CN100503977C - 斜拉桥的塔柱及其施工方法 - Google Patents

斜拉桥的塔柱及其施工方法 Download PDF

Info

Publication number
CN100503977C
CN100503977C CNB2007100676279A CN200710067627A CN100503977C CN 100503977 C CN100503977 C CN 100503977C CN B2007100676279 A CNB2007100676279 A CN B2007100676279A CN 200710067627 A CN200710067627 A CN 200710067627A CN 100503977 C CN100503977 C CN 100503977C
Authority
CN
China
Prior art keywords
post
king
steel
lifting
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007100676279A
Other languages
English (en)
Other versions
CN101029472A (zh
Inventor
王昌将
沈旺
史方华
陈向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Original Assignee
LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG, Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG
Priority to CNB2007100676279A priority Critical patent/CN100503977C/zh
Publication of CN101029472A publication Critical patent/CN101029472A/zh
Application granted granted Critical
Publication of CN100503977C publication Critical patent/CN100503977C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于桥梁建造技术领域,涉及一种平行或空间索面斜拉桥的塔柱及其施工方法。斜拉桥的塔柱包括锚固区,锚固区的混凝土塔柱竖向通长布置预埋钢板,预埋钢板焊接钢牛腿,钢牛腿支撑钢锚梁,钢锚梁与斜拉索固定相连。斜拉桥的塔柱锚固区的施工方法,(1)预制吊装节段;(2)用塔顶悬臂吊机将临时框架节段吊装到锚固区的设计位置;(3)重复步骤(1)(2),上下相邻的预埋钢板间采用螺栓固接;(4)吊装数个节段后,采用滑模浇筑混凝土塔柱,吊装好的预埋钢板作为滑模的施工模板;(5)混凝土塔柱浇筑完成后,张拉斜拉索。本发明具有施工进度快、钢锚梁吊装精度高、强度高的优点。

Description

斜拉桥的塔柱及其施工方法
技术领域
本发明属于桥梁建造技术领域,特别涉及一种平行或空间索面斜拉桥的塔柱及其施工方法。
背景技术
在斜拉桥建造技术领域中,塔柱锚固区广泛采用钢锚梁锚固斜拉索。钢锚梁支撑于空心塔柱的内部塔壁的垂直牛腿上,塔柱及牛腿由混凝土一体浇筑而成。在各种受力荷载作用下,竖向分力通过牛腿传到塔身后,全部由塔柱承受;每对斜拉索面内的平衡水平分力由钢锚梁承受,部分不平衡水平分力由塔柱承受。混凝土塔柱在斜拉索锚固区段受力明确,受水平作用力小,因此,混凝土塔柱不会产生水平裂缝,确保斜拉桥的使用寿命及安全可靠性。
根据斜拉桥塔柱锚固区的结构特点,目前钢锚梁吊装方法有两种:第一种,在上节段塔柱及牛腿浇筑混凝土后,吊装钢锚梁。该方法的缺点是钢锚梁的吊装必须在上节段塔柱浇筑混凝土完成后进行,两者交错施工,严重影响整桥的施工工期。第二种,在塔柱及牛腿混凝土浇筑全部完成后,再吊装钢锚梁。由于塔腔内空间狭窄,无法吊装整节钢锚梁,需将钢锚梁一分为二,中间采用高强螺栓螺接。该方法的缺点:第一、吊装时无法直接测量并定位,且要在狭窄的高空塔腔内进行钢锚梁拼装和定位,并进行高强螺栓施拧及检查,吊装工序和定位的难度很大。第二、由于塔柱与牛腿由混凝土一体浇筑而成,受混凝土牛腿的影响,浇筑混凝土的施工滑模不能沿塔柱往上平移,必须拆卸后再往上节段安装,后进行上一节段的混凝土浇筑,施工进度缓慢,影响工期。第三、混凝土牛腿的顶面不平整,影响由其支撑的钢锚梁安装精度。
发明内容
本发明公开了一种施工进度快、钢锚梁安装精度高的平行或空间索面斜拉桥的塔柱及其施工方法。
为解决上述技术问题,本发明所采取的技术方案:斜拉桥的塔柱,包括锚固区,锚固区的混凝土塔柱竖向通长布置预埋钢板,预埋钢板焊接钢牛腿,钢牛腿支撑钢锚梁,钢锚梁与斜拉索固定相连。
所述的斜拉桥的塔柱,钢牛腿包括由钢制成的顶板、支撑板,顶板呈水平状,顶板、支撑板与塔壁预埋钢板两两之间相互垂直并通过焊接连接,顶板、支撑板垂直焊接加劲板。
斜拉桥的塔柱的施工方法,锚固区按以下步骤施工:
(1)预制吊装节段:钢牛腿与塔壁预埋钢板连成一体,后将钢牛腿和钢锚梁通过螺栓固结,作为一个吊装节段;
(2)在预埋钢板上选取四个角点,用型钢与预埋钢板焊接形成临时框架节段,后采用塔顶悬臂吊机将临时框架节段吊装到锚固区的设计位置,与塔柱内劲性骨架固定相连;
(3)重复步骤(1)(2),同时,上下相邻的预埋钢板间采用螺栓固接;
(4)吊装数个节段后,采用滑模浇筑混凝土塔柱,吊装好的预埋钢板作为滑模的施工模板,滑模可沿预埋钢板上下移动;
(5)混凝土塔柱浇筑完成后,张拉斜拉索。
所述的斜拉桥的塔柱的施工方法,上部节段的吊装与下部已吊装节段的混凝土塔柱浇筑同步进行。
所述的斜拉桥的塔柱的施工方法,混凝土塔柱全部浇筑完成后,先卸掉钢锚梁和钢牛腿临时固结中一侧的连接螺栓,后张拉斜拉索,再卸掉另一侧螺栓,确保钢锚梁与钢牛腿间顺桥向无约束。
本发明的牛腿由钢制成,钢牛腿与预埋钢板成一体状,预埋钢板沿混凝土塔柱竖向通长布置,上下相邻的预埋钢板通过高强螺栓连接。本发明的钢牛腿与塔柱通过预埋钢板固定连接,在浇筑混凝土塔柱时,塔壁预埋钢板可作为混凝土施工滑模的模板,当下一节段的塔柱浇筑混凝土完成后,滑模沿通长布置的预埋钢板向上平移至上一节段的塔柱进行混凝土浇筑,而无需如现有技术一样,将浇筑滑模拆卸并安装于上一节段后,才能开始浇筑混凝土。从而方便浇筑混凝土塔柱施工,大幅提高施工进度。同时,本发明采用钢牛腿避免了混凝土牛腿开裂的问题,提高了牛腿的强度,钢牛腿顶面的平整度也能得到了保证,确保钢锚梁的安装精度。
本发明的钢锚梁吊装快捷,且钢锚梁吊装过程不需与混凝土塔柱浇筑交错施工,两道施工工序各自独立完成,加快了施工进度,同时也确保了钢锚梁吊装的精度及强度。
附图说明
图1为本发明的塔柱锚固区的局部结构示意图。
图2为图1的A向示图。
图3为本发明的钢锚梁结构示意图。
图4为本发明的钢锚梁俯视图。
图示中,1—顶板、2—支撑板、3—加劲板、4—塔壁预埋钢板、5—塔柱、11—钢梁、12—上盖板、13—下盖板、14—横隔板、15—锚固头、16—锚板、17—支撑板、18—腹板、19—侧板、20—加劲板、21—钢牛腿、22—钢锚梁。
具体实施方式
下面结合附图对本发明实施例作详细说明。
如图1、2所示,平行或空间索面斜拉桥的塔柱包括斜拉索锚固区,预埋钢板4沿锚固区的混凝土塔柱的塔壁竖向通长布置,上下相邻预埋钢板4通过高强螺栓连接,每一节段的预埋钢板4焊接钢牛腿21,钢牛腿21支撑钢锚梁22。钢牛腿21由顶板1、支撑板2、加劲板3构成,顶板1、支撑板2与预埋钢板4焊接,顶板1、支撑板2都与预埋钢板4相垂直,顶板1呈水平状,顶板1下方垂直焊接支撑板2。顶板1、支撑板2都与加劲板3焊接,以增强钢牛腿的承重强度。钢牛腿21与混凝土塔柱5通过塔壁预埋钢板4固定相连。如图3、4所示,钢锚梁22由箱形钢梁11及四个连接斜拉索的锚固头15构成。箱形钢梁11由上盖板12、两侧板19及下盖板13焊接而成,箱形钢梁11的中段内部均匀焊接五块横隔板14,内部两端头各焊接五块加劲板20,以加强钢梁11的强度。钢梁11的两端各焊接两个锚固头15,锚固头15对称分布,锚固头15由锚板16和支撑板17焊接而成,锚板16、支撑板17与钢梁11焊接。斜拉索的上端头穿入锚固头15并固定连接,斜拉索与锚板16垂直,与支撑板17平行。四个锚固头15对称布置,极大地平衡掉水平方向的不平衡力,使平行索面斜拉桥的塔柱更稳定,也使钢锚梁可以适用于空间索面斜拉桥,扩大了其使用范围。
平行或空间索面斜拉桥的塔柱锚固区按以下步骤施工:
(1)预制多个吊装节段:每一吊装节段包括钢牛腿21、预埋钢板4及钢锚梁22,钢牛腿21与预埋钢板4成一体状,钢牛腿21和钢锚梁22通过螺栓作临时固结,作为一个吊装节段;
(2)在预埋钢板4上选取四个角点,利用型钢与预埋钢板4焊接形成临时框架节段,以确保预埋钢板4不变形,然后采用塔顶悬臂吊机将临时框架节段吊装到锚固区的设计位置,并与塔柱5内劲性骨架固定相连;
(3)完成步骤(2)后,向该节段的上方吊装下一个预制的吊装节段,上下相邻的预埋钢板4间采用高强螺栓连接;
(4)吊装节段的预埋钢板总高度为10-15米时,安装滑模浇筑混凝土塔柱5,已吊装好的预埋钢板兼作滑模的施工模板,滑模可沿预埋钢板上下移动;上部节段的吊装与下部已经吊装节段的混凝土塔柱5浇筑同步进行;
(5)混凝土塔柱5全部浇筑完成后,先卸掉钢锚梁22和钢牛腿21临时固结中一侧的连接螺栓,后张拉斜拉索,再卸掉另一侧的螺栓,确保钢锚梁22与钢牛腿21间顺桥向无约束。

Claims (3)

1、斜拉桥的塔柱的施工方法,其特征是锚固区按以下步骤施工:
(1)预制吊装节段:钢牛腿与塔壁预埋钢板连成一体,后将钢牛腿和钢锚梁通过螺栓固结,作为一个吊装节段;
(2)在预埋钢板上选取四个角点,用型钢与预埋钢板焊接形成临时框架节段,后采用塔顶悬臂吊机将临时框架节段吊装到锚固区的设计位置,与塔柱内劲性骨架固定相连;
(3)重复步骤(1)(2),同时,上下相邻的预埋钢板间采用螺栓固接;
(4)吊装数个节段后,采用滑模浇筑混凝土塔柱,吊装好的预埋钢板作为滑模的施工模板,滑模可沿预埋钢板上下移动;
(5)混凝土塔柱浇筑完成后,张拉斜拉索。
2、根据权利要求1所述的斜拉桥的塔柱的施工方法,其特征在于:上部节段的吊装与下部已吊装节段的混凝土塔柱浇筑同步进行。
3、根据权利要求1所述的斜拉桥的塔柱的施工方法,其特征在于:混凝土塔柱全部浇筑完成后,先卸掉钢锚梁和钢牛腿临时固结中一侧的连接螺栓,后张拉斜拉索,再卸掉另一侧螺栓,确保钢锚梁与钢牛腿间顺桥向无约束。
CNB2007100676279A 2007-03-21 2007-03-21 斜拉桥的塔柱及其施工方法 Expired - Fee Related CN100503977C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100676279A CN100503977C (zh) 2007-03-21 2007-03-21 斜拉桥的塔柱及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100676279A CN100503977C (zh) 2007-03-21 2007-03-21 斜拉桥的塔柱及其施工方法

Publications (2)

Publication Number Publication Date
CN101029472A CN101029472A (zh) 2007-09-05
CN100503977C true CN100503977C (zh) 2009-06-24

Family

ID=38715010

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100676279A Expired - Fee Related CN100503977C (zh) 2007-03-21 2007-03-21 斜拉桥的塔柱及其施工方法

Country Status (1)

Country Link
CN (1) CN100503977C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639500A (zh) * 2016-12-22 2017-05-10 广西建工集团第建筑工程有限责任公司 高风压下方形变截面多层平台烟囱一次滑模施工方法

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781878B (zh) * 2010-01-21 2012-12-05 中铁二十局集团有限公司 独塔无背索斜拉桥主塔整体提升模板及其提升施工方法
CN102561187B (zh) * 2010-12-10 2015-09-02 上海市基础工程集团有限公司 超大异型钢塔联结系节点角度样板定位方法
CN102277836B (zh) * 2011-06-14 2013-07-10 中铁五局集团建筑工程有限责任公司 倾斜式混凝土塔座的施工方法
CN104343086B (zh) * 2014-10-27 2016-11-09 中铁港航局集团有限公司 斜拉桥上塔柱钢锚梁锚固区段小空间施工方法
CN105129614B (zh) * 2015-08-05 2017-06-30 武船重型工程股份有限公司 一种拼接板预置方法
CN105839541B (zh) * 2016-04-29 2023-06-09 贵州大通路桥工程建设有限公司 刚构桥0号段无焊接支架的施工方法及结构
CN108316150B (zh) * 2018-01-25 2024-03-15 北京城建道桥建设集团有限公司 斜拉桥主塔及钢锚梁的施工系统和施工方法
CN108004907A (zh) * 2018-01-26 2018-05-08 西安市政设计研究院有限公司 一种格构式钢桁架塔斜拉桥钢拉索锚固系统
CN108330831A (zh) * 2018-03-13 2018-07-27 中交公路规划设计院有限公司 钢箱格式索-塔连接结构及其制作方法
CN108265614A (zh) * 2018-03-15 2018-07-10 中铁第四勘察设计院集团有限公司 一种斜拉桥的桥塔锚固结构及锚固方法
CN109267489B (zh) * 2018-10-17 2021-04-06 中铁大桥局集团有限公司 一种斜拉桥索塔锚固区施工方法
CN109338869A (zh) * 2018-11-28 2019-02-15 中国铁建大桥工程局集团有限公司 一种斜拉桥主塔下牛腿同步施工方法
CN109555025B (zh) * 2018-12-28 2023-10-20 中交路桥华南工程有限公司 支撑系统和支撑架拆除方法
CN109763431A (zh) * 2019-03-05 2019-05-17 湖北旺科模板有限公司 一种桥塔液压爬模无拉杆模板施工方法
CN109811643A (zh) * 2019-03-21 2019-05-28 广东省交通规划设计研究院股份有限公司 钢锚梁结构及其安装方法
CN109972528A (zh) * 2019-04-24 2019-07-05 中铁十一局集团第一工程有限公司 一种斜拉桥斜塔下横梁支撑剪力件
CN111877126B (zh) * 2020-08-25 2022-08-30 中交路桥华南工程有限公司 拱桥拱圈的安装方法
CN111851317B (zh) * 2020-08-25 2022-08-30 中交路桥华南工程有限公司 拱桥拱圈的安装方法
CN113389134B (zh) * 2021-06-07 2022-06-07 中建三局第一建设工程有限责任公司 一种钢板带悬桥及其施工方法
CN113944226A (zh) * 2021-11-19 2022-01-18 中国建筑第四工程局有限公司 一种钢结构连廊多支座组合连接结构

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
东海大桥Ⅶ标主桥斜拉桥主塔施工. 杨国平,闫朔,党权交.公路,第3期. 2006
东海大桥Ⅶ标主桥斜拉桥主塔施工. 杨国平,闫朔,党权交.公路,第3期. 2006 *
东海大桥主通航孔索塔施工技术. 顾建平,朱毅敏,顾亚囝.施工技术,第增刊期. 2005
东海大桥主通航孔索塔施工技术. 顾建平,朱毅敏,顾亚囝.施工技术,第增刊期. 2005 *
灌河特大桥钢锚梁安装. 杨忠明,王庆曾.桥梁建设,第增刊Ⅰ期. 2006
灌河特大桥钢锚梁安装. 杨忠明,王庆曾.桥梁建设,第增刊Ⅰ期. 2006 *
钢结构厂房立柱与悬臂牛腿节点强度计算和截面尺寸的确定. 朱其崇,梁兆新.装备制造技术,第2期. 2005
钢结构厂房立柱与悬臂牛腿节点强度计算和截面尺寸的确定. 朱其崇,梁兆新.装备制造技术,第2期. 2005 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639500A (zh) * 2016-12-22 2017-05-10 广西建工集团第建筑工程有限责任公司 高风压下方形变截面多层平台烟囱一次滑模施工方法
CN106639500B (zh) * 2016-12-22 2019-01-11 广西建工集团第一建筑工程有限责任公司 高风压下方形变截面多层平台烟囱一次滑模施工方法

Also Published As

Publication number Publication date
CN101029472A (zh) 2007-09-05

Similar Documents

Publication Publication Date Title
CN100503977C (zh) 斜拉桥的塔柱及其施工方法
JP5179804B2 (ja) 移動吊支保工
JP4569878B2 (ja) 橋桁の架設方法
CN106894639B (zh) 一种下挂式钢结构逆向安装施工方法
CN106702910A (zh) 一种双塔双索面矮塔斜拉桥的主梁施工工艺
JP6702835B2 (ja) 多径間連続橋の橋桁架設方法
CN110820573B (zh) 山区高墩大跨径桥梁钢混组合梁施工方法
CN103669224A (zh) 斜置拱塔双索面预应力混凝土斜拉桥中拱塔施工方法及钢管支架
CN111764282B (zh) 基于斜拉扣挂法的刚性悬索加劲钢桁梁桥施工方法
JP2020105803A (ja) 斜張橋、および斜張橋の架設方法
JP2008274586A (ja) 柱頭部の施工方法
CN108103945A (zh) 一种现浇箱梁用整体落地模架
KR101335382B1 (ko) 내부힌지를 활용한 복합트러스 거더교의 시공법
CN110468743B (zh) 一种用于旧桥墩帽改造的移动式吊架及施工方法
CN207749417U (zh) 一种混凝土塔柱内模劲性骨架
CN107268455A (zh) 混凝土主梁钢横梁组合结构梁挂篮施工方法
CN111395186B (zh) 一种大跨径钢混组合梁斜拉桥临时墩支设方法
CN103147405A (zh) 斜主桁斜拉桥钢梁架设方法
CN219218724U (zh) 一种用于组合梁斜拉桥的主梁吊铺一体机
CN110983987B (zh) 钢-混结合梁的施工方法
CN110761165B (zh) 钢腹板箱梁安装体系及其施工方法
CN111042003A (zh) 一种斜拉桥混凝土梁组合式挂篮施工方法
CN113550230B (zh) 一种异形拱塔双索面钢斜拉桥装配式施工及控制方法
CN210368664U (zh) 一种宽体架桥机
CN209039975U (zh) 一种可临时转永久的钢桥桥面结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090624

Termination date: 20100321