JP2005284388A - プラントの運転スケジュール最適化方法および最適化システム - Google Patents
プラントの運転スケジュール最適化方法および最適化システム Download PDFInfo
- Publication number
- JP2005284388A JP2005284388A JP2004093281A JP2004093281A JP2005284388A JP 2005284388 A JP2005284388 A JP 2005284388A JP 2004093281 A JP2004093281 A JP 2004093281A JP 2004093281 A JP2004093281 A JP 2004093281A JP 2005284388 A JP2005284388 A JP 2005284388A
- Authority
- JP
- Japan
- Prior art keywords
- optimization
- plant
- data
- calculation
- cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/042—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/048—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Software Systems (AREA)
- Entrepreneurship & Innovation (AREA)
- Medical Informatics (AREA)
- Evolutionary Computation (AREA)
- Automation & Control Theory (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】本発明に係るプラントの運転スケジュール最適化システム10は、1つ以上の制御対象プラント11の未来の運転計画値を送信するデータ入力手段14と、制御対象プラント11の運転データを送信する運転データ入力手段12と、両入力手段14,12から運転計画値およびプラント運転データを入力して制御対象プラント11の運転スケジュール最適化計算を行なう運転スケジュール演算装置13とを有する。運転スケジュール演算装置13は、運転スケジュールの最適化計算を行なう最適化演算部17と、制御対象プラント11の運転モードの種別、運転パターン、運転モードに応じた運転コストが予め格納され、記憶されたデータベース18とを備え、最適化演算部17の運転スケジュール最適化計算にデータベース18に記憶された記憶データが参照されるように設定したものである。
【選択図】 図1
Description
[数2]
起動運転パターン[Ystart(1),Ystart(2),…,Ystart(m)]
停止運転パターン[Ystop(1),Ystop(2),…,Ystop(m)]
が最適化演算部17から独立した予め運転パターン調整手段15で計算され、この起動運転パターンおよび停止運転パターンが運転スケジュール演算手段または装置13で予め任意のタイミングで計算されており、この計算結果は運転パターンデータベース18に予め格納され、記憶される。このため、プラントの運転スケジュール最適化計算では、運転パターンデータベース18に記録された起動運転パターンおよび停止運転パターンを最適化演算部17で参照し、取り込むだけで最適化演算を行なうことができ、最適化演算部17は短時間に、ほぼリアルタイムで最適運転スケジュールの解を迅速に求めることができる。
◎:発電ユニットを最適計算にて起動するか停止するか決定する。
○:発電ユニットを必ず運転し、その時の負荷は指定された値とする。
×:発電ユニットを必ず停止とする。
[運転スケジュール最適化問題の具体例]
最適化にて決定する
○:(式7)〜(式15)の中に現れる起動停止に関する2値変数の値は1固定とし、
指定された負荷になるように関連する最適化変数をその値に固定とする
×:(式7)〜(式15)の中に現れる起動停止に関する2値変数の値は0固定とする
δ2=1(2:00時の値)、
δ1=0(3:00時の値)、
δ2=1(3:00時の値)、
MW2=100(2:00時の値)、
MW2=100(3:00時の値)、
0:00時と1:00時は、指定なし
これによりプラントユーザが記号(◎、○、×)により指定した運転スケジュールを満足する最適化計算を実現することができる。
11 制御対象プラント
12 運転制御システム(運転データ入力手段、データ収集装置)
13 運転スケジュール演算装置
14 データ入力手段
15 運転パターン調整手段
17 最適化演算部
18 運転パターンデータベース
19 評価関数設定部
20 プラント予測モデル
21 制約条件設定部
30 運転スケジュール演算装置
31 データ処理装置
32 最適化演算手段(最適化演算部)
33 データ入力手段
34 最適化演算手段(最適化演算部)
36 データ通信手段(運転データ入力手段)
37 データ記憶手段
38 データ描画手段
39 表示装置
40 データ選択手段
41 選択データ指定手段
45 特殊コスト演算手段(運転パターン調整手段)
46 特殊コスト設定手段(運転パターンデータベース)
47 特性式設定手段(プラント予測モデル)
48 制約式設定手段(制約条件設定部)
49 モード選択式設定手段
50 総コスト計算式設定手段(評価関数設定部)
51 最適化補助データ入力手段
52 最適化補助データ記憶手段
55,63 画面
56 日付表示手段
57 日付選択手段
58 運転計画値入力手段
59 補間実施手段
60 グラフ表示手段
61 パターン選択手段
64 日付表示手段
65 日付選択手段
66 運転状態指定手段
Claims (13)
- 1つ以上の制御対象プラントの特性モデル、運転制約条件、現在から将来に亘る運転計画値に基づき、コスト評価関数が最小となる最適運転スケジュールを計算するプラントの運転スケジュール最適化方法において、
前記制御対象プラントの運転モードの種別を整数の運転モード変数として運転スケジュール最適化計算における独立変数の一部に有し、
運転モード変数に応じて予め決められた運転パターンを運転拘束条件として付与し、
運転モード毎の運転コストあるいはモード変化時の運転コストを前記コスト評価関数内で最小となるように前記制御対象プラントの運転スケジュール最適化計算を行なうことを特徴とするプラントの運転スケジュール最適化方法。 - 前記制御対象プラントの運転モードの種別、運転パターン、運転モードに応じた運転コストを最適化演算部とは異なるデータベースに記憶させ、最適化演算部による制御対象プラントの運転スケジュール最適化計算に際し、前記データベースを参照することを特徴とする請求項1記載のプラントの運転スケジュール最適化方法。
- 特定の運転モードにおける最適な運転パターンおよびそのときの運転コストを、制御対象プラントのモデルを用いた最適化計算により算出し、算出された最適な運転パターンおよび運転コストで、運転モードの種別、運転パターン、運転モードに応じた運転コストを記憶したデータベースを更新することを特徴とする請求項1記載のプラントの運転スケジュール最適化方法。
- 1つ以上の制御対象プラントの未来の運転計画値を送信するデータ入力手段と、
前記制御対象プラントの運転データを送信する運転データ入力手段と、
前記両入力手段から運転計画値およびプラント運転データを入力して制御対象プラントの運転スケジュール最適化計算を行なう運転スケジュール演算装置とを有し、
上記運転スケジュール演算装置は、運転スケジュールの最適化計算を行なう最適化演算部と、前記制御対象プラントの運転モードの種別、運転パターン、運転モードに応じた運転コストが予め格納され、記憶されたデータベースとを備え、前記最適化演算部の運転スケジュール最適化計算に前記データベースに記憶された記憶データが参照されるように設定されたことを特徴とするプラントの運転スケジュール最適化システム。 - 前記運転スケジュール演算装置には、前記最適化演算部で運転スケジュールの最適化計算により算出された最適化結果を取り扱うデータ処理装置を電気的に接続して設けられ、
前記データ処理装置は、前記最適化演算部からの最適化結果を記憶するデータ記憶手段と、
このデータ記憶手段に記憶される記憶データから運転スケジュール演算装置の最適化演算を行なうに必要なデータを選択し、最適化入力データとして出力するデータ選択手段とを備えたことを特徴とする請求項4記載のプラントの運転スケジュール最適化システム。 - 前記データ処理装置は、制御対象プラントの運転制御を行なう運転制御システムよりプラント運転データを受信するデータ通信手段を有し、
このデータ通信手段は、データ記憶手段から最適化結果データを入力して運転制御システムに運転スケジュール最適化信号を出力するように設定したことを特徴とする請求項4または5記載のプラントの運転スケジュール最適化システム。 - 前記データ入力手段は、未来の運転計画値が入力される計画値入力手段と、
入力された未来の運転計画値の補間値を算出する補間実施手段とを備えたことを特徴とする請求項4記載のプラントの運転スケジュール最適化システム。 - 前記データ入力手段は、未来の運転計画値を入力する計画値入力手段と、入力された未来の運転計画値をグラフ表示するグラフ表示手段とを備えたことを特徴とする請求項4記載のプラントの運転スケジュール最適化システム。
- 前記データ入力手段は、制御対象プラントを構成する各ユニットおよびユニット構成機器の未来の運転計画値を入力する運転状態指定手段を備えたことを特徴とする請求項4記載のプラントの運転スケジュール最適化システム。
- 前記運転データ入力手段は、制御対象プラントのプラント状態量を表わす運転データを収集するデータ収集装置と、収集された運転データをデータ記憶手段に出力するデータ通信手段とを有することを特徴とする請求項4記載のプラントの運転スケジュール最適化システム。
- 前記データ処理装置は、データ記憶手段に記憶される最適化計算結果を読み出してデータを描画するデータ描画手段と、
このデータ描画手段からの描画信号に基づきデータ表示を行なう表示装置とを有することを特徴とする請求項5記載のプラントの運転スケジュール最適化システム。 - 前記運転スケジュール演算装置は、
制御対象プラントや運転条件の特性式を設定して出力する特性式設定手段と、
制御対象プラントの上下限値や変化率などの制約式を設定して出力する制約式設定手段と、
特殊コストを設定して出力する特殊コスト設定手段と、
制御対象プラントの運転モードを判定し選択するモード選択式を設定して出力するモード選択式設定手段と、
制御対象プラント運転の総コストを計算する総コスト式を設定して出力する総コスト計算式設定手段と、
運転スケジュール演算装置の運転最適化計算を行うために必要な各種データの値を設定し最適化補助データとして出力する最適化補助データ入力手段と、
この最適化補助データ入力手段からの最適化補助データを受け取り記憶し、所要時に最適化補助データとして出力する最適化補助データ記憶手段と、
前記特性式設定手段の特性式、制約式設定手段の制約式、特殊コスト設定手段の特殊コスト、モード選択式設定手段のモード選択式、総コスト計算式設定手段の総コスト式、最適化補助データ記憶手段からの最適化補助データからの入力に基づき、総コスト式で評価されるコストが最小となる最適運転スケジュールを求める最適化演算手段と、を備え、
上記最適化演算手段は、最適化演算部を構成して運転スケジュール最適化計算により算出された最適化結果をデータ処理装置に出力するように設定したことを特徴とする請求項4記載のプラントの運転スケジュール最適化システム。 - 前記運転スケジュール演算装置は、最適化演算部としての最適化演算手段から出力される最適化結果に基づき、起動コスト、停止コスト、待機コスト等の特殊コストを算出する特殊コスト演算手段を外付けで備え、
上記特殊コスト演算手段で算出された特殊コストを特殊コスト設定手段に出力する一方、特殊コスト設定手段は受け取った特殊コストを最適化演算手段に出力するように設定したことを特徴とする請求項4または12記載のプラントの運転スケジュール最適化システム。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004093281A JP4115958B2 (ja) | 2004-03-26 | 2004-03-26 | プラントの運転スケジュール最適化方法および最適化システム |
CNA2005100560822A CN1673910A (zh) | 2004-03-26 | 2005-03-24 | 成套设备的运转计划最优化方法及最优化系统 |
US11/089,360 US7206644B2 (en) | 2004-03-26 | 2005-03-25 | Method and system for optimizing operation schedule of plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004093281A JP4115958B2 (ja) | 2004-03-26 | 2004-03-26 | プラントの運転スケジュール最適化方法および最適化システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005284388A true JP2005284388A (ja) | 2005-10-13 |
JP4115958B2 JP4115958B2 (ja) | 2008-07-09 |
Family
ID=35046492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004093281A Expired - Fee Related JP4115958B2 (ja) | 2004-03-26 | 2004-03-26 | プラントの運転スケジュール最適化方法および最適化システム |
Country Status (3)
Country | Link |
---|---|
US (1) | US7206644B2 (ja) |
JP (1) | JP4115958B2 (ja) |
CN (1) | CN1673910A (ja) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008108087A (ja) * | 2006-10-26 | 2008-05-08 | Toshiba Corp | 運転支援装置及びプログラム |
JP2009282799A (ja) * | 2008-05-23 | 2009-12-03 | Hitachi Ltd | プラント運転計画立案方法およびそのプログラム |
JP2011247577A (ja) * | 2010-05-28 | 2011-12-08 | General Electric Co <Ge> | 複合サイクル動作における安全なドラム水位を決定する方法およびシステム |
JP2013516670A (ja) * | 2009-12-31 | 2013-05-13 | アーベーベー・リサーチ・リミテッド | 発電プラントのための、プロセス最適化方法およびシステム |
JP2013527372A (ja) * | 2010-05-07 | 2013-06-27 | オーカン エナジー ゲーエムベーハー | 熱サイクルプロセスの制御 |
JP2015101975A (ja) * | 2013-11-21 | 2015-06-04 | 三菱日立パワーシステムズ株式会社 | 蒸気タービンプラント起動制御装置 |
JP2015518104A (ja) * | 2012-04-06 | 2015-06-25 | シーメンス エナジー インコーポレイテッド | 過渡状態期間における発電装置の不具合の分類および検出 |
JP2016105687A (ja) * | 2014-11-26 | 2016-06-09 | ゼネラル・エレクトリック・カンパニイ | 発電プラント発電ユニットの制御を強化するための方法およびシステム |
JP2016156306A (ja) * | 2015-02-24 | 2016-09-01 | 株式会社東芝 | 発電計画支援装置および発電計画支援方法 |
JP2017025819A (ja) * | 2015-07-23 | 2017-02-02 | 三菱日立パワーシステムズ株式会社 | 発電プラントの起動制御装置及び起動制御方法 |
JP2018081350A (ja) * | 2016-11-14 | 2018-05-24 | 株式会社日立製作所 | 運転支援装置及びプログラム |
CN108153149A (zh) * | 2016-12-05 | 2018-06-12 | 斗山重工业建设有限公司 | 联合循环发电厂的快速启动控制方法以及系统 |
JP2020529664A (ja) * | 2017-09-22 | 2020-10-08 | 日本電気株式会社 | 組み合わせ制御システム、組み合わせ制御方法、および、組み合わせ制御プログラム |
WO2022145330A1 (ja) * | 2021-01-04 | 2022-07-07 | 三菱重工業株式会社 | 燃料評価システム及び燃料評価方法 |
Families Citing this family (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090210081A1 (en) * | 2001-08-10 | 2009-08-20 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US8417360B2 (en) * | 2001-08-10 | 2013-04-09 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US8914300B2 (en) | 2001-08-10 | 2014-12-16 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20090204237A1 (en) * | 2001-08-10 | 2009-08-13 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US9729639B2 (en) * | 2001-08-10 | 2017-08-08 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US7797062B2 (en) * | 2001-08-10 | 2010-09-14 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20060041459A1 (en) * | 2004-08-18 | 2006-02-23 | The Boeing Company | System, method and computer program product for total effective cost management |
US20060161467A1 (en) * | 2005-01-14 | 2006-07-20 | Tarun Kumar | System and method for strategic budgeting of initial response for managing wildfires |
US20080021749A1 (en) * | 2006-07-21 | 2008-01-24 | David Alan Hope | Boiler energy management system |
JP4776590B2 (ja) * | 2007-06-19 | 2011-09-21 | 株式会社日立製作所 | 保守管理支援装置およびその表示方法、保守管理支援システム |
JP4383476B2 (ja) * | 2007-10-05 | 2009-12-16 | 新日本製鐵株式会社 | プラント制御システム及び方法 |
DE102007061604A1 (de) * | 2007-12-20 | 2009-06-25 | Alstom Technology Ltd. | Optimierung des Betriebs eines Kraftwerks |
US20090171493A1 (en) * | 2007-12-31 | 2009-07-02 | Nirmal Govind | System and method for performance based production scheduling and dispatching |
JP4627553B2 (ja) * | 2008-03-28 | 2011-02-09 | 株式会社日立製作所 | プラントの制御装置および火力発電プラントの制御装置 |
US20090264225A1 (en) * | 2008-04-17 | 2009-10-22 | Lee William B | Golf tee |
US8352148B2 (en) * | 2008-05-21 | 2013-01-08 | General Electric Company | System for controlling input profiles of combined cycle power generation system |
EP2159496A1 (en) * | 2008-08-29 | 2010-03-03 | Vito NV | Controller for energy supply systems |
US8321326B2 (en) | 2009-09-15 | 2012-11-27 | Auerbach Group Llc | Method and system for enhancing the efficiency of a digitally communicated data exchange |
US8195339B2 (en) * | 2009-09-24 | 2012-06-05 | General Electric Company | System and method for scheduling startup of a combined cycle power generation system |
US8812166B2 (en) * | 2009-10-20 | 2014-08-19 | Hewlett-Packard Development Company, L.P. | Supplying a resource to an entity from a resource actuator |
US20110276336A1 (en) * | 2010-03-25 | 2011-11-10 | Tracy Sweely | Method and apparatus for managing production complexity of high yield, multiple crop gardening and sustainable farming operations |
US8539059B2 (en) * | 2010-06-02 | 2013-09-17 | Hewlett-Packard Development Company, L.P. | Managing cooling devices and computing nodes in an infrastructure |
GB201012442D0 (en) * | 2010-07-26 | 2010-09-08 | Rolls Royce Plc | System control |
US20120209646A1 (en) * | 2011-02-16 | 2012-08-16 | Francesco Montrone | Method and computer program product for optimization of maintenance plans |
US20120283988A1 (en) * | 2011-05-03 | 2012-11-08 | General Electric Company | Automated system and method for implementing unit and collective level benchmarking of power plant operations |
CN102830616A (zh) * | 2011-06-14 | 2012-12-19 | 北京三博中自科技有限公司 | 一种蒸汽系统的运行优化系统和方法 |
CN102298371B (zh) * | 2011-06-28 | 2014-06-25 | 中国能源建设集团广东省电力设计研究院 | 一种分布式冷电联供系统控制方法 |
US20130073101A1 (en) * | 2011-09-15 | 2013-03-21 | General Electric Company | Systems and Methods for Startup of a Power Plant |
US8756180B2 (en) * | 2011-11-28 | 2014-06-17 | General Electric Company | Method and system for managing plant operation |
US9792568B2 (en) * | 2011-12-23 | 2017-10-17 | Hewlett Packard Enterprise Development Lp | Generating a capacity schedule for a facility |
JP5957235B2 (ja) | 2012-01-30 | 2016-07-27 | 株式会社東芝 | 運転計画システム |
US9134713B2 (en) * | 2012-05-11 | 2015-09-15 | Siemens Corporation | System and method for fault prognostics enhanced MPC framework |
WO2014001864A1 (en) * | 2012-06-29 | 2014-01-03 | Abb Technology Ltd. | A method for optimization of control and fault analysis in a thermal power plant |
CN102890450A (zh) * | 2012-09-27 | 2013-01-23 | 安徽省电力公司 | 一种在线的变压器经济运行优化平台 |
US9957843B2 (en) | 2013-12-31 | 2018-05-01 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
US20150184549A1 (en) | 2013-12-31 | 2015-07-02 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
JP5830706B2 (ja) * | 2014-01-29 | 2015-12-09 | パナソニックIpマネジメント株式会社 | 店員作業管理装置、店員作業管理システムおよび店員作業管理方法 |
CN104866698A (zh) * | 2014-02-23 | 2015-08-26 | 倪成胜 | 一种数据中心基础运营效率判定方法 |
US10018972B2 (en) * | 2014-06-10 | 2018-07-10 | General Electric Company | Economic optimization of power generation system with alternative operating modes |
US10447077B2 (en) * | 2017-04-26 | 2019-10-15 | Kohler Co. | Predictive generator events |
JP6851501B2 (ja) * | 2017-11-29 | 2021-03-31 | 三菱パワー株式会社 | 運転条件評価装置、運転条件評価方法、及びボイラの制御システム |
CN109840636B (zh) * | 2019-02-19 | 2020-09-25 | 清华大学 | 一种基于牛顿法的电力系统随机滚动调度方法 |
CN109728578B (zh) * | 2019-02-19 | 2020-09-25 | 清华大学 | 基于牛顿法求解分位数的电力系统随机动态机组组合方法 |
CN111443681B (zh) * | 2020-05-29 | 2021-05-11 | 聊城信源集团有限公司 | 超临界火电机组协调控制系统多模型预测控制设计方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57176409A (en) * | 1981-04-24 | 1982-10-29 | Hitachi Ltd | Method and apparatus for optimum operation device selection |
JPS61182102A (ja) * | 1985-02-07 | 1986-08-14 | Toshiba Corp | 浄水場制御装置 |
JPS6243044B2 (ja) * | 1982-03-19 | 1987-09-11 | Toshiba Kk | |
JPH0683433A (ja) * | 1992-08-31 | 1994-03-25 | Sony Corp | 位置決め制御装置 |
JPH06245280A (ja) * | 1993-02-15 | 1994-09-02 | Mitsubishi Electric Corp | 情報伝送装置 |
JPH09179604A (ja) * | 1995-09-13 | 1997-07-11 | Toshiba Corp | プラントの運転制御システム及び方法 |
JPH09229336A (ja) * | 1996-02-23 | 1997-09-05 | Toshiba Corp | ごみ焼却プラント監視装置 |
JPH1195804A (ja) * | 1997-09-24 | 1999-04-09 | Toshiba Corp | プラントデータ監視システム |
JP2000029534A (ja) * | 1998-07-08 | 2000-01-28 | Kobe Steel Ltd | 制御装置 |
JP2003248512A (ja) * | 2002-02-26 | 2003-09-05 | Hitachi Ltd | 発電設備の診断方法及び発電設備の診断システム |
JP2003284242A (ja) * | 2002-03-22 | 2003-10-03 | Meidensha Corp | 発電機の起動停止計画作成装置とその方法 |
JP2003314367A (ja) * | 2002-04-23 | 2003-11-06 | Daikin Ind Ltd | コージェネレーションシステムの運用支援システムおよび運用管理システム |
JP2004088842A (ja) * | 2002-08-23 | 2004-03-18 | Mitsubishi Electric Corp | 発電機制御装置 |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4466383A (en) * | 1983-10-12 | 1984-08-21 | The Babcock & Wilcox Company | Boiler cleaning optimization with fouling rate identification |
JPH06236202A (ja) * | 1993-02-10 | 1994-08-23 | Hitachi Ltd | プラントの運転方法及び装置 |
JP3666036B2 (ja) | 1994-11-04 | 2005-06-29 | 株式会社日立製作所 | 火力発電プラント起動制御システム及び起動制御方法 |
US5873251A (en) * | 1995-09-13 | 1999-02-23 | Kabushiki Kaisha Toshiba | Plant operation control system |
CA2273182A1 (en) * | 1996-11-27 | 1998-06-04 | Steag Ag | Method for optimizing fossil-fueled power stations |
WO2004084371A1 (ja) * | 1998-08-31 | 2004-09-30 | Kaoru Fujita | 発電プラントの最適化制御方法及び最適化制御装置 |
US6105520A (en) * | 1999-02-26 | 2000-08-22 | L&P Property Management Company | Quilt making automatic scheduling system and method |
JP2001255925A (ja) * | 2000-03-10 | 2001-09-21 | Mitsubishi Chemicals Corp | 生産計画の最適化システム |
EP1202142A1 (en) * | 2000-10-25 | 2002-05-02 | Abb Research Ltd. | Maintenance planning system and method |
US7991633B2 (en) * | 2000-12-12 | 2011-08-02 | On Time Systems, Inc. | System and process for job scheduling to minimize construction costs |
JP2002300720A (ja) | 2001-03-29 | 2002-10-11 | Toshiba Corp | 発電機の起動停止計画作成装置 |
JP2003052083A (ja) * | 2001-08-07 | 2003-02-21 | Hitachi Ltd | 発電プラントの遠隔運転操作システム |
JP2004171548A (ja) * | 2002-11-06 | 2004-06-17 | Fuji Electric Holdings Co Ltd | プラントの最適運用方法、最適設計方法、最適運転計画方法、及び最適化装置 |
US20040230541A1 (en) * | 2003-05-16 | 2004-11-18 | Lefton Steven A. | Process for estimating and reducing cost of cycling |
US8069077B2 (en) * | 2003-06-11 | 2011-11-29 | Kabushiki Kaisha Toshiba | Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing support method, and program for executing operation management support method on computer |
US8112300B2 (en) * | 2005-04-22 | 2012-02-07 | Air Liquide Large Industries U.S. Lp | Production optimizer for supply chain management |
-
2004
- 2004-03-26 JP JP2004093281A patent/JP4115958B2/ja not_active Expired - Fee Related
-
2005
- 2005-03-24 CN CNA2005100560822A patent/CN1673910A/zh active Pending
- 2005-03-25 US US11/089,360 patent/US7206644B2/en not_active Expired - Fee Related
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57176409A (en) * | 1981-04-24 | 1982-10-29 | Hitachi Ltd | Method and apparatus for optimum operation device selection |
JPS6243044B2 (ja) * | 1982-03-19 | 1987-09-11 | Toshiba Kk | |
JPS61182102A (ja) * | 1985-02-07 | 1986-08-14 | Toshiba Corp | 浄水場制御装置 |
JPH0683433A (ja) * | 1992-08-31 | 1994-03-25 | Sony Corp | 位置決め制御装置 |
JPH06245280A (ja) * | 1993-02-15 | 1994-09-02 | Mitsubishi Electric Corp | 情報伝送装置 |
JPH09179604A (ja) * | 1995-09-13 | 1997-07-11 | Toshiba Corp | プラントの運転制御システム及び方法 |
JPH09229336A (ja) * | 1996-02-23 | 1997-09-05 | Toshiba Corp | ごみ焼却プラント監視装置 |
JPH1195804A (ja) * | 1997-09-24 | 1999-04-09 | Toshiba Corp | プラントデータ監視システム |
JP2000029534A (ja) * | 1998-07-08 | 2000-01-28 | Kobe Steel Ltd | 制御装置 |
JP2003248512A (ja) * | 2002-02-26 | 2003-09-05 | Hitachi Ltd | 発電設備の診断方法及び発電設備の診断システム |
JP2003284242A (ja) * | 2002-03-22 | 2003-10-03 | Meidensha Corp | 発電機の起動停止計画作成装置とその方法 |
JP2003314367A (ja) * | 2002-04-23 | 2003-11-06 | Daikin Ind Ltd | コージェネレーションシステムの運用支援システムおよび運用管理システム |
JP2004088842A (ja) * | 2002-08-23 | 2004-03-18 | Mitsubishi Electric Corp | 発電機制御装置 |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008108087A (ja) * | 2006-10-26 | 2008-05-08 | Toshiba Corp | 運転支援装置及びプログラム |
JP2009282799A (ja) * | 2008-05-23 | 2009-12-03 | Hitachi Ltd | プラント運転計画立案方法およびそのプログラム |
KR101774205B1 (ko) * | 2009-12-31 | 2017-09-04 | 에이비비 리써치 리미티드 | 전력 플랜트를 위한 프로세스 최적화 방법 및 시스템 |
JP2013516670A (ja) * | 2009-12-31 | 2013-05-13 | アーベーベー・リサーチ・リミテッド | 発電プラントのための、プロセス最適化方法およびシステム |
JP2013527372A (ja) * | 2010-05-07 | 2013-06-27 | オーカン エナジー ゲーエムベーハー | 熱サイクルプロセスの制御 |
US10519814B2 (en) | 2010-05-07 | 2019-12-31 | Orcan Energy Ag | Control of a thermal cyclic process |
JP2011247577A (ja) * | 2010-05-28 | 2011-12-08 | General Electric Co <Ge> | 複合サイクル動作における安全なドラム水位を決定する方法およびシステム |
JP2015518104A (ja) * | 2012-04-06 | 2015-06-25 | シーメンス エナジー インコーポレイテッド | 過渡状態期間における発電装置の不具合の分類および検出 |
JP2015101975A (ja) * | 2013-11-21 | 2015-06-04 | 三菱日立パワーシステムズ株式会社 | 蒸気タービンプラント起動制御装置 |
JP2016105687A (ja) * | 2014-11-26 | 2016-06-09 | ゼネラル・エレクトリック・カンパニイ | 発電プラント発電ユニットの制御を強化するための方法およびシステム |
JP2016156306A (ja) * | 2015-02-24 | 2016-09-01 | 株式会社東芝 | 発電計画支援装置および発電計画支援方法 |
US10378375B2 (en) | 2015-02-24 | 2019-08-13 | Kabushiki Kaisha Toshiba | Power generation planning support apparatus and power generation planning support method |
JP2017025819A (ja) * | 2015-07-23 | 2017-02-02 | 三菱日立パワーシステムズ株式会社 | 発電プラントの起動制御装置及び起動制御方法 |
JP2018081350A (ja) * | 2016-11-14 | 2018-05-24 | 株式会社日立製作所 | 運転支援装置及びプログラム |
CN108153149A (zh) * | 2016-12-05 | 2018-06-12 | 斗山重工业建设有限公司 | 联合循环发电厂的快速启动控制方法以及系统 |
JP2020529664A (ja) * | 2017-09-22 | 2020-10-08 | 日本電気株式会社 | 組み合わせ制御システム、組み合わせ制御方法、および、組み合わせ制御プログラム |
JP7060080B2 (ja) | 2017-09-22 | 2022-04-26 | 日本電気株式会社 | 組み合わせ制御システム、組み合わせ制御方法、および、組み合わせ制御プログラム |
WO2022145330A1 (ja) * | 2021-01-04 | 2022-07-07 | 三菱重工業株式会社 | 燃料評価システム及び燃料評価方法 |
Also Published As
Publication number | Publication date |
---|---|
JP4115958B2 (ja) | 2008-07-09 |
CN1673910A (zh) | 2005-09-28 |
US20050246039A1 (en) | 2005-11-03 |
US7206644B2 (en) | 2007-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4115958B2 (ja) | プラントの運転スケジュール最適化方法および最適化システム | |
EP2312407B1 (en) | System and method for scheduling startup of a combined cycle power generation system | |
JP5251938B2 (ja) | プラントの制御装置及び火力発電プラントの制御装置 | |
JP2011048688A (ja) | プラントライフサイクル評価装置及び方法 | |
WO2007102269A1 (ja) | プラントの制御装置と制御方法及び火力発電プラントとその制御方法 | |
US10386826B2 (en) | Start-up control device and start-up control method for power plant | |
JP5033710B2 (ja) | プラント運転計画立案装置およびそのプログラム | |
JP2004178156A (ja) | 運転計画決定支援システム | |
JP2007138856A (ja) | 蒸気タービンプラントの起動スケジュール予測システムおよび予測方法、ならびに予測用プログラムおよび該プログラムを格納した記録媒体 | |
JP6032847B2 (ja) | 蒸気タービン起動制御システム | |
JP2016126453A (ja) | エネルギーシステムの最適運用計画立案装置及び方法、プログラム並びに記録媒体 | |
JP4296140B2 (ja) | プラント最適運転支援システムと方法、プログラム | |
JP4683284B2 (ja) | プラントの計画立案システムおよび計画立案方法 | |
JP3723931B2 (ja) | プラントの起動予測制御装置 | |
JP2009146145A (ja) | プラント最適運用システム、最適運転点計算方法及び最適運転点計算プログラム | |
JP2007255198A (ja) | エネルギープラントの最適運用システムと方法、およびプログラム | |
JP6472338B2 (ja) | 起動停止スケジュール作成装置及び起動停止スケジュール最適化システム | |
JP2004116416A (ja) | コンバインドサイクル発電プラントの運転方法 | |
JP2678216B2 (ja) | 火力発電プラント起動時運転支援装置 | |
JP2011028416A (ja) | プラント最適運転計画装置 | |
JP6163407B2 (ja) | プラント最適運転計画立案装置および方法 | |
JP7410083B2 (ja) | 起動制御装置、起動制御方法及び起動制御プログラム | |
JP2005261021A (ja) | 運用計画システムおよび運用計画立案プログラム | |
JP2009266141A (ja) | データ処理装置、及びデータ処理方法 | |
JP3887578B2 (ja) | プロセス運転計画システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060206 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070814 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070828 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071029 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080408 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080416 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110425 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110425 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130425 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140425 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |