WO2015022903A1 - 舗装体基層構造、舗装体及び舗装体の施工方法 - Google Patents

舗装体基層構造、舗装体及び舗装体の施工方法 Download PDF

Info

Publication number
WO2015022903A1
WO2015022903A1 PCT/JP2014/070914 JP2014070914W WO2015022903A1 WO 2015022903 A1 WO2015022903 A1 WO 2015022903A1 JP 2014070914 W JP2014070914 W JP 2014070914W WO 2015022903 A1 WO2015022903 A1 WO 2015022903A1
Authority
WO
WIPO (PCT)
Prior art keywords
pavement
dimensional structure
clay
base layer
resin
Prior art date
Application number
PCT/JP2014/070914
Other languages
English (en)
French (fr)
Inventor
森石 清
一光 柳川
Original Assignee
奥アンツーカ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 奥アンツーカ株式会社 filed Critical 奥アンツーカ株式会社
Publication of WO2015022903A1 publication Critical patent/WO2015022903A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/02Concrete base for bituminous paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds

Definitions

  • the present invention relates to a pavement base layer structure used for a base layer of a pavement that can be used in a field or ground of various competition facilities, a plaza, or a promenade, a pavement having this base layer structure, and a method for constructing the pavement.
  • the base layer is usually formed in an all-weather type with asphalt concrete pavement or cement concrete pavement, but cement is mixed with natural soil and solidified.
  • the base layer is also improved by improved soil-based pavement.
  • a method has also been proposed in which emulsion or polymer aqueous solution is sprayed and infiltrated into the soil in the local soil, and the soil is consolidated and renovated to an all-weather type, using this as a base layer and laying artificial grass on it.
  • Patent Document 4 As a base layer of an artificial turf pavement, a method of solidifying crushed stone with an emulsion and a method of solidifying a clay pavement by modifying cement are proposed (for example, Patent Document 5).
  • improved soil pavement bases and all-weather pavement bases have improved surface dust particles, but they lack water permeability and are artificial pavement that is a surface pavement material. Even after pasting, the rainwater entering from the edges and seams eroded the base layer and caused unevenness, resulting in the artificial turf becoming unstable, causing folds, and distorting the artificial turf due to the folds. However, there is a problem that the joint portion opens due to excessive tension, or the strength of the adhesive decreases due to the base layer lacking water permeability, and the joint portion opens.
  • the above-mentioned improved soil-based pavement base and all-weather pavement base layer are not flexible, so that there is a problem that the dent generated when a heavy object falls is left intact and cannot be restored. It was.
  • an object of the present invention is to provide a pavement base layer structure having durability and water permeability, a pavement, and a construction method of the pavement.
  • Another object of the present invention is to provide a pavement base layer structure, a pavement, and a method for constructing a pavement that have resilience to a dent.
  • Still another object of the present invention is to provide a pavement base layer structure that can be easily installed and removed, a pavement, and a construction method for the pavement.
  • the pavement base layer structure provided with the three-dimensional structure of the porous structure which has flexibility and a predetermined porosity, and the clay pavement material with which the three-dimensional structure was filled is provided. .
  • a porous three-dimensional structure having flexibility and a predetermined porosity and a clay pavement material filled in the three-dimensional structure By using a porous three-dimensional structure having flexibility and a predetermined porosity and a clay pavement material filled in the three-dimensional structure, it has durability and drainage, and dents and the like are generated. Can be restored to its original state and can be easily installed and removed.
  • a clay pavement material with a three-dimensional structure it is possible to lower the bounce height when installing an artificial turf on the upper part and performing a round shot competition as compared with an asphalt base layer. For this reason, it can be set as the base layer structure in consideration of safety.
  • the porosity of the three-dimensional structure is 70 to 95%. Thereby, it has durability and drainage suitable for a stadium and the like, and can be easily restored when a dent or the like occurs.
  • the impact value (Ia value) of the three-dimensional structure is preferably 2 to 10, and more preferably 4 to 8. Thereby, a desired supporting force can be secured as the base layer material.
  • the impact value will be described in detail later.
  • the three-dimensional structure is preferably formed from polyethylene resin, polypropylene resin, polyurethane resin, polyester resin, vinyl chloride resin, waste plastic, wire mesh, or rubber material. Thereby, it is realizable at comparatively low cost.
  • Clay paving material is natural soil, sandy soil, viscous soil, organic soil, volcanic ash clay, crushed stone, silica sand, sand, ceramics, processed aggregate, waste recycled aggregate, and / or styrene-butadiene rubber , Ethylene / propylene / diene rubber, polyurethane, cork, ethylene vinyl acetate copolymer, vinyl chloride, or nylon is preferable. Thereby, it is possible to obtain a predetermined hardness and to easily fill the three-dimensional structure.
  • a porous three-dimensional structure having flexibility and a predetermined porosity, and a clay paving material filled in the three-dimensional structure.
  • a pavement base layer structure having a rate of 70 to 95%, an impact value of 2 to 10, and a pressure resistance in the range of 15 to 80% under a pressure of 300 kPa is provided.
  • a pavement comprising the above-mentioned pavement base layer structure and a surface pavement material provided on the pavement base layer structure.
  • a solidifying agent layer Made of resin made of polyurethane resin, acrylic resin, epoxy resin, vinyl chloride resin, cationic asphalt emulsion, nonionic asphalt emulsion, or butadiene copolymer latex provided between pavement base layer structure and surface pavement material It is preferable to further include a solidifying agent layer. Thereby, pulverization of the soil particles on the surface can be prevented, the stability of the surface layer can be improved, the water permeability of the clay paving material can be adjusted, and a desired supporting force can be obtained.
  • the surface pavement material is an all-weather surface pavement material, artificial turf or natural turf.
  • a pavement construction method is provided.
  • the clay pavement material further includes a solidifying material mixing step of mixing ordinary Portland cement, blast furnace cement, or cement-based or inorganic solidified material in advance.
  • the foundation surface comprising the road bed or the crushed stone layer is flexible and has a porosity of 70 to 95%, an impact value of 2 to 10, and a pressure resistance of 300 kPa.
  • 3D structure placement process for placing a 3D structure in a range of 15 to 80% under the pressure of the clay, clay paving material filling process for filling the placed 3D structure with clay paving material, and clay paving There is provided a pavement construction method comprising a surface pavement material laying step of laying a surface pavement material on a three-dimensional structure filled with a material.
  • ADVANTAGE OF THE INVENTION it has durability and drainage property by using the three-dimensional structure of a porous structure which has flexibility and a predetermined porosity, and the clay pavement material with which a three-dimensional structure is filled. Moreover, when a dent etc. arise, it can be restored to its original state and can be easily installed and removed, which is particularly suitable for construction of a temporary ground. In addition, by combining a clay pavement material with a three-dimensional structure, it is possible to lower the bounce height when installing an artificial turf on the upper part and performing a round shot competition as compared with an asphalt base layer. For this reason, it can be set as the base layer structure in consideration of safety.
  • a three-dimensional structure having flexibility and a porosity of 70 to 95% is arranged on the surface of a foundation composed of a road bed body or a crushed stone layer, and the arranged three-dimensional structure
  • a foundation composed of a road bed body or a crushed stone layer
  • the arranged three-dimensional structure By filling the body with clay pavement material and laying the surface pavement material on the three-dimensional structure filled with clay pavement material, it has durability and drainage, and when dents etc. occur And can be easily installed and removed.
  • FIG. 1 schematically shows a configuration of a base layer structure 100 of an artificial turf pavement according to the first embodiment of the present invention
  • FIG. 2 shows a construction stage of the artificial turf pavement in the first embodiment of FIG. Is shown schematically.
  • the base layer structure 100 in this embodiment includes a three-dimensional structure 10 and a clay pavement material 20.
  • the three-dimensional structure 10 is a porous structure having flexibility and a predetermined porosity, for example, a three-dimensional network formed of a resin material and having a porosity of 70 to 95%.
  • a porosity for example, a three-dimensional network formed of a resin material and having a porosity of 70 to 95%.
  • the porosity is less than 70%, there are too many skeleton parts, and cushioning properties are reduced.
  • the porosity exceeds 95%, since the portion of the frame is small, it does not play a role like a steel frame and is not different from a normal clay paving material.
  • the impact value of the three-dimensional structure 10 is 2 to 10, more preferably 4 to 8.
  • the impact value (Ia value), also called Caspol value is a simple bearing force test value measured by a simple bearing force measuring device (Caspol, Caspol) developed by the Kinki Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism of Japan. is there. Caspol is composed of a main body and a display. A 50mm diameter, 4.5kg rammer (weight) is allowed to fall freely from a certain height (from 45cm) to the ground, and the impact acceleration is measured with an accelerometer built in the rammer.
  • the impact value (Ia value) is related to soil adhesion, shear resistance angle, ground reaction force coefficient, CBR, and the like, and is used for ground hardness management.
  • the impact value (Ia value) of clay pavement is 10-30.
  • the pressure resistance of the three-dimensional structure 10 is preferably in the range of 15 to 80% under a pressure of 300 kPa. A combination of the pressure resistance, the structure / material restoration property, and the clay paving material 20 provides a restoration function for the dent.
  • the three-dimensional structure 10 uses a mat member of a loofah structure (three-dimensional network) mainly made of polypropylene resin.
  • a loofah structure three-dimensional network
  • the three-dimensional structure 10 for example, “Moray Drain (registered trademark)” of Yoshihara Chemical Co., Ltd., “Endoren Mat (registered trademark)”, “Core Mat (registered trademark)” of Maeda Kosen Co., Ltd., Toyobo “Breath Air (registered trademark)”, “Hetimaron (registered trademark)” of Shinko Nylon Co., Ltd., and “Netron Water-permeable Mat” of Hoyo Sangyo Co., Ltd. can be used.
  • the three-dimensional structure 10 may be formed of polyethylene resin, polyurethane resin, polyester resin, vinyl chloride resin, waste plastic, wire mesh, or rubber material instead of polypropylene resin.
  • the clay paving material 20 is filled in the three-dimensional structure 10.
  • natural soil, sandy soil, cohesive soil, organic soil, volcanic ash cohesive soil, crushed stone, quartz sand, sand, ceramics, processed aggregate, or waste recycled aggregate can be used as the clay pavement 20. .
  • the clay pavement material 20 is preliminarily provided with normal portland cement, blast furnace cement, or cement system in order to prevent the clay pavement material from flowing away immediately after construction.
  • an inorganic solidifying material may be mixed. The mixing amount is 2 to 5 kg / m 2 , but can be adjusted according to the purpose.
  • FIG. 2 shows the construction stage of the base layer structure 100.
  • an artificial turf is constructed by laying artificial turf using a base layer structure 100
  • a flat foundation for example, a roadbed body or a crushed stone layer
  • a three-dimensional structure 10 having flexibility and a porosity of 70 to 95% is disposed (see FIG. 2A).
  • the clay pavement material 20 is filled into the arranged three-dimensional structure 10 (see FIG. 2B).
  • the artificial turf 30 is laid on the three-dimensional structure 10 filled with the clay pavement material 20 (see FIG. 2C).
  • the base layer structure 100 is comprised from the three-dimensional structure 10 and the clay pavement material 20 with which it was filled, and the artificial turf 30 was laid on it, this pavement is , Has excellent durability and drainage. Further, the function of the three-dimensional structure 10 can easily restore the original state when a dent or the like is generated. Moreover, the base layer structure 100 can be easily installed and removed. Furthermore, by using such a three-dimensional structure 10, when playing a game such as throwing, it is possible to ensure that the tip of the heel is pierced, particularly in throwing a spear.
  • the three-dimensional structure 10 since the porosity of the three-dimensional structure 10 is 70 to 95%, the three-dimensional structure 10 has durability and drainage suitable for a stadium and the like, and can be reliably restored when a dent or the like occurs.
  • the impact value of the three-dimensional structure 10 is 2 to 10, more preferably 4 to 8, a desired supporting force can be secured as the base layer material.
  • the three-dimensional structure 10 is formed of polyethylene resin, polypropylene resin, polyurethane resin, polyester resin, vinyl chloride resin, waste plastic, wire mesh, or rubber material, so that the pavement can be manufactured at a relatively low cost. Can be realized.
  • the clay pavement 20 is natural soil, sandy soil, viscous soil, organic soil, volcanic ash clay, crushed stone, quartz sand, sand, ceramics, processed aggregate, waste recycled aggregate, A predetermined hardness can be obtained, and the three-dimensional structure 10 can be easily filled.
  • the clay pavement material 20 can be prevented from flowing out by previously mixing ordinary portland cement, blast furnace cement, or cement-based or inorganic solidifying material with the clay pavement material 20.
  • the porous three-dimensional structure 10 having flexibility and a predetermined porosity, and the clay paving material 20 filled in the three-dimensional structure 10 are provided. Is used, it is durable and drainable, can be restored to its original state when a dent or the like occurs, can be easily installed and removed, and is particularly suitable for construction of a temporary ground.
  • the clay pavement material 20 with the three-dimensional structure 10, it is possible to lower the rebound height when installing a artificial turf on the upper part and performing a shot-throw competition as compared to the case of an asphalt base layer. is there. For this reason, it can be set as the base layer structure in consideration of safety.
  • FIG. 3 schematically shows the configuration of the artificial turf pavement in the second embodiment.
  • the base layer structure 200 in this embodiment includes a three-dimensional structure 10, a clay paving material 20, and a resin solidifying agent layer 40. Since the configurations of the three-dimensional structure 10 and the clay pavement 20 are the same as the configurations of the base layer structure 100 in the first embodiment described above, detailed description thereof is omitted.
  • the resin solidifying agent layer 40 is a resin solidifying agent layer made of polyurethane resin, acrylic resin, epoxy resin, vinyl chloride resin, or butadiene copolymer latex.
  • the resin solidifying agent layer 40 is formed by spraying a resin solidifying agent on the upper surface of the base layer structure 200 including the three-dimensional structure 10 and the clay paving material 20 filled in the three-dimensional structure 10. ing.
  • the application amount of the resin solidifying agent is, for example, in the range of 0.1 to 2.0 kg / m 2 . Considering the thickness of the resin solidifying agent layer 40 to be formed and the water permeability of the clay paving material 20, the selection of the resin, the amount of application, and the application method can be freely selected. When the application amount increases, the water permeability deteriorates. A desired supporting force can be obtained by adjusting the spray amount.
  • FIG. 4 shows a construction stage of the base layer structure 200.
  • a flat foundation for example, a road bed or a crushed stone layer
  • a three-dimensional structure 10 having flexibility and a porosity of 70 to 95% is disposed (see FIG. 4A).
  • the clay pavement material 20 is filled into the arranged three-dimensional structure 10 (see FIG. 4B).
  • a resin solidifying agent layer 40 is formed by spraying a resin solidifying agent on the upper surface of the three-dimensional structure 10 filled with the clay paving material 20 (see FIG. 4C).
  • the artificial turf 30 is laid thereon (see FIG. 4D).
  • the resin solidifying agent layer 40 is spread and formed on the upper surface of the three-dimensional structure 10 and the clay pavement 20 filled in the three-dimensional structure 10.
  • the surface soil particles can be prevented from being pulverized and the stability of the surface layer can be improved.
  • playing a game such as throwing it is possible to ensure that the tip of the tip is pierced, particularly in throwing a spear.
  • Other functions and effects of the second embodiment are the same as those of the first embodiment.
  • Table 1 below shows the evaluation results for the artificial turf pavement in the first and second embodiments described above.
  • Examples 1 to 4 differ in the porosity of the three-dimensional structure 10 from each other.
  • Examples 1 and 2 use silica sand as the clay paving material 20
  • Example 3 uses pure sand as the clay paving material 20
  • Example 4 uses black soil as the clay paving material 20.
  • Examples 1 and 2 are those in which the resin solidifying agent layer 40 is not dispersed and formed (the surface material is not solidified)
  • Examples 3 and 4 are those in which the resin solidifying agent layer 40 is dispersed (surface layer). There is solidification of the material).
  • Comparative Examples 1 and 2 have the three-dimensional structure 10
  • Comparative Examples 3 and 4 have no three-dimensional structure 10.
  • Comparative Examples 1 to 3 pure sand is used as the clay pavement 20, and black soil is used as the clay pavement 20 in Comparative Example 4. Further, Comparative Examples 1 and 2 are those in which there is no spray formation of the resin solidifying agent layer 40 (no solidification of the surface layer material), and Comparative Examples 3 and 4 are those in which the resin solidifying agent layer 40 is sprayed (surface layer). There is solidification of the material).
  • the three-dimensional structure 10 is provided, but since the porosity is 65%, it becomes difficult to fill the gap with the clay pavement material, and the particle size is fine and the particle size is small. It is necessary to select materials that are hard to solidify. For this reason, material loss is high. Furthermore, since the proportion of the three-dimensional structure is large, the cushioning property and the slipperiness after raining are slightly lowered, and the shot-drop drop rebound height is somewhat high. In Comparative Examples 3 and 4, the shot drop rebound height tended to be relatively low, but since the three-dimensional structure 10 was not provided, the material spillability and the slipperiness after rainfall were considerably reduced. This approaches the same level as conventional clay pavement.
  • the cushioning property was evaluated based on the measurement result of the impact value (Ia). For example, when the impact value (Ia) is 10 to 25, ⁇ , when 7 to 10, 25 to 35, ⁇ , when 4 to 7, or 35 to 40, ⁇ , 0 to 4, 40 or more In the case, it is set as x.
  • Material loss evaluation is based on the weight of material flow after a sample of 500 mm square is prepared, a gradient of 30 degrees is applied to the material, and shower-like water is flowed at a flow rate of 50 mm for 60 minutes.
  • initial weight 100%
  • 100-95% (0-5% runaway)
  • 95-80% (5-20% runaway)
  • 80-70% (20- 30% runoff)
  • x 70% or less (30% runoff).
  • Cannonball fall rebound height is evaluated by setting a long pile artificial turf on the asphalt base, dropping the male cannonball ball 2 to 5 times, and using the average value as a reference, 80% or less from the reference value. 100% to 100% was evaluated as ⁇ , 100% to 150% as ⁇ , and 150% or more as X.
  • the cannonball is generally 16 pounds (7.260 kg) for men, and it is dangerous to bounce high, so the drop rebound height should be low.
  • the average rebound height dropped on the long pile artificial grass on the asphalt base was 188 mm. Accordingly, 150.4 mm or less was evaluated as ⁇ , 150.4 mm or more and 188 mm or less as ⁇ , 188 mm or more and 282 mm or less as ⁇ , and 282 mm or more as ⁇ .
  • the base layer structures 100 and 200 are durable and drainable and can be restored when a dent or the like is generated by using a configuration in which the clay pavement material 20 is filled in the three-dimensional structure 10. And the effect that it can be installed and removed easily.
  • the three-dimensional structure 10 alone has good drainage and good stability after rain, but the material itself is compressed and deformed, resulting in poor running stability.
  • the clay pavement material 20 that is, a combination of the three-dimensional structure 10 and the clay pavement material 20
  • a very strong base layer structure is obtained.
  • irregular bouncing can be prevented, for example, when a paving body is used for a ball stadium, and a comfortable game can be performed.
  • EN14808 shock absorption of sports surface layer
  • EN14808 also known as the Berlin method, measures the ability to reduce the impact of an object falling on the surface.
  • AAA method can be said to be an evolution test method of EN14808. Since the EN14808 testing machine is commonly called Artificial Athlete, this evolutionary testing machine is called AAA (TripleTrA), which is an acronym for Advanced Artificial Athlete. FIFA and IRB previously used EN4808, but FIFA has adopted AAA method since January 2012 and IRB since March 2011. At the time when this EN14808 was adopted, the standard value was around 55 to 70%, indicating that the value of the artificial turf laid on the base layer structure of the present application is also in a fairly safe area.
  • ⁇ Permeability is also important when laying long pile artificial turf.
  • the water permeability is measured according to EN12616, and the standard is 180 mm / h or more. Originally, clay paving materials contain several tens of percent of silt / clay, and the water permeability is low, and even if solidified, the water permeability is further inferior. If the water permeation performance is very high (for example, if the base is composed only of sand), the water permeation performance is naturally improved, but the indicating power as the base cannot be maintained. In this respect, since the three-dimensional structure forms a framework in this embodiment application, it has excellent water permeability that can clear the FIFA standard value while maintaining the indicating power as a base even if it is filled with sand. Can be achieved.
  • the base layer structures 100 and 200 use a mat material having a loofah structure mainly made of polypropylene resin as the three-dimensional structure 10, but the present invention is not limited to this.
  • a ramen structure may be used so that the filled pavement 20 does not run away. If soil can be filled in some cases, a structure such as a foot-wiping mat, a continuous foam structure, or a perforated structure may be used.
  • the clay pavement 20 may be natural soil, sandy soil, viscous soil, organic soil, volcanic ash clay, crushed stone, processed aggregate, or waste recycled aggregate.
  • Sandy soil, clayey soil, organic soil, volcanic ash clay, crushed stone, processed aggregate, or waste recycled aggregate, and / or SBR (styrene butadiene rubber), EPDM (ethylene propylene diene rubber), polyurethane, Granules such as cork, EVA (ethylene vinyl acetate copolymer), vinyl chloride, or nylon may be used alone, or a mixture thereof.
  • the embodiment described above relates to an artificial turf pavement in which the artificial turf 30 is laid on the base layer structures 100 and 200, but the present invention is not limited to this.
  • natural grass may be provided on the base layer structure instead of artificial grass.
  • An all-weather surface pavement material may be provided in place of the artificial turf.
  • the paving body of the present invention can be used for paving fields, grounds, plazas, and promenades of various competition facilities.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

 舗装体基層構造は、可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、三次元構造体内に充填されているクレイ舗装材とを備えている。

Description

舗装体基層構造、舗装体及び舗装体の施工方法
 本発明は、各種競技施設のフィールド若しくはグラウンド、広場、又は遊歩道などに使用可能な舗装体の基層に用いられる舗装体基層構造、この基層構造を有する舗装体、及び舗装体の施工方法に関する。
 陸上競技場、運動場、球技場、及びテニスコートなどのグラウンドの舗装を行う場合、土質系舗装を行うことが一般的であった。しかしながら、土質系舗装には、泥濘化や浸食し易い点、及び埃が立ち易い点などの弱点があった。このため、この弱点を改善する目的で、土壌中に改良材を添加する工法が従来から種々提案され実施されてきた。例えば、グラウンドの表層土に消石灰や塩化ナトリウムを混合する工法は広く知られており実施されている。その他に、酸化マグネシウムなどを混合する工法が提案されている(例えば、特許文献1)。また、ポリビニルアルコールなどを混合する工法も提案されている(例えば、特許文献2及び3)。
 テニスコートなどに用いられている砂入り人工芝舗装体においては、その基層が、通常はアスファルトコンクリート舗装やセメントコンクリート舗装による全天候型に形成されているが、自然土にセメントを混合し、固化させて改良した土質系舗装による基層とすることも行われている。また、現地土による土壌にエマルジョンや高分子水溶液を散布して浸透させ、土壌を固結させて全天候型に改修し、これを基層とし、その上に人工芝を敷設する工法も提案されている(例えば、特許文献4)。人工芝舗装体の基層としては、砕石をエマルジョンで固化させる方法、及びセメント改質をしてクレイ舗装を固化させる方法なども提案されている(例えば、特許文献5)。
特開昭54-121525号公報 特開昭62-1907号公報 特開2000-7926号公報 特開2000-178911号公報 特許第4515677号公報
 しかしながら、改良した土質系舗装による基層や全天候型の舗装体基層は、表面の土粒子が微粉化することについての改良はされているが、透水性が欠けており、表面舗装材である人工芝の貼付け後も、端部や継目から侵入した雨水によって、基層面が浸食されて不陸が生じ、結果として人工芝が不安定となり、皺ができたり、その皺の影響で人工芝に歪みができ、無理な張力により接合部分が開いてしまったり、透水性に欠けた基層の為に接着剤の強度が落ち、接合部分が開いてしまったりする問題があった。
 また、上述した改良した土質系舗装による基層や全天候型の舗装体基層は、可撓性を有しないので、重たいものが落下した際に生じた凹みがそのままの状態となり、復元できないという問題もあった。
 さらに、上述した改良した土質系舗装による基層や全天候型の舗装体基層を人工芝の基層として陸上競技場に使用する場合、舗装体が硬く、投擲などの競技を行う場合、特に槍投げにおいて槍先が刺さらないという問題もあった。
 従って、本発明の目的は、耐久性及び透水性を有する舗装体基層構造、舗装体及び舗装体の施工方法を提供することにある。
 本発明の他の目的は、凹みに対して復元性を有する舗装体基層構造、舗装体及び舗装体の施工方法を提供することにある。
 本発明のさらに他の目的は、簡単に設置及び撤去することができる舗装体基層構造、舗装体及び舗装体の施工方法を提供することにある。
 本発明によれば、可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、三次元構造体内に充填されたクレイ舗装材とを備えている舗装体基層構造が提供される。
 可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、三次元構造体内に充填されたクレイ舗装材とを用いることにより、耐久性及び排水性を有すると共に、凹みなどが生じた場合に元の状態に復元でき、かつ簡単に設置及び撤去することができる。また、三次元構造体にクレイ舗装材を組み合わせたことにより、上部に人工芝を設置して砲丸投げ競技を行った場合、アスファルト基層の場合に比べて跳ね返り高さを低くすることが可能である。このため、安全性に配慮した基層構造とすることができる。
 三次元構造体の空隙率が70~95%であることが好ましい。これにより、競技場などに適した耐久性及び排水性を有すると共に、凹みなどが生じた場合に容易に復元できる。
 三次元構造体のインパクト値(Ia値)が、2~10であることが好ましく、4~8であることがより好ましい。これにより、基層材として所望の支持力を確保できる。なお、インパクト値に関しては、後に詳しく説明する。
 三次元構造体が、ポリエチレン樹脂、ポリプロピレン樹脂、ポリウレタン樹脂、ポリエステル樹脂、塩化ビニル系樹脂、廃プラスチック、金網、又はゴム材料から形成されていることが好ましい。これにより、比較的に低コストで実現することができる。
 クレイ舗装材が、天然の土壌、砂質土、粘性土、有機質土、火山灰質粘性土、砕石、珪砂、砂、セラミックス、加工骨材、若しくは廃棄物リサイクル骨材、及び/又はスチレン・ブタジエンゴム、エチレン・プロピレン・ジエンゴム、ポリウレタン、コルク、エチレン酢酸ビニルコポリマー、塩化ビニル、若しくはナイロンの粒状物であることが好ましい。これにより、所定の硬さを得られると共に、三次元構造体に充填することが容易にできる。
 クレイ舗装材に、普通ポルトランドセメント、高炉セメント、又はセメント系若しくは無機系固化材が混合されていることが好ましい。これにより、クレイ舗装材の流亡を防ぐことができる。
 本発明によれば、可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、三次元構造体内に充填されたクレイ舗装材とを備えており、三次元構造体は、空隙率が70~95%であり、インパクト値が2~10であり、耐圧性が300kPaの圧力下で15~80%の範囲にある舗装体基層構造が提供される。
 本発明によれば、さらに、上述の舗装体基層構造と、この舗装体基層構造上に設けられた表面舗装材とを備えている舗装体が提供される。
 舗装体基層構造及び表面舗装材の間に設けられた、ポリウレタン樹脂、アクリル樹脂、エポキシ樹脂、塩化ビニル系樹脂、カチオン系アスファルト乳剤、ノニオン系アスファルト乳剤、又はブタジエン系共重合体ラテックスからなる樹脂製固化剤層をさらに備えていることが好ましい。これにより、表面の土粒子の微粉化を防ぎ、表層の安定性を向上すると共に、クレイ舗装材の透水性を調整することができ、かつ所望の支持力を得ることができる。
 表面舗装材が、全天候表面舗装材、人工芝又は天然芝であることも好ましい。
 本発明によれば、さらにまた、路床体又は砕石層からなる基礎の表面に、可撓性を有すると共に空隙率が70~95%である三次元構造体を配置する三次元構造体配置工程と、配置された三次元構造体内にクレイ舗装材を充填するクレイ舗装材充填工程と、クレイ舗装材が充填された三次元構造体の上に表面舗装材を敷設する表面舗装材敷設工程とを備えている舗装体の施工方法が提供される。
 これにより、耐久性及び排水性を有すると共に、凹みなどが生じた場合に元の状態に復元し、かつ簡単に設置及び撤去することができる。また、投擲などの競技を行う場合、特に槍投げにおいて槍先が確実に突き刺さるようにすることができる。
 クレイ舗装材に、予め、普通ポルトランドセメント、高炉セメント、又はセメント系若しくは無機系固化材を混合する固化材混合工程をさらに備えていることが好ましい。
 クレイ舗装材が充填された前記三次元構造体の上表面にポリウレタン樹脂、アクリル樹脂、エポキシ樹脂、塩化ビニル系樹脂、又はブタジエン系共重合体ラテックスからなる樹脂製固化剤を散布して樹脂製固化剤層を形成する樹脂製固化剤散布工程をさらに備えていることが好ましい。
 表面舗装材として、全天候表面舗装材、人工芝又は天然芝を用いることが好ましい。
 本発明によれば、さらに、路床体又は砕石層からなる基礎の表面に、可撓性を有すると共に空隙率が70~95%であり、インパクト値が2~10であり、耐圧性が300kPaの圧力下で15~80%の範囲にある三次元構造体を配置する三次元構造体配置工程と、配置された三次元構造体内にクレイ舗装材を充填するクレイ舗装材充填工程と、クレイ舗装材が充填された三次元構造体の上に表面舗装材を敷設する表面舗装材敷設工程とを備えている舗装体の施工方法が提供される。
 本発明によれば、可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、三次元構造体に充填されるクレイ舗装材とを用いることで、耐久性及び排水性を有すると共に、凹みなどが生じた場合に元の状態に復元でき、かつ簡単に設置及び撤去することができ、仮設グラウンドの施工に特に好適である。また、三次元構造体にクレイ舗装材を組み合わせたことにより、上部に人工芝を設置して砲丸投げ競技を行った場合、アスファルト基層の場合に比べて跳ね返り高さを低くすることが可能である。このため、安全性に配慮した基層構造とすることができる。
 また、本発明によれば、路床体又は砕石層からなる基礎の表面に、可撓性を有すると共に空隙率が70~95%である三次元構造体を配置し、配置された三次元構造体内にクレイ舗装材を充填し、そしてクレイ舗装材が充填された三次元構造体の上に表面舗装材を敷設することで、耐久性及び排水性を有すると共に、凹みなどが生じた場合に元の状態に復元でき、かつ簡単に設置及び撤去することができる。また、投擲などの競技を行う場合、特に槍投げにおいて槍先が確実に突き刺さるようにすることができる。
本発明の第1の実施形態に係る舗装体の構成を概略的に示す局部断面図である。 本発明の第1の実施形態に係る舗装体の施工段階を示す局部断面図である。 本発明の第2の実施形態に係る舗装体の構成例を概略的に示す局部断面図である。 本発明の第2の実施形態に係る舗装体の施工段階を示す局部断面図である。
 図1は本発明の第1の実施形態に係る人工芝舗装体の基層構造100の構成を概略的に示しており、図2は図1の第1の実施形態における人工芝舗装体の施工段階を概略的に示している。
 図1に示すように、本実施形態における基層構造100は、三次元構造体10と、クレイ舗装材20とを備えている。
 三次元構造体10は、可撓性及び所定の空隙率を有する多孔質構造であり、例えば、樹脂材料から形成され、空隙率が70~95%の立体網状体である。空隙率が70%を下回った場合は、骨組の部分が多過ぎ、クッション性が低下することになる。空隙率が95%を上回った場合は、骨組の部分が少ないため、鉄骨のような役目を果たさず、通常のクレイ舗装材と変わらなくなってしまう。
 また、三次元構造体10のインパクト値は、2~10であり、より好ましくは、4~8である。なお、インパクト値(Ia値)とは、キャスポル値とも称し、日本の国土交通省近畿整備局が開発した衝撃加速度法による簡易支持力測定器(キャスポル、Caspol)によって測定した簡易支持力試験値である。キャスポルは、本体部と表示部とから構成されており、直径50mm、4.5kgのランマー(重錘)を一定の高さ(45cmから地盤に自由落下させ、ランマー内蔵の加速度計で衝撃加速度を測定し、その衝撃加速度の最大値とCBR値、K30値(地盤反力係数:modulus of subgrade reaction)、qc値(ポータブルコーン貫入試験値:cone penetration resistance)などと相関させて得た値を表示器のディスプレイ上に表示するように構成されている。即ち、加速度計で測定された衝撃加速度から最大値を検出してCPUに記録し、その値を、下記の式によってインパクト値(Ia)に換算してディスプレイ上に表示する仕組みになっている。
インパクト値(Ia)= 加速度(gal) /( 2.78×980(gal))
この試験機械は、日本国内で主に地盤の指示力を簡易的に求める際に使用されている。
 上述したように、インパクト値(Ia値)は、土の粘着力、せん断抵抗角、地盤反力係数、CBRなどとも関連があり、地盤の硬さ管理に使用されている。一般的に、クレイ舗装のインパクト値(Ia値)は10~30である。さらに、三次元構造体10の耐圧性は、300kPaの圧力下で15~80%の範囲にあることが好ましい。この耐圧性と構造・素材の復元性とクレイ舗装材20との組み合わせにより凹みに対しての復元機能が生まれる。
 本実施形態において、三次元構造体10は、ポリプロピレン樹脂を主素材とするヘチマ状構造体(立体網状体)のマット材を用いている。三次元構造体10として、例えば、株式会社吉原化工の「もやいドレーン(登録商標)」、前田工繊株式会社の「エンドレンマット(登録商標)」、「コアマット(登録商標)」、東洋紡績の「ブレスエアー(登録商標)」、新光ナイロン株式会社の「ヘチマロン(登録商標)」、豊洋産業株式会社の「ネトロン透水マット」を使用することが可能である。なお、三次元構造体10を、ポリプロピレン樹脂に代えて、ポリエチレン樹脂、ポリウレタン樹脂、ポリエステル樹脂、塩化ビニル系樹脂、廃プラスチック、金網、又はゴム材料から形成しても良い。
 クレイ舗装材20は、三次元構造体10内に充填されるものである。例えば、クレイ舗装材20として、天然の土壌、砂質土、粘性土、有機質土、火山灰質粘性土、砕石、珪砂、砂、セラミックス、加工骨材、又は廃棄物リサイクル骨材を用いることができる。
 また、クレイ舗装材20は、施工直後において、クレイ舗装材が落ち着かない状態にあって流亡してしまうことを防ぐため、このクレイ舗装材20に、予め、普通ポルトランドセメント、高炉セメント、又はセメント系若しくは無機系固化材を混合しても良い。混合量は、2~5kg/mであるが、目的に応じて調整可能である。
 図2は基層構造100の施工段階を示している。同図に示すように、基層構造100を用いて人工芝を敷設し人工芝舗装体を作製する際に、まず、平坦にした基礎(例えば、路床体又は砕石層)Eの表面に、可撓性を有すると共に空隙率が70~95%である三次元構造体10を配置する(図2(a)参照)。次に、配置された三次元構造体10内にクレイ舗装材20を充填する(図2(b)参照)。次に、クレイ舗装材20が充填された三次元構造体10の上に人工芝30を敷設する(図2(c)参照)。
 このように、基層構造100が、三次元構造体10と、その内部に充填されたクレイ舗装材20とから構成されており、その上に人工芝30が敷設されているため、この舗装体は、優れた耐久性及び排水性を有している。また、三次元構造体10の機能により、凹みなどが生じた場合に元の状態に容易に復元することができる。しかも、この基層構造100は、簡単に設置及び撤去することができる。さらに、このような三次元構造体10を用いることにより、投擲などの競技を行う場合、特に槍投げにおいて、槍先が確実に突き刺さるようにすることが可能となる。
 特に、三次元構造体10の空隙率が70~95%であることにより、競技場などにより適した耐久性及び排水性を有すると共に、凹みなどが生じた場合により確実に復元することができる。
 また、三次元構造体10のインパクト値が2~10であり、より好ましくは、4~8であることにより、基層材として所望の支持力を確保することができる。
 さらに、三次元構造体10が、ポリエチレン樹脂、ポリプロピレン樹脂、ポリウレタン樹脂、ポリエステル樹脂、塩化ビニル系樹脂、廃プラスチック、金網、又はゴム材料から形成されていることにより、比較的に低コストで舗装体を実現することができる。
 さらにまた、クレイ舗装材20が、天然の土壌、砂質土、粘性土、有機質土、火山灰質粘性土、砕石、珪砂、砂、セラミックス、加工骨材、廃棄物リサイクル骨材であることにより、所定の硬さを得られると共に、三次元構造体10内に容易に充填することができる。
 さらに、クレイ舗装材20に、予め、普通ポルトランドセメント、高炉セメント、又はセメント系若しくは無機系固化材を混合させておくことにより、クレイ舗装材20の流亡を防ぐことができる。
 以上説明したように、第1の実施形態によれば、可撓性及び所定の空隙率を有する多孔質構造の三次元構造体10と、三次元構造体10に充填されるクレイ舗装材20とを用いることで、耐久性及び排水性を有すると共に、凹みなどが生じた場合に元の状態に復元でき、かつ簡単に設置及び撤去することができ、仮設グラウンドの施工に特に好適である。また、三次元構造体10にクレイ舗装材20を組み合わせたことにより、上部に人工芝を設置して砲丸投げ競技を行った場合、アスファルト基層の場合に比べて跳ね返り高さを低くすることが可能である。このため、安全性に配慮した基層構造とすることができる。
 以下、本発明の第2の実施形態に係る人工芝舗装体の基層構造200の構成について説明する。
 図3は、この第2の実施形態における人工芝舗装体の構成を概略的に示している。同図に示すように、本実施形態における基層構造200は、三次元構造体10と、クレイ舗装材20と、樹脂製固化剤層40とを備えている。三次元構造体10及びクレイ舗装材20の構成は上述した第1の実施形態における基層構造100の構成と同様であるため、詳細な説明を省略する。
 樹脂製固化剤層40は、ポリウレタン樹脂、アクリル樹脂、エポキシ樹脂、塩化ビニル系樹脂、又はブタジエン系共重合体ラテックスからなる樹脂製固化剤の層である。樹脂製固化剤層40は、三次元構造体10と三次元構造体10内に充填されるクレイ舗装材20とからなる基層構造200の上表面上に樹脂製固化剤を散布することにより形成されている。
 樹脂製固化剤の散布量は、例えば、0.1~2.0kg/mの範囲にある。形成する樹脂製固化剤層40の厚みやクレイ舗装材20の透水性を考えて、樹脂の選定、散布量、及び散布方法を自由に選択することができる。散布量が多くなると、透水性が悪くなる。散布量を調整することで、所望の支持力を得ることができる。
 図4は、基層構造200の施工段階を示している。同図に示すように、基層構造200を用いて人工芝を敷設し人工芝舗装体を作製する際に、まず、平坦にした基礎(例えば、路床体又は砕石層)Eの表面に、可撓性を有すると共に空隙率が70~95%である三次元構造体10を配置する(図4(a)参照)。次に、配置された三次元構造体10内にクレイ舗装材20を充填する(図4(b)参照)。次に、クレイ舗装材20が充填された三次元構造体10の上表面に樹脂製固化剤を散布することによって樹脂製固化剤層40を形成する(図4(c)参照)。次に、その上に人工芝30を敷設する(図4(d)参照)。
 以上説明したように、第2の実施形態によれば、三次元構造体10と三次元構造体10内に充填されたクレイ舗装材20との上表面上に樹脂製固化剤層40が散布形成されることで、表面の土粒子の微粉化を防ぎ、表層の安定性を向上することができる。投擲などの競技を行う場合、特に槍投げにおいて槍先が確実に突き刺さるようにすることができる。この第2の実施形態におけるその他の作用効果は、第1の実施形態の場合と同様である。
 下記の表1は、以上述べた第1の実施形態及び第2の実施形態における人工芝舗装体に対する評価結果を示している。
Figure JPOXMLDOC01-appb-T000001
 この表1において、実施例1~4は、三次元構造体10の空隙率を互いに相違させたものである。実施例1及び2はクレイ舗装材20として珪砂を用い、実施例3はクレイ舗装材20として真砂土を用い、実施例4はクレイ舗装材20として黒土を用いている。また、実施例1及び2は樹脂製固化剤層40の散布形成が無い(表層材の固化が無い)ものであり、実施例3及び4は樹脂製固化剤層40の散布形成が有る(表層材の固化が有る)ものである。一方、比較例1及び2は三次元構造体10が有るものであり、比較例3及び4は三次元構造体10が無いものである。また、比較例1~3はクレイ舗装材20として真砂土を用い、比較例4はクレイ舗装材20として黒土を用いている。また、比較例1及び2は樹脂製固化剤層40の散布形成が無い(表層材の固化が無い)ものであり、比較例3及び4は樹脂製固化剤層40の散布形成が有る(表層材の固化が有る)ものである。
 なお、表1の評価欄において、◎はきわめて良好、○は良、△は不良、×はきわめて不良を意味している。評価結果から実施例1~4は、クッション性、材料流亡性、降雨後の滑り性及び砲丸落下反発高さのいずれもがきわめて良好であることが分かる。一方、比較例1の場合、三次元構造体10は設けられているが、空隙率が98%であるため、クッション性がやや低下し、材料流亡性及び降雨後の滑り性がかなり低下した結果となっている。また、比較例2の場合も、三次元構造体10は設けられているが、空隙率が65%であるため、クレイ舗装材を空隙に充填することが困難になり、粒径が細かく粒度が揃った固化しにくい材料を選定する必要がある。このため、材料流亡性が高い。さらに、三次元構造体の割合が大きいため、クッション性と降雨後の滑り性はやや低下し、砲丸落下反発高さはやや高い結果となっている。比較例3及び4は、砲丸落下反発高さは比較的低い傾向を示したが、三次元構造体10が設けられていないため、材料流亡性及び降雨後の滑り性はかなり低下しており、これは従来のクレイ舗装と同等に近づく。
 なお、クッション性の評価は、インパクト値(Ia)の測定結果に基づいて行った。例えば、インパクト値(Ia)が、10~25の場合、◎とし、7~10、25~35の場合、○とし、4~7、35~40の場合△とし、0~4、40以上の場合、×とする。
 材料流亡性の評価は、500mm角のサンプルを製作し、材料に30度の勾配をつけ、シャワー状の水を60分間で50mmの流量を流した後の材料流亡重量から判断している。初期状態の重量を100%とした場合、◎は100~95%(0~5%の流亡)、○は95~80%(5~20%の流亡)、△は80~70%(20~30%の流亡)、×は70%以下(30%以上の流亡)である。
 降雨後の滑り性の評価は、被験者10人に、それぞれのサンプル毎に足で踏み込んでもらい、アンケートを実施した。◎は全く滑らない。○は滑らない。△は滑っているような感じがする。×は滑る。
 砲丸落下反発高さの評価は、アスファルト基盤上にロングパイル人工芝をセットし、男子砲丸球を2mから5回落下させ、その平均値を基準とし、基準値より、80%以下を◎、80~100%を○、100~150%を△、150%以上を×とした。砲丸球は男子一般で16ポンド(7.260kg)あり、高く跳ねると危険が伴うため、落下反発高さは、低い方がよい。なお、アスファルト基盤上のロングパイル人工芝に落下させた反発高さの平均値は188mmであった。よって、150.4mm以下を◎、150.4mm以上188mm以下を○、188mm以上282mm以下を△、282mm以上を×とした。
 上述したように、基層構造100及び200は、三次元構造体10内にクレイ舗装材20を充填する構成を用いることで、耐久性及び排水性を有すると共に、凹みなどが生じた場合に復元でき、かつ簡単に設置、撤去できるという効果が得られる。
 三次元構造体10単体では排水性がよく、降雨後の安定性は良いものの、素材自身は圧縮変形するため走行安定性に乏しくなる。クレイ舗装材20を充填すること(即ち、三次元構造体10とクレイ舗装材20との組み合わせ)により、非常に強固な基層構造となる。また、表面に段差が生じないため、例えばボール競技場の舗装体とした場合にイレギュラーなバウンドを防止でき、快適な競技を行うことができる。
 次に、EN14808を利用した表面舗装材の安全性について説明する。本実施形態における舗装体基層構造上に設けられた表面舗装材の衝撃吸収性能も評価した。この試験は、「EN14808 スポーツ表層面の衝撃吸収性」を利用した。EN14808は、通称Berlin法とも呼ばれ、表層面上に落下する物体の衝撃を低減する能力を測定するものである。
 実施例1の舗装体基層構造と、その上にロングパイル人工芝と呼ばれるパイル長が63mmの人工芝を表面舗装材として接地した場合の衝撃減衰率を調査した。
Figure JPOXMLDOC01-appb-T000002
 表2に示す通り、本願舗装体基層構造上に表面舗装材として人工芝を接地した場合、良好な衝撃減衰率を得ることが判明した。比較として、実施例1′で使用した人工芝を、基層をアスファルトに変更して計測した結果は、衝撃減衰率=55.9%であった。このことから、基層構造をアスファルトにし、人工芝を敷設した場合よりも、基層構造を本願舗装体基層構造にすることによって、安全側にも働くことが判明した。
 なお、現在のFIFAやIRBは、衝撃減衰率を測定するのは、AAA methodを使用している。 AAA methodは、EN14808の進化型の試験方法といえる。EN14808の試験機は、通称Artificial Athleteと呼ばれていることから、この進化型の試験機はAdvanced Artificial Athleteの頭文字をとって、AAA(Triple A)と呼ばれている。FIFAやIRBは、以前はEN4808を採用していたが、FIFAは2012年1月から、IRBは2011年3月からAAA methodを採用している。このEN14808を採用していた当時は55~70%程度の間で規格値としていたことから、本願基層構造上に敷設した人工芝の数値もかなり安全な領域にあることを示している。
 ロングパイルの人工芝を敷設する際、透水性能も重要となる。FIFAにおいても、透水性能(Water permeability)は、EN12616により測定し、180mm/h以上を規格としている。本来、クレイ舗装材は、シルト・粘土分が数十%含まれており、透水性能は低い、ましてや固化させてしまうと、さらに透水性能が劣る。透水性能を非常に高くすれば(例えば砂のみで基盤を構成すれば)、当然に透水性能が高くなるが、基盤としての指示力が保持できない。この点、本実施形態願は、三次元構造体が骨組みをなす訳であるから、砂を充填しても基盤としての指示力を保持しつつ、FIFAの規格値もクリアできる優れた透水性能を達成できる。
 なお、上述した実施形態において、基層構造100及び200は、三次元構造体10としてポリプロピレン樹脂を主素材とするヘチマ構造のマット材を用いたが、本発明はこれに限定されるものではない。充填される舗装材20が流亡しないよう、ラーメン構造体であれば良い。場合により土を充填できれば、足ふきマットのような構造、連続発泡構造又は穴あき構造にしても良い。
 また、上述した実施形態において、クレイ舗装材20には、天然の土壌、砂質土、粘性土、有機質土、火山灰質粘性土、砕石、加工骨材、又は廃棄物リサイクル骨材を用いることができると説明したが、本発明はこれに限定されるものではない。砂質土、粘性土、有機質土、火山灰質粘性土、砕石、加工骨材、若しくは廃棄物リサイクル骨材、及び/又はSBR(スチレン・ブタジエンゴム)、EPDM(エチレン・プロピレン・ジエンゴム)、ポリウレタン、コルク、EVA(エチレン酢酸ビニルコポリマー)、塩化ビニル、若しくはナイロンなどの粒状物の単体でも良いし、これらの混合物でも良い。
 また、上述した実施形態は、人工芝30を基層構造100及び200上に敷設した人工芝舗装体に関するものであるが、本発明はこれに限定されるものではない。例えば、人工芝に代えて天然芝を基層構造上に設けても良い。この場合、天然芝の根が三次元構造体10に絡み、剥がれにくくなる利点がある。また、全天候型の表面舗装材を人工芝に代えて設けても良い。
 以上述べた実施形態は本発明を例示的に示すものであって限定的に示すものではなく、本発明は他の種々の変形態様及び変更態様で実施することができる。従って本発明の範囲は特許請求の範囲及びその均等範囲によってのみ規定されるものである。
 本発明の舗装体は、各種競技施設のフィールド若しくはグラウンド、広場又は遊歩道などの舗装に利用できる。

Claims (15)

  1.  可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、前記三次元構造体内に充填されたクレイ舗装材とを備えていることを特徴とする舗装体基層構造。
  2.  前記三次元構造体の空隙率が70~95%であることを特徴とする請求項1に記載の舗装体基層構造。
  3.  前記三次元構造体のインパクト値が2~10であることを特徴とする請求項1に記載の舗装体基層構造。
  4.  前記三次元構造体が、ポリエチレン樹脂、ポリプロピレン樹脂、ポリウレタン樹脂、ポリエステル樹脂、塩化ビニル系樹脂、廃プラスチック、金網、又はゴム材料から形成されていることを特徴とする請求項1に記載の舗装体基層構造。
  5.  前記クレイ舗装材が、天然の土壌、砂質土、粘性土、有機質土、火山灰質粘性土、砕石、珪砂、砂、セラミックス、加工骨材、若しくは廃棄物リサイクル骨材、及び/又はスチレン・ブタジエンゴム、エチレン・プロピレン・ジエンゴム、ポリウレタン、コルク、エチレン酢酸ビニルコポリマー、塩化ビニル、若しくはナイロンの粒状物であることを特徴とする請求項1に記載の舗装体基層構造。
  6.  前記クレイ舗装材に、普通ポルトランドセメント、高炉セメント、又はセメント系若しくは無機系固化材が混合されていることを特徴とする請求項1に記載の舗装体基層構造。
  7.  可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、前記三次元構造体内に充填されたクレイ舗装材とを備えており、前記三次元構造体は、空隙率が70~95%であり、インパクト値が2~10であり、耐圧性が300kPaの圧力下で15~80%の範囲にあることを特徴とする舗装体基層構造。
  8.  可撓性及び所定の空隙率を有する多孔質構造の三次元構造体と、前記三次元構造体内に充填されたクレイ舗装材とを備えている舗装体基層構造と、
     該舗装体基層構造上に設けられた表面舗装材と
    を備えていることを特徴とする舗装体。
  9.  前記舗装体基層構造及び前記表面舗装材の間に設けられた、ポリウレタン樹脂、アクリル樹脂、エポキシ樹脂、塩化ビニル系樹脂、カチオン系アスファルト乳剤、ノニオン系アスファルト乳剤、又はブタジエン系共重合体ラテックスからなる樹脂製固化剤層をさらに備えていることを特徴とする請求項8に記載の舗装体。
  10.  前記表面舗装材が、全天候表面舗装材、人工芝又は天然芝であることを特徴とする請求項8に記載の舗装体。
  11.  路床体又は砕石層からなる基礎の表面に、可撓性を有すると共に空隙率が70~95%である三次元構造体を配置する三次元構造体配置工程と、
     該配置された三次元構造体内にクレイ舗装材を充填するクレイ舗装材充填工程と、
     前記クレイ舗装材が充填された前記三次元構造体の上に表面舗装材を敷設する表面舗装材敷設工程と
    を備えていることを特徴とする舗装体の施工方法。
  12.  前記クレイ舗装材に、予め、普通ポルトランドセメント、高炉セメント、又はセメント系若しくは無機系固化材を混合する固化材混合工程をさらに備えていることを特徴とする請求項11に記載の舗装体の施工方法。
  13.  前記クレイ舗装材が充填された前記三次元構造体の上表面にポリウレタン樹脂、アクリル樹脂、エポキシ樹脂、塩ビ系樹脂、又はブタジエン系共重合体ラテックスからなる樹脂製固化剤を散布して樹脂製固化剤層を形成する樹脂製固化剤散布工程をさらに備えていることを特徴とする請求項11に記載の舗装体の施工方法。
  14.  前記表面舗装材として、全天候表面舗装材、人工芝又は天然芝を用いることを特徴とする請求項11に記載の舗装体の施工方法。
  15.  路床体又は砕石層からなる基礎の表面に、可撓性を有すると共に空隙率が70~95%であり、インパクト値が2~10であり、耐圧性が300kPaの圧力下で15~80%の範囲にある三次元構造体を配置する三次元構造体配置工程と、
     該配置された三次元構造体内にクレイ舗装材を充填するクレイ舗装材充填工程と、
     前記クレイ舗装材が充填された前記三次元構造体の上に表面舗装材を敷設する表面舗装材敷設工程と
    を備えていることを特徴とする舗装体の施工方法。
PCT/JP2014/070914 2013-08-12 2014-08-07 舗装体基層構造、舗装体及び舗装体の施工方法 WO2015022903A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013167598A JP5542999B1 (ja) 2013-08-12 2013-08-12 舗装体基層構造、舗装体及び舗装体の施工方法
JP2013-167598 2013-08-12

Publications (1)

Publication Number Publication Date
WO2015022903A1 true WO2015022903A1 (ja) 2015-02-19

Family

ID=51409497

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/070914 WO2015022903A1 (ja) 2013-08-12 2014-08-07 舗装体基層構造、舗装体及び舗装体の施工方法

Country Status (2)

Country Link
JP (1) JP5542999B1 (ja)
WO (1) WO2015022903A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017166151A (ja) * 2016-03-14 2017-09-21 長谷川体育施設株式会社 人工芝・天然芝複合グラウンドおよびその施工方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6324856B2 (ja) * 2014-09-17 2018-05-16 日本体育施設株式会社 複合型弾性舗装材
JP6849442B2 (ja) * 2017-01-17 2021-03-24 長谷川体育施設株式会社 人工芝グラウンドおよびその施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60111903U (ja) * 1983-12-30 1985-07-29 日瀝化学工業株式会社 緩衝性舗装体
JP2011051219A (ja) * 2009-09-01 2011-03-17 Astro:Kk 衝撃吸収性部材

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2777821B2 (ja) * 1989-05-19 1998-07-23 大成ロテック株式会社 強化砂層構造版からなる透水性砂舗装
JPH07102515A (ja) * 1993-10-08 1995-04-18 Otsuka Chem Co Ltd 人工芝生及びその施工方法
JP2756644B2 (ja) * 1994-05-26 1998-05-25 ソーコー株式会社 人工芝競技場の施工方法
JP3505519B2 (ja) * 2001-05-08 2004-03-08 ティ・アイ・シー有限会社 植物栽培マット及び支持体

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60111903U (ja) * 1983-12-30 1985-07-29 日瀝化学工業株式会社 緩衝性舗装体
JP2011051219A (ja) * 2009-09-01 2011-03-17 Astro:Kk 衝撃吸収性部材

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017166151A (ja) * 2016-03-14 2017-09-21 長谷川体育施設株式会社 人工芝・天然芝複合グラウンドおよびその施工方法

Also Published As

Publication number Publication date
JP5542999B1 (ja) 2014-07-09
JP2015036481A (ja) 2015-02-23

Similar Documents

Publication Publication Date Title
WO2015022903A1 (ja) 舗装体基層構造、舗装体及び舗装体の施工方法
CN107602145A (zh) 一种高韧混凝土及利用其浇注的混凝土路面
JP4746654B2 (ja) 表層体及び表層体の施工方法
JP5213246B2 (ja) 人工芝構造体およびその構築方法
JPH07158007A (ja) 人工芝生製運動競技場
JP5613381B2 (ja) 人工芝敷設構造
SK158697A3 (en) Impact absorbing macadam
US20170319943A1 (en) Artificial turf system and method of installing same
CN102852070B (zh) 一种红土网球场的建造方法
JP5290464B1 (ja) 人工芝用充填物及びこれを用いた人工芝
JP4069287B2 (ja) 弾性舗装構成体の施工方法
JP5440832B2 (ja) 土系舗装材
JP4977530B2 (ja) 人工芝舗装構造体、人工芝舗装体、および人工芝舗装構造体の施工方法
JP3795767B2 (ja) 土質系舗装体及びその施工法
JP3936013B2 (ja) 土舗装材用結合剤組成物、土舗装材、自然土舗装方法、及び土舗装構造体
EP1428935A2 (en) Improvements relating to the construction of playing surfaces
JP4462669B2 (ja) 弾性舗装路
JP2001254310A (ja) 砂入り人工芝および運動競技場
CN109082971A (zh) Etpu、epdm混合型运动场地及其施工方法
JP2000001383A (ja) 衝撃吸収性アスファルト舗装の材料
JP3380758B2 (ja) 弾性舗装体
JPH0115641B2 (ja)
JPH0559204B2 (ja)
JPH0748725Y2 (ja) 弾性舗装構造体
JP2706700B2 (ja) 透水性を有する人工芝用クッション性路盤材

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14836728

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14836728

Country of ref document: EP

Kind code of ref document: A1