WO2010076859A1 - 架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置 - Google Patents

架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置 Download PDF

Info

Publication number
WO2010076859A1
WO2010076859A1 PCT/JP2009/067862 JP2009067862W WO2010076859A1 WO 2010076859 A1 WO2010076859 A1 WO 2010076859A1 JP 2009067862 W JP2009067862 W JP 2009067862W WO 2010076859 A1 WO2010076859 A1 WO 2010076859A1
Authority
WO
WIPO (PCT)
Prior art keywords
tension balancer
fixed cylinder
yoke
pairs
openings
Prior art date
Application number
PCT/JP2009/067862
Other languages
English (en)
French (fr)
Inventor
治 佐々
Original Assignee
日本発條株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本発條株式会社 filed Critical 日本発條株式会社
Priority to US12/680,019 priority Critical patent/US8492649B2/en
Priority to CN200980100508.6A priority patent/CN101918240B/zh
Priority to KR1020107006317A priority patent/KR101203307B1/ko
Publication of WO2010076859A1 publication Critical patent/WO2010076859A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/26Compensation means for variation in length
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device

Definitions

  • the present invention relates to a tension balancer that always applies an appropriate tension to an overhead line, particularly an overhead train line such as a trolley line, a suspension line, and an auxiliary suspension line, and an auxiliary device for installing the tension balancer on the overhead line.
  • an overhead train line such as a trolley line, a suspension line, and an auxiliary suspension line
  • an auxiliary device for installing the tension balancer on the overhead line.
  • Such spring type tension balancers include a coil spring type tension balancer and a gas spring type tension balancer (see Patent Documents 1 and 2).
  • FIG. 12 is a schematic view showing a simplified work in installing a general tension balancer.
  • a hollow rod 113 is drawn out in advance by a predetermined size using a shimmer (stretcher) 200, a yoke 201 and a wire 202, Install with the spring compressed.
  • a shackle-shaped connecting portion (also referred to as a puller) 101 is provided at the tip of the hollow rod 113 of the tension balancer 100.
  • the shackle-shaped connecting portion 101 has a yoke into which a yoke 201 is inserted.
  • a through hole 102 is provided.
  • the yoke 201 is inserted into the yoke through hole 102, the wire 202 is inserted into the shimmer wire insertion hole 203 provided in the yoke 201, the wire 202 is wound up by the shimmer 200, and the hollow rod 113 is pulled out.
  • the tension balancer 100 is installed by locking the overhead train line to the shackle-like connecting portion 101.
  • the installation of the tension balancer 100 on the overhead train line is performed in a short time while avoiding the passage time of late-night trains where there is usually little train operation. Further, since the work is performed at a high place, the burden on the worker is large. In particular, the burden on the worker is large when the wire 202 is wound up by the shimmer 200 or the like. Therefore, if the hollow rod 113 is fixed in a state in which a predetermined dimension is drawn in advance at the time of factory shipment, the burden on the worker can be reduced and work efficiency can be improved.
  • Patent Document 3 a tension balancer fixing device 1 is proposed.
  • the fixing device 1 is fixed to the tension balancer 100 by a semicircular contact member 2 and a pressing band 5 that presses the opposite side of the contact member 2. Therefore, in order to remove the fixing device 1 after the tension balancer 100 is installed, it is necessary to remove a total of four bolts, that is, the bolts at both ends of the fixing yoke 4 and the bolts fixing the pair of pressure-resistant rods 3 to the ear 2a. (See Patent Document 3), the working efficiency is not improved so much.
  • the object of the present invention is to provide an inexpensive tension balancer installation auxiliary device and overhead wire tension balancer that can improve work efficiency.
  • a fixed cylinder having both ends opened, a slit and a pair of first openings, and a yoke, the one end of the fixed cylinder abuts against a casing of a tension balancer.
  • the tension balancer installation aid wherein the yoke is mounted through the pair of first through holes and the pair of first openings of the shackle-like connecting portion of the tension balancer.
  • a tension balancer mounted through each of the through holes, and the fixing member is mounted through each of the 2n pairs of second openings and each of the n pairs of second through holes.
  • a casing a rod having a shackle-like connecting portion for locking to an overhead wire, a rod disposed in the casing, an installation assisting device including a fixed cylinder and a yoke.
  • the shackle-shaped connecting portion has a pair of first through holes
  • the fixed tube has open both ends, a slit having a width larger than the width of the overhead wire, and a pair of first And one end of the yoke is disposed in contact with the casing, and the yoke is mounted through each of the pair of first through holes and the pair of first openings of the rod.
  • a casing, a shackle-shaped connecting portion for locking to an overhead wire, a rod disposed in the casing, a fixed cylinder, a yoke, and a fixing member are included.
  • the yoke has n pairs of second through holes and passes through each of the pair of first through holes of the rod.
  • the rod is pulled out of the casing by a first length such that each of the n pairs of second through-holes of the mounted yoke is coaxial with each of the 2n pairs of second openings.
  • the fixing member has a second opening and a pair of 2n pairs.
  • Tension balancer is provided, characterized in that it is mounted through the respective second through hole of the n pairs.
  • the present invention provides an inexpensive tension balancer installation auxiliary device and overhead wire tension balancer that can improve work efficiency.
  • FIG. 4 is a sectional plan view of a tension balancer installation assisting device according to an embodiment of the present invention
  • FIG. 4 is a vertical sectional view.
  • FIG. 1 is a schematic view of a tension balancer installation assisting device according to an embodiment of the present invention.
  • FIG. 2 is a schematic view of the tension balancer installation assisting device according to the embodiment of the present invention as viewed from below.
  • 3 and 4 are schematic cross-sectional views of the tension balancer installation assisting device according to the embodiment of the present invention.
  • FIG. 3 is a plan cross-sectional view and
  • FIG. 4 is a vertical cross-sectional view.
  • FIG. 5 is a schematic plan view of the tension balancer installation auxiliary device according to the embodiment of the present invention as viewed from the front end side.
  • FIG. 1 is a schematic view of a tension balancer installation assisting device according to an embodiment of the present invention.
  • FIG. 2 is a schematic view of the tension balancer installation assisting device according to the embodiment of the present invention as viewed from below.
  • 3 and 4 are schematic cross-sectional views of the tension balancer installation assisting device according to the embodiment of the present invention.
  • FIG. 3
  • a tension balancer installation assisting device 1 includes a substantially fixed cylinder 10 and a yoke 20.
  • the tension balancer installation assisting device 1 is disposed so that the fixed cylinder 10 contacts the casing 110 as shown in FIG.
  • the yoke 20 is a shackle provided at the tip of the pair of first openings 40 and the rod 113 provided with the fixed cylinder 10 in a state where the middle cylinders 111 and 112 and the rod 113 of the tension balancer 100 are pulled out from the casing 110.
  • the fixed cylinder 10 is a cylindrical member having both ends opened, and a slit 30 having a predetermined width is formed.
  • the tension balancer 100 to which the fixed cylinder 10 is attached is the tension balancer 100 in which a plurality of cylindrical cylinders are telescopically arranged, and therefore the fixed cylinder 10 is also cylindrical. It is done.
  • the diameter of the fixed cylinder 10 is formed smaller than the diameter of the casing 110 of the tension balancer 100 to be mounted. This is because when the fixed cylinder 10 is attached to the tension balancer 100, the opened one end is in contact with the casing 110 so as not to fall off from the casing 110 side.
  • the shape of the fixed cylinder 10 is preferably a cylinder having the same shape as that of the tension balancer 100 to be mounted, but is not limited thereto.
  • the shape of the tension balancer 100 and the shape of the fixed tube 10 may be different as long as one end of the fixed tube 10 contacts the casing 110 and does not fall off from the tension balancer 100 side.
  • the slit 30 having the predetermined width is formed and used regardless of the shape of the fixed cylinder 10.
  • the slit 30 is a slit for removing the fixed cylinder 10 from the overhead wire when the tension balancer 100 is locked to the overhead wire and the installation is completed. Therefore, the width W of the slit is set to be larger than the width of the overhead line on which the tension balancer 100 is installed, and is appropriately set according to the width of the overhead line. As shown in FIGS. 4 and 5, in the case of the tension balancer 100 in which the scale plate 121 and the pointer plate are mounted via the support arm 120 in order to display the tension of the tension balancer 100, etc. A slit width W is set in consideration of the size of.
  • first openings 40 having a predetermined shape are coaxially arranged in the radial direction of the fixed cylinder 10 on the one end side where the fixed cylinder 10 is opened.
  • the first opening 40 has a yoke 20 for pulling out and locking a hollow rod (hereinafter simply referred to as a rod) 113 of the tension balancer 100 by a predetermined length.
  • a rod hollow rod
  • the shape of the first opening 40 is set corresponding to the shape of the yoke 20 and can be changed as appropriate. Also, as shown in FIG.
  • the size of the first opening 40 is set slightly larger so that the yoke 20 can be easily attached, and a large play is provided particularly in the horizontal direction.
  • the tension balancer 100 When the tension balancer 100 is installed, the weight of the overhead wire is applied to the rod 113. Therefore, it is for ensuring the sliding ability of the yoke 20 in the horizontal direction and facilitating the installation work. Another reason is to enable the yoke 20 to slide in the horizontal direction when the tension balancer 100 is installed with the tension balancer installation auxiliary device 1.
  • the first opening 40 corresponds to a point where the first through hole 102 opened in the shackle-like connecting member 101 attached to the rod 113 is located when the rod 113 is pulled out from the casing 110 having the first length.
  • the fixed cylinder 10 is disposed. That is, the casing-side end of the first opening 40 is located at the casing-side 110 end of the first through-hole 102 in a state where the rod 113 is not pulled out from the one end contacting the casing 110 of the fixed cylinder 10. It is established so as to be located at a position of a length obtained by adding the length of the rod 113 drawn out at the time of shipment to the length of the rod 113 (this corresponds to the first length).
  • the first opening 40 and the first through hole 102 are positioned in a line, and the yoke 20 is placed in the first opening 40 and the first through hole 102. Each of these can be easily inserted through. Note that the position where the first opening 40 is opened is appropriately changed according to the required length of the rod 113 to be pulled out.
  • an eye nut 50 may be provided at a position facing the slit 30 of the fixed cylinder 10.
  • the eye nut 50 is a member that locks a wire or the like that connects the fixed cylinder 10 to an overhead wire so that the fixed cylinder 10 does not fall during operation.
  • a through hole is provided in the fixed cylinder 10
  • a yoke anchoring member 60 such as a wire is provided, and one end of the wire is provided in the yoke 20. You may connect to the hole 21.
  • Some yokes 20 are pre-arranged with shimmer wire insertion holes, in which case the shimmer wire insertion holes can be diverted.
  • the yoke 20 extends from the tension balancer 100 through the pair of first through holes 102 of the shackle-like connecting portion 101 provided in the rod 113 of the tension balancer 100 and the pair of first openings 40 provided in the fixed cylinder 10. It is a member for locking the drawn-out rod 113 at a predetermined position.
  • the conventional tension balancer 100 is installed by using the shimmer 2000, the yoke 201, the wire 202, and the like to pass the yoke 201 through the first through-hole 102 of the shackle-like connecting portion 101 and wire the both ends of the yoke. 202 was hung and pulled by Shimmer 200.
  • the yoke 20 of the tension balancer installation auxiliary device may use the conventional yoke 201. Further, in order to use the yoke 201 in the installation work as described above, the shackle-like connecting portion 101 is provided with a pair of first through holes 102. Therefore, the tension balancer installation assisting device 1 according to the embodiment of the present invention can be used without applying new processing to the tension balancer 100. Furthermore, in order to prevent the yoke 20 from falling off, a bolt 70 or the like may be inserted into the through hole 21 and stopped with a nut 71 to restrict the movement of the yoke 20 in the width direction.
  • the fixed cylinder 10 and the yoke 20 are formed using a structural steel pipe such as SS400 or STK400, and the surface is plated for rust prevention.
  • the material of the fixed cylinder 10 is not limited to this, and is appropriately changed according to the repulsive force of the spring of the tension balancer related to the drawn rod 113. Further, if a galvanized steel pipe is used instead of the structural steel pipe described above, the plating process can be omitted.
  • the shape of the fixed cylinder 10 is circular, but is not limited to this. As described above, as long as one end portion of the fixed cylinder 10 is in contact with the casing 110 and does not fall off from the tension balancer 100 side, for example, an elliptical shape, a triangular prism shape, a quadrangular prism shape such as a quadrangular prism shape may be used.
  • the rod 113 is pulled out from the casing 110 in advance by a predetermined length set according to the tension required for the overhead wire to be installed. It is fixed by the tension balancer installation auxiliary device 1.
  • the fixed cylinder 10 is mounted from the front end side of the completed tension balancer 100.
  • a wire is disposed in the overhead wire locking hole 103 at the tip of the shackle-like connecting portion 101, and the rod 113 is pulled out of the casing 110 by a predetermined length by mechanically pulling the wire.
  • the elastic means such as a spring disposed in the tension balancer 100 is in a compressed state.
  • the pair of first openings 40 provided in the fixed cylinder 10 are positioned substantially horizontally with the pair of first through holes 102 of the shackle-like connecting portion 101 when the rod 113 is pulled out of the casing 110 with a predetermined length. It is formed as follows.
  • the rod 113 when the rod 113 is pulled out of the casing 110 having a predetermined length, the four of the first opening 40 and the first through hole 102 are arranged in a line. In this state, the yoke 20 is inserted so as to penetrate the four. When the pulling is stopped, the rod 113 is pulled back toward the casing 110 by the repulsive force of the elastic means disposed in the tension balancer 100. The yoke 20 comes into contact with the end portions of the first opening 40 and the first through hole 102 on the casing 110 side, and the pullback of the rod 113 is stopped. If the wire is removed from the overhead wire locking hole 103, the tension balancer 100 can be shipped with the rod 113 pulled out by a predetermined length.
  • the tension balancer 100 when the tension balancer 100 is installed on an overhead wire, the tension balancer 100 is first attached to the column via a fixing member such as a shackle-like connecting member provided at the rear end of the tension balancer 100.
  • the wire 202 is connected to the yoke 20, and the rod 113 is further pulled by the shimmer 200 and installed on the overhead wire.
  • the weight of the overhead wire is applied to the rod 113 of the installed tension balancer 100, and the rod 113 is pulled to the overhead wire side.
  • the first through hole 102 also moves to the overhead wire side, and the yoke 20 is released from contact with the casing side end of the first opening 40.
  • the wire is removed, and the yoke 20 is further removed.
  • the fixed cylinder 10 is movable. Therefore, the fixed cylinder 10 is moved to the overhead line side, and the fixed cylinder 10 is removed from the overhead line using the slit 30.
  • the tension balancer installation auxiliary device 1 can be easily removed.
  • the installation work of the tension balancer 100 requires that the rod 113 be pulled out of the casing having a necessary length using the shimmer 200 or the like. Therefore, if the rod 113 is pulled out to a necessary length in advance, the work at the site is greatly reduced.
  • the tension balancer installation assisting device 1 has a simple structure and the tension balancer installation assisting device 1 that can reduce the burden of installation work on site. Can be provided. Moreover, the tension balancer 100 in which such an apparatus is installed can be provided. Therefore, it is possible to greatly reduce the burden of installation work at the site and improve work efficiency. This is particularly effective for a tension balancer for an overhead train line that works while driving between vehicles at night when there is little vehicle operation.
  • the tension balancer installation assisting device 1 since the tension balancer installation assisting device 1 according to the embodiment of the present invention has a simple configuration, the cost can be greatly suppressed as compared with the conventional assisting device.
  • the yoke 20 can be used as the yoke 201 used in the general shimmer 200, and is effective in cost reduction.
  • the fixed cylinder 10 can also be formed using a general steel pipe, a cost is suppressed also in this point. This also leads to the suppression of the cost increase of the tension balancer provided with the tension balancer installation assist device. Therefore, it can be said that the tension balancer 100 according to the embodiment of the present invention is a tension balancer that improves installation work efficiency at a low cost.
  • the rod 113 drawn out from the casing 110 of a predetermined length is fixed by one yoke 20.
  • the fixed force of the rod 113 to the casing 110 is applied to the fixed rod 113.
  • the movement of the yoke 20 is restricted at the ends of the pair of first openings 40 on the casing 110 side. Accordingly, the force concentrates on the ends of the pair of first openings 40 on the casing 110 side. Therefore, in order to disperse this force, the number of pairs of the first openings 40 is considered, and the yoke 20 may be arranged according to the number of pairs of the first openings 40.
  • FIG. 7 is a schematic view of a tension balancer installation auxiliary device 1 according to the second embodiment of the present invention.
  • the tension balancer installation assisting apparatus 1 according to the second embodiment of the present invention is an embodiment in which two yokes 20 are arranged and the number of pairs of the first openings 40 is two pairs, as shown in FIG. is there.
  • the tension balancer installation auxiliary device 1 according to the second embodiment will be described with reference to the drawings. In the description, duplicate description is omitted.
  • the tension balancer installation assisting device 1 includes two pairs of first openings 40 a and 40 b in the fixed cylinder 10.
  • two pairs of first through holes 102 installed in the shackle-like connecting portion 102 of the tension balancer 100 are also provided. Therefore, when using the tension balancer installation assisting device 1, it is necessary to dispose the shackle-like connecting portion 102 corresponding to the tension balancer 100.
  • yokes 20A and 20B are disposed.
  • the two pairs of first openings 40a and 40b are formed at a certain distance so that the central axes in the horizontal direction are the same and the central axes are parallel to the radial direction of the fixed cylinder 10. Is done.
  • the shapes and sizes of the two pairs of openings are basically the same, but are not limited thereto. One shape may be different from the other, or one size may be different from the other. However, in this case, the two pairs of first through-holes 102 of the shackle-like connecting portion 102 have a corresponding shape and size.
  • the two yokes 20A and 20B are appropriately selected according to the first openings 40a and 40b.
  • Each yoke 20 ⁇ / b> A, 20 ⁇ / b> B may have a through hole 21.
  • the yoke anchoring member 60 may be disposed in each of the yokes 20A and 20B.
  • wearing and removal method of the installation assistance apparatus 1 for tension balancers which concerns on the 2nd Embodiment of this invention is the same as that of Embodiment 1 mentioned above, description is abbreviate
  • the tension balancer 100 having the above configuration and having the tension balancer installation assisting device 1 and the tension balancer installation assisting device 1 according to the second embodiment of the present invention has two pairs of first openings 40a and 40b. Since the movement of the yokes 20A and 20B is locked at the end of the casing 110, the rod 113 can be fixed securely. Moreover, it is stronger than the tension balancer installation auxiliary device 1 according to the first embodiment against the breakage of the fixed cylinder 10. Therefore, in order to reduce the weight, the thickness of the fixed cylinder 10 can be reduced, or a notch or a through opening can be provided in the fixed cylinder 10.
  • the rod 113 can be securely fixed in the pulled-out state.
  • FIG. 8 is a schematic view of a tension balancer installation assisting device 1 according to the third embodiment of the present invention.
  • the tension balancer installation assisting device 1 according to the present embodiment does not have the first opening 40 in the fixed cylinder 10 unlike the first embodiment.
  • the fixed cylinder 10 has 2n (n is a natural number) pairs of second openings 41.
  • the yoke 20 is locked with the bolt 80 and the nut 81.
  • FIG. 8 although it locks with the U-shaped volt
  • the rear end portion of the tension balancer is opened, and a bottom plate is disposed in the casing 110, and the movement of the bottom plate is described with U-bolts and nuts. Therefore, if this U-shaped bolt and nut can be diverted, the cost can be further reduced. Therefore, the U-shaped bolt 80 and the nut 81 are preferably used.
  • the second opening 41 is coaxially arranged in the radial direction and is disposed in contrast.
  • the yoke 20 is provided with n (n is a natural number) pairs of through holes 22 arranged in accordance with the interval between 2n (n is a natural number) pair of second openings 41.
  • the yoke 20 is attached to the shackle-like connecting portion 102, and then the fixed cylinder 10 is attached to the tension balancer 100.
  • the rod 113 is mechanically pulled through the yoke 20 and the second opening 41 and the through hole 22 are lined up in a row, and a U-bolt is attached so as to pass through the second opening 41 and the through hole 22. Fasten with nut 81.
  • the rod 113 is pulled toward the casing 110, but the movement is described in the 2n second opening.
  • the movement of the U-shaped bolt 80 is restricted by the four second openings 41. Since the forces related to the four second openings 41 are dispersed, the fixed cylinder 10 can be prevented from being damaged. Further, since the fixed cylinder 10 is not provided with a large opening, the strength of the fixed cylinder 10 itself can be ensured.
  • the tension balancer installation assisting device 1 is used for the tension balancer 100 installed on an overhead train line.
  • the tension balancer for overhead train lines requires a large tension, and therefore the weight of the tension balancer 100 is very heavy.
  • the tension balancer 100 for Shinkansen overhead wires has a total length of 750 mm or more and a weight exceeding 20 kg. Therefore, if the weight of the tension balancer installation auxiliary device 1 is heavy, work efficiency is deteriorated.
  • the total weight of the tension balancer installation auxiliary device 1 depends on the weight of the fixed cylinder 10. Therefore, it is conceivable to reduce the weight of the fixed cylinder 10. However, on the other hand, since a very large force is applied to the fixed cylinder 10, it is necessary to ensure the strength as well.
  • a notch portion 11 is provided in the fixed cylinder 10. If the cutout portion 11 is provided in the upper portion having little influence on the first opening 40 that supports the yoke 20, the weight can be suppressed.
  • the arrangement position of the notch 11 is not limited to the upper part, and the arrangement number is not limited to one. If the necessary number of notches 11 are appropriately provided at positions where the strength can be ensured, the weight can be further suppressed.
  • FIG. 10 shows still another modified embodiment of the fixed cylinder 10.
  • a large number of through openings 12 are arranged in the fixed cylinder 10 like a muffler used in a motorcycle or the like.
  • the plurality of through openings 12 are arranged in a plurality of rows, but the present invention is not limited to this and can be changed as appropriate.
  • FIG. 11 shows still another modified embodiment of the fixed cylinder 10. In this embodiment, a plurality of through-openings 12 having the same shape are arranged in a mesh shape. The weight of the fixed cylinder 10 can also be reduced by such an arrangement method.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)
  • Warping, Beaming, Or Leasing (AREA)

Abstract

作業効率を向上させることができ、かつ、安価なテンションバランサ用設置補助装置及び架空線用テンションバランサを提供する。本発明によって、開口された両端部、スリット30及び一対の第1開口40を有する固定筒10と、ヨーク20と、を備え、前記固定筒は、一端部がテンションバランサ100のケーシング110に当接して配設され、前記ヨークは、前記テンションバランサのシャックル状連結部101の一対の第1貫通孔102及び前記一対の第1開口のそれぞれを貫通して装着されることを特徴とするテンションバランサ用設置補助装置1。

Description

架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置
本発明は、架空線、特にトロリ線、吊架線、補助吊架線等の架空電車線に常時適当な張力を付与するテンションバランサ及び前記テンションバランサを架空線に設置する際の補助装置に関する。
 架空電車線には、電車の安全走行を維持するために、常時適当な張力を付与して当該架空電車線の弛みや切断等を防止することが行われる。気温の変動による伸びや支柱等の傾倒によって架空電車線の張力が変化すると、事故等の原因ともなるからである。かかる目的のために、一般的に、架空電車線にはばね式のテンションバランサや滑車式テンションバランサが設置されるが、コンパクトで取り扱い易いため、近年はばね式テンションバランサの需要が増大している。
 かかるばね式テンションバランサには、コイルばね式テンションバランサやガスばね式テンションバランサがある(特許文献1、2参照)。
 ここで、テンションバランサの架空電車線への設置について説明する。図12は、一般的なテンションバランサの設置の際の作業の簡略を示す概観図である。いずれのテンションバランサ100も、架空電車線へ設置する際には、図12に示すように、シメラー(張線器)200、ヨーク201及びワイヤ202を用いて予め中空ロッド113を所定寸法引き出して、ばねを圧縮させた状態で設置する。架空電車線への設置のために、テンションバランサ100の中空ロッド113先端には、シャックル状連結部(引手ともいう。)101が設けられ、シャックル状連結部101には、ヨーク201を挿入するヨーク貫通孔102が設けられている。ヨーク貫通孔102にヨーク201を挿入し、ヨーク201に設けられたシメラーワイヤ挿入孔203にワイヤ202を挿入してシメラー200でワイヤ202を巻き上げ、中空ロッド113を引き出す。シャックル状連結部101に架空電車線を係止することでテンションバランサ100が設置される。
 このテンションバランサ100の架空電車線への設置は、通常列車の運行が少ない深夜の列車の通過時間帯を避けながら短時間で行われる。また、高所での作業となるため作業員の負担が大きく、特にシメラー200等でワイヤ202を巻き上げる作業は作業員の負担が大きい。そこで、工場出荷時に、予め中空ロッド113が所定寸法引きだされた状態で固定されていれば、かかる作業員の負担が軽減され作業効率の向上を図ることができる。
 そこで、特許文献3において、テンションバランサの固定装置1が提案されている。しかし、この固定装置1は、当該特許文献3の図3に示されたように、半円状の当接部材2と当接部材2の反対側を押さえる押さえバンド5によってテンションバランサ100に固定されるため、テンションバランサ100の設置後に当該固定装置1を取り外すために、固定ヨーク4両端のボルトと、一対の抗圧杆3をイヤ2aに固定しているボルトの合計4個のボルトを取り外す必要があり(特許文献3参照)、作業効率があまり改善されない。また、この固定装置は、回収して再使用することを前提に開発されたため、非常に高価であり、また、ユーザーは、次の回収まで固定装置を保管する必要があり、特に新幹線の架空電車線用の固定装置は全長500mm以上と大きいため、保管場所の問題も生じる。
特開2008-114850号公報 特開2000-255288号公報 特開2004-42780号公報
 本発明は、作業効率を向上させることができ、かつ、安価なテンションバランサ用設置補助装置及び架空線用テンションバランサを提供することを目的とする。
 本発明の一実施形態によれば、開口された両端部、スリット及び一対の第1開口を有する固定筒と、ヨークと、を備え、前記固定筒は、一端部がテンションバランサのケーシングに当接して配設され、前記ヨークは、前記テンションバランサのシャックル状連結部の一対の第1貫通孔及び前記一対の第1開口のそれぞれを貫通して装着されることを特徴とするテンションバランサ用設置補助装置が提供される。
 本発明の一実施形態によれば、開口された両端部、架空線の幅より大きい幅を有するスリット及び2n(nは自然数)対の第2開口を有する固定筒と、n対の第2貫通孔を有するヨークと、固定部材と、を備え、前記固定筒は、一端部がテンションバランサのケーシングに当接して配設され、前記ヨークは、前記テンションバランサのシャックル状連結部の一対の第1貫通孔のそれぞれを貫通して装着され、前記固定部材は、前記2n対の第2開口のそれぞれ及び前記n対の第2貫通孔のそれぞれを貫通して装着されることを特徴とするテンションバランサ用設置補助装置が提供される。
 本発明の一実施形態によれば、ケーシングと、架空線に係止するためのシャックル状連結部を有し、前記ケーシング内に配設されるロッドと、固定筒及びヨークを含む設置補助装置と、を備え、前記シャックル状連結部は、一対の第1貫通孔を有し、前記固定筒は、開口された両端部と、前記架空線の幅より大きい幅を有するスリットと、一対の第1開口とを有し、一端部が前記ケーシングに当接して配設され、前記ヨークは、前記ロッドの前記一対の第1貫通孔及び前記一対の第1開口のそれぞれを貫通して装着されることを特徴とするテンションバランサが提供される。
 本発明の一実施形態によれば、ケーシングと、架空線に係止するためのシャックル状連結部を有し、前記ケーシング内に配設されるロッドと、固定筒、ヨーク及び固定部材を含む設置補助装置と、を備え、前記シャックル状連結部は、一対の第1貫通孔を有し、前記固定筒は、開口された両端と、スリットと、2n(nは自然数)対の第2開口とを有して、一端部が前記ケーシングに当接して配設され、前記ヨークは、n対の第2貫通孔を有して、前記ロッドの前記一対の第1貫通孔のそれぞれを貫通して装着され、前記ロッドは、装着された前記ヨークの前記n対の第2貫通孔のそれぞれが前記2n対の第2開口のそれぞれと同軸上に位置するように前記ケーシングから第1の長さ引き出され、前記固定部材は、前記2n対の第2開口及び前記n対の第2貫通孔のそれぞれを貫通して装着されることを特徴とするテンションバランサが提供される。
 本発明によって、作業効率を向上させることができ、かつ、安価なテンションバランサ用設置補助装置及び架空線用テンションバランサが提供される。
本発明の一実施の形態に係るテンションバランサ用設置補助装置の概略図である。 本発明の一実施の形態に係るテンションバランサ用設置補助装置を下側から見た概略図である。 本発明の一実施の形態に係るテンションバランサ用設置補助装置の平面断面図、図4が垂直断面図である。 本発明の一実施の形態に係るテンションバランサ用設置補助装置の垂直断面図である。 本発明の一実施の形態に係るテンションバランサ用設置補助装置の先端側から見た概略平面図である。 本発明の一実施の形態に係るテンションバランサ用設置補助装置の固定筒10の概略図である。 本発明の第2の実施の形態に係るテンションバランサ用設置補助装置1の概略図である。 本発明の第3の実施の形態に係るテンションバランサ用設置補助装置1の概略図である。 本発明に係るテンションバランサ用設置補助装置1の固定筒10の変形実施例を示す図である。 本発明に係るテンションバランサ用設置補助装置1の固定筒10の変形実施例を示す図である。 本発明に係るテンションバランサ用設置補助装置1の固定筒10の変形実施例を示す図である。 一般的なテンションバランサの設置の際の作業の簡略を示す概観図である。
  1:テンションバランサ用設置補助装置
 10:固定筒
 20:ヨーク
 30:スリット
 40:第1開口
 41:第2開口
100:テンションバランサ
101:シャックル状連結部
102:第1貫通孔
110:ケーシング
113:ロッド
 以下、本発明の実施の形態を、図面を参照しつつ、説明する。なお、実施の形態において、同一構成要素には同一符号を付け、実施の形態の間において重複する説明は省略する。
(第1の実施形態)
[設置補助装置の構成]
 図1は、本発明の一実施の形態に係るテンションバランサ用設置補助装置の概略図である。図2は、本発明の一実施の形態に係るテンションバランサ用設置補助装置を下側から見た概略図である。また、図3、図4は、本発明の一実施の形態に係るテンションバランサ用設置補助装置の概略断面図であり、図3が平面断面図、図4が垂直断面図である。更に図5は、本発明の一実施の形態に係るテンションバランサ用設置補助装置の先端側から見た概略平面図である。また更に、図6は、本発明の一実施の形態に係るテンションバランサ用設置補助装置の固定筒10の概略図である。図1に示すように、本発明の一実施の形態に係るテンションバランサ用設置補助装置1は、概略固定筒10及びヨーク20から構成される。そして、本テンションバランサ設置補助装置1は、図2に示すように、固定筒10がケーシング110に当接するように配設される。また、ヨーク20は、テンションバランサ100の中筒111及び112及びロッド113がケーシング110から引き出された状態で、固定筒10の設けられた一対の第1開口40及びロッド113先端に設けられたシャックル状連結部101の一対の第1貫通孔102を貫通する状態で装着される。ヨーク20が、第1開口40及び第1貫通孔102を貫通している状態は、図3から把握される。また、図5から、ヨーク20が第1開口40を貫通している状況が把握される。
 固定筒10は、両端が開口した筒状の部材で、所定の幅を有するスリット30が形成されている。本実施の形態においては、固定筒10が装着されるテンションバランサ100が、円筒形の複数の筒がテレスコピック状に配設されたテンションバランサ100であるため、固定筒10も円筒形のものが用いられる。固定筒10の径は、装着するテンションバランサ100のケーシング110の径より小さく形成される。これは、固定筒10をテンションバランサ100に装着した場合に、開口された一端部が、ケーシング110に当接して、ケーシング110側から抜け落ちないようにするためである。また、固定筒10の形状は、装着されるテンションバランサ100の形状と同一形状の筒が好適に用いられるが、これに限定されるわけではない。固定筒10の一端部がケーシング110に当接してテンションバランサ100側から抜け落ちなければ、テンションバランサ100の形状と固定筒10の形状が異なる形状であってもよい。但し、固定筒10がいかなる形状であっても、上述した所定の幅を有するスリット30を形成して用いる。
 このスリット30は、テンションバランサ100を架空線に係止して設置が終了した段階で、固定筒10を架空線から取り外すためのスリットである。従って、スリットの幅Wは、テンションバランサ100が設置される架空線の幅より大きな幅に設定され、架空線の幅に応じて適宜設定される。なお、図4及び図5に示されるように、テンションバランサ100の張力等を表示するために、目盛板121や指針板等が支持アーム120を介して装着されているテンションバランサ100の場合、これらの大きさを考慮されたスリット幅Wが設定される。
 また、固定筒10の開口された一端部側には、所定の形状の第1開口40が、固定筒10の径方向に互いに同軸をなし対照的に一対配置される。第1開口40は、製造されたテンションバランサ100の設置作業を軽減するために、テンションバランサ100の中空ロッド(以下、単にロッドという)113を所定の長さ引き出して係止するためのヨーク20を挿入する開口である。従って、第1開口40の形状は、ヨーク20の形状に対応して設定され、適宜変更され得る。また、図4に示すように、第1開口40の大きさはヨーク20を装着しやすいように若干大きめに設定され、特に水平方向に大きな遊びを設けている。テンションバランサ100の設置時にロッド113には、架空線の重量等が掛かる。従って、ヨーク20の水平方向への摺動能力を確保して、設置作業をしやすくするためである。また、テンションバランサ100に、本テンションバランサ用設置補装置1を設置する際の、ヨーク20の水平方向への摺動を可能にするためでもある。
 また第1開口40は、ロッド113が第1の長さケーシング110から引き出された際に、ロッド113に付属するシャックル状連結部材101に開口された第1貫通孔102が位置する地点に対応して固定筒10に配設される。即ち、第1開口40のケーシング側の端部は、固定筒10のケーシング110に当接する一端部から、ロッド113を引き出さない状態において第1貫通孔102のケーシング側110の端部が位置するケーシング110からの長さに出荷時に求められるロッド113の引き出しの長さ(これが、第1の長さに相当する)を加算した長さの位置に位置するように開設される。従って、出荷時に前記所定の長さロッド113を引き出せば、第1開口40と第1貫通孔102とは、ほぼ一列に位置することになり、ヨーク20を第1開口40及び第1貫通孔102のそれぞれを貫通して容易に装着することができる。なお、第1開口40が開設される位置は、要求されるロッド113の引き出しの長さに応じて適宜変更される。
なお、図6に示すように、固定筒10のスリット30に対向する位置に、アイナット50を設けてもよい。アイナット50は、作業時に固定筒10が落下等しないように、固定筒10を架空線に繋ぎとめるワイヤ等を係止する部材である。また、図3に示すように、ヨーク20の落下を防止するために、固定筒10に貫通孔を設け、ワイヤ等のヨーク繋留部材60を配設し、ワイヤの一端をヨーク20に設けた貫通孔21に繋着してもよい。ヨーク20には、シメラーワイヤ挿入孔が予め配設されているものもあり、その場合は、シメラーワイヤ挿入孔を流用できる。
 ヨーク20は、テンションバランサ100のロッド113に設けられたシャックル状連結部101の一対の第1貫通孔102及び固定筒10に設けられた一対の第1開口40を貫通させて、テンションバランサ100から引き出されたロッド113を所定の位置で係止するための部材である。上述したように、従来テンションバランサ100の設置作業は、シメラー2000、ヨーク201、ワイヤ202等を用いて、シャックル状連結部101の第1貫通孔102にヨーク201を貫通させ、ヨークの両端にワイヤ202を掛けてシメラー200で牽引して設置していた。従って、本発明に係るテンションバランサ用設置補助装置のヨーク20は、かかる従来品のヨーク201を流用してもよい。また、上述のように設置作業においてヨーク201を使用するため、シャックル状連結部101には、一対の第1貫通孔102が設けられている。よって、本願発明の一実施の形態に係るテンションバランサ用設置補助装置1は、テンションバランサ100に新たな加工を施すことなく使用することができる。更に、ヨーク20が抜け落ちるのを防止するために、貫通孔21にボルト70等を挿入してナット71で止めて、幅方向へのヨーク20の移動を規制してもよい。
 本実施の形態においては、固定筒10及びヨーク20は、SS400又はSTK400等の構造用鋼管を用いて形成し、防錆のため表面をめっき処理して用いている。固定筒10の材質はこれに限定されず、引き出されたロッド113に係るテンションバランサのばねの反発力等に応じて適宜変更される。また、上述した構造用鋼管に変えて、亜鉛めっき鋼管を用いれば、めっき処理を省略することが可能である。
 また、本実施の形態において、固定筒10の形状は、円形に形成しているが、これに限定されるわけではない。上述したように固定筒10の一端部がケーシング110に当接してテンションバランサ100側から抜け落ちない大きさであれば、例えば、楕円形状や三角柱、四角柱等の多角柱状であってもよい。
[設置補助装置の装着及び取り外し]
 上述した構成有する本発明に一実施の形態に係るテンションバランサ用設置補助装置1の、装着及び取り外しについて説明する。上述したように、本テンションバランサ用補助装置1は、テンションバランサ100の工場出荷時に装着される。
 テンションバランサ100の設置作業の負担を軽減するために、設置される架空線に必要とされる張力に応じてさだめられた所定の長さだけ予めロッド113をケーシング110から引き出して、その状態で本テンションバランサ用設置補装置1によって固定される。
 まず、完成したテンションバランサ100の先端側から、固定筒10を装着する。次に、シャックル状連結部101の先端の架空線係止孔103にワイヤを配設し、ワイヤを機械的に牽引してロッド113を所定の長さケーシング110から引き出す。この時、テンションバランサ100に配設されたばね等の弾性手段は、圧縮された状態となる。固定筒10に設けた一対の第1開口40は、ロッド113が所定の長さケーシング110から引き出された際に、シャックル状連結部101の一対の第1貫通孔102とほぼ水平の位置になるように形成されている。従って、ロッド113を所定の長さケーシング110から引き出すと、第1開口40と第1貫通孔102の4つは、ほぼ一列に並ぶ。この状態で、ヨーク20をこの4つを貫通するように挿入する。牽引を中止すると、ロッド113はテンションバランサ100内に配設された弾性手段の反発力でケーシング110方向に引戻される。ヨーク20が第1開口40及び第1貫通孔102のそれぞれのケーシング110側の端部に当接し、ロッド113の引戻しが停止させられる。ワイヤを架空線係止孔103から取り外せば、ロッド113が所定の長さ引き出された状態でテンションバランサ100を出荷することができる。
 一方、テンションバランサ100を架空線に設置する場合は、まずテンションバランサ100の後端部に設けられたシャックル状連結部材等の固定部材を介して、テンションバランサ100を支柱に取り付ける。次に、ヨーク20にワイヤ202を接続し、シメラー200でロッド113を更に牽引して、架空線に設置する。設置されたテンションバランサ100のロッド113には、架空線の重量等が掛かり、ロッド113は、架空線側に牽引される。これに伴って第1貫通孔102も架空線側に移動し、ヨーク20は、第1開口40のケーシング側の端部との当接が開放される。ワイヤを取り外し、更にヨーク20を取り外す。固定筒10が移動自在となる。従って固定筒10を架空線側に移動させ、スリット30を使用して固定筒10を架空線から取り外す。以上の操作によって、簡単に本テンションバランサ用設置補助装置1を取り外すことができる。特にテンションバランサ100の設置作業は、シメラー200等を使用してロッド113を必要な長さケーシングから引き出して設置することが必要となる。従って、予め必要な長さ近くまでロッド113が引き出されていれば、現場の作業が大幅に軽減される。
[効果]
 以上説明したように、本発明の一実施の形態に係るテンションバランサ用設置補助装置1は、簡単な構造で、現場での設置作業の負担を軽減することができるテンションバランサ用設置補助装置1を提供することができる。また、かかる装置が設置されたテンションバランサ100を提供することができる。従って、現場での設置作業の負担を大幅に軽減できる、作業効率の向上を図ることができる。特に、車両運行の少ない夜間に、車両の運行の合間をぬって作業する架空電車線用テンションバランサに大きな効果がある。
 また、本発明の一実施の形態に係るテンションバランサ用設置補助装置1は、簡単な構成であるため、従来の補助装置に比してコストを大幅に抑制できる。特に、ヨーク20は一般的なシメラー200に使用するヨーク201を流用することができるため、コスト抑制に有効である。また、固定筒10も、一般的な鋼管を使用して形成することができるため、この点でもコストが抑制される。これは、かかるテンションバランサ用設置補助装置を備えたテンションバランサのコスト上昇を抑制できることにも結びつく。従って、本願発明の一実施の形態に係るテンションバランサ100は、ローコストで設置作業効率が向上するテンションバランサであるといえる。
(第2の実施の形態)
 上述した実施の形態1に係るテンションバランサ用設置補助装置1は、1個のヨーク20で、所定の長さケーシング110から引き出されたロッド113を固定する。固定されたロッド113には、ロッド113はケーシング110に引戻す力が働く。この時、ヨーク20は一対の第1開口40のケーシング110側の端部で移動を規制される。従って、一対の第1開口40のケーシング110側の端部には力が集中することになる。そこで、この力を分散するために、第1開口40の対の数をし、ヨーク20を第1開口40の対の数に応じて配設することが考えられる。図7は、本発明の第2の実施の形態に係るテンションバランサ用設置補助装置1の概略図である。本発明の第2の実施の形態に係るテンションバランサ用設置補助装置1は、図7に示すように、ヨーク20を2個配設し、第1開口40の対数を2対とした実施形態である。以下、本第2の実施の形態に係るテンションバランサ用設置補助装置1について、図を基に説明する。なお、説明に当たっては、重複する説明を省略する。
 図7に示すように、本第2の実施の形態に係るテンションバランサ用設置補助装置1は、固定筒10に2対の第1開口40a、40bを有する。また、テンションバランサ100のシャックル状連結部102に設置される第1貫通孔102も、2対配設される。従って、本テンションバランサ用設置補助装置1を用いる場合には、テンションバランサ100に対応するシャックル状連結部102を配設する必要がある。更に、ヨーク20A、20Bが配設される。
 2対の第1開口40a、40bは、水平方向の中心軸が同一になるように、かつ、固定筒10の径方向にそれぞれの中心軸が平行となるように、ある程度の間隔をあけて形成される。2対の開口のそれぞれの形状及び大きさは基本的に同一とされるが、これに限定されるわけではない。一方の形状を他方と異なるものにし、あるいは一方の大きさを他方と異なる大きさとしてもよい。但しこの場合、シャックル状連結部102の2対の第1貫通孔102についても対応する形状及び大きさとされる。
 一方、2個のヨーク20A、20Bは、それぞれの第1開口40a、40bに応じて適宜選択される。それぞれのヨーク20A、20Bは、貫通孔21を有してもよい。また、それぞれのヨーク20A、20Bに
ヨーク繋留部材60を配設してもよい。なお、本発明の第2の実施の形態に係るテンションバランサ用設置補助装置1の装着及び取り外し方法は、上述した実施の形態1と同様であるので、説明を省略する。また、本テンションバランサ用設置補助装置1を装着すれば、本テンションバランサ用設置補助装置1を有するテンションバランサ100が提供される。
 以上のような構成を有する、発明の第2の実施の形態に係るテンションバランサ用設置補助装置1及び本テンションバランサ用設置補助装置1を有するテンションバランサ100は、2対の第1開口40a、40bのケーシング110側の端部でそれぞれのヨーク20A、20Bの移動を係止するので、ロッド113を確実に固定できる。また、固定筒10の破損に対して、第1の実施の形態に係るテンションバランサ用設置補助装置1よりも強い。従って、重量の軽減のために、固定筒10の肉厚を薄くでき、あるいは、固定筒10に切り欠き部や貫通開口を設けることの可能となる。
 また、二つのヨーク20A、20Bであるため、輸送時に一つのヨークが抜け落ちることがあっても、確実にロッド113を引き出した状態で固定できる。
(第3の実施の形態)
 更に、一対の第1開口40のケーシング110側の端部にかかる力を分散するために、別の実施形態について説明する。図8は、本発明の第3の実施の形態に係るテンションバランサ用設置補助装置1の概略図である。図8に示すように、判実施の形態に係るテンションバランサ用設置補助装置1は、第1の実施の形態と異なり、固定筒10に第1開口40を持たない。代わりに、固定筒10に2n(nは自然数)対の第2開口41を有する。そして、ヨーク20の係止を、ボルト80とナット81で行う。図8においては、U字ボルト80とナット81で係止しているが、これに限定されるわけではない。但し、図示していないが、一般的にテンションバランサの後端部は開口し、ケーシング110内に底板が配設され、U字ボルト及びナットで、底板の移動が記載される。従って、このU字ボルト及びナットを流用できれば、よりコストの削減につながるため、U字ボルト80及びナット81を好適に用いる。
 第2開口41は、径方向に同軸をなし対照的に配置される。また、ヨーク20には、2n(nは自然数)対の第2開口41間の間隔に合わせて配設された貫通孔22がn(nは自然数)対配設される。
 シャックル状連結部102にヨーク20を装着し、その後固定筒10をテンションバランサ100に装着する。ヨーク20にワイヤかけて機械的にロッド113を牽引し第2開口41及び貫通孔22が一列に並んだ状態で、U字ボルトを第2開口41及び貫通孔22を貫通するように装着し、ナット81で締結する。牽引を止め、ワイヤを外すと、ロッド113はケーシング110側に牽引されるが、2n対の第2開口で移動が記載される。U字ボルト80は、4つの第2開口41によって移動が規制されている。4つの第2開口41に係る力は分散されているため、固定筒10の破損等を防ぐことができる。また、固定筒10に大きな開口を設けないので、固定筒10の強度自体も確保することができる。
 なお、配設するU字ボルト80の個数を増やすことで、より強固に係止することができる。また、図1に示した、第1の実施の形態に係るテンションバランサ用設置補助装置1に、本実施の形態に係るU字ボルト80とナット81を更に付加して、固定を強固にしてもよい。
(変形実施例)
 上述した本発明の実施の形態1、第2の実施の形態及び第3の実施の形態に係るテンションバランサ用設置補助装置1の変形実施例について、図を基に説明する。図9から図11は、本発明に係るテンションバランサ用設置補助装置1の固定筒10の変形実施例を示す図である。
 上述したように、本発明に係るテンションバランサ用設置補助装置1は、架空電車線に設置されるテンションバランサ100に用いられる。架空電車線用のテンションバランサは、要求される張力が大きく、従ってテンションバランサ100の重量は、非常に重いものとなる。特に、新幹線の架空電線用のテンションバランサ100は、全長が750mm以上となり、また重量も20kgを超える。従って、テンションバランサ用設置補助装置1の重量が重ければ、作業効率を悪化させる。そして、本テンションバランサ用設置補助装置1の全重量は、固定筒10の重量に左右される。そこで、固定筒10を軽量化することが考えられる。しかし、一方で固定筒10には非常に大きな力が掛かるため、強度も併せて確保する必要がある。
 そこで、図9に示すように、固定筒10に切り欠き部11を設ける。ヨーク20を支える第1開口40に影響の少ない上部に切り欠き部11を設ければ、重量を抑制できる。但し、切り欠き部11の配設位置は上部に限定されるわけではなく、また、配設個数も1つに限定されない。強度を確保できる位置に適宜、必要な個数切り欠き部11を設ければ、より一層重量を抑制できる。
 図10は、固定筒10の更に別の変形実施例である。本変形実施例においては、固定筒10の強度を確保しながら軽量化を図るために、オートバイ等に用いられるマフラーのように、固定筒10に多数の貫通開口12を配設した。本実施例においては、複数の貫通開口12を列状に複数列配設しているが、これに限定されず、適宜変更可能である。また、図11は、固定筒10の更に別の変形実施例である。本実施例においては、同一形状の複数の貫通開口12をメッシュ状になるように配設した例である。このような配設方法によっても固定筒10の軽量化を図ることができる。

Claims (16)

  1.  開口された両端部、スリット及び一対の第1開口を有する固定筒と、
     ヨークと、を備え、
     前記固定筒は、一端部がテンションバランサのケーシングに当接して配設され、
     前記ヨークは、前記テンションバランサのシャックル状連結部の一対の第1貫通孔及び前記一対の第1開口のそれぞれを貫通して装着されることを特徴とするテンションバランサ用設置補助装置。
  2.  開口された両端部、架空線の幅より大きい幅を有するスリット及び2n(nは自然数)対の第2開口を有する固定筒と、
     n対の第2貫通孔を有するヨークと、
     固定部材と、を備え、
     前記固定筒は、一端部がテンションバランサのケーシングに当接して配設され、
     前記ヨークは、前記テンションバランサのシャックル状連結部の一対の第1貫通孔のそれぞれを貫通して装着され、
     前記固定部材は、前記2n対の第2開口のそれぞれ及び前記n対の第2貫通孔のそれぞれを貫通して装着されることを特徴とするテンションバランサ用設置補助装置。
  3.  前記固定筒は、前記ケーシングからの距離が最も近い位置に配設された前記一対の第1開口を含む複数対の開口群を有し、
     前記ヨークは、開口群に対応する複数個が配設され、
     それぞれのヨークが、前記テンションバランサのシャックル状連結部の複数対の第1貫通孔のそれぞれ及び前記複数対の開口群のそれぞれを貫通して装着されることを特徴とする請求項1に記載のテンションバランサ用設置補助装置。
  4.  前記固定筒は、断面形状が円形、楕円形、多角形のいずれかであることを特徴とする請求項1に記載のテンションバランサ用設置補助装置。
  5.  前記固定筒は、1以上の切り欠き部を有することを特徴とする請求項1に記載のテンションバランサ用設置補助装置。
  6.  前記固定筒は、1以上の貫通開口を有することを特徴とする請求項1に記載のテンションバランサ用設置補助装置。
  7.  前記固定筒は、更にアイナット部を有することを特徴とする請求項1に記載のテンションバランサ用設置補助装置。
  8.  前記固定筒は、更に前記ヨークを該固定筒に繋留するための1以上の繋留部材を有することを特徴とする請求項1に記載のテンションバランサ用設置補助装置。
  9.  ケーシングと、
     架空線に係止するためのシャックル状連結部を有し、前記ケーシング内に配設されるロッドと、
     固定筒及びヨークを含む設置補助装置と、を備え、
     前記シャックル状連結部は、一対の第1貫通孔を有し、
     前記固定筒は、開口された両端部と、前記架空線の幅より大きい幅を有するスリットと、一対の第1開口とを有し、一端部が前記ケーシングに当接して配設され、
     前記ヨークは、前記ロッドの前記一対の第1貫通孔及び前記一対の第1開口のそれぞれを貫通して装着されることを特徴とするテンションバランサ。
  10.  ケーシングと、
     架空線に係止するためのシャックル状連結部を有し、前記ケーシング内に配設されるロッドと、
     固定筒、ヨーク及び固定部材を含む設置補助装置と、を備え、
     前記シャックル状連結部は、一対の第1貫通孔を有し、
     前記固定筒は、開口された両端と、スリットと、2n(nは自然数)対の第2開口とを有して、一端部が前記ケーシングに当接して配設され、
     前記ヨークは、n対の第2貫通孔を有して、前記ロッドの前記一対の第1貫通孔のそれぞれを貫通して装着され、
    前記ロッドは、装着された前記ヨークの前記n対の第2貫通孔のそれぞれが前記2n対の第2開口のそれぞれと同軸上に位置するように前記ケーシングから第1の長さ引き出され、
     前記固定部材は、前記2n対の第2開口及び前記n対の第2貫通孔のそれぞれを貫通して装着されることを特徴とするテンションバランサ。
  11.  前記シャックル状連結部材は、複数対の前記第1貫通孔を有し、
     前記固定筒は、前記ケーシングからの距離が最も近い位置に配設された前記一対の第1開口を含む複数対の開口群を有し、
     前記ヨークは、複数配設されて、前記複数のヨークのそれぞれが、前記ロッドの前記複数対の第1貫通孔及び前記複数対の開口群のそれぞれを貫通して装着されることを特徴とする請求項10に記載のテンションバランサ。
  12.  前記固定筒は、断面形状が円形、楕円形、多角形のいずれかであることを特徴とする請求項9に記載のテンションバランサ。
  13.  前記固定筒は、1以上の切り欠き部を有することを特徴とする請求項9に記載のテンションバランサ。
  14.  前記固定筒は、1以上の貫通開口を有することを特徴とする請求項9に記載のテンションバランサ。
  15.  前記固定筒は、更にアイナット部を有することを特徴とする請求項9に記載のテンションバランサ。
  16.  前記固定筒は、更に前記ヨークを該固定筒に繋留するための1以上の繋留部材を有することを特徴とする請求項9に記載のテンションバランサ。
PCT/JP2009/067862 2008-12-29 2009-10-15 架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置 WO2010076859A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US12/680,019 US8492649B2 (en) 2008-12-29 2009-10-15 Tension balancer for overhead wire and tension balancer installation auxiliary device for overhead wire
CN200980100508.6A CN101918240B (zh) 2008-12-29 2009-10-15 架空线用张力平衡器和架空线用张力平衡器设置辅助装置
KR1020107006317A KR101203307B1 (ko) 2008-12-29 2009-10-15 가공선용 텐션 밸런서 및 가공선용 텐션 밸런서 설치보조장치

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008-335731 2008-12-29
JP2008335731A JP4861398B2 (ja) 2008-12-29 2008-12-29 架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置

Publications (1)

Publication Number Publication Date
WO2010076859A1 true WO2010076859A1 (ja) 2010-07-08

Family

ID=42309912

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/067862 WO2010076859A1 (ja) 2008-12-29 2009-10-15 架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置

Country Status (5)

Country Link
US (1) US8492649B2 (ja)
JP (1) JP4861398B2 (ja)
KR (1) KR101203307B1 (ja)
CN (1) CN101918240B (ja)
WO (1) WO2010076859A1 (ja)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5028239B2 (ja) * 2007-12-06 2012-09-19 東北電力株式会社 テンションバランサー
JP5203051B2 (ja) * 2008-06-05 2013-06-05 日本発條株式会社 架空線用テンションバランサ装置およびその潤滑油飛散防止装置
JP5036063B2 (ja) * 2008-06-10 2012-09-26 日本発條株式会社 架空線用テンションバランサ装置および架空線用テンションバランサ防水カバー
KR102049134B1 (ko) * 2012-09-25 2019-11-26 니혼 하츠쵸 가부시키가이샤 가공선용 텐션 밸런서
US9504211B2 (en) * 2013-03-15 2016-11-29 Specialty Enterprises, Llc Planar linkage, methods of decoupling, mitigating shock and resonance, and controlling agricultural spray booms mounted on ground vehicles
ES2554054B1 (es) * 2014-06-12 2016-12-30 Sic Lazaro, S.L. Contrapeso para tensar el cable de una catenaria en una línea ferroviaria
USD859110S1 (en) * 2017-02-10 2019-09-10 Nagaki Seiki Co., Ltd. Wire-tensioning device for live-wire separating tool
USD855427S1 (en) * 2017-02-10 2019-08-06 Nagaki Seiki Co., Ltd. Wire-tensioning device for live-wire separating tool
USD937648S1 (en) * 2019-09-03 2021-12-07 Michael John Daniels Rotating tool attachment
CN117691528B (zh) * 2024-02-02 2024-04-12 国网山东省电力公司菏泽市定陶区供电公司 一种用于双排电缆线安装的电缆线束紧装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1148834A (ja) * 1997-08-06 1999-02-23 Dengiyou:Kk 架空線用テンションバランサ
JP2000158980A (ja) * 1998-11-25 2000-06-13 Dengyo:Kk 架空線用テンションバランサ
JP2004042780A (ja) * 2002-07-11 2004-02-12 East Japan Railway Co 電車線用テンションバランサの固定装置
JP2008114850A (ja) * 2007-12-26 2008-05-22 Nhk Spring Co Ltd 架空線用テンションバランサ

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US481666A (en) * 1892-08-30 Safety attachment for electric conducting-wires
JP4335994B2 (ja) * 1999-03-10 2009-09-30 東海旅客鉄道株式会社 ガスばね式テンションバランサ
CN201009766Y (zh) * 2007-03-27 2008-01-23 史尧 并体式金属线索张力补偿器
JP4462634B2 (ja) * 2007-06-20 2010-05-12 生 西村 架空線用テンションバランサ

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1148834A (ja) * 1997-08-06 1999-02-23 Dengiyou:Kk 架空線用テンションバランサ
JP2000158980A (ja) * 1998-11-25 2000-06-13 Dengyo:Kk 架空線用テンションバランサ
JP2004042780A (ja) * 2002-07-11 2004-02-12 East Japan Railway Co 電車線用テンションバランサの固定装置
JP2008114850A (ja) * 2007-12-26 2008-05-22 Nhk Spring Co Ltd 架空線用テンションバランサ

Also Published As

Publication number Publication date
JP4861398B2 (ja) 2012-01-25
CN101918240A (zh) 2010-12-15
CN101918240B (zh) 2014-02-19
US8492649B2 (en) 2013-07-23
KR101203307B1 (ko) 2012-11-20
JP2010155577A (ja) 2010-07-15
US20110253443A1 (en) 2011-10-20
KR20100100748A (ko) 2010-09-15

Similar Documents

Publication Publication Date Title
JP4861398B2 (ja) 架空線用テンションバランサ及び架空線用テンションバランサ設置補助装置
CN208395696U (zh) 桥梁预应力碳纤维板加固结构
EP3487724B1 (en) An improved hanger for a suspended contact wire of a railway line and a power line comprising said hanger
JP2014193078A (ja) 金車装置および架空地線架け替え工法
JP2012244644A (ja) 碍子連の碍子交換方法
JP5730674B2 (ja) 鉄塔の腕金メンテナンス方法
JP2007245933A (ja) テンションバランサの支持装置
JP4671722B2 (ja) 碍子取付プレートと碍子取付方法
KR101488345B1 (ko) 대차의 능동형 댐퍼 안전장치 및 이를 구비한 철도차량
CN200985258Y (zh) 可调节式牵引装置
JP2012139046A (ja) 電線支持装置
JP4744258B2 (ja) 組立自在可動ブラケット・キット
JP5118841B2 (ja) 落橋防止装置
CN110645295B (zh) 一种多级阻尼钢板弹簧
JP4719620B2 (ja) 応力緩和接続構造とこれを用いた耐震用緩衝装置およびその取付板
CN201241463Y (zh) 悬挑架工具式圆钢筋斜拉杆
US10544011B2 (en) Hoisting frame for overweight lifting
JP5105525B2 (ja) 電車線引止め装置
CN212609074U (zh) 一种能伸缩的压缩机底撬吊耳装置
JP3232775U (ja) 引留装置取替用工具
CN219790177U (zh) 一种轨道检测设备的安装装置
JP6486438B1 (ja) トロリー線引上装置及び設置位置調整方法
CN107994501A (zh) 一种输电线路耐张塔更换横担主材用受力装置及使用方法
JP4333958B2 (ja) 車両用エアタンクの配管固定装置
JP2008125209A (ja) 緊線方法及びそれに用いるバーニア金具

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980100508.6

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 20107006317

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 12680019

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09836199

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09836199

Country of ref document: EP

Kind code of ref document: A1