KR20090001179A - 엘레베이터 가이드 레일의 생산 방법 및 교정장치 - Google Patents
엘레베이터 가이드 레일의 생산 방법 및 교정장치 Download PDFInfo
- Publication number
- KR20090001179A KR20090001179A KR1020070065380A KR20070065380A KR20090001179A KR 20090001179 A KR20090001179 A KR 20090001179A KR 1020070065380 A KR1020070065380 A KR 1020070065380A KR 20070065380 A KR20070065380 A KR 20070065380A KR 20090001179 A KR20090001179 A KR 20090001179A
- Authority
- KR
- South Korea
- Prior art keywords
- rail
- fixing
- fixing part
- rails
- elevator guide
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D3/00—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts
- B21D3/16—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts of specific articles made from metal rods, tubes, or profiles, e.g. crankshafts, by specially adapted methods or means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D3/00—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts
- B21D3/12—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts by stretching with or without twisting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/02—Advancing work in relation to the stroke of the die or tool
- B21D43/04—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
- B21D43/12—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by chains or belts
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Straightening Metal Sheet-Like Bodies (AREA)
Abstract
Description
Claims (7)
- 엘리베이터 가이드 레일 가공 방법에 있어서,레일의 양단을 고정하고 길이방향을 따라 인장시키는 스트레칭교정단계;와인장된 레일의 양끝단부를 절단하는 끝단부절단단계;와상기 레일을 플레이너로 가공하는 절삭단계;와절삭된 레일의 직진도를 높이는 2차교정단계; 및레일의 요철부 및 체결부를 가공하는 포밍단계;를 포함하여 이루어지는 것을 특징으로 하는 엘리베이터 가이드 레일 가공 방법.
- 제 1 항에 있어서, 상기 스트레칭교정단계는 레일의 일단을 고정시키고 타측을 인장시켜 교정하는 것을 특징으로 하는 엘리베이터 가이드 레일 가공 방법.
- 제 1 항 또는 제 2 항에 있어서, 포밍가공시에 발생한 버를 제거하는 디버링 단계를 더 포함하여 이루어지는 것을 특징으로 하는 엘리베이터 가이드 레일 가공 방법.
- 엘리베이터 레일의 직진도를 향상시키는 교정장치에 있어서,레일의 길이방향과 수직방향으로 레일을 이송하는 컨베이어;와상기 컨베이어를 따라 이송되는 레일을 정지시키는 스토퍼;와레일의 일단을 고정하는 제1고정부;와레일의 타단을 고정하는 제2고정부; 및상기 제1고정부를 일측으로 이송시키는 인장부;를 포함하여 이루어지고,상기 제1고정부는 레일의 바닥면과 일측면으로 압착하여 고정하는 것을 특징으로 하는 레일의 교정장치.
- 제 4 항에 있어서, 상기 제1고정부는상기 인장부와 결합되어 이송되는 고정부하우징;과상기 고정부하우징 내에서 고정된 고정쇠;와상기 고정쇠와 대향하여 배치되어 레일의 일측면을 고정쇠에 가압하는 누름쇠;와상기 누름쇠가 설치되고 일단이 힌지 결합된 브라켓;과상기 브라켓의 타단에 결합된 실린더; 및상기 고정쇠의 하부에서 상하운동을 하며 레일의 바닥면을 고정쇠에 가압하는 가압판;을 포함하여 이루어지는 것을 특징으로 하는 레일의 교정장치.
- 제 4 항 또는 제 5 항에 있어서, 리프트를 더 포함하여 이루어지는 것을 특징으로 하는 레일의 교정장치.
- 제 4 항 또는 제 5 항에 있어서, 상기 누름쇠의 표면에 나사산이 형성된 것을 특징으로 하는 레일의 교정장치.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070065380A KR100890065B1 (ko) | 2007-06-29 | 2007-06-29 | 엘레베이터 가이드 레일의 생산 방법 및 교정장치 |
CN2007101479846A CN101332955B (zh) | 2007-06-29 | 2007-08-30 | 升降机导轨的制造方法及调整设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070065380A KR100890065B1 (ko) | 2007-06-29 | 2007-06-29 | 엘레베이터 가이드 레일의 생산 방법 및 교정장치 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090001179A true KR20090001179A (ko) | 2009-01-08 |
KR100890065B1 KR100890065B1 (ko) | 2009-03-25 |
Family
ID=40195881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070065380A KR100890065B1 (ko) | 2007-06-29 | 2007-06-29 | 엘레베이터 가이드 레일의 생산 방법 및 교정장치 |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR100890065B1 (ko) |
CN (1) | CN101332955B (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111940546A (zh) * | 2020-06-30 | 2020-11-17 | 湖州和通电梯部件有限公司 | 一种适用于电梯导轨生产加工的用扭曲矫直装置 |
CN118237456A (zh) * | 2024-02-23 | 2024-06-25 | 浙江西豪电梯成套设备制造有限公司 | 一种电梯导轨的冲压加工装置及使用方法 |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101758116B (zh) * | 2009-12-31 | 2011-05-04 | 浙江大学 | T型导轨自动矫直装置 |
CN102688913A (zh) * | 2011-03-24 | 2012-09-26 | 长江润发机械股份有限公司 | 一种电梯导轨自动精矫装置 |
CN105057446B (zh) * | 2015-08-26 | 2017-02-01 | 浙江三永机械有限公司 | 一种空轨的加工流水线 |
CN111940991B (zh) * | 2020-07-07 | 2022-04-05 | 江苏宏德特种部件股份有限公司 | 一种高精度数控龙门加工中心滑枕生产装置 |
CN115256054A (zh) * | 2022-07-05 | 2022-11-01 | 安徽迅立达电梯有限公司 | 一种电梯制造用电梯导轨生产流水线 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05278967A (ja) * | 1992-03-31 | 1993-10-26 | Hitachi Ltd | エレベーター用ガイドレールの製造方法 |
CN1142042C (zh) * | 2001-04-02 | 2004-03-17 | 山西榆次华益型钢实业有限公司 | T型电梯导轨的成形工艺 |
KR100815985B1 (ko) | 2007-02-08 | 2008-03-24 | 조용삼 | 엘레베이터용 가이드 레일의 제조방법 |
-
2007
- 2007-06-29 KR KR1020070065380A patent/KR100890065B1/ko active IP Right Grant
- 2007-08-30 CN CN2007101479846A patent/CN101332955B/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111940546A (zh) * | 2020-06-30 | 2020-11-17 | 湖州和通电梯部件有限公司 | 一种适用于电梯导轨生产加工的用扭曲矫直装置 |
CN118237456A (zh) * | 2024-02-23 | 2024-06-25 | 浙江西豪电梯成套设备制造有限公司 | 一种电梯导轨的冲压加工装置及使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101332955A (zh) | 2008-12-31 |
KR100890065B1 (ko) | 2009-03-25 |
CN101332955B (zh) | 2010-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100890065B1 (ko) | 엘레베이터 가이드 레일의 생산 방법 및 교정장치 | |
KR100815985B1 (ko) | 엘레베이터용 가이드 레일의 제조방법 | |
CN107214580A (zh) | 清除不锈钢带表面毛刺的方法 | |
CN209849706U (zh) | 一种折弯机用无压痕下模及下模组件 | |
JP2015514592A (ja) | 複列プレス処理が可能なトランスファー金型 | |
KR20170087680A (ko) | 가공오차 조정이 가능한 벤딩금형 핀치다이 | |
CN104190726A (zh) | 冷轧带钢防跑偏装置 | |
TW201716160A (zh) | 金屬棒材精搓機 | |
CN105127211B (zh) | 一种金属板带横向仿形矫形方法及装置 | |
KR100781387B1 (ko) | 개선된 엘레베이터 가이드 레일의 생산 방법 | |
CN206083408U (zh) | 一种带钢热轧装置 | |
CN104117555A (zh) | 一种导轨扭矩矫正机 | |
CN107442579A (zh) | 一种集成轧制导卫与张力控制功能的装置及其实现方法 | |
CN203972533U (zh) | 一种导轨扭矩矫正机 | |
KR20090131544A (ko) | 강판 양측 절단용 정렬장치 | |
CN110788169A (zh) | 一种电梯地坎的折弯工艺及其折弯设备 | |
CN101607288B (zh) | 一种小型圆筒拉伸装置 | |
CN211768884U (zh) | 一种新型传输装置 | |
KR100792784B1 (ko) | 판재 절곡방법 | |
KR200204907Y1 (ko) | 강판 후진장치의 구조 | |
KR20210032234A (ko) | 튜브 뒤틀림 방지장치가 구비된 조관기 | |
CN115181834B (zh) | 一种用于直线导轨的热处理设备 | |
CN219883354U (zh) | 一种用于新能源行业的压机装置 | |
CN220144575U (zh) | 一种制造螺旋钢管时保证钢板平顺送入的液压立辊装置 | |
KR100970273B1 (ko) | 프로그레시브 금형의 모재 절곡장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130311 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140304 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20150316 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20160316 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20171219 Year of fee payment: 9 |
|
R401 | Registration of restoration | ||
FPAY | Annual fee payment |
Payment date: 20190227 Year of fee payment: 11 |