KR101331324B1 - 다중 스탠드 압연 트레인을 통과하는 압연 재료의 배출 두께 조정 방법, 개회로 제어 장치 및/또는 폐회로 제어 장치 및 압연 설비 - Google Patents
다중 스탠드 압연 트레인을 통과하는 압연 재료의 배출 두께 조정 방법, 개회로 제어 장치 및/또는 폐회로 제어 장치 및 압연 설비 Download PDFInfo
- Publication number
- KR101331324B1 KR101331324B1 KR1020117012212A KR20117012212A KR101331324B1 KR 101331324 B1 KR101331324 B1 KR 101331324B1 KR 1020117012212 A KR1020117012212 A KR 1020117012212A KR 20117012212 A KR20117012212 A KR 20117012212A KR 101331324 B1 KR101331324 B1 KR 101331324B1
- Authority
- KR
- South Korea
- Prior art keywords
- rolling
- train
- stand
- thickness
- discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
- B21B37/24—Automatic variation of thickness according to a predetermined program
- B21B37/26—Automatic variation of thickness according to a predetermined program for obtaining one strip having successive lengths of different constant thickness
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B13/00—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories
- B21B13/22—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories for rolling metal immediately subsequent to continuous casting, i.e. in-line rolling of steel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2265/00—Forming parameters
- B21B2265/02—Tension
- B21B2265/06—Interstand tension
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2265/00—Forming parameters
- B21B2265/12—Rolling load or rolling pressure; roll force
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
- B21B2275/06—Product speed
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
- Metal Rolling (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP08018949.1 | 2008-10-30 | ||
| EP08018949 | 2008-10-30 | ||
| PCT/EP2009/063508 WO2010049280A2 (de) | 2008-10-30 | 2009-10-15 | Verfahren zur einstellung einer auslaufdicke eines eine mehrgerüstige walzstrasse durchlaufenden walzguts, steuer- und/oder regeleinrichtung und walzanlage |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20110079767A KR20110079767A (ko) | 2011-07-07 |
| KR101331324B1 true KR101331324B1 (ko) | 2013-11-20 |
Family
ID=40293842
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020117012212A Active KR101331324B1 (ko) | 2008-10-30 | 2009-10-15 | 다중 스탠드 압연 트레인을 통과하는 압연 재료의 배출 두께 조정 방법, 개회로 제어 장치 및/또는 폐회로 제어 장치 및 압연 설비 |
Country Status (9)
| Country | Link |
|---|---|
| US (1) | US9314828B2 (https=) |
| EP (1) | EP2346625B2 (https=) |
| JP (1) | JP2012506776A (https=) |
| KR (1) | KR101331324B1 (https=) |
| CN (1) | CN102271833B (https=) |
| BR (1) | BRPI0921435B1 (https=) |
| PL (1) | PL2346625T5 (https=) |
| RU (1) | RU2477661C2 (https=) |
| WO (1) | WO2010049280A2 (https=) |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9314828B2 (en) | 2008-10-30 | 2016-04-19 | Siemens Aktiengesellschaft | Method for adjusting a discharge thickness of rolling stock that passes through a multi-stand mill train, control and/or regulation device and rolling mill |
| CN102672999B (zh) * | 2011-03-16 | 2016-01-27 | 上海板机电气制造有限公司 | 一种板坯厚度控制方法、装置和系统 |
| JP5783925B2 (ja) * | 2012-02-08 | 2015-09-24 | 株式会社日立製作所 | 熱間タンデム圧延ミルの制御装置および熱間タンデム圧延ミルの制御方法 |
| US10016799B2 (en) | 2013-12-20 | 2018-07-10 | Novelis Do Brasil Ltda | Dynamic shifting of reduction (DSR) to control temperature in tandem rolling mills |
| EP2910316A1 (de) * | 2014-02-21 | 2015-08-26 | Primetals Technologies Germany GmbH | Einfache Vorsteuerung einer Keilanstellung eines Vorgerüsts |
| ES2759247T3 (es) | 2014-06-18 | 2020-05-08 | Boehringer Ingelheim Vetmedica Gmbh | Antagonistas muscarínicos y combinaciones de estos para el tratamiento de enfermedades de las vías respiratorias en caballos |
| EP3000539B1 (de) | 2014-09-24 | 2016-11-16 | SMS group GmbH | VERFAHREN ZUM GIEßEN UND WALZEN EINES ENDLOSEN STRANGGUTES |
| DE102015216512A1 (de) | 2015-08-28 | 2017-03-02 | Sms Group Gmbh | Anlage nach dem CSP-Konzept sowie Verfahren zum Betreiben einer solchen Anlage |
| IT201700028768A1 (it) * | 2017-03-15 | 2018-09-15 | Danieli Off Mecc | Impianto combinato di colata continua e laminazione di nastri metallici a caldo |
| IT201700028732A1 (it) * | 2017-03-15 | 2018-09-15 | Danieli Off Mecc | Impianto combinato di colata continua e laminazione di nastri metallici a caldo |
| CN107977793B (zh) * | 2017-12-13 | 2021-12-24 | 东北大学 | 一种冷轧轧制升降速过程中加速度设定的优化方法 |
| RU2732451C2 (ru) * | 2019-02-18 | 2020-09-18 | Публичное Акционерное Общество "Новолипецкий металлургический комбинат" | Способ компенсации отклонения толщины прокатываемой полосы на реверсивном стане холодной прокатки |
| DE102019217966A1 (de) | 2019-11-21 | 2021-05-27 | Sms Group Gmbh | Einstellung einer Auslauftemperatur eines aus einer Walzstraße auslaufenden Metallbands |
| IT202000000316A1 (it) | 2020-01-10 | 2021-07-10 | Danieli Off Mecc | Metodo ed apparato di produzione di prodotti metallici piani |
| DE102021213566A1 (de) * | 2021-11-30 | 2023-06-01 | Sms Group Gmbh | Verfahren zum Betreiben einer Walzstraße |
| CN120456987A (zh) * | 2023-01-06 | 2025-08-08 | 杰富意钢铁株式会社 | 动态板厚变更方法 |
| DE102023211721A1 (de) | 2023-11-24 | 2025-05-28 | Sms Group Gmbh | Verfahren zur Regelung der Umformtemperatur in einem Warmwalzwerk sowie Warmwalzwerk |
| DE102024200354B3 (de) * | 2024-01-16 | 2025-07-17 | Sms Group Gmbh | Verfahren zum Betreiben eines Walzgerüstes |
| DE102025101221B3 (de) * | 2025-01-15 | 2026-02-05 | Sms Group Gmbh | Verfahren und Anlage zur Herstellung eines stranggegossenen metallischen Produkts |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07148504A (ja) * | 1993-11-30 | 1995-06-13 | Kawasaki Steel Corp | H形鋼ウエブ内幅の拡幅方法 |
Family Cites Families (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2416625C3 (de) * | 1973-04-10 | 1978-12-21 | Kobe Steel Ltd., Kobe, Hyogo (Japan) | Vorrichtung zum Verriegeln der auswechselbaren Traversen eines Führungswalzengerüstes einer Stranggießanlage |
| JPS5561306A (en) | 1978-11-01 | 1980-05-09 | Mitsubishi Electric Corp | Changing system for rolling schedule while running rolling stand |
| SU865460A1 (ru) * | 1979-05-07 | 1981-09-23 | Всесоюзный Научно-Исследовательский Институт Автоматизации Черной Металлургии | Система автоматического регулировани толщины полосы при прокате |
| JPS59191509A (ja) * | 1983-04-14 | 1984-10-30 | Toshiba Corp | 連続圧延機における走間寸法変更方法 |
| JPS60148620A (ja) * | 1984-01-13 | 1985-08-05 | Kawasaki Steel Corp | タンデム圧延機の走間板厚変更方法 |
| JPS61273210A (ja) | 1985-05-27 | 1986-12-03 | Nippon Steel Corp | タンデム圧延機の走間スケジユ−ル変更方法 |
| US4745556A (en) | 1986-07-01 | 1988-05-17 | T. Sendzimir, Inc. | Rolling mill management system |
| IT1224318B (it) | 1988-05-26 | 1990-10-04 | Mannesmann Ag | Processo ed impianto per la produzione continua di nastro di acciaio |
| US5307864A (en) | 1988-05-26 | 1994-05-03 | Mannesmann Aktiengesellschaft | Method and system for continuously producing flat steel product by the continuous casting method |
| JPH0615317A (ja) * | 1992-07-01 | 1994-01-25 | Toshiba Corp | 熱間仕上圧延機の制御方法 |
| US6044895A (en) * | 1993-12-21 | 2000-04-04 | Siemens Aktiengesellschaft | Continuous casting and rolling system including control system |
| JPH08300010A (ja) * | 1995-03-03 | 1996-11-19 | Toshiba Corp | 熱間圧延方法および装置 |
| CN1070393C (zh) * | 1995-03-03 | 2001-09-05 | 株式会社东芝 | 热轧装置 |
| JP3083247B2 (ja) | 1995-07-26 | 2000-09-04 | 新日本製鐵株式会社 | 連続鋳造熱間圧延によるステンレスストリップの製造方法及びステンレスストリップの連続鋳造熱間圧延用熱処理炉 |
| KR100206504B1 (ko) | 1995-04-14 | 1999-07-01 | 다나카 미노루 | 스테인레스강스트립제조장치 |
| CN1211476A (zh) | 1997-09-12 | 1999-03-24 | 冶金工业部钢铁研究总院 | 板带轧制过程中的板形测量和控制方法 |
| JPH10232848A (ja) * | 1996-11-12 | 1998-09-02 | Matsushita Electric Ind Co Ltd | クライアント/サーバシステム |
| JP3568726B2 (ja) * | 1997-01-17 | 2004-09-22 | 東洋鋼鈑株式会社 | タンデム圧延機の制御装置 |
| JP2001293510A (ja) | 2000-04-12 | 2001-10-23 | Nkk Corp | 熱間連続圧延機における走間板厚変更制御方法 |
| JP2004283909A (ja) * | 2003-01-27 | 2004-10-14 | Jfe Steel Kk | 連続熱間圧延における走間板厚変更方法及び熱延鋼板の製造方法 |
| JP4272086B2 (ja) * | 2004-02-25 | 2009-06-03 | 株式会社日立製作所 | 鉄鋼鋼板連続圧延機の制御装置 |
| JP5371421B2 (ja) | 2005-04-07 | 2013-12-18 | アルベディ,ジョバンニ | 連続鋳造および圧延の間に連続性を分断することなく金属ストリップおよび金属シートを製造するプロセスおよびシステム |
| FR2887480B1 (fr) * | 2005-06-23 | 2007-09-21 | Vai Clecim Soc Par Actions Sim | Procede et dispositif de regulation de l'epaisseur d'un produit lamine en sortie d'une installation de laminage en tandem |
| JP4700444B2 (ja) | 2005-08-31 | 2011-06-15 | 新日本製鐵株式会社 | 圧延機の走間板厚変更時の板厚制御方法 |
| CN1760913A (zh) * | 2005-11-08 | 2006-04-19 | 苏州有色金属加工研究院 | 设定金属板带轧制规程的方法 |
| CN102271831B (zh) * | 2008-10-30 | 2014-01-29 | 西门子公司 | 调整轧制轧制物的轧机列的多个驱动装置的驱动负载的方法、控制和/或调节装置、存储介质、程序代码及轧制设备 |
| US9314828B2 (en) | 2008-10-30 | 2016-04-19 | Siemens Aktiengesellschaft | Method for adjusting a discharge thickness of rolling stock that passes through a multi-stand mill train, control and/or regulation device and rolling mill |
-
2009
- 2009-10-15 US US13/126,547 patent/US9314828B2/en active Active
- 2009-10-15 CN CN200980153374.4A patent/CN102271833B/zh active Active
- 2009-10-15 RU RU2011121671/02A patent/RU2477661C2/ru active
- 2009-10-15 EP EP09736931.8A patent/EP2346625B2/de active Active
- 2009-10-15 JP JP2011533668A patent/JP2012506776A/ja active Pending
- 2009-10-15 BR BRPI0921435-6A patent/BRPI0921435B1/pt active IP Right Grant
- 2009-10-15 KR KR1020117012212A patent/KR101331324B1/ko active Active
- 2009-10-15 PL PL09736931.8T patent/PL2346625T5/pl unknown
- 2009-10-15 WO PCT/EP2009/063508 patent/WO2010049280A2/de not_active Ceased
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07148504A (ja) * | 1993-11-30 | 1995-06-13 | Kawasaki Steel Corp | H形鋼ウエブ内幅の拡幅方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| US9314828B2 (en) | 2016-04-19 |
| BRPI0921435B1 (pt) | 2020-09-15 |
| WO2010049280A3 (de) | 2010-07-15 |
| BRPI0921435A2 (pt) | 2016-01-05 |
| EP2346625B1 (de) | 2013-05-29 |
| KR20110079767A (ko) | 2011-07-07 |
| CN102271833A (zh) | 2011-12-07 |
| PL2346625T3 (pl) | 2013-10-31 |
| RU2477661C2 (ru) | 2013-03-20 |
| EP2346625A2 (de) | 2011-07-27 |
| PL2346625T5 (pl) | 2024-04-29 |
| RU2011121671A (ru) | 2012-12-10 |
| US20110289993A1 (en) | 2011-12-01 |
| CN102271833B (zh) | 2014-01-29 |
| WO2010049280A2 (de) | 2010-05-06 |
| EP2346625B2 (de) | 2021-02-17 |
| JP2012506776A (ja) | 2012-03-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101331324B1 (ko) | 다중 스탠드 압연 트레인을 통과하는 압연 재료의 배출 두께 조정 방법, 개회로 제어 장치 및/또는 폐회로 제어 장치 및 압연 설비 | |
| RU2434696C1 (ru) | Способ получения полосы из стали | |
| CN103079719B (zh) | 用于通过全连续轧制制造带钢的方法 | |
| US9050637B2 (en) | Operating method for introducing a product to be rolled into a roll stand of a roll mill, control device, data carrier, and roll mill for rolling a strip-type product to be rolled | |
| US12103061B2 (en) | Cold rolling rolled stock in a mill train with multiple roll stands | |
| JP7404545B2 (ja) | 板状の金属製品を製造するための方法および装置 | |
| KR101581168B1 (ko) | 압연 재료를 압연하기 위한 압연 트레인의 복수의 구동부를 위한 구동 부하를 조정하는 방법, 개회로 제어 및/또는 폐회로 제어 장치, 저장 매체, 프로그램 코드 및 압연 설비 | |
| US10821502B2 (en) | Method and casting/rolling system for casting and rolling a continuous strand material | |
| CN102413955B (zh) | 制造轧件的方法、轧制设备和开环和/或闭环控制装置 | |
| MX2013001745A (es) | Procedimiento para la produccion de material de laminacion mediante una instalacion compuesta de laminacion de colada continua, equipo de control y/o regulacion para una instalacion compuesta de colada de laminacion de colada continua e instalacion compuesta de laminacion de colada continua. | |
| CN1758970A (zh) | 用于制造钢带的铸轧设备 | |
| US3618348A (en) | Method of controlling rolling of metal strips | |
| US8850860B2 (en) | Method of controlling operation of tandem rolling mill and method of manufacturing hot-rolled steel sheet using the same | |
| US10875065B2 (en) | Method for rolling a rolling material and rolling mill | |
| JP7772957B2 (ja) | 金属帯材を横切断する方法及び金属帯材を横切断するシャーを有する圧延設備 | |
| CN118847718B (zh) | 基于轧制速度的板坯翘扣头控制方法及系统 | |
| CN121797765A (zh) | 一种粗轧机轧制速度与飞剪剪切速度同步的方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0105 | International application |
St.27 status event code: A-0-1-A10-A15-nap-PA0105 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U12-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| FPAY | Annual fee payment |
Payment date: 20161104 Year of fee payment: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20171102 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| FPAY | Annual fee payment |
Payment date: 20181101 Year of fee payment: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| R17-X000 | Change to representative recorded |
St.27 status event code: A-5-5-R10-R17-oth-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 11 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 12 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 13 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 13 |