WO2013168706A1 - 車体用部品取付システム - Google Patents

車体用部品取付システム Download PDF

Info

Publication number
WO2013168706A1
WO2013168706A1 PCT/JP2013/062839 JP2013062839W WO2013168706A1 WO 2013168706 A1 WO2013168706 A1 WO 2013168706A1 JP 2013062839 W JP2013062839 W JP 2013062839W WO 2013168706 A1 WO2013168706 A1 WO 2013168706A1
Authority
WO
WIPO (PCT)
Prior art keywords
parts
carriage
workpiece
floor
cart
Prior art date
Application number
PCT/JP2013/062839
Other languages
English (en)
French (fr)
Inventor
伸大 小佐々
勝由 堤田
秀俊 高橋
智徳 岩崎
克俊 江花
玄徳 藤井
浅野 芳樹
佳男 長澤
健次 竜田
仁志 鈴川
佐野 浩一
守 宮村
邦彦 男庭
祐二 川村
忠生 黒澤
山田 洋平
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to CN201380024522.9A priority Critical patent/CN104321161B/zh
Priority to BR112014028095A priority patent/BR112014028095A2/pt
Priority to MX2014013536A priority patent/MX352690B/es
Priority to US14/398,292 priority patent/US9586297B2/en
Priority to MYPI2014703291A priority patent/MY186269A/en
Publication of WO2013168706A1 publication Critical patent/WO2013168706A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D65/00Designing, manufacturing, e.g. assembling, facilitating disassembly, or structurally modifying motor vehicles or trailers, not otherwise provided for
    • B62D65/02Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D65/00Designing, manufacturing, e.g. assembling, facilitating disassembly, or structurally modifying motor vehicles or trailers, not otherwise provided for
    • B62D65/02Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components
    • B62D65/18Transportation, conveyor or haulage systems specially adapted for motor vehicle or trailer assembly lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P2700/00Indexing scheme relating to the articles being treated, e.g. manufactured, repaired, assembled, connected or other operations covered in the subgroups
    • B23P2700/50Other automobile vehicle parts, i.e. manufactured in assembly lines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/51Plural diverse manufacturing apparatus including means for metal shaping or assembling
    • Y10T29/5191Assembly

Definitions

  • the present invention relates to a vehicle body component mounting system for mounting a component to a vehicle body as a workpiece.
  • the line production method was the mainstream for attaching parts to the car body, but in recent years the cell production method has also been adopted.
  • the line production method is a method in which parts are attached to a vehicle body that moves continuously at a low speed by the hand of an operator standing by the side of the line.
  • the cell production method is a method in which a parts box is arranged around the vehicle body and the parts taken out from the parts box are attached to the vehicle body.
  • the work carriage used in the cell production method disclosed in Patent Document 1 includes a fixed wheel and a free wheel at the lower part of the support column, and a work table at the upper end of the support column. Because it has a fixed ring and a free ring, it can be pushed manually.
  • the work carriage is moved along the production line from “START” to “END” by the operator's pushing operation.
  • the parts taken out from the parts shelf by the operator's hands are attached to an attachment object such as a vehicle body.
  • Patent Document 1 since the technique disclosed in Patent Document 1 assumes a work cart such as a hand cart, the object to be mounted on the work cart is limited to small articles. On the other hand, it is desired to produce a vehicle body having a length of about 5 m. However, when such a large article is to be attached, the number of parts is extremely large, which increases the length of the production line and greatly increases the walking distance of the worker. That is, it is difficult to say that the cell production method according to Patent Document 1 is suitable for a large attachment object such as a vehicle body.
  • a carriage or a conveyor may be used for conveying a workpiece such as a vehicle body or a part, but the workpiece or part can be continuously conveyed by using the conveyor.
  • a conveyer for conveying such workpieces and parts a technique for conveying a workpiece such as a vehicle body is known (for example, see Patent Document 2).
  • FIG. 33 shows a conveyor disclosed in Patent Document 2.
  • the conveyor 200 is used for assembling and transporting the vehicle body.
  • the conveyor 200 has a support floor plate 201 having a convex arc shape at both ends and an intermediate floor plate 202 having a concave arc shape at both ends so that the convex arc shape portion fits into the concave arc shape portion.
  • the intermediate floor plate 202 is rotatably connected around the central axis of the convex arc-shaped portion of the support floor plate 201.
  • the concave arc shape portion moves along the convex arc shape portion, and no gap is generated between the support floor plate 201 and the intermediate floor plate 202.
  • the conveyance path 203 of the vehicle body since the conveyance path 203 of the vehicle body is in a closed state, it takes time to place a plurality of parts on the conveyor 200 from another place, and it is difficult to efficiently supply the parts to the conveyance path 203.
  • An object of the present invention is to provide a component mounting system and a transport technique that are suitable for a large mounting object such as a vehicle body and that can easily make production time constant. Furthermore, another object of the present invention is to provide a component conveyance system that can efficiently convey and supply components to a conveyance path through which a workpiece such as a vehicle body is continuously conveyed.
  • a vehicle body component mounting system for mounting components on a vehicle body, wherein the vehicle body is transported in a raised state, and at least the engine is mounted on the vehicle body during this time.
  • the parts that need to be installed before the engine is installed are the upstream parts installation work area that is attached to the vehicle body by the cell production method, and the parts that need to be installed after the engine is installed are cell production.
  • a downstream part attachment work area attached to the vehicle body by a method, and along the conveyance path of the vehicle body, the upstream part attachment work area, the central part attachment work area, and the downstream part attachment work area There is provided a vehicle body component mounting system in which and are arranged in this order.
  • the upstream part attachment work area in which the cell production method is performed is a U-shaped conveyance path projecting laterally with respect to the conveyance path of the central part attachment work area. I have.
  • the downstream part mounting work area in which the cell production method is performed includes a U-shaped transport path projecting sideways with respect to the transport path of the central part mounting work area. ing.
  • a conveyance trolley unit which conveys components and the workpiece
  • a workpiece carriage that is arranged later and is detachably connected to the parts carriage, and the workpiece carriage is mounted on the carriage body and the carriage body. It comprises a platform floor that can be ridden, and a component storage section that is provided on the platform floor to store the components, and the work carriage includes a work floor on which the worker rides, and the transport carriage unit includes: A transport cart unit is provided that is pivotably connected to the front and rear transport cart units.
  • the said components storage part stores the 1st components storage part which accommodates the components attached to the said workpiece
  • the turntable is a turntable that is rotatably supported by the carriage main body, and the turntable is moved from the first component storage part to the workpiece by a rotation angle control part. The rotation is controlled so that the distance is substantially equal to the distance from the second component storage portion to the workpiece disposed forward or backward.
  • the workpiece carriage is disposed behind the parts carriage, and left and right sub-part carriages are further connected to the parts carriage, and the left sub-part carriage is It is arranged on the left side of the work carriage, and the right sub-part carriage is arranged on the right side of the work carriage.
  • the floor plate on which both ends have a concave arc shape and a workpiece is placed, and the floor on which the both ends have a convex arc shape and a part to be attached to the workpiece is placed, are provided on the concave arc shape portion.
  • a U-shaped conveyance path that guides the floor plate and the floor on the table, which are provided in the conveyance path of the workpiece and connected to each other, via at least one bent portion, and the U-shaped conveyance A connection station for connecting the floor plate to the upper floor provided at the upstream end of the road, and a release station for releasing the connection of the floor plate from the upper floor provided at the downstream end of the U-shaped conveyance path
  • the release Has been carried to said platform on a floor released by station, the loading parts to said platform top floor, the parts conveying systems and a component station for unloading to the connecting station is provided.
  • the parts conveying system further includes a mounting station for mounting the workpiece on the floor board before the floor board arrives at the connection station, and the floor board serving as the release station. And a payout station for paying out the workpiece from the floor board after passing through, and the floor board is circulated and conveyed from the payout station to the mounting station.
  • the parts station includes: a collection station that collects an empty part storage unit from the table floor after the table floor passes through the release station; and the table floor includes A supply station that supplies the component storage unit loaded with the components to the platform floor before arriving at the connection station, and the platform floor is circulated from the collection station to the supply station.
  • a conveyance trolley unit which conveys the workpiece
  • a parts carriage that conveys a part of the parts, and the workpiece carriage includes a work floor on which an operator rides, and the parts carriage is disposed on the carriage body and the carriage body.
  • the transport carriage unit is composed of a base floor to be attached and a parts storage part that is provided on the base floor and stores a part of the parts.
  • the transport carriage unit is pivotally connected to the front and rear transport carriage units. Is provided.
  • a conveyance trolley unit which conveys a workpiece
  • a parts cart that conveys a part of the parts, and left and right sub-part carriages that are pulled by the parts carriage or the work carriage and convey the remaining part of the parts.
  • the carriage includes a work floor on which an operator rides, and the parts carriage includes a carriage body, a carriage floor attached to the carriage body, and a parts storage portion provided on the carriage floor and storing a part of the parts.
  • the left and right sub-part trolleys are arranged on the side of the work carriage of the subsequent transport trolley unit, and the transport trolley unit is pivotally connected to the front and rear transport trolley units.
  • Car unit is provided.
  • the said components storage part contains the 1st components storage part which accommodates the components attached to the said workpiece
  • the turntable is a turntable that is rotatably supported by the cart body, and the turntable has a distance from the first component storage unit to the workpiece by a rotation angle control unit. The rotation is controlled so as to be substantially equal to the distance from the second component storage portion to the workpiece disposed behind.
  • release station which cancels
  • the said front conveyance trolley unit moves forward,
  • a parts conveyance system is provided that includes a fixture attachment station for attaching fixtures from the side to the workpiece on the subsequent carriage cart unit.
  • the upstream part mounting work area by the cell production system, the central part mounting work area for transporting the car body by the overhead conveyor, and the downstream part mounting work area by the cell production system along the transport path of the vehicle body are provided in this order.
  • So-called high-end cars have more parts such as interior parts than ordinary cars. That is, the number of parts other than main parts (such as an engine) varies depending on the vehicle type. If parts other than the main parts can be attached by the line production method, the line length is determined in consideration of the maximum number of parts, so the line is inevitably elongated.
  • the parts other than the main parts are attached by the cell production method. If it is a cell production system, since it can respond by increasing the number of parts boxes, lengthening of a line is suppressed. That is, the present invention is based on the line production method, and the cell production method is used in part of the line production method.
  • the present invention is based on the line production method, it is possible to suppress variation in production time, and production time becomes constant. Therefore, according to claim 1, it is suitable for a large attachment object such as a vehicle body, the production time can be easily made constant, and the line length can be shortened.
  • the upstream part attachment work area in which the cell production method is performed includes a U-shaped conveyance path projecting sideways with respect to the conveyance path of the central part attachment work area.
  • the downstream part mounting work area in which the cell production method is performed includes a U-shaped transport path that projects sideways with respect to the transport path of the central part mounting work area.
  • the workpiece carriage and the parts carriage can be connected, the workpiece carriage and the parts carriage can be continuously conveyed.
  • the worker can work in the form of riding on a parts cart or a workpiece cart. Since it is not necessary to stop the work carriage for a long time, the production time becomes constant.
  • transport cart unit is pivotably connected to the front and rear transport cart units, it is possible to meander the transport flow line. By meandering, it is possible to increase the length of the transport flow line, and to prevent the assembly work area from becoming long.
  • the fourth aspect it is suitable for a large attachment object such as a vehicle body, and the production time can be easily made constant.
  • the rotation angle control unit turns so that the distance from the first component storage unit to the workpiece is substantially equal to the distance from the second component storage unit to the workpiece arranged forward or rearward.
  • the table is rotationally controlled. By controlling the rotation of the turntable, the workability related to the first component storage unit and the workability related to the second component storage unit are made equal. As a result, it is possible to level the parts mounting operation.
  • the left and right sub-part trolleys are further connected to the parts trolley, the left sub-part trolley is disposed on the left side of the work trolley, and the right sub-part trolley is the right side of the work trolley. Placed in the direction. The moving distance of the parts can be shortened, and the work efficiency can be increased.
  • the platform floor can be separated from the floorboard, the platform floor released at the release station can be loaded into the parts station, and components can be loaded onto the platform floor and transported to the connection station.
  • the workability of parts supply is improved, and the parts can be efficiently transported and supplied to the transport path where the work is transported continuously.
  • the invention according to claim 8 is provided with a loading station for mounting the work on the floor board before the floor board arrives at the connection station, and a payout station for paying out the work from the floor board after the floor board has passed through the release station.
  • the parts station is composed of a collection station that collects an empty parts storage unit from the floor and a supply station that supplies the parts storage part loaded with the parts to the floor.
  • the empty component storage unit is simply replaced with a component storage unit in which a plurality of components have already been stored, man-hours for supplying components to the platform floor can be reduced.
  • productivity can be improved in parts supply.
  • the productivity can be further improved.
  • the carriage truck can continuously convey the workpiece carriage and the parts carriage.
  • the operator can work in the form of riding on the transport carriage unit. Since it is not necessary to stop the transport carriage unit for a long time during the part assembling work of the worker, the production time becomes constant.
  • the side of the work cart of the transport cart unit is open. Since the lifter can be arranged on the side of the work carriage, a heavy object such as a vehicle body can be moved from the work carriage by the lifter. As a result, the lifter can be used in a state where the parts cart is arranged adjacent to the workpiece carriage without separating the parts carriage from the workpiece carriage, and productivity can be improved.
  • the carriage truck can continuously convey the workpiece carriage and the parts carriage.
  • the operator can work in the form of riding on the transport carriage unit. Since it is not necessary to stop the transport carriage unit for a long time during the part assembling work of the worker, the production time becomes constant.
  • transport cart unit is pivotably connected to the front and rear transport cart units, it is possible to meander the transport flow line. By meandering, it is possible to increase the length of the transport flow line, and to prevent the assembly work area from becoming long.
  • the carriage unit by moving the carriage unit by self-propelling or hooking it to the circulating chain hook, it is not necessary for the operator to push the carriage by hand. Even heavy objects can be transported. Therefore, according to the eleventh aspect, it is suitable for a large attachment object such as a vehicle body, and the production time can be easily made constant.
  • the parts are placed near the operator by placing the parts on the transport cart unit and the worker also getting on, the movement distance of the operator can be shortened and the work efficiency can be improved.
  • the lifter can be arranged on the side of the work carriage, a heavy object such as a vehicle body can be moved from the work carriage by the lifter. As a result, the lifter can be used in a state where the parts cart is arranged adjacent to the workpiece carriage without separating the parts carriage from the workpiece carriage, and productivity can be improved.
  • the rotation angle control unit turns so that the distance from the first component storage unit to the workpiece is substantially equal to the distance from the second component storage unit to the workpiece disposed forward or rearward.
  • the table is rotationally controlled. By controlling the rotation of the turntable, the workability related to the first component storage unit and the workability related to the second component storage unit are made equal. As a result, leveling of the component mounting work can be achieved.
  • the invention according to claim 13 includes a connection release station and an equipment mounting station.
  • a connection release station When the connection of the front and rear transport cart units is released and the front transport cart unit is advanced, the side of the work cart of the rear transport cart unit is released.
  • An assist device for assisting lifting of the equipment can be arranged on the side of the work carriage. As a result, a large fixture such as a sheet can be attached from the side to a workpiece such as a vehicle body on a subsequent transport cart unit, and work efficiency can be increased.
  • FIG. 5 is a cross-sectional view taken along line 5-5 in FIG. It is the figure seen from the arrow 6 direction of FIG. It is an effect
  • FIG. 20 is an arrangement view of an overhead conveyor extracted from the component mounting facility. It is the layout of the conveyance path of the work extracted from the component mounting equipment. It is a detailed view of a component mounting facility. It is explanatory drawing of the components conveyance system shown in FIG. It is the figure which showed the example of a change of the upstream component attachment work area shown in FIG. It is a top view of the conveyance trolley unit by Example 2 of the present invention. It is a perspective view of the work trolley
  • the vehicle body component mounting and component transport system according to the present invention is implemented by a “component mounting facility”.
  • the “conveyance carriage unit” is an important element. Therefore, the “transport cart unit” will be described first, followed by the “component mounting facility”.
  • the transport cart unit 10 includes a work cart 20 that transports a vehicle body 12 as a workpiece (attachment target), and a parts cart that is arranged in front of the work cart 20 and transports a component 13.
  • 40 and left and right sub-part carts 70L and 70R which are pulled by the component cart 40 and are arranged on the side of the workpiece cart 20.
  • Reference numeral 40r indicated by an imaginary line denotes a subsequent parts cart.
  • the work carriage 20 includes a frame body 21 in which steel materials are assembled in a lattice shape, a floor plate 22 stuck on the frame body 21, and four workpiece receivers placed on the floor plate 22.
  • the base 23 is a main element.
  • the floor plate 22 is provided with concave arc-shaped portions 22a and 22a that are notched in the shape of a concave arc at the front and rear.
  • the left and right side portions of the floor board 22 are work floors 24L and 24R that are provided with anti-slip.
  • a first operation post 25 is provided at the rear of one work floor 24R.
  • Locating pins 26 and 26 are set up on the work cradles 23 and 23, respectively. These positioning pins 26 and 26 position the vehicle body 12 (FIG. 1) in the horizontal direction. In addition, the vehicle body is supported by the four workpiece cradle 23.
  • the eye plates 27L and 27R are plates each having a hole 28 formed therein.
  • a longitudinal arm 29 extends rearward from the rear portion of the frame body 21, and a first locking mechanism 31 is provided at the tip of the longitudinal arm 29.
  • the first locking mechanism 31 is preferably a cylinder unit in which the pin 32 protrudes upward.
  • the cylinder unit may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
  • a plurality of free wheels 33 are provided on the lower surface of the frame body 21.
  • the universal wheel 33 is also called a caster, and does not prevent the bogie from turning by turning itself.
  • a drive box 34 is provided at the center of the lower surface of the frame body 21.
  • the drive box 34 incorporates a drive source such as a motor, and the left and right drive wheels 35L, 35R are driven by this drive source.
  • the drive wheels 35L and 35R come into contact with the track (or road surface) and cause the work carriage 20 to self-propel.
  • a guide wheel 36 protrudes from the drive box 34.
  • the guide wheel 36 plays a role of defining a flow line of the work carriage 20 by fitting in a U-shaped conveyance path described later.
  • the guide wheel 36 may be a non-rotating guide shoe.
  • the parts carriage 40 is attached to a carriage main body 41 in which steel materials are assembled in a lattice shape, a plurality of free wheels 42 attached to the lower surface of the carriage main body 41, and the upper surface of the carriage main body 41.
  • a plurality of rollers 43, a circular platform floor 44 mounted on the carriage body 41 so as to be placed on these rollers 43, a roof frame 45 provided on the platform floor 44, and the roof frame 45 are provided.
  • the first component storage unit 46 and the second component storage unit 47 are the main elements.
  • the platform floor 44 is provided with a second operation post 48 including two operation elements 48a and 48b.
  • the circular platform floor 44 has a work floor 44a around the first component storage portion 46 and the second component storage portion 47, and the worker performs work on the work floor 44a.
  • the platform floor 44 was circular, it is not limited to this, If the convex-arc-shaped parts 44b and 44b which exhibit a convex-arc shape are provided before and behind the platform floor 44, an ellipse etc. Even if it is the shape of.
  • the left and right plates 51L and 51R extend rearward from the rear portion of the cart body 41, and the second locking mechanisms 52L and 52R are provided on the plates 51L and 51R, respectively.
  • the second locking mechanisms 52L and 52R are preferably cylinder units in which the pins 53 protrude upward.
  • the cylinder unit may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
  • side arms 54L and 54R are extended from the left and right sides of the carriage main body 41, and third locking mechanisms 55L and 55R are provided on the side arms 54L and 54R, respectively.
  • the third locking mechanisms 55L and 55R are preferably cylinder units in which the pins 56 and 56 protrude upward.
  • the cylinder unit may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
  • a perforated plate 57 is provided at the center lower portion of the carriage main body 41, and a bearing block 58 is provided at the center upper portion.
  • a central shaft 59 extends from the center of the table top floor 44 to the bottom, and the tip of the central shaft 59 is fitted into the bearing block 58. Since the platform floor 44 is supported by the plurality of rollers 43, a downward load does not act on the bearing block 58.
  • the bearing block 58 exhibits the effect of guiding the central shaft 59 in a freely rotatable manner.
  • a driven gear 61 is provided in the middle of the central shaft 59.
  • a servo motor 62 is disposed in the vicinity of the driven gear 61, and the driven gear 61 is rotated by a drive gear 63 driven by the servo motor 62.
  • the platform floor 44 rotates horizontally around the central axis 59. That is, the platform floor 44 is a turntable.
  • the servo motor 62 is provided with an encoder 64 that detects the rotation angle and direction of the motor central shaft 59. Further, the carriage main body 41 is provided with a rotary sensor 65 and a rotation angle control unit 66 in addition to the servo motor 62. Although the operation of the rotary sensor 65 will be described later, the angle information from the rotary sensor 65 and the angle information from the encoder 64 are input to the rotation angle control unit 66. The rotation angle control unit 66 controls the servo motor 62 based on the angle information.
  • the pin 32 is located on the central axis 49 of the convex arc-shaped portion 44b (the table floor 44).
  • the work carriage 20 is connected to the parts carriage 40 by operating the operating element 25a shown in FIG. That is, the floor plate 22 is detachably connected to the platform floor 44 via the pins 32.
  • the work carriage 20 is pivotally connected to the position of the central axis 49 of the convex arc-shaped portion 44b by a pin 32. That is, the floor plate 22 is connected to the platform floor 44 so as to be rotatable at the position of the central axis 49.
  • the front part of the parts cart 40 is connected to the front work truck 20 via a pin 53, and the rear part of the parts carriage 40 is connected to the rear work truck 20 via a pin 32. That is, the floor plate 22 and the table floor 44 are alternately and continuously conveyed.
  • the tip of the longitudinal arm 29 is fitted to the fork-shaped arm 67 extending from the rotary sensor 65.
  • the fork-shaped arm 67 does not tilt.
  • the longitudinal arm 29 can be rotated horizontally around the pin 32 of the first locking mechanism 31. As a result, as shown in FIG. 7, the longitudinal arm 29 may rotate by 2 ⁇ around the pin 32. This rotation angle 2 ⁇ is detected by the rotary sensor 65.
  • the vehicle body 12 is placed behind the parts cart 40, and the front vehicle body 12f is placed in front of the parts cart 40.
  • the part is taken out from the first part storage 46 and attached to the vehicle body 12.
  • the part is taken out from the second part storage part 47 and attached to the previous vehicle body 12f.
  • the rotation angle control unit 66 causes the distance L from the first component storage unit 46 to the vehicle body 12 to be substantially equal to the distance Lf from the second component storage unit 47 to the front vehicle body 12f (expressed in terms of angle,
  • the turntable (the platform floor 44) is controlled to rotate so that the angle of the part with the front and rear vehicle bodies is the same.
  • the workability of the first component storage unit 46 and the workability of the second component storage unit 47 are made equal. As a result, leveling of the component mounting work can be achieved.
  • the conveyance is continuously carried at a constant speed without stopping.
  • the front and rear carriages are adjusted by rotating the turntable on the parts carriage so that the angle between the parts storage part and the front and rear bodies is the same when approaching the corner.
  • the distance that the worker who has boarded the vehicle moves to the part is made as small as possible.
  • FIG. 5 is the turning center of the turntable 44.
  • the pin 32 shown in FIG. The turning center and the rotation center (center axis 59) of the turntable (table floor 44) are coaxial. That is, since the turning center of the transport carriage unit and the rotation center of the turntable are coaxial, the relative positions of the component storage portions 46 and 47 with respect to the vehicle body 12 can be easily controlled.
  • the left and right sub-part carts 70L and 70R are pulled by the parts cart 40.
  • the operating element 48b provided on the second operation post 48, the pin 56 of the third locking mechanism 55L can be lowered.
  • the sub-part cart 70L is separated from the parts cart 40.
  • the sub-part cart 70R By operating the operating element 48b, it is possible to arbitrarily connect the sub-part carts 70L, 70R to the parts cart 40 and to separate the sub-part carts 70L, 70R from the parts cart 40.
  • the left and right sub-part carts 70L and 70R are further connected to the parts cart 40, the left sub-part cart 70L is disposed on the left side of the workpiece carriage 20, and the right sub-part cart 70R is used for the workpiece. It is arranged on the right side of the carriage 20.
  • the moving distance of the parts can be shortened, and the work efficiency can be increased.
  • the transport cart unit 10 includes the workpiece cart 20 and the component cart 40 disposed in front of the workpiece cart 20 as essential components.
  • the parts carriage 40 can also be arranged behind the workpiece carriage 20 as indicated by an imaginary line in FIG. Therefore, the parts cart 40 is disposed before or after the workpiece cart 20.
  • the transport cart unit 10 is disposed in front of or behind the component cart 40 for transporting components, and is connected to the component cart 40 in a separable manner (workpiece 12). And a work carriage 20 for conveying the workpiece. As shown in FIG. 8, the parts carriage 40 is connected to the workpiece carriage 20 so as to be able to turn around.
  • the workpiece carriage 20 and the parts carriage 40 can be connected, the workpiece carriage 20 and the parts carriage 40 can be continuously conveyed.
  • the worker can work in the form of riding on the parts carriage 40 or the workpiece carriage 20. Since it is not necessary to stop the work carriage 20 for a long time, the production time becomes constant.
  • transport carriage unit 10 is pivotably connected to the front and rear transport carriage units 10, it is possible to meander the transport flow line. By meandering, it is possible to increase the length of the transport flow line, and to prevent the assembly work area from becoming long.
  • FIG. 13 The component mounting facility 80 for operating the component transport system is shown in FIG. 13, but since the facility configuration is complicated, FIGS. 10 to 12 extracted for each genre will be described first.
  • FIG. 10 shows the arrangement of the lifters, and the discharge line 83 extends from the painting process 81 to the first lifter 82.
  • the discharge line 83 has a substantially L shape for changing direction.
  • An assembly line 85 extends from the first lifter 82 to the inspection step 84, and the first lifter 82, the second lifter 86, the third lifter 87, the fourth lifter 88, and the fifth lifter 89 are placed on the assembly line 85.
  • the assembly line 85 corresponds to the “transport path” in the present invention.
  • FIG. 11 is a layout diagram of the overhead conveyor, and the first overhead conveyor 91 is placed along the discharge line 83.
  • the painted vehicle body 12 is hung on the hanger 92 of the first overhead conveyor 91 and is carried onto the first lifter 82.
  • a second overhead conveyor 93 is placed along the assembly line 85.
  • the second overhead conveyor 93 conveys the vehicle body 12 in a state where the vehicle body 12 is lifted by the hanger 94, and components to be attached to the bottom surface of the vehicle body floor such as an engine are attached to the vehicle body 12 while the vehicle body 12 is being conveyed.
  • a third overhead conveyor 96 is provided which receives the door 95 between the first overhead conveyor 91 and the second overhead conveyor 93, incorporates a window regulator or the like into the door 95, and carries the door 95 to the entrance side of the inspection process 84.
  • FIG. 12 shows the arrangement of the workpiece conveyance path, and the upstream part mounting work area 97 is between the first lifter 82 and the second lifter 86, and between the first lifter 82 and the second lifter 86.
  • a U-shaped conveyance path 98 that extends from the assembly line 85 to the side at a right angle or obliquely is laid.
  • the transport cart unit 10 on which the vehicle body 12 is placed moves along a U-shaped transport path 98 having a bent portion 99.
  • the parts-dedicated conveyance paths 101 and 102 indicated by broken lines are connected to the leg portions of the U-shaped conveyance path 98, and the component carriage 40 full of parts is conveyed from the parts-dedicated conveyance path 101 to the U-shaped conveyance in the component station 110.
  • the parts cart 40 that has been thrown into the path 98 and emptied is returned from the U-shaped transport path 98 to the parts dedicated transport path 102.
  • Sub-part carts 70L and 70R are pulled by the parts cart 40.
  • a central part attachment work area 104 Between the second lifter 86 and the third lifter 87 is a central part attachment work area 104, and parts to be attached to the bottom of the vehicle body floor such as an engine are attached in the central part attachment work area 104.
  • the component mounting facility 80 shown in FIG. 13 is completed.
  • the component mounting facility 80 includes an upstream component mounting work region 97, a central component mounting work region 104, and a downstream component mounting work region 103.
  • the central part attachment work area 104 parts attached to the bottom surface of the vehicle body floor such as an engine are attached to the vehicle body 12C conveyed while being suspended by the second overhead conveyor 93.
  • the parts to be installed in this work area are the engine / front suspension assembly (an assembly in which the components of the engine and the front suspension are assembled in advance) and the rear suspension assembly (the components in the rear suspension are assembled in advance). Assembly) and other parts attached to the bottom of the vehicle body floor (parts that can only be attached to the vehicle body in the raised state).
  • the engine / front suspension assembly and the rear suspension assembly are each transferred to the mounting station in the state of assembly, lifted from below the vehicle body by an automatic mounting machine, and tightened with bolts while being docked to the vehicle body.
  • stop-and-go transport is performed at least at this station.
  • upstream part attachment work area 97 parts that need to be attached to the vehicle body before the engine is attached, that is, parts that cannot be attached after the engine or the like is attached are attached by the cell production method.
  • the parts are engine room wall surface mounting members (for example, a radiator, a pedal assembly, a steering column, a brake hose, etc.).
  • other parts are also attached as appropriate.
  • the upstream part installation work area 97 a plurality of workers board a single truck, and the parts are installed during the transfer time from the start point to the end point of this work area. Done.
  • This work corresponds to work by the cell production method.
  • the conveyance is continuously carried at a constant speed without stopping.
  • the turntable on the parts cart rotates and the angle of the parts storage part with the front and rear bodies is adjusted to be the same, so that the workers on the front and rear carriages move to the parts. Make the distance as small as possible.
  • the downstream part mounting work area 103 is similarly operated by the cell production method.
  • parts that need to be attached to the vehicle body after the engine is attached that is, parts that can only be attached after the engine or the like is attached are attached by the cell production method.
  • the parts are, for example, a battery, an air cleaner filter, an engine mount side bracket, an engine tightening bolt, and the like.
  • a fuel injection operation and an oil injection operation are performed in this region 103.
  • other parts are also attached as appropriate.
  • the painted vehicle body 12A (English letters are added to facilitate identification. The same applies hereinafter) is transferred from the hanger 92 to the first lifter 82.
  • a lower harness is attached to the vehicle body 12.
  • Below the first lifter 82 only the work carriage 20 separated from the parts carriage 40 stands by.
  • the vehicle body 12 ⁇ / b> A is moved to the work carriage 20.
  • a mounting station 111 for mounting the vehicle body 12A as a workpiece on the floor plate 22 of the workpiece carriage 20 is provided below the first lifter 82.
  • the work carriage 20 carrying the vehicle body 12A moves forward.
  • the door is removed at the door removal stage 105.
  • the vehicle body without a door has a reference number of 10B. Further, the removed door is carried by the third overhead conveyor 96.
  • the work carriage 20 moves forward, proceeds to the entrance of the U-shaped conveyance path 98, and waits there. On the other hand, a parts cart (see FIG. 12) full of parts awaits in the workpiece dedicated conveyance path 101.
  • the parts cart 40 and the workpiece carriage 20 are alternately advanced to the U-shaped conveyance path 98, the parts carriage 40 is connected to the previous workpiece carriage 20f, and the workpiece carriage 20 is connected to the parts carriage 40. Connect them in a daisy chain.
  • a connection station 112 for connecting the floor plate 22 of the work carriage 20 to the platform floor 44 of the parts carriage 40 is provided.
  • the parts carriage 40 may be connected to the workpiece carriage 20 in advance, and the workpiece carriage 20 may be connected to the previous parts carriage 40 in a set state.
  • a plurality of transport cart units 10 connected to each other are arranged in series.
  • the conveyance carriage unit 10 advances continuously at a constant speed. Since there is a sufficient distance from the entrance to the exit of the U-shaped conveyance path 98, parts are attached to the vehicle body 12B during this time.
  • the vehicle body in which the attachment of the parts is completed is indicated by 12C.
  • the upstream component attachment work area 97 the relative position between the component storage portion and the vehicle body does not change, and thus the cell production method is implemented.
  • the head part carriage 40 is separated from the work carriage 20 on which the vehicle body 12C is mounted. Then, the parts cart 40 is returned to the parts dedicated conveyance path 102. The work carriage 20 is also separated from the subsequent parts carriage 40.
  • a release station 113 for releasing the connection between the platform floor 44 (FIG. 4) of the parts carriage 40 and the floor plate 22 of the workpiece carriage 20 is provided.
  • the second lifter 86 scoops up the vehicle body 12 ⁇ / b> C and hangs it on the hanger 94 of the second overhead conveyor 93.
  • a payout station 114 for scooping up the vehicle body 12C as a work from the floor plate 22 of the work carriage 20.
  • the empty work carriage 20 is returned to the mounting station 111 below the first lifter 82 through the work carriage circulation path 115. In this way, the floor plate 22 of the work carriage 20 is circulated and conveyed through the U-shaped conveyance path 98 and the work carriage circulation path 115. Since the work carriage 20 emptied at the dispensing station 114 is quickly returned to the mounting station 111, productivity is improved.
  • central part attachment work area 104 parts to be attached to the bottom of the vehicle body floor such as an engine are attached to the vehicle body 12C suspended on the hanger 94.
  • the 2nd overhead conveyor 93 repeats advancing and a stop, since a component box is being fixed on the ground, a line production system is implemented.
  • the operation in the downstream part mounting work area 103 is the same as that in the upstream part mounting work area 97. That is, the vehicle body 12D is moved to the work carriage 20 by the third lifter 87, and the parts are mounted in the downstream component mounting work area 103, whereby the vehicle body of reference numeral 12E is completed.
  • the tire is attached to the vehicle body 12E in the raised state with the fourth lifter 88. With the fifth lifter 89, the bumper is attached to the vehicle body 12F in the raised state.
  • the door attachment station 106 the door is attached to the vehicle body 12G and advanced to the inspection step 84.
  • the number of parts that need to be installed before (or after) the engine can be increased or decreased by adjusting the overhang lengths of the U-shaped conveyance paths 98 and 98. Since the apparent line length is determined by the direction of the conveyance path in the central component mounting work area, the apparent line length is not affected even if the overhang length of the U-shaped conveyance path 98 is increased. Therefore, by adopting the U-shaped conveyance path 98, the apparent line length can be shortened.
  • the parts station 110 collects the sub parts trucks 70L and 70R, the first parts storage section 46, and the second parts storage section 47 that have been emptied from the parts carriage 40. And sub-part carts 70L and 70R packed with parts 13, supply parts 117 and 117 for supplying the first part storage part 46 and the second part storage part 47.
  • the parts cart 40 which has been released from the connection at the release station 113 proceeds on the parts dedicated conveyance path 102.
  • the collection station 116 that collects the sub-part carts 70L and 70R the sub-part carts 70L and 70R that are empty from the parts cart 40 are removed.
  • the supply station 117 that supplies the sub-part carts 70L and 70R the sub-part carts 70L and 70R in which the parts 13 are fully loaded on the parts cart 40 are attached.
  • the parts cart 40 advances, and at the collection station 116 that collects the first parts storage unit 46 and the second parts storage unit 47, the first parts storage unit 46 and the emptied parts from the platform floor 44 of the parts cart 40 and The second component storage part 47 is removed. Then, at the supply station 117 that supplies the first component storage unit 46 and the second component storage unit 47, the first component storage unit 46 and the second component storage unit 47 loaded with the components 13 are placed on the platform floor 44.
  • the empty first part storage part 46 and second part with respect to the platform floor 44 of the parts cart 40.
  • the number of man-hours for replacing the component storage unit 47 and the first component storage unit 46 and the second component storage unit 47 loaded with the components 13 can be reduced.
  • the parts cart 40 coming out from the parts station 110 proceeds on the parts dedicated conveyance path 101 and is connected to the work carriage 20 at the connection station 112. In this way, by allowing the parts cart 40 to be separated from the workpiece carriage 20, the platform floor 44 of the parts cart 40 is circulated and conveyed through the U-shaped conveyance path 98 and the component conveyance paths 101 and 102. . Since the parts cart 40 loaded with the parts 13 is returned to the connection station 112 via the parts station 110 at a location different from the work conveyance path 85, the workability of supplying and discharging the parts 13 is improved.
  • the conveyance path may be W-shaped.
  • the conveyance path 107 By using the W-shaped conveyance path 107, more parts can be attached.
  • the distance x between the first lifter 82 and the second lifter 86 increases, the overhang distance y from the assembly line 85 decreases.
  • the work carriage 20 is a self-propelled carriage having a drive source, but may be moved by being hooked on a hook of a chain that circulates or moved by an operator.
  • connection / separation of the work carriage 20 and the parts carriage 40, and the connection / separation of the parts carriage 40 and the sub-parts trucks 70L, 70R may be manually inserted and removed. That is, it is indispensable to use the overhead conveyor 93 in the central part mounting work area 104, but the movement of the carriages 20 and 40 in the upstream / downstream part mounting work areas 97 and 103 is self-propelled, driven by external force, and manually pushed. It may be any of the traveling by.
  • the conveyance vehicle unit of the present invention may be configured to convey articles other than the vehicle body.
  • the platform floor may be a non-rotating floor affixed on the cart body, and the component storage section may be a single storage section that does not distinguish between the first and second.
  • the transport cart unit 10 is for a workpiece cart 20 that transports a vehicle body 12 as a workpiece (attachment target), and for a component that is disposed adjacent to the workpiece cart 20.
  • the carriage 40 and left and right sub-part carriages 70L and 70R disposed on the side of the workpiece carriage 20r after being pulled by the parts carriage 40 are included.
  • 20r indicated by an imaginary line is a subsequent work carriage, and 40r indicated by an imaginary line is a rear part carriage.
  • the carts 20, 40, 70L, and 70R will be individually described in detail.
  • the work carriage 20 includes a frame body 21 in which steel materials are assembled in a lattice shape, a floor plate 22 stuck on the frame body 21, and four workpiece receivers placed on the floor plate 22.
  • the base 23 is a main element.
  • the floor plate 22 is notched in an arc shape at the front and rear. Further, the left and right side portions of the floor board 22 are work floors 24L and 24R that are provided with anti-slip.
  • a first operation post 25 is provided at the front of one work floor 24L.
  • Locating pins 26 and 26 are set up on the work cradles 23 and 23, respectively. These positioning pins 26 and 26 position the vehicle body 12 (FIG. 1) in the horizontal direction. In addition, the vehicle body 12 is supported by the four workpiece cradle 23.
  • the left and right eye plates 27L and 27R are provided at the rear of the frame body 21.
  • the eye plates 27L and 27R are plates each having a hole 28 formed therein.
  • a longitudinal arm 29 extends forward from the front portion of the frame body 21, and a first locking mechanism 31 is provided at the tip of the longitudinal arm 29.
  • the first locking mechanism 31 is preferably a cylinder unit in which the pin 32 protrudes upward.
  • the cylinder unit may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
  • a plurality of free wheels 33 are provided on the lower surface of the frame body 21.
  • the universal wheel 33 is also called a caster, and does not prevent the bogie from turning by turning itself.
  • a drive box 34 is provided at the center of the lower surface of the frame body 21.
  • the drive box 34 incorporates a drive source such as a motor, and the drive wheels 35L and 35R are driven by this drive source.
  • the drive wheels 35L and 35R come into contact with the track (or road surface) and cause the work carriage 20 to self-propel.
  • a guide wheel 36 protrudes from the drive box 34.
  • the guide wheel 36 plays a role of defining a flow line of the work carriage 20 by fitting in a U-shaped conveyance path described later.
  • the guide wheel 36 may be a non-rotating guide shoe.
  • the parts carriage 40 is attached to a carriage main body 41 in which steel materials are assembled in a lattice shape, a plurality of free wheels 42 attached to the lower surface of the carriage main body 41, and the upper surface of the carriage main body 41.
  • a plurality of rollers 43, a circular platform floor 44 mounted on the carriage body 41 so as to be placed on these rollers 43, a roof frame 45 provided on the platform floor 44, and the roof frame 45 are provided.
  • the first component storage unit 46 and the second component storage unit 47 are the main elements.
  • the platform floor 44 is provided with a second operation post 48 including two operation elements 48a and 48b.
  • the circular platform floor 44 has a work floor 44a around the first component storage portion 46 and the second component storage portion 47, and the worker performs work on the work floor 44a.
  • the roof-type frame 45, the first component storage unit 46, and the second component storage unit 47 constitute a component storage unit 50.
  • the component storage unit 50 is detachably provided on the platform floor 44.
  • the plates 51L and 51R are extended forward from the rear part of the cart body 41, and the second locking mechanisms 52L and 52R are provided on the plate plates 51L and 51R, respectively.
  • the second locking mechanisms 52L and 52R are also preferably cylinder units in which the pins 53 protrude upward.
  • the cylinder unit may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
  • side arms 54L and 54R are extended from the left and right sides of the carriage main body 41, and third locking mechanisms 55L and 55R are provided on the side arms 54L and 54R, respectively.
  • the third locking mechanisms 55L and 55R are also preferably cylinder units in which the pins 56 and 56 protrude upward.
  • the cylinder unit may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
  • a perforated plate 57 is provided at the center lower portion of the carriage main body 41, and a bearing block 58 is provided at the center upper portion.
  • a central shaft 59 extends from the center of the table top floor 44 to the bottom, and the tip of the central shaft 59 is fitted into the bearing block 58. Since the platform floor 44 is supported by the plurality of rollers 43, a downward load does not act on the bearing block 58.
  • the bearing block 58 exhibits the effect of guiding the central shaft 59 in a freely rotatable manner.
  • a driven gear 61 is provided in the middle of the central shaft 59.
  • a servo motor 62 is disposed in the vicinity of the driven gear 61, and the driven gear 61 is rotated by a drive gear 63 driven by the servo motor 62.
  • the platform floor 44 turns horizontally around the central axis 59. That is, the platform floor 44 is a turntable.
  • the servo motor 62 is provided with an encoder 64 that detects the rotation angle and direction of the motor central shaft 59.
  • the cart body 41 is provided with a rotary sensor 65 and a rotation angle control unit 66. Although the operation of the rotary sensor 65 will be described later, the angle information from the rotary sensor 65 and the angle information from the encoder 64 are input to the rotation angle control unit 66.
  • the rotation angle control unit 66 controls the servo motor 62 based on the angle information.
  • the tip of the longitudinal arm 29 is fitted to a fork-shaped arm 67 extending from the rotary sensor 65.
  • the fork-shaped arm 67 does not tilt.
  • the long arm 29 can rotate horizontally around the pin 32 of the first locking mechanism 31.
  • the longitudinal arm 29 may rotate by 2 ⁇ around the pin 32. This rotation angle 2 ⁇ is detected by the rotary sensor 65.
  • the vehicle body 12 is placed in front of the parts cart 40, and the rear vehicle body 12r is placed behind the parts cart 40.
  • the part is taken out from the first part storage 46 and attached to the vehicle body 12.
  • the part is taken out from the second part storage part 47 and attached to the vehicle body 12r after the part.
  • the rotation angle control unit 66 causes the distance L from the first component storage unit 46 to the vehicle body 12 to be approximately equal to the distance Lr from the second component storage unit 47 to the rear vehicle body 12r (expressed in terms of angle,
  • the turntable (the platform floor 44) is controlled to rotate so that the angle of the part with the front and rear vehicle bodies is the same.
  • the workability of the first component storage unit 46 and the workability of the second component storage unit 47 are made equal. As a result, leveling of the component mounting work can be achieved.
  • the conveyance is continuously carried at a constant speed without stopping.
  • the turntable on the parts cart rotates when reaching the corner, and the front and rear carriages are adjusted so that the angle between the parts storage part and the front and rear bodies is the same.
  • the distance that the worker who has boarded the vehicle moves to the part is made as small as possible.
  • the turning center and the rotation center (center axis 59) of the turntable (table floor 44) are coaxial. That is, since the turning center of the transport carriage unit and the rotation center of the turntable are coaxial, the relative positions of the component storage portions 46 and 47 with respect to the vehicle body 12 can be easily controlled.
  • the left and right sub-part carts 70L and 70R are pulled by the parts cart 40.
  • the operation element 48b provided on the second operation post 48 the pin 56 of the third locking mechanism 55R can be lowered.
  • the right sub-part cart 70R is separated from the parts cart 40.
  • the left sub-part cart 70L By operating the operating element 48b, it is possible to arbitrarily connect the left and right sub-part carts 70L and 70R to the parts cart 40 and to separate the left and right sub-part carts 70L and 70R from the parts cart 40.
  • the left and right sub-part carts 70L and 70R are further connected to the parts cart 40, the left sub-part cart 70L is arranged on the left side of the rear work cart 20r, and the right sub-part cart 70R is It is arranged on the right side of the rear work carriage 20r.
  • the moving distance of the parts can be shortened, and the work efficiency can be increased.
  • the transport cart unit 10 includes the workpiece cart 20 and the component cart 40 disposed after the workpiece cart 20 as essential components.
  • the parts cart 40 can also be disposed in front of the workpiece cart 20r of the subsequent transport cart unit 10r, as indicated by an imaginary line in FIG. Therefore, the parts cart 40 can be arranged before and after the workpiece cart 20.
  • the conveyance carriage unit 10 is arranged after the workpiece carriage 20 that conveys the workpiece (body 12) and the workpiece carriage 20 and is detachably connected to the workpiece carriage 20 to convey parts. As shown in FIG. 23, it is connected to the front and rear transport carriage units so as to be able to turn.
  • the workpiece carriage 20 and the parts carriage 40 can be connected, the workpiece carriage 20 and the parts carriage 40 can be continuously conveyed.
  • the worker can work in the form of riding on the parts carriage 40 or the workpiece carriage 20. Since it is not necessary to stop the work carriage 20 for a long time, the production time becomes constant.
  • transport carriage unit 10 is pivotably connected to the front and rear transport carriage units 10, it is possible to meander the transport flow line. By meandering, it is possible to increase the length of the transport flow line, and to prevent the assembly work area from becoming long.
  • FIG. 27 The component mounting facility 80 for operating the vehicle body component mounting system is shown in FIG. 27. Since the facility configuration is complicated, FIGS. 25 and 26 extracted for each genre will be described first.
  • FIG. 25 is a layout diagram of the overhead conveyor, and the first overhead conveyor 91 is placed along the discharge line 83.
  • the painted vehicle body 12 is hung by the hanger 92 of the first overhead conveyor 91 and is carried onto the first lifter 82 (FIG. 10).
  • a second overhead conveyor 93 is placed along the assembly line 85.
  • the second overhead conveyor 93 is transported in a state where it is lifted by a hanger 94, and components such as an engine attached to the bottom surface of the vehicle body floor are attached to the vehicle body 12 during the transportation.
  • a third overhead conveyor 96 is provided which receives the door 95 between the first overhead conveyor 91 and the second overhead conveyor 93, incorporates a window regulator or the like into the door 95, and carries the door 95 to the entrance side of the inspection process 84.
  • FIG. 26 is an arrangement diagram of the upstream / downstream part mounting work area, and an upstream part mounting work area 97 is provided between the first lifter 82 and the second lifter 86, and the first lifter 82 and the second lifter 86 In between, a U-shaped conveyance path 98 is laid out from the assembly line 85 to the side at a right angle or obliquely.
  • the transport carriage unit 10 on which the vehicle body 12 is placed moves along the U-shaped transport path 98.
  • the parts-dedicated conveying paths 101 and 102 indicated by broken lines are connected to the legs of the U-shaped conveying path 98, and the conveying cart unit 10 full of parts is thrown into the U-shaped conveying path 98 from the parts-dedicated conveying path 101.
  • the transport carriage unit 10 that has been emptied is returned from the U-shaped transport path 98 to the parts dedicated transport path 102.
  • the sub-part carts 70L and 70R are pulled by the parts cart 40 of the transport cart unit 10.
  • downstream part attachment work area 103 is between the third lifter 87 and the fourth lifter 88, and U extends over the side of the assembly line 85 between the third lifter 87 and the fourth lifter 88.
  • a character-shaped conveyance path 98 is laid. Others are the same as the upstream part mounting work area 97, and thus the description thereof is omitted.
  • a central part attachment work area 104 Between the second lifter 86 and the third lifter 87 is a central part attachment work area 104, and parts to be attached to the bottom of the vehicle body floor such as an engine are attached in the central part attachment work area 104.
  • the component mounting facility 80 shown in FIG. 27 includes an upstream component mounting work region 97, a central component mounting work region 104, and a downstream component mounting work region 103.
  • the central part attachment work area 104 parts attached to the bottom surface of the vehicle body floor such as an engine are attached to the vehicle body 12C conveyed while being suspended by the second overhead conveyor 93.
  • the parts to be installed in this work area are the engine / front suspension assembly (an assembly in which the components of the engine and the front suspension are assembled in advance) and the rear suspension assembly (the components in the rear suspension are assembled in advance). Assembly) and other parts attached to the bottom of the vehicle body floor (parts that can only be attached to the vehicle body in the raised state).
  • the engine / front suspension assembly and the rear suspension assembly are each transferred to the mounting station in the state of assembly, lifted from below the vehicle body by an automatic mounting machine, and tightened with bolts while being docked to the vehicle body.
  • stop-and-go transport is performed at least at this station.
  • upstream part attachment work area 97 parts that need to be attached to the vehicle body before the engine is attached, that is, parts that cannot be attached after the engine or the like is attached are attached by the cell production method.
  • the parts are engine room wall surface mounting members (for example, a radiator, a pedal assembly, a steering column, a brake hose, etc.).
  • other parts are also attached as appropriate.
  • the upstream part installation work area 97 a plurality of workers board a single truck, and the parts are installed during the transfer time from the start point to the end point of this work area. Done.
  • This work corresponds to work by the cell production method.
  • the conveyance is continuously carried at a constant speed without stopping.
  • the turntable on the parts cart rotates and the angle of the parts storage part with the front and rear bodies is adjusted to be the same, so that the workers on the front and rear carriages move to the parts. Make the distance as small as possible.
  • the downstream part mounting work area 103 is similarly operated by the cell production method.
  • parts that need to be attached to the vehicle body after the engine is attached that is, parts that can only be attached after the engine or the like is attached are attached by the cell production method.
  • the parts are, for example, a battery, an air cleaner filter, an engine mount side bracket, an engine tightening bolt, and the like.
  • a fuel injection operation and an oil injection operation are performed in this region 103.
  • other parts are also attached as appropriate.
  • the painted vehicle body 12 ⁇ / b> A is transferred from the hanger 92 to the first lifter 82.
  • a lower harness is attached to the vehicle body 12. Below the first lifter 82, the work carriage 20 of the transport carriage unit 10 full of parts is waiting.
  • the vehicle body 12 ⁇ / b> A is moved to the work carriage 20 by lowering the first lifter 82.
  • the place where the first lifter 82 is disposed is a vehicle body mounting station 111 for mounting the vehicle body 12 ⁇ / b> A on the transport carriage unit 10.
  • the door is removed at the door removal stage 105.
  • a vehicle body without a door has a code of 12B.
  • the vehicle body 12B is placed on the work carriage 20, and the transport carriage unit 10 moves forward. Further, the removed door is carried by the third overhead conveyor 96.
  • the transport cart unit 10 moves forward to a connection station 112 that connects the transport cart units 10 to each other.
  • the transport cart unit 10 that has moved forward is connected to the rear portion of the transport cart unit 10 that has previously waited at the connection station 112.
  • the work carriage 20 of the transport carriage unit 10 that has moved forward is connected to the parts carriage 40 of the transport carriage unit 10 that has been waiting first.
  • the plurality of transfer carriage units 10 are connected in a daisy chain.
  • a plurality of transport cart units 10 connected to each other are arranged in series.
  • the conveyance carriage unit 10 advances continuously at a constant speed. Since there is a sufficient distance from the entrance to the exit of the U-shaped conveyance path 98, parts are attached to the vehicle body 12B during this time.
  • the transport cart unit 10 moves forward to the connection release station 113 just before the exit of the U-shaped transport path 98. At the connection release station 113, the previous transport carriage unit 10 is disconnected. The side of the work carriage 20 of the subsequent transport carriage unit 10 is opened. The transport cart unit 10 after the side is opened is also sequentially separated.
  • an equipment attachment station 114 for attaching equipment to the vehicle body 12B is provided.
  • an assist device 121 that lifts relatively heavy equipment such as a sheet is disposed.
  • the transport cart unit 10 disconnected at the disconnection station 113 moves forward to the equipment mounting station 114.
  • the assist device 121 lifts equipment such as a seat and attaches the equipment to the vehicle body 12B from the side of the work carriage 20.
  • the vehicle body in which the attachment of parts and fixtures has been completed has a code of 12C.
  • the upstream component attachment work area 97 the relative position between the component storage portion and the vehicle body does not change, and thus the cell production method is implemented.
  • the transport cart unit 10 with the vehicle body 12 ⁇ / b> C is advanced to the bottom of the second lifter 86.
  • the second lifter 86 scoops up the vehicle body 12 ⁇ / b> C and hangs it on the hanger 94 of the second overhead conveyor 93.
  • the place where the second lifter 86 is disposed is a vehicle body unloading station 115 for unloading the vehicle body 12 ⁇ / b> C from the transport cart unit 10.
  • the transport cart unit 10 that has been emptied is advanced to the parts dedicated transport path 102.
  • the parts-dedicated transport path 102 is connected to a parts station for mounting parts on the transport cart unit 10 that has been emptied.
  • central part attachment work area 104 parts to be attached to the bottom of the vehicle body floor such as an engine are attached to the vehicle body 12C suspended on the hanger 94.
  • the 2nd overhead conveyor 93 repeats advancing and a stop, since a component box is being fixed on the ground, a line production system is implemented.
  • the operation in the downstream part mounting work area 103 is the same as that in the upstream part mounting work area 97. That is, the vehicle body 12D is moved to the work carriage 20 by the third lifter 87, and the parts are mounted in the downstream component mounting work area 103, whereby the vehicle body of reference numeral 12E is completed.
  • the tire is attached to the vehicle body 12E in the raised state with the fourth lifter 88. With the fifth lifter 89, the bumper is attached to the vehicle body 12F in the raised state.
  • the door attachment station 106 the door is attached to the vehicle body 12G and advanced to the inspection step 84.
  • the number of parts that need to be installed before (or after) the engine can be increased or decreased by adjusting the overhang lengths of the U-shaped conveyance paths 98 and 98. Since the apparent line length is determined by the direction of the conveyance path in the central component mounting work area, the apparent line length is not affected even if the overhang length of the U-shaped conveyance path 98 is increased. Therefore, by adopting the U-shaped conveyance path 98, the apparent line length can be shortened.
  • the parts station 110 includes an empty parts storage unit 50, left and right sub-part carts 70L and 70R, a collection station 116 that collects from the transport cart unit 10, and a part storage unit that is packed with parts. 50 and the sub-part carts 70L and 70R are supplied to the transport cart unit 10 and supply stations 117 and 117.
  • the transport carriage unit 10 from which the vehicle body 12 has been unloaded at the vehicle body unloading station 115 proceeds on the parts dedicated conveyance path 102.
  • the component storage unit 50 and the sub-component carts 70L and 70R that are emptied from the component cart 40 are removed.
  • the transport cart unit 10 moves forward on the parts dedicated transport path 102, and at the supply station 117, the parts storage unit 50 loaded with parts is placed on the parts cart 40, and the sub parts carts 70 ⁇ / b> L and 70 ⁇ / b> R loaded with parts are loaded. It is connected to the parts cart 40.
  • the empty part storage unit 50 and the sub-parts trucks 70L and 70R and the parts 13 for the parts cart 40 are It is possible to reduce the man-hours for exchanging the fully loaded component storage unit 50 and the sub-part carts 70L and 70R.
  • the transport cart unit 10 that has exited from the supply station 117 proceeds on the parts dedicated transport path 101, and the vehicle body 12 is mounted at the vehicle body mounting station 111.
  • the vehicle body 12 can be loaded and unloaded while the workpiece carriage 20 and the component carriage 40 are integrated, and the component storage portion 50 and the sub-part carts 70L and 70R can be collected and connected. , Productivity can be improved.
  • the assist device 121 is disposed at the equipment mounting station 114.
  • the assist device 121 includes a support column 122, a beam portion 123 provided on an upper portion of the support column 122, and an equipment support unit 124 provided movably on the beam portion 123.
  • the assist device 121 can be arranged on the side of the work carriage 20. Since the assist device 121 supports the seat 125 as the fixture with the fixture support portion 124, the worker 126 can easily assemble a heavy object such as the seat 125 to the vehicle body 12.
  • the side of the work carriage 20 of the transport carriage unit 10 is open.
  • the arm portion 94a of the hanger 94 can be brought close to the side of the vehicle body 12 to support the vehicle body 12.
  • the hanger 94 can be used in a state where the workpiece carriage 20 is not separated from the parts carriage 40 (FIG. 28), and the number of man-hours can be reduced, so that the production capacity of the entire assembly line can be improved.
  • the side of the work carriage 20 of the transport carriage unit 10 is open.
  • the 2nd lifter 86 can be arrange
  • the second lifter 86 can be used in a state where the workpiece carriage 20 is not separated from the parts carriage 40 (FIG. 28), and the number of man-hours can be reduced, so that the production capacity of the entire assembly line can be improved.
  • FIG. 32 shows a modification of the component mounting facility 80 according to the second embodiment shown in FIG.
  • the conveyance path may be W-shaped.
  • the W-shaped conveyance path 107 By using the W-shaped conveyance path 107, more parts can be attached.
  • the distance x between the first lifter 82 and the second lifter 86 increases, the overhang distance y from the assembly line 85 decreases. The same applies to the downstream component mounting work area 103.
  • the workpiece carriage 20 is a self-propelled carriage having a drive source. However, the workpiece carriage 20 may be moved by being hooked on a circulating chain hook, or may be pushed by an operator.
  • connection / separation of the work carriage 20 and the parts carriage 40, and the connection / separation of the parts carriage 40 and the sub-parts trucks 70L, 70R may be manually inserted and removed. That is, it is indispensable to use the overhead conveyor 93 in the central part mounting work area 104, but the movement of the carriages 20 and 40 in the upstream / downstream part mounting work areas 97 and 103 is self-propelled, driven by external force, and manually pushed. It may be any of the traveling by.
  • the conveyance trolley unit of this invention does not interfere with the object for conveyance other than a vehicle body other than conveying a vehicle body.
  • the platform floor may be a non-rotating floor affixed on the cart body, and the component storage section may be a single storage section with no distinction between first and second.
  • the transport cart unit is applied to the cell production method.
  • the present invention is not limited to this, and the transport cart unit may be used in a normal production line.
  • the sub-part carts 70L and 70R are hooked and pulled by the pins 56 of the side arms 54L and 54R. If it is connected to the carriage 40, it may be connected to a pin or the like provided in another part of the transport unit.
  • the present invention is suitable for a part mounting line for attaching parts to a vehicle body.
  • SYMBOLS 10 Conveyor trolley unit, 12 ... Attachment object (work, vehicle body), 13 ... Parts, 20 ... Work trolley, 22 ... Floor board, 22a ... Concave arc shape part, 24L, 24R ... Work floor, 40 parts trolley DESCRIPTION OF SYMBOLS 41 ... Carriage body, 44 ... Stand-up floor (turn table), 44a ... Work floor, 44b ... Convex-arc shaped part, 46 ... Parts storage part (1st parts storage part), 47 ... Parts storage part (2nd parts storage part) ), 49... Central axis of convex arc-shaped portion, 50... Component storage portion, 66... Rotation angle control portion, 70 L, 70 R.
  • Sub-part cart 85 ... Workpiece conveyance path (assembly line), 93. 2 ... overhead conveyor), 97 ... upstream part mounting work area, 98 ... U-shaped transport path, 99 ... bent part, 101, 102 ... part dedicated transport path, 103 ... downstream part mounting work area, 104 ... central part mounting work area 110 ... parts station, 111 ... mounting station, 112 ... connecting station, 113 ... uncoupling station, 114 ... fixtures mounted station, 116 ... collecting station, 117 ... supply station

Abstract

 車体部品取付システムは、車体(12)の搬送路(85)に沿って、セル生産方式による上流部品取付作業領域(97)と、オーバヘッドコンベア(93)で車体(12)を搬送する中央部品取付作業領域(104)と、セル生産方式による下流部品取付作業領域(103)とをこの順に備えている。主要部品以外の部品は、セル生産方式で車体(12)に取付けられる。セル生産方式であれば、部品箱の数を増やすことで対応可能であり、ラインの長大化が抑制される。ライン生産方式をベースとし、その一部にセル生産方式を併用してラインの長大化を抑制する。

Description

車体用部品取付システム
 本発明は、ワークである車体に部品を取付ける車体用部品取付システムに関する。
 車体へ部品を取付ける作業は、ライン生産方式が主流であったが、近年はセル生産方式も採用されるようになってきた。ライン生産方式は、低速で連続的に移動する車体へ、ラインの側方に待機する作業者の手で部品が取付けられる方式である。セル生産方式は、車体の周囲に部品箱が配置され、部品箱から取り出した部品を車体に取付ける方式である。今までに、例えば、特許文献1に開示されているように、種々のセル生産方式が提案されてきた。
 特許文献1に開示されているセル生産方式に用いられている作業台車は、支柱の下部に固定輪および自由輪を備え、支柱の上端に作業テーブルを備える。固定輪および自由輪を備えているため、手動で押すことができる。
 そこで、「START」から「END」までの生産ラインを、作業者の押し操作により、作業台車が移動される。この間に、作業者の手で部品棚から取り出された部品が車体等の取付対象物に取付けられる。
 作業者は、所望の部品棚の側に作業台車を止めて部品を取付け、その後に次の部品棚へ作業台車を移動させる。作業台車は移動と停止が繰り返されるため、作業者の熟練度に応じて停止時間にばらつきが出る。その結果、生産時間の管理が難しくなる。
 また、特許文献1に開示されている技術では、手押し台車のような作業台車を想定しているため、作業台車に載せる取付対象物は、小型物品に限定される。一方、長さが5m前後になる車体でも生産が望まれる。しかし、このような大型物品を取付対象とした場合、部品点数が極めて多くなり、そのために、生産ラインが長大化し、作業者の歩行距離が大幅に伸びる。すなわち、特許文献1によるセル生産方式は、車体などの大型の取付対象物に適しているとは言い難い。
 そこで、車体などの大型の取付対象物に適し、生産時間を容易に一定にすることができる部品取付システムおよび搬送技術が求められる。
 さらに、車体等のワークや部品の搬送は、台車やコンベア等が利用されることがあるが、コンベアを利用することでワークや部品を連続的に搬送することができる。このようなワークや部品を搬送するコンベアとして、車体等のワークを搬送する技術が知られている(例えば、特許文献2参照。)。図33は、特許文献2に開示されているコンベアを示している。
 図33に示すように、コンベア200は、車体の組立や搬送に用いられる。コンベア200は、両端が凸円弧形状の支持床板201と、両端が凹円弧形状の中間床板202とが、凸円弧形状部が凹円弧形状部に嵌るようにして配置される。
 支持床板201の凸円弧形状部の中心軸を中心に、中間床板202が回動自在に連結される。車体の搬送路203のカーブにおいて、凹円弧形状部が凸円弧形状部に沿って移動し、支持床板201と中間床板202との間に隙間は生じない。
 ワークが車体である場合、車体に部品を取付ける作業が生じる。コンベア200に載せられた車体に部品を取付けるには、移動する車体に対して部品を取付ける必要があるため、車体と一緒にコンベア200に部品を載せると部品の取付けが容易になる。車体はリフト等によりコンベア200に載せられる。
 しかし、車体の搬送路203が閉じた状態であるため、複数の部品を別の場所からコンベア200に載せるには手間がかかり、搬送路203への効率良い部品供給が困難であった。
 そこで、ワークが連続して搬送される搬送路に、効率良く部品を搬送して供給することができる部品搬送システムが求められる。
特開2003-251575号公報 特表2007-526861号公報
 本発明の課題は、車体などの大型の取付対象物に適し、生産時間を容易に一定にすることができる部品取付システムおよび搬送技術を提供することにある。
 さらに、本発明の別の課題は、車体等のワークが連続して搬送される搬送路に、効率良く部品を搬送して供給することができる部品搬送システムを提供することにある。
 請求項1による発明によれば、自動車の車体に部品を取付ける車体用部品取付システムであって、前記車体が上昇した状態で搬送され、この間に少なくともエンジンが前記車体に取付けられる中央部品取付作業領域と、前記エンジンが取付けられる前に取付ける必要がある部品類が、セル生産方式により前記車体に取付けられる上流部品取付作業領域と、前記エンジンが取付けられた後に取付ける必要がある部品類が、セル生産方式により前記車体に取付けられる下流部品取付作業領域と、を備えており、前記車体の搬送路に沿って、前記上流部品取付作業領域と、前記中央部品取付作業領域と、前記下流部品取付作業領域とがこの順に配置されている車体用部品取付システムが提供される。
 請求項2に係る発明では、好ましくは、セル生産方式が行われる前記上流部品取付作業領域は、前記中央部品取付作業領域の前記搬送路に対して、側方へ張り出すU字状搬送路を備えている。
 請求項3に係る発明では、好ましくは、セル生産方式が行われる前記下流部品取付作業領域は、前記中央部品取付作業領域の搬送路に対して、側方へ張り出すU字状搬送路を備えている。
 請求項4に係る発明によれば、部品及びこの部品が取付けられる取付対象物としてのワークを搬送する搬送台車ユニットであって、前記部品を搬送する部品用台車と、前記部品用台車の前又は後に配置されると共に前記部品用台車に分離可能に連結され前記ワークを搬送するワーク用台車と、を備えており、前記部品用台車は、台車本体と、前記台車本体に取付けられると共に作業者が乗ることができる台上床と、前記台上床に設けられ前記部品を収納する部品収納部とからなり、前記ワーク用台車は、前記作業者が乗る作業床を備えており、前記搬送台車ユニットは、前後の搬送台車ユニットに、旋回可能に連結されている搬送台車ユニットが提供される。
 請求項5に係る発明では、好ましくは、前記部品収納部は、前記ワークに取付ける部品を収納する第1部品収納部と、前記ワークの前方又は後方に配置されるワークに取付ける部品を収納する第2部品収納部とからなり、前記台上床は、前記台車本体に回転可能に支持されるターンテーブルであり、前記ターンテーブルは、回転角制御部により、前記第1部品収納部から前記ワークまでの距離が、前記第2部品収納部から前方又は後方に配置される前記ワークまでの距離とほぼ等しくなるように回転制御される。
 請求項6に係る発明では、好ましくは、前記ワーク用台車は、前記部品用台車の後方に配置され、前記部品用台車に、さらに左右のサブ部品台車が連結され、前記左のサブ部品台車は前記ワーク用台車の左側方に配置され、前記右のサブ部品台車は前記ワーク用台車の右側方に配置される。
 請求項7に係る発明によれば、両端が凹円弧形状を呈しワークを載せる床板と、両端が凸円弧形状を呈し前記ワークに取り付ける部品を載せる台上床とが、前記凹円弧形状部に前記凸円弧形状部が嵌るようにして配置され、前記床板が、前記台上床の凸円弧形状部の中心軸に回動自在に且つ前記台上床に分離可能に連結されると共に連続して搬送される部品の搬送システムであって、前記ワークの搬送路に設けられ互いに連結された前記床板及び前記台上床を少なくとも1箇所の曲がり部を経由して案内するU字状搬送路と、前記U字状搬送路の上流側端部に設けられ前記台上床に前記床板を連結する連結ステーションと、前記U字状搬送路の下流側端部に設けられ前記台上床から前記床板の連結を解除する解除ステーションと、前記解除ステーションで解除された前記台上床を搬入し、前記台上床に前記部品を積み込み、前記連結ステーションに搬出する部品ステーションと、を備えている部品搬送システムが提供される。
 請求項8に係る発明では、好ましくは、前記部品搬送システムは、さらに、前記床板が前記連結ステーションに到着する前に、前記ワークを前記床板に搭載する搭載ステーションと、前記床板が前記解除ステーションを通過した後に、前記ワークを前記床板から払い出す払出ステーション、とを備えており、前記床板は、前記払出ステーションから前記搭載ステーションへ循環搬送される。
 請求項9に係る発明では、好ましくは、前記部品ステーションは、前記台上床が前記解除ステーションを通過した後に、空になった部品収納部を前記台上床から回収する回収ステーションと、前記台上床が前記連結ステーションに到着する前に、前記部品が積み込まれた前記部品収納部を前記台上床に供給する供給ステーションと、からなり、前記台上床は、前記回収ステーションから前記供給ステーションへ循環搬送される。
 請求項10に係る発明によれば、部品及びこの部品が取付けられる取付対象物としてのワークを搬送する搬送台車ユニットであって、前記ワークを搬送するワーク用台車と、前記ワーク用台車に隣接して配置され前記部品の一部を搬送する部品用台車と、を備えており、前記ワーク用台車は、作業者が乗る作業床を備え、前記部品用台車は、台車本体と、前記台車本体に取付けられる台上床と、前記台上床に設けられ前記部品の一部を収納する部品収納部とからなり、前記搬送台車ユニットは、前後の搬送台車ユニットに、旋回可能に連結されている搬送台車ユニットが提供される。
 請求項11に係る発明によれば、部品及びこの部品が取付けられる取付対象物としてのワークを搬送する搬送台車ユニットであって、前記ワークを搬送するワーク用台車と、前記ワーク用台車に隣接して配置され前記部品の一部を搬送する部品用台車と、前記部品用台車又は前記ワーク用台車で牽引され前記部品の残部を搬送する左右のサブ部品台車と、を備えており、前記ワーク用台車は作業者が乗る作業床を備え、前記部品用台車は、台車本体と、前記台車本体に取付けられる台上床と、前記台上床に設けられ前記部品の一部を収納する部品収納部とからなり、左右の前記サブ部品台車は、後の搬送台車ユニットのワーク用台車の側方に配置され、前記搬送台車ユニットは、前後の搬送台車ユニットに、旋回可能に連結されている搬送台車ユニットが提供される。
 請求項12に係る発明では、好ましくは、前記部品収納部は、前記ワークに取付ける部品を収納する第1部品収納部と、前記ワークの後方に配置されるワークに取付ける部品を収納する第2部品収納部とからなり、前記台上床は、前記台車本体に回転可能に支持されるターンテーブルであり、前記ターンテーブルは、回転角制御部により、前記第1部品収納部から前記ワークまでの距離が、前記第2部品収納部から前記後方に配置されるワークまでの距離とほぼ等しくなるように回転制御される。
 請求項13に係る発明によれば、ワークの搬送路に設けられ、前後の前記搬送台車ユニットの連結を解除する連結解除ステーションと、前の前記搬送台車ユニットが前進し、後の前記搬送台車ユニットのワーク用台車の側方が開放されたら、後の前記搬送台車ユニット上の前記ワークに側方から備品を取り付ける備品取り付けステーションと、を備えた部品搬送システムが提供される。
 請求項1に係る発明では、車体の搬送路に沿って、セル生産方式による上流部品取付作業領域と、オーバヘッドコンベアで車体を搬送する中央部品取付作業領域と、セル生産方式による下流部品取付作業領域とがこの順に備えられる。
 塗装工程から搬送される車体へ取付けられる部品は、多岐にわたる。しかし、エンジンについては、排気量などに応じて大きさや形状が変化するものの、1車体当たり1個のエンジンが取付けられる。サスペンションについても、大きさや形状が変化するものの、1車体当たり前後左右の合計4個のサスペンションが取付けられる。このように、個数が変わらない部品(エンジン等)は、中央部品取付作業領域で取付けられる。加えて、その他の車体フロア底面に取りつける部品が取付けられる。オーバヘッドコンベアで低速移動中に取付け作業が行われるため、中央部品取付作業領域ではライン生産方式で作業が実施される。
 いわゆる高級車では、普通車に比較して内装品などの部品が多くなる。すなわち、主要な部品(エンジン等)以外の部品は、車種によって数が異なる。仮に、主要部品以外の部品をもライン生産方式で取付けられるとすると、最大の部品数を考慮してライン長さが決められるため、必然的にラインが長大化する。
 本発明では、主要部品以外の部品をセル生産方式で取付けるようにした。セル生産方式であれば、部品箱の数を増やすことで対応可能であるため、ラインの長大化が抑制される。すなわち、本発明は、ライン生産方式をベースとし、その一部にセル生産方式を併用したので、ラインの長大化が抑制される。
 また、本発明は、ライン生産方式をベースとしているため、生産時間のばらつきを抑えることができ、生産時間が一定になる。よって、請求項1によれば、車体などの大型の取付対象物に適し、生産時間を容易に一定にすることができると共にライン長を短くすることができる。
 請求項2に係る発明では、セル生産方式が行われる上流部品取付作業領域は、中央部品取付作業領域の搬送路に対して、側方へ張り出すU字状搬送路を備えている。U字状搬送路の張り出し長さを調整することで、エンジン取付け前に取付ける必要がある部品の数を増減させることができる。見かけ上のライン長さは、中央部品取付作業領域の搬送路の方向で定められるため、見かけ上のライン長さは、U字状搬送路の張り出し長さを増加しても影響されない。よって、U字状搬送路を採用したことにより、見かけ上のライン長さの短縮化が図れる。
 請求項3に係る発明では、セル生産方式が行われる下流部品取付作業領域は、中央部品取付作業領域の搬送路に対して、側方へ張り出すU字状搬送路を備えている。U字状搬送路の張り出し長さを調整することで、エンジン取付け後に取付ける必要がある部品の数を増減させることができる。見かけ上のライン長さは、中央部品取付作業領域の搬送路の方向で定められるため、見かけ上のライン長さは、U字状搬送路の張り出し長さを増加しても影響されない。よって、U字状搬送路を採用したことにより、見かけ上のライン長さの短縮化が図れる。
 請求項4に係る発明では、ワーク用台車と部品用台車が連結可能であるため、ワーク用台車と部品用台車を連続して搬送させることができる。作業者は部品用台車又はワーク用台車に乗った形態で作業が可能となる。ワーク台車を長時間止める必要がないため、生産時間が一定になる。
 また、搬送台車ユニットは、前後の搬送台車ユニットに旋回可能に連結されるため、搬送動線を蛇行させることができる。蛇行により搬送動線の長さを稼ぐことができ、組立作業エリアの長大化を防止することができる。
 さらに、ワーク用台車と部品用台車の一方を自走させることで他方を牽引することができ、作業者の手で台車を押す必要がなく、車体のような重量物でも搬送が可能となる。よって、請求項4によれば、車体などの大型の取付対象物に適し、生産時間を容易に一定にすることができる。
 請求項5に係る発明では、回転角制御部により、第1部品収納部からワークまでの距離が、第2部品収納部から前方又は後方に配置されるワークまでの距離とほぼ等しくなるようにターンテーブルが回転制御される。ターンテーブルを回転制御することにより、第1部品収納部に係る作業性と第2部品収納部に係る作業性を同等にする。その結果、部品取付作業の平準化を図ることができる。
 請求項6に係る発明では、部品用台車に、さらに左右のサブ部品台車が連結され、左のサブ部品台車がワーク用台車の左側方に配置され、右のサブ部品台車がワーク用台車の右側方に配置される。部品の移動距離を短縮することができ、作業能率を高めることができる。
 請求項7に係る発明では、U字状搬送路の上流側端部に設けられ台上床に床板を連結する連結ステーションと、U字状搬送路の下流側端部に設けられ台上床から床板の連結を解除する解除ステーションとを備える。
 床板から台上床を分離可能にしたので、部品ステーションに解除ステーションで解除された台上床を搬入し、この台上床に部品を積み込み、連結ステーションに搬出することができる。その結果、部品供給の作業性が向上し、ワークが連続して搬送される搬送路に、効率良く部品を搬送して供給することができる。
 請求項8に係る発明では、床板が連結ステーションに到着する前に、ワークを床板に搭載する搭載ステーションと、床板が解除ステーションを通過した後に、ワークを床板から払い出す払出ステーションとを備える。
 部品が取付けられたワークを床板から払出し、空になった床板は、払出ステーションから搭載ステーションへ迅速に循環搬送されるので、生産性を向上させることができる。
 請求項9に係る発明では、部品ステーションは、空になった部品収納部を台上床から回収する回収ステーションと、部品が積み込まれた部品収納部を台上床に供給する供給ステーションとからなる。
 空になった部品収納部を、既に複数の部品が収納された部品収納部に入れ替えるだけなので、台上床に部品を供給する工数の短縮を図ることができる。加えて、台上床は、回収ステーションから供給ステーションへ迅速に循環搬送されるので、部品供給においても生産性の向上を図ることができる。このように、本発明では、ワークの搬送路において、ワークの供給と、部品の供給とを別々に且つ同時に行うことができるので、より生産性の向上を図ることができる。
 請求項10に係る発明では、搬送台車ユニットは、ワーク用台車に部品用台車が隣接して配置されるので、ワーク用台車と部品用台車を連続して搬送させることができる。作業者は搬送台車ユニットに乗った形態で作業が可能となる。作業者の部品組み付け作業中は搬送台車ユニットを長時間止める必要がないため、生産時間が一定になる。
 また、搬送台車ユニットのワーク用台車の側方が開放されている。ワーク用台車の側方にリフターを配置できるので、リフターで車体のような重量物をワーク用台車から移動させることができる。その結果、ワーク用台車から部品用台車を切り離すことなく、ワーク用台車に部品用台車を隣接して配置した状態で、リフターを使用することができ、生産性を向上させることができる。
 請求項11に係る発明では、搬送台車ユニットは、ワーク用台車に部品用台車が隣接して配置されるので、ワーク用台車と部品用台車を連続して搬送させることができる。作業者は搬送台車ユニットに乗った形態で作業が可能となる。作業者の部品組み付け作業中は搬送台車ユニットを長時間止める必要がないため、生産時間が一定になる。
 また、搬送台車ユニットは、前後の搬送台車ユニットに旋回可能に連結されるため、搬送動線を蛇行させることができる。蛇行により搬送動線の長さを稼ぐことができ、組立作業エリアの長大化を防止することができる。
 さらに、搬送台車ユニットを自走させる又は循環移動するチェーンのフックに引っ掛けて移動させることで、作業者が手で台車を押す必要がなくなるので、多くの部品が搬送可能となると共に、車体のような重量物でも搬送が可能となる。よって、請求項11によれば、車体などの大型の取付対象物に適し、生産時間を容易に一定にすることができる。
 さらにまた、搬送台車ユニットに部品を載せると共に作業者も乗ることで、作業者の近くに部品が配置されるので、作業者の移動距離を短くでき、作業効率を向上させることができる。
 さらに、前の搬送台車ユニットの連結を解除して前進させると、後の搬送台車ユニットのワーク用台車の側方が開放される。ワーク用台車の側方にリフターを配置できるので、リフターで車体のような重量物をワーク用台車から移動させることができる。その結果、ワーク用台車から部品用台車を切り離すことなく、ワーク用台車に部品用台車を隣接して配置した状態で、リフターを使用することができ、生産性を向上させることができる。
 請求項12に係る発明では、回転角制御部により、第1部品収納部からワークまでの距離が、第2部品収納部から前方又は後方に配置されるワークまでの距離とほぼ等しくなるようにターンテーブルが回転制御される。ターンテーブルを回転制御することにより、第1部品収納部に係る作業性と第2部品収納部に係る作業性を同等にする。結果、部品取付作業の平準化を図ることができる。
 請求項13に係る発明では、連結解除ステーションと、備品取り付けステーションとを備える。前後の搬送台車ユニットの連結を解除し、前の搬送台車ユニットが前進させると、後の搬送台車ユニットのワーク用台車の側方が開放される。ワーク用台車の側方に、備品の持ち上げを補助するアシスト装置を配置できる。結果、後の搬送台車ユニット上の車体のようなワークに、側方からシートのような大きい備品を取り付けることでき、作業能率を高めることができる。
本発明の実施例1による搬送台車ユニットの平面図である。 図1に示したワーク用台車の斜視図である。 図2に示したワーク用台車を底面から見た斜視図である。 図1に示した部品用台車の分解斜視図である。 図4の5-5線に沿った断面図である。 図5の矢印6方向から見た図である。 図6に示したロータリーセンサの作用図である。 搬送台車ユニットの作用図である。 図1に示した搬送台車ユニットの斜視図である。 部品取付設備から抜粋したリフターの配置図である。 部品取付設備から抜粋したオーバヘッドコンベアの配置図である。 部品取付設備から抜粋したワークの搬送路の配置図である。 部品取付設備の詳細図である。 図13に示した部品搬送システムの説明図である。 図13に示した上流部品取付作業域の変更例を示した図である。 本発明の実施例2による搬送台車ユニットの平面図である。 図16に示したワーク用台車の斜視図である。 図16に示したワーク用台車を底面から見た斜視図である。 図16に示した部品用台車の分解斜視図である。 図19の20-20線に沿った断面図である。 図20の矢印21方向に見た図である。 図21に示したロータリーセンサの作用図である。 搬送台車ユニットの作用図である。 図16に示した搬送台車ユニットの斜視図である。 部品取付設備から抜粋したオーバヘッドコンベアの配置図である。 部品取付設備から抜粋したワークの搬送路の配置図である。 部品取付設備の詳細図である。 図27に示した部品搬送システムの説明図である。 アシスト装置の作用図である。 リフターの作用図である。 ハンガーの作用図である。 図28に示した上流部品取付作業域の変更例を示した図である。 従来における車体等の搬送技術を示した概略図である。
 以下、本発明の好ましい実施例について、添付した図面に基づいて詳細に説明する。
 本発明に係る車体用部品取付および部品搬送システムは、「部品取付設備」により実施される。この部品取付設備を構成する要素のうちで、「搬送台車ユニット」が重要要素である。そこで、「搬送台車ユニット」を先に説明し、その後に「部品取付設備」を説明する。
 図1に示すように、搬送台車ユニット10は、ワーク(取付対象物)としての車体12を搬送するワーク用台車20と、このワーク用台車20の前に配置され部品13を搬送する部品用台車40と、この部品用台車40で牽引されワーク用台車20の側方に配置される左右のサブ部品台車70L、70Rとからなる。想像線で示す40rは、後の部品用台車である。
 台車20、40、70L、70Rを個別に詳しく説明する。
 図2に示すように、ワーク用台車20は、鋼材を格子状に組んでなる枠体21と、この枠体21上に貼られた床板22と、この床板22に載せられる4個のワーク受け台23とを主要素とする。床板22は前後に凹円弧形状に切り欠かれた凹円弧形状部22a、22aが設けられている。また、床板22の左右側部は、滑り止めが施された作業床24L、24Rとされる。一方の作業床24Rの後部に第1操作ポスト25が設けられる。
 ワーク受け台23、23に、各々位置決めピン26、26が立てられる。こられの位置決めピン26、26により、車体12(図1)の水平方向の位置決めを行う。その上で、4個のワーク受け台23により、車体が支承される。
 枠体21の前部に左右2個のアイプレート27L、27Rに設けられる。アイプレート27L、27Rは、各々穴28が開けられたプレートである。また、枠体21の後部から後方へ長手アーム29が延ばされ、この長手アーム29の先端に第1係止機構31が設けられる。この第1係止機構31は、ピン32が上方へ向けて突出するシリンダユニットが好適である。シリンダユニットは、エアシリンダ、油圧シリンダ、電動シリンダの何れでもよい。第1操作ポスト25の操作子25aを操作することで、ピン32を上下させることができる。操作子25aは押しボタン、レバー、タッチセンサの何れでもよく、種類は問わない。
 図3に示すように、枠体21の下面に、複数の自在車輪33が設けられる。自在車輪33はキャスターとも呼ばれ、自身が旋回することで、台車の旋回を妨げない。また、枠体21の下面中央に、駆動ボックス34が設けられる。駆動ボックス34にはモータなど駆動源が内蔵され、この駆動源により左右の駆動輪35L、35Rが駆動される。駆動輪35L、35Rが軌道(又は路面)と接触し、ワーク用台車20を自走させる。さらに、駆動ボックス34からガイド輪36が突出する。ガイド輪36は、後述するU字状搬送路に嵌ることで、ワーク用台車20の動線を定める役割を果たす。ガイド輪36は、非回転のガイドシューであってもよい。
 図4に示すように、部品用台車40は、鋼材を格子状に組んでなる台車本体41と、この台車本体41の下面に取付けられる複数の自在車輪42と、台車本体41の上面に取付けられる複数のころ43と、これらのころ43に載せるようにして台車本体41上に取付けられる円形の台上床44と、この台上床44に設けられる屋根型フレーム45と、この屋根型フレーム45に設けられる第1部品収納部46及び第2部品収納部47を主要素とする。台上床44には、2つの操作子48a、48bを備える第2操作ポスト48が設けられる。
 円形の台上床44は、第1部品収納部46及び第2部品収納部47の周囲が、作業床44aとされ、作業員はこの作業床44a上で作業を行う。なお、実施例では、台上床44を円形としたが、これに限定されず、台上床44の前後に凸円弧形状を呈する凸円弧形状部44b、44bが設けられていれば長円等、他の形状であっても差し支えない。
 さらに、台車本体41の後部から左右のプレート51L、51Rが後方へ延ばされ、これらのプレート51L、51Rに各々第2係止機構52L、52Rが設けられる。第2係止機構52L、52Rも、第1係止機構31(図2)と同様にピン53が上方に向けて突出するシリンダユニットが好適である。シリンダユニットは、エアシリンダ、油圧シリンダ、電動シリンダの何れでもよい。第2操作ポスト48の操作子48aを操作することで、ピン53、53を上下させることができる。
 ピン53、53が下からワーク用台車20側のアイプレート27L、27Rに嵌るため、部品用台車40は、横揺れすることなく且つ旋回することなくワーク用台車20と一緒に走行する。
 また、台車本体41の左右辺からサイドアーム54L、54Rが延ばされ、これらのサイドアーム54L、54Rに各々第3係止機構55L、55Rが設けられる。第3係止機構55L、55Rも、第2係止機構52L,52Rと同様にピン56、56が上方へ向けて突出するシリンダユニットが好適である。シリンダユニットは、エアシリンダ、油圧シリンダ、電動シリンダの何れでもよい。第2操作ポスト48の操作子48bを操作することで、ピン56、56を上下させることができる。
 図5に示すように、台車本体41の中央下部に穴開きプレート57が設けられ、中央上部に軸受ブロック58が設けられる。台上床44の中央から下へ中心軸59が延ばされ、この中心軸59の先端は軸受ブロック58に嵌められる。台上床44は複数のころ43で支承されるため、軸受ブロック58に下向き荷重は作用しない。軸受ブロック58は回転自在に中心軸59をガイドする作用を発揮する。
 中心軸59の途中に従動ギヤ61が設けられる。従動ギヤ61の近傍にサーボモータ62が配置され、このサーボモータ62で駆動される駆動ギヤ63により従動ギヤ61が回される。その結果、台上床44は中心軸59を中心にして水平旋回する。すなわち、台上床44は、ターンテーブルである。
 サーボモータ62には、モータ中心軸59の回転角度及び回転方向を検出するエンコーダ64が備えられる。さらに、台車本体41には、サーボモータ62の他、ロータリーセンサ65及び回転角制御部66が設けられる。ロータリーセンサ65の作用は後述するが、このロータリーセンサ65からの角度情報とエンコーダ64からの角度情報とが回転角制御部66にインプットされる。回転角制御部66は、角度情報に基づいてサーボモータ62を制御する。
 ピン32は、凸円弧形状部44b(台上床44)の中心軸49に位置する。図2に示した操作子25aを操作してピン32を上下させることにより、ワーク用台車20は、部品用台車40に連結される。すなわち、床板22は、ピン32を介して台上床44に分離可能に連結される。
 ワーク用台車20は、ピン32により凸円弧形状部44bの中心軸49の位置に回動自在に連結される。すなわち、床板22は、台上床44に中心軸49の位置で回動自在に連結される。
 部品用台車40の前部は、ピン53を介して前側のワーク用台車20に連結され、部品用台車40の後部は、ピン32を介して後側のワーク用台車20に連結される。すなわち、床板22と台上床44とは、交互に連続して搬送される。
 図6に示すように、ロータリーセンサ65から延びるフォーク状アーム67に、長手アーム29の先端が嵌っている。図6では、長手アーム29が傾動していないため、フォーク状アーム67も傾動しない。
 図5に示すように、長手アーム29は、第1係止機構31のピン32を中心に水平に回転可能である。その結果、図7に示すように、長手アーム29は、ピン32を中心に2θだけ回転することがある。この回転角度2θは、ロータリーセンサ65で検出される。
 図8(a)に示すように、部品用台車40の後方に車体12が置かれると共に、部品用台車40の前方に前の車体12fが置かれる。矢印(1)のように第1部品収納部46から部品が取り出され車体12へ取付けられる。また、矢印(2)のように第2部品収納部47から部品が取り出され前の車体12fへ取付けられる。
 ワーク用台車20に対して、前のワーク用台車20fが2θだけ旋回した場合、図8(b)に示すように、台上床44はθだけ回される。この操作は回転角制御部66(図5)で実施される。
 結果、回転角制御部66により、第1部品収納部46から車体12までの距離Lが、第2部品収納部47から前の車体12fまでの距離Lfとほぼ等しく(角度で表現すると、部品収納部の前後車体との角度が同じに)なるようにターンテーブル(台上床44)が回転制御される。ターンテーブル(台上床44)を回転制御することにより、第1部品収納部46に係る作業性と第2部品収納部47に係る作業性を同等にする。結果、部品取付作業の平準化を図ることができる。
 すなわち、図8(a)に示すように、正常作動時においては、搬送は停止することなく一定速度で連続搬送される。図8(b)に示すように、コーナーに差し掛かったとき、部品台車上のターンテーブルが回転して、部品収納部の前後車体との角度が同じになるように調整することで、前後の台車に搭乗した作業者が部品まで移動する距離を極力小さくなるようにする。
 図5に示すピン32がターンテーブル44の旋回中心となる。この旋回中心とターンテーブル(台上床44)の回転中心(中心軸59)は同軸である。すなわち、搬送台車ユニットの旋回中心とターンテーブルの回転中心が同軸であるため、車体12に対する部品収納部46、47の相対位置が制御容易となる。
 図9に示すように、左右のサブ部品台車70L、70Rは、部品用台車40で牽引される。第2操作ポスト48に設けられる操作子48bを操作することで、第3係止機構55Lのピン56を下げることができる。その結果、部品用台車40からサブ部品台車70Lが分離される。サブ部品台車70Rも同様である。操作子48bを操作することで、部品用台車40にサブ部品台車70L、70Rを連結すること及び部品用台車40からサブ部品台車70L、70Rを分離することが任意に行える。
 図1において、部品用台車40に、さらに左右のサブ部品台車70L、70Rが連結され、左のサブ部品台車70Lがワーク用台車20の左側方に配置され、右のサブ部品台車70Rがワーク用台車20の右側方に配置される。部品の移動距離を短縮することができ、作業能率を高めることができる。
 ただし、サブ部品台車70L、70Rは省くことができるため、搬送台車ユニット10は、ワーク用台車20と、このワーク用台車20の前に配置する部品用台車40とを必須の構成要素とする。部品用台車40は、図1に想像線で示すように、ワーク用台車20の後に配置することもできる。したがって、部品用台車40は、ワーク用台車20の前又は後に配置される。
 すなわち、図1において、搬送台車ユニット10は、部品を搬送する部品用台車40と、この部品用台車40の前又は後に配置されると共に部品用台車40に分離可能に連結されワーク(車体12)を搬送するワーク用台車20とからなる。図8に示すように、部品用台車40は、ワーク用台車20の前後に旋回可能に連結される。
 ワーク用台車20と部品用台車40が連結可能であるため、ワーク用台車20と部品用台車40を連続して搬送させることができる。作業者は部品用台車40やワーク用台車20に乗った形態で作業が可能となる。ワーク用台車20を長時間止める必要がないため、生産時間が一定になる。
 また、搬送台車ユニット10は、前後の搬送台車ユニット10に旋回可能に連結されるため、搬送動線を蛇行させることができる。蛇行により搬送動線の長さを稼ぐことができ、組立作業エリアの長大化を防止することができる。
 さらに、ワーク用台車20と部品用台車40の一方を自走させることで他方を牽引することができ、作業者の手で台車を押す必要がなく、車体のような重量物でも搬送が可能となる。
 以上に説明した搬送台車ユニット10を採用してなる部品搬送システムについて、以下に説明する。部品搬送システムを運用するための部品取付設備80は、図13に示すが、設備構成が複雑であるため、ジャンル毎に抜粋した図10~図12を先に説明する。
 図10はリフターの配置を示しており、塗装工程81から第1リフター82まで排出ライン83が延びる。排出ライン83は、方向を変えるために略L字を呈する。第1リフター82から検査工程84まで組立ライン85が延び、この組立ライン85上に、第1リフター82、第2リフター86、第3リフター87、第4リフター88、第5リフター89が置かれる。組立ライン85が本発明における「搬送路」に相当する。
 図11はオーバヘッドコンベアの配置図であり、排出ライン83に沿って第1オーバヘッドコンベア91が置かれる。この第1オーバヘッドコンベア91のハンガー92で塗装済みの車体12が吊され、第1リフター82上まで運ばれる。
 また、組立ライン85に沿って第2オーバヘッドコンベア93が置かれる。この第2オーバヘッドコンベア93は、ハンガー94で車体12を吊り上げた状態で搬送し、この車体12の搬送中に、エンジンなど車体フロア底面に取付ける部品が車体12に取付けられる。
 また、第1オーバヘッドコンベア91と第2オーバヘッドコンベア93との間でドア95を受け取り、このドア95にウインドウレギュレータなどを組み込み、検査工程84の入り側へ運ぶ第3オーバヘッドコンベア96が、設けられる。
 図12はワークの搬送路の配置を示しており、第1リフター82と第2リフター86との間が上流部品取付作業領域97であって、この第1リフター82と第2リフター86との間に、組立ライン85から側方へ直角又は斜めに張り出すU字状搬送路98が敷設される。車体12を載せた搬送台車ユニット10は、曲がり部99を有するU字状搬送路98に沿って移動する。なお、U字状搬送路98の脚部に破線で示す部品専用搬送路101、102が接続され、部品ステーション110において、部品を満載した部品用台車40が部品専用搬送路101からU字状搬送路98に投入され、また、空になった部品用台車40がU字状搬送路98から部品専用搬送路102へ戻される。部品用台車40には、サブ部品台車70L、70Rが牽引されている。
 第3リフター87と第4リフター88との間が下流部品取付作業領域103であって、この第3リフター87と第4リフター88との間に、組立ライン85から側方へ張り出すU字状搬送路98が敷設される。その他は上流部品取付作業領域97と同様であるため、説明を省略する。
 第2リフター86と第3リフター87との間が、中央部品取付作業領域104となり、この中央部品取付作業領域104でエンジンなど車体フロア底面に取付ける部品が取付けられる。
 以上を組み合わせることで図13に示す部品取付設備80が出来あがる。部品取付設備80は、上流部品取付作業領域97と中央部品取付作業領域104と下流部品取付作業領域103とからなる。
 中央部品取付作業領域104では、第2オーバヘッドコンベア93で吊されつつ搬送される車体12Cへ、エンジンなど車体フロア底面に取付ける部品が取付けられる。具体的は、この作業領域で取付ける部品は、エンジン・フロントサスペンションアセンブリ(エンジンとフロントサスペンションとの構成部品を先行して組み立てたアセンブリ)と、リヤサスペンションアセンブリ(リヤサスペンションの構成部品を先行して組立てたアセンブリ)と、その他の車体フロア底面に取付ける部品(上昇状態でしか車体に取付けることができない部品)である。そして、エンジン・フロントサスペンションアセンブリとリヤサスペンションアセンブリは各々アセンブリの状態で、取付けステーションに搬送され、自動搭載機で車体の下方から上昇させ、車体にドッキングした状態でボルトで締め付けられる。この作業領域では、少なくともこのステーションにおいてストップ・アンド・ゴーの搬送が行われる。
 上流部品取付作業領域97では、エンジンが取付けられる前に車体へ取付ける必要がある部品、すなわち、エンジン等が取付けられた後では取りつけることが出来ない部品が、セル生産方式により取付けられる。部品は、エンジンルーム壁面取付部材(例えばラジエータ、ペダルアセンブリ、ステアリングコラム、ブレーキホースなど)である。加えて、上流部品取付作業領域97では、その他の部品も適宜取付けられる。
 詳細には、上流部品取付作業領域97では、一台の台車に対し、複数の作業員が搭乗し、この作業領域の開始点から終了点までかけて、その搬送時間中に部品の取付け作業が行われる。この作業がセル生産方式による作業に該当する。正常作動時においては、搬送は停止することなく一定速度で連続搬送される。コーナーに差し掛かったとき、部品台車上のターンテーブルが回転して、部品収納部の前後車体との角度が同じになるように調整することで、前後の台車に搭乗した作業者が部品まで移動する距離を極力小さくなるようにする。
 下流部品取付作業領域103も同様にセル生産方式による作業が行われる。下流部品取付作業領域103では、エンジンが取付けられた後に車体へ取付ける必要がある部品、すなわち、エンジン等が取付けられた後でないと取りつけることが出来ない部品が、セル生産方式により取付けられる。部品は、例えば、バッテリ、エアクリーナフィルタ、エンジンマウントサイドブラケット、エンジン締付けボルトなどである。加えて、燃料注入作業やオイル注入作業がこの領域103で実施される。さらに加えて、下流部品取付作業領域103では、その他の部品も適宜取付けられる。
 次に、全体的な作用を説明する。塗装済み車体12A(識別を促すために、英文字を添える。以下同じ。)がハンガー92から第1リフター82に移される。車体12に下回りハーネスが取付けられる。第1リフター82の下方に、部品用台車40とは分離されたワーク用台車20だけが待機している。第1リフター82を下げることで、車体12Aがワーク用台車20に移される。第1リフター82の下方に、ワークとしての車体12Aをワーク用台車20の床板22に搭載する搭載ステーション111が備えられる。
 車体12Aを載せたワーク用台車20は前進する。ドア取り外しステージ105でドアが外される。ドアなし車体は参照番号が10Bになる。また、外されたドアは第3オーバヘッドコンベア96で運ばれる。ワーク用台車20は前進して、U字状搬送路98の入口に進み、そこで待機する。一方、ワーク専用搬送路101には、部品を満載した部品用台車(図12参照)が待っている。
 そこで、部品用台車40、ワーク用台車20の順で交互にU字状搬送路98へ進め、前のワーク用台車20fに部品用台車40を連結し、この部品用台車40にワーク用台車20を連結する要領で、数珠繋ぎ状態に連結する。U字状搬送路98の上流側端部に、部品用台車40の台上床44にワーク用台車20の床板22を連結する連結ステーション112が備えられる。
 なお、U字状搬送路98の入口で、予めワーク用台車20に部品用台車40を連結し、セットの状態で前の部品用台車40にワーク用台車20を連結することは差し支えない。
 以上により、互いに連結された複数の搬送台車ユニット10が直列に並ぶ。U字状搬送路98上では搬送台車ユニット10は一定速度で連続的に前進する。U字状搬送路98の入口から出口までの距離が十分にあるため、この間に、車体12Bに部品を取付ける。部品の取付が完了した車体は符号が12Cとなる。上流部品取付作業領域97では、部品収納部と車体との相対位置は変わらないため、セル生産方式が実施されたことになる。
 U字状搬送路98の出口で、先頭の部品用台車40を、車体12Cが載っているワーク用台車20から切り離す。そして、部品用台車40を部品専用搬送路102へ戻す。ワーク用台車20は後の部品用台車40とも切り離す。U字状搬送路98の下流端部に、部品用台車40の台上床44(図4)とワーク用台車20の床板22との連結を解除する解除ステーション113が備えられる。
 自由になったワーク用台車20を第2リフター86の下まで前進させる。第2リフター86で車体12Cを掬い上げ、第2オーバヘッドコンベア93のハンガー94に吊す。第2リフター86の下方に、ワークとしての車体12Cをワーク用台車20の床板22から掬い上げて払い出す払出ステーション114が備えられる。
 空になったワーク用台車20は、ワーク用台車循環路115を通って第1リフター82下方の搭載ステーション111まで戻される。このように、ワーク用台車20の床板22は、U字状搬送路98及びワーク用台車循環路115を循環搬送される。払出ステーション114で空になったワーク用台車20を、迅速に搭載ステーション111に戻すので、生産性が向上する。
 中央部品取付作業領域104では、ハンガー94に吊された車体12Cへエンジンなど車体フロア底面に取付ける部品を取付ける。第2オーバヘッドコンベア93は、前進と停止とを繰り返すものの、部品箱は地上に固定されているため、ライン生産方式が実施されることになる。
 下流部品取付作業領域103での作用は、上流部品取付作業領域97と同一である。すなわち、第3リフター87で、車体12Dをワーク用台車20へ移し、下流部品取付作業領域103で、部品を取付けることで、符号12Eの車体ができあがる。
 第4リフター88で、上昇状態にある車体12Eへタイヤを取付ける。第5リフター89で、上昇状態にある車体12Fへバンパを取付ける。次にドア取付ステーション106で、車体12Gへドアを取付け、検査工程84へ前進させる。
 U字状搬送路98、98の張り出し長さを調整することで、エンジン取付け前(又は、後)に取付ける必要がある部品の数を増減させることができる。見かけ上のライン長さは、中央部品取付作業領域の搬送路の方向で定められるため、見かけ上のライン長さは、U字状搬送路98の張り出し長さを増加しても影響されない。よって、U字状搬送路98を採用したことにより、見かけ上のライン長さの短縮化が図れる。
 次に部品ステーションについて説明する。
 図14に示すように、部品ステーション110は、部品用台車40から、空になったサブ部品台車70L、70R、第1部品収納部46及び第2部品収納部47を回収する回収ステーション116、116と、部品13が満載されたサブ部品台車70L、70R、第1部品収納部46及び第2部品収納部47を供給する供給ステーション117、117とからなる。
 解除ステーション113で連結を解除された部品用台車40は、部品専用搬送路102を進む。サブ部品台車70L、70Rを回収する回収ステーション116で、部品用台車40から空になったサブ部品台車70L、70Rが外される。そして、サブ部品台車70L、70Rを供給する供給ステーション117で、部品用台車40に部品13が満載されたサブ部品台車70L、70Rが取付けられる。
 サブ部品台車70L、70Rには、予め部品置き場で部品13が積み込まれているので、部品用台車40に対する、空のサブ部品台車70L、70Rと、部品13が満載されたサブ部品台車70L、70Rの交換工数を短縮することができる。
 さらに部品用台車40は進み、第1部品収納部46及び第2部品収納部47を回収する回収ステーション116で、部品用台車40の台上床44から、空になった第1部品収納部46及び第2部品収納部47が外される。そして、第1部品収納部46及び第2部品収納部47を供給する供給ステーション117で、台上床44に部品13が満載された第1部品収納部46及び第2部品収納部47が載せられる。
 第1部品収納部46及び第2部品収納部47には、予め部品置き場で部品13が積み込まれているので、部品用台車40の台上床44に対する、空の第1部品収納部46及び第2部品収納部47と、部品13が満載された第1部品収納部46及び第2部品収納部47の交換工数を短縮することができる。
 部品ステーション110から出た部品用台車40は、部品専用搬送路101を進み、連結ステーション112でワーク用台車20に連結される。このように、部品用台車40をワーク用台車20と分離可能にすることで、部品用台車40の台上床44は、U字状搬送路98及び部品用搬送路101、102を循環搬送される。ワークの搬送路85とは別の場所の部品ステーション110を介して、部品13が満載された部品用台車40を連結ステーション112に戻すので、部品13の供給及び払出しの作業性が向上する。
 図13に示した部品取付設備80の変更例を次に示す。
 図15に示すように、上流部品取付作業領域97では、搬送路をW字状にしてもよい。W字状搬送路107にすることにより、より多くの部品を取付けさせることができる。また、第1リフター82と第2リフター86の距離xは増加するものの、組立ライン85からの張り出し距離yが小さくなる。下流部品取付作業領域103(図13)も同様である。
 ワーク用台車20は、駆動源を有する自走台車であるが、循環移動するチェーンのフックに引っ掛けて移動させる、又は作業者が押して移動させるようにしてもよい。
 ワーク用台車20と部品用台車40との連結、分離や、部品用台車40とサブ部品台車70L、70Rとの連結、分離は人手でピンを抜き差しするようにしてもよい。すなわち、中央部品取付作業領域104でオーバヘッドコンベア93を使用することは必須であるが、上流・下流部品取付作業領域97、103での台車20、40の移動は、自走、外力による走行、手押しによる走行の何れであってもよい。
 本発明の搬送台車ユニットは、車体を搬送する他、車体以外の物品を搬送対象とすることは差し支えない。台上床は台車本体上に貼られた非回転床であっても良く、部品収納部は第1・第2の区別がない1個の収納部であってもよい。
 次に、実施例2による搬送技術について、説明するが、実施例1による搬送技術と同様の要素については、同一の参照番号を付して説明する。
 図16に示すように、実施例2による搬送台車ユニット10は、ワーク(取付対象物)としての車体12を搬送するワーク用台車20と、このワーク用台車20に隣接して配置される部品用台車40と、この部品用台車40で牽引され後のワーク用台車20rの側方に配置される左右のサブ部品台車70L、70Rとからなる。想像線で示す20rは、後のワーク用台車であり、想像線で示す40rは、後の部品用台車である。台車20、40、70L、70Rを個別に詳しく説明する。
 図17に示すように、ワーク用台車20は、鋼材を格子状に組んでなる枠体21と、この枠体21上に貼られた床板22と、この床板22に載せられる4個のワーク受け台23とを主要素とする。床板22は前後が円弧状に切り欠かれている。また、床板22の左右側部は、滑り止めが施された作業床24L、24Rとされる。一方の作業床24Lの前部に第1操作ポスト25が設けられる。
 ワーク受け台23、23に、各々位置決めピン26、26が立てられる。こられの位置決めピン26、26により、車体12(図1)の水平方向の位置決めを行う。その上で、4個のワーク受け台23により、車体12が支承される。
 枠体21の後部に左右2個のアイプレート27L、27Rに設けられる。アイプレート27L、27Rは、各々穴28が開けられたプレートである。また、枠体21の前部から前方へ長手アーム29が延ばされ、この長手アーム29の先端に第1係止機構31が設けられる。この第1係止機構31は、ピン32が上へ突出するシリンダユニットが好適である。シリンダユニットは、エアシリンダ、油圧シリンダ、電動シリンダの何れでもよい。第1操作ポスト25の操作子25aを操作することで、ピン32を上下させることができる。操作子25aは押しボタン、レバー、タッチセンサの何れでもよく、種類は問わない。
 図18に示すように、枠体21の下面に、複数の自在車輪33が設けられる。自在車輪33はキャスターとも呼ばれ、自身が旋回することで、台車の旋回を妨げない。枠体21の下面中央に、駆動ボックス34が設けられる。駆動ボックス34にはモータなど駆動源が内蔵され、この駆動源により駆動輪35L、35Rが駆動される。駆動輪35L、35Rが軌道(又は路面)と接触し、ワーク用台車20を自走させる。さらに、駆動ボックス34からガイド輪36が突出する。ガイド輪36は、後述するU字状搬送路に嵌ることで、ワーク用台車20の動線を定める役割を果たす。ガイド輪36は、非回転のガイドシューであってもよい。
 図19に示すように、部品用台車40は、鋼材を格子状に組んでなる台車本体41と、この台車本体41の下面に取付けられる複数の自在車輪42と、台車本体41の上面に取付けられる複数のころ43と、これらのころ43に載せるようにして台車本体41上に取付けられる円形の台上床44と、この台上床44に設けられる屋根型フレーム45と、この屋根型フレーム45に設けられる第1部品収納部46及び第2部品収納部47を主要素とする。台上床44には、2つの操作子48a、48bを備える第2操作ポスト48が設けられる。
 円形の台上床44は、第1部品収納部46及び第2部品収納部47の周囲が、作業床44aとされ、作業員はこの作業床44a上で作業を行う。屋根型フレーム45、第1部品収納部46及び第2部品収納部47により部品収納部50が構成される。部品収納部50は、台上床44に着脱可能に設けられる。
 さらに、台車本体41の後部からプレート51L、51Rが前方へ延ばされ、これらのプレートプレート51L、51Rに各々第2係止機構52L、52Rが設けられる。第2係止機構52L、52Rも、ピン53が上へ突出するシリンダユニットが好適である。シリンダユニットは、エアシリンダ、油圧シリンダ、電動シリンダの何れでもよい。第2操作ポスト48の操作子48aを操作することで、ピン53、53を上下させることができる。
 ピン53、53が下からワーク用台車20側の左右のアイプレート27L、27Rに嵌まるため、部品用台車40は、横揺れすることなく且つ旋回することなくワーク用台車20と一緒に走行する。
 また、台車本体41の左右辺からサイドアーム54L、54Rが延ばされ、これらのサイドアーム54L、54Rに各々第3係止機構55L、55Rが設けられる。第3係止機構55L、55Rも、ピン56、56が上へ突出するシリンダユニットが好適である。シリンダユニットは、エアシリンダ、油圧シリンダ、電動シリンダの何れでもよい。第2操作ポスト48の操作子48bを操作することで、ピン56、56を上下させることができる。
 図20に示すように、台車本体41の中央下部に穴開きプレート57が設けられ、中央上部に軸受ブロック58が設けられる。台上床44の中央から下へ中心軸59が延ばされ、この中心軸59の先端が軸受ブロック58に嵌められる。台上床44は複数のころ43で支承されるため、軸受ブロック58に下向き荷重は作用しない。軸受ブロック58は回転自在に中心軸59をガイドする作用を発揮する。
 中心軸59の途中に従動ギヤ61が設けられる。従動ギヤ61の近傍にサーボモータ62が配置され、このサーボモータ62で駆動される駆動ギヤ63により従動ギヤ61が回される。結果、台上床44が中心軸59を中心にして水平旋回する。すなわち、台上床44は、ターンテーブルである。
 サーボモータ62には、モータ中心軸59の回転角度及び回転方向を検出するエンコーダ64が備えられる。また、台車本体41には、サーボモータ62の他、ロータリーセンサ65及び回転角制御部66が設けられる。ロータリーセンサ65の作用は後述するが、このロータリーセンサ65からの角度情報とエンコーダ64からの角度情報とが回転角制御部66にインプットされる。回転角制御部66は、角度情報に基づいてサーボモータ62を制御する。
 図21に示すように、ロータリーセンサ65から延びるフォーク状アーム67に、長手アーム29の先端が嵌っている。図では、長手アーム29が傾動していないため、フォーク状アーム67も傾動しない。
 図20に示すように、長手アーム29は、第1係止機構31のピン32を中心に水平に回転可能である。結果、図22に示すように、長手アーム29は、ピン32を中心に2θだけ回転することがある。この回転角度2θは、ロータリーセンサ65で検出される。
 図23(a)に示すように、部品用台車40の前方に車体12が置かれると共に、部品用台車40の後方に後の車体12rが置かれる。矢印(1)のように第1部品収納部46から部品が取り出され車体12へ取付けられる。また、矢印(2)のように第2部品収納部47から部品が取り出され後の車体12rへ取付けられる。
 ワーク用台車20に対して、後のワーク用台車20rが2θだけ旋回した場合、図23(b)に示すように、台上床44はθだけ回される。この操作は回転角制御部66(図20)で実施される。
 結果、回転角制御部66により、第1部品収納部46から車体12までの距離Lが、第2部品収納部47から後の車体12rまでの距離Lrとほぼ等しく(角度で表現すると、部品収納部の前後車体との角度が同じに)なるようにターンテーブル(台上床44)が回転制御される。ターンテーブル(台上床44)を回転制御することにより、第1部品収納部46に係る作業性と第2部品収納部47に係る作業性を同等にする。結果、部品取付作業の平準化を図ることができる。
 すなわち、図23(a)に示すように、正常作動時においては、搬送は停止することなく一定速度で連続搬送される。図23(b)に示すように、コーナーに差し掛かったとき、部品台車上のターンテーブルが回転して、部品収納部の前後車体との角度が同じになるように調整することで、前後の台車に搭乗した作業者が部品まで移動する距離を極力小さくなるようにする。
 図20に示すピン32が搬送台車ユニット10の旋回中心となる。この旋回中心とターンテーブル(台上床44)の回転中心(中心軸59)は同軸である。すなわち、搬送台車ユニットの旋回中心とターンテーブルの回転中心が同軸であるため、車体12に対する部品収納部46、47の相対位置が制御容易となる。
 図24に示すように、左右のサブ部品台車70L、70Rは、部品用台車40で牽引される。第2操作ポスト48に設けられる操作子48bを操作することで、第3係止機構55Rのピン56を下げることができる。結果、部品用台車40から右のサブ部品台車70Rが分離される。左のサブ部品台車70Lも同様である。操作子48bを操作することで、部品用台車40に左右のサブ部品台車70L、70Rを連結すること及び部品用台車40から左右のサブ部品台車70L、70Rを分離することが任意に行える。
 図16において、部品用台車40に、さらに左右のサブ部品台車70L、70Rが連結され、左のサブ部品台車70Lが後のワーク用台車20rの左側方に配置され、右のサブ部品台車70Rが後のワーク用台車20rの右側方に配置される。部品の移動距離を短縮することができ、作業能率を高めることができる。
 ただし、サブ部品台車70L、70Rは省くことができるため、搬送台車ユニット10は、ワーク用台車20と、このワーク用台車20の後に配置する部品用台車40とを必須の構成要素とする。部品用台車40は、図16に想像線で示すように、後の搬送台車ユニット10rのワーク用台車20rの前に配置することもできる。したがって、部品用台車40は、ワーク用台車20の前後に配置することができる。
 すなわち、図16において、搬送台車ユニット10は、ワーク(車体12)を搬送するワーク用台車20と、このワーク用台車20の後に配置されると共にワーク用台車20に分離可能に連結され部品を搬送する部品用台車40とからなり、図23に示すように、前後の搬送台車ユニットに、旋回可能に連結される。
 ワーク用台車20と部品用台車40が連結可能であるため、ワーク用台車20と部品用台車40を連続して搬送させることができる。作業者は部品用台車40やワーク用台車20に乗った形態で作業が可能となる。ワーク用台車20を長時間止める必要がないため、生産時間が一定になる。
 また、搬送台車ユニット10は、前後の搬送台車ユニット10に旋回可能に連結されるため、搬送動線を蛇行させることができる。蛇行により搬送動線の長さを稼ぐことができ、組立作業エリアの長大化を防止することができる。
 また、ワーク用台車20と部品用台車40の一方を自走させることで他方も一体的に移動することができ、作業者の手で台車を押す必要がなく、車体のような重量物でも搬送が可能となる。
 以上に説明した搬送台車ユニット10を採用してなる車体用部品取付システムについて、以下に説明する。車体用部品取付システムを運用するための部品取付設備80は、図27に示すが、設備構成が複雑であるため、ジャンル毎に抜粋した図25、図26を先に説明する。
 塗装工程、リフター、排出ライン、組立ラインの配置は、図10に示した実施例と同様である。
 図25はオーバヘッドコンベアの配置図であり、排出ライン83に沿って第1オーバヘッドコンベア91が置かれる。この第1オーバヘッドコンベア91のハンガー92で塗装済みの車体12が吊され、第1リフター82(図10)上まで運ばれる。
 また、組立ライン85に沿って第2オーバヘッドコンベア93が置かれる。この第2オーバヘッドコンベア93は、ハンガー94で吊り上げた状態で搬送し、この搬送中に車体12に、エンジンなど車体フロア底面に取付ける部品が取付けられる。
 また、第1オーバヘッドコンベア91と第2オーバヘッドコンベア93との間でドア95を受け取り、このドア95にウインドウレギュレータなどを組み込み、検査工程84の入り側へ運ぶ第3オーバヘッドコンベア96が、設けられる。
 図26は上流・下流部品取付作業域の配置図であり、第1リフター82と第2リフター86との間が上流部品取付作業領域97であって、この第1リフター82と第2リフター86との間に、組立ライン85から側方へ直角又は斜めに張り出すU字状搬送路98が敷設される。車体12を載せた搬送台車ユニット10は、U字状搬送路98に沿って移動する。なお、U字状搬送路98の脚部に破線で示す部品専用搬送路101、102が接続され、部品を満載した搬送台車ユニット10が部品専用搬送路101からU字状搬送路98に投入され、また、空になった搬送台車ユニット10がU字状搬送路98から部品専用搬送路102へ戻される。なお、搬送台車ユニット10の部品用台車40には、サブ部品台車70L、70Rが牽引されている。
 また、第3リフター87と第4リフター88との間が下流部品取付作業領域103であって、この第3リフター87と第4リフター88との間に、組立ライン85から側方へ張り出すU字状搬送路98が敷設される。その他は上流部品取付作業領域97と同様であるため、説明を省略する。
 第2リフター86と第3リフター87との間が、中央部品取付作業領域104となり、この中央部品取付作業領域104でエンジンなど車体フロア底面に取付ける部品が取付けられる。
 以上を組み合わせることで図27に示す部品取付設備80が出来あがる。部品取付設備80は、上流部品取付作業領域97と中央部品取付作業領域104と下流部品取付作業領域103とからなる。
 中央部品取付作業領域104では、第2オーバヘッドコンベア93で吊されつつ搬送される車体12Cへ、エンジンなど車体フロア底面に取付ける部品が取付けられる。具体的は、この作業領域で取付ける部品は、エンジン・フロントサスペンションアセンブリ(エンジンとフロントサスペンションとの構成部品を先行して組み立てたアセンブリ)と、リヤサスペンションアセンブリ(リヤサスペンションの構成部品を先行して組立てたアセンブリ)と、その他の車体フロア底面に取付ける部品(上昇状態でしか車体に取付けることができない部品)である。そして、エンジン・フロントサスペンションアセンブリとリヤサスペンションアセンブリは各々アセンブリの状態で、取付けステーションに搬送され、自動搭載機で車体の下方から上昇させ、車体にドッキングした状態でボルトで締め付けられる。この作業領域では、少なくともこのステーションにおいてストップ・アンド・ゴーの搬送が行われる。
 上流部品取付作業領域97では、エンジンが取付けられる前に車体へ取付ける必要がある部品、すなわち、エンジン等が取付けられた後では取りつけることが出来ない部品が、セル生産方式により取付けられる。部品は、エンジンルーム壁面取付部材(例えばラジエータ、ペダルアセンブリ、ステアリングコラム、ブレーキホースなど)である。加えて、上流部品取付作業領域97では、その他の部品も適宜取付けられる。
 詳細には、上流部品取付作業領域97では、一台の台車に対し、複数の作業員が搭乗し、この作業領域の開始点から終了点までかけて、その搬送時間中に部品の取付け作業が行われる。この作業がセル生産方式による作業に該当する。正常作動時においては、搬送は停止することなく一定速度で連続搬送される。コーナーに差し掛かったとき、部品台車上のターンテーブルが回転して、部品収納部の前後車体との角度が同じになるように調整することで、前後の台車に搭乗した作業者が部品まで移動する距離を極力小さくなるようにする。
 下流部品取付作業領域103も同様にセル生産方式による作業が行われる。下流部品取付作業領域103では、エンジンが取付けられた後に車体へ取付ける必要がある部品、すなわち、エンジン等が取付けられた後でないと取りつけることが出来ない部品が、セル生産方式により取付けられる。部品は、例えば、バッテリ、エアクリーナフィルタ、エンジンマウントサイドブラケット、エンジン締付けボルトなどである。加えて、燃料注入作業やオイル注入作業がこの領域103で実施される。さらに加えて、下流部品取付作業領域103では、その他の部品も適宜取付けられる。
 次に、全体的な作用を説明する。
 塗装済み車体12Aがハンガー92から第1リフター82に移される。車体12に下回りハーネスが取付けられる。第1リフター82の下方に、部品を満載した搬送台車ユニット10のワーク用台車20が待機している。
 第1リフター82を下げることで、車体12Aがワーク用台車20に移される。また、第1リフター82の配置された場所が、車体12Aを搬送台車ユニット10に搭載する車体搭載ステーション111である。
 ドア取り外しステージ105でドアが外される。ドアなし車体は符号が12Bになる。車体12Bをワーク用台車20に載せ、搬送台車ユニット10は前進する。また、外されたドアは第3オーバヘッドコンベア96で運ばれる。搬送台車ユニット10は、搬送台車ユニット10同士を連結する連結ステーション112へ前進する。前進した搬送台車ユニット10は、先に連結ステーション112で待機している搬送台車ユニット10の後部に連結される。
 具体的には、前進した搬送台車ユニット10のワーク用台車20が、先に待機している搬送台車ユニット10の部品用台車40に連結される。この部品用台車40にワーク用台車20を連結する要領で、複数の搬送台車ユニット10が数珠繋ぎ状態に連結される。
 以上により、互いに連結された複数の搬送台車ユニット10が直列に並ぶ。U字状搬送路98上では搬送台車ユニット10は一定速度で連続的に前進する。U字状搬送路98の入口から出口までの距離が十分にあるため、この間に、車体12Bに部品を取付ける。
 搬送台車ユニット10は、U字状搬送路98の出口の手前の連結解除ステーション113まで前進する。連結解除ステーション113では、前の搬送台車ユニット10が切り離される。後の搬送台車ユニット10のワーク用台車20の側方が開放される。この側方が開放された後の搬送台車ユニット10も、順次切り離される。
 連結解除ステーション113と第2リフター86との間に、車体12Bに備品を取り付ける備品取り付けステーション114が設けられる。備品取り付けステーション114には、例えばシートなどの比較的重い備品を持ち上げるアシスト装置121が配置される。
 連結解除ステーション113で切り離された搬送台車ユニット10は、備品取り付けステーション114に前進する。アシスト装置121でシートなどの備品を持ち上げ、ワーク用台車20の側方から車体12Bに備品を取り付ける。部品及び備品の取付が完了した車体は符号が12Cとなる。上流部品取付作業領域97では、部品収納部と車体との相対位置は変わらないため、セル生産方式が実施されたことになる。
 車体12Cを載せた搬送台車ユニット10を第2リフター86の下まで前進させる。第2リフター86で車体12Cを掬い上げ、第2オーバヘッドコンベア93のハンガー94に吊す。また、第2リフター86の配置された場所が、車体12Cを搬送台車ユニット10から搬出する車体搬出ステーション115である。
 空になった搬送台車ユニット10を部品専用搬送路102へ前進させる。部品専用搬送路102は、空になった搬送台車ユニット10に部品を搭載する部品ステーションに繋がっている。
 中央部品取付作業領域104では、ハンガー94に吊された車体12Cへエンジンなど車体フロア底面に取付ける部品を取付ける。第2オーバヘッドコンベア93は、前進と停止とを繰り返すものの、部品箱は地上に固定されているため、ライン生産方式が実施されることになる。
 下流部品取付作業領域103での作用は、上流部品取付作業領域97と同一である。すなわち、第3リフター87で、車体12Dをワーク用台車20へ移し、下流部品取付作業領域103で、部品を取付けることで、符号12Eの車体ができあがる。
 第4リフター88で、上昇状態にある車体12Eへタイヤを取付ける。第5リフター89で、上昇状態にある車体12Fへバンパを取付ける。次にドア取付ステーション106で、車体12Gへドアを取付け、検査工程84へ前進させる。
 U字状搬送路98、98の張り出し長さを調整することで、エンジン取付け前(又は、後)に取付ける必要がある部品の数を増減させることができる。見かけ上のライン長さは、中央部品取付作業領域の搬送路の方向で定められるため、見かけ上のライン長さは、U字状搬送路98の張り出し長さを増加しても影響されない。よって、U字状搬送路98を採用したことにより、見かけ上のライン長さの短縮化が図れる。
 次に部品ステーションについて説明する。図28に示すように、部品ステーション110は、空になった部品収納部50及び左右のサブ部品台車70L、70Rを搬送台車ユニット10から回収する回収ステーション116と、部品が満載された部品収納部50及びサブ部品台車70L、70Rを搬送台車ユニット10に供給する供給ステーション117、117とからなる。
 車体搬出ステーション115で車体12が搬出された搬送台車ユニット10は、部品専用搬送路102を進む。回収ステーション116で、部品用台車40から空になった部品収納部50及びサブ部品台車70L、70Rが外される。搬送台車ユニット10は、部品専用搬送路102を前進し、供給ステーション117で、部品が満載された部品収納部50が部品用台車40に載せられ、部品が満載されたサブ部品台車70L、70Rが部品用台車40に連結される。
 部品収納部50及びサブ部品台車70L、70Rには、予め部品置き場で部品が積み込まれているので、部品用台車40に対する、空の部品収納部50及びサブ部品台車70L、70Rと、部品13が満載された部品収納部50及びサブ部品台車70L、70Rの交換工数を短縮することができる。
 供給ステーション117から出た搬送台車ユニット10は、部品専用搬送路101を進み、車体搭載ステーション111で車体12が搭載される。このように、ワーク用台車20と部品用台車40とが一体となった状態で、車体12の搭載及び搬出ができると共に、部品収納部50及びサブ部品台車70L、70Rの回収及び連結ができるので、生産性の向上を図ることができる。
 加えて、上流部品取付領域における、搬送台車ユニット10の経路が1つで済むので、設備のコスト低減を図ることもできる。
 次にアシスト装置の作用について説明する。図29に示すように、アシスト装置121は、備品取付ステーション114に配置される。アシスト装置121は、支柱122と、この支柱122の上部に設けられた梁部123と、この梁部123に移動自在に設けられた備品支持部124とからなる。
 備品取付ステーション114では、搬送台車ユニット10のワーク用台車20の側方は開放されている。このため、アシスト装置121をワーク用台車20の側方に配置することができる。そして、アシスト装置121は、備品支持部124で備品としてのシート125を支持するので、作業員126が、シート125のような重量物を車体12に容易に組み付けることができる。
 図30及び図31に示すように、車体搬出ステーション115(図28)においては、搬送台車ユニット10のワーク用台車20の側方は開放されている。このため、ハンガー94のアーム部94aを車体12側方から近づけて、車体12を支持することができる。ワーク用台車20を部品用台車40(図28)から切り離さない状態でハンガー94を使用することができ、工数を低減できるので、組立ライン全体としての生産能力を向上させることができる。
 さらに、搬送台車ユニット10のワーク用台車20の側方は開放されている。このため、第2リフター86をワーク用台車20の側方に配置させることができ、車体12を持ち上げることができる。ワーク用台車20を部品用台車40(図28)から切り離さない状態で第2リフター86を使用することができ、工数を低減できるので、組立ライン全体としての生産能力を向上させることができる。
 次に、図27に示した実施例2による部品取付設備80の変更例を図32に示す。図32に示すように、上流部品取付作業領域97では、搬送路をW字状にしてもよい。W字状搬送路107にすることにより、より多くの部品を取付けさせることができる。また、第1リフター82と第2リフター86の距離xは増加するものの、組立ライン85からの張り出し距離yが小さくなる。下流部品取付作業領域103も同様である。
 なお、ワーク用台車20は、駆動源を有する自走台車であるが、循環移動するチェーンのフックに引っ掛けて移動させる、又は作業者が押して移動させるようにしてもよい。
 ワーク用台車20と部品用台車40との連結、分離や、部品用台車40とサブ部品台車70L、70Rとの連結、分離は人手でピンを抜き差しするようにしてもよい。すなわち、中央部品取付作業領域104でオーバヘッドコンベア93を使用することは必須であるが、上流・下流部品取付作業領域97、103での台車20、40の移動は、自走、外力による走行、手押しによる走行の何れであってもよい。
 尚、本発明の搬送台車ユニットは、車体を搬送する他、車体外の物品を搬送対象とすることは差し支えない。また、台上床は台車本体上に貼られた非回転床であっても良く、部品収納部は第1・第2の区別がない1個の収納部であってもよい。また、実施例では、搬送台車ユニットをセル生産方式に適用したが、これに限定されず、搬送台車ユニットを通常の生産ラインで使用しても差し支えない。
 また、実施例では、サブ部品台車70L、70Rをサイドアーム54L、54Rのピン56に引っ掛けて牽引するようにしたが、これに限定されず、サブ部品台車70L、70Rがワーク用台車20又は部品用台車40に連結されれば、搬送ユニットの他の部分に設けたピン等に連結されていても差し支えない。
 本発明は、車体に部品を取付ける部品取付ラインに好適である。
 10…搬送台車ユニット、12…取付対象物(ワーク、車体)、13…部品、20…ワーク用台車、22…床板、22a…凹円弧形状部、24L,24R…作業床、40部品用台車、41…台車本体、44…台上床(ターンテーブル)、44a…作業床、44b…凸円弧形状部、46…部品収納部(第1部品収納部)、47…部品収納部(第2部品収納部)、49…凸円弧形状部の中心軸、50…部品収納部、66…回転角制御部、70L、70R…サブ部品台車、85…ワークの搬送路(組立ライン)、93…オーバヘッドコンベア(第2オーバヘッドコンベア)、97…上流部品取付作業領域、98…U字状搬送路、99…曲がり部、101、102…部品専用搬送路、103…下流部品取付作業領域、104…中央部品取付作業領域、110…部品ステーション、111…搭載ステーション、112…連結ステーション、113…連結解除ステーション、114…備品取付ステーション、116…回収ステーション、117…供給ステーション

Claims (13)

  1.  自動車の車体に部品を取付ける車体用部品取付システムであって、
     前記車体が上昇した状態で搬送され、この間に少なくともエンジンが前記車体に取付けられる中央部品取付作業領域と、
     前記エンジンが取付けられる前に取付ける必要がある部品類が、セル生産方式により前記車体に取付けられる上流部品取付作業領域と、
     前記エンジンが取付けられた後に取付ける必要がある部品類が、セル生産方式により前記車体に取付けられる下流部品取付作業領域と、
    を備えており、
     前記車体の搬送路に沿って、前記上流部品取付作業領域と、前記中央部品取付作業領域と、前記下流部品取付作業領域とがこの順に配置されていることを特徴とする車体用部品取付システム。
  2.  セル生産方式が行われる前記上流部品取付作業領域は、前記中央部品取付作業領域の前記搬送路に対して、側方へ張り出すU字状搬送路を備えている、請求項1に記載の車体用部品取付システム。
  3.  セル生産方式が行われる前記下流部品取付作業領域は、前記中央部品取付作業領域の搬送路に対して、側方へ張り出すU字状搬送路を備えている、請求項1又は請求項2に記載の車体用部品取付システム。
  4.  部品及びこの部品が取付けられる取付対象物としてのワークを搬送する搬送台車ユニットであって、
     前記部品を搬送する部品用台車と、
     前記部品用台車の前又は後に配置されると共に前記部品用台車に分離可能に連結され前記ワークを搬送するワーク用台車と、
    を備えており、
     前記部品用台車は、台車本体と、前記台車本体に取付けられると共に作業者が乗ることができる台上床と、前記台上床に設けられ前記部品を収納する部品収納部とからなり、
     前記ワーク用台車は、前記作業者が乗る作業床を備えており、
     前記搬送台車ユニットは、前後の搬送台車ユニットに、旋回可能に連結されていることを特徴とする搬送台車ユニット。
  5.  前記部品収納部は、前記ワークに取付ける部品を収納する第1部品収納部と、前記ワークの前方又は後方に配置されるワークに取付ける部品を収納する第2部品収納部とからなり、
     前記台上床は、前記台車本体に回転可能に支持されるターンテーブルであり、前記ターンテーブルは、回転角制御部により、前記第1部品収納部から前記ワークまでの距離が、前記第2部品収納部から前方又は後方に配置される前記ワークまでの距離とほぼ等しくなるように回転制御される、請求項4に記載の搬送台車ユニット。
  6.  前記ワーク用台車は、前記部品用台車の後方に配置され、前記部品用台車に、さらに左右のサブ部品台車が連結され、前記左のサブ部品台車は前記ワーク用台車の左側方に配置され、前記右のサブ部品台車は前記ワーク用台車の右側方に配置される、請求項4又は請求項5に記載の搬送台車ユニット。
  7.  両端が凹円弧形状を呈しワークを載せる床板と、両端が凸円弧形状を呈し前記ワークに取り付ける部品を載せる台上床とが、前記凹円弧形状部に前記凸円弧形状部が嵌るようにして配置され、前記床板が、前記台上床の凸円弧形状部の中心軸に回動自在に且つ前記台上床に分離可能に連結されると共に連続して搬送される部品の搬送システムであって、
     前記ワークの搬送路に設けられ互いに連結された前記床板及び前記台上床を少なくとも1箇所の曲がり部を経由して案内するU字状搬送路と、
     前記U字状搬送路の上流側端部に設けられ前記台上床に前記床板を連結する連結ステーションと、
     前記U字状搬送路の下流側端部に設けられ前記台上床から前記床板の連結を解除する解除ステーションと、
     前記解除ステーションで解除された前記台上床を搬入し、前記台上床に前記部品を積み込み、前記連結ステーションに搬出する部品ステーションと、
    を備えていることを特徴とする部品搬送システム。
  8.  前記部品搬送システムは、さらに、前記床板が前記連結ステーションに到着する前に、前記ワークを前記床板に搭載する搭載ステーションと、
     前記床板が前記解除ステーションを通過した後に、前記ワークを前記床板から払い出す払出ステーション、とを備えており、
     前記床板は、前記払出ステーションから前記搭載ステーションへ循環搬送される、請求項7に記載の部品搬送システム。
  9.  前記部品ステーションは、前記台上床が前記解除ステーションを通過した後に、空になった部品収納部を前記台上床から回収する回収ステーションと、前記台上床が前記連結ステーションに到着する前に、前記部品が積み込まれた前記部品収納部を前記台上床に供給する供給ステーションと、からなり、
     前記台上床は、前記回収ステーションから前記供給ステーションへ循環搬送される、請求項7又は請求項8に記載の部品搬送システム。
  10.  部品及びこの部品が取付けられる取付対象物としてのワークを搬送する搬送台車ユニットであって、
     前記ワークを搬送するワーク用台車と、
     前記ワーク用台車に隣接して配置され前記部品の一部を搬送する部品用台車と、を備えており、
     前記ワーク用台車は、作業者が乗る作業床を備え、
     前記部品用台車は、台車本体と、前記台車本体に取付けられる台上床と、前記台上床に設けられ前記部品の一部を収納する部品収納部とからなり、
     前記搬送台車ユニットは、前後の搬送台車ユニットに、旋回可能に連結されていることを特徴とする搬送台車ユニット。
  11.  部品及びこの部品が取付けられる取付対象物としてのワークを搬送する搬送台車ユニットであって、
     前記ワークを搬送するワーク用台車と、
     前記ワーク用台車に隣接して配置され前記部品の一部を搬送する部品用台車と、
     前記部品用台車又は前記ワーク用台車で牽引され前記部品の残部を搬送する左右のサブ部品台車と、を備えており、
     前記ワーク用台車は、作業者が乗る作業床を備え、
     前記部品用台車は、台車本体と、前記台車本体に取付けられる台上床と、前記台上床に設けられ前記部品の一部を収納する部品収納部とからなり、
     左右の前記サブ部品台車は、後の搬送台車ユニットのワーク用台車の側方に配置され、
     前記搬送台車ユニットは、前後の搬送台車ユニットに、旋回可能に連結されていることを特徴とする搬送台車ユニット。
  12.  前記部品収納部は、前記ワークに取付ける部品を収納する第1部品収納部と、前記ワークの後方に配置されるワークに取付ける部品を収納する第2部品収納部とからなり、
     前記台上床は、前記台車本体に回転可能に支持されるターンテーブルであり、
     前記ターンテーブルは、回転角制御部により、前記第1部品収納部から前記ワークまでの距離が、前記第2部品収納部から前記後方に配置されるワークまでの距離とほぼ等しくなるように回転制御される、請求項10又は請求項11に記載の搬送台車ユニット。
  13.  請求項10~12のいずれか1項記載の搬送台車ユニットを用いた部品搬送システムであって、
     ワークの搬送路に設けられ、前後の前記搬送台車ユニットの連結を解除する連結解除ステーションと、
     前の前記搬送台車ユニットが前進し、後の前記搬送台車ユニットのワーク用台車の側方が開放されたら、後の前記搬送台車ユニット上の前記ワークに側方から備品を取り付ける備品取り付けステーションと、
    を備えている部品搬送システム。
PCT/JP2013/062839 2012-05-11 2013-05-07 車体用部品取付システム WO2013168706A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201380024522.9A CN104321161B (zh) 2012-05-11 2013-05-07 车身用部件安装系统
BR112014028095A BR112014028095A2 (pt) 2012-05-11 2013-05-07 sistema de montagem de componente de corpo de veículo, unidade de carro de transporte, sistema de transporte de componente e sistema de transporte de componente com o uso da unidade de carro de transporte
MX2014013536A MX352690B (es) 2012-05-11 2013-05-07 Sistema de montaje de un componente en la carrocería del vehículo.
US14/398,292 US9586297B2 (en) 2012-05-11 2013-05-07 Vehicle body component mounting system
MYPI2014703291A MY186269A (en) 2012-05-11 2013-05-07 Vehicle body component mounting system

Applications Claiming Priority (8)

Application Number Priority Date Filing Date Title
JP2012109812 2012-05-11
JP2012109821 2012-05-11
JP2012-109821 2012-05-11
JP2012-109812 2012-05-11
JP2013070057 2013-03-28
JP2013-070057 2013-03-28
JP2013-084287 2013-04-12
JP2013084287 2013-04-12

Publications (1)

Publication Number Publication Date
WO2013168706A1 true WO2013168706A1 (ja) 2013-11-14

Family

ID=49550741

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/062839 WO2013168706A1 (ja) 2012-05-11 2013-05-07 車体用部品取付システム

Country Status (7)

Country Link
US (1) US9586297B2 (ja)
JP (1) JPWO2013168706A1 (ja)
CN (1) CN104321161B (ja)
BR (1) BR112014028095A2 (ja)
MX (1) MX352690B (ja)
MY (1) MY186269A (ja)
WO (1) WO2013168706A1 (ja)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104400343A (zh) * 2014-10-30 2015-03-11 芜湖莫森泰克汽车科技有限公司 一种叉臂式摇窗机总成生产流程方法
ITTO20130995A1 (it) * 2013-12-05 2015-06-06 Fiat Group Automobiles Spa Linea per il montaggio di componenti a pezzi in lavorazione
JP2015134664A (ja) * 2014-01-17 2015-07-27 中西金属工業株式会社 台車搬送装置
WO2015111274A1 (ja) * 2014-01-21 2015-07-30 本田技研工業株式会社 台車装置、ワーク移載方法及びワーク搬送装置
JP2015137153A (ja) * 2014-01-21 2015-07-30 本田技研工業株式会社 連結台車
WO2015129389A1 (ja) * 2014-02-28 2015-09-03 株式会社ダイフク 台車利用の搬送装置
WO2015132378A1 (de) * 2014-03-06 2015-09-11 Kuka Systems Gmbh Fertigungsstation, fertigungsanlage und verfahren
WO2015132379A1 (de) * 2014-03-06 2015-09-11 Kuka Systems Gmbh Fertigungsanlage, transportsystem und verfahren
JP2017056531A (ja) * 2015-09-18 2017-03-23 本田技研工業株式会社 作業支援システム
WO2020066661A1 (ja) * 2018-09-25 2020-04-02 三菱自動車工業株式会社 ライン搬送システム
JP2020138280A (ja) * 2019-02-28 2020-09-03 本田技研工業株式会社 製造システム
JP2022517919A (ja) * 2019-01-11 2022-03-11 デュール システムズ アーゲー 移送装置、加工設備、対象を移送及び/又は加工する方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106413872A (zh) * 2014-05-13 2017-02-15 卢卡·德罗科 使容器在流体生产设备的站之间移动的移动系统
DE102015206983A1 (de) * 2015-04-17 2016-10-20 Kuka Systems Gmbh Montageplattform
DE202015103857U1 (de) 2015-07-22 2016-10-26 Kuka Systems Gmbh Fertigungseinrichtung
TWI607202B (zh) * 2016-05-11 2017-12-01 Intelligent modular metering system
CN108016530B (zh) * 2017-12-11 2019-06-28 安徽江淮汽车集团股份有限公司 一种车门装配用输送系统
DE102018111202A1 (de) 2018-05-09 2019-11-14 Eisenmann Se Tauchbehandlungsanlage und Verfahren zum Tauchbehandeln von Gegenständen, insbesondere von Fahrzeugkarosserien
CN111136623B (zh) * 2020-01-09 2023-10-27 广西科技大学 一种可实现万向移动和驻停的移动平台

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH027924U (ja) * 1988-06-28 1990-01-18
JPH02243234A (ja) * 1989-03-14 1990-09-27 Daifuku Co Ltd 自動車等組立ラインへの部品供給システム
EP0718179A1 (de) * 1994-12-23 1996-06-26 INDUMAT GmbH & Co. KG Transport- und Lagersysteme Bearbeitungsanlage für Werkstücke
JP2000085649A (ja) * 1998-07-17 2000-03-28 Honda Motor Co Ltd 車両の組立ライン
DE19858989A1 (de) * 1998-12-21 2000-06-29 Volkswagen Ag Montage- und/oder Transportband für die Montage oder den Transport eines Kraftfahrzeugs
JP2004230485A (ja) * 2003-01-29 2004-08-19 Sintokogio Ltd 製品の生産方法
JP2005518952A (ja) * 2002-03-01 2005-06-30 バイエリッシェ モートーレン ウエルケ アクチエンゲゼルシャフト 産業製品を組み立てるための組立工場
JP2005182388A (ja) * 2003-12-18 2005-07-07 Aisin Aw Co Ltd セル生産方法及びセル生産設備、並びに作業台車
JP2006198764A (ja) * 2004-12-24 2006-08-03 Aisin Aw Co Ltd セル生産方法及びセル生産設備
JP2007112605A (ja) * 2005-10-24 2007-05-10 Honda Motor Co Ltd 組立ラインのワーク搬送装置
JP2007526861A (ja) * 2003-07-14 2007-09-20 シーメンス アクチエンゲゼルシヤフト 曲線部分を有する組立及び/又は搬送ベルト
WO2011118246A1 (ja) * 2010-03-26 2011-09-29 株式会社ダイフク ワーク搬送設備
JP2012148357A (ja) * 2011-01-17 2012-08-09 Honda Motor Co Ltd 組立ラインにおける部品配膳システム
WO2013042511A1 (ja) * 2011-09-19 2013-03-28 本田技研工業株式会社 部品取付設備および部品取付方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE460757B (sv) 1988-01-19 1989-11-20 Electrolux Ab Anordning foer avskiljning av tunga foeremaal i en dammsugare
JP2003251575A (ja) 2002-03-01 2003-09-09 Daifuku Co Ltd セル生産方法およびセル生産設備ならびにセル生産用作業台車
CN201087033Y (zh) * 2007-07-23 2008-07-16 江苏天奇物流系统工程股份有限公司 前后桥随行顶升机构

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH027924U (ja) * 1988-06-28 1990-01-18
JPH02243234A (ja) * 1989-03-14 1990-09-27 Daifuku Co Ltd 自動車等組立ラインへの部品供給システム
EP0718179A1 (de) * 1994-12-23 1996-06-26 INDUMAT GmbH & Co. KG Transport- und Lagersysteme Bearbeitungsanlage für Werkstücke
JP2000085649A (ja) * 1998-07-17 2000-03-28 Honda Motor Co Ltd 車両の組立ライン
DE19858989A1 (de) * 1998-12-21 2000-06-29 Volkswagen Ag Montage- und/oder Transportband für die Montage oder den Transport eines Kraftfahrzeugs
JP2005518952A (ja) * 2002-03-01 2005-06-30 バイエリッシェ モートーレン ウエルケ アクチエンゲゼルシャフト 産業製品を組み立てるための組立工場
JP2004230485A (ja) * 2003-01-29 2004-08-19 Sintokogio Ltd 製品の生産方法
JP2007526861A (ja) * 2003-07-14 2007-09-20 シーメンス アクチエンゲゼルシヤフト 曲線部分を有する組立及び/又は搬送ベルト
JP2005182388A (ja) * 2003-12-18 2005-07-07 Aisin Aw Co Ltd セル生産方法及びセル生産設備、並びに作業台車
JP2006198764A (ja) * 2004-12-24 2006-08-03 Aisin Aw Co Ltd セル生産方法及びセル生産設備
JP2007112605A (ja) * 2005-10-24 2007-05-10 Honda Motor Co Ltd 組立ラインのワーク搬送装置
WO2011118246A1 (ja) * 2010-03-26 2011-09-29 株式会社ダイフク ワーク搬送設備
JP2012148357A (ja) * 2011-01-17 2012-08-09 Honda Motor Co Ltd 組立ラインにおける部品配膳システム
WO2013042511A1 (ja) * 2011-09-19 2013-03-28 本田技研工業株式会社 部品取付設備および部品取付方法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITTO20130995A1 (it) * 2013-12-05 2015-06-06 Fiat Group Automobiles Spa Linea per il montaggio di componenti a pezzi in lavorazione
JP2015134664A (ja) * 2014-01-17 2015-07-27 中西金属工業株式会社 台車搬送装置
US10017219B2 (en) * 2014-01-21 2018-07-10 Honda Motor Co., Ltd. Platform truck apparatus, workpiece transfer method, and workpiece conveyor equipment
WO2015111274A1 (ja) * 2014-01-21 2015-07-30 本田技研工業株式会社 台車装置、ワーク移載方法及びワーク搬送装置
JP2015137153A (ja) * 2014-01-21 2015-07-30 本田技研工業株式会社 連結台車
JP2015160740A (ja) * 2014-02-28 2015-09-07 本田技研工業株式会社 台車利用の搬送装置
WO2015129389A1 (ja) * 2014-02-28 2015-09-03 株式会社ダイフク 台車利用の搬送装置
US10696339B2 (en) 2014-03-06 2020-06-30 Kuka Systems Gmbh Manufacturing station, manufacturing plant and method
WO2015132378A1 (de) * 2014-03-06 2015-09-11 Kuka Systems Gmbh Fertigungsstation, fertigungsanlage und verfahren
WO2015132379A1 (de) * 2014-03-06 2015-09-11 Kuka Systems Gmbh Fertigungsanlage, transportsystem und verfahren
CN106103316A (zh) * 2014-03-06 2016-11-09 库卡系统有限责任公司 制造设备、运输系统和方法
US10392063B2 (en) 2014-03-06 2019-08-27 Kuka Systems Gmbh Manufacturing plant, conveying system and method
EP3114018B1 (de) 2014-03-06 2021-04-21 KUKA Systems GmbH Fertigungsanlage, transportsystem und verfahren
CN104400343A (zh) * 2014-10-30 2015-03-11 芜湖莫森泰克汽车科技有限公司 一种叉臂式摇窗机总成生产流程方法
JP2017056531A (ja) * 2015-09-18 2017-03-23 本田技研工業株式会社 作業支援システム
WO2020066661A1 (ja) * 2018-09-25 2020-04-02 三菱自動車工業株式会社 ライン搬送システム
JPWO2020066661A1 (ja) * 2018-09-25 2021-08-30 三菱自動車工業株式会社 ライン搬送システム
JP7200987B2 (ja) 2018-09-25 2023-01-10 三菱自動車工業株式会社 ライン搬送システム
JP2022517919A (ja) * 2019-01-11 2022-03-11 デュール システムズ アーゲー 移送装置、加工設備、対象を移送及び/又は加工する方法
JP2020138280A (ja) * 2019-02-28 2020-09-03 本田技研工業株式会社 製造システム

Also Published As

Publication number Publication date
CN104321161A (zh) 2015-01-28
MY186269A (en) 2021-07-01
BR112014028095A2 (pt) 2017-06-27
JPWO2013168706A1 (ja) 2016-01-07
MX2014013536A (es) 2015-10-14
MX352690B (es) 2017-12-04
US9586297B2 (en) 2017-03-07
CN104321161B (zh) 2016-08-24
US20150128397A1 (en) 2015-05-14

Similar Documents

Publication Publication Date Title
WO2013168706A1 (ja) 車体用部品取付システム
JP2008239019A (ja) トレーラ
US20070101567A1 (en) Work transport apparatus and method
JP2000318664A (ja) ハイブリッド搬送台車
US2022186A (en) Tractor-trailer system
JP2011109859A (ja) 物品搬送装置
JP2011102159A (ja) カートレインの車両積込み積卸し装置
CN108928407B (zh) 一种报废车辆的拆解流水线及拆解方法
CN113619970B (zh) 一种agv小车物料输送系统及其控制方法
JP2003072608A (ja) 自動車等の組立用搬送装置
JP6006154B2 (ja) 車体組み立てライン及び部品取付方法
JP5391036B2 (ja) 物品搬送装置
JP2007217076A (ja) 搬送車
JP3906900B2 (ja) 自動車の組立用搬送装置
JP2000001213A (ja) 搬送台車のストレージ装置
JP2009102105A (ja) 台車コンベア
JP2005329935A (ja) 接続構造とこれを備えた物品誘導システム
JP5804277B2 (ja) 搬送装置
JP5470307B2 (ja) 作業ライン用コンベヤ設備
JP3933466B2 (ja) スラットコンベヤ使用の台車搬送設備
JPH0976959A (ja) プッシャーフィーダ
JPH05193498A (ja) 自動車ドアの搬送装置
JP3246422B2 (ja) 搬送装置
JP3826754B2 (ja) 物品搬送設備
JP3619646B2 (ja) 車両搬送ラインの車両再投入装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13787406

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014514722

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14398292

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: MX/A/2014/013536

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112014028095

Country of ref document: BR

122 Ep: pct application non-entry in european phase

Ref document number: 13787406

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 112014028095

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20141110