|
US6877153B2
(en)
*
|
1996-04-10 |
2005-04-05 |
Paul M. Konnersman |
Computer-based system for work processes that consist of interdependent decisions involving one or more participants
|
|
US20070150330A1
(en)
*
|
1999-12-30 |
2007-06-28 |
Mcgoveran David O |
Rules-based method and system for managing emergent and dynamic processes
|
|
JP4529213B2
(ja)
*
|
2000-01-19 |
2010-08-25 |
富士ゼロックス株式会社 |
要素編成支援装置及び要素編成支援プログラムが記録された記憶媒体
|
|
US7774219B1
(en)
|
2000-04-28 |
2010-08-10 |
Microsoft Corporation |
Long running transaction integration with selective dehydration and selective compensation
|
|
US7409356B1
(en)
|
2000-06-21 |
2008-08-05 |
Applied Systems Intelligence, Inc. |
Method and system for intelligent supply chain collaboration
|
|
US6892192B1
(en)
*
|
2000-06-22 |
2005-05-10 |
Applied Systems Intelligence, Inc. |
Method and system for dynamic business process management using a partial order planner
|
|
US8190463B2
(en)
*
|
2000-09-06 |
2012-05-29 |
Masterlink Corporation |
System and method for managing mobile workers
|
|
US7283971B1
(en)
*
|
2000-09-06 |
2007-10-16 |
Masterlink Corporation |
System and method for managing mobile workers
|
|
US20020032692A1
(en)
*
|
2000-09-08 |
2002-03-14 |
Atsuhito Suzuki |
Workflow management method and workflow management system of controlling workflow process
|
|
EP1328890A2
(de)
|
2000-10-20 |
2003-07-23 |
Siemens Aktiengesellschaft |
System und verfahren zum verwalten von softwareapplikationen, insbesondere mes-applikationen
|
|
US7155491B1
(en)
|
2000-11-13 |
2006-12-26 |
Websidestory, Inc. |
Indirect address rewriting
|
|
US7426687B1
(en)
*
|
2001-01-04 |
2008-09-16 |
Omniture, Inc. |
Automatic linking of documents
|
|
US7184967B1
(en)
*
|
2001-03-06 |
2007-02-27 |
Microsoft Corporation |
System and method utilizing a graphical user interface of a business process workflow scheduling program
|
|
US7483841B1
(en)
*
|
2001-07-06 |
2009-01-27 |
Eproject Management, Llc |
Project management system and method
|
|
US7120699B2
(en)
*
|
2001-09-20 |
2006-10-10 |
Ricoh Company, Ltd. |
Document controlled workflow systems and methods
|
|
US7685527B2
(en)
*
|
2001-11-20 |
2010-03-23 |
Siebel Systems, Inc. |
Method and apparatus for controlling view navigation in workflow systems
|
|
US7152075B2
(en)
*
|
2001-12-21 |
2006-12-19 |
International Business Machines Corporation |
System and method for removing rules from a data administration system
|
|
US7219301B2
(en)
*
|
2002-03-01 |
2007-05-15 |
Iparadigms, Llc |
Systems and methods for conducting a peer review process and evaluating the originality of documents
|
|
US20040054566A1
(en)
*
|
2002-06-17 |
2004-03-18 |
J'maev Jack Ivan |
Method and apparatus for event driven project management
|
|
US20070129953A1
(en)
*
|
2002-10-09 |
2007-06-07 |
Business Objects Americas |
Methods and systems for information strategy management
|
|
AU2003301602A1
(en)
*
|
2002-10-23 |
2004-05-13 |
David Theiler |
Method and apparatus for managing workflow
|
|
US7610575B2
(en)
*
|
2003-01-08 |
2009-10-27 |
Consona Crm Inc. |
System and method for the composition, generation, integration and execution of business processes over a network
|
|
US7703000B2
(en)
*
|
2003-02-13 |
2010-04-20 |
Iparadigms Llc |
Systems and methods for contextual mark-up of formatted documents
|
|
CA2527864C
(en)
*
|
2003-04-30 |
2016-05-24 |
Landmark Graphics Corporation |
Stochastically generating facility and well schedules
|
|
US20050182641A1
(en)
*
|
2003-09-16 |
2005-08-18 |
David Ing |
Collaborative information system for real estate, building design, construction and facility management and similar industries
|
|
DE10354146A1
(de)
*
|
2003-11-19 |
2005-06-30 |
Schneider Electric Gmbh |
Verfahren zur Entwicklung und Implementierung eines Modells zur formalen Beschreibung von mehrere verteilte Komponenten aufweisenden kollaborativen Systemen, insbesondere von intelligenten flexiblen Produktionsautomatisierungssystemen
|
|
US7849052B2
(en)
*
|
2004-01-28 |
2010-12-07 |
Paul David Vicars |
Electronic document manager
|
|
JP2005285106A
(ja)
*
|
2004-03-01 |
2005-10-13 |
Ricoh Co Ltd |
プロセス管理装置、ユーザ端末装置、プロセス管理プログラム、ユーザ端末プログラム、記録媒体、プロセス管理方法及び検索方法
|
|
US20050256818A1
(en)
*
|
2004-04-30 |
2005-11-17 |
Xerox Corporation |
Workflow auto generation from user constraints and hierarchical dependence graphs for workflows
|
|
US7593916B2
(en)
*
|
2004-08-19 |
2009-09-22 |
Sap Ag |
Managing data administration
|
|
US20060059419A1
(en)
*
|
2004-09-13 |
2006-03-16 |
Santicola Ronald V |
Cube method of film notation
|
|
US20060074904A1
(en)
*
|
2004-09-30 |
2006-04-06 |
Mungara Ajay M |
Content delivery rendering engine
|
|
US20060074704A1
(en)
*
|
2004-10-01 |
2006-04-06 |
Microsoft Corporation |
Framework to model cross-cutting behavioral concerns in the workflow domain
|
|
US7805324B2
(en)
*
|
2004-10-01 |
2010-09-28 |
Microsoft Corporation |
Unified model for authoring and executing flow-based and constraint-based workflows
|
|
US8024303B2
(en)
*
|
2005-07-29 |
2011-09-20 |
Hewlett-Packard Development Company, L.P. |
Software release validation
|
|
JP5657189B2
(ja)
*
|
2005-11-09 |
2015-01-21 |
株式会社神戸製鋼所 |
スケジュール修正装置及びスケジュール修正プログラム、並びにスケジュール修正方法
|
|
WO2007076137A2
(en)
*
|
2005-12-27 |
2007-07-05 |
Late Night Writer, Llc |
System and method for creating a writing
|
|
US8595047B2
(en)
*
|
2006-02-13 |
2013-11-26 |
Microsoft Corporation |
Automatically-generated workflow report diagrams
|
|
US8046703B2
(en)
*
|
2006-02-28 |
2011-10-25 |
Sap Ag |
Monitoring and integration of an organization's planning processes
|
|
US20070239498A1
(en)
*
|
2006-03-30 |
2007-10-11 |
Microsoft Corporation |
Framework for modeling cancellation for process-centric programs
|
|
US20080021758A1
(en)
*
|
2006-07-05 |
2008-01-24 |
Jan Teichmann |
Responsibility determination
|
|
US8739068B2
(en)
*
|
2007-06-15 |
2014-05-27 |
Microsoft Corporation |
Dynamic user interface for in-diagram shape selection
|
|
US8683436B2
(en)
*
|
2007-12-19 |
2014-03-25 |
Sap Ag |
Timer patterns for process models
|
|
US8762871B2
(en)
*
|
2008-02-03 |
2014-06-24 |
Microsoft Corporation |
Dynamic preview of diagram elements to be inserted into a diagram
|
|
WO2010036803A2
(en)
*
|
2008-09-24 |
2010-04-01 |
Savvion Inc. |
Computer software
|
|
US9741006B2
(en)
|
2010-05-14 |
2017-08-22 |
Oracle International Corporation |
System and method for providing complex access control in workflows
|
|
US9589240B2
(en)
*
|
2010-05-14 |
2017-03-07 |
Oracle International Corporation |
System and method for flexible chaining of distinct workflow task instances in a business process execution language workflow
|
|
US9852382B2
(en)
|
2010-05-14 |
2017-12-26 |
Oracle International Corporation |
Dynamic human workflow task assignment using business rules
|
|
EP2612257A4
(en)
|
2010-09-03 |
2016-09-07 |
Iparadigms Llc |
SYSTEMS AND METHOD FOR DOCUMENT ANALYSIS
|
|
US20120084110A1
(en)
*
|
2010-10-05 |
2012-04-05 |
M3 Technology, Inc. |
System and method for smart oil, gas and chemical process scheduling
|
|
US20140249882A1
(en)
*
|
2012-10-19 |
2014-09-04 |
The Curators Of The University Of Missouri |
System and Method of Stochastic Resource-Constrained Project Scheduling
|
|
JP6048957B2
(ja)
|
2012-12-21 |
2016-12-21 |
インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation |
情報処理装置、プログラム、及び情報処理方法
|
|
US9207887B1
(en)
|
2014-09-09 |
2015-12-08 |
Ricoh Company, Ltd. |
Presentation of predicted steps in a print workflow
|
|
US11222076B2
(en)
*
|
2017-05-31 |
2022-01-11 |
Microsoft Technology Licensing, Llc |
Data set state visualization comparison lock
|
|
JP7015340B2
(ja)
*
|
2020-03-26 |
2022-02-02 |
株式会社日立製作所 |
作業計画最適化方法及びシステム
|
|
JP2023552322A
(ja)
*
|
2020-11-24 |
2023-12-15 |
ビーエーエスエフ ソシエタス・ヨーロピア |
工程制御システムの制御パラメータを生成するコンピュータ実装された方法
|