KR101462202B1 - 하로식 폼 트레블러 - Google Patents
하로식 폼 트레블러 Download PDFInfo
- Publication number
- KR101462202B1 KR101462202B1 KR1020130123419A KR20130123419A KR101462202B1 KR 101462202 B1 KR101462202 B1 KR 101462202B1 KR 1020130123419 A KR1020130123419 A KR 1020130123419A KR 20130123419 A KR20130123419 A KR 20130123419A KR 101462202 B1 KR101462202 B1 KR 101462202B1
- Authority
- KR
- South Korea
- Prior art keywords
- frame
- support frame
- girder
- frames
- lower side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 17
- 238000000034 method Methods 0.000 claims description 17
- 239000010959 steel Substances 0.000 claims description 17
- 239000004567 concrete Substances 0.000 claims description 6
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 230000005484 gravity Effects 0.000 claims 1
- 238000009415 formwork Methods 0.000 description 17
- 238000010276 construction Methods 0.000 description 11
- 239000006260 foam Substances 0.000 description 11
- 238000009434 installation Methods 0.000 description 10
- 230000003014 reinforcing effect Effects 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 210000003850 cellular structure Anatomy 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
도 2는 종래 상로식 폼 트래블러의 사시도이다.
도 3은 종래 상로식 폼 트래블러의 설치 과정을 나타내는 도면이다.
도 4는 종래 상로식 폼 트래블러의 측면도이다.
도 5는 도 4에 도시된 I-I 라인 절개도이다.
도 6은 종래 상로식 폼 트레블러를 이용하여 시공되는 거더의 단면도이다.
도 7은 종래 하로식 폼 트레블러의 정면도 및 시공상태도이다.
도 8은 본 발명에 의한 하로식 폼 트레블러를 이용한 외부 및 내부거푸집의 설치구성도,
도 9a 및 도 9b는 본 발명에 따른 하로식 폼 트레블러 구성단면도이다.
110: 상부레일
120: 철근조립체
130: 메인프레임
131: 횡단상부지지프레임
131a: 상단지지프레임
131b: 양 측방지지프레임
132: 하부측면프레임
132a,132b: 상면 수평프레임, 경사프레임
133: 바닥프레임
140: 후방지지대차
141: U형 프레임
142: 롤러
143: 리어잭
150: 상부 내측가이드레일 151: 인양장치(인양후크)
160: 메인잭
170: 지그
Claims (4)
- 시공된 거더 세그먼트(50) 상면에 교축방향으로 연장되도록 설치된 상부레일(110);
상기 상부레일을 따라 교축방향으로 전방 및 후방으로 이동하도록 설치되는 것으로서, 상단지지프레임(131a)과 상기 상단지지프레임의 측단에 형성된 양 측방지지프레임(131b)을 포함하여 역 ㄷ 자 형태로 형성된 횡단상부지지프레임(131); 과 상기 횡단상부지지프레임(131)의 무게중심선과 일치하는 무게중심선을 가지도록 배치된 삼각 트러스 형태로서 상기 횡단상부지지프레임의 양 측방지지프레임(131b)에 연결되어 함께 이동하도록 설치된 하부측면프레임(132);을 포함하는 메인프레임(130);
상기 삼각 트러스 형태의 하부측면프레임(132) 후방 상면에 상기 거더 사이에 설치되어 메인프레임이 전방으로 전도되지 않도록 설치된 후방지지대차(140); 및 상기 거더의 상부플랜지 내측 저면으로부터 교축방향으로 연장되도록 설치된 가이드레일로 설치된 상부 내측가이드레일(150);을 포함하여,
선 조립된 철근조립체(120)가 지그(170)에 끼워져 형태가 유지되도록 한 상태에서 인양되어 상기 상부 내측가이드레일(150)에 설치된 인양장치(151)에 지그(170)가 걸려지도록 하여 외측거푸집 및 내측거푸집 사이에 수평 이동되어 설치되도록 하는 것을 특징으로 하는 하로식 폼 트레블러. - 제 1항에 있어서,
상기 횡단상부지지프레임(131)은 관부재를 이용하여 제작된 것을 이용하되 거더 세그먼트(50)의 양 플랜지를 상하로 관통하는 강봉(125)에 의하여 확실하게 고정 지지되도록 하여 내부거푸집 및 철근조립체 설치 및 콘크리트 타설 시 작업하중을 안정적으로 지지할 수 있도록 하는 것을 특징으로 하는 하로식 폼 트레블러. - 제 1항에 있어서,
상기 메인프레임(130)은 횡단상부지지프레임(131)의 양 측방지지프레임(131b)의 내측단부에 고정되어 거더 세그먼트(50)의 양 측방에 위치하도록 설치된 삼각트러스 형태의 양 하부측면프레임(132) 및 상기 양 하부측면프레임(132)의 하부 사이에 설치된 거더 하방으로 횡단 연장되는 바닥프레임(133)을 포함하도록 형성되며,
상기 삼각트러스 형태의 양 하부측면프레임(132)는 상면 수평프레임(132a)의 양 측단 하부로 경사프레임(132b)을 포함하는 역 삼각 프레임으로서 그 무게중심선이 횡단상부지지프레임(131)을 구성하는 양 측방지지프레임(131b)의 무게중심선과 일치하도록 하는 것을 특징으로 하는 하로식 폼 트레블러. - 제 1항에 있어서,
상기 후방지지대차(140)의 내부에는 리어잭이 설치될 수 있도록 U형 프레임(141)으로 형성되어 삼각 트러스 형태의 하부측면프레임의 후방 상면 고정되며 거더 저면과 접하는 상면에 롤러(142)가 장착되도록 하여, 메인프레임(130)이 전방으로 전도 모멘트에 저항하도록 하되 리어잭(143)에 의한 반력도 확보할 수 있도록 하는 것을 특징으로 하는 하로식 폼 트레블러.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130123419A KR101462202B1 (ko) | 2013-10-16 | 2013-10-16 | 하로식 폼 트레블러 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130123419A KR101462202B1 (ko) | 2013-10-16 | 2013-10-16 | 하로식 폼 트레블러 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101462202B1 true KR101462202B1 (ko) | 2014-12-24 |
Family
ID=52676745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130123419A Active KR101462202B1 (ko) | 2013-10-16 | 2013-10-16 | 하로식 폼 트레블러 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101462202B1 (ko) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463993A (zh) * | 2015-11-24 | 2016-04-06 | 中铁大桥局集团有限公司 | 适用于多幅梁的移动模架及施工方法 |
CN105603882A (zh) * | 2016-02-29 | 2016-05-25 | 中交第一公路工程局有限公司 | 一种接触网不停电连续梁中跨合拢施工方法及其结构 |
KR101723653B1 (ko) * | 2016-03-28 | 2017-04-06 | (주)콘텍이엔지 | 흡수율이 개선된 고기능성 콘크리트 조성물 및 이를 이용한 교량 시공방법 |
CN106758864A (zh) * | 2016-12-13 | 2017-05-31 | 石家庄铁道大学 | 一种移动模架下导梁过孔时使用的悬臂梁吊装机构 |
CN109457628A (zh) * | 2019-01-18 | 2019-03-12 | 郑州大学 | 一种新型菱形挂篮 |
WO2021026986A1 (zh) * | 2019-08-13 | 2021-02-18 | 山东恒堃机械有限公司 | 一种下行自行移动模架的前横梁结构 |
WO2021026984A1 (zh) * | 2019-08-12 | 2021-02-18 | 山东恒堃机械有限公司 | 一种下行自行移动模架的后横梁 |
CN114687297A (zh) * | 2021-12-29 | 2022-07-01 | 湖北华略建设工程有限公司 | 一种模块组装三维调节桥梁三角挂篮 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3125653B2 (ja) * | 1995-10-30 | 2001-01-22 | 株式会社大林組 | 橋桁の架設工法 |
JP3177904B2 (ja) * | 1992-10-30 | 2001-06-18 | 清水建設株式会社 | Pc斜張橋用移動式作業車 |
KR200247460Y1 (ko) * | 2001-06-28 | 2001-10-17 | 동국엔지니어링 주식회사 | 교량 시공을 위한 까치발 설치장치 |
KR100597872B1 (ko) * | 2004-03-11 | 2006-07-07 | 엠에스아시아 주식회사 | 지그대를 이용한 교량시공방법 |
-
2013
- 2013-10-16 KR KR1020130123419A patent/KR101462202B1/ko active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3177904B2 (ja) * | 1992-10-30 | 2001-06-18 | 清水建設株式会社 | Pc斜張橋用移動式作業車 |
JP3125653B2 (ja) * | 1995-10-30 | 2001-01-22 | 株式会社大林組 | 橋桁の架設工法 |
KR200247460Y1 (ko) * | 2001-06-28 | 2001-10-17 | 동국엔지니어링 주식회사 | 교량 시공을 위한 까치발 설치장치 |
KR100597872B1 (ko) * | 2004-03-11 | 2006-07-07 | 엠에스아시아 주식회사 | 지그대를 이용한 교량시공방법 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463993A (zh) * | 2015-11-24 | 2016-04-06 | 中铁大桥局集团有限公司 | 适用于多幅梁的移动模架及施工方法 |
CN105603882A (zh) * | 2016-02-29 | 2016-05-25 | 中交第一公路工程局有限公司 | 一种接触网不停电连续梁中跨合拢施工方法及其结构 |
CN105603882B (zh) * | 2016-02-29 | 2017-05-10 | 中交第一公路工程局有限公司 | 一种接触网不停电连续梁中跨合拢施工方法及其结构 |
KR101723653B1 (ko) * | 2016-03-28 | 2017-04-06 | (주)콘텍이엔지 | 흡수율이 개선된 고기능성 콘크리트 조성물 및 이를 이용한 교량 시공방법 |
CN106758864A (zh) * | 2016-12-13 | 2017-05-31 | 石家庄铁道大学 | 一种移动模架下导梁过孔时使用的悬臂梁吊装机构 |
CN106758864B (zh) * | 2016-12-13 | 2018-06-19 | 石家庄铁道大学 | 一种移动模架下导梁过孔时使用的悬臂梁吊装机构 |
CN109457628A (zh) * | 2019-01-18 | 2019-03-12 | 郑州大学 | 一种新型菱形挂篮 |
WO2021026984A1 (zh) * | 2019-08-12 | 2021-02-18 | 山东恒堃机械有限公司 | 一种下行自行移动模架的后横梁 |
WO2021026986A1 (zh) * | 2019-08-13 | 2021-02-18 | 山东恒堃机械有限公司 | 一种下行自行移动模架的前横梁结构 |
CN114687297A (zh) * | 2021-12-29 | 2022-07-01 | 湖北华略建设工程有限公司 | 一种模块组装三维调节桥梁三角挂篮 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101462202B1 (ko) | 하로식 폼 트레블러 | |
KR101456635B1 (ko) | 하로식 폼 트래블러와 선조립된 철근조립체를 이용한 교량시공방법 | |
CN100503977C (zh) | 斜拉桥的塔柱及其施工方法 | |
KR101259031B1 (ko) | 횡단 프레임을 구비한 폼 트래블러 및 그 런칭 방법 | |
CN108194116B (zh) | 一种地铁车站整体预制轨顶风道装配结构 | |
JP4748420B2 (ja) | 架設作業用桁を用いた波形鋼板ウェブ橋の構築方法 | |
JP4403051B2 (ja) | 波形鋼板ウエブ橋の架設方法 | |
CN102704406B (zh) | 基于组合槽型梁的道床板无拉应力施工方法 | |
CN204019724U (zh) | 制作预制箱梁钢筋骨架的胎具 | |
CN107034791A (zh) | 一种悬臂浇注施工用挂篮的拼装方法 | |
CN105839516B (zh) | 一种桥梁横向防落梁装置及其施工方法 | |
JP6752160B2 (ja) | 移動作業車 | |
KR20130036890A (ko) | 교량용 타이드 아치형 p.s.c 거더와 이를 이용한 교량 시공방법 | |
JP4777922B2 (ja) | 移動吊支保工 | |
CN114770706B (zh) | 一种轻型t梁预制装备及预制安装施工方法 | |
CN104831632B (zh) | 一种桥梁索塔上横梁与下横梁施工方法 | |
CN211815595U (zh) | 用于索塔的下塔柱拉压结构 | |
CN109577650B (zh) | 施工现场辅助预制大型钢筋骨架用的装配式型钢挂架及其辅助预制大型钢筋骨架的施工方法 | |
CN113373810A (zh) | 上跨既有线路的连续t构高架桥边跨支架结构 | |
CN215593730U (zh) | 一种悬臂浇筑双边箱斜拉桥宽体有梁板的寄生支架挂篮 | |
CN210658035U (zh) | 一种斜拉挂扣支架结构 | |
CN205577264U (zh) | 一种梁钢筋的定位结构 | |
CN201511439U (zh) | 箱梁钢筋骨架整体绑扎、整体吊装系统 | |
CN103754770B (zh) | 钢筋笼吊装装置 | |
CN207175285U (zh) | 一种适用于地震多发带地区施工的塔吊附着节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20131016 |
|
PA0201 | Request for examination | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20140930 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20141110 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20141111 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
FPAY | Annual fee payment |
Payment date: 20171110 Year of fee payment: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20171110 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20181106 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20181106 Start annual number: 5 End annual number: 5 |
|
FPAY | Annual fee payment |
Payment date: 20191204 Year of fee payment: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20191204 Start annual number: 6 End annual number: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20201210 Start annual number: 7 End annual number: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20211123 Start annual number: 8 End annual number: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20221206 Start annual number: 9 End annual number: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20240108 Start annual number: 10 End annual number: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20241111 Start annual number: 11 End annual number: 11 |