JP3833403B2 - 大断面トンネルのいわし骨工法 - Google Patents
大断面トンネルのいわし骨工法 Download PDFInfo
- Publication number
- JP3833403B2 JP3833403B2 JP33802398A JP33802398A JP3833403B2 JP 3833403 B2 JP3833403 B2 JP 3833403B2 JP 33802398 A JP33802398 A JP 33802398A JP 33802398 A JP33802398 A JP 33802398A JP 3833403 B2 JP3833403 B2 JP 3833403B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- section
- arch
- steel pipe
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000000988 bone and bone Anatomy 0.000 title claims description 6
- 238000000034 method Methods 0.000 title claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 238000002347 injection Methods 0.000 claims description 20
- 239000007924 injection Substances 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 238000010276 construction Methods 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 9
- 239000011435 rock Substances 0.000 claims description 8
- 238000005553 drilling Methods 0.000 claims description 5
- 239000004567 concrete Substances 0.000 claims description 4
- 238000009415 formwork Methods 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000009412 basement excavation Methods 0.000 description 17
- 230000003014 reinforcing effect Effects 0.000 description 4
- 102000001999 Transcription Factor Pit-1 Human genes 0.000 description 3
- 108010040742 Transcription Factor Pit-1 Proteins 0.000 description 3
- 238000005452 bending Methods 0.000 description 3
- 239000000835 fiber Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000011378 shotcrete Substances 0.000 description 2
- 241001125046 Sardina pilchardus Species 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011210 fiber-reinforced concrete Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 235000019512 sardine Nutrition 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
【発明の属する技術分野】
本発明は、トンネル周辺地山を改良補強して人工地山アーチを造成し、トンネルを安全且つ迅速に掘進する工法に関するものである。
【0002】
【従来の技術】
従来、軟弱な地盤でトンネルを掘進する工法として、地山を補強して自立性を高め、崩落を防止するために、切羽からトンネルの周辺の地山に掘進方向に向けてボーリングを行い、ボーリング孔内に注入管を挿入し地盤硬化材を注入して周辺地山を補強し、補強された部分を掘削して支保覆工を行うという工程を繰り返しながら掘進するものがある(特開平1−137094号参照)。
【0003】
【発明が解決しようとする課題】
しかし、このような工法では、地山補強のためにボーリングと注入を行う作業と、トンネルの掘削と覆工を行う作業とを交互に繰り返して行わねばならないので作業が煩雑で能率が悪く、工期が長期化するという問題がある。
【0004】
この発明は、トンネルの掘進におけるかかる問題を解決するものであって、トンネルの工区全長に亙り予め地山の補強改良を行うことにより、大断面トンネルを安全且つ迅速に掘進することのできる工法を提供することを目的とする。
【0005】
【課題を解決するための手段】
本発明の大断面トンネルのいわし骨工法(SBR工法)では、トンネルの工区全長に亙り導坑を掘進し貫通させた後、さく岩機と曲がり鋼管によって、所定間隔で導坑からトンネルの断面の周縁に沿って曲がりさく孔を行ない、さく孔内に注入管を挿入後曲がり鋼管を抜き、注入管からトンネル周辺地山に注入材を注入して人工地山アーチを造成してからトンネルを掘削し、型枠を前進させてコンクリートを打設し二次覆工を行うことによりトンネルを掘進するようにして上記課題を解決している。
【0006】
この工法では、まず、トンネルの工区全長に亙り導坑を急速掘進し貫通させた後、さく岩機と曲がり鋼管による曲がりさく孔と、注入管の挿入後の曲がり鋼管の抜出し、注入材の注入による地山の改良補強の作業を導坑から行なうので、切羽で掘削作業の合間に行う場合と異なり能率よく作業ができる。また、地山の改良補強の作業を行なうときには、導坑は既に貫通しているので、曲がりさく孔と注入を複数箇所で同時に平行して行うことも可能であり、迅速に人工地山アーチが造成される。
【0007】
人工地山アーチを造成してからトンネルを掘削するので、掘削作業は安全に行うことができ、また、切羽では掘削と覆工作業のみを連続して行うので作業が煩雑化せず能率良く掘進することができる。
導坑を頂設導坑とすると、上部半断面先進工法でトンネルを掘進する場合に、上部に人工地山アーチを造成するのに好都合である。
【0008】
導坑を中段の壁導坑とし、導坑から上方にトンネルの断面のアーチに沿って頂部まで曲がりボーリングを行なえば、軟弱地山の上半掘削に適用できる。
【0009】
【発明の実施の形態】
図1は本発明の工法の実施の一形態を説明する頂設導坑を設けた大断面トンネルの断面図、図2は頂設導坑を設けた大断面トンネルの概要を示す斜視図、図3はさく岩機と曲がり鋼管による曲がりさく孔の説明図である。
【0010】
大断面のトンネル1を掘進する場合、まず、トンネル1の工区全長に亙り幅5m程度の頂設導坑2を、トンネルボーリングマシン(TBM)や横型ロードヘッダー(RH)等の掘進機を用いて急速掘進し貫通させる。
その後、頂設導坑2から、通常のさく岩機20と曲がり鋼管3を用いて、トンネル1の断面のアーチに沿って曲がりさく孔を行なう。このとき、直径120mm、単位長さ1.5〜2m程度の曲がり鋼管3を継ぎながらさく孔する。
【0011】
このさく孔内にマンシェットチューブ等の注入管(図示略)を挿入後曲がり鋼管3を抜出し、注入管からトンネル周辺地山に注入材を注入して人工地山アーチ4を造成する。
注入には、二重管ダブルパッカー等を利用し、注入管から外側の地山約2mの範囲が1軸圧縮強度σgd>3MPa程度となるように高圧のセメント系注入材を注入する。トンネルの掘進方向への注入管の設置間隔は、地山条件に応じて1.5〜2mとする。曲がりさく孔の曲率の関係からさく孔方向を前後45度程度まで斜めにすることもできる。
【0012】
このようにして、図2に示すように、トンネル1の断面のアーチ上にいわし骨(Sardin Bone)状に人工地山アーチ4が造成される。
人工地山アーチ4の造成が終わると、トンネル1の上半部1Aを1進行1.5〜3mづつ掘削する。強度150MPa級までの地山の掘削は、原則として大型ブレーカー(Bk)と横型ロードヘッダー(RH)による機械掘削とする。
【0013】
掘削後直ちに、吊り型枠6を前進させ、鋼繊維を40〜50kg/m3 混和した高流動急結コンクリートを厚さ50〜70cm打設してアーチ部7の二次覆工を終える。
下半部1Bの掘削も機械掘削が望ましいが、必要があればゆるめ爆破を併用する。側壁部8には吹付コンクリート9とロックボルト10を施工する。側壁部8とインバート部11の覆工も原則として鋼繊維補強コンクリートとするが、鋼繊維の量は適宜加減する。逆巻きとなる上下半の打継目については、必要があれば、予めプラスティック管等を設置しておいて、後で低粘性のアクリル酸塩系材料等を注入して止水する。
【0014】
このように、まずトンネル1の工区全長に亙り頂設導坑2を急速掘進し貫通させた後、さく岩機20と曲がり鋼管3による曲がりさく孔と、注入管の挿入後の曲がり鋼管3の抜出し、注入材の注入による地山の改良補強の作業を頂設導坑2から行なうので、切羽で掘削作業の合間に行う場合と異なり能率よく作業ができる。また、地山の改良補強の作業を行なうときには、頂設導坑2は既に貫通しているので、曲がりさく孔と注入を複数箇所で同時に平行して行うことも可能であり、迅速に人工地山アーチ4が造成される。
【0015】
人工地山アーチ4を必要箇所に造成してからトンネル1を掘削するので、掘削作業は安全に行うことができる。また、上半部1A、下半部1Bは各々専進させ、切羽では掘削と覆工作業のみを連続して行うので作業が煩雑化せず能率良く急速に掘進することができる。
【0016】
なお、条件によっては導坑を中段の側壁導坑とすることもできる。この場合には、側壁部に導坑を掘進し、この導坑から、さく岩機と曲がり鋼管により、上方にトンネルの断面のアーチに沿って頂部まで曲がりさく孔を行ない、注入管を挿入後曲がり鋼管を抜出し、注入管からトンネル周辺地山に注入材を注入して人工地山アーチを造成する。このとき左右の鋼管の先端部の位置は必ずしも一致せずともよい。
【0017】
【発明の効果】
以上説明したように、本発明の工法によれば、トンネルの工区全長に亙り予め地山の補強改良を行うことにより、大断面トンネルを安全且つ迅速に掘進することができる。
【0018】
導坑を頂設導坑とすると、上部半断面先進工法でトンネルを掘進する場合に、上部に人工地山アーチを造成するのに好都合である。
導坑を側壁導坑とし、導坑から上方にトンネルの断面のアーチに沿って頂部まで曲がりボーリングを行なえば軟弱地山の上半掘削に適用できる。
【図面の簡単な説明】
【図1】本発明の工法の実施の一形態を説明する頂設導坑を設けた大断面トンネルの断面図である。
【図2】頂設導坑を設けた大断面トンネルの概要を示す斜視図である。
【図3】さく岩機と曲がり鋼管による曲がりさく孔の説明図である。
【符号の説明】
1 トンネル
1A 上半部
1B 下半部
2 頂設導坑
3 鋼管
4 人工地山アーチ
6 吊り型枠
7 アーチ部
8 側壁部
9 吹付コンクリート
10 ロックボルト
11 インバート部
20 さく岩機
Claims (3)
- トンネルの工区全長に亙り導坑を掘進し貫通させた後、さく岩機と曲がり鋼管によって、所定間隔で導坑からトンネルの断面の周縁に沿って曲がりさく孔を行ない、さく孔内に注入管を挿入後曲がり鋼管を抜出し、注入管からトンネル周辺地山に注入材を注入して人工地山アーチを造成してからトンネルを掘削し、型枠を前進させてコンクリートを打設し二次覆工を行うことにより、トンネルを掘進する大断面トンネルのいわし骨工法。
- 導坑が頂設導坑であることを特徴とする請求項1記載の大断面トンネルのいわし骨工法。
- 導坑が中段の側壁導坑であることを特徴とする請求項1記載の大断面トンネルのいわし骨工法。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/763,993 US6520718B1 (en) | 1998-11-27 | 1998-11-16 | Sardine-bone construction method for large-section tunnel |
JP33802398A JP3833403B2 (ja) | 1998-11-27 | 1998-11-27 | 大断面トンネルのいわし骨工法 |
PCT/JP1999/006397 WO2000032906A1 (fr) | 1998-11-27 | 1999-11-16 | Procede de construction en arete de sardine pour tunnel de grande section |
EP99973093A EP1178180A4 (en) | 1998-11-27 | 1999-11-16 | CONSTRUCTION METHOD FOR LARGE SPACES |
CN99811521A CN1105819C (zh) | 1998-11-27 | 1999-11-16 | 大断面隧道的沙丁鱼鱼刺式施工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33802398A JP3833403B2 (ja) | 1998-11-27 | 1998-11-27 | 大断面トンネルのいわし骨工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000160980A JP2000160980A (ja) | 2000-06-13 |
JP3833403B2 true JP3833403B2 (ja) | 2006-10-11 |
Family
ID=18314217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP33802398A Expired - Fee Related JP3833403B2 (ja) | 1998-11-27 | 1998-11-27 | 大断面トンネルのいわし骨工法 |
Country Status (5)
Country | Link |
---|---|
US (1) | US6520718B1 (ja) |
EP (1) | EP1178180A4 (ja) |
JP (1) | JP3833403B2 (ja) |
CN (1) | CN1105819C (ja) |
WO (1) | WO2000032906A1 (ja) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100398781C (zh) * | 2002-11-18 | 2008-07-02 | 范文达 | 隧道断裂式开挖方法及其开挖机组 |
KR101069706B1 (ko) * | 2009-04-07 | 2011-10-04 | 주식회사 엔티에스이앤씨 | 암반 경계층의 지하터널 형성용 구조물 설치방법 |
CN101566064B (zh) * | 2009-06-01 | 2011-06-08 | 中国建筑第八工程局有限公司 | 一种大断面隧道施工方法 |
ES2361702B2 (es) * | 2009-12-09 | 2011-11-02 | Universidad De Alicante | Procedimiento para la ejecución de túneles o perforaciones en obra civil mediante tuneles de sacrificio. |
US9080444B1 (en) * | 2010-01-04 | 2015-07-14 | Rei, Inc. | Method and system of coal mine roof stabilization |
CN102071947B (zh) * | 2011-01-21 | 2013-02-06 | 中交四航局第一工程有限公司 | 大跨度隧道洞口软弱围岩段施工方法 |
CN102296960A (zh) * | 2011-01-28 | 2011-12-28 | 沈阳市政集团有限公司 | 一种预应力后背箱涵顶进施工方法 |
CN102182466B (zh) * | 2011-04-08 | 2013-05-01 | 中铁上海设计院集团有限公司 | 隧道双侧壁导坑结合拱部跳挖开挖方法 |
CN102155239A (zh) * | 2011-04-15 | 2011-08-17 | 中铁隧道集团有限公司 | 用于高地应力软岩隧道正台阶法开挖的地应力释放方法 |
JP6223751B2 (ja) * | 2013-08-30 | 2017-11-01 | 東日本高速道路株式会社 | 既設トンネルのインバート施工方法 |
CN104453937B (zh) * | 2014-12-12 | 2017-01-04 | 中铁十九局集团有限公司 | 一种隧道拱顶接地端子预埋装置及其预埋方法 |
CN106351662B (zh) * | 2016-08-29 | 2017-10-17 | 济南力稳岩土工程有限公司 | 分隔式分段注浆加固方法、施工方法及应用 |
US20180069380A1 (en) * | 2016-09-07 | 2018-03-08 | John Giorgio | Submersible Meter Box |
CN106968686A (zh) * | 2017-03-28 | 2017-07-21 | 中国五冶集团有限公司 | 一种管棚施工方法 |
CN106948840B (zh) * | 2017-05-17 | 2019-04-30 | 洛阳理工学院 | 一种与旧隧道交叉修建新隧道的方法 |
JP6857097B2 (ja) * | 2017-07-11 | 2021-04-14 | 鹿島建設株式会社 | トンネルの構築方法 |
GB2582376B (en) * | 2019-03-22 | 2021-06-09 | Hypertunnel Ip Ltd | Method and system of constructing an underground tunnel |
CN110219679B (zh) * | 2019-07-22 | 2024-08-20 | 西南交通大学 | 一种软弱地层隧道衬砌结构 |
CN111691894A (zh) * | 2020-06-22 | 2020-09-22 | 中铁十八局集团有限公司 | 一种洞口管棚施工工艺 |
CN112796796A (zh) * | 2021-02-08 | 2021-05-14 | 中铁四局集团第一工程有限公司 | 一种富水冻融破碎围岩隧道支护方法 |
CN114086968B (zh) * | 2021-11-27 | 2024-04-09 | 中铁广州工程局集团有限公司 | 一种下穿既有建筑暗挖隧道施工方法 |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US528367A (en) * | 1894-10-30 | Robert l | ||
US721830A (en) * | 1902-02-18 | 1903-03-03 | Charles P Perin | Method of freezing the ground and excavating or tunneling. |
US3631680A (en) * | 1968-06-25 | 1972-01-04 | Tube Headings Ltd | Construction of tunnels |
ES414134A1 (es) * | 1973-04-27 | 1976-02-01 | Mackina Westfalia S A | Procedimiento y dispositivo para la construccion frontal detuneles. |
US3968655A (en) * | 1973-07-13 | 1976-07-13 | Mcglothlin William K | Method of reinforcing tunnels before excavation |
CH642416A5 (fr) * | 1978-02-21 | 1984-04-13 | Frankignoul Pieux Armes | Procede de construction d'ouvrages souterrains a parois verticales, dispositif pour l'execution du procede et ouvrage souterrain. |
US4666336A (en) * | 1985-09-26 | 1987-05-19 | Okumura Corporation | Method of and apparatus for building thin lining on tunnel |
JPH01137094A (ja) | 1987-11-24 | 1989-05-30 | Nit Co Ltd | トンネル等の掘削工法とこれに用いる注入装置 |
JPH07107359B2 (ja) * | 1988-06-15 | 1995-11-15 | 株式会社小松製作所 | 地下空洞施工法及びトンネル掘削機 |
IT1234069B (it) * | 1989-04-28 | 1992-04-29 | Trevi Spa | Procedimento per l'esecuzione del rivestimento di una galleria ed apparecchiatura per l'attivazione di tale procedimento |
JP3050925B2 (ja) | 1990-12-17 | 2000-06-12 | 東洋炭素株式会社 | 黒鉛発熱体及びその製造方法 |
JPH0617590A (ja) | 1991-01-14 | 1994-01-25 | Konoike Constr Ltd | トンネルの掘削工法 |
JP2551506B2 (ja) | 1991-07-16 | 1996-11-06 | 株式会社フジタ | トンネル先受工におけるアーチシエルの構築方法 |
JPH0674715A (ja) | 1992-08-28 | 1994-03-18 | Japan Steel Works Ltd:The | カメラ式プリント基板穴明機のキリ径検知方法及び装置 |
JPH06264698A (ja) | 1993-03-17 | 1994-09-20 | Mitsui Constr Co Ltd | トンネルの構築工法 |
JP2597298B2 (ja) | 1993-09-06 | 1997-04-02 | アイサワ工業株式会社 | トンネル切羽前方地山の先受け工法 |
IL112441A (en) * | 1995-01-25 | 1998-02-08 | Lipsker Yitshaq | Method for underground excavation |
DE19542971C2 (de) * | 1995-11-17 | 1999-01-21 | Flowtex Technologie Import Von | Verfahren zur vorauseilenden Firstsicherung von Tunnelauffahrungen |
JP3155471B2 (ja) | 1996-08-05 | 2001-04-09 | 山九株式会社 | トンネル工法及びトンネル支保構造 |
JP3824114B2 (ja) | 1997-11-28 | 2006-09-20 | 島田 巌乃 | 大断面トンネルの鯨骨工法 |
JP3252350B2 (ja) * | 1998-01-16 | 2002-02-04 | 鉄建建設株式会社 | トンネルの構造およびその施工方法 |
CA3080779C (en) * | 2013-01-17 | 2023-09-12 | Sun Patent Trust | Dynamic tdd uplink/downlink configuration using dci |
-
1998
- 1998-11-16 US US09/763,993 patent/US6520718B1/en not_active Expired - Fee Related
- 1998-11-27 JP JP33802398A patent/JP3833403B2/ja not_active Expired - Fee Related
-
1999
- 1999-11-16 CN CN99811521A patent/CN1105819C/zh not_active Expired - Fee Related
- 1999-11-16 EP EP99973093A patent/EP1178180A4/en not_active Withdrawn
- 1999-11-16 WO PCT/JP1999/006397 patent/WO2000032906A1/ja active Application Filing
Also Published As
Publication number | Publication date |
---|---|
CN1105819C (zh) | 2003-04-16 |
CN1320190A (zh) | 2001-10-31 |
JP2000160980A (ja) | 2000-06-13 |
WO2000032906A1 (fr) | 2000-06-08 |
EP1178180A4 (en) | 2005-06-15 |
EP1178180A1 (en) | 2002-02-06 |
US6520718B1 (en) | 2003-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3833403B2 (ja) | 大断面トンネルのいわし骨工法 | |
JP3824114B2 (ja) | 大断面トンネルの鯨骨工法 | |
JP7125550B2 (ja) | 逆アーチを備えた2段階高速閉鎖トンネルの支持構造及びその施工方法 | |
JP4958035B2 (ja) | シールドルーフ工法 | |
CN106884665B (zh) | 一种基于拱套拱的双连拱进洞施工方法 | |
JPH08170484A (ja) | 大断面トンネルの構築方法 | |
JP3927842B2 (ja) | 二重管掘り小径杭の構築方法 | |
JPH0835391A (ja) | 導坑による先行脚部補強型フォアパイリング工法 | |
JP2005029964A (ja) | 長尺フェイスボルトの施工方法 | |
JP4480907B2 (ja) | トンネルの掘削工法 | |
JP4269301B2 (ja) | 既設トンネルの断面拡大工法 | |
KR20090011442A (ko) | 쉬트 파일을 이용한 터널 굴착 공법 및 이에 의한 터널구조물 | |
JP5012149B2 (ja) | 地山の支持構造及び地山の支持方法 | |
JPH0913872A (ja) | 大断面アーチ形トンネルの掘進工法 | |
JP3851550B2 (ja) | 削孔ロッド埋設型の無拡幅長尺先受工法 | |
JPS6149473B2 (ja) | ||
JP2005036454A (ja) | 地下空洞の支保構造および支保工法 | |
JP2697762B2 (ja) | トンネルの構造とその築造方法 | |
JP3267571B2 (ja) | 地山補強工法 | |
JP7311894B2 (ja) | 地山補強工法 | |
JP3710991B2 (ja) | 地山補強工法 | |
JP2000073697A (ja) | レッグパイル工法 | |
CN217352449U (zh) | 一种人工挖孔桩超前支护系统和输送装置 | |
JP3804444B2 (ja) | 山岳トンネル工事における下方先受け工法 | |
JPH08165899A (ja) | 補強筋兼用の支保工を用いたトンネルの覆工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A625 | Written request for application examination (by other person) |
Free format text: JAPANESE INTERMEDIATE CODE: A625 Effective date: 20051124 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20051209 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20051209 Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20051209 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060704 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060719 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100728 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100728 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110728 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120728 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120728 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130728 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |