EP3390263B1 - Verfahren zum errichten einer aufzugsanlage und an zunehmende gebäudehöhe anpassbare aufzugsanlage - Google Patents
Verfahren zum errichten einer aufzugsanlage und an zunehmende gebäudehöhe anpassbare aufzugsanlage Download PDFInfo
- Publication number
- EP3390263B1 EP3390263B1 EP16819301.9A EP16819301A EP3390263B1 EP 3390263 B1 EP3390263 B1 EP 3390263B1 EP 16819301 A EP16819301 A EP 16819301A EP 3390263 B1 EP3390263 B1 EP 3390263B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- guide rail
- elevator
- elevator car
- counterweight
- drive platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 122
- 239000000725 suspension Substances 0.000 description 52
- 238000009434 installation Methods 0.000 description 14
- 238000010276 construction Methods 0.000 description 12
- 239000000969 carrier Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
- B66B7/024—Lateral supports
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
- B66B7/027—Mounting means therefor for mounting auxiliary devices
Definitions
- the invention relates to a method for installing an elevator system in an elevator shaft of a building in its construction phase, in which method at least one lifting operation is carried out in order to adapt a usable lifting height of the elevator system to an increasing height of the building, in which a drive platform with an elevator drive machine and an elevator car hanging on the drive platform via at least one suspension means is lifted along at least one elevator car guide rail.
- the invention further relates to an elevator installation which is created using this method.
- the invention relates to a method for erecting an elevator system that can be adapted to an increasing building height, in which the counterweight track is arranged on the same side of the elevator car as one of the elevator car guide rails, and in the final state of the elevator system this elevator car guide rail is fastened to a plurality of guide rail holders enclosing the counterweight track.
- an elevator system adaptable to an increasing building height, which is built in a shell enclosing an elevator shaft of a building.
- the elevator installation comprises a machine platform on which an elevator drive machine with a traction sheave is mounted.
- a suspension element is guided around this traction sheave, which leads on the one hand to the elevator car and on the other hand to a counterweight.
- the machine platform can be raised together with the elevator car in the vertical direction along the guide rails of the elevator car.
- the lifting takes place with the aid of a hoist or a crane, the necessary extension of the suspension means being achieved by the suspension extension being fed from a supply roll.
- the machine platform can be supported at predetermined positions via four telescopic arms in the shaft walls of the elevator shaft by pushing the telescopic arms into suitable recesses.
- An elevator car guide rail and two counterweight guide rails are provided on the side of the elevator car on which the counterweight is arranged. These extend from the shaft floor to the retracted protective floor.
- the purpose of out of the FR 2 694 279 A1 known invention is the use of a To reduce the construction crane by adapting the usable height of the elevator system from time to time to the increasing building height, so that certain transports required during the construction phase of the building can already be carried out with the elevator system.
- the specified solution can only be used if the width of the counterweight is so small that its counterweight track - as in the FIGS FR 2 694 279 A1 shown - can be arranged with a fastening element between a front wall or a rear wall of the elevator shaft and the counterweight-side elevator car guide rail. Otherwise, the elevator car guide rail mentioned could not be attached to the adjacent shaft wall.
- an elevator arrangement according to the preamble of claim 1 is known.
- a lifting process can be carried out for the purpose of adapting a usable lifting height to an increasing height of the building, in which lifting process a drive platform, which carries a drive machine and an elevator car and a counterweight via flexible suspension means, is lifted along elevator car guide rails.
- a special arrangement of the suspension means of the elevator car and of the compensation traction means results in an optimal distribution of the supporting forces supporting the drive platform to support points in the elevator shaft wall or to guide rails supporting the drive platform.
- the object of the invention is to provide a method for erecting an elevator system in an elevator shaft of a building, in which method a usable lifting height of the elevator system can be adapted to an increasing height of the building, and to specify an elevator system which is produced by this method, both the method and the elevator system do not have the disadvantages of the prior art mentioned.
- the object is achieved by a method for erecting an elevator system in an elevator shaft of a building, in which method at least one is used to adapt a usable lifting height of the elevator system to an increasing height of the building Lifting operation is carried out, in which lifting operation at least one drive platform, which carries an elevator drive machine and, via flexible suspension means, an elevator car and a counterweight, are lifted along at least one elevator car guide rail, the at least one elevator car guide rail being extended above the drive platform in the upward direction and in the area before the lifting process this extension is fixed to a shaft wall of the elevator shaft by means of at least one auxiliary carrier, and wherein after the lifting process the at least one auxiliary carrier which is then located below the drive platform is replaced by a final guide rail holder designed differently from the auxiliary carrier.
- shaft wall is to be understood to mean any type of lateral limitation of the elevator shaft on which components of the elevator system can be fixed.
- shaft walls can for example consist only of steel girders.
- a drive platform can also be raised along the elevator car guide rails if parts of the drive platform would collide with guide rail holders arranged above the drive platform in their final embodiment.
- counterweight roadway used in the following is intended to express that the counterbalance roadway that can already be used is gradually extended upwards by mounting further guide rail brackets and fastening the counterweight guide rails to them.
- counterweight roadway is also used simply because it results from the context whether the part that is already usable or the part that is being created is meant.
- an elevator installation in which the counterweight track is arranged on the same side of the elevator car as one of the elevator car guide rails, comprises a plurality of guide rail holders, each with at least two support elements projecting at right angles to a shaft wall into the elevator shaft and a cross member, the support elements and the cross member of each guide rail holder form a frame lying in a horizontal plane and at least partially enclosing the counterweight roadway.
- the guide rail holders are fixed in place on a shaft wall of the elevator shaft. Vertical distances are provided between the individual guide rail holders, which are more or less regular depending on the structural conditions.
- a counterweight guide rail can then be attached to each of the two supporting elements of a guide rail holder, and an elevator car guide rail can be attached to the cross member.
- the drive platform can be designed such that it would collide with such conventional guide rail holders during a lifting operation.
- the at least one elevator car guide rail above the drive platform is therefore extended in the upward direction and temporarily fixed to the counterweight-side shaft wall in the region of this extension by means of at least one auxiliary support.
- the at least one auxiliary carrier ensures the stability of the elevator car guide rail newly mounted above the drive platform before the lifting process, and on the other hand it is designed such that - in contrast to a conventional guide rail holder - it does not hinder the lifting movement of the drive platform during a lifting process.
- auxiliary carrier makes it possible to guide the drive platform and the elevator car during the lifting process on the part of the elevator car guide rail that extends above the drive platform and thus above the final guide rail holders before the lifting process .
- several auxiliary carriers can be used here, which after their respective disassembly are used again for a further lifting operation, ie H. above, can be used. Even after the elevator system has been completely erected, the auxiliary carriers can be used for a next elevator system to be erected, so that the use of such auxiliary carriers does not cause significantly higher material costs.
- the auxiliary carrier is designed in such a way that it does not form an obstacle to movement for the entire drive platform in the installed state during the lifting process.
- the term “entire drive platform” is to be understood here as the drive platform with all the components attached to it, in particular with the suspension element rollers and the drive pulley mounted on the drive platform.
- the counterweight is moved along a vertical counterweight track which is arranged on the same side of the elevator car as the elevator car guide rail, which is fixed to at least the final guide rail holder mentioned, the suspension means between the elevator car and the counterweight via a Traction sheave of the elevator drive machine and at least one deflection roller supported on the drive platform, and wherein at least the deflection roller or the drive sheave is arranged such that it protrudes into the counterweight roadway.
- the method for adapting the usable lifting height can also be used in an elevator installation in which the elevator car interacts with a counterweight which is arranged on the same side of the elevator car as one of the elevator car guide rails, the counterweight has a horizontal cross section which does not permit the arrangement of the counterweight - viewed in the direction of the elevator car depth - in front of or behind the laterally arranged elevator car guide rail.
- the final guide rail holder comprises a first support element and a second support element, which are fixed to the shaft wall on opposite sides of an emerging counterweight roadway and protrude into the elevator shaft before or after the lifting process at approximately the same height.
- a cross member that does not extend through the counterweight roadway that is created is integrated into the guide rail holder by the cross member at one end with an end of the first support element that projects into the elevator shaft and at its other end End is connected to an end of the second support element protruding into the elevator shaft.
- the final guide rail bracket consisting of the support elements and the cross member then encloses the counterweight track together with the shaft wall, the final guide track bracket - in contrast to the temporarily mounted auxiliary bracket - allowing unhindered vertical travel of the counterweight along the counterweight track.
- the at least one auxiliary support is fixed directly or indirectly to the shaft wall above the drive platform before the lifting process in such a way that it extends at least partially through the resulting counterweight roadway and does not hinder the lifting process of the drive platform, and after the lifting process the at least one subcarrier then located below the drive platform is disassembled and replaced by a final guide rail holder, the components of which, however, are at least partially arranged outside the resulting counterweight roadway within the vertical projection of the entire drive platform.
- the present task can be solved in a simple manner for many embodiments of elevator systems with an adaptable usable lifting height.
- two support elements assigned to a guide rail holder are fixed to the shaft wall above the drive platform before a lifting operation, a counterweight roadway extending between these support elements, and before the lifting operation, the at least one auxiliary support is temporarily indirectly or directly on the shaft wall fixed, wherein the auxiliary carrier extends at least partially through the resulting counterweight roadway, and the elevator car guide rail is up to the auxiliary carrier before the lifting process Extended at the top and temporarily attached to the auxiliary support in the area of its extension, and after the lifting process, a cross member that does not extend through the resulting counterweight roadway is integrated into the final guide rail holder, the elevator car guide rail is attached to this cross member and the auxiliary support is removed.
- the assembly of the support elements of the final guide rail brackets together with the associated auxiliary supports is easier to carry out before a lifting process and above the drive platform because of the better accessibility than after the lifting process below the drive platform.
- the jointly possible alignment of the support elements and the auxiliary supports saves assembly time.
- At least the drive platform with the elevator drive machine is lifted along the elevator car guide rail during the lifting process, the drive platform being guided on a part of the elevator car guide rail that is temporarily mounted on the auxiliary carrier.
- both the drive platform and the elevator car or the counterweight are raised and at least guided on the elevator car guide rail, which is temporarily mounted on at least one auxiliary carrier.
- the elevator car can be coupled to the drive platform and raised together with it.
- the counterweight remains supported in its lowermost position during the lifting process.
- the lengthening of the suspension means required in this process takes place in that a corresponding length of suspension means is fed in at the counterweight-side fixed point of the suspension means, this being rolled off by a suspension means reserve unit.
- Said suspension element reserve unit can, for example, be mounted on a shaft floor.
- the first support element and the second support element of the final guide rail holder are at least mounted approximately at the same height on opposite sides of the counterweight carriageway in the elevator shaft, a first counterweight guide rail being connected to the first support element and a second counterweight guide rail to the second support element, and a counterweight hanging from the suspension means together with the elevator car on the drive platform is guided on the first counterweight guide rail and the second counterweight guide rail.
- the counterweight guide rails can be mounted on the support elements of the guide rail holders before the lifting process, and they remain mounted accordingly even after the lifting process.
- the auxiliary carrier is temporarily or indirectly attached to the shaft wall in such a way that it extends essentially horizontally from the shaft wall of the elevator shaft through a central region of the counterweight carriageway being created into the elevator shaft.
- At least the extensions of the elevator car guide rails required above the drive platform and the temporary supports serving to temporarily fix the extension of the elevator car guide rails arranged on the counterweight side of the elevator car are assembled from a temporarily installed, liftable and lowerable assembly platform above the drive platform.
- the suspension means are extended during the lifting process, the extensions of the suspension means being supplemented or rolled off by a suspension means reserve unit in accordance with the additional length requirement caused by the new usable lifting height.
- This method step avoids the need to replace the suspension elements after each adjustment of the usable lifting height of the elevator system.
- the guide rail holders below the drive platform are brought into their final state by attaching their crossbeams, the crossbeams are connected to the elevator car guide rail arranged on the counterweight side of the elevator car, and the subcarriers also lying below the drive platform after the lifting process disassembled.
- the installation can be carried out in the elevator shaft which is gradually built up in height in accordance with the construction progress.
- the elevator system can be used from the start of construction to permanent installation.
- this enables the floors to be completed, rented and occupied to a certain extent from the bottom up when the building is partially completed.
- this results in a significant improvement in cost-effectiveness and a significantly more advantageous first occupancy period.
- Fig. 1 shows an elevator system 1 in an elevator shaft 2 of a building that can be adapted to an increasing building height in a schematic representation according to an exemplary embodiment of the invention.
- Fig. 2 shows the in Fig. 1 Elevator system 1 shown from the in Fig. 1 with II marked viewing direction.
- the elevator shaft comprises two in Fig. 1 visible shaft walls 10, 11 and two in Fig. 2 visible shaft walls 12, 13.
- An elevator system 1 is adapted to a newly reached greater height of a building under construction essentially by a drive platform 14 temporarily fixed in the elevator shaft 2, on which an elevator car 18 and a counterweight 28 are lifted by means of suspension means (19, 19 ') - Suspended and lowered, raised to a higher building level in the course of a lifting operation and temporarily fixed there again, the effective length of the suspension means being adapted to the new lifting height during the lifting operation, and the elevator system subsequently being put into operation again.
- the drive platform 14 can, if provided, be permanently fixed as a machine room floor.
- floors 4A to 4G are shown by way of example. In reality, a large number of such floors can arise during the construction of the building.
- the floor 4G which here temporarily represents the top floor and is possibly only partially erected, is used here to support a shaft roof 3, which protects the elevator shaft 2 from the weather and any objects falling down.
- the elevator installation 1 is described below with reference to FIG 1 and 2 explained further.
- the elevator installation 1 has the drive platform 14, which has an elevator drive machine 15, a support device 16 for supporting the drive platform 14 in the elevator shaft and includes a canopy 17.
- the drive platform 14 with the elevator drive machine 15 is supported on the building via the support device 16, the support device 16 being supported on the one hand in the recess 8 of the shaft wall 10 and on the other hand on the floor 4C.
- the canopy 17 serves, among other things, to protect against falling objects.
- the elevator installation 1 further comprises an elevator car 18 and a counterweight 28 which hang on the drive platform 14 via suspension means 19, 19 'and via these suspension means through the elevator drive machine 15 along two elevator cabin guide rails 41, 42 or two counterweight guide rails 38, 39 and can be moved from.
- the 1 and 2 the elevator car guide rails 41, 42 are shown by dashed lines and the counterweight guide rails 38, 39 by dash-dot lines.
- the suspension elements 19, 19 ' are guided vertically upwards from a suspension element reserve unit 20 to deflection rollers 21 which are mounted on the drive platform 14.
- the suspension elements 19, 19' are connected to the elevator support rollers 23, 24. passed under the elevator car 18.
- the suspension means 19, 19' are deflected to the counterweight track 44 and guided vertically to the counterweight support rollers 29, 29 'connected to the counterweight 28, they run around and finally extend to a second suspension means fixing device 30, where they are connected to the Drive platform 14 are connected.
- a lifting device 6 In the area of the upper end of the elevator shaft, on the level of floor 4F, a lifting device 6 is arranged, which has been lifted there before by a lifting process by means of a further lifting device or by means of a construction crane.
- the lifting device 6 is used to lift the entire drive platform 14 with the elevator car 18 attached thereto and the counterweight 28 to a new level adapted to the current building height during a lifting operation via a traction means 6.1. It is mounted on a support frame 5, which is supported in a recess 7 of the shaft wall 10 and on the floor 4F.
- further niches 8, 9 are provided on the shaft wall 10, which can be used to support system components.
- the length of the suspension means 19, 19 ′ that can be used for the operating stroke of the elevator cabin 18 can be extended from the suspension means reserve unit 20 if this is done in the course of an adjustment to the usable one Lifting height carried out is required.
- the suspension elements 19, 19 ' can be clamped or released by means of the first suspension element fixing device 22.
- suspension element extensions required for this are pulled out of the suspension element reserve unit 20.
- the lifting device 6 Before a lifting process in which the drive platform 14 is raised by the lifting device 6, the lifting device 6 must be positioned and fixed sufficiently high, for example by means of a further lifting device or a construction crane, for example 3 floors above the drive platform 14.
- the drive platform 14 can then be raised to a desired position in the elevator shaft 2 and supported there.
- the drive platform 14 is then, for example, two floors above the floor 4C on which it is located in the 1, 2 initial state shown was positioned.
- the drive platform 14 is thus on the floor 4E, being supported on the one hand on the floor 4E and on the other hand in the recess 9 of the shaft wall 10.
- the stroke of the drive platform 14 during a lifting operation is not necessarily limited to an integer multiple of a floor height.
- a mounting platform 32 is temporarily installed, which can be raised and lowered by means of a lifting device 33 that can be controlled from the mounting platform by means of a traction means 33.1.
- This assembly platform 32 serves mainly as a working platform, from which the extensions of the counterweight guide rails 38, 39 and the elevator car guide rails 41, 42 required above the drive platform 14, and for temporarily fixing the extension of the elevator car guide rail 41 arranged on the counterweight side of the elevator car, are used
- Subcarrier 43 are mounted. The purpose and mode of operation of these auxiliary carriers 43 are explained below1.
- assembly steps are carried out to create or extend the guide rails of the counterweight 28 and the guide rails of the elevator car 18 and thus the liftable drive platform 14. These assembly steps are also below with reference to the 3 to 6 further described.
- the elevator installation 1 has a multiplicity of guide rail holders 35. 1 to 35.9, which are attached to the shaft wall 12 in this exemplary embodiment, and which in their final state both for fixing two counterweight guide rails 38, 39 and for fixing the on the Serve counterweight side of the elevator car 18 arranged elevator car guide rail 41.
- Fig. 3 Elevation
- Fig. 4 Floor plan shows a final guide rail holder 35.5 arranged below the drive platform 14 in connection with parts of the drive platform 14 protruding into the counterweight track 44.
- the final guide rail holder 35.5 has support elements 36, 37, the support element 36 here being referred to as the first support element 36 and the support element 37 here as the second support element 37.
- the support elements 36, 37 are designed, for example, as an L-angle and are attached to the shaft wall 12 of the building.
- a first counterweight guide rail 38 is fastened to the first support element 36.
- a second counterweight guide rail 39 is fastened to the second support element 37.
- the guide rail holder 35.5 also has a cross member 40 connected to the support elements 36, 37, to which the elevator car guide rail 41 arranged on the counterweight side of the elevator car 18 is fastened.
- the drive platform 14 comprises components protruding into the counterweight carriageway 44 - in particular the deflection rollers 27, 27 'with their bearings and the parts of the drive platform 14 supporting them - which in an elevator system 1 with an elevator car guide rail 41 arranged on the counterweight side of the elevator car 18 serve to guide the suspension means 19, 19 'in such a way that they subsequently move vertically, ie parallel to the counterweight track 44, to the counterweight support roller 29 (not visible in FIG 3, 4 ) extend.
- the solution to this problem is that before the lifting process, the counterweight-side elevator car guide rail 41 is extended in the upward direction above the drive platform 14 and in the area of this extension is fixed to a shaft wall 12 of the elevator shaft 2 by means of at least one auxiliary support 43, and that after the lifting process it is then below the at least one auxiliary carrier 43 lying on the drive platform 14 is replaced by a final guide rail holder 35.1-35.9 designed differently than the auxiliary carrier.
- the in the 1 and 2 The final guide rail brackets 35.1-35.5 shown below the drive platform 14 are therefore only assembled or brought into their final state by attaching the cross members 40 after the drive platform 14 has passed them in the course of a lifting process. This is preferably carried out after the lifting process has ended or after the elevator installation has been restarted by a fitter operating from the roof of the vertically controllable elevator car 18.
- the in the 1 and 2 Non-final guide rail brackets 35.6-35.9 shown above the drive platform 14 can advantageously - but do not have to - be installed together with the aforementioned auxiliary supports 43 from the assembly platform 32 described above before a lifting operation.
- These non-final guide rail brackets 35.6-35.9 differ from the final guide rail brackets 35.1-35.5 in that their cross members 40 have not yet been installed.
- Fig. 5 (Elevation) and 6 (floor plan) show the drive platform 14 with its - as in connection with the - in a situation existing before a lifting process 3 and 4 described - deflecting rollers 27, 27 'projecting into the counterweight roadway 44.
- Above the Drive platform 14 is one of several auxiliary supports 43 which are temporarily attached to shaft wall 12 above drive platform 14 and are designed such that they can protrude into said drive platform between said deflection rollers 27 and 27 'as far as the counterweight-side elevator car guide rail 41 without the upward movement of the To hamper drive platform 14 during the lifting process.
- the auxiliary supports 43 must be designed to be sufficiently stable in order to be able to fix the elevator car guide rail 41 sufficiently at least during the lifting process. Furthermore, in Fig.
- auxiliary supports 43 are arranged approximately centrally between the support element parts 36, 37 of the guide rail holders 35. The exact position of the auxiliary carrier 43 results from the predetermined position of the elevator car guide rail 41.
- the extension of the counterweight-side elevator car guide rail 41 which extends upward from the drive platform 14, is connected to the shaft wall 12 via the auxiliary carrier 43.
- Another elevator car guide rail 42 which in the 1 and 2 is shown schematically by the dashed line 42, is also extended upwards before the lifting process. Both this extension and the attachment of the second elevator car guide rail 42 to the shaft wall 13 can likewise be carried out from the lifting and lowering mounting platform 32.
- the drive platform 14 with the elevator car temporarily connected to the latter is raised by the lifting device 6 via the traction means 6.1.
- additional suspension element will be released by the suspension element reserve unit 20.
- the drive platform 14 is guided on the elevator car guide rails 41, 42, which are extended before the lifting process and on which the elevator car 18 is also guided.
- the deflection rollers 27, 27 'and the latter Components of the drive platform 14 that carry deflection rollers protrude into the counterweight track 44, which extends upward between the support elements 36, 37 of all the guide rail holders 35.1 to 35.9.
- a collision of the deflection rollers 27, 27 'with the guide rail brackets 35E to 35H is avoided by the fact that the cross member 40 is not yet mounted on the guide rail brackets mentioned and the auxiliary supports 43 fixing the counterweight-side elevator car guide rail 41 are designed and positioned such that they are between the deflection rollers 27 or the components of the drive platform 14 that carry them.
- the cross members 40 become on the one hand at the end 45 of the first support element 36 and on the other hand at the end 46 of the second support element from the roof of the vertically movable elevator car 18 37 of their assigned guide rail brackets, which are now located below the drive platform, and thus integrated into it, so that the guide rail brackets 35.1-35.8 are now in their final state.
- the elevator car guide rail 41 is then definitely fixed to the cross beams and the auxiliary beams 43 are removed.
- the drive platform 14 is supported at the level of the floor 4E after the lifting process has been carried out.
- the support device 16 of the drive platform 14 can have extendable and retractable arms for this purpose.
- the roof 5 is moved further up accordingly.
- the lifting device 6 is also moved further up.
- a further lifting process for the drive platform 14 can then be carried out.
- the drive platform 14 is used directly to form a machine room floor.
- other solutions are also conceivable in which the drive platform 14 is completely or partially removed.
- an elevator car door 55 is located on a front side 54 of the elevator car 18.
- the counterweight carriageway 44 is located on a doorless side 56 of the elevator car 18, along which the suspension elements 19, 19 'are also guided.
- a further doorless side 57 is provided which faces away from the doorless side 56 and on which the suspension means 19, 19 'are also guided.
- the rear side facing away from the front side 54 is also available in this embodiment in order to attach an elevator car door there.
- the elevator car guide rail 41 is connected to the cross member 40 via an angle profile 59.
- the support elements 36, 37 can also be connected indirectly to the shaft wall 12.
- a support structure is provided, to which elements in the elevator shaft 2 can be attached. A load-bearing shaft wall 12 may then not be necessary.
- the invention is not limited to the exemplary embodiment described.
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Types And Forms Of Lifts (AREA)
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP15199820 | 2015-12-14 | ||
PCT/EP2016/080727 WO2017102684A1 (de) | 2015-12-14 | 2016-12-13 | Verfahren zum errichten einer aufzugsanlage und an zunehmende gebäudehöhe anpassbare aufzugsanlage |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3390263A1 EP3390263A1 (de) | 2018-10-24 |
EP3390263B1 true EP3390263B1 (de) | 2020-03-25 |
Family
ID=54849836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16819301.9A Active EP3390263B1 (de) | 2015-12-14 | 2016-12-13 | Verfahren zum errichten einer aufzugsanlage und an zunehmende gebäudehöhe anpassbare aufzugsanlage |
Country Status (11)
Country | Link |
---|---|
US (1) | US10807833B2 (ru) |
EP (1) | EP3390263B1 (ru) |
CN (1) | CN108367897B (ru) |
AU (1) | AU2016374028B2 (ru) |
CA (1) | CA3006023A1 (ru) |
HK (1) | HK1251539A1 (ru) |
MX (1) | MX2018007137A (ru) |
MY (1) | MY194382A (ru) |
PH (1) | PH12018501040A1 (ru) |
RU (1) | RU2721376C2 (ru) |
WO (1) | WO2017102684A1 (ru) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR112019006854A2 (pt) * | 2016-11-30 | 2019-06-25 | Inventio Ag | equipamento de elevador e processo para construção de um equipamento de elevador |
WO2019068469A1 (de) * | 2017-10-06 | 2019-04-11 | Inventio Ag | Verfahren zum errichten einer aufzugsanlage mit zunehmender nutzbarer hubhöhe |
EP3807205B1 (de) * | 2018-06-14 | 2022-05-18 | Inventio AG | Verfahren zum errichten einer aufzugsanlage |
CN110844743B (zh) * | 2018-08-21 | 2022-07-12 | 奥的斯电梯公司 | 跃层电梯和跃层方法 |
WO2020088979A1 (de) | 2018-10-30 | 2020-05-07 | Inventio Ag | Verfahren zum installieren einer aufzugsanlage |
CN109205445B (zh) * | 2018-11-23 | 2019-08-02 | 燕山大学 | 一种用于安装电梯导轨的自爬升机器人 |
EP3898490B1 (de) * | 2018-12-18 | 2023-02-01 | Inventio Ag | Verfahren zum betreiben einer baustelleneinrichtung und baustelleneinrichtung |
EP3766818B1 (en) * | 2019-07-16 | 2023-06-07 | KONE Corporation | A method and an arrangement for installing elevator guide rails into an elevator shaft |
EP3816088B1 (en) * | 2019-10-31 | 2023-07-12 | KONE Corporation | A self-climbing elevator arrangement for use during the construction of a building |
CN114728769A (zh) * | 2019-11-08 | 2022-07-08 | 因温特奥股份公司 | 用于电梯竖井中的安装装置 |
AU2020403849A1 (en) * | 2019-12-18 | 2022-06-30 | Inventio Ag | Method for erecting a lift installation |
EP3838828B1 (en) * | 2019-12-19 | 2023-02-08 | KONE Corporation | Elevator arrangement and method |
US20230042428A1 (en) * | 2020-01-20 | 2023-02-09 | Inventio Ag | Lifting device for lifting a payload within an elevator shaft in a controllable manner |
EP3865448A1 (en) * | 2020-02-12 | 2021-08-18 | KONE Corporation | Method for constructing elevator |
US20230113785A1 (en) * | 2020-03-30 | 2023-04-13 | Inventio Ag | Positioning aid for positioning a nut on a guide rail of an elevator system |
CN113620147A (zh) | 2020-05-09 | 2021-11-09 | 奥的斯电梯公司 | 在建筑物的建造过程中使用的跃升电梯系统和跃升方法 |
US20230339727A1 (en) * | 2020-06-26 | 2023-10-26 | Inventio Ag | Method for building an elevator system, and elevator system suitable for carrying out the method |
CN115734933A (zh) * | 2020-06-30 | 2023-03-03 | 因温特奥股份公司 | 运输系统 |
DE102023102305A1 (de) | 2023-01-31 | 2024-04-11 | Tk Elevator Innovation And Operations Gmbh | Hebeanordnung und Verfahren zum Bewegen einer Maschinenplattform oder einer Aufzuganlagen-Maschinenraumeinheit |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3851736A (en) * | 1973-03-20 | 1974-12-03 | Westinghouse Electric Corp | Apparatus and method for installing elevator hoistway equipment |
SU622741A1 (ru) * | 1976-09-16 | 1978-09-05 | Московское Монтажное Управление Треста "Союзлифтмонтаж" | Устройство дл монтажа направл ющих подъемника |
SU1047814A1 (ru) * | 1982-01-04 | 1983-10-15 | Центральное Проектно-Конструкторское Бюро По Лифтам Всесоюзного Промышленного Объединения По Производству Лифтов "Союзлифтмаш" | Способ монтажа направл ющей в шахте лифта и направл юща дл кабины лифта |
US5065843A (en) * | 1990-05-16 | 1991-11-19 | Otis Elevator Company | Method for installing elevator system components |
FR2694279A1 (fr) * | 1992-08-03 | 1994-02-04 | Otis Elevator Co | Ascenseur ou monte-charges, suivant l'avancement du gros-Óoeuvre de la construction de bâtiments. |
JPH06321456A (ja) * | 1993-05-12 | 1994-11-22 | Hitachi Building Syst Eng & Service Co Ltd | ガイドレールの吊り雇 |
FI91849C (fi) * | 1993-09-10 | 1994-08-25 | Kone Oy | Menetelmä johteiden kiinnittämiseksi ja säätämiseksi |
US6672013B1 (en) * | 2000-11-02 | 2004-01-06 | Otis Elevator Company | Method of installing elevator rails |
US7635049B2 (en) * | 2002-12-02 | 2009-12-22 | Kone Corporation | Method and apparatus for installing an elevator during the construction of a building |
CN100564225C (zh) * | 2003-09-29 | 2009-12-02 | 奥蒂斯电梯公司 | 用于安装尤其是无任何机房的电梯的轿厢驱动机器的方法,以及所获得的电梯 |
FI117335B (fi) * | 2004-07-30 | 2006-09-15 | Kone Corp | Menetelmä hissin asentamiseksi ja hissi |
FI119983B (fi) * | 2006-05-24 | 2009-05-29 | Kone Corp | Menetelmä ja järjestelmä hissin johteiden asentamiseksi |
FI118644B (fi) * | 2006-11-17 | 2008-01-31 | Kone Corp | Menetelmä ja laitteisto konehuoneettoman hissin asentamiseksi rakennuksen rakentamisvaiheessa |
FI122066B (fi) * | 2009-12-31 | 2011-08-15 | Kone Corp | Menetelmä hissin valmistamisessa |
FI125124B (fi) * | 2012-05-23 | 2015-06-15 | Kone Corp | Hissijärjestely ja menetelmä |
DE102012111622A1 (de) * | 2012-11-29 | 2014-06-05 | Thyssenkrupp Elevator Ag | Aufzuganlage für ein im Bau befindliches Gebäude |
CN104340813B (zh) * | 2014-10-30 | 2016-09-14 | 中国建筑股份有限公司 | 一种电梯安装施工方法 |
-
2016
- 2016-12-13 MY MYPI2018701921A patent/MY194382A/en unknown
- 2016-12-13 RU RU2018125274A patent/RU2721376C2/ru not_active IP Right Cessation
- 2016-12-13 AU AU2016374028A patent/AU2016374028B2/en active Active
- 2016-12-13 EP EP16819301.9A patent/EP3390263B1/de active Active
- 2016-12-13 WO PCT/EP2016/080727 patent/WO2017102684A1/de active Application Filing
- 2016-12-13 US US15/781,502 patent/US10807833B2/en active Active
- 2016-12-13 MX MX2018007137A patent/MX2018007137A/es unknown
- 2016-12-13 CN CN201680071667.8A patent/CN108367897B/zh active Active
- 2016-12-13 CA CA3006023A patent/CA3006023A1/en active Pending
-
2018
- 2018-05-16 PH PH12018501040A patent/PH12018501040A1/en unknown
- 2018-08-27 HK HK18110982.9A patent/HK1251539A1/zh unknown
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
US20180273349A1 (en) | 2018-09-27 |
PH12018501040A1 (en) | 2019-01-28 |
RU2018125274A (ru) | 2020-01-16 |
CN108367897B (zh) | 2020-04-14 |
EP3390263A1 (de) | 2018-10-24 |
WO2017102684A1 (de) | 2017-06-22 |
RU2721376C2 (ru) | 2020-05-19 |
AU2016374028A1 (en) | 2018-07-05 |
AU2016374028B2 (en) | 2019-09-19 |
RU2018125274A3 (ru) | 2020-03-12 |
CA3006023A1 (en) | 2017-06-22 |
HK1251539A1 (zh) | 2019-02-01 |
CN108367897A (zh) | 2018-08-03 |
MX2018007137A (es) | 2018-08-15 |
US10807833B2 (en) | 2020-10-20 |
MY194382A (en) | 2022-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3390263B1 (de) | Verfahren zum errichten einer aufzugsanlage und an zunehmende gebäudehöhe anpassbare aufzugsanlage | |
EP3548413B1 (de) | Aufzugsanlage und verfahren zum errichten einer aufzugsanlage | |
DE69822303T2 (de) | Teilweise einziehbare bauplattform | |
EP3472084B1 (de) | Verfahren zur modernisierung einer fahrtreppe oder eines fahrsteiges | |
EP3212556B1 (de) | Verfahren zur installation von führungsschienen | |
EP3478621B1 (de) | Verfahren zum errichten einer aufzugsanlage mit einer anpassbaren nutzbaren hubhöhe | |
EP3873840B1 (de) | Verfahren zum installieren einer aufzugsanlage | |
EP2882635B1 (de) | Überflurfördereinrichtung mit selbsttragendem traggerüst | |
DE102017113571A1 (de) | Aufzugsystem | |
WO2010052109A1 (de) | Modernisierungsverfahren für aufzuganlagen | |
EP3381858B1 (de) | Aus einem bausatz gebildeter temporärer aufzug | |
EP2035314B1 (de) | Hubplattform und verfahren zum aufbauen einer hubplattform | |
EP3681836B1 (de) | Installationseinrichtung für eine verwendung in einem aufzugschacht | |
WO2023057607A1 (de) | Vorrichtung zum aufbau einer aussenecke einer deckenschalung, deckenschalung, horizontalträger, stützkopf, höhenausgleichselement und abspannadapter und verfahren zum aufbau einer aussenecke einer deckenschalung | |
EP1717186A1 (de) | Verfahren und Vorrichtung zur Installation von Führungsschienen in einem Aufzugsschacht | |
EP3645443B1 (de) | Aufzugsanlage | |
WO2019166467A1 (de) | Verfahren und vorrichtung zum montieren von bauelementen, insbesondere fassadenelementen an sehr hohen gebäuden | |
DE202014000273U1 (de) | Aufzugsanlage sowie Basissektion, Kopfsektion und Mittelsektion dafür | |
DE102014110824B4 (de) | Turmartiges Vergnügungsgerät sowie Verfahren zur Errichtung eines Vergnügungsgeräts | |
DE102020126730B4 (de) | Aufzug-Vorrichtung eines Gebäude-Gerüstes | |
EP3782949B1 (de) | Hebekonstruktion und verfahren zur aushebung einer brücke | |
WO2022233804A1 (de) | Verfahren zur installation einer aufzuganlage | |
EP3259455B1 (de) | Hebe- und transportvorrichtung für eine schwerlast | |
EP4334230A1 (de) | Topmodul und verfahren zum abschliessen eines aufzugschachts einer aufzuganlage | |
WO2023118419A1 (de) | Aufhängeschuh, klettereinheit und verfahren zur errichtung eines bauwerks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180523 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B66B 7/02 20060101ALI20190809BHEP Ipc: B66B 9/187 20060101ALI20190809BHEP Ipc: B66B 19/00 20060101AFI20190809BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20191104 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1248341 Country of ref document: AT Kind code of ref document: T Effective date: 20200415 Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502016009326 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200625 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200626 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200625 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200818 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200725 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502016009326 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
26N | No opposition filed |
Effective date: 20210112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20201231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201213 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201231 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1248341 Country of ref document: AT Kind code of ref document: T Effective date: 20211213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211213 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231219 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20231226 Year of fee payment: 8 Ref country code: FR Payment date: 20231226 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20231227 Year of fee payment: 8 Ref country code: CH Payment date: 20240101 Year of fee payment: 8 |