the configuration of the display screen of the monitor 701.
  • the eighth embodiment is basically the same as the configuration of the seventh embodiment, but is characterized by the following points.
  • the monitor 701 includes the base display switching units 801 to 804, the power equipment symbols 901 and 902 within the jurisdiction displayed by the system diagrams 805 to 808, and the power equipment symbols 901 and 902.
  • An alarm 903 to be issued and an alarm 904 to be issued from the display area of the base display switching units 801 to 804 of the monitoring and control bases including the power facility within the jurisdiction are displayed. These alarms 903 and 904 are for displaying the accident range of the jurisdiction on the system diagrams 805 to 808.
  • the alarms 903 and 904 are displayed when the accident information (shown by the two-dot chain line arrow in FIG. 13) is sent from the monitoring information determination means 108 to the monitor 701 based on the accident information of the power facilities 12 to 23. Is set to
  • the monitoring information determination means 108 in the eighth embodiment outputs monitoring information of the power facilities 12 to 23 to the display switching units 801 to 804 and the system diagrams 805 to 808 on the monitor 701 based on the monitoring authority data file 109. Whether it is necessary or not is determined. Further, when the received monitoring information includes the accident information of the power facilities 12 to 23, the monitoring information determination means 108 sends the accident information (shown by a two-dot chain line arrow in FIG. 13) to the monitor 701. It is like that.
  • the monitoring information determination means 108 sends the accident information of the power equipment 22 to the monitor 701.
  • the monitor 701 receives the accident information of the power equipment 22
  • the alarm 903 is issued to the power equipment symbol 901 corresponding to the accident information.
  • the monitoring information determination unit 108 sends the accident information of the power equipment 23 to the monitor 701.
  • the monitor 701 receives the accident information of the power equipment 23
  • the monitor 701 issues an alarm 903 to the power equipment symbol 902 corresponding to the error information.
  • Table 12 is a data table that defines which of the monitoring control bases 1 to 4 monitors the power facilities 12 to 23 of the electric stations 8 to 11. Table 12 allows a plurality of monitoring control bases to be “authorized” for one power facility.
  • the monitoring information determination means 108 uses the display switching units 801 to 804 on the monitor 701 and the system for the received monitoring information and the monitoring information obtained from the power facility based on the monitoring jurisdiction definition data file 704 and the monitoring authority data file 109. In FIG. 805 to 808, it is determined whether the monitoring information needs to be output.
  • the supervisory authority for the power facilities 19 and 20 under the control of the supervisory control base 3 is “1: authorized” at the supervisory control base 3, and in addition to this, the power under the supervision of the supervisory control base 4
  • the monitoring authority for the facility 21 is also “1: authority”. Therefore, regarding the base display switching units 803 and 804 and the system diagrams 805 and 806 on the monitor 701, the monitoring information determination unit 108 is “necessary” regarding whether or not monitoring information obtained from the power facilities 19 to 21 is necessary. judge.
  • the monitor 701 outputs the monitoring information from the power facilities 21 to 23 to the base display switching units 803 and 804 and the system diagrams 805 and 806 on the monitor 701 based on the determination result of the monitoring information determination unit 108.
  • the monitoring information determination means 108 outputs the accident information
  • an alarm 903 is issued to the power facility symbol on the system diagram whose output is determined to be “necessary” and the base display switching unit including the power facility. 904 can be generated.
  • the monitoring information determination unit 108 determines “No” for the necessity of outputting the monitoring information obtained from the power equipment 22 with respect to the base display switching unit 803 and the system diagram 806 on the monitor 701.
  • the monitor 701 does not output monitoring information from the power equipment 22 toward the base display switching unit 803 and the system diagram 806 on the monitor 701 based on the determination result of the monitoring information determination unit 108.
  • the alarms 903 and 904 based on the accident information are not generated for the power equipment symbol on the system diagram determined as “No” and the base display switching unit including the equipment in the jurisdiction.
  • the monitoring authority for the power facilities 21 to 23 under the control of the monitoring control base 4 is “1: authority”. Therefore, the monitoring information determination unit 108 determines “necessary” for the necessity of outputting the monitoring information obtained from the power facilities 21 to 23 with respect to the base display switching unit 804 and the system diagram 805 on the monitor 701. In the monitoring control base 4, the monitoring authority for the power equipment 20 under the control of the monitoring control base 3 is “1: authority”.
  • the monitoring information determination means 108 determines “necessary” for the necessity of outputting the monitoring information obtained from the power equipment 20 with respect to the base display switching unit 804 and the system diagram 805 on the monitor 701.
  • the monitor 701 outputs monitoring information from the power equipment 20 toward the base display switching unit 804 and the system diagram 805 on the monitor 701 based on the determination result of the monitoring information determination unit 108.
  • an alarm 903 is issued to the power facility symbol on the system diagram whose output is determined to be “necessary” and the base display switching unit including the power facility. 904 can be generated.
  • the alarms 903 and 904 for displaying the accident information of the power equipment as the accident scope of the jurisdiction corresponding to the system diagram are adopted, the accident information can be easily informed to a plurality of operators. Accordingly, it is possible for operators at each monitoring control base to notice error information of the power equipment at an early stage while covering each other. As a result, accident response and the like can be performed smoothly and quickly, and the efficiency of the system can be further increased.
  • FIG. 14 is a diagram showing a display example of the monitor of the ninth embodiment
  • FIG. 15 is a block diagram showing the configuration of the console in the ninth embodiment.
  • a system monitoring board 25 is provided instead of the console 24 shown in FIG.
  • the components of the system monitoring board 25 are basically the same as those of the console 24 in the sixth embodiment shown in FIG. 9, such as the monitoring jurisdiction definition / monitoring authority changing means 705, but have been described with reference to FIG.
  • a monitor 1001 of the system monitoring board 25 is provided. Multi-windows 1002 to 1004 are displayed on the monitor 1001.
  • the multi-window 1002 displays “monitoring control base 2”, the multi-window 1003 displays “monitoring control base 3”, and the multi-window 1004 displays “monitoring control base 4”.
  • the multi window 1002 is formed in a square area on the left half of the monitor 1001, and the multi window 1003 and the multi window 1004 are formed on the right half of the monitor 1001.
  • the multi window 1003 is formed above the right half of the monitor 1001 and the multi window 1004 is formed below the right half of the monitor 1001.
  • FIG. 14 The effect
  • FIG. An example of the contents of the monitoring authority data file 109 is shown in Table 1.
  • multi-windows 1002 to 1004 are displayed on the monitor 1001 installed at the monitoring control base 4, and the monitoring information of the monitoring control bases 2 to 4 is output and displayed on each.
  • system diagram information managed by the monitoring control bases 2 to 4 is displayed.
  • the operator can confirm the state of the system diagram of the supervisory control base 4 as the jurisdiction by displaying it on the multi-window 1004. Further, the status of the system diagram of the monitoring control bases 2 and 3 that are not under jurisdiction can be confirmed by displaying them on the multi-windows 1002 and 1003. Information of the system diagram displayed in the multi-windows 1002 to 1004 is included in the received monitoring information. Therefore, the monitoring information determination means 108 determines whether or not the received monitoring information is to be output on the multi-windows 1002 to 1004 displayed on the monitor 1001 based on the monitoring authority data file 109. I do.
  • the monitoring information determination means 108 determines whether the monitoring information output to the multi-window 1002 is necessary or not.
  • the monitor 1001 outputs information on the system diagram included in the monitoring information on the multi-window 1002 based on the determination result of the monitoring information determination unit 108.
  • the monitoring information determination means 108 displays the monitoring information on the multi-windows 1003 and 1004 on the monitor 1001. The necessity of output is determined as “No”.
  • the multi-windows 1003 and 1004 on the monitor 1001 do not output the system diagram information included in the monitoring information to the multi-windows 1003 and 1004 based on the determination result of the monitoring information determination unit 108.
  • the system diagrams of the plurality of monitoring control bases 1 to 4 can be displayed on the multi-windows 1002 to 1004 of the system monitoring board 25. Therefore, compared with the conventional power system monitoring control system, the operator can know the state of the necessary system from the system monitoring panel 25 without switching the screen. Further, since it is a multi-window, it is easy to change the display position as appropriate, and a screen layout that is easy for the operator to operate can be easily created.
  • FIG. 16 is a diagram showing a display example of the monitor according to the tenth embodiment
  • FIG. 17 is a block diagram showing the configuration of the console in the tenth embodiment.
  • FIG. 16 The effect
  • FIG. An example of the contents of the monitoring authority data file 109 is shown in Table 12.
  • the multi-window 1003 will be described as “monitoring control base 3” as a display target, and the multi-window 1004 will be described as “monitoring control base 4” as a display target.
  • the monitoring information determination unit 108 uses the monitoring jurisdiction definition data file 704 and the monitoring authority data file 109 to monitor the received monitoring information to the telops 1101 to 1103 and the system diagrams 1104 to 1106 of the multi-windows 1002 to 1004 on the monitor 1001. It is determined whether or not output is necessary.
  • the monitoring authority for the power facilities 19 and 20 of the monitoring control base 3 is “1: authority”. For this reason, the monitoring information determination unit 108 determines that the monitoring information output necessity is “necessary” for the telop 1101 of the multi-window 1002 on the monitor 1001 and the system diagram 1104. Further, the monitoring authority for the power equipment 21 of the monitoring control base 3 is also “1: authority”. Therefore, the monitoring information determination unit 108 determines whether or not the monitoring information output is necessary for the telop 1102 and the system diagram 1105 of the multi-window 1003 on the monitor 1001.
  • the monitor 1001 outputs the monitoring information toward the telops 1101 and 1102 and the system diagrams 1104 and 1105 of the multi-windows 1002 and 1003 on the monitor 1001 based on the determination result of the monitoring information determination unit 108.
  • the monitoring information determination means 108 outputs the accident information of the power facilities 19 and 20
  • the accidents of the power facilities 19 and 20 are displayed in the telops 1101 and 1102 and the system diagrams 1104 and 1105 whose output is determined to be “necessary”. Information can be displayed.
  • the monitoring information determination unit 108 displays monitoring information on the telop 1102 and the system diagram 1105 in the multi-window 1003 on the monitor 1001. The necessity of output is determined as “No”.
  • the monitor 1001 does not output monitoring information toward the telop 1102 or the system diagram 1105 of the multi-window 1003 on the monitor 1001 based on the determination result of the monitoring information determination unit 108. Therefore, the accident information of the power facilities 22 and 23 is not displayed.
  • the monitoring information determination means 108 monitors the telop 1103 of the multi-window 1004 on the monitor 1001 and the system diagram 1106. The necessity of outputting information is determined as “necessary”. Further, since the monitoring authority for the power equipment 20 at the monitoring control base 4 is also “1: authority”, the monitoring information determination means 108 needs to output monitoring information to the telop 1103 of the multi-window 1004 on the monitor 1001 and the system diagram 1106. No is determined as “necessary”.
  • the monitor 1001 outputs monitoring information toward the telop 1103 and the system diagram 1106 of the multi-window 1004 on the monitor 1001 based on the determination result of the monitoring information determination unit 108.
  • the monitoring information determination unit 108 outputs the accident information of the power facilities 21 and 23
  • the accident information of the power facilities 21 and 23 is displayed on the telop 1103 and the system diagram 1106 whose output is determined to be “necessary”.
  • the telops 1101 to 1103 and the system diagrams 1104 to 1106 are displayed in the multi-windows 1002 to 1004 of the system monitoring panel 25, and the accident information of the power facilities 12 to 23 is displayed here. be able to.
  • the operator can simultaneously confirm the accident information of the power facilities 12 to 23 to be monitored on the telops 1101 to 1103 while confirming the states of a plurality of system diagrams without being affected by the jurisdiction. Can do.
  • the power system monitoring control system can be realized by controlling a computer including a CPU or the like with a predetermined program.
  • the program in this case implements the above processing by physically utilizing computer hardware.
  • a method for executing the above processing, a program, and a recording medium on which the program is recorded are also one aspect of the embodiment.
  • any one of the above-described units can be configured as a circuit that realizes each process. Further, each processing unit and storage unit described above may be realized in a common computer. Furthermore, the number of monitoring control bases and electrical stations installed in the system, the type of components, the type of display device at the monitoring control base, the number of multi-window displays, and the like can be selected as appropriate. Further, the display mode of the system diagram, the symbol of the power equipment, the alarm or flicker, the telop or the message can be changed as appropriate.
  • priority is set for the control authority of different supervisory control bases. You may make it change the base which has. Specifically, the “monitoring jurisdiction definition data” shown in Tables 10 and 11 is changed to “control jurisdiction definition data”, and control information determination in the third embodiment is performed based on this definition data. The determination criterion of the means 105 may be changed.
  • Pattern control authority data file 603 ... Pattern monitoring / control authority changing means 604 ... Pattern monitoring authority data file 605 ; Pattern monitoring / control authority change information sender 606 ... Pattern monitoring / control authority change information receiving means 701, 1001 ... Monitor 702 ... Monitoring jurisdiction display area 704 ... Monitoring jurisdiction definition data file 705 . Monitoring jurisdiction definition / monitoring authority changing means 801 to 804 ... Base display switching sections 805 to 808 1104 to 1106 ... System diagram 901 and 902 ... Electric power equipment symbols 903 and 904 ... Alarms 1002 to 1004 ... Multi-window 1101 to 1103 ... Telop

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 電力系統監視制御システムにおいて、電力設備の監視情報を複数の監視制御拠点にて把握すると共に、複数の監視制御拠点から電力設備の制御を行うことにより、電力設備に対する監視制御拠点の管轄を効率良く変更することができ、動的で柔軟な運用を図る。電力設備12~23の監視権限および制御権限を、監視権限データファイル109と制御権限データファイル106に格納する。電力設備12~23の監視権限および制御権限は変更入力手段104によって変更可能である。監視情報判定手段108は監視権限データファイル109を基にして、監視情報の出力要否を判定し、監視権限があれば、監視情報を監視情報出力手段103に送る。制御情報判定手段105は、制御情報入力手段102を用いて制御情報を入力した場合に、制御権限データ106を基にして、制御情報の送信要否を判定し、制御権限があれば、制御情報を制御情報送信手段110に送る。

Description

電力系統監視制御システム
 広域統合環境下で柔軟な運用が可能な電力系統監視制御システムに関するものである。
 一般に、電力系統監視制御システムは、電気所などに配置される電力設備を地域や電圧階級に応じて分割し、制御所など電力設備の監視制御を行う監視制御拠点を複数設けて、電力設備の管轄を割り当てている。このため、特定の監視制御拠点が管轄下にある電力設備だけを監視制御しており、監視制御拠点は相互に独立した状態にある。しかし、近年の電力系統監視制御システムにおいては、それぞれ独立していた監視制御拠点を、広域IP(Internet Protocol)ネットワーク技術によって統合することが可能となっている。
 このような背景の下、電力系統監視制御システムにおいても、広域統合環境下で運用される広域分散型システムが種々開発されている(例えば、特許文献1)。
特開2013-33389号公報
 しかしながら、従来の電力系統監視制御システムでは、各電力設備と、その電力設備を管轄する監視制御拠点との関係は固定的であり、監視制御拠点が管轄外の電力設備について監視制御を実施していなかった。すなわち、監視制御拠点が監視制御する電力設備は、予め決められた管轄下のものだけであり、広域分散型のシステムであったとしても、広域統合環境が十分に活用されているとは言えない状況にある。
 そのため、大規模災害時や緊急時に任意の監視制御拠点が使用不能になると、その監視制御拠点の管轄下にある電力設備については監視制御が滞ることになる。このような事態に陥った場合、監視制御拠点間で、広域バックアップや緊急時における業務応援を行う必要が生じ、人員の移動が不可欠となった。その結果、電力系統監視制御システムにおいて、効率性が低下し、業務の継続性を維持することが困難となっていた。したがって、電力系統監視制御システムにおいて、広域ネットワーク分散型システムとして操作性や信頼性を損なうことなく、柔軟性の高い運用を行うことが求められている。
 本発明の実施形態では、電力設備の監視情報を複数の監視制御拠点にて把握すると共に、複数の監視制御拠点から電力設備の制御を行うことにより、電力設備に対する監視制御拠点の管轄を効率良く変更することができ、動的で柔軟な運用が可能である電力系統監視制御システムを提供することを目的とする。
 上記目的を達成するために、本発明の実施形態は、監視情報を送信すると共に制御情報を受信する電力設備が配置された複数の電気所と、前記電力設備の監視情報を受信すると共に制御情報を送信する複数の監視制御拠点と、前記電力設備および前記監視制御拠点に対し広域ネットワーク網を介して前記電力設備の監視情報および制御情報を送受信する監視制御装置、を備えた電力系統監視制御システムにおいて、前記監視制御拠点は、次の構成要素を備えたことを特徴とする。
(1)前記電力設備と各監視制御拠点とを関連付ける監視フラグを設定する監視フラグ設定部。
(2)前記監視制御装置から前記電力設備の監視情報を受信する監視情報受信部。
(3)前記監視情報の送信元の電力設備に対し前記監視フラグが設定されているか否かにより前記監視情報の出力要否を判定する監視情報判定部。
(4)前記監視情報判定部の判定結果に基づき前記監視制御拠点にて前記監視情報を出力する監視情報出力部。
(5)前記電力設備と各監視制御拠点とを関連付ける制御フラグを設定する制御フラグ設定部。
(6)前記電力設備の制御情報を入力する制御情報入力部。
(7)前記制御情報の送信先の電力設備に対し前記制御フラグが設定されているか否かにより前記制御情報の送信要否を判定する制御情報判定部。
(8)前記制御情報判定部の判定結果に基づき前記監視制御拠点から前記電力設備に対し前記制御情報を送信する制御情報送信部。
第1の実施形態の構成を示すブロック図。 第1の実施形態の操作卓の構成を示すブロック図。 第1の実施形態の監視制御装置の構成を示すブロック図。 第2の実施形態の操作卓の構成を示すブロック図。 第3の実施形態の操作卓の構成を示すブロック図。 第4の実施形態の操作卓の構成を示すブロック図。 第5の実施形態の操作卓の構成を示すブロック図。 第6の実施形態のモニタの表示例を示す図。 第6の実施形態の操作卓の構成を示すブロック図。 第7の実施形態のモニタの表示例を示す図。 第7の実施形態の操作卓の構成を示すブロック図。 第8の実施形態のモニタの表示例を示す図。 第8の実施形態の操作卓の構成を示すブロック図。 第9の実施形態のモニタの表示例を示す図。 第9の実施形態の操作卓の構成を示すブロック図。 第10実施形態の系統監視盤の表示例を示す図。 第10の実施形態の系統監視盤の構成を示すブロック図。
(1)第1の実施形態
 本発明の第1の実施形態に係る電力系統監視制御システムについて、図1、図2、図3、表1~表4を参照して具体的に説明する。図1は第1の実施形態システムの構成を示すブロック図、図2は第1の実施形態における操作卓の構成を示すブロック図、図3は第1の実施形態における監視制御装置の構成を示すブロック図である。
(構成)
 図1に示すように、電力系統監視制御システムには、4つの監視統制御拠点1~4と、2つの広域ネットワーク網5、7と、監視制御装置6と、変電所などの電気所8~11が設けられている。電気所8には電力設備12~14が配置され、電気所9には電力設備15~18が配置され、電気所10には電力設備19、20が配置され、電気所11には電力設備21~23が配置されている。各監視統制御拠点1~4には、操作卓24と系統監視盤25が設置されている。
(操作卓と系統監視盤)
 操作卓24は、オペレータが入力処理を行うキーボードなどの入力装置を有しており、これらの入力装置により、制御対象となっている電力設備12~23の制御情報を入力するようになっている。また、操作卓24は、電力設備12~23のいずれかの監視情報の出力表示を行う表示パネルを有している。系統監視盤25は、オペレータなどが電力系統の状態変化を監視するためのものであり、ディスプレイ装置を有している。
 操作卓24が表示パネルに出力表示する電力設備12~23の監視情報と、入力装置にて入力する電力設備12~23の制御情報について説明する。
(監視情報)
 電力設備12~23の監視情報とは、各電力設備12~23の状態変化を表す情報であって、電力設備12~23が送信する。監視情報は、電力系統監視制御システムの中で、図1にて実線の矢印で示されるように送受信される。すなわち、監視情報は電気所8~11の各電力設備12~23から広域ネットワーク網7、監視制御装置6および広域ネットワーク網5を経由して、監視統制御拠点1~4の操作卓24へと送られる。
 ただし、操作卓24の表示パネルに出力表示される電力設備12~23の監視情報は、電力設備12~23全ての監視情報ではなく、後述する監視権限によって出力が許可された電力設備12~23の監視情報のみに限定される。例えば監視統制御拠点1の操作卓24において、電力設備12だけを監視する権限が与えられているのであれば、監視統制御拠点1の操作卓24の表示パネルには電力設備12の監視情報のみが出力表示されることになる。
 また、電力設備12~23の監視情報は、操作卓24の表示パネルに加えて、系統監視盤25のディスプレイ装置にも出力表示される。監視情報の表示態様としては、電力設備12~23の状態変化を表すものであれば、適宜選択可能である。監視情報の表示態様としては、例えば、フリッカなどを伴って、注意を喚起するためのアラームあるいはメッセージを表示するようになっている。
(制御情報)
 電力設備12~23の制御情報とは、例えば電力設備12~23に対する制御指令である。制御情報の流れは、電力系統監視制御システムの中で、図1にて粗い点線の矢印で示される。すなわち、制御情報は、監視統制御拠点1~4から広域ネットワーク網5、監視制御装置6および広域ネットワーク網7を経由して、電気所8~11の各電力設備12~23へと送られる。操作卓24から入力された電力設備12~23の制御情報は、後述する制御権限によって送信が許可された電力設備12~23にだけ送られる。例えば監視統制御拠点1の操作卓24において、電力設備12だけを制御する権限が与えられているのであれば、監視統制御拠点1の操作卓24からの制御情報は電力設備12のみに送信されることになる。
(監視権限と制御権限)
 電力設備12~23の監視情報の出力に関する監視権限ならびに電力設備12~23の制御情報の送信に関する制御権限について説明する。電力設備12~23の監視権限とは、監視制御拠点1~4と関連付けられた電力設備12~23の監視情報のみを、各監視制御拠点1~4にて出力する権限のことである。言い換えると、監視権限は、監視制御拠点1~4のうち、どの拠点が、電気所8~11の電力設備12~23のどれを監視するのかを定義した権限である。一方、電力設備12~23の制御権限とは、監視制御拠点1~4と関連付けられた電力設備12~23への制御情報を、監視制御拠点1~4から送信する権限のことである。同じく言い換えると、制御権限は、監視制御拠点1~4のうち、どの拠点が、電気所8~11の電力設備12~23のどれを制御するのかを定義した権限である。
 これら電力設備12~23の監視権限および制御権限に関する情報は、図2に示す監視権限データファイル109と制御権限データファイル106に格納されている。また、電力設備12~23の監視権限および制御権限は、操作卓24に設けた変更入力手段104によって変更可能であり、変更を受けた監視権限および制御権限に関する情報を監視権限の変更情報および制御権限の変更情報と呼ぶ。図1に示した細かい点線の矢印は、このような監視権限の変更情報および制御権限の変更情報(以下、「監視/制御権限変更情報」と記載する)の流れを示しており、広域ネットワーク網5を介して監視制御装置6に送られるのではなく、監視統制御拠点1~4同士で授受するようになっている。
(「権限」と「フラグ」)
 以上述べたような電力設備12~23の監視権限に基づいて、電力設備12~23と各監視制御拠点1~4とを関連付ける監視フラグが設定される。監視フラグとは、電力設備12~23の監視情報の出力に関して「権限あり」であることを示すデータの保存領域であって、これを設定したことで電力設備12~23を監視する監視制御拠点が確定する。例えば監視権限データファイル(図2に示す)の中身がデータテーブルであるとき、監視フラグはデータテーブルにて「1」で示される(後述の表1参照)。
 また、電力設備12~23の制御権限に基づいて、電力設備12~23と各監視制御拠点1~4とを関連付ける制御フラグが設定される。制御フラグとは、電力設備12~23の制御情報の送信に関して「権限あり」であることを示すデータの保存領域であって、これを設定したことで電力設備12~23を制御する監視制御拠点が確定する。例えば制御権限データファイル(図2に示す)の中身がデータテーブルであるとき、制御フラグは同じくデータテーブルにて「1」で示される(後述の表2参照)。
 以上のような監視フラグおよび制御フラグの設定部は、第1の実施形態では、電力設備12~23の監視権限および制御権限の変更情報を入力するための監視/制御権限変更入力手段104と、入力された各権限の変更情報に基づいて監視権限および制御権限を変更する監視/制御権限変更手段107(共に図2に示す)から構成される。つまり、監視フラグおよび制御フラグは、オペレータが監視/制御権限変更入力手段104を用いて入力操作を行うことにより設定される。
(電力設備、広域ネットワーク網、監視制御装置)
 電気所8~11に設置される電力設備12~23は、変圧器や開閉器などにより電力系統の構成を変更するための設備である。広域ネットワーク網5および7は、IP(Internet Protocol)により、各電力設備12~23の状態変化を示す監視情報(図1の実線矢印)および各電力設備12~23に対する制御情報(図1の粗い点線矢印)を運搬するものである。監視制御装置6は、広域ネットワーク網5および7を介して監視統制御拠点1~4と電気所8~11とを接続し、広域ネットワーク網5および7との間で電力設備12~23の監視情報および制御情報の授受を行う装置である。
(操作卓)
 続いて監視統制御拠点1~4の操作卓24の構成について図2を用いて説明する。操作卓24の構成は、監視統制御拠点1~4にて共通である。図2では、監視統制御拠点1の操作卓24の構成を示している。操作卓24には、入力手段と、出力手段と、受信手段と、送信手段と、権限データファイルと、情報判定手段とがそれぞれ2つずつ設けられ、権限変更手段が1つ設けられている。
(入力手段)
 操作卓24における2つの入力手段とは、オペレータが電力設備12~23の制御情報を入力操作する制御情報入力手段102と、オペレータが監視権限についての変更情報および制御権限についての変更情報を入力操作する監視/制御権限変更入力手段104である。これらの入力手段は操作卓24に接続されるキーボードなどの入力装置などからなる。
(出力手段)
 操作卓24における2つの出力手段とは、エラー情報出力手段101と、監視情報出力手段103である。エラー情報出力手段101は、自拠点には制御権限がない旨、あるいは入力した制御情報を送信しない旨を示すエラー情報を、操作卓24の表示パネルおよび系統監視盤25のディスプレイ装置に出力表示する。また、監視情報出力手段103は、後段に述べる監視情報判定手段108の判定に従って、操作卓24の表示パネルや系統監視盤25のディスプレイ装置に対し電力設備12~23の監視情報を出力する。
(送信手段)
 操作卓24における2つの送信手段とは、制御情報送信手段110と、監視/制御権限変更情報送信手段112である。制御情報送信手段110は、後段に述べる制御情報判定手段105の判定に従って、広域ネットワーク網5に、電力設備12~23の制御情報を送信する。監視/制御権限変更情報送信手段112は、自拠点以外の他の監視制御拠点(例えば監視制御拠点1が自拠点であれば、他拠点は監視制御拠点2~4)へ、電力設備12~23の監視/制御権限変更情報を送信する。
(権限データファイル)
 操作卓24における2つの権限データファイルとは、監視権限をデータとして格納する監視権限データファイル109と、制御権限をデータとして格納する制御権限データファイル106である。これらのデータファイル109、106は、監視/制御権限変更手段107から監視/制御権限変更情報を入力し、入力した監視/制御権限変更情報を監視/制御権限変更情報送信手段112へと送る。
(受信手段)
 操作卓24における2つの受信手段とは、監視情報受信手段111と、監視/制御権限変更情報受信手段113である。このうち、監視情報受信手段111は、広域ネットワーク網5を介して監視制御装置6から電力設備12~23の監視情報を受信する。また、監視/制御権限変更情報受信手段113は、自拠点以外の他の監視制御拠点(例えば監視制御拠点1が自拠点であれば、他拠点は監視制御拠点2~4)から、各拠点が送信した監視/制御権限変更情報を受信する。
(情報判定手段)
 操作卓24における2つの情報判定手段とは、監視情報判定手段108と、制御情報判定手段105である。監視情報判定手段108は監視権限データファイル109を基にして、監視情報の送信元の電力設備に対する監視権限が有るか無いかにより、監視情報受信手段111にて受信した監視情報の出力要否を判定し、監視権限が有り、出力を「要」とするのであれば、前記監視情報を監視情報出力手段103に送る。
 一方、制御情報判定手段105は、制御情報入力手段102を用いて制御情報を入力した場合に、制御権限データ106を基にして、制御情報の送信先の電力設備に対する制御権限が有るか無いかにより、制御情報送信手段110による制御情報の送信要否を判定し、制御権限が有り、送信を「要」とするのであれば、前記制御情報を制御情報送信手段110に送る。また、制御情報判定手段105は、判定結果が送信を「否」とするのであれば、エラー情報(図2に一点鎖線で示す)を、エラー情報出力手段101へと送信する。エラー情報とは、前述したように、自拠点には制御権限がない旨、あるいは入力した制御情報を送信しない旨を示す情報である。
(監視/制御権限変更手段)
 監視/制御権限変更手段107は、監視/制御権限変更入力手段104から変更情報を入力することにより起動する。また、監視/制御権限変更手段107は、監視/制御権限変更情報受信手段113が他の監視制御拠点から監視権限あるいは制御権限の変更情報を受信することでも起動する。起動した監視/制御権限変更手段107は、監視/制御権限変更入力手段104もしくは監視/制御権限変更情報受信手段113からの監視/制御権限変更情報に従って、監視権限データファイル109または制御権限データファイル106に変更を加える。
(監視制御装置)
 図3に示すように、監視制御装置6は、制御情報受信手段201と、監視情報送信手段202と、制御情報送信手段203と、監視情報受信手段204を有している。制御情報受信手段201は、監視制御拠点1~4から広域ネットワーク網5を介して制御情報を受信する。
 制御情報送信手段203は、制御情報受信手段201が受信した制御情報を、広域ネットワーク7網を介して電気所8~11の電力設備12~23に送信する。監視情報受信手段204は、電気所8~11の電力設備12~23から広域ネットワーク網7を介して、電力設備12~23の監視情報を受信する。監視情報送信手段202は、監視情報受信手段204が受信した電力設備12~23の監視情報を、広域ネットワーク網5を介して監視制御拠点1~4の操作卓24の監視情報受信手段111に送信する。
(作用)
 以上の構成を有する第1の実施形態の作用について、図1、図2、図3、表1~表4を参照して説明する。監視権限データファイル109の中身である監視権限の例を表1および表3に示す。また、制御権限データファイル106の中身である制御権限の例を表2および表4に示す。
Figure JPOXMLDOC01-appb-I000001
Figure JPOXMLDOC01-appb-I000002
Figure JPOXMLDOC01-appb-I000003
Figure JPOXMLDOC01-appb-I000004
 表1と表3は、監視制御拠点1~4のうち、どの拠点が、電気所8~11の電力設備12~23のどれを監視するのかを定義した監視権限のデータテーブルである。表2と表4は監視制御拠点1~4のうち、どの拠点が、電気所8~11の電力設備12~23のどれを制御するかを定義した制御権限のデータテーブルである。各表において、「0」の場合は、監視または制御の「権限なし」として、その監視制御拠点では監視または制御を行わないことを示す。一方、「1」の場合は、監視または制御の「権限あり」として、その監視制御拠点で監視または制御を行うことを示す。
 表1および表2に示した例では、各拠点1~4と電気所8~11内の電力設備12~23が対応している。
 監視制御拠点1は電気所8内の電力設備12~14の監視権限および制御権限を持ち、
 監視制御拠点2は電気所9内の電力設備15~18の監視権限および制御権限を持ち、
 監視制御拠点3は電気所10内の電力設備19~20の監視権限および制御権限を持ち、
 監視制御拠点4は電気所11内の電力設備21~23の監視権限および制御権限を持っている。
 表3および表4に示した例は、表1および表2の状態から、監視制御拠点1の監視権限および制御権限に変更を加えており、
 監視制御拠点1は電力設備13~14の監視権限および制御権限を持ち(つまり表1および表2の状態から言えば電気所8内の電力設備12の監視権限および制御権限を外し)、
 監視制御拠点2は電力設備12、15~18の監視権限および制御権限を持っている(つまり表1および表2の状態から言えば電気所8内の電力設備12の監視権限および制御権限を加えたことになる)。
(電力設備12の監視について)
 以上のように電力設備12~23の監視権限および制御権限が設定された電力系統監視制御システムでは、次のごとく監視制御が実施される。例えば、電気所8に属する電力設備12の状態が変化した場合、電力設備12は状態変化を表す監視情報を、広域ネットワーク網7を介して監視制御装置6へ送信する(図1参照)。図3に示すように、監視制御装置6は監視情報受信手段204により監視情報を受信し、監視情報送信手段202に送る。監視情報送信手段202は電力設備12の監視情報を、広域ネットワーク網5を介して全ての監視制御拠点1~4へと送信する。
 図2に示すように、視制御拠点1の操作卓24では、監視情報受信手段111が電力設備12の監視情報を受信し、この監視情報を監視情報判定手段108へと送る。監視情報判定手段108は、受信した電力設備12の監視情報について、監視権限データファイル109を基に、監視情報出力手段103への出力要否を判定する。
 表1では、監視制御拠点1の電力設備12に対する監視権限は「1:権限あり」である。そのため、監視情報判定手段108は監視情報出力手段103への出力要否を「要」、つまり電力設備12の監視情報を出力すると判定し、監視情報判定手段108は、受信した電力設備12の監視情報を監視情報出力手段103へと送る。監視情報出力手段103は、監視情報判定手段108の判定結果に基づき、電力設備12の監視情報を操作卓24の表示パネルと系統監視盤25のディスプレイ装置に出力する。
 また、監視制御拠点2~4の操作卓24は、監視情報受信手段111により電力設備12の監視情報を受信し、監視情報判定手段108へと送る。監視情報判定手段108は、受信した電力設備12の監視情報について、監視権限データファイル109を基に、監視情報出力手段103への出力要否を判定する。
 表1より、監視制御拠点2~4の電力設備12に対する監視権限は「0:権限なし」のため、監視情報判定手段108は監視情報出力手段103への出力要否を「否」、つまり電力設備12の監視情報を出力しないと判定し、電力設備12の監視情報を監視情報出力手段103へと送信しない。このため、監視情報出力手段103は電力設備12の監視情報を操作卓24の表示パネルや系統監視盤25のディスプレイ装置に出力することはない。
(電力設備12の制御について)
 図2に示すように、監視制御拠点1にて、オペレータが操作卓24の制御情報入力手段102を用いて電力設備12に対する制御情報を入力した場合、制御情報入力手段102は、入力した電力設備12の制御情報を制御情報判定手段105へと送る。制御情報判定手段105は、入力した電力設備12の制御情報について、制御権限データファイル106を基に、電力設備12への送信要否を判定する。
 表2では、監視制御拠点1の電力設備12に対する制御権限は「1:権限あり」である。そのため、制御情報判定手段105は電力設備12への送信要否を「要」、つまり電力設備12の制御情報を送信すると判定し、制御情報判定手段105は電力設備12の制御情報を制御情報送信手段110へと送る。制御情報送信手段110は、制御情報判定手段105の判定結果を基に、電力設備12の制御情報を、広域ネットワーク網5へ送信する。図3に示すように、監視制御装置6は、制御情報受信手段201により電力設備12の制御情報を受信し、制御情報送信手段203に送る。さらに制御情報送信手段203は電力設備12の制御情報を、広域ネットワーク網7を介して電力設備12へ送信する(図1参照)。電力設備12は、受信した制御情報に従って制御を実施する。
 一方、監視制御拠点2~4の操作卓24において、オペレータが制御情報入力手段102を用いて電力設備12に対する制御情報を入力した場合、制御情報を制御情報判定手段105へと送る。制御情報判定手段105は、入力した電力設備12の制御情報について、制御権限データファイル106を基に電力設備12への送信要否を判定する。
 表2より、監視制御拠点2~4の電力設備12に対する制御権限は「0:権限なし」のため、制御情報判定手段105は電力設備12への送信要否を「否」と判定する。したがって、制御情報判定手段105は電力設備12の制御情報を制御情報送信手段110へと送信しない。このとき、制御情報判定手段105はエラー情報をエラー情報出力手段101へと送る。エラー情報出力手段101は、制御情報判定手段105の判定結果を基にエラー情報を出力し、制御権限がない旨、あるいは制御情報を送信しない旨を、エラーとして操作卓24の表示パネルおよび系統監視盤25のディスプレイ装置に出力表示する。
(監視権限の変更)
 以上述べた状態は、監視権限データファイル109の内容が表1の状態であるが、オペレータが、監視制御拠点1の操作卓24の監視/制御権限変更入力手段104を用いて、監視権限データファイル109を表1から表3の内容へ変更したとする。このとき、監視/制御権限変更入力手段104は、監視権限の変更情報を監視/制御権限変更手段107に送る。
 監視/制御権限変更手段107は、この監視権限の変更情報に基づいて、監視権限データファイル109を表3の通りに変更する。表3では、監視権限に関して、監視統制御拠点1と電力設備12との関連付けを変え、監視制御拠点1が持っていた電力設備12の監視権限を監視制御拠点2に移した状態となる。監視/制御権限変更手段107は、監視権限データファイル109を表3に変更した後、監視/制御変更情報送信手段112に監視権限の変更情報を送る。監視/制御権限変更情報送信手段112は監視制御拠点2~4の操作卓24へ監視権限の変更情報を送信する。
 監視制御拠点2~4の操作卓24では、監視/制御権限変更情報受信手段113が監視権限の変更情報を受信し、監視/制御権限変更手段107へ送信する。監視制御拠点2~4の操作卓24では、監視/制御権限変更手段107が監視権限の変更情報に基づいて監視権限データファイル109を表3の通りに変更する。電力設備12~23の監視権限の変更後は、変更された監視権限に従い、監視権限が設定された電力設備12~23の監視情報のみが出力されることになる。
(制御権限の変更)
 また、オペレータが、監視制御拠点1の操作卓24の監視/制御権限変更入力手段104を用いて、制御権限データファイル106を表2から表4の内容へ変更したとする。このとき、監視/制御権限変更入力手段104は、制御権限の変更情報を監視/制御権限変更手段107に送る。
 監視/制御権限変更手段107は、この制御権限の変更情報に基づいて、制御権限データファイル106を表4の通りに変更する。表4では、制御権限に関して、監視統制御拠点1と電力設備12との関連付けを変え、監視制御拠点1が持っていた電力設備12の制御権限を監視制御拠点2に移した状態となる。監視/制御権限変更手段107は、この制御権限の変更情報に基づいて制御権限データファイル106を表4の通りに変更する。監視/制御権限変更手段107は、制御権限データファイル106を表4に変更した後、監視/制御変更情報送信手段112に制御権限の変更情報を送る。監視/制御権限変更情報送信手段112は監視制御拠点2~4の操作卓24へ制御権限の変更情報を送信する。
 監視制御拠点2~4の操作卓24では、監視/制御権限変更情報受信手段113が制御権限の変更情報を受信し、監視/制御権限変更手段107へ送る。監視制御拠点2~4の操作卓24では、監視/制御権限変更手段107が制御権限の変更情報に基づいて制御権限データファイル106を表4の通りに変更する。電力設備12~23の制御権限の変更後は、変更された制御権限に従い、制御権限が設定された電力設備12~23の制御情報のみが送信されることになる。
(効果)
 以上説明したように、第1の実施形態では、オペレータが監視統制御拠点1~4の操作卓24の監視/制御権限変更手段107を用いて、電力設備12~23の監視権限および制御権限を変更することができる。つまり、監視制御拠点1~4の管轄下にある電力設備12~23の監視対象および制御対象を、自由に変更することが可能となる。したがって、大規模災害時や緊急時に、監視制御拠点1~4のいずれかが使用不能といった事態に陥ったとしても、使用できなくなった監視制御拠点が監視制御していた電力設備について、その監視権限および制御権限を移行させることができる。
 このため、使用可能な監視制御拠点から、もともとは管轄下にない電力設備に関して、監視および制御を実施することが可能となる。その結果、大規模災害などが発生して監視制御拠点1~4のいずれかが故障した場合でも、拠点間でのバックアップ運用が容易となり、電力系統監視制御システムを安定して継続することが可能である。よって、第1の実施形態では、広域統合環境を十分に活用して柔軟性の高い運用が可能であって、システムの効率性および信頼性を高めることができる。
(2)第2の実施形態
 第2の実施形態に係る電力系統監視制御システムについて、図4、表5を参照して説明する。第2の実施形態の基本的な構成は上記第1の実施形態と同様であり、図4に示した操作卓24の構成に特徴がある。以下、図4を用いて、第2の実施形態の構成について説明する。図4は第2の実施形態における操作卓の構成を示すブロック図である。
(構成)
 第2の実施形態では、監視フラグ設定部が、1つの電力設備に対し監視制御拠点が複数重複するように監視フラグを設定するように構成された点に特徴がある。1つの電力設備に対し監視制御拠点が複数重複するように監視フラグを設定した場合の監視権限を複数監視権限と呼ぶことにする。
 このような構成を実現するために、図4に示すように、第2の実施形態に係る操作卓24には、
 監視/制御権限変更入力手段104に代えて複数監視権限変更入力手段301が、
 監視/制御権限変更手段107に代えて複数監視限変更手段302が、
 監視権限データファイル109に代えて複数監視権限データファイル303が、
 監視/制御権限変更情報送信手段112に代えて複数監視権限変更情報送信手段304が、
 監視/制御権限変更情報受信手段113に代えて複数監視権限変更情報受信手段305が、設けられている。
 複数監視権限変更入力手段301は、オペレータが入力操作を行うことで、1つの電力設備12~23に対し複数の監視制御拠点1~4が「監視権限あり」となることを許容するよう入力する。ここで監視制御拠点1~4のうち、複数の監視制御拠点が重複して「監視権限あり」となることが、「複数監視権限あり」の状態である。
 複数監視権限変更手段302は、複数監視権限変更入力手段301により起動して、複数監視権限データファイル303を変更する。また、複数監視権限変更手段302は、他の監視制御拠点から複数監視権限変更情報受信手段305が複数監視権限の変更情報を受信することにより起動して、複数監視権限データファイル303を変更する。複数監視権限変更情報送信手段304は変更された複数監視権限データファイル303に基づいて複数監視権限の変更情報を送信する。複数監視権限変更情報受信手段305は他の監視制御拠点から複数監視権限の変更情報を受信する。
(作用)
 以上の構成を有する第2の実施形態の作用について、図4を参照して説明する。複数監視権限データファイル303の中身である複数監視権限の例を表5に示す。表5は、上記の表1、表3と同様、電気所8~11の電力設備12~23の状態変化について、監視制御拠点1~4のうちどの監視制御拠点が、どの電力設備を監視するかを定義したデータテーブルである。表5は、1つの電力設備に対して複数の監視制御拠点が「監視権限あり」となることを許容する。「0」の場合は「権限なし」として監視を行わない。「1」の場合は「権限あり」として監視を行う。つまり、「1:権限あり」が監視フラグとして設定されることになる。
Figure JPOXMLDOC01-appb-I000005
 以下の説明で、複数監視権限データファイル303の内容は、当初、前記表1の状態であるとする。表1の状態では、複数監視権限データファイル303は、1つの電力設備12~23に対し1つの監視制御拠点1~4のみが「監視権限あり」となっている。この場合は、「複数監視権限あり」の状態とはなっていないことになる。
 監視制御拠点1の操作卓24において、複数監視権限データファイル303を表1から表5の内容へ変更する目的で、オペレータが複数監視権限変更入力手段301を用いて複数監視権限の変更情報を入力操作したとする。すなわち、電力設備12~14に対しては、2つの監視制御拠点1、2が「監視権限あり」となるように変更して、「複数監視権限あり」の状態にしたとする。そして複数監視権限変更入力手段301が複数監視権限の変更情報を複数監視権限変更手段302に送る。
 複数監視権限変更手段302は複数監視権限の変更情報に基づいて複数監視権限データファイル303を表5の通りに変更する。複数監視権限変更手段302は、複数監視権限データファイル303を変更した後、複数監視権限変更情報送信手段304に複数監視権限の変更情報を送る。複数監視権限変更情報送信手段304は監視制御拠点2~4の操作卓24へ複数監視権限の変更情報を送信する。
 監視制御拠点2~4の操作卓24では、複数監視権限変更情報受信手段305が複数監視権限の変更情報を受信し、複数監視権限変更手段302へ送る。そして監視制御拠点2~4の操作卓24の複数監視権限変更手段302では、受信した複数監視権限の変更情報に基づいて複数監視権限データ303を表5の通りに変更する。
 ここで、電気所8に属する電力設備12の状態が変化した場合、電力設備12は状態変化を表す監視情報を、広域ネットワーク網7を介して監視制御装置6へ送信する。監視制御装置6は複数監視情報受信手段305により電力設備12の監視情報を受信し、複数監視情報送信手段302に送る。複数監視情報送信手段302は電力設備12の監視情報を、広域ネットワーク網5を介して監視制御拠点1~4の操作卓24へ送信する。
 監視制御拠点1~4の操作卓24は、監視情報受信手段111により電力設備12の監視情報を受信し、監視情報判定手段108へ送信する。監視情報判定手段108では、受信した電力設備12の監視情報について、複数監視権限データファイル303(監視権限データの内容は表5を参照)を基に、監視情報出力手段103への出力要否を判定する。
 表5より、監視制御拠点1、2では、電力設備12に対する監視権限は「1:権限あり」である。そのため、監視制御拠点1、2の操作卓24において、監視情報判定手段108は監視情報出力手段103への出力要否を「要」と判定し、監視情報判定手段108は監視情報を監視情報出力手段103へと送る。監視情報出力手段103は、監視情報判定手段108の判定結果を基に、電力設備12の監視情報を、操作卓24の表示パネルと系統監視盤25のディスプレイ装置に出力する。
 監視制御拠点3および4の操作卓24は、監視情報受信手段111により電力設備12の監視情報を受信し、監視情報判定手段108へと送信する。監視情報判定手段108では、受信した電力設備12の監視情報につて、複数監視権限データファイル303(監視権限データの内容は表5を参照)を基に、監視情報出力手段103への出力要否を判定する。
 表5より、監視制御拠点3および4の電力設備12に対する監視権限は「0:権限なし」である。そのため、監視情報判定手段108は監視情報出力手段103への出力要否を「否」と判定し、監視情報判定手段108は監視情報を監視情報出力手段103へと送ることはない。監視情報出力手段103は、監視情報判定手段108の判定結果を基に、電力設備12の監視情報を出力することはない。以上のような電力設備12に関する監視については、電力設備13、14についても同様である。
(効果)
 第2の実施形態では、上記の第1の実施形態が持つ効果に加えて、次のような独自の効果を持つ。すなわち、第2の実施形態においては、表5のような複数監視権限データファイル303を設定することにより、電力設備12~14に対して2つの監視制御拠点1および2からの監視が可能となる。このような第2の実施形態によれば、複数の監視制御拠点が同一の電力設備の監視情報を取得することができ、複数の監視制御拠点に関わる連系設備の停止操作などにおいて、操作手順や実行状況を共有することが可能となる。よって、監視制御拠点間の情報連携が容易になり、システムの効率性がさらに向上する。
(3)第3の実施形態
 第3の実施形態に係る電力系統監視制御システムについて、図5、表6を参照して説明する。第3の実施形態の基本的な構成は上記第1の実施形態と同様であり、図5に示した操作卓24の構成に特徴がある。以下、図5のブロック図を用いて、第3の実施形態の構成について説明する。
 第3の実施形態では、制御フラグ設定部が、1つの電力設備に対し監視制御拠点が複数重複するように制御フラグを設定するように構成された点に特徴がある。1つの電力設備に対し監視制御拠点が複数重複するように制御フラグを設定した場合の制御権限を複数制御権限と呼ぶことにする。
 このような構成を実現するために、図5に示すように、第3の実施形態に係る操作卓24には、
 監視/制御権限変更入力手段104に代えて複数制御権限変更入力手段311が、
 監視/制御権限変更手段107に代えて複数制御限変更手段312が、
 監視権限データファイル109に代えて複数制御権限データファイル401が、
 監視/制御権限変更情報送信手段112に代えて複数制御権限変更情報送信手段314が、
 監視/制御権限変更情報受信手段113に代えて複数制御権限変更情報受信手段315が、設けられている。
 複数制御権限変更入力手段311は、オペレータが入力操作を行うことで、1つの電力設備12~23に対し複数の監視制御拠点1~4が「制御権限あり」となることを許容するよう入力する。ここで複数の監視制御拠点1~4のうち、複数の監視制御拠点が重複して「制御権限あり」となることが、「複数制御権限あり」の状態である。
 複数制御権限変更手段312は、複数制御権限変更入力手段311により起動して、複数制御権限データファイル401を変更する。また、複数制御権限変更手段312は、複数制御権限変更情報受信手段315が複数制御権限の変更情報を受信することにより起動して、複数制御権限データファイル401を変更する。複数制御権限変更情報送信手段314は変更された複数制御権限データファイル401に基づいて複数制御権限の変更情報を送信する。複数制御権限変更情報受信手段315は他の監視制御拠点2~4から複数制御権限の変更情報を受信する。
 1つの電力設備に対し複数の監視制御拠点を重複させた本実施形態では、異なる監視制御拠点が同一の電力設備に対して制御権限を持つことになる。そのため、異なる監視制御拠点が持つ制御権限に関しては優先順位を設定しておくようにする。例えば、監視制御拠点1と監視制御拠点2が共通の電力設備12に制御権限を持つ場合に、監視制御拠点1の方が最終的な制御の責任を持つ監視制御点とする。
 このため、監視制御拠点1において、制御権限がある電力設備12の制御実施中に、同じく電力設備12に対し制御権限がある監視制御拠点2の制御権限入力手段102にて制御情報を入力したとしても、監視制御拠点2の制御情報判定手段105は、監視制御拠点1にて電力設備12の制御を実施している限り、電力設備12への制御情報の送信要否を「否」と判定するようになっている。
 また、監視制御拠点1にて電力設備12の制御を実施しておらず、電力設備12に対し制御権限がある監視制御拠点2の制御権限入力手段102にて電力設備12への制御情報を入力した場合には、監視制御拠点2の制御情報判定手段105は、監視制御拠点1にて電力設備12の制御を実施していないことを確認し、その上で、電力設備12への制御情報の送信要否を「要」と判定するようになっている。 
(作用)
 以上の構成を有する第3の実施形態の作用について、図5を参照して説明する。複数制御権限データファイル401の中身である複数制御権限の例を表6に示す。表6は、上記の表2、表4と同様、電気所8~11の電力設備12~23について、監視制御拠点1~4のうちどの拠点が、どの電力設備を制御するかを定義したデータテーブルである。表6は、1つの電力設備に対して複数の監視制御拠点が「制御権限あり」となることを許容する。「0」の場合は「権限なし」として制御を行わない。「1」の場合は「権限あり」として制御を行う。つまり、「1:権限あり」が制御フラグとして設定されることになる。
Figure JPOXMLDOC01-appb-I000006
 以下の説明で、複数制御権限データファイル401の内容は、当初、前記表2の状態であるとする。表2の状態では、複数制御権限データファイル401は、1つの電力設備12~23に対し1つの監視制御拠点1~4のみが「制御権限あり」となっており、この場合は「複数制御権限あり」の状態とはなっていないことになる。
 監視制御拠点1の操作卓24において、複数制御権限データファイル401を表2から表6の内容へ変更する目的で、オペレータが複数制御権限変更入力手段311を用いて複数制御権限の変更情報を入力操作したとする。すなわち、電力設備12~14に対しては、2つの監視制御拠点1、2が「制御権限あり」となるように変更して、「複数制御権限あり」の状態にしたとする。そして複数制御権限変更入力手段311が複数制御権限の変更情報を複数制御権限変更手段312に送る。
 複数制御権限変更手段312は複数制御権限の変更情報に基づいて複数制御権限データファイル401を表6の通りに変更する。複数制御権限変更手段312は、複数制御権限データファイル401を変更した後、複数制御権限変更情報送信手段314に複数制御権限の変更情報を送る。複数制御権限変更情報送信手段314は監視制御拠点2~4の操作卓24へ複数制御権限の変更情報を送信する。
 監視制御拠点2~4の操作卓24では、複数制御権限変更情報受信手段315が複数制御権限の変更情報を受信し、複数制御権限変更手段312へ送る。そして監視制御拠点2~4の操作卓24の複数制御権限変更手段312では、受信した複数制御権限の変更情報に基づいて、複数制御権限データファイル401を表6の通りに変更する。
 例えば、監視制御拠点1において、オペレータが操作卓24を介して制御情報入力手段102を用いて電気所8に属する電力設備12に対する制御指令を入力した場合、電力設備12の制御情報を制御情報判定手段105に送る。制御情報判定手段105は、受け取った制御情報について、複数制御権限データファイル401を基に、電力設備12への送信要否を判定する。
 表6より、監視制御拠点1における電力設備12に対する制御権限は「1:権限あり」である。そのため、制御情報判定手段105は制御情報送信手段110への出力要否を「要」と判定し、電力設備12の制御情報を制御情報出送信手段110へと送る。制御情報送信手段110は、制御情報判定手段105の判定結果を基に、電力設備12の制御情報を、広域ネットワーク網5を介して監視制御装置6へ送信する。
 監視制御装置6は制御情報受信手段201により電力設備12の制御情報を受信し、制御情報送信手段203に送る。制御情報送信手段203は電力設備12の制御情報を、広域ネットワーク網5を介して電気所8に属する電力設備12へ送信する。電力設備12は、監視制御拠点1から受信した制御情報を基に、制御を実施する。
 監視制御拠点1において電力設備12の制御実施中に、オペレータが監視制御拠点2の制御権限入力手段102から制御情報を入力すると、監視制御拠点2の制御情報判定手段105は、この制御情報を受け取る。ただし、監視制御拠点1で電力設備12の制御を実施している限り、たとえ監視制御拠点2に電力設備12の制御権限があるにせよ、監視制御拠点2の制御情報判定手段105は電力設備12の制御情報の送信要否を「否」と判定する。
 すなわち、本実施形態では最終的な責任を持つ監視制御点1が最終的な制御を行う。このため、監視制御拠点2の制御情報判定手段105は制御情報を制御情報送信手段110へと送ることなく、エラー情報をエラー情報出力手段101へと送信する。エラー情報出力手段101は、制御情報判定手段105の判定結果を基にエラー情報を、操作卓24の表示パネルと系統監視盤25のディスプレイ装置に出力する。
 ただし、監視制御拠点1において電力設備12の制御を実施していない場合には、オペレータが監視制御拠点2の制御権限入力手段102から制御情報を入力すると、監視制御拠点2の制御情報判定手段105は、この制御情報を受け取る。そして、制御情報判定手段105が監視制御拠点1にて電力設備12の制御を実施していないことを確認した上で、電力設備12への制御情報の送信要否を「要」と判定する。このため、監視制御拠点2の制御情報判定手段105は制御情報を制御情報送信手段110へと送る。
 また、監視制御拠点1による制御実施後、監視制御拠点2において、オペレータが操作卓24の制御情報入力手段102を用いて電力設備12に対する制御指令を入力した場合、制御情報入力手段102は電力設備12の制御情報を制御情報判定手段105に送る。制御情報判定手段105は、受け取った電力設備12の制御情報について、複数制御権限データファイル401を基に、電力設備12への送信要否を判定する。表6より、系統監視制御拠点2の電力設備12に対する制御権限は「1:権限あり」のため、制御情報判定手段105は電力設備12への制御情報の送信要否を「要」と判定し、制御情報判定手段105は電力設備12の制御情報を制御情報送信手段110へと送信する。
 制御情報送信手段110は、制御情報判定手段105の判定結果を基に、電力設備12の制御情報を、広域ネットワーク網5を介して監視制御装置6へ送信する。監視制御装置6は制御情報受信手段201により制御情報を受信し、制御情報送信手段203に送る。制御情報送信手段203は電力設備12の制御情報を、広域ネットワーク網7を介して電気所8に属する電力設備12へ送信する。電力設備12は、監視制御拠点2からの制御情報を基に、制御を実施する。以上のような電力設備12に関する制御については、電力設備13、14についても同様である。
(効果)
 第3の実施形態では、上記第1の実施形態が持つ効果に加えて、次のような独自の効果を持つ。すなわち、 第3の実施形態においては、表6に示したような複数制御権限データファイル401を設定することにより、電力設備12~14に対して2つの監視制御拠点1および2からの制御が可能となる。したがって、第3の実施形態によれば、電力系統の接続状態による監視制御拠点毎の管轄系統を意識することなく、同一の電力設備に関する電圧無効電力制御などを、複数の監視制御拠点から行うことができる。よって、システム運用の柔軟性をさらに高めることができる。
(4)第4の実施形態
 第4の実施形態に係る電力系統監視制御システムについて、図6、表7、表8を参照して説明する。第4の実施形態の基本的な構成は上記第1の実施形態と同様であり、図6のブロック図に示した操作卓24の構成に特徴がある。以下、図6を用いて、第4の実施形態の構成について説明する。
(構成)
 第4の実施形態の特徴は、監視権限または制御権限の権限変更手段が、予めグルーピングされた電力設備ごとに、監視権限または制御権限を一括して変更するように構成された点にある。複数の電力設備を1つのグループとして登録し、登録したグループ単位で付与される監視権限または制御権限を、グループ監視権限またはグループ制御権限と呼ぶことにする。電力設備のグループ化に際しては、電力設備の設置個所や接続設備、管理組織など、電力設備が持つ属性情報に基づいて、グループ分けを行うものとする。
 図6に示す監視制御拠点1の操作卓24には、図2で説明した操作卓24のうち、
 監視権限データファイル109に代えてグループ監視権限データファイル504が、
 制御権限データファイル106に代えてグループ制御権限データファイル502が、
 監視/制御権限変更入力手段104に代えてグループ監視/制御権限変更入力手段501が、
 監視/制御権限変更手段107に代えてグループ監視/制御権限変更手段503が、
 監視/制御権限変更情報受信手段113に代えてグループ監視/制御権限変更情報受信手段506が、
 監視/制御権限変更情報送信手段112に代えてグループ監視/制御権限変更情報送信手段505が、設けられている。
 このうち、グループ監視/制御権限変更入力手段501は、オペレータが操作卓24を介して複数の電力設備を、
電気所8に含まれる3台の電力設備12~14を1つのグループ、
電気所9に含まれる4台の電力設備15~18を1つのグループ、
電気所10に含まれる2台の電力設備19、20を1つのグループ、
電気所11に含まれる3台の電力設備21~23を1つのグループとして登録する。
 グループ監視/制御権限変更入力手段501が、電力設備の監視権限および制御権限を変更する場合、グループ単位で一括して変更を許容するよう入力する。グループ単位で変更される電力設備の監視権限および制御権限の変更情報を、グループ監視/制御権限の変更情報と呼ぶことにする。
 グループ監視/制御権限変更手段503は、グループ監視/制御権限変更入力手段501から変更情報を入力することにより起動し、グループ監視/制御権限の変更情報に基づいてグループ監視権限データファイル504およびグループ制御権限データファイル502を変更する。また、グループ監視/制御権限変更手段503は、他の監視制御拠点からグループ監視/制御権限変更情報受信手段506がグループ監視/制御権限変更情報を受信することでも起動し、グループ監視/制御権限の変更情報に基づいてグループ監視権限データファイル504およびグループ制御権限データファイル502を変更する。
 グループ監視権限データファイル504はグループ監視/制御権限変更手段503からグループ監視権限の変更情報を入力し、グループ制御権限データファイル502はグループ監視/制御権限変更手段503からグループ制御権限の変更情報を入力し、これらの変更情報を、グループ監視/制御権限変更情報送信手段505へと送る。
 グループ監視/制御権限変更情報送信手段505は、グループ監視権限データファイル504および制御権限データファイル502に基づいて、自拠点以外の他の監視制御拠点へと、グループ監視/権限変更の変更情報を送信する。グループ監視/制御権限変更情報受信手段506は他の監視制御拠点2~4からのグループ監視/制御権限の変更情報を受信する。
(作用)
 第4の実施形態の作用について、図6を参照して説明する。グループ監視権限データファイル504の中身であるグループ監視権限の例を表7、表8に示す。表7と表8は、電気所8~11の電力設備12~23の状態変化を、監視制御拠点1~4のうち、どの監視制御拠点が監視するかを定義したデータテーブルであって、各電力設備を電気所ごとにグルーピングしている。第4の実施形態では、電気所8~11のそれぞれが1つのグループとして登録されており、各電気所8~11に含まれる電力設備12~23は、グループ単位つまり電気所ごとに、一括して監視権限が変更されることになる。
Figure JPOXMLDOC01-appb-I000007
Figure JPOXMLDOC01-appb-I000008
 表7では、監視制御拠点1が電気所8に含まれる電力設備12~14だけを監視し、監視制御拠点2が電気所9に含まれる電力設備15~18だけを監視し、監視制御拠点3が電気所10に含まれる電力設備19、20だけを監視し、監視制御拠点4が電気所11に含まれる電力設備21~23だけを監視している。ここで、オペレータが監視権限データを表7から表8に変更するオペレーションをとるものとする。
 例えば、オペレータが操作卓24のグループ監視/制御権限変更入力手段501を用いてグループ監視権限の変更情報を入力した場合、グループ監視/制御権限変更入力手段501はグループ監視権限の変更情報を、グループ監視/制御権限変更手段503に送る。グループ監視/制御権限変更手段503は受け取ったグループ監視権限の変更情報を基にグループ監視権限データファイル504を表8の通り、監視制御拠点1のグループ権限と監視制御拠点2のグループ監視権限を変更する。
 すなわち、監視制御拠点2が電気所8に含まれる電力設備12~14だけを監視し、監視制御拠点1が電気所8に含まれる電力設備15~18だけを監視する。監視制御拠点3、4の監視対象は変更しない。グループ監視権限データファイル504の変更後、グループ監視/制御権限変更情報送信手段505は、他拠点である監視制御拠点2~4の操作卓24へグループ監視権限の変更情報を送信する。
 監視制御拠点2~4の操作卓24では、グループ監視/制御権限変更情報受信手段506がグループ監視権限の変更情報を受信し、グループ監視/制御権限変更手段503に送信する。グループ監視/制御権限変更手段503は受信したグループ監視権限の変更情報に基づいてグループ監視権限データファイル504を表8の通りに変更する。
(効果)
 以上のような第4の実施形態によれば、電力設備12~23の設置個所や接続設備、管理組織などの属性情報によって電力設備をグループ化しておき、グループ単位で一括して、監視権限および制御権限を変更することができる。このため、オペレータが個々の電力設備12~23に対し、いちいち監視権限および制御権限の設定変更を行う必要がない。したがって、監視制御拠点1~4のいずれかが被災して使用不能に陥った場合でも、監視制御拠点1~4間で、グループ化した電力設備12~23の監視範囲および制御範囲を、一括して迅速に引き継ぐことができ、業務の安定性がいっそう向上する。
(5)第5の実施形態
 第5の実施形態に係る電力系統監視制御システムの実施例を図7、表9を参照して説明する。第5の実施形態の基本的な構成は上記第4の実施形態と同様であり、図7に示した操作卓24の構成に特徴がある。以下、図7を用いて、第5の実施形態の構成について説明する。
(構成)
 第5の実施形態は、監視権限または制御権限の権限変更手段が、予め設定されたパターン単位で監視権限または制御権限の変更を行うことに特徴がある。図7に示す監視制御拠点1の操作卓24は、第4の実施形態の操作卓24にて「グループ」と記載した部分を、「パターン」に変えている。前述したように「グループ」とは、電気所単位等でフラグ全体をまとめて一括して変更する電力設備群である。一方、「パターン」とは、例えば、被災時や通常時、メンテナンス時等を独立した別のシーンと予め設定しておき、外部からの指令によりシーンを切替える場合に、シーン切替えに伴って、各シーンに該当するフラグ全体を一括して変更する場合の変更状況である。つまり、「グループ」の場合、変更を要する対象だけが決められており変更値は適宜選択されるが、これに対して「パターン」の場合は、変更対象および変更値が予め設定されている。
 パターン単位で付与される監視権限または制御権限を、パターン監視権限またはパターン制御権限と呼ぶことにする。ここで、監視権限または制御権限に設定されるパターンとは、例えば、任意の監視制御拠点が被災したケースをあらかじめ複数想定しておき、それぞれ想定したケースに対する監視制御拠点のバックアップ運用状態の組み合わせパターンなどがある。
 すなわち、第5の実施形態に係る操作卓24には、
 グループ監視権限データファイル504に代えてパターン監視権限データファイル604が、
 グループ制御権限データファイル502に代えてパターン制御権限データファイル602が、
 グループ監視/制御権限変更入力手段501に代えてパターン監視/制御権限変更入力手段601が、
 グループ監視/制御権限変更手段503に代えてパターン監視/制御権限変更手段603が、
 グループ監視/制御権限変更情報受信手段506に代えてパターン監視/制御権限変更情報受信手段606が、
 グループ監視/制御権限変更情報送信手段505に代えてパターン監視/制御権限変更情報送信手段605が、設けられている。
 このうち、パターン監視/制御権限変更入力手段601は、オペレータが操作卓24を介して監視権限の設定値および制御権限の設定値を、あらかじめ複数のパターンとして登録しておき、パターン単位で変更することを許容するよう入力する。ここで、パターン監視権限およびパターン制御権限の変更情報を、パターン監視/制御権限の変更情報と呼ぶこととする。
 パターン監視/制御権限変更手段603は、パターン監視/制御権限変更入力手段601により起動して、パターン監視/制御権限の変更情報に基づきパターン監視権限データファイル604およびパターン制御権限データファイル602を変更する。また、パターン監視/制御権限変更手段603は、他の監視制御拠点からパターン監視/制御権限変更情報受信手段606がパターン監視/制御権限変更情報を受信することで起動し、パターン監視/制御権限の変更情報に基づきパターン監視権限データファイル604およびパターン制御権限データファイル602を変更する。
 パターン監視権限データファイル604はパターン監視/制御権限変更手段603からパターン監視権限の変更情報を入力し、パターン制御権限データファイル602はグループ監視/制御権限変更手段603からパターン制御権限の変更情報を入力し、これらの変更情報を、パターン監視/制御権限変更情報送信手段605へと送る。
 パターン監視/制御権限変更情報送信手段605は、パターン監視権限データファイル604およびパターン権限データファイル602に基づいて、他の監視制御拠点へと、パターン監視/権限変更の変更情報を送信する。パターン監視/制御権限変更情報受信手段606は他の監視制御拠点からのパターン監視/制御権限の変更情報を受信する。
(作用)
 第5の実施形態の作用について、図7を参照して説明する。パターン制御権限データファイル602の中身であるパターン制御権限の例を表9に示す。表9は、監視制御拠点1~4のうち、どの拠点が、電気所8~11の電力設備12~23のどれを制御するかを定義したデータテーブルであって、各電力設備の制御権限を、予め設定されたパターン単位で変更するようになっている。
Figure JPOXMLDOC01-appb-I000009
 監視制御拠点1の操作卓24において、パターン制御権限データファイル602の内容は、当初、前述した表2の状態であったとする。ここで、オペレータは制御権限を、表2の状態から、あらかじめパターンとして登録された表9の状態に変更するオペレーションをとるものとする。オペレータが操作卓24を利用し、パターン監視/制御権限変更入力手段603を用いてパターン制御権限の変更情報を入力する。このとき、パターン監視/制御権限変更入力手段603はパターン制御権限の変更情報をパターン監視/制御権限変更手段603に送る。
 パターン監視/制御権限変更手段603は受け取ったグループ制御権限の変更情報を基にパターン制御権限データファイル602を、表2から表9のように変更する。すなわち、監視制御拠点1が電気所8に含まれる電力設備12~14と、電気所9に含まれる電力設備15~18の両方を制御し、監視制御拠点2は電気所9に含まれる電力設備15~18を制御しないものとする。監視制御拠点3、4の制御対象は変更していない。パターン制御権限データファイル602の変更後、パターン監視/制御権限変更情報送信手段605が監視制御拠点2~4の操作卓24へパターン制御権限の変更情報を送信する。
 監視制御拠点2~4の操作卓24では、パターン監視/制御権限変更情報受信手段606がパターン制御権限の変更情報を受信し、パターン監視/制御権限変更手段603に送信する。パターン監視/制御権限変更手段603は受信したパターン制御権限の変更情報に基づいてパターン制御権限データファイル602を表9の通りに変更する。これにより、仮に監視制御拠点2が使用不能となったとしても、電気所2に含まれる電力設備15~18に対する制御権限を、あらかじめ設定されたパターンに基づいて、監視制御拠点2から、使用可能な監視制御拠点1へと変更することが可能となる。
(効果)
 以上のような第5の実施形態によれば、あらかじめ設定したパターン単位で監視権限または制御権限を変更することができるため、グループ単位で一括して監視権限および制御権限を変更することと同じく、監視権限および制御権限を迅速に変更することができる。そのため、バックアップ運用への移行もスピーディとなり、業務の安定性を高めることができる。
(6)第6の実施形態
 第6の実施形態に係る電力系統監視制御システムについて、図8、図9、表10、表11を参照して説明する。以下、図8および図9を用いて、第6の実施形態の構成について説明する。図8は第6の実施形態のモニタの表示例を示す図、図9は第6の実施形態における操作卓の構成を示すブロック図である。
(構成)
 第6の実施形態では、操作卓24に複数の監視制御拠点1~4の系統状態を切り替えて表示するモニタ701を備えた点に特徴がある。第6の実施形態は、基本的な構成は上記第1の実施形態と同様であるが、図9に示すように、モニタ701は、タッチパネルなどの入力手段を兼ねた表示パネルを有している。モニタ701は監視情報出力手段103と監視/制御権限変更入力手段104の役割を果たす構成要素であって、オペレータがタッチパネルなどを用いて、監視管轄定義および監視権限の変更情報の入力操作を行うようになっている。ここで監視管轄定義および監視権限の変更情報を監視管轄定義/監視権限変更情報と呼ぶことにする。
 監視管轄定義とは、監視制御拠点1~4のうち、どの監視制御拠点の管轄を監視範囲とするかを定義することであって、監視制御拠点1~4のいずれかの拠点名称をモニタ701の表示画面の一部に表示することで、監視範囲を示すようになっている。図8に示す表示例では、モニタ701の左角部に監視管轄表示領域702が設けられており、監視制御拠点4の管轄を監視範囲と定義すれば、図8の(a)のように監視管轄表示領域702に「監視制御拠点4」が出力表示される。また、監視制御拠点3の管轄を監視範囲と定義すれば、図8の(b)のように、監視管轄表示領域702に「監視制御拠点3」が出力表示される。
 モニタ701には監視管轄定義/監視権限変更手段705が接続されている。モニタ701は監視管轄定義/監視権限変更手段705に対し、オペレータの入力した監視管轄定義および監視権限の変更情報を送るようになっている。監視管轄定義/監視権限変更手段705は、モニタ701から監視管轄定義/監視権限変更情報を入力することにより起動する。起動した監視管轄定義/監視権限変更手段705は、モニタ701からの監視管轄定義/監視権限変更情報に従って、監視管轄定義データファイル704および監視権限データファイル109に変更を加える。
 監視管轄定義データファイル704は監視管轄定義/監視権限変更手段705から変更された監視管轄定義を入力し、変更された監視管轄定義を監視情報判定手段708へと送る。監視情報判定手段708は、監視管轄定義データファイル704および監視権限データファイル109を基にして、監視情報受信手段111にて受信した監視情報をモニタ701への出力の要否を判定し、出力を「要」と判定すれば、受信した監視情報をモニタ701へと送る。
(作用)
 第6の実施形態の作用について、図9を参照して説明する。監視管轄定義データファイル704の中身である監視管轄定義の例を、表10、表11に示す。表10と表11は、電力系統監視制御拠点1~4のうち、どの拠点の管轄を監視範囲とするかを定義したデータテーブルである。表10、表11において、「0」の場合は「管轄対象なし」として監視範囲の管轄としないことを示す。「1」の場合は「管轄対象あり」として監視範囲の管轄とすることを示す。表10に示す監視管轄定義データファイル704の内容は、監視制御拠点4のみが「管轄対象あり」となっており、表11に示す監視管轄定義データファイル704の内容は、監視制御拠点3のみが「管轄対象あり」となっている。
Figure JPOXMLDOC01-appb-I000010
Figure JPOXMLDOC01-appb-I000011
 例えば、モニタ701が表示画面上の監視管轄表示領域702に「監視制御拠点4」を出力表示しているとき、監視情報受信処理手段111により監視情報を受信後、表10の通りである監視管轄定義データファイル704内の監視管轄定義に関するデータを基にして、受信した監視管轄内の電力設備の監視情報をモニタ701に出力する。
 オペレータがモニタ701のタッチパネルなどを用いて、監視管轄定義の変更情報の入力操作を行い、「監視制御拠点4」から「監視制御拠点3」へと監視管轄を変更したとすると、管轄定義/監視権限変更手段705は、表10から表11の通りに監視管轄定義ファイル704を変更する。これにより、モニタ701では監視管轄表示領域702に「監視制御拠点3」を表示する。このとき、監視情報受信処理手段111により監視情報を受信後、監視情報判定手段708では監視管轄定義データファイル704の監視管轄定義に関するデータを基にして、受信した監視管轄内の監視情報をモニタ701に出力する。
(効果)
 このような第6の実施形態によれば、操作卓24のモニタ701が、複数の監視制御拠点1~4の系統状態を切り替えて表示することにより、1つの操作卓24から管轄内の電力設備を監視するだけでなく、管轄外の電力設備の監視も実行することができる。また、上記の「監視管轄定義ファイル」の「監視」を「制御」に代えて、「制御管轄定義ファイル」を採用すれば、1つの操作卓24から管轄内の電力設備を制御するだけでなく、管轄外の電力設備に対しても制御を実行することができる。
 したがって、第6の実施形態に係る電力系統監視制御システムによれば、従来の電力系統監視制御システムと比較して、電力設備の管轄を固定的にとらえることがなく、柔軟なシステム運用が可能となる。その結果、災害時などに監視制御拠点が使用不能となってその機能が停止したとしても、停止した監視制御拠点の管轄下にある電力設備の監視制御を、使用可能な監視制御拠点から実施することができる。これにより、システムの運用を継続して行うことができ、システム効率が低下することがなく、優れた信頼性を発揮することができる。
(7)第7の実施形態
 第7の実施形態に係る電力系統監視制御システムについて、図10、図11、表1を参照して説明する。以下、図10および図11を用いて、第7の実施形態の構成について説明する。図10は第7の実施形態のモニタの表示例を示す図、図11は第7の実施形態における操作卓の構成を示すブロック図である。
 (構成)
 第7の実施形態は、前記第6の実施形態と同じく、モニタ701における表示構成に特徴がある。第7の実施形態では、図11に示すように、操作卓24のモニタ701が、「監視制御拠点1」、「監視制御拠点2」、「監視制御拠点3」および「監視制御拠点4」の表示を切り替える拠点表示切替部801~804と、各拠点が管轄とする電力系統の状態を示す系統図805~808を、出力表示する。
 すなわち、オペレータが、
拠点表示切替部804を選択すると監視制御拠点1管轄下の系統図805を((a)に図示)、
拠点表示切替部803を選択すると監視制御拠点2管轄下の系統図806を((b)に図示)、
拠点表示切替部802を選択すると監視制御拠点3管轄下の系統図807を((c)に図示)、
拠点表示切替部801を選択すると監視制御拠点4管轄下の系統図808を((d)に図示)、
それぞれ表示するようになっている。拠点表示切替部801~804は長方形の表示領域を横方向に並べて表示しており、系統図805~808はその下方に表示するようになっている。
 拠点表示切替部801~804は、モニタ701上でタッチパネルなどの入力選択手段となっており、各表示領域をオペレータがタッチなどにより選択すると、拠点表示切替部801~804は、表示色を変えるなどして、オペレータに選択されたことを示す表示形態に移行する。また、拠点表示切替部801~804の表示切替と同時に、選択された拠点に応じて系統図805~808の表示を切り替えるようになっている。さらに、拠点表示切替部801~804は各拠点が管轄する系統図805~808の出力表示と共に、各拠点が管轄とする電力系統や設備の状態などの監視情報も表示する。
(作用)
 第7の実施形態の作用について、図10、図11、表1を参照して説明する。例えばオペレータが拠点表示切替部804を選択すると、その部分が選択されたことを示す表示がなされると同時に、監視制御拠点4の系統図805と、監視制御拠点4が管轄とする電力系統や設備の状態などの監視情報を、モニタ701上に表示する。
 また、オペレータが拠点表示切替部801~803のいずれかを選択すると、選択された拠点表示切替部801~803は選択されたことを示す表示形態に移行し、それに合わせて、監視制御拠点4の管轄ではない監視制御拠点1~3の系統図806~808を表示する(図10参照)。これにより、監視制御拠点4に設置された操作卓24のモニタ701上に、他拠点である監視制御拠点1~3が管轄とする電力系統や電力設備の監視情報を表示することが可能となる。よって、監視制御拠点4にて、監視制御拠点1~3の管轄下にある電力系統や電力設備を監視することができる。
(効果)
 以上のような拠点表示切替部801~804を有する第7の実施形態によれば、1つの操作卓24から各監視制御拠点1~4の系統図805~808を切り替えて表示することができるので、各監視制御拠点1~4の管轄内だけでなく、管轄外の電力系統および電力設備についても監視が可能である。したがって、従来の電力系統監視制御システムと比較して、各監視制御拠点1~4でそれぞれの監視情報を容易に共有することができ、監視制御拠点1~4間での業務連携も可能となる。その結果、柔軟性の高いバックアップ運用が可能となり、システムの効率がさらに向上する。
(8)第8の実施形態
 第8の実施形態に係る電力系統監視制御システムについて、図12、図13、表12を参照して説明する。以下、図12および図13を用いて、第8の実施形態の構成について説明する。図12は第8の実施形態のモニタの表示例を示す図、図13は第8の実施形態における操作卓の構成を示すブロック図である。
 (構成)
 第8の実施形態もまた、モニタ701の表示画面の構成に特徴がある。第8の実施形態は、基本的に前記第7の実施形態の構成と同様であるが、次の点に特徴がある。図12および図13に示すように、モニタ701には、拠点表示切替部801~804と、系統図805~808が表示する管轄内の電力設備シンボル901、902と、電力設備シンボル901、902に発せられるアラーム903と、その電力設備を管轄内に含む監視制御拠点の拠点表示切替部801~804の表示領域から発せられるアラーム904とを表示する。これらのアラーム903、904は、系統図805~808上に管轄の事故範囲を表示するためのものである。アラーム903、904は、電力設備12~23の事故情報に基づいて、監視情報判定手段108から事故情報(図13の二点鎖線の矢印に図示)がモニタ701に送られることで表示されるように設定されている。
 第8の実施形態における監視情報判定手段108では監視権限データファイル109を基に、モニタ701上の表示切替部801~804と系統図805~808に対し、電力設備12~23の監視情報の出力要否について、判定するようになっている。さらに監視情報判定手段108では、受信した監視情報の中に、電力設備12~23の事故情報が含まれていると、事故情報(図13の二点鎖線の矢印に図示)をモニタ701に送るようになっている。
 例えば、電力設備シンボル901が電力設備22の状態を表示し、電力設備シンボル902が電力設備21の状態を表示している場合、電力設備22の監視情報の中に事故情報が含まれていれば、監視情報判定手段108は電力設備22の事故情報をモニタ701に送る。モニタ701は電力設備22の事故情報を受け取ると、事故情報に該当する電力設備シンボル901にアラーム903を発することになる。また、電力設備23の監視情報の中に事故情報が含まれていれば、監視情報判定手段108は電力設備23の事故情報をモニタ701に送る。モニタ701は電力設備23の事故情報を受け取ると、エラー情報に該当する電力設備シンボル902にアラーム903を発することになる。
(作用)
 以上のような第8の実施形態の作用について、図12、図13、表12を参照して説明する。監視権限データファイル109の中身の例を表12に示す。表12は、電気所8~11の電力設備12~23を、監視制御拠点1~4のうちどの拠点が監視するかを定義したデータテーブルである。表12は、1つの電力設備に対して複数の監視制御拠点が「権限あり」となることを許容する。
Figure JPOXMLDOC01-appb-I000012
 「0」の場合は権限なしとして監視を行わない。「1」の場合は権限ありとして監視を行う。監視情報判定手段108では、監視管轄定義データファイル704と監視権限データファイル109を基に、受信した監視情報と、電力設備から得られる監視情報について、モニタ701上の表示切替部801~804と系統図805~808における監視情報の出力要否を判定する。
 表12より、監視制御拠点3では、監視制御拠点3管轄下にある電力設備19、20に対する監視権限は、「1:権限あり」であり、これに加えて、監視制御拠点4管轄下の電力設備21に対する監視権限もまた「1:権限あり」である。そのため、監視情報判定手段108は、モニタ701上の拠点表示切替部803、804および系統図805、806に関し、電力設備19~21から得られる監視情報の出力要否について、「要」であると判定する。
 モニタ701は、監視情報判定手段108の判定結果を基に、電力設備21~23からの監視情報を、モニタ701上の拠点表示切替部803、804と系統図805、806へ向けて出力する。このとき、監視情報判定手段108が事故情報を出力した場合、出力が「要」と判定された系統図上の電力設備シンボルと、その電力設備を管轄に含む拠点表示切替部に対し、アラーム903、904を発生させることができる。
 また、表12より、監視制御拠点3では、監視制御拠点4管轄下の電力設備22に対する監視権限は「0:権限なし」である。そのため、監視情報判定手段108は、モニタ701上の拠点表示切替部803と系統図806に関し、電力設備22から得られる監視情報の出力要否について、「否」と判定する。モニタ701は、監視情報判定手段108の判定結果を基に、電力設備22からの監視情報をモニタ701上の拠点表示切替部803と系統図806上へ向けて出力しない。その結果、「否」と判定された系統図上の電力設備シンボルと、その設備を管轄に含む拠点表示切替部に対し、事故情報に基づくアラーム903、904を発生させることはない。
 さらに、表12より、監視制御拠点4では、監視制御拠点4管轄下の電力設備21~23に対する監視権限は「1:権限あり」である。そのため、監視情報判定手段108は、モニタ701上の拠点表示切替部804と系統図805に関し、電力設備21~23から得られる監視情報の出力要否について、「要」と判定する。また、監視制御拠点4では、監視制御拠点3管轄下にある電力設備20に対する監視権限は「1:権限あり」である。
 したがって、監視情報判定手段108は、モニタ701上の拠点表示切替部804と系統図805に関し、電力設備20から得られる監視情報の出力要否について、「要」と判定する。モニタ701は、監視情報判定手段108の判定結果を基に、電力設備20からの監視情報をモニタ701上の拠点表示切替部804と系統図805へ向けて出力する。このとき、監視情報判定手段108が事故情報を出力した場合、出力が「要」と判定された系統図上の電力設備シンボルと、その電力設備を管轄に含む拠点表示切替部に対し、アラーム903、904を発生させることができる。
(効果)
 以上のような第8の実施形態によれば、各監視制御拠点において、監視管轄内に限らず、監視管轄外の電力設備であっても監視管轄として登録することで可能であり、登録した監視管轄外の電力設備について、事故情報を基にしてアラーム903、904によって表示することができる。これにより、従来の電力系統監視制御システムと比較して、各監視制御拠点で、管轄内外の重要な電力設備における事故情報を、速やかに報知することができる。
 しかも、電力設備の事故情報を、系統図に対応する管轄の事故範囲として表示するアラーム903、904を採用しているため、複数のオペレータに事故情報を容易に知らしめることができる。したがって、各監視制御拠点のオペレータは互いにカバーしあいながら、電力設備のエラー情報を早い段階で気づくことが可能となる。その結果、事故対応等がスムーズ且つ迅速に行えるようになり、システムの効率を一層高めることができる。
(9)第9の実施形態
 第9の実施形態について、図14、図15、表1を参照して説明する。以下、図14および図15を用いて、第9の実施形態の構成について説明する。図14は第9の実施形態のモニタの表示例を示す図、図15は第9の実施形態における操作卓の構成を示すブロック図である。
(構成)
 第9の実施形態では、図9に示した操作卓24に代えて、系統監視盤25が設けられている。系統監視盤25が有する構成要素は、監視管轄定義/監視権限変更手段705など、基本的に図9に示した第6の実施形態における操作卓24のそれと同様であるが、図9で説明した操作卓24のモニタ701の代わりに、系統監視盤25のモニタ1001が設けられている。モニタ1001上にはマルチウィンドウ1002~1004が表示されるようになっている。
 マルチウィンドウ1002は「監視制御拠点2」を、マルチウィンドウ1003は「監視制御拠点3」を、マルチウィンドウ1004は「監視制御拠点4」を、それぞれ表示するようになっている。マルチウィンドウ1002はモニタ1001の左半分の正方形領域に形成され、マルチウィンドウ1003とマルチウィンドウ1004はモニタ1001の右半分に形成されている。マルチウィンドウ1003はモニタ1001の右半分の上側に、マルチウィンドウ1004はモニタ1001の右半分の下側に形成される。
(作用)
 第9の実施形態の作用について、図14、図15、表1を参照して説明する。監視権限データファイル109の中身の例を表1に示す。例えば、監視制御拠点4に設置されたモニタ1001上に、マルチウィンドウ1002~1004を表示して、それぞれには監視制御拠点2~4の監視情報を出力表示する。また、マルチウィンドウ1002~1004にはそれぞれ、監視制御拠点2~4が管轄とする系統図の情報を表示する。
 このとき、オペレータは、管轄とする監視制御拠点4の系統図の状態を、マルチウィンドウ1004に表示することで確認することができる。また、管轄でない監視制御拠点2、3の系統図の状態を、マルチウィンドウ1002、1003に表示することで確認することができる。マルチウィンドウ1002~1004に表示する系統図の情報は、受信する監視情報に含まれている。そこで、監視情報判定手段108によって、監視権限データファイル109を基にして、受信した監視情報を、モニタ1001上に表示されたマルチウィンドウ1002~1004上へ出力するか否かという出力要否の判定を行う。
 表1より、監視制御拠点2における電力設備15に対する監視権限は「1:権限あり」のため、監視情報判定手段108はマルチウィンドウ1002への監視情報の出力要否を「要」と判定する。モニタ1001は、監視情報判定手段108の判定結果を基に、監視情報に含まれる系統図の情報を、マルチウィンドウ1002上へ向けて出力する。
 また、表1より、監視制御拠点3、4では、電力設備15に対する監視権限は「0:権限なし」のため、監視情報判定手段108はモニタ1001上のマルチウィンドウ1003、1004への監視情報の出力要否を「否」と判定する。モニタ1001上のマルチウィンドウ1003、1004は、監視情報判定手段108の判定結果を基に、監視情報に含まれる系統図の情報を、マルチウィンドウ1003、1004へ向けて出力しない。
(効果)
 以上のような第9の実施形態では、系統監視盤25のマルチウィンドウ1002~1004上に、複数の監視制御拠点1~4の系統図を、表示することが可能である。そのため、従来の電力系統監視制御システムと比較して、オペレータは画面を切り替えることなく、必要な系統の状態を、系統監視盤25上から一括で知ることができる。また、マルチウィンドウなので、その表示位置を適宜変えることが容易であり、オペレータの運用しやすい画面レイアウトを簡単に作成することができる。
(10)第10の実施形態
 第10の実施形態について、図16、図17、表12を参照して説明する。以下、図16および図17を用いて、第10の実施形態の構成について説明する。図16は第10の実施形態のモニタの表示例を示す図、図17は第10の実施形態における操作卓の構成を示すブロック図である。
(構成)
 第10の実施形態は、上記第9の実施形態に改良を加えたものであり、図16、図17に示すように、系統監視盤25のモニタ1001上のマルチウィンドウ1002~1004に、電力設備12~23の事故情報(図17に二点鎖線の矢印で示す)などを表示するテロップ1101~1103および系統図1104~1106を表示するようにした点に特徴がある。電力設備12~23の事故情報は、前記第8の実施形態にて説明したものと同様、監視情報判定手段108から出力されるようになっている。テロップ1101~1103では、事故情報を示すメッセージが、固定、または流れるように表示される。
 (作用)
 第10の実施形態の作用について、図16、図17、表12を参照して説明する。監視権限データファイル109の中身の例を表12に示す。マルチウィンドウ1003は「監視制御拠点3」を表示対象、マルチウィンドウ1004は「監視制御拠点4」を表示対象として説明する。監視情報判定手段108では、監視管轄定義データファイル704と監視権限データファイル109を基に、受信した監視情報について、モニタ1001上のマルチウィンドウ1002~1004のテロップ1101~1103および系統図1104~1106への出力要否を判定する。
 表12より、監視制御拠点3の電力設備19、20に対する監視権限は「1:権限あり」である。そのため、監視情報判定手段108はモニタ1001上のマルチウィンドウ1002のテロップ1101や系統図1104に対して、監視情報の出力要否を「要」と判定する。また、監視制御拠点3の電力設備21に対する監視権限も「1:権限あり」である。そのため、監視情報判定手段108はモニタ1001上のマルチウィンドウ1003のテロップ1102や系統図1105に対して、監視情報の出力要否を「要」と判定する。
 モニタ1001は、監視情報判定手段108の判定結果を基にして、監視情報を、モニタ1001上のマルチウィンドウ1002、1003のテロップ1101、1102および系統図1104、1105に向けて出力する。このとき、監視情報判定手段108が電力設備19、20の事故情報を出力した場合、出力が「要」と判定されたテロップ1101、1102および系統図1104、1105に、電力設備19、20の事故情報を表示することができる。
 監視制御拠点3の電力設備22、23に対する監視権限は「1:権限なし」のため、監視情報判定手段108はモニタ1001上のマルチウィンドウ1003に、テロップ1102や系統図1105上への監視情報の出力要否を「否」と判定する。モニタ1001は、監視情報判定手段108の判定結果を基にして、モニタ1001上のマルチウィンドウ1003のテロップ1102や系統図1105に向けて、監視情報を出力することがない。したがって、電力設備22、23の事故情報を表示することはない。
 表12より、監視制御拠点4の電力設備21、23に対する監視権限は「1:権限あり」のため、監視情報判定手段108はモニタ1001上のマルチウィンドウ1004のテロップ1103や系統図1106への監視情報の出力要否を「要」と判定する。また、監視制御拠点4の電力設備20に対する監視権限も「1:権限あり」のため、監視情報判定手段108はモニタ1001上のマルチウィンドウ1004のテロップ1103や系統図1106への監視情報の出力要否を「要」と判定する。
 モニタ1001は、監視情報判定手段108の判定結果を基に、モニタ1001上のマルチウィンドウ1004のテロップ1103や系統図1106へ向けて、監視情報を出力する。このとき、監視情報判定手段108が電力設備21、23の事故情報を出力した場合、出力が「要」と判定されたテロップ1103および系統図1106に電力設備21、23の事故情報を表示させる。
(効果)
 以上のような第10の実施形態では、系統監視盤25のマルチウィンドウ1002~1004に、テロップ1101~1103と系統図1104~1106を表示し、ここに電力設備12~23の事故情報を表示することができる。これにより、オペレータは、管轄に影響を受けることなく、複数の系統図の状態を確認しながら、監視対象とした電力設備12~23の事故情報を、テロップ1101~1103上で、同時に確認することができる。これにより、系統状態の変化に対する速やかな対応が可能となり、システムの効率がより一層向上する。
(11)他の実施形態
 上記の実施形態は、本明細書において一例として提示したものであって、発明の範囲を限定することを意図するものではない。すなわち、その他の様々な形態で実施されることが可能であり、発明の範囲を逸脱しない範囲で、種々の省略や置き換え、変更を行うことが可能である。これらの実施形態やその変形例は、発明の範囲や要旨に含まれると同様に、請求の範囲に記載された発明とその均等の範囲に含まれるものである。
 電力系統監視制御システムは、CPU等を含むコンピュータを所定のプログラムで制御することによって実現できる。この場合のプログラムは、コンピュータのハードウェアを物理的に活用することで上記の処理を実現するものである。上記の処理を実行する方法、プログラム及びプログラムを記録した記録媒体も、実施形態の一態様である。
 ハードウェアで処理する範囲、プログラムを含むソフトウェアで処理する範囲をどのように設定するかは、特定の態様には限定されない。したがって、上記の各部のいずれかを、それぞれの処理を実現する回路として構成することも可能である。また、上記の各処理部や記憶部等は、共通のコンピュータにおいて実現してもよい。さらに、システム内の監視制御拠点や電気所の設置数や構成要素の種類、監視制御拠点における表示装置の種類、マルチウィンドウの表示数などは適宜選択可能である。また、系統図、電力設備のシンボル、アラームやフリッカ、テロップやメッセージなどの表示態様に関しても適宜変更自由である。
 また、1つの電力設備に対し複数の監視制御拠点を重複させた第3の実施形態では、異なる監視制御拠点が持つ制御権限に関し優先順位を設定したが、優先順位や、制御の最終的な責任を持つ拠点を変更するようにしてもよい。具体的には、表10、表11で示した「監視管轄定義データ」を「制御管轄定義データ」に変えたものを用意し、この定義データに基づいて、第3の実施形態における制御情報判定手段105の判定基準を変えるようにしてもよい。
1~4…監視制御拠点
5、7…広域ネットワーク網
6…監視制御装置
8~11…電気所
12~23…電力設備
24…操作卓
25…系統監視盤
101…エラー情報出力手段
102…制御情報入力手段
103…監視情報出力手段
104…監視/制御権限変更入力手段
105…制御情報判定手段
106…制御権限データファイル
107…監視/制御権限変更手段
108、708…監視情報判定手段
109…監視権限データファイル
110…制御情報送信手段
111…監視情報受信手段
112…監視/制御権限変更情報送信手段
113…監視/制御権限変更情報受信手段
201…制御情報受信手段
202…監視情報送信手段
203…制御情報送信手段
204…監視情報受信手段
301…複数監視/制御権限変更入力手段
302…複数監視/制御権限変更手段
303…複数監視権限データファイル
304…複数監視権限変更情報送信手段
305…複数監視権限変更情報受信手段
314…複数制御権限変更情報送信手段
315…複数制御権限変更情報受信手段
401…複数制御権限データファイル
501…グループ監視/制御権限変更入力手段
502…グループ制御権限データファイル
503…グループ監視/制御権限変更手段
504…グループ監視権限データファイル
505…グループ監視/制御権限変更情報送信手段
506…グループ監視/制御権限変更情報受信手段
601…パターン監視/制御権限変更入力手段
602…パターン制御権限データファイル
603…パターン監視/制御権限変更手段
604…パターン監視権限データファイル
605…パターン監視/制御権限変更情報送信手段
606…パターン監視/制御権限変更情報受信手段
701、1001…モニタ
702…監視管轄表示領域
704…監視管轄定義データファイル
705…監視管轄定義/監視権限変更手段
801~804…拠点表示切替部
805~808、1104~1106…系統図
901、902…電力設備シンボル
903、904…アラーム
1002~1004…マルチウィンドウ
1101~1103…テロップ
 

Claims (16)

  1.  監視情報を送信すると共に制御情報を受信する電力設備が配置された複数の電気所と、前記電力設備の監視情報を受信すると共に制御情報を送信する複数の監視制御拠点と、前記電力設備および前記監視制御拠点に対し広域ネットワーク網を介して前記電力設備の監視情報および制御情報を送受信する監視制御装置、を備えた電力系統監視制御システムにおいて、
     前記監視制御拠点は、
     前記電力設備と前記監視制御拠点とを関連付ける監視フラグを設定する監視フラグ設定部と、
     前記監視制御装置から前記電力設備の監視情報を受信する監視情報受信部と、
     前記監視情報の送信元の電力設備に対し前記監視フラグが設定されているか否かにより前記監視情報の出力要否を判定する監視情報判定部と、
     前記監視情報判定部の判定結果に基づき前記監視制御拠点にて前記監視情報を出力する監視情報出力部と、
     前記電力設備と前記監視制御拠点とを関連付ける制御フラグを設定する制御フラグ設定部と、
     前記電力設備の制御情報を入力する制御情報入力部と、
     前記制御情報の送信先の電力設備に対し前記制御フラグが設定されているか否かにより前記制御情報の送信要否を判定する制御情報判定部と、
     前記制御情報判定部の判定結果に基づき前記監視制御拠点から前記電力設備に対し前記制御情報を送信する制御情報送信部と、
    を備えたことを特徴とする電力系統監視制御システム。
  2.  前記監視フラグ設定部は、1つの前記電力設備に対し前記監視制御拠点が複数重複するように前記監視フラグを設定することを特徴とする請求項1に記載の電力系統監視制御システム。
  3.  前記制御フラグ設定部は、1つの前記電力設備に対し前記監視制御拠点が複数重複するように前記制御フラグを設定することを特徴とする請求項1に記載の電力系統監視制御システム。
  4.  前記監視フラグ設定部は、
     前記監視フラグの設定により定義される監視権限を入力する監視権限入力部と、
     前記監視権限に基づき既定の監視権限を変更する監視権限変更部を有し、
     前記制御フラグ設定部は、
     前記制御フラグの設定により定義される制御権限を入力する制御権限入力部と、
     前記制御権限に基づき既定の制御権限を変更する制御権限変更部を有することを特徴とする請求項1~3のいずれか1項に記載の電力系統監視制御システム。
  5.  前記監視フラグ設定部は、属性情報に基づいて予めグルーピングされた前記電力設備ごとに、一括して前記監視フラグの設定を変更することを特徴とする請求項1~4のいずれか1項に記載の電力系統監視制御システム。
  6.  前記制御フラグ設定部は、属性情報に基づいて予めグルーピングされた前記電力設備ごとに、一括して前記制御フラグの設定を変更することを特徴とする請求項1~4のいずれか1項に記載の電力系統監視制御システム。
  7.  前記監視フラグ設定部は、前記監視フラグの設定パターンを予め複数定義し、システムの運転中に設定パターンの変更を行うことを特徴とする請求項1~6のいずれか1項に記載の電力系統監視制御システム。
  8.  前記制御フラグ設定部は、前記制御フラグの設定パターンを予め複数定義し、システムの運転中に設定パターンの変更を行うことを特徴とする請求項1~6のいずれか1項に記載の電力系統監視制御システム。
  9.  前記監視制御拠点は、他の監視制御拠点から前記監視フラグまたは前記制御フラグの変更情報を受信する変更情報受信部を備え、
     前記監視フラグ設定部または前記制御フラグ設定部は、前記変更情報受信部が受信した前記変更情報に従って前記監視フラグまたは前記制御フラグの設定変更を行うことを特徴とする請求項1~8のいずれか1項に記載の電力系統監視制御システム。
  10.  前記監視情報は、注意を喚起するためのアラームあるいはメッセージを表示するように構成したことを特徴とする請求項1~9のいずれか1項に記載の電力系統監視制御システム。
  11.  前記監視制御拠点は、前記制御情報判定部が制御情報を送信しないと判定すると前記制御情報を送信しない旨のエラー情報を出力するエラー情報出力部を備えたことを特徴とする請求項1~10のいずれか1項に記載の電力系統監視制御システム。
  12.  前記監視制御拠点は、複数の前記監視制御拠点の系統状態を切り替えて表示する表示装置を備えたことを特徴とする請求項1~11のいずれか1項に記載の電力系統監視制御システム。
  13.  前記表示装置は、前記電力設備の事故情報を表示することを特徴とする請求項12に記載の電力系統監視制御システム。
  14.  前記電力設備の事故情報を、系統図に対応する管轄の事故範囲として表示することを特徴とする請求項13に記載の電力系統監視制御システム。
  15.  前記表示装置は、前記複数の系統図をマルチウィンドウで表示可能な系統監視盤を備えたことを特徴とする請求項1~14のいずれか1項に記載の電力系統監視制御システム。
  16.  前記表示装置は、マルチウィンドウ上に前記電力設備の事故情報を示すテロップを出力することを特徴とする請求項1~15のいずれか1項に記載の電力系統監視制御システム。
PCT/JP2015/085486 2015-01-23 2015-12-18 電力系統監視制御システム WO2016117257A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PH12017501325A PH12017501325A1 (en) 2015-01-23 2017-07-21 Electrical grid monitoring control system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-011754 2015-01-23
JP2015011754A JP2016136824A (ja) 2015-01-23 2015-01-23 電力系統監視制御システム

Publications (1)

Publication Number Publication Date
WO2016117257A1 true WO2016117257A1 (ja) 2016-07-28

Family

ID=56416817

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/085486 WO2016117257A1 (ja) 2015-01-23 2015-12-18 電力系統監視制御システム

Country Status (3)

Country Link
JP (1) JP2016136824A (ja)
PH (1) PH12017501325A1 (ja)
WO (1) WO2016117257A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111381583A (zh) * 2020-03-23 2020-07-07 北京经纬恒润科技有限公司 一种控制系统故障监测方法及装置

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7032044B2 (ja) * 2016-12-27 2022-03-08 株式会社クボタ 管理装置、及び、管理方法
JP7351112B2 (ja) * 2019-06-27 2023-09-27 中国電力株式会社 Lng設備

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000092751A (ja) * 1998-09-08 2000-03-31 Toshiba Corp 監視制御システム
JP2008123063A (ja) * 2006-11-08 2008-05-29 Chugoku Electric Power Co Inc:The 監視制御システムおよび方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4767238B2 (ja) * 2007-10-25 2011-09-07 中国電力株式会社 監視制御システム
JP2011024289A (ja) * 2009-07-13 2011-02-03 Toshiba Corp 電力系統監視制御装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000092751A (ja) * 1998-09-08 2000-03-31 Toshiba Corp 監視制御システム
JP2008123063A (ja) * 2006-11-08 2008-05-29 Chugoku Electric Power Co Inc:The 監視制御システムおよび方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111381583A (zh) * 2020-03-23 2020-07-07 北京经纬恒润科技有限公司 一种控制系统故障监测方法及装置

Also Published As

Publication number Publication date
JP2016136824A (ja) 2016-07-28
PH12017501325A1 (en) 2017-12-18

Similar Documents

Publication Publication Date Title
WO2016117257A1 (ja) 電力系統監視制御システム
JP2010273457A (ja) 広域分散型電力系統監視制御システム
JP2016201581A (ja) 統合監視制御装置および統合監視制御システム
JP2010127959A (ja) 系統監視盤表示装置
JP5213374B2 (ja) Ip式遠隔監視制御装置および監視制御システム
KR101498667B1 (ko) 매트릭스를 이용하는 영상 신호 처리 시스템
JP2014030070A (ja) 監視カメラ制御装置
JP5867698B2 (ja) フィールド無線監視表示装置
JP5755076B2 (ja) 遠隔監視システム
JP6820394B1 (ja) 運行監視業務支援システム
JP3513027B2 (ja) 監視システム及びその監視方法
JP4149856B2 (ja) 電力系統監視制御装置および電力系統監視制御装置用プログラム
KR101498674B1 (ko) 영상 신호 스위칭 장치 및 시스템
CN112437112A (zh) 一种无线kvm控制系统
JP2017151129A (ja) マルチディスプレイシステム
JP2006311763A (ja) 電力系統監視制御システム
JP6238720B2 (ja) 監視制御システム
JP6725750B2 (ja) 監視システム、画像情報提供装置、クライアント制御装置、画像情報提供プログラム、及びクライアント制御プログラム
JP2016197374A (ja) 監視制御装置、監視制御方法及びコンピュータプログラム
JP2005215913A (ja) プラント監視装置
JP5826544B2 (ja) 施設管制装置
JP2001178026A (ja) 電気所等における監視制御装置
KR101772529B1 (ko) 지리 정보 기반의 철도 시스템 현시장치 및 방법
JP2020043411A (ja) 放送マスターシステム
JP2005222197A (ja) プロセス監視制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15878946

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 12017501325

Country of ref document: PH

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15878946

Country of ref document: EP

Kind code of ref document: A1