WO2013125008A1 - エレベーター群管理装置 - Google Patents
エレベーター群管理装置 Download PDFInfo
- Publication number
- WO2013125008A1 WO2013125008A1 PCT/JP2012/054415 JP2012054415W WO2013125008A1 WO 2013125008 A1 WO2013125008 A1 WO 2013125008A1 JP 2012054415 W JP2012054415 W JP 2012054415W WO 2013125008 A1 WO2013125008 A1 WO 2013125008A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- car
- existing car
- existing
- storage means
- evaluation value
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B1/00—Control systems of elevators in general
- B66B1/24—Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration
- B66B1/2408—Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration where the allocation of a call to an elevator car is of importance, i.e. by means of a supervisory or group controller
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B1/00—Control systems of elevators in general
- B66B1/24—Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration
- B66B1/2408—Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration where the allocation of a call to an elevator car is of importance, i.e. by means of a supervisory or group controller
- B66B1/2458—For elevator systems with multiple shafts and a single car per shaft
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/007—Mining-hoist operation method for modernisation of elevators
Definitions
- This invention relates to an elevator group management device.
- a matching computer is connected between an existing car control device and a newly installed group management control device, and the existing car is placed under the management control of the new group management control device.
- Patent Document 1 what can put the existing elevator under the management control of the new group management control device by exchanging the status signal and the operation signal through the display device and operation device of the existing elevator, Conventionally known (see, for example, Patent Document 2).
- the hall call button is connected to the existing group management control device and the new group management control device via the call detection unit, and input
- the hall call is assigned to either an existing group management control device or a new group management control device according to a predetermined rule such as random assignment or alternate assignment (see, for example, Patent Document 3).
- This invention was made to solve such a problem, and in the case of managing and controlling a plurality of cars including an existing car and a newly installed car as a group, while suppressing the occurrence of a failure and improving the operation efficiency.
- an elevator group management device capable of realizing appropriate car assignment is obtained.
- an elevator group management apparatus that manages and controls a plurality of cars including an existing car and a new car as a group, the existing car control apparatus that controls the existing car, and the new installation
- a new car control device for controlling a car
- an evaluation value creating means for creating an evaluation value for the existing car and the new car, and an assigned car for a call based on the evaluation value created by the evaluation value creating means
- Allocation determination means for determining from the plurality of cars, existing car storage means for storing in advance which of the plurality of cars is the existing car, and a weighting factor for the existing car in the evaluation value are stored in advance
- a weight storage means wherein the evaluation value creating means stores the stored contents of the existing car storage means and the weight storage means. With that weight coefficient, a configuration of generating the evaluation value for the existing car.
- the elevator group management device when a plurality of cars including an existing car and a new car are managed and controlled as a group, an appropriate car is considered while suppressing the occurrence of a failure and taking into account the operation efficiency. There is an effect that the allocation can be realized.
- FIG. 1 and 2 relate to Embodiment 1 of the present invention.
- FIG. 1 is a block diagram showing the overall configuration of the elevator group management apparatus
- FIG. 2 is a flowchart showing the operation of the elevator group management apparatus.
- reference numeral 1 denotes an existing elevator car that has already been installed. The operation of the existing car 1 is controlled by the existing car control device 2.
- Reference numeral 3 denotes a newly installed elevator car. The operation of the new car 3 is controlled by the new car control device 4.
- the existing car control device 2 is provided in the same number as the existing car 1 corresponding to each of the one or more existing cars 1, and the new car control device 4 is provided as the new car 3 corresponding to each of the one or more new cars 3. The same number is provided.
- a group management control device 5 is provided as a host device of the existing car control device 2 and the new car control device 4.
- a landing button 6 for a user to register a landing call is installed at the floor landing where the existing car 1 and the new car 3 stop.
- an operation signal is output from the operated landing button 6 to the group management control device 5.
- the group management control device 5 registers a hall call to the floor where the hall button 6 from which the operation signal is output is installed.
- the group management control device 5 is provided with an assignment determination means 7 for determining an assigned car to be assigned from among the plurality of existing cars 1 and the new car 3 for the landing call registered in this way.
- This allocation determination means 7 is the time estimated for each car to arrive at the floor where the hall call is registered for each of the existing car 1 and the new car 3. Estimated arrival time is calculated based on the operation state of each car. For the new car 3, the calculated estimated arrival time is used as the evaluation value. For the existing car 1, a value obtained by multiplying the calculated estimated arrival time by a weighting factor described below is used as the evaluation value. That is, the evaluation value of the new car 3 and the evaluation value of the existing car 1 are calculated by the following equations, respectively.
- the assignment determining means 7 compares the evaluation values for the respective cars thus calculated, and determines the car having the smallest evaluation value as the assigned car for the call.
- the assigned information is transmitted from the group management control device 5 to the existing car control device 2 or the new car control device 4 that controls the assigned car. Then, according to this allocation information, the existing car control device 2 or the new car control device 4 sends the assigned car (the existing car 1 or the new car 3) to the floor where the call is registered in order to respond to the registered call. Let it run.
- the group management control device 5 is provided with an existing car storage unit 8, a weight storage unit 9, and a weight generation unit 10 in order to create a weighting coefficient used in calculation of the evaluation value in the assignment determination unit 7.
- the existing car storage means 8 stores in advance existing car information indicating which car is the existing car 1 among a plurality of cars that are subject to management control of the group management control device 5.
- the weight storage means 9 stores in advance the value of the weight coefficient for each existing car 1 stored in the existing car storage means 8.
- the weight creating means 10 obtains the existing car information from the existing car storage means 8 and obtains the weight coefficient for the existing car 1 from the weight storage means 9, whereby the evaluation value for each existing car 1 in the assignment determination means 7. A weighting coefficient to be used for calculation is generated. As described above, the assignment determining unit 7 sets the value obtained by multiplying the calculated estimated arrival time by the weight coefficient created by the weight creating unit 10 as the evaluation value of the existing car 1.
- step S1 when the user operates the landing button 6, the operated landing button 6 transmits an operation signal to the group management control device 5 (step S2), and the group management control device 5 receives the operation signal. Register the hall call to the floor where the hall button 6 as the sender is installed.
- step S 3 the weight creation means 10 of the group management control device 5 acquires information about the existing car 1 from the existing car storage means 8. Then, the process proceeds to step S4, where the weight creating means 10 acquires the weight coefficient for the existing car 1 from the weight storage means 9, based on the acquired information about the existing car 1. After step S4, the process proceeds to step S5.
- step S5 the allocation determining means 7 first calculates the estimated arrival time for each car for the floor where the hall call is registered (that is, the floor where the hall button 6 operated in step S2 is installed). To calculate. Then, for the existing car 1, the allocation determining means 7 multiplies the calculated estimated arrival time by the weight coefficient created by the weight creating means 10 in step S4. When the estimated arrival times for all the existing cars 1 and new cars 3 are thus evaluated, the process proceeds to step S6.
- the car having the smallest evaluation value (the shortest estimated arrival time) among all the existing cars 1 and the new car 3 is determined as the assigned car.
- the weight coefficient for the existing car 1 stored in the weight storage means 9 is set to a value of 1 or more.
- the evaluation value is calculated assuming that the weighting factor is 1. Therefore, the allocation priority of the existing car 1 is lowered by the amount corresponding to the weighting factor to make it difficult for the existing car 1 to be determined as the allocation car. It is also possible to prevent the existing car 1 from being determined as an assigned car by setting the weighting coefficient for the existing car 1 to an extremely large value.
- step S6 the process proceeds to step S7, where it is determined whether the assigned car determined in step S6 is the existing car 1. In this determination, if the assigned car is the existing car 1, the process proceeds to step S8. In this step S ⁇ b> 8, the group management control device 5 transmits the allocation information to the existing car control device 2. Then, in the subsequent step S9, the existing car control device 2 that has received the assignment information causes the existing car 1 to travel to the floor where the call is registered in accordance with the received assignment information.
- step S ⁇ b> 10 the group management control device 5 transmits the allocation information to the new car control device 4. Then, in the subsequent step S11, the new car control device 4 that has received the assignment information causes the new car 3 to travel to the floor where the call is registered in accordance with the received assignment information.
- the assignment determination means 7 performs both the creation of the evaluation value for each of the existing car 1 and the new car 3 and the determination of the assignment car based on the created evaluation value has been described.
- an evaluation value creating function for taking out the evaluation value creating function from the assignment determining means 7 and creating an evaluation value for each of the existing car 1 and the new car 3 is separately provided.
- the assigned car may be determined based on the evaluation value created by the evaluation value creating means.
- the elevator group management device configured as described above is an elevator group management device that manages and controls a plurality of cars including an existing car and a new car as a group, and an existing car control device that controls the existing car, A new car control device for controlling the car, an evaluation value for the existing car and the new car, and an assignment determination means for determining an assigned car for a call from a plurality of cars based on the created evaluation value; and a plurality of cars
- An existing car storage means for storing in advance which is an existing car, and a weight storage means for storing in advance a weighting factor for the existing car in the evaluation value, and the assignment determination means is a memory of the existing car storage means.
- the evaluation value for the existing car is created using the weighting coefficient stored in the content and weight storage means.
- FIG. FIGS. 3 and 4 relate to Embodiment 2 of the present invention.
- FIG. 3 is a block diagram showing the overall configuration of the elevator group management apparatus.
- FIG. 4 is a weighting factor acquisition at the time of evaluation value creation in the elevator group management apparatus. It is a flowchart which shows a process.
- the value of the weighting factor used when calculating the evaluation value of the existing car is changed according to the failure rate depending on the installation period of the existing car. It is a thing.
- the existing car storage unit 8 included in the group management control device 5 indicates which of the plurality of cars that are subject to management control of the group management control device 5 is the existing car 1.
- information on the manufacturing time for each existing car 1 is also stored in advance.
- the group management control device 5 is provided with failure rate storage means 11 for storing in advance the failure rate of the existing car 1 for each installation period of the existing car 1.
- the weight storage means 9 stores in advance a weight coefficient for each failure rate of the existing car 1.
- the weighting factor is set so as to increase as the failure rate of the existing car 1 increases.
- the weight creating means 10 creates a weighting coefficient to be used for calculating an evaluation value for each existing car 1 in the assignment determining means 7 according to the flow shown in FIG.
- the weight creating unit 10 acquires existing car information from the existing car storage unit 8 and information related to the manufacturing time for each existing car 1.
- the weight preparation means 10 calculates the installation period for each existing car 1 from the manufacturing time for each existing car 1.
- the failure rate for the calculated installation period is acquired from the failure rate storage unit 11.
- step S22 in which the weight creating means 10 obtains a weighting factor for the acquired failure rate from the weight storage means 9 and uses it for calculating an evaluation value for each existing car 1 in the assignment determining means 7. Create a weighting factor for.
- Other configurations and operations are the same as those in the first embodiment, and detailed description thereof is omitted.
- the existing car is further assigned to the call according to the failure occurrence rate of the existing car.
- the frequency of occurrence it is possible to realize the car assignment that suppresses the occurrence of the failure and has good operation efficiency.
- FIG. FIGS. 5 to 7 relate to Embodiment 3 of the present invention
- FIG. 5 is a block diagram showing the overall configuration of the elevator group management device
- FIG. 6 shows wear / deterioration status registration processing in the elevator group management device
- FIG. 7 is a flowchart showing weight coefficient acquisition processing at the time of evaluation value creation in the elevator group management apparatus.
- the value of the weighting factor used when calculating the evaluation value of the existing car is changed according to the wear / deterioration state of the existing car. Is.
- the group management control device 5 is provided with existing car wear / deterioration status storage means 12 for storing the wear / deterioration status of each existing car 1 in advance.
- a wear / deterioration status input means 13 for inputting the wear / deterioration status of each existing car 1 to be stored in the degradation status storage means 12 is provided.
- FIG. 6 shows a flow of the process of registering the wear / degradation status in the existing car wear / degradation status storage unit 12 using the wear / degradation status input unit 13.
- step S30 for example, during regular maintenance inspection, the maintenance staff investigates the wear / deterioration status of the existing car 1 and the existing car control device 2. Then, the maintenance staff evaluates the wear / deterioration status of the existing car 1 and the existing car control device 2 based on the investigation result.
- this evaluation method for example, by preparing a manual, etc., it will be possible to perform an objectively unified evaluation so that there is no difference between maintenance personnel.
- a score is given according to the location and degree of wear / deterioration of the existing car 1 and the existing car control device 2, and the wear / deterioration is performed by ranking based on this score.
- Use a method such as evaluating the situation in stages.
- step S31 The wear / degradation status of each existing car 1 as a result of the evaluation in this way is input to the wear / degradation status input means 13 by the maintenance staff (step S31).
- step S32 the wear / deterioration status input means 13 registers the input wear / deterioration status for each existing car 1 in the existing car wear / deterioration status storage means 12.
- the weight storage means 9 stores in advance a weighting factor for each wear / deterioration situation of the existing car 1.
- the weighting factor is set so as to increase as the worn / degraded state of the existing car 1 becomes more severe.
- the weight creating means 10 creates a weight coefficient to be used for calculating the evaluation value for each existing car 1 in the assignment determining means 7 according to the flow shown in FIG.
- the weight creating unit 10 acquires existing car information from the existing car storage unit 8.
- the weight creating means 10 refers to the acquired existing car information and acquires the wear / deterioration status for each existing car 1 from the existing car wear / deterioration status storage means 12.
- step S42 the weight creating means 10 obtains a weighting factor for the acquired wear deterioration state from the weight storage means 9 and uses it to calculate an evaluation value for each existing car 1 in the assignment determining means 7. Create a weighting factor for Other configurations and operations are the same as those in the first embodiment, and detailed description thereof is omitted.
- the existing car is called according to the wear / deterioration status of the existing car.
- the frequency of allocation it is possible to realize car allocation that suppresses the occurrence of failure and has good operation efficiency.
- FIG. 8 and 9 relate to Embodiment 4 of the present invention.
- FIG. 8 is a block diagram showing the overall configuration of the elevator group management apparatus
- FIG. 9 is a weighting factor acquisition at the time of evaluation value creation in the elevator group management apparatus. It is a flowchart which shows a process.
- the value of the weighting factor used when calculating the evaluation value of the existing car is changed according to the period until the planned repair of the existing car. It is what I did.
- the group management control device 5 includes a repair schedule storage unit 14 that stores in advance a repair schedule scheduled for each existing car 1.
- storage means 9 has memorize
- FIG. The weighting factor is set to a larger value as the period until the existing car 1 is repaired becomes longer.
- the weight creating means 10 creates a weighting coefficient to be used for calculating the evaluation value for each existing car 1 in the assignment determining means 7 according to the flow shown in FIG.
- the weight creating means 10 acquires existing car information from the existing car storage means 8.
- the process proceeds to step S51, and the repair schedule scheduled for each existing car 1 is acquired from the repair schedule storage means 14 with reference to the acquired existing car information.
- step S52 the weight preparation means 10 calculates the period until the repair for every existing car 1 from the acquired repair schedule. Subsequently, a weighting factor for use in calculating an evaluation value for each existing car 1 in the assignment determining unit 7 is created by obtaining the weighting factor for the calculated period until the renovation from the weight storage unit 9.
- Other configurations and operations are the same as those in the first embodiment, and detailed description thereof is omitted.
- the existing car is called according to the period until the existing car is repaired.
- the frequency of allocation it is possible to realize car allocation that suppresses the occurrence of failure and has good operation efficiency.
- FIG. FIGS. 10 to 14 relate to Embodiment 5 of the present invention
- FIG. 10 is a block diagram showing the overall configuration of the elevator group management device
- FIG. 11 is a flowchart showing a car pausing operation in the elevator group management device.
- FIG. 12 is a flowchart showing the first pause car determination process in the elevator group management apparatus
- FIG. 13 is a flowchart showing the second pause car determination process in the elevator group management apparatus
- FIG. 14 is a third chart in the elevator group management apparatus. It is a flowchart which shows the idle car determination process of.
- the operation state of the elevator becomes quiet, and any one of a plurality of cars is operated from the viewpoint of power saving and the like.
- the existing car is preferentially determined to be a suspended car.
- the group management control device 5 determines a suspension car to stop the operation from among a plurality of cars including the existing car 1 and the new car 3 when the operation state of the elevator becomes quiet.
- a suspension car determination means 15 is provided.
- the suspension car determination means 15 preferentially determines the existing car 1 from among a plurality of cars based on the existing car information stored in the existing car storage means 8. In this case, if the group management control device 5 is provided with any one of the failure rate storage means 11, the existing car wear / degradation status storage means 12, and the repair schedule storage means 14, the data is stored in these storage means. The rested car is determined using the recorded information.
- the flowchart of FIG. 11 shows the car pause operation in the elevator group management apparatus.
- the group management control device 5 determines that the elevator is in a quiet state from the call registration status, the driving status of each car, etc.
- the group management control device 5 pauses some of the plurality of cars subject to group management. Make a decision.
- the suspended car determination means 15 acquires the existing car information from the existing car storage means 8 in step S60.
- the suspension car determination means 15 determines a suspension car from the existing cars 1 based on the acquired existing car information. Then, the process proceeds to step S62, and the group management control device 5 transmits the suspension information to the existing car control device 2 that controls the existing car 1 determined to be the resting car. In step S63, the existing car control device 2 that has received the pause information pauses the existing car 1 according to the received pause information.
- FIG. 12 shows that when the existing car storage means 8 stores information on the manufacturing time of each existing car 1 and the group management control device 5 is provided with the failure rate storage means 11, the suspended car is determined. It is a flowchart which shows a process in case the means 15 determines a dormant car using the memory
- step S70 the suspension car determination means 15 acquires the existing car information and the information about the manufacturing time for each existing car from the existing car storage means 8. Next, it progresses to step S31 and the suspension car determination means 15 calculates the installation period for each existing car 1 from the manufacturing time for each existing car 1. Subsequently, the failure rate for the calculated installation period is acquired from the failure rate storage unit 11. And it progresses to step S32, the suspension car determination means 15 compares the acquired failure rate for every existing car 1, and determines the existing car 1 with a relatively high failure rate to a suspension car preferentially.
- FIG. 13 shows the existing car 1 stored in the existing car wear / deterioration status storage means 12 when the group management control device 5 is provided with the existing car wear / deterioration status storage means 12. It is a flowchart which shows the process in the case of determining a dormant car using the wear / deterioration state of the car.
- step S80 the suspension car determination means 15 acquires existing car information from the existing car storage means 8.
- step S81 the quiescent car determination means 15 refers to the acquired existing car information, and acquires the wear / deterioration status for each existing car 1 from the existing car wear / deterioration status storage means 12.
- step S82 the quiescent car determination means 15 compares the acquired wear / deterioration status of each existing car 1 and preferentially selects the existing car 1 having a relatively severe wear / deterioration condition as the quiescent car. decide.
- FIG. 14 shows that when the group management control device 5 is provided with the renovation schedule storage means 14, the suspension car determination means 15 uses the renovation schedule of the existing car 1 stored in the refurbishment schedule storage means 14. It is a flowchart which shows the process in the case of determining.
- step S ⁇ b> 90 the suspension car determination unit 15 acquires existing car information from the existing car storage unit 8.
- the suspended car determination unit 15 refers to the acquired existing car information, and acquires the repair schedule scheduled for each existing car 1 from the repair schedule storage unit 14. And it progresses to step S92 and the suspension car determination means 15 calculates the period until the repair for every existing car 1 from the acquired repair schedule. Subsequently, the calculated period until the repair of each existing car 1 is compared, and the existing car 1 with a relatively long period until the repair is preferentially determined as a suspended car.
- Other configurations and operations are the same as those in the first to fourth embodiments.
- the failure rate acquired from the failure rate storage means 11 the wear / deterioration status acquired from the existing car wear / deterioration status storage means 12, and the repair date obtained from the repair schedule acquired from the repair schedule storage means 14
- the weight storage means 9 acquires the weighting factor for the failure rate, the wear / deterioration condition, and the period until refurbishment, and the existing car 1 having the largest acquired weighting factor is determined as the resting car. It can also be done.
- the elevator group management apparatus configured as described above can achieve the same effects as those of the first to fourth embodiments, and further preferentially pauses the existing cars, By reducing the frequency of use, it is possible to suppress the occurrence of failure in the existing car.
- the present invention can be used for an elevator group management apparatus that manages and controls a plurality of cars including an existing car and a new car as a group.
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Elevator Control (AREA)
- Maintenance And Inspection Apparatuses For Elevators (AREA)
Abstract
Description
図1及び図2は、この発明の実施の形態1に係るもので、図1はエレベーター群管理装置の全体構成を示すブロック図、図2はエレベーター群管理装置の動作を示すフロー図である。
(既設かご1の評価値)=(既設かご1の到着予想時間)×(重み係数)
まず、ステップS1において、利用者が乗場ボタン6を操作すると、当該操作された乗場ボタン6は群管理制御装置5へと操作信号を送信し(ステップS2)、群管理制御装置5は操作信号の送信元である乗場ボタン6が設置された階床への乗場呼びを登録する。
図3及び図4は、この発明の実施の形態2に係るもので、図3はエレベーター群管理装置の全体構成を示すブロック図、図4はエレベーター群管理装置における評価値作成時の重み係数取得処理を示すフロー図である。
まず、ステップS20において、重み作成手段10は、既設かご記憶手段8から既設かご情報と各既設かご1毎の製造時期に関する情報を取得する。次に、ステップS21へと進み、重み作成手段10は、各既設かご1毎の製造時期から各既設かご1毎の設置期間を計算する。続いて、計算した設置期間に対する故障率を故障率記憶手段11から取得する。
なお、その他の構成や動作等については実施の形態1と同様であって、その詳細説明は省略する。
図5から図7は、この発明の実施の形態3に係るもので、図5はエレベーター群管理装置の全体構成を示すブロック図、図6はエレベーター群管理装置における摩耗・劣化状況登録処理を示すフロー図、図7はエレベーター群管理装置における評価値作成時の重み係数取得処理を示すフロー図である。
まず、ステップS30において、例えば、定期保守点検等の際に、保守員は、既設かご1及び既設かご制御装置2の摩耗・劣化状況の調査を行う。そして、保守員は、この調査結果に基づいて、既設かご1及び既設かご制御装置2の摩耗・劣化状況の評価を行う。
まず、ステップS40において、重み作成手段10は、既設かご記憶手段8から既設かご情報を取得する。次に、ステップS41へと進み、重み作成手段10は、取得した既設かご情報を参照して各既設かご1毎の摩耗・劣化状況を既設かご摩耗・劣化状況記憶手段12から取得する。
なお、その他の構成や動作等については実施の形態1と同様であって、その詳細説明は省略する。
図8及び図9は、この発明の実施の形態4に係るもので、図8はエレベーター群管理装置の全体構成を示すブロック図、図9はエレベーター群管理装置における評価値作成時の重み係数取得処理を示すフロー図である。
まず、ステップS50において、重み作成手段10は、既設かご記憶手段8から既設かご情報を取得する。次に、ステップS51へと進み、取得した既設かご情報を参照して各既設かご1毎に予定されている改修日程を改修日程記憶手段14から取得する。
なお、その他の構成や動作等については実施の形態1と同様であって、その詳細説明は省略する。
図10から図14は、この発明の実施の形態5に係るもので、図10はエレベーター群管理装置の全体構成を示すブロック図、図11はエレベーター群管理装置におけるかご休止動作を示すフロー図、図12はエレベーター群管理装置における第1の休止かご決定処理を示すフロー図、図13はエレベーター群管理装置における第2の休止かご決定処理を示すフロー図、図14はエレベーター群管理装置における第3の休止かご決定処理を示すフロー図である。
まず、群管理制御装置5は、呼び登録状況や各かごの運転状況等からエレベーターが閑散な状態であると判断すると、群管理の対象である複数のかごのうちの一部のかごを休止させる判断をする。そして、一部のかごの休止が判断されると、ステップS60において、休止かご決定手段15は、既設かご記憶手段8から既設かご情報を取得する。
その他の構成や動作等については実施の形態1から実施の形態4と同様である。
2 既設かご制御装置
3 新設かご
4 新設かご制御装置
5 群管理制御装置
6 乗場ボタン
7 割当て決定手段
8 既設かご記憶手段
9 重み記憶手段
10 重み作成手段
11 故障率記憶手段
12 既設かご摩耗・劣化状況記憶手段
13 摩耗・劣化状況入力手段
14 改修日程記憶手段
15 休止かご決定手段
Claims (10)
- 既設かごと新設かごとを含む複数のかごを一群として管理制御するエレベーター群管理装置であって、
前記既設かごを制御する既設かご制御装置と、
前記新設かごを制御する新設かご制御装置と、
前記既設かご及び前記新設かごに対する評価値を作成する評価値作成手段と、
前記評価値作成手段により作成された前記評価値に基づいて、呼びに対する割当てかごを前記複数のかごから決定する割当て決定手段と、
前記複数のかごのうちいずれが前記既設かごであるのかを予め記憶する既設かご記憶手段と、
前記評価値における前記既設かごに対する重み係数を予め記憶する重み記憶手段と、を備え、
前記評価値作成手段は、前記既設かご記憶手段の記憶内容及び前記重み記憶手段が記憶する重み係数を用いて、前記既設かごに対する前記評価値を作成することを特徴とするエレベーター群管理装置。 - 前記評価値は、各かごにおける呼びが登録された階床までの到着予想時間であり、
前記割当て決定手段は、前記到着予想時間が最短であるかごを前記割当てかごに決定し、
前記評価値作成手段は、前記既設かごに対する前記評価値を、前記到着予想時間に前記重み記憶手段から取得した前記重み係数を乗じることにより作成し、
前記重み記憶手段が記憶する前記既設かごに対する前記重み係数は、1以上に設定されることを特徴とする請求項1に記載のエレベーター群管理装置。 - 前記既設かごの設置期間に対する前記既設かごの故障率を予め記憶する故障率記憶手段を備え、
前記既設かご記憶手段は、前記既設かご毎の製造時期に関する情報を予めさらに記憶し、
前記重み記憶手段は、前記故障率に対する前記重み係数を予め記憶し、
前記評価値作成手段は、前記既設かご記憶手段が記憶する前記既設かごの製造時期に関する情報から前記既設かごの設置期間を求め、この求めた前記既設かごの設置期間に対する前記故障率を前記故障率記憶手段から取得し、この取得した前記故障率に対する前記重み係数を前記重み記憶手段から取得して、前記既設かごに対する前記評価値を作成することを特徴とする請求項1又は請求項2のいずれかに記載のエレベーター群管理装置。 - 前記既設かご毎の摩耗・劣化状況を予め記憶する摩耗・劣化状況記憶手段を備え、
前記重み記憶手段は、摩耗・劣化状況に対する前記重み係数を予め記憶し、
前記評価値作成手段は、前記既設かごの摩耗・劣化状況を前記摩耗・劣化状況記憶手段から取得し、この取得した摩耗・劣化状況に対する前記重み係数を前記重み記憶手段から取得して、前記既設かごに対する前記評価値を作成することを特徴とする請求項1から請求項3のいずれかに記載のエレベーター群管理装置。 - 前記摩耗・劣化状況記憶手段に記憶させる前記既設かご毎の摩耗・劣化状況を入力するための摩耗・劣化状況入力手段を備えたことを特徴とする請求項4に記載のエレベーター群管理装置。
- 前記既設かご毎の改修予定を予め記憶する改修予定記憶手段を備え、
前記重み記憶手段は、改修までの期間に対する前記重み係数を予め記憶し、
前記評価値作成手段は、前記改修予定記憶手段が記憶する前記既設かごの改修予定から前記既設かごの改修までの期間を求め、この求めた前記既設かごの改修までの期間に対する前記重み係数を前記重み記憶手段から取得して、前記既設かごに対する前記評価値を作成することを特徴とする請求項1から請求項5のいずれかに記載のエレベーター群管理装置。 - 前記既設かご記憶手段の記憶内容に基づいて、前記既設かごを優先的に休止かごに決定する休止かご決定手段を備えたことを特徴とする請求項1から請求項6のいずれかに記載のエレベーター群管理装置。
- 前記既設かご記憶手段が記憶する前記既設かごの製造時期に関する情報から前記既設かごの設置期間を求め、この求めた前記既設かごの設置期間に対する前記故障率を前記故障率記憶手段から取得し、この取得した前記故障率が相対的に高い前記既設かごを優先的に休止かごに決定する休止かご決定手段を備えたことを特徴とする請求項3に記載のエレベーター群管理装置。
- 前記既設かごの摩耗・劣化状況を前記摩耗・劣化状況記憶手段から取得し、この取得した摩耗・劣化状況が相対的に酷い前記既設かごを優先的に休止かごに決定する休止かご決定手段を備えたことを特徴とする請求項4又は請求項5のいずれかに記載のエレベーター群管理装置。
- 前記改修予定記憶手段が記憶する前記既設かごの改修予定から前記既設かごの改修までの期間を求め、この求めた前記既設かごの改修までの期間が相対的に長い前記既設かごを優先的に休止かごに決定する休止かご決定手段を備えたことを特徴とする請求項6に記載のエレベーター群管理装置。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014500816A JP5720847B2 (ja) | 2012-02-23 | 2012-02-23 | エレベーター群管理装置 |
US14/364,504 US9533857B2 (en) | 2012-02-23 | 2012-02-23 | Elevator group management device |
PCT/JP2012/054415 WO2013125008A1 (ja) | 2012-02-23 | 2012-02-23 | エレベーター群管理装置 |
CN201280070059.7A CN104136354B (zh) | 2012-02-23 | 2012-02-23 | 电梯组群管理装置 |
DE112012005942.5T DE112012005942B4 (de) | 2012-02-23 | 2012-02-23 | Aufzugsgruppen-Verwaltungsvorrichtung |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2012/054415 WO2013125008A1 (ja) | 2012-02-23 | 2012-02-23 | エレベーター群管理装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013125008A1 true WO2013125008A1 (ja) | 2013-08-29 |
Family
ID=49005228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2012/054415 WO2013125008A1 (ja) | 2012-02-23 | 2012-02-23 | エレベーター群管理装置 |
Country Status (5)
Country | Link |
---|---|
US (1) | US9533857B2 (ja) |
JP (1) | JP5720847B2 (ja) |
CN (1) | CN104136354B (ja) |
DE (1) | DE112012005942B4 (ja) |
WO (1) | WO2013125008A1 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109179106A (zh) * | 2018-11-01 | 2019-01-11 | 浙江华夏电梯有限公司 | 一种用于双子轿厢的控制柜 |
JP7375978B1 (ja) * | 2023-05-22 | 2023-11-08 | 三菱電機ビルソリューションズ株式会社 | エレベーター制御装置、エレベーターシステム、エレベーター制御方法及びエレベーター制御プログラム |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106365004A (zh) * | 2016-10-14 | 2017-02-01 | 深圳万发创新进出口贸易有限公司 | 一种电梯控制系统 |
WO2023165696A1 (en) * | 2022-03-03 | 2023-09-07 | Kone Corporation | A solution for an elevator call allocation of an elevator group |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6231682A (ja) * | 1985-07-31 | 1987-02-10 | 株式会社東芝 | エレベ−タの運転方法 |
JP2011162294A (ja) * | 2010-02-08 | 2011-08-25 | Toshiba Elevator Co Ltd | エレベータの群管理システム |
JP2012502863A (ja) * | 2008-09-15 | 2012-02-02 | オーチス エレベータ カンパニー | エレベータ装置の近代化中のエレベータかごの動的出発管理 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI68797C (fi) | 1984-03-14 | 1985-11-11 | Kone Oy | Foerfarande foer modernisering av styrsystemet vid en hissgrupp |
JPS60252575A (ja) | 1984-03-02 | 1985-12-13 | エレベ−タ−・ゲ−エムベ−ハ− | リフト群の制御システムの近代化方法 |
JPS62126086A (ja) | 1985-11-22 | 1987-06-08 | 三菱電機株式会社 | エレベ−タの群管理装置 |
JPH0818767B2 (ja) | 1990-12-21 | 1996-02-28 | 三菱電機株式会社 | 群管理エレベータの制御方法 |
JP2002114458A (ja) * | 2000-10-03 | 2002-04-16 | Hitachi Building Systems Co Ltd | エレベータ群管理制御装置 |
JP2005008414A (ja) * | 2003-06-18 | 2005-01-13 | Inventio Ag | エレベーター設備、このエレベーター設備を操作する方法、およびエレベーター設備を最新化する方法 |
JP4907990B2 (ja) * | 2003-07-09 | 2012-04-04 | コネ コーポレイション | エレベータの制御 |
KR101093664B1 (ko) * | 2006-10-24 | 2011-12-15 | 오티스 엘리베이터 컴파니 | 그룹 간 상대 시스템 응답 (irsr) 디스패칭을 이용하는 엘리베이터 크로스-디스패칭 시스템 |
SG144027A1 (en) | 2006-12-21 | 2008-07-29 | Inventio Ag | Method and system for modernisation of a lift installation |
FI120301B (fi) * | 2007-11-26 | 2009-09-15 | Kone Corp | Hissijärjestelmä |
FI123017B (fi) * | 2011-08-31 | 2012-10-15 | Kone Corp | Hissijärjestelmä |
WO2014108594A2 (en) * | 2013-01-09 | 2014-07-17 | Kone Corporation/Patent Department | Method and system for modernizing an elevator installation |
-
2012
- 2012-02-23 US US14/364,504 patent/US9533857B2/en active Active
- 2012-02-23 JP JP2014500816A patent/JP5720847B2/ja active Active
- 2012-02-23 CN CN201280070059.7A patent/CN104136354B/zh not_active Expired - Fee Related
- 2012-02-23 WO PCT/JP2012/054415 patent/WO2013125008A1/ja active Application Filing
- 2012-02-23 DE DE112012005942.5T patent/DE112012005942B4/de not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6231682A (ja) * | 1985-07-31 | 1987-02-10 | 株式会社東芝 | エレベ−タの運転方法 |
JP2012502863A (ja) * | 2008-09-15 | 2012-02-02 | オーチス エレベータ カンパニー | エレベータ装置の近代化中のエレベータかごの動的出発管理 |
JP2011162294A (ja) * | 2010-02-08 | 2011-08-25 | Toshiba Elevator Co Ltd | エレベータの群管理システム |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109179106A (zh) * | 2018-11-01 | 2019-01-11 | 浙江华夏电梯有限公司 | 一种用于双子轿厢的控制柜 |
JP7375978B1 (ja) * | 2023-05-22 | 2023-11-08 | 三菱電機ビルソリューションズ株式会社 | エレベーター制御装置、エレベーターシステム、エレベーター制御方法及びエレベーター制御プログラム |
Also Published As
Publication number | Publication date |
---|---|
JPWO2013125008A1 (ja) | 2015-05-21 |
US20140367203A1 (en) | 2014-12-18 |
US9533857B2 (en) | 2017-01-03 |
DE112012005942B4 (de) | 2019-12-24 |
CN104136354A (zh) | 2014-11-05 |
DE112012005942T5 (de) | 2014-12-24 |
JP5720847B2 (ja) | 2015-05-20 |
CN104136354B (zh) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5230749B2 (ja) | エレベーター群管理装置 | |
US8794388B2 (en) | Elevator group control apparatus | |
JP5720847B2 (ja) | エレベーター群管理装置 | |
CN110027952B (zh) | 用于诊断和/或维护运输系统的方法及软件程序 | |
JP2011162294A (ja) | エレベータの群管理システム | |
WO2016208394A1 (ja) | エレベーターシステム | |
JP6370008B1 (ja) | エレベータ管理システム | |
JP5609582B2 (ja) | エレベータの設置計画装置及び方法 | |
CN104724555A (zh) | 电梯群管理系统以及电梯群管理方法 | |
JPWO2018109946A1 (ja) | エレベーターのリニューアル方法およびエレベーター制御盤 | |
CN111386540B (zh) | 维护计划系统和维护计划方法 | |
US8997940B2 (en) | Elevator installation and operation method therefor | |
JP5717301B2 (ja) | エレベータ群管理制御装置 | |
JP2012162331A (ja) | エレベータ | |
JP2012250787A (ja) | エレベータ制御装置 | |
WO2020234928A1 (ja) | エレベーターの運行管理システム | |
JP2019031382A (ja) | 群管理エレベータ装置 | |
JP2016037331A (ja) | エレベータの群管理システム | |
WO2014112070A1 (ja) | エレベーターの群管理制御装置 | |
JP6049538B2 (ja) | エレベータシステムおよびエレベータ結露防止方法 | |
JP5826073B2 (ja) | エレベータの群管理システム | |
JP6540383B2 (ja) | エレベータの群管理制御装置及び群管理制御方法 | |
JP2014172723A (ja) | エレベータの制御装置 | |
JP5733842B2 (ja) | エレベータ群管理装置 | |
CN115402888B (zh) | 电梯的群管理控制装置以及电梯的群管理控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12869222 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2014500816 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14364504 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 112012005942 Country of ref document: DE Ref document number: 1120120059425 Country of ref document: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12869222 Country of ref document: EP Kind code of ref document: A1 |