EP2230124B1 - Verfahren zur ladung einer lithiumsekundärzelle und hybridfahrzeug - Google Patents
Verfahren zur ladung einer lithiumsekundärzelle und hybridfahrzeug Download PDFInfo
- Publication number
- EP2230124B1 EP2230124B1 EP09702790.8A EP09702790A EP2230124B1 EP 2230124 B1 EP2230124 B1 EP 2230124B1 EP 09702790 A EP09702790 A EP 09702790A EP 2230124 B1 EP2230124 B1 EP 2230124B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- charging
- lithium ion
- ion secondary
- secondary cell
- period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 229910001416 lithium ion Inorganic materials 0.000 title claims description 309
- HBBGRARXTFLTSG-UHFFFAOYSA-N Lithium ion Chemical compound [Li+] HBBGRARXTFLTSG-UHFFFAOYSA-N 0.000 title claims description 286
- 238000000034 method Methods 0.000 title claims description 56
- 238000007600 charging Methods 0.000 claims description 692
- 238000007599 discharging Methods 0.000 claims description 152
- 239000000725 suspension Substances 0.000 claims description 151
- 239000007774 positive electrode material Substances 0.000 claims description 7
- 210000004027 cell Anatomy 0.000 description 322
- 238000012423 maintenance Methods 0.000 description 75
- 238000012360 testing method Methods 0.000 description 51
- 229910052751 metal Inorganic materials 0.000 description 37
- 239000002184 metal Substances 0.000 description 37
- 230000008021 deposition Effects 0.000 description 30
- 238000012545 processing Methods 0.000 description 24
- 230000000717 retained effect Effects 0.000 description 18
- 238000009792 diffusion process Methods 0.000 description 17
- 239000008151 electrolyte solution Substances 0.000 description 16
- 230000000694 effects Effects 0.000 description 8
- 230000004308 accommodation Effects 0.000 description 3
- 230000006866 deterioration Effects 0.000 description 3
- KMTRUDSVKNLOMY-UHFFFAOYSA-N Ethylene carbonate Chemical compound O=C1OCCO1 KMTRUDSVKNLOMY-UHFFFAOYSA-N 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 230000000994 depressogenic effect Effects 0.000 description 2
- 239000010432 diamond Substances 0.000 description 2
- IEJIGPNLZYLLBP-UHFFFAOYSA-N dimethyl carbonate Chemical compound COC(=O)OC IEJIGPNLZYLLBP-UHFFFAOYSA-N 0.000 description 2
- JBTWLSYIZRCDFO-UHFFFAOYSA-N ethyl methyl carbonate Chemical compound CCOC(=O)OC JBTWLSYIZRCDFO-UHFFFAOYSA-N 0.000 description 2
- 239000007773 negative electrode material Substances 0.000 description 2
- 239000011255 nonaqueous electrolyte Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 229910001290 LiPF6 Inorganic materials 0.000 description 1
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 description 1
- 239000003575 carbonaceous material Substances 0.000 description 1
- 210000001787 dendrite Anatomy 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 229910052744 lithium Inorganic materials 0.000 description 1
- -1 lithium hexafluorophosphate Chemical compound 0.000 description 1
- URIIGZKXFBNRAU-UHFFFAOYSA-N lithium;oxonickel Chemical compound [Li].[Ni]=O URIIGZKXFBNRAU-UHFFFAOYSA-N 0.000 description 1
- 229910021382 natural graphite Inorganic materials 0.000 description 1
- 238000010278 pulse charging Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000002904 solvent Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W10/00—Conjoint control of vehicle sub-units of different type or different function
- B60W10/04—Conjoint control of vehicle sub-units of different type or different function including control of propulsion units
- B60W10/06—Conjoint control of vehicle sub-units of different type or different function including control of propulsion units including control of combustion engines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W10/00—Conjoint control of vehicle sub-units of different type or different function
- B60W10/24—Conjoint control of vehicle sub-units of different type or different function including control of energy storage means
- B60W10/26—Conjoint control of vehicle sub-units of different type or different function including control of energy storage means for electrical energy, e.g. batteries or capacitors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W20/00—Control systems specially adapted for hybrid vehicles
- B60W20/10—Controlling the power contribution of each of the prime movers to meet required power demand
- B60W20/13—Controlling the power contribution of each of the prime movers to meet required power demand in order to stay within battery power input or output limits; in order to prevent overcharging or battery depletion
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/007—Regulation of charging or discharging current or voltage
- H02J7/0071—Regulation of charging or discharging current or voltage with a programmable schedule
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W20/00—Control systems specially adapted for hybrid vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W2510/00—Input parameters relating to a particular sub-units
- B60W2510/24—Energy storage means
- B60W2510/242—Energy storage means for electrical energy
- B60W2510/244—Charge state
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W2520/00—Input parameters relating to overall vehicle dynamics
- B60W2520/10—Longitudinal speed
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/05—Accumulators with non-aqueous electrolyte
- H01M10/052—Li-accumulators
- H01M10/0525—Rocking-chair batteries, i.e. batteries with lithium insertion or intercalation in both electrodes; Lithium-ion batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/14—Plug-in electric vehicles
Definitions
- the present invention relates to a method for charging a lithium ion secondary cell and a hybrid electric vehicle.
- a lithium ion secondary cell has attracted attention as a power source for a portable device or a power source for an electric vehicle, a hybrid electric vehicle, and the like.
- various methods for charging the lithium ion secondary cell are proposed (for example, see Patent Literatures 1 to 3).
- Patent Literature 1 discloses a method for charging using such a pulsed current method in which energization and stop of the energization are repeated. Specifically, energization for 0.1 to 10 milliseconds and stop of the energization for 0.5 to 100 milliseconds are repeated, whereby a lithium ion secondary cell is charged. According to this configuration, the growth of dendrite can be prevented, and charging can be repeated a large number of times without the occurrence of charging failure.
- Patent Literature 2 discloses a method for charging comprising charging with a constant current until the cell voltage reaches a full charge voltage, and after the cell voltage reaches the full charge voltage, performing such intermittent charging in which stop of charging and charging with a constant current are repeated. This configuration can prevent a cell from being damaged by overcharge and can perform charging neither too much nor too little to the full charge voltage.
- Patent Literature 3 discloses such a method for intermittently charging in which energization and suspension of the energization are repeated. Specifically, a lithium ion secondary cell is charged at a charge rate of 20C while charging for 10 seconds and suspension for 0.8 seconds are repeated. This configuration can increase the effective capacity of the cell.
- the lithium ion secondary cell when the storage amount of a lithium ion secondary cell, which is used as a power source for driving and mounted therein, is lowered to a first predetermined value (for example, the storage amount corresponding to SOC 30%), the lithium ion secondary cell may be charged until the storage amount of the lithium ion secondary cell reaches a second predetermined value (for example, the storage amount corresponding to SOC 60%) while the hybrid electric vehicle stops running.
- a first predetermined value for example, the storage amount corresponding to SOC 30%
- metal Li may be deposited on a surface of a negative electrode. It is considered that this is because Li ions that are not incorporated into the negative electrode are deposited as metal Li on the surface of the negative electrode due to the diffusion control of Li ions on the negative electrode surface. Thus, repetition of the rapid and continuous charging may cause the deposition of a large amount of metal Li. Once metal Li is deposited on the negative electrode surface, it is difficult for the metal Li to contribute to charge transfer again as Li Prior art which is related to this field of technology can be found in e.g.
- the present invention has been made in view of the above situations, and it is an object of the present invention to provide a method for charging a lithium ion secondary cell mounted in a hybrid electric vehicle, which is capable of suppressing the deposition of metal Li on a surface of a negative electrode to suppress the reduction of the electrical capacity, and preventing the loss the comfort of riding the hybrid electric vehicle, and a hybrid electric vehicle.
- a method for charging a lithium ion secondary cell which is used as a power source for driving and mounted in a hybrid electric vehicle, the method comprising the steps of: determining whether a value of a physical quantity corresponding to a storage amount of the lithium ion secondary cell has lowered to a first predetermined value; determining whether the hybrid electric vehicle is in a travel stop state; and when it is determined that the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell has lowered to the first predetermined value and in addition when it is determined that the hybrid electric vehicle is in the travel stop state, charging the lithium ion secondary cell until the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell reaches a second predetermined value while the hybrid electric vehicle stops running, wherein in the step of charging, a period during which the lithium ion secondary cell is charged is split into two or more split charging periods and non-charging periods provided between the split charging periods, and charging is performed in the split charging period and
- the present invention relates to a method for charging a lithium ion secondary cell used as a power source for driving and mounted in a hybrid electric vehicle.
- a value of a physical quantity corresponding to a storage amount of the lithium ion secondary cell is lowered to a first predetermined value
- the lithium ion secondary cell is charged until the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell reaches a second predetermined value while the hybrid electric vehicle stops running.
- a charging period during which charging is performed until the value of the physical quantity corresponding to the storage amount lowered to the first predetermined value reaches the second predetermined value is split into two or more split charging periods and non-charging periods provided between the split charging periods.
- the split charging periods charging is performed, and in the non-charging period, at least one of suspension of charging and discharging is performed. At least one of suspension of charging and discharging is performed while charging from the first predetermined value to the second predetermined value, whereby the deposition of metal Li on a negative electrode surface can be suppressed.
- the length of each split charging period is not less than 40 seconds.
- the physical quantity corresponding to the storage amount means the storage amount and the physical quantity having one-to-one correspondence to the storage amount and includes SOC (State of Charge) and a cell voltage (a voltage between terminals).
- the first predetermined value may include the storage amount corresponding to SOC 30% and a value of the voltage between terminals of a cell in this storage state.
- the second predetermined value may include the storage amount corresponding to SOC 60% and a value of the voltage between terminals of a cell in this storage state.
- At least one of suspension of charging and discharging is performed in the non-charging period means that charging may be suspended over the entire non-charging period, or discharging may be performed over the entire non-charging period.
- the non-charging period during which charging is suspended and the non-charging period during which discharging is performed may be mixed. Alternatively, suspension of charging and discharging may be performed in one non-charging period.
- the non-charging period is a charging suspension period during which charging of the lithium ion secondary cell is suspended, and a ratio tr/tc between the length tc of each of the split charging periods and the length tr of the charging suspension period immediately after the split charging period is not less than 0.14 and not more than 0.9.
- the non-charging period is the charging suspension period.
- charging is suspended over the entire non-charging period.
- split charging is separately performed so that suspension is interposed in between until the value of the physical quantity corresponding to the storage amount reaches the second predetermined value.
- a ratio tr/tc between the length tc of each split charging period and the length tr of the charging suspension period immediately after the split charging period is not less than 0.14. This configuration can suppress the deposition of metal Li on a negative electrode surface.
- the charging suspension period when the charging suspension period is long, the deposition of metal Li on a negative electrode surface can be suppressed; however, when the charging suspension period is too long, the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell cannot be restored to the second predetermined value while the hybrid electric vehicle stops running. It is sufficient for the charging suspension period to have a length allowing the diffusion of Li ions retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control, and there is no use in suspending charging over the relevant period.
- the ratio tr/tc is not more than 0.9. This configuration can rapidly and appropriately return the value of the physical quantity, corresponding to the storage amount of the lithium ion secondary cell, to the second predetermined value without spending useless charging suspension time.
- the non-charging period is a discharging period during which the lithium ion secondary cell is discharged.
- the non-charging period discharging can diffuse Li ions more rapidly than in the case of suspending charging.
- the non-charging period is the discharging period. Namely, discharging is performed over the entire non-charging period. Thus, split charging is separately performed so that discharging is interposed in between until the value of the physical quantity corresponding to the storage amount reaches the second predetermined value. According to this configuration, the lithium ion secondary cell with the value of the physical quantity lowered to the first predetermined value can rapidly be charged until the value of the physical quantity reaches the second predetermined value.
- each of the non-charging periods is a charging suspension period during which charging of the lithium ion secondary cell is suspended and a discharging period during which the lithium ion secondary cell is discharged.
- each non-charging period when suspension of charging and discharging are performed, Li ions retained on a negative electrode surface can be satisfactorily diffused.
- each non-charging period includes the charging suspension period and the discharging period. Namely, in each non-charging period, suspension of charging and discharging are performed. Thus, split charging is separately performed so that suspension of charging and discharging are interposed in between until the value of the physical quantity corresponding to the storage amount reaches the second predetermined value. According to this configuration, the reduction of the electrical capacity can be further suppressed.
- the above method for charging the lithium ion secondary cell preferably, further comprises the steps of: determining whether an engine mounted in the hybrid electric vehicle is in an operating state; and instructing start of the operation of the engine when it is determined that the engine is not operating, wherein in the step of charging, in such a state that a generator mounted in the hybrid electric vehicle is being driven by the operation of the engine, an electric power generated by the generator is supplied to the lithium ion secondary cell to charge the lithium ion secondary cell.
- the engine mounted in the hybrid electric vehicle it is determined whether the engine mounted in the hybrid electric vehicle is in an operating state. When it is determined that the engine is not operating, the start of the operation of the engine is instructed. According to this configuration, the electrical power generated by the generator mounted in the hybrid electric vehicle can be supplied to the lithium ion secondary cell in such a state that the generator is being driven by the operation of the engine. Thus, the lithium ion secondary cell in which the value of the physical quantity corresponding to the storage amount is lowered to the first predetermined value can appropriately be charged until the value of the physical quantity reaches the second predetermined value.
- the lithium ion secondary cell is charged with a current having a magnitude of not less than 2C in the step of charging.
- the lithium ion secondary cell is charged with a current having a magnitude of not less than 2C.
- the lithium ion secondary cell in which the value of the physical quantity corresponding to the storage amount is lowered to the first predetermined value can be charged in a shorter time so that the value of the physical quantity reaches the second predetermined value.
- the charging time can be shortened as described above.
- Li ions are easily retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control of Li ions.
- the Li ions retained on the interface between the electrolytic solution and the negative electrode can be diffused, whereby the deposition of metal Li on a negative electrode surface can be suppressed.
- the lithium ion secondary cell can be charged so that the value of the physical quantity reaches the second predetermined value in a shorter time.
- the charging current is too large, the deterioration of the cell, a charging system, and so on is accelerated.
- the magnitude of the charging current is not less than 2C and not more than 10C, for example.
- a hybrid electric vehicle comprising: a lithium ion secondary cell which is used as a power source for driving and mounted in the hybrid electric vehicle; a first determination device which determines whether a value of a physical quantity corresponding to a storage amount of the lithium ion secondary cell has lowered to a first predetermined value; a stop state determination device which determines whether the hybrid electric vehicle is in a travel stop state; and a charging control device which, when it is determined that the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell has lowered to the first predetermined value and in addition when it is determined that the hybrid electric vehicle is in the travel stop state, controls charging of the lithium ion secondary cell until the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell reaches a second predetermined value while the hybrid electric vehicle stops running, wherein the charging control device splits a period during which the lithium ion secondary cell is charged into two or more split charging periods and non-charging periods provided between the split
- the charge control device of the hybrid electric vehicle controls charging of the lithium ion secondary cell until the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell reaches the second predetermined value while the hybrid electric vehicle stops running.
- the charging control device splits a period during which charging is performed until the value of the physical quantity corresponding to the storage amount lowered to the first predetermined value reaches the second predetermined value, into two or more split charging periods and the non-charging periods provided between the split charging periods.
- the charging control device further performs charging in the split charging period and performs at least one of suspension of charging and discharging in the non-charging period.
- the deposition of metal Li on a negative electrode surface can be suppressed. It is considered that this is because when at least one of suspension of charging and discharging is performed, it is possible to diffuse Li ions retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control.
- the hybrid electric vehicle of the present invention it is possible to suppress the reduction of the electrical capacity of the lithium ion secondary cell which is used as a power source for driving and mounted therein.
- the charging control device sets the length of each split charging period to not less than 40 seconds. When a single split charging period is long in this way, the idling of the hybrid electric vehicle can be stabilized, and therefore, the comfort of riding the hybrid electric vehicle is not lost.
- the charging control device is configured so that the non-charging period is a charging suspension period during which charging of the lithium ion secondary cell is suspended and that a ratio tr/tc between the length tc of each of the split charging periods and the length tr of the charging suspension period immediately after the split charging period is not less than 0.14 and not more than 0.9, the charging control device controls charging of the lithium ion secondary cell.
- the non-charging period is the charging suspension period in the charging control device.
- charging is suspended over the entire non-charging period.
- split charging is separately performed so that suspension is interposed in between until the value of the physical quantity corresponding to the storage amount reached the second predetermined value.
- a ratio tr/tc between the length tc of each split charging period and the length tr of the charging suspension period immediately after the split charging period is not less than 0.14 and not more than 0.9.
- the configuration that the ratio tr/tc is not less than 0.14 can suppress the deposition of metal Li on the negative electrode surface. Further, the configuration that the ration tr/tc is not more than 0.9 can rapidly and appropriately return the value of the physical quantity corresponding to the storage amount of the lithium ion secondary cell to the second predetermined value without spending useless charging suspension time.
- the charging control device is configured so that the non-charging period is a discharging period during which the lithium ion secondary cell is discharged.
- the non-charging period discharging can diffuse Li ions more rapidly than in the case of suspending charging.
- the non-charging period is the discharging period in the charging control device. Namely, discharging is performed over the entire non-charging period. Thus, split charging is separately performed so that discharging is interposed in between until the value of the physical quantity corresponding to the storage amount reaches the second predetermined value. According to this configuration, the lithium ion secondary cell with the value of the physical quantity corresponding to the storage amount lowered to the first predetermined value can rapidly be charged until the value of the physical quantity reached the second predetermined value.
- the charging control device is configured so that each of the non-charging periods is a charging suspension period during which charging of the lithium ion secondary cell is suspended and a discharging period during which the lithium ion secondary cell is discharged.
- each non-charging period when suspension of charging and discharging are performed, Li ions retained on a negative electrode surface can be satisfactorily diffused.
- each non-charging period includes the charging suspension period and the discharging period in the charging control device. Namely, in each non-charging period, suspension of charging and discharging are performed. Thus, split charging is separately performed so that suspension of charging and discharging are interposed in between until the value of the physical quantity corresponding to the storage amount reaches the second predetermined value. According to this configuration, the reduction of the electrical capacity can be further suppressed.
- the above hybrid electric vehicle preferably, further comprises: an engine operation determination device which determines whether an engine mounted in the hybrid electric vehicle is operating; and an engine operation instruction device which instructs start of the operation of the engine when it is determined that the engine is not operating, wherein the charging control device performs control so that, in such a state that a generator mounted in the hybrid electric vehicle is being driven by the operation of the engine, an electric power generated by the generator is supplied to the lithium ion secondary cell to charge the lithium ion secondary cell.
- the hybrid electric vehicle of the present invention it is determined whether the engine mounted in the hybrid electric vehicle is in an operating state. When it is determined that the engine is not operating, the start of the operation of the engine is instructed. According to this configuration, the electrical power generated by the generator mounted in the hybrid electric vehicle can be supplied to the lithium ion secondary cell in such a state that the generator is being driven by the operation of the engine. Thus, the lithium ion secondary cell in which the value of the physical quantity corresponding to the storage amount is lowered to the first predetermined value can appropriately be charged until the value of the physical quantity reached the second predetermined value.
- the charging control device performs control so that the lithium ion secondary cell is charged with a current having a magnitude of not less than 2C.
- the lithium ion secondary cell is charged with a current having a magnitude of not less than 2C.
- the lithium ion secondary cell in which the value of the physical quantity corresponding to the storage amount is lowered to the first predetermined value can be charged in a shorter time so that the value of the physical quantity reaches the second predetermined value.
- the Li ions retained on the interface between the electrolytic solution and the negative electrode can be diffused, whereby the deposition of metal Li on a negative electrode surface can be suppressed.
- the lithium ion secondary cell can be charged so that the value of the physical quantity reached the second predetermined value in a shorter time.
- the charging current is too large, the deterioration of the cell, a charging system, and so on is accelerated.
- the magnitude of the charging current is not less than 2C and not more than 10C, for example.
- a hybrid electric vehicle 1 according to the embodiment 1, as shown in FIG. 1 includes a vehicle body 2, an engine 3, a front motor 4, a rear motor 5, a cell system 6, a cable 7, and a generator 9 and is driven by the combined use of the engine 3, the front motor 4, and the rear motor 5.
- the cell system 6 is used as a power source for driving the front motor 4 and the rear motor 5, and the hybrid electric vehicle 1 is configured by well-known means in such a manner as to run using the engine 3, the front motor 4, and the rear motor 5.
- the cell system 6 is mounted in the vehicle body 2 of the hybrid electric vehicle 1 and connected to the front motor 4 and the rear motor 5 via the cable 7. As shown in FIG. 2 , the cell system 6 comprises an assembled cell 10 including a plurality of lithium ion secondary cells 100 (electric cells) electrically connected to each other in series, a voltage detector 40, a current detector 50, and a cell controller 30.
- the cell controller 30 includes a ROM 31, a CPU 32, and a RAM 33 and the like.
- the voltage detector 40 detects a voltage between terminals V of each of the lithium ion secondary cells 100. Meanwhile, the current detector 50 detects a current value I of the current flowing through the lithium ion secondary cells 100 constituting the assembled cell 10.
- the cell controller 30 calculates a storage amount of the lithium ion secondary cell 100 based on the voltage V between terminals detected by the voltage detector 40 (specifically, the average value of the lithium ion secondary cells 100 constituting the assembled cell 10) to estimate an SOC (State of Charge) of the lithium ion secondary cell 100 from the calculated storage amount.
- SOC State of Charge
- the cell controller 30 determines whether the storage amount of the lithium ion secondary cell 100 is lowered to a first predetermined value (the storage amount corresponding to SOC 30% in the embodiment 1). In the embodiment 1, whether the estimated SOC is lowered to 30% is determined.
- the cell controller 30 determines whether the hybrid electric vehicle 1 is in a stop state. Specifically, the cell controller 30 determines whether the hybrid electric vehicle 1 is in the stop state based on a signal transmitted from an ECU 60. In the ECU 60, when the cell system 6 is in an activated state, and when a shift position is an "N position" or a "P position", it is determined that the hybrid electric vehicle 1 is in the stop state, and the ECU 60 transmits a stop state signal, indicating that the hybrid electric vehicle 1 is in the stop state, to the cell controller 30.
- the shift position is a "D position"
- an accelerator is not depressed and thus the speed of the hybrid electric vehicle 1 is "0”
- the ECU 60 transmits the stop state signal to the cell controller 30.
- the cell controller 30 detects the stop state signal, it is determined that the hybrid electric vehicle 1 is in the stop state.
- the cell controller 30 determines whether the engine 3 mounted in the hybrid electric vehicle 1 is operating. Specifically, the cell controller 30 determines whether the engine 3 is operating based on the signal transmitted from the ECU 60. In the ECU 60, when the number of rotations of the engine 3 is not "0", it is determined that the engine 3 is operating, and an operating state signal indicating that the engine 3 is operating is transmitted to the cell controller 30. When the cell controller 30 detects the operating state signal, it is determined that the engine 3 is operating.
- the cell controller 30 determines that the engine 3 is not operating, the start of the operation of the engine 3 is instructed. This instruction allows the engine 3 to be in the operating state (idling state), and therefore the generator 9 (alternator) is driven.
- the cell controller 30 determines that the storage amount of the lithium ion secondary cell 100 is lowered to the first predetermined value (the estimated SOC is lowered to 30%), and, in addition, when the cell controller 30 determines that the hybrid electric vehicle 1 is in a travel stop state, the cell controller 30 performs control so that the lithium ion secondary cell 100 is charged until the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value while the hybrid electric vehicle 1 is stopped. Specifically, in such a state in which the generator 9 is being driven by the operation of the engine 3, the electric power generated by the generator 9 is supplied to the lithium ion secondary cells 100 constituting the assembled cell 10.
- the second predetermined value is the storage amount corresponding to SOC 60%.
- the cell controller 30 continues charging of the lithium ion secondary cell 100 until the estimated SOC reaches 60%. Since a theoretical electrical capacity of the lithium ion secondary cell 100 is 5 Ah, the storage amount corresponding to SOC 100% is 5 Ah.
- the cell controller 30 corresponds to a first determination device, a stop state determination device, an engine operation determination device, an engine operation instruction device, and a charging control device.
- the cell controller 30 splits a charging period until the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value into two or more split charging periods and non-charging periods provided between the split charging periods. Charging is performed during the split charging period, and charging is suspended during the non-charging period.
- a charging period K is split into two split charging periods (a first split charging period KC1 and a second split charging period KC2) and a non-charging period (a charging suspension period KR) between these split charging periods.
- charging and suspension of charging are repeated in order of "charging, suspension, and charging", whereby the storage amount is restored to the second predetermined value.
- the charging suspension period KR is provided in the charging period K from the first predetermined value to the second predetermined value, and consequently the deposition of metal Li on a negative electrode surface can be suppressed. It is considered that this is because the suspension of charging enables Li ions, retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control, to be diffused in the lithium ion secondary cell 100. This configuration can prevent the reduction of the electrical capacity caused by the deposition of metal Li.
- the length tc of the split charging period may be not less than 40 seconds, in the embodiment 1, the length tc of the first split charging period KC1 is 67.5 seconds, and the length tc of the second split charging period KC2 is also 67.5 seconds. In this way the length of the split charging period is increased, whereby the idling of the hybrid electric vehicle 1 can be stabilized. Therefore, the comfort of riding the hybrid electric vehicle is not lost, and thus a driver and fellow passengers do not feel uncomfortable.
- the length tr of the charging suspension period is set so that a ratio tr/tc between the length tc of each split charging period and the length tr of the charging suspension period immediately after the split charging period is not less than 0.14 and not more than 0.9.
- the number of the split charging periods, the length tc of the split charging period, and the length tr of the charging suspension period are previously stored in the ROM 31 of the cell controller 30.
- the magnitude of the charging current is preferably set to not less than 2C and not more than 10C.
- the charging current in the split charging period KC1 and the second split charging period KC2, the charging current is a constant current of the magnitude of 8C (40A). Charging with a large current can realize that the lithium ion secondary cell 100 whose storage amount is lowered to the first predetermined value can be charged so that the storage amount reaches the second predetermined value in a short time.
- the lithium ion secondary cell 100 is a rectangular encapsulated lithium ion secondary cell which comprises a cell case 110 having a rectangular solid shape, a positive electrode terminal 120, and a negative electrode terminal 130.
- the cell case 110 includes a rectangular accommodation portion 111, which is formed of metal and provides an accommodation space having a rectangular solid shape, and a metal lid 112.
- the cell case 110 (the rectangular accommodation portion 111) houses an electrode body 150, a positive electrode collecting member 122, a negative electrode collecting member 132, and a nonaqueous electrolyte solution 140.
- the electrode body 150 has an oval cross section, and is, as shown in FIG. 6 , a flat wound body comprising a wound sheet-like positive electrode plate 155, a negative electrode plate 156, and a separator 157.
- the electrode body 150 has a positive electrode wound portion 155b located at one end portion (in FIG. 4 , the right end portion) in the axial direction (in FIG. 4 , the left and right directions) and a negative electrode wound portion 156b located at the other end portion (in FIG. 4 , the left end portion).
- the positive electrode wound portion 155b only a part of the positive electrode plate 155 is stacked in a spiral manner.
- the negative electrode wound portion 156b only a part of the negative electrode plate 156 is stacked in a spiral manner.
- a positive electrode composite material 152 containing a positive-electrode active material 153 is coated onto the positive electrode plate 155 excluding the positive electrode wound portion 155b (see FIG. 6 ).
- a negative electrode composite material 159 containing a negative-electrode active material 154 is coated onto the negative electrode plate 156 excluding the negative electrode wound portion 156b (see FIG. 6 ).
- the positive electrode wound portion 155b is electrically connected to the positive electrode terminal 120 via the positive electrode collecting member 122.
- the negative electrode wound portion 156b is electrically connected to the negative electrode terminal 130 via the negative electrode collecting member 132.
- lithium nickel oxide is used as the positive-electrode active material 153.
- a natural graphite-based carbon material is used as the negative-electrode active material 154.
- the nonaqueous electrolyte solution 140 is prepared by dissolving lithium hexafluorophosphate (LiPF 6 ) in a nonaqueous solvent mixed with EC (ethylene carbonate), DMC (dimethyl carbonate), and EMC (ethyl methyl carbonate).
- the theoretical electrical capacity of the lithium ion secondary cell 100 is 5 Ah.
- 1C corresponds to a current value of 5A.
- step S1 it is determined whether the storage amount of the lithium ion secondary cell 100 is lowered to the first predetermined value (in the embodiment 1, the storage amount corresponding to SOC 30%). Specifically, the cell controller 30 calculates the storage amount of the lithium ion secondary cell 100 based on the voltage V between terminals (the average value of the lithium ion secondary cells 100 constituting the assembled cell 10 for details) detected by the voltage detection detector 40 to estimate the SOC (State of Charge) of the lithium ion secondary cell 100 from the calculated storage amount. Then, it is determined whether the storage amount of the lithium ion secondary cell 100 is lowered to the first predetermined value based on the estimated SOC. In the embodiment 1, when the estimated SOC is lowered to 30%, it can be determined that the storage amount of the lithium ion secondary cell 100 is lowered to the first predetermined value.
- step S1 When it is determined in step S1 that the storage amount of the lithium ion secondary cell 100 is not lowered to the first predetermined value (in the embodiment 1, the storage amount corresponding to SOC 30%) (No), the processing is terminated without starting charging.
- step S2 it is determined whether the hybrid electric vehicle 1 is in the stop state. Specifically, it is determined whether the hybrid electric vehicle 1 is in the stop state based on the signal transmitted from the ECU 60.
- the ECU 60 when the cell system 6 is in an activated state, and when the shift position is the "N position" or the "P position", it is determined that the hybrid electric vehicle 1 is in the stop state, and the ECU 60 transmits the stop state signal, indicating that the hybrid electric vehicle 1 is in the stop state, to the cell controller 30.
- the shift position is the "D position"
- an accelerator is not depressed and thus the speed of the hybrid electric vehicle 1 is "0”
- the ECU 60 transmits the stop state signal to the cell controller 30.
- the cell controller 30 detects the stop state signal transmitted from the ECU 60, it is determined that the hybrid electric vehicle 1 is in the stop state.
- step S2 When it is determined in step S2 that the hybrid electric vehicle 1 is not in the stop state (No), the flow returns to step S1 again, and the above processing is performed.
- step S3 it is determined whether the engine 3 mounted in the hybrid electric vehicle 1 is operating. Specifically, it is determined whether the engine 3 is operating based on the signal transmitted from the ECU 60. In the ECU 60, when the number of rotations of the engine 3 is not "0", it is determined that the engine 3 is operating, and the operating state signal indicating that the engine 3 is operating is transmitted to the cell controller 30. Thus, when the cell controller 30 detects the operating state signal transmitted from the ECU 60, it is determined that the engine 3 is operating.
- step S3 When it is determined in step S3 that the engine 3 is not operating (No), the flow proceeds to step S4, and the start of the operation of the engine 3 is instructed.
- This instruction allows the engine 3 to be in the operating state (the idling state), and therefore the generator (alternator) 9 is driven.
- step S5 charging of the lithium ion secondary cells 100 constituting the assembled cell 10 is started. Specifically, in such a state that the generator 9 is driven by the operation of the engine 3, the electric power generated by the generator 9 is supplied to the lithium ion secondary cells 100 constituting the assembled cell 10. In the embodiment 1, a constant current having a magnitude of 8C (40A) is supplied to the lithium ion secondary cell 100.
- step S6 it is determined whether the first split charging period KC1 has elapsed.
- the length tc of the first split charging period KC1 is 67.5 seconds. Thus, it is determined whether 67.5 seconds have elapsed after the start of charging.
- the electric quantity (0.75 Ah) corresponding to SOC 15% can be supplied to each of the lithium ion secondary cells 100.
- the lithium ion secondary cell 100 with SOC lowered to 30% can be charged so that the SOC is restored to 45%.
- step S6 When it is determined in step S6 that the first split charging period KC1 has not elapsed (No), the processing is repeated until the first split charging period KC 1 elapses.
- step S6 the flow proceeds to step S7, the charging of the lithium ion secondary cell 100 is suspended.
- step S8 it is determined whether the charging suspension period KR has elapsed.
- the length tr of the charging suspension period KR is 30 seconds. Thus, it is determined whether 30 seconds have elapsed after the suspension of charging.
- step S8 When it is determined in step S8 that the charging suspension period KR has not elapsed (No), the processing is repeated until the charging suspension period KR elapses. Thereafter, in step S8, when it is determined that the charging suspension period KR has elapsed (Yes), the flow proceeds to step S9, and the charging of the lithium ion secondary cell 100 is started again.
- step SA it is determined whether the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value (in the embodiment 1, the storage amount corresponding to SOC 60%).
- the cell controller 30 calculates the storage amount of the lithium ion secondary cell 100 based on the voltage V between terminals (specifically, the average value of the lithium ion secondary cells 100 constituting the assembled cell 100) detected by the voltage detector 40 to estimate the SOC of the lithium ion secondary cell 100 from the calculated storage amount. Then, based on the estimated SOC, it is determined whether the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value. In the embodiment 1, when the estimated SOC has reached 60%, it can be determined that the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value.
- the lithium ion secondary cell 100 is charged with a constant current of 8C (40A).
- the length tc of the second split charging period KC2 is 67.5 seconds as with the first split charging period KC1.
- the second split charging period KC2 corresponds to a period from when charging of the lithium ion secondary cell 100 is started again in step S9 till when the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value (the storage amount corresponding to SOC 60%).
- step SA It is determined in step SA that the storage amount of the lithium ion secondary cell 100 has not reached the second predetermined value (No), the processing is repeated until the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value. Thereafter, when it is determined in step SA that the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value (Yes), the charging of the lithium ion secondary cell 100 is terminated.
- the processing of steps S7 and S8 are performed, whereby charging can be suspended within a period during which the storage amount of the lithium ion secondary cell 100 is charged from the first predetermined value (SOC 30%) to the second predetermined value (SOC 60%).
- the suspension of charging can enable Li ions, retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control, to be diffused in the lithium ion secondary cell 100, and therefore, the deposition of metal Li on a negative electrode surface can be suppressed. This configuration can prevent the reduction of the electrical capacity caused by the deposition of metal Li.
- the length tc of each split charging period is not less than 40 seconds (specifically, 67.5 seconds).
- the idling of the hybrid electric vehicle 1 can be stabilized even during the charging period, and therefore, the comfort of riding the hybrid electric vehicle is not lost.
- the length tc of each split charging period is 67.5 seconds, and the length tr of the charging suspension period is 30 seconds.
- tr/tc is not less than 0.14, the deposition of metal Li on a negative electrode surface can be suppressed.
- tr/tc is not more than 0.9, the storage amount of the lithium ion secondary cell 100 can be rapidly and appropriately restored to the second predetermined value without spending useless charging suspension time.
- steps S5 to SA correspond to a charging step.
- the lithium ion secondary cell 100 is charged from the first predetermined value (the storage amount corresponding to SOC 30%) to the second predetermined value (the storage amount corresponding to SOC 60%) and thereafter discharged to be lowered to the first predetermined value.
- This charging and discharging cycle is determined as 1 cycle, and a cycle test is performed. The cycle test will be described hereinafter in detail.
- the lithium ion secondary cell 100 with the storage amount corresponding to SOC 30% is prepared.
- the lithium ion secondary cell 100 is charged in the above manner under a temperature environment at 15 °C until the SOC is restored to 60%.
- the lithium ion secondary cell 100 is charged with a constant current of 40A (8C) for 67.5 seconds and thereafter, the charging is suspended for 30 seconds.
- the lithium ion secondary cell 100 is charged again with the constant current of 40A (8C) for 67.5 seconds.
- This configuration can restore the storage amount of the lithium ion secondary cell 100 to the storage amount corresponding to SOC 60%.
- the lithium ion secondary cell 100 is discharged with a constant current of 20A (4C), whereby the storage amount of the lithium ion secondary cell 100 is lowered so as to correspond to SOC 30%.
- This charging and discharging cycle is determined as 1 cycle and repeated for 128 cycles.
- the discharge capacities in each of the cycles 40, 68, 89, and 128 was measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as a capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 40, 68, 89, and 128 were 99.67%, 99.49%, 99.31%, and 98.53%, respectively. This result as a relation between the number of charging and discharging cycles and the capacity maintenance ratio is indicated by the chain line in FIG. 8 .
- the number of the split charging periods is 2
- the length tc of the split charging period is 67.5 seconds
- the embodiment 2 was different from the embodiment 1 in that the lithium ion secondary cell 100 was charged under conditions that the number of the split charging periods was 3, and the length tc of the split charging period was 45 seconds.
- the conditions of discharging were the same as the embodiment 1. Under such conditions, the charging and discharging cycle was repeated for 113 cycles. At that time, the discharge capacities in each of the cycles 33, 58, 78, and 113 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 33, 58, 78, and 113 were 99.77%, 99.68%, 99.56%, and 98.39%, respectively. This result is indicated by the solid line in FIG. 8 .
- the cycle test according to the comparison 1 was performed.
- the comparison 1 was different from the embodiments 1 and 2 in that charging was continuously performed without splitting the charging period.
- the lithium ion secondary cell 100 was continuously charged with a constant current of 40A (8C) for 135 seconds, whereby the storage amount of the lithium ion secondary cell 100 was restored to the storage amount corresponding to SOC 60%.
- the lithium ion secondary cell 100 was discharged with a constant current of 20A (4C), whereby the storage amount of the lithium ion secondary cell 100 was lowered so as to correspond to SOC 30%.
- This charging and discharging cycle was determined as 1 cycle and repeated for 117 cycles.
- the discharge capacities in each of the cycles 16, 45, 81, and 117 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 16, 45, 81, and 117 were 99.75%, 99.42%, 98.93%, and 97.78%, respectively. This result is indicated by the dashed line in FIG. 8 .
- the reduction of the capacity maintenance ratio caused by the cycle test was smaller than that in the comparison 1.
- the charging period from the first predetermined value to the second predetermined value was split into two or more split charging periods and the charging suspension periods (non-charging periods) provided between the split charging periods. It can be considered that charging was suspended in the middle of the charging period, whereby Li ions retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control was diffused in the lithium ion secondary cell 100. It can be said that the reduction of the electrical capacity caused by the deposition of metal Li was suppressed with this configuration.
- the reduction of the capacity maintenance ratio in the embodiment 2 was smaller than that in the embodiment 1. It is considered that this is because, in the embodiment 2, the number of the split charging periods is larger than that in the embodiment 1, and thus the number of the charging suspension periods provided between the split charging periods is also larger than that in the embodiment 1 (the total charging period is also larger than that in the embodiment 1). This result shows that the larger the number of the split charging periods is, the greater the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li is.
- Embodiments 3 to 5 are different from the embodiment 1 in that the lithium ion secondary cell 100 was charged under conditions that the number of the split charging periods was 6, the length tc of the split charging period was 60 seconds, and the charging current was a constant current of 15A (3C).
- the conditions of discharging were the same as the embodiment 1. Under such conditions, the cycle test was performed. However, the embodiments 3 to 5 were different from each other in the length tr of the charging suspension period.
- the discharging current is a constant current of 7.5A (1.5C).
- the charging and discharging cycle was repeated for 1613 cycles with the condition that the length tc of the charging suspension period is 10 seconds.
- the discharge capacities in each of the cycles 152, 506, 689, 909, 1161, 1394, and 1613 cycles were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 152, 506, 689, 909, 1161, 1394, and 1613 were 99.69%, 99.49%, 99.15%, 99.1%, 99.23%, 98.84%, and 98.93%, respectively. This result is indicated by the chain line in FIG. 9 .
- the charging and discharging cycle was repeated for 1539 cycles with the condition that the length tr of the charging suspension period is 30 seconds.
- the discharge capacities in each of the cycles 145, 487, 661, 870, 1110, 1332, and 1539 cycles were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 145, 487, 661, 870, 1110, 1332, and 1539 were 99.75%, 99.5%, 99.13%, 99.05%, 99.1%, 98.75%, and 98.87%, respectively. This result is indicated by the solid line in FIG. 9 .
- the charging and discharging cycle was repeated for 1443 cycles with the condition that the length tr of the charging suspension period is 50 seconds.
- the discharge capacities in each of the cycles 141, 462, 626, 821, 1043, 1249, and 1443 cycles were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 141, 462, 626, 821, 1043, 1249, and 1443 were 99.65%, 99.47%, 99.37%, 99.34%, 99.27%, 99.09%, and 98.95%, respectively. This result is indicated by the chain double-dashed line in FIG. 9 .
- the cycle test according to the comparison 2 was performed.
- the comparison 2 was different from the embodiments 3 to 5 in that charging was continuously performed without splitting the charging period.
- the lithium ion secondary cell 100 was continuously charged with a constant current of 15A (3C) for 360 seconds, whereby the storage amount of the lithium ion secondary cell 100 was restored to the storage amount corresponding to SOC 60%.
- the lithium ion secondary cell 100 was discharged with a constant current of 20A (4C), whereby the storage amount of the lithium ion secondary cell 100 was lowered so as to correspond to SOC 30%.
- This charging and discharging cycle was determined as 1 cycle and repeated for 1838 cycles.
- the discharge capacities in each of the cycles 173, 574, 785, 1036, 1321, 1589, and 1838 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 173, 574, 785, 1036, 1321, 1589, and 1838 were 99.48%, 99.04%, 98.69%, 98.61%, 98.21%, 97.89%, and 97.68%, respectively. This result is indicated by the dashed line in FIG. 9 .
- the reduction of the capacity maintenance ratio caused by the cycle test was smaller than that in the comparison 2. This is because, in the embodiments 3 to 5, the charging period from the first predetermined value to the second predetermined value was split into two or more split charging periods and the charging suspension periods (non-charging periods) provided between the split charging periods.
- the capacity maintenance ratio becomes larger in order of the embodiment 3, 4, and 5.
- the number of the split charging periods is equal (namely, the number of the charging suspension periods is equal)
- the length tr of the charging suspension period is different (the length tr is increased in sequence). This result shows that even when the number of the split charging periods is equal (the number of the charging suspension periods is equal), the longer the length tr of the charging suspension period is, the greater the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li is.
- the cycle test was performed at the test environment temperature of 0°C.
- the lengths tr of the charging suspension periods were respectively 10 seconds, 30 seconds, and 60 seconds.
- the conditions of discharging were the same as the embodiment 1.
- the charging and discharging cycle was repeated for 897 cycles with the condition that the length tr of the charging suspension period is 10 seconds.
- the discharge capacities in each of the cycles 15, 55, 200, 403, 461, 603, and 897 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 15, 55, 200, 403, 461, 603, and 897 were 99.63%, 99.23%, 98.37%, 97.62%, 97.13%, 95.63% and 89.19%, respectively. This result is indicated by the chain line in FIG. 10 .
- the charging and discharging cycle was repeated for 891 cycles with the condition that the length tr of the charging suspension period is 30 seconds.
- the discharge capacities in each of the cycles 15, 55, 155, 384, 450, 584, and 891 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 15, 55, 155, 384, 450, 584, and 891 were 99.61%, 99.22%, 98.44%, 98.04%, 97.78%, 96.98% and 90.63%, respectively. This result is indicated by the solid line in FIG. 10 .
- the charging and discharging cycle was repeated for 892 cycles with the condition that the length tr of the charging suspension period is 60 seconds.
- the discharge capacities in each of the cycles 15, 54, 211, 388, 455, 588, and 892 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 15, 54, 211, 388, 455, 588, and 892 were 99.69%, 99.38%, 98.45%, 98.07%, 97.74%, 97.13% and 91.76%, respectively. This result is indicated by the chain double-dashed line in FIG. 10 .
- the cycle test according to the comparison 3 was performed.
- the comparison 3 is different from the embodiments 6 to 8 in that charging was continuously performed without splitting the charging period.
- the charging and discharging cycle is repeated 889 cycles.
- the discharge capacities in each of the cycles 15, 55, 161, 282, 351, 516, and 889 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of 15, 55, 161, 282, 351, 516, and 889 were 99.62%, 99.29%, 98.49%, 97.8%, 97.12%, 95.64%, 87.8%, respectively. This result is indicated by the dashed line in FIG. 10 .
- the reduction of the capacity maintenance ratio caused by the cycle test is smaller than that in the comparison 3. This is because, in the embodiments 6 to 8, the charging period from the first predetermined value to the second predetermined value was split into two split charging periods and the charging suspension period (non-charging period) provided between the two split charging periods.
- the capacity maintenance ratio becomes larger in order of the embodiment 6, 7, and 8.
- the number of the split charging periods is equal (namely, the number of the charging suspension periods is equal)
- the length tr of the charging suspension period is different (the length tr is increased in sequence). This result shows that even when the number of the split charging periods is equal (the number of the charging suspension periods is equal), the longer the length tr of the charging suspension period is, the greater the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li is.
- the storage amount of the lithium ion secondary cell 100 may not be able to be restored to the second predetermined value (the storage amount corresponding to SOC 60% in the embodiments 1 to 8) while the hybrid electric vehicle 1 stops running. It is sufficient for the charging suspension period to have a length allowing the diffusion of Li ions retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control, and there is no use in suspending charging over the relevant period.
- the capacity maintenance ratio in the embodiment 8 is larger than that in the embodiment 7; however, the difference is very small.
- the length tc of the split charging period is 67.5 seconds
- the length tr of the charging suspension period is 60 seconds, whereby tr/tc is about 0.9.
- the ratio tr/tc between the length tc of each split charging period and the length tr of the charging suspension period immediately after the split charging period is preferably not more than 0.9. This configuration can enable the storage amount of the lithium ion secondary cell 100 to rapidly and appropriately restore to the second predetermined value without spending useless charging suspension time.
- the cycle test was performed at a test environment temperature of 0°C as in the embodiments 6 to 8.
- the lengths tr of the charging suspension period were 1 second and 5 seconds, respectively.
- the charging and discharging cycle was repeated for 428 cycles with the condition that the length tr of the charging suspension period is 1 second.
- the discharge capacities in each of the cycles 16, 59, 212, and 428 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 16, 59, 212, and 428 were, respectively, 99.75%, 99.05%, 98.12%, and 96.54%. This result is indicated by the solid line in FIG. 11 .
- the charging and discharging cycle was repeated for 418 cycles with the condition that the length tr of the charging suspension period is 5 seconds.
- the discharge capacities in each of the cycles 16, 56, 206, and 418 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 16, 56, 206, and 418 were 99.55%, 98.99%, 98.05%, and 96.31%, respectively. This result is indicated by the chain double-dashed line in FIG. 11 .
- the results of the tests in the embodiment 6 and the comparison 3 are shown respectively by the chain line and the dashed line in FIG. 11 .
- the ratio tr/tc in each of the comparison 3 and the embodiments 9, 10, and 6 is 0, 0.015, 0.074, and 0.148 in this order.
- the rate of the capacity reduction is rarely different from the rate in the comparison 3. This is because, since the length tr of the charging suspension period was too short relative to the length tc of the split charging period (specifically, tr/tc is 0.015 and 0.074), Li ions retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control could not satisfactorily be diffused, whereby the deposition of metal Li on the negative electrode surface could not satisfactorily be suppressed. Meanwhile, in the embodiment 6, since tr/tc is not less than 0.14, it is clear that the capacity maintenance ratio is higher than that in the comparison 3.
- the ratio tr/tc between the length tc of each split charging period and the length tr of the charging suspension period immediately after the split charging period is preferably not less than 0.14. This configuration can satisfactorily suppress the deposition of metal Li on the negative electrode surface.
- the lithium ion secondary cell 100 was charged under such changed conditions that the test environment temperature is -15°C, the charging current was a constant current of 20A (4C), and the length tc of the split charging period was 136.5 seconds and 91 seconds.
- the conditions of discharging were the same as those in the embodiment 1. Under such conditions, the cycle test was performed. However, the embodiments 11 and 12 were different from each other in the number of the split charging periods. The discharging current was changed to a constant current of 10A (2C).
- the charging and discharging cycle was repeated for 506 cycles with the condition that the number of the split charging periods was 2.
- the discharge capacities in each of the cycles 27, 103, 278, 447, and 506 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 27, 103, 278, 447, and 506 were 99.63%, 99.02%, 97.6%, 95.78%, and 94.73%, respectively. This result is indicated by the chain line in FIG. 12 .
- the charging and discharging cycle was repeated for 447 cycles with the condition that the number of the split charging periods was 3.
- the discharge capacities in each of the cycles 24, 93, 245, 396, and 447 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 24, 93, 245, 396, and 447 were 99.6%, 99.12%, 98.23%, 97.26%, and 96.76%, respectively. This result is indicated by the solid line in FIG. 12 .
- the cycle test according to the comparison 4 was performed.
- the comparison 4 is different from the embodiments 11 and 12 in that charging was continuously performed without splitting the charging period.
- the charging and discharging cycle is repeated 531 cycles as in the embodiments 11 and 12.
- the discharge capacities in each of the cycles 45, 118, 214, 254, 374, and 531 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of 45, 118, 214, 254, 374, and 531 were 99.34%, 98.95%, 97.89%, 97.17%, 94.9%, and 90.49%, respectively. This result is indicated by the dashed line in FIG. 12 .
- the reduction of the capacity maintenance ratio caused by the cycle test was smaller than that in the comparison 4. This is because, in the embodiments 11 and 12, the charging period from the first predetermined value to the second predetermined value was split into two or more split charging periods and the charging suspension periods (non-charging periods) provided between the split charging periods.
- the reduction of the capacity maintenance ratio in the embodiment 12 was smaller than that in the embodiment 11. It is considered that this is because, in the embodiment 12, the number of the split charging periods is larger than that in the embodiment 11, and thus the number of the charging suspension periods provided between the split charging periods is also larger than that in the embodiment 11 (the total charging period is also larger than that in the embodiment 11). This result shows that the larger the number of the split charging periods is, the greater the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li is.
- the cycle tests were performed under such changed conditions that the test environment temperature as -15°C, the charging current was a constant current of 10A (2C), the length tc of the split charging period was 60 seconds, and the number of the split charging periods was 6.
- the embodiments 13 and 14 were different in the length tr of the charging suspension period.
- the discharging current was changed to a constant current of 5A (1C).
- the charging and discharging cycle was repeated for 1346 cycles with the condition that the length of the charging suspension period is 10 seconds.
- the discharge capacities in each of the cycles 133, 434, 586, 765, 974, 1166, and 1346 cycles were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 133, 434, 586, 765, 974, 1166, and 1346 were 99.61%, 99.45%, 99.25%, 98.89%, 98.83%, 98.71%, and 98.52%, respectively. This result is indicated by the chain line in FIG. 13 .
- the charging and discharging cycle was repeated for 1254 cycles with the condition that the length of the charging suspension period is 30 seconds.
- the discharge capacities in each of the cycles 124, 405, 546, 711, 906, 1086, and 1254 cycles were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 124, 405, 546, 711, 906, 1086, and 1254 were 99.75%, 99.61%, 99.38%, 99.12%, 98.97%, 98.92%, and 98.84%, respectively. This result is indicated by the solid line in FIG. 13 .
- the cycle test according to the comparison 5 was performed.
- the comparison 5 is different from the embodiments 13 and 14 in that charging was continuously performed without splitting the charging period.
- the charging and discharging cycle is repeated 1531 cycles as in the embodiments 13 and 14. At that time, the discharge capacities in each of the cycles 150, 496, 666, 872, 1110, 1329, and 1531 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of 150, 496, 666, 872, 1110, 1329, and 1531 were 99.59%, 99.24%, 98.95%, 98.43%, 97.92%, 97.43%, and 96.58%, respectively. This result is indicated by the dashed line in FIG. 13 .
- the reduction of the capacity maintenance ratio caused by the cycle test was smaller than that in the comparison 5. This is because, in the embodiments 13 and 14, the charging period from the first predetermined value to the second predetermined value was split into two or more split charging periods and the charging suspension periods (non-charging periods) provided between the split charging periods.
- the capacity maintenance ratio in the embodiment 14 is larger than that in the embodiment 13. This is because, although the embodiments 13 and 14 have the same number of the split charging periods (namely, they have the same number of the charging suspension periods), the length tr of the charging suspension period in the embodiment 14 is longer than that in the embodiment 13. This result shows that even when the number of the split charging periods is equal (the number of the charging suspension periods is equal), the longer the length tr of the charging suspension period is, the greater the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li is.
- the non-charging period is the discharging period. In other words, discharging is performed over the entire non-charging period.
- the cell controller 30 splits the charging period before the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value into three split charging periods (first to third split charging periods) and the non-charging periods provided between the split charging periods. Then, charging is performed in the split charging period, and discharging is performed in the non-charging period. In other words, charging and discharging are repeated in order of "charging, discharging, charging, discharging, and charging" so that the storage amount is restored to the second predetermined value.
- step U51 charging of the lithium ion secondary cells 100 constituting the assembled cell 10 is started. Specifically, in such a state that the generator 9 is being driven by the operation of the engine 3, the electric power generated by the generator 9 is supplied to the lithium ion secondary cells 100 constituting the assembled cell 10. In the embodiment 15, a constant current having a magnitude of 3C (15A) is supplied to the lithium ion secondary cell 100.
- the flow proceeds to step U52, and it is determined whether the first split charging period has elapsed.
- the length of the first split charging period is 120 seconds. Thus, it is determined whether 120 seconds have elapsed after the start of charging.
- the lithium ion secondary cell 100 When the lithium ion secondary cell 100 is charged for 120 seconds with a constant current of 3C (15A), the electric capacity (0.5 Ah) corresponding to SOC 10% can be supplied to each of the lithium ion secondary cells 100. Thus, in the embodiment 15, in the first split charging period (120 seconds), the lithium ion secondary cell 100 with SOC lowered to 30% can be charged so that the SOC is restored to 40%.
- step U52 when it is determined that the first split charging period has not elapsed (No), the processing is repeated until the first split charging period elapses.
- step U52 when it is determined that the first split charging period has elapsed (Yes), the flow proceeds to step U53, and charging of the lithium ion secondary cell 100 is stopped to start discharging.
- discharging is performed with a constant current of 7.5A.
- the flow proceeds to step U54, and it is determined whether the discharging period has elapsed.
- the length of the discharging period is 0.5 second. Thus, it is determined whether 0.5 second has elapsed after the start of discharging.
- step U54 When it is determined in step U54 that the discharging period has not elapsed (No), the processing is repeated until the discharging period elapses. Thereafter, when it is determined in step U54 that the discharging period has elapsed (Yes), the flow proceeds to step U55, and charging of the lithium ion secondary cell 100 is started again.
- step U56 it is determined whether the second split charging period has elapsed.
- the length of the second split charging period is 120 seconds. Thus, it is determined whether 120 seconds have elapsed after the start of charging.
- the lithium ion secondary cell 100 When the lithium ion secondary cell 100 is charged for 120 seconds with a constant current of 3C (15A), the electric capacity (0.5 Ah) corresponding to SOC 10% can be supplied to each of the lithium ion secondary cells 100. Thus, in the embodiment 15, in the second split charging period (120 seconds), the lithium ion secondary cell 100 with SOC of 40% can be charged so that the SOC is restored to 50%.
- step U56 When it is determined in step U56 that the second split charging period has not elapsed (No), the processing is repeated until the second split charging period elapses.
- step U56 the flow proceeds to step U57, and charging of the lithium ion secondary cell 100 is stopped to start discharging. As in the above case, discharging is performed with a constant current of 7.5A.
- step U58 whether the discharging period has elapsed is determined.
- the length of the discharging period is 0.5 second.
- step U58 When it is determined in step U58 that the discharging period has not elapsed (No), the processing is repeated until the discharging period elapses. Thereafter, when it is determined in step U58 that the discharging period has elapsed (Yes), the flow proceeds to step U59, and charging of the lithium ion secondary cell 100 is started again.
- step SA of the embodiment 1 it is determined whether the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value (also in the embodiment 15, the storage amount corresponding to SOC 60%). Also in the embodiment 15, when the estimated SOC reaches 60%, it can be determined that the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value.
- the lithium ion secondary cell 100 is charged with a constant current of 3C (15A) in the first, second, and third split charging periods.
- the length of the third split charging period is 120 seconds as in the first split charging period.
- the third split charging period corresponds to a period from when charging of the lithium ion secondary cell 100 with SOC restored to 50% is started again in step U59 till when the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value (the storage amount corresponding to SOC 60%).
- step U5A When it is determined in step U5A that the storage amount of the lithium ion secondary cell 100 has not reached the second predetermined value (No), the processing is repeated until the storage amount reaches the second predetermined value. Thereafter, when it is determined in step U5A that storage amount of the lithium ion secondary cell 100 has reached the second predetermined value (Yes), the flow returns to the main routine of FIG. 15 , and charging is terminated.
- steps U51 to U5A correspond to the charging step.
- An embodiment 16 is different from the embodiment 15 only in the length of the discharging period, and the other conditions are the same as those in the embodiment 15. Specifically, in the embodiment 16, the lithium ion secondary cell 100 is charged (steps U51 to U5A) under such a condition that the length of each discharging period is 1.0 second.
- An embodiment 17 is different from the embodiment 15 in that the non-charging period includes the charging suspension period and the discharging period. Namely, suspension of charging and discharging are performed in each non-charging period.
- the cell controller 30 splits the charging period until the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value into three split charging periods (first to third split charging periods) and the non-charging periods provided between the split charging periods. Charging is performed in each split charging period and suspension of charging and discharging are performed in each non-charging period. Namely, charging, suspension of charging, and discharging are repeated in order of "charging, suspension, discharging, charging, suspension, discharging, and charging" so that the storage amount is restored to the second predetermined value.
- step V5 charging of the lithium ion secondary cells 100 constituting the assembled cell 10 is started. Specifically, in such a state that the generator 9 is being driven by the operation of the engine 3, the electric power generated by the generator 9 is supplied to the lithium ion secondary cells 100 constituting the assembled cell 10. In the embodiment 17, a constant current having a magnitude of 3C (15A) is supplied to the lithium ion secondary cell 100.
- step V52 it is determined whether the first split charging period has elapsed.
- the length of the first split charging period is 120 seconds. Thus, it is determined whether 120 seconds have elapsed after the start of charging.
- the lithium ion secondary cell 100 When the lithium ion secondary cell 100 is charged for 120 seconds with a constant current of 3C (15A), the electric quantity (0.5 Ah) corresponding to SOC 10% can be supplied to each of the lithium ion secondary cells 100.
- the lithium ion secondary cell 100 with SOC lowered to 30% can be charged so that the SOC is restored to 40%.
- step V52 When it is determined in step V52 that the first split charging period has not elapsed (No), the processing is repeated until the first split charging period elapses.
- step V52 charging of the lithium ion secondary cell 100 is suspended.
- step V54 it is determined whether the charging suspension period has elapsed.
- the length of charging suspension period is 30 seconds. Thus, it is determined whether 30 seconds have elapsed after the suspension of charging.
- step V54 When it is determined in step V54 that the charging suspension period has not elapsed (No), the processing is repeated until the charging suspension period elapses. Thereafter, when it is determined in step V54 that the charging suspension period has elapsed (Yes), the flow proceeds to step V55, and discharging of the lithium ion secondary cell 100 is started. Also in the embodiment 17, discharging is performed with a constant current of 7.5A.
- step V56 it is determined whether the discharging period has elapsed.
- the length of the discharging period is 1.0 second as in the embodiment 16. Thus, it is determined whether 1.0 second has elapsed after the start of discharging.
- step V56 When it is determined in step V56 that the discharging period has not elapsed (No), the processing is repeated until the discharging period elapses. Thereafter, when it is determined in step V56 that the discharging period has elapsed (Yes), the flow proceeds to step V57, and charging of the lithium ion secondary cell 100 is started again.
- step V58 it is determined whether the second split charging period has elapsed.
- the length of the second split charging period is 120 seconds. Thus, it is determined whether 120 seconds have elapsed after the restart of charging.
- the lithium ion secondary cell 100 When the lithium ion secondary cell 100 is charged for 120 seconds with a constant current of 3C (15A), the electric quantity (0.5 Ah) corresponding to SOC 10% can be supplied to each of the lithium ion secondary cells 100.
- the lithium ion secondary cell 100 with SOC of 40% in the second split charging period (120 seconds), the lithium ion secondary cell 100 with SOC of 40% can be charged so that the SOC is restored to 50%.
- step V58 When it is determined in step V58 that the second split charging period has not elapsed (No), the processing is repeated until the second split charging period elapses.
- step V58 the flow proceeds to step V59, and charging of the lithium ion secondary cell 100 is suspended.
- step V5A it is determined whether the charging suspension period has elapsed. Also in this case, the length of the charging suspension period is 30 seconds. Thus, it is determined whether 30 seconds have elapsed after the suspension of charging.
- step V5A When it is determined in step V5A that the charging suspension period has not elapsed (No), the processing is repeated until the charging suspension period elapses. Thereafter, when it is determined in step V5A that the charging suspension period has elapsed (Yes), the flow proceeds to step V5B, and discharging of the lithium ion secondary cell 100 is started. Also in this case, discharging is performed with a constant current of 7.5A.
- step V5C whether the discharging period has elapsed is determined.
- the length of the discharging period is 1.0 second.
- step V5C When it is determined in step V5C that the discharging period has not elapsed (No), the processing is repeated until the discharging period elapses. Thereafter, when it is determined in step V5C that the discharging period has elapsed (Yes), the flow proceeds to step V5D, and charging of the lithium ion secondary cell 100 is started again.
- step SA of the embodiment 1 it is determined whether the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value (also in the embodiment 17, the storage amount corresponding to SOC 60%). Also in the embodiment 17, when the estimated SOC reaches 60%, it can be determined that the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value.
- the lithium ion secondary cell 100 is charged with a constant current of 3C (15A) in the first, second, and third split charging periods.
- the length of the third split charging period is 120 seconds as in the first split charging period.
- the third split charging period corresponds to a period from when charging of the lithium ion secondary cell 100 with SOC restored to 50% is started again in step V5D till when the storage amount of the lithium ion secondary cell 100 reaches the second predetermined value (the storage amount corresponding to SOC 60%).
- step V5E When it is determined in step V5E that the storage amount of the lithium ion secondary cell 100 has not reached the second predetermined value (No), the processing is repeated until the storage amount reaches the second predetermined value. Thereafter, when it is determined in step V5E that storage amount of the lithium ion secondary cell 100 has reached the second predetermined value (Yes), the flow returns to the main routine of FIG. 15 , and charging is terminated.
- steps V51 to V5E correspond to the charging step.
- the lithium ion secondary cell 100 is charged from the first predetermined value (the storage amount corresponding to SOC 30%) to the second predetermined value (the storage amount corresponding to SOC 60%) and thereafter discharged to be lowered to the first predetermined value.
- This charging and discharging cycle is determined as 1 cycle, and a cycle test is performed. The cycle test will be described hereinafter in detail.
- the lithium ion secondary cell 100 with the storage amount corresponding to SOC 30% is prepared.
- the lithium ion secondary cell 100 is charged under the temperature environment of -15°C until the SOC is restored to 60% (steps U51 to U5A) as described above. Thereafter, the lithium ion secondary cell 100 is discharged with a constant current of 20A (4C), whereby the storage amount of the lithium ion secondary cell 100 is lowered so as to correspond to SOC 30%.
- the charging and discharging cycle was determined as 1 cycle and repeated for 1124 cycles.
- the discharge capacities in each of the cycles 101, 295, 496, 708, 915, and 1124 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 101, 295, 496, 708, 915, and 1124 were 99.54%, 99.01%, 98.61%, 98.14%, 97.23% and 96.04%, respectively. This result as the relation between the number of charging and discharging cycles and the capacity maintenance ratio is indicated by the chain line and black triangles in FIG. 17 .
- the embodiment 16 is different from the embodiment 15 in that the lithium ion secondary cell 100 was charged under such a changed condition that the length of the discharging period was 1.0 second (steps U51 to U5A). Other conditions were the same as those in the embodiment 15, and the charging and discharging cycle was repeated for 1097 cycles. At that time, the discharge capacities in each of the cycles 101, 294, 496, 704, 913, and 1097 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 101, 294, 496, 704, 913, and 1097 were 99.34%, 99.03%, 98.83%, 98.41%, 97.78% and 97.13%, respectively. This result is indicated by the chain double-dashed line and black diamond shapes in FIG. 17 .
- the embodiment 17 is different from the embodiment 15 in that the processing from steps V51 to V5E was performed, and the lithium ion secondary cell 100 was charged. Other conditions were the same as those in the embodiment 15, and the charging and discharging cycle was repeated for 1068 cycles.
- the discharge capacities in each of the cycles 80, 238, 401, 568, 733, 903, and 1068 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 80, 238, 401, 568, 733, 903, and 1068 were 99.86%, 99.83%, 99.52%, 99.35%, 98.98%, 98.76%, and 98.28%, respectively. This result is indicated by the solid line and white squares in FIG. 17 .
- the cycle test according to the comparison 6 was performed.
- the comparison 6 was different from the embodiments 15 to 17 in that charging was continuously performed without splitting the charging period.
- the lithium ion secondary cell 100 was continuously charged with a constant current of 15A (3C) for 360 seconds, whereby the storage amount of the lithium ion secondary cell 100 was restored to the storage amount corresponding to SOC 60%.
- the lithium ion secondary cell 100 was discharged with a constant current of 20A (4C), whereby the storage amount of the lithium ion secondary cell 100 was lowered so as to correspond to SOC 30%.
- This charging and discharging cycle was determined as 1 cycle and repeated for 1134 cycles.
- the discharge capacities in each of the cycles 103, 298, 500, 713, 921, and 1134 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 103, 298, 500, 713, 921, and 1134 were 99.44%, 98.88%, 98.42%, 97.58%, 96.43%, and 95.27%, respectively. This result is indicated by the dashed line and black circles in FIG. 8 .
- the reduction of the capacity maintenance ratio caused by the cycle test was smaller than that in the comparison 6.
- the charging period from the first predetermined value to the second predetermined value was split into three split charging periods and the charging suspension periods (non-charging periods) provided between the split charging periods. It can be considered that charging was suspended in the middle of the charging period, whereby Li ions retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control was diffused in the lithium ion secondary cell 100. It can be said that the reduction of the electrical capacity caused by the deposition of metal Li was suppressed with this configuration.
- the reduction of the capacity maintenance ratio caused by the cycle test is smaller than that in the comparison 6.
- the charging period from the first predetermined value to the second predetermined value is split into three split charging periods and the non-charging periods (the charging suspension period and the discharging period) provided between the split charging periods. It is considered that suspension and discharging are performed during the charging period, whereby Li ions, retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control, can be diffused in the lithium ion secondary cell 100. It can be said that the reduction of the electrical capacity caused by the deposition of metal Li was suppressed with this configuration.
- the reduction of the capacity maintenance ratio in the embodiment 16 is smaller than that in the embodiment 15. It is considered that this is because the discharging period in the embodiment 16 is longer than that in the embodiment 15. This result shows that the longer the discharging period is, the greater the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li is.
- the reduction of the capacity maintenance ratio in the embodiment 17 is further smaller than that in the embodiment 16. It is considered that this is because, in the embodiment 17, discharging similar to the embodiment 16 is performed in the non-charging period and at the same time, the charging suspension period is provided in the non-charging period. This result shows that suspension of charging and discharging are performed in each non-charging period, whereby the effect of suppressing the reduction of the electrical capacity caused by the deposition of metal Li can be further enhanced compared with the case where only discharging is performed.
- step S6 it is determined whether the first split charging period has elapsed (see FIG. 7 ). Specifically, the length tc of the first split charging period KC1 is set to 67.5 seconds, and it is determined whether 67.5 seconds have elapsed after the start of charging in step S5.
- step T6 is provided instead of step S6, and it is determined whether the storage amount of the lithium ion secondary cell 100 has reached a predetermined splitting value.
- the predetermined splitting value is set to the storage amount corresponding to SOC 45% which is an intermediate value between the first predetermined value (the storage amount corresponding to SOC 30%) and the second predetermined value (the storage amount corresponding to SOC 60%).
- the estimated SOC estimated by the cell controller 30, has reached 45%, it can be determined that the storage amount of the lithium ion secondary cell 100 has reached the predetermined splitting value.
- charging is suspended in step S7. Thereafter, as in the embodiment 1, the processing from steps S8 to SA is performed so that the storage amount of the lithium ion secondary cell 100 is restored to the second predetermined value.
- the charging period during which charging is performed until the storage amount lowered to the first predetermined value reaches the second predetermined value is split into two split charging periods and the non-charging period (charging suspension period) provided between the split charging periods, and charging can be performed in the split charging period and charging can be suspended in the non-charging period.
- charging is suspended in the course of the charging period, whereby Li ions, retained on the interface between the electrolytic solution and the negative electrode due to the diffusion control, can be diffused in the lithium ion secondary cell 100, and therefore, the deposition of metal Li on the negative electrode surface is suppressed.
- This configuration can suppress the reduction of the electrical capacity caused by the deposition of metal Li.
- the length tc of each split charging period can be increased to not less than 40 seconds.
- the electric capacity (0.75 Ah) corresponding to SOC 15% is supplied to the lithium ion secondary cell 100 with a constant current of 8C (40A).
- the length tc of each split charging period is 67.5 seconds.
- the storage amount of the lithium ion secondary cell 100 is used as the first and second predetermined values and the predetermined splitting value; however, the voltage V between terminals of the lithium ion secondary cell 100 may be used.
- step S1 of FIGs. 7 , 14 , and 15 it may be determined whether the voltage V between terminals of the lithium ion secondary cell 100 has lowered to the first predetermined value (a voltage value V1 between terminals which corresponds to the storage amount corresponding to SOC 30%).
- the voltage value V1 between terminals when the storage amount of the lithium ion secondary cell 100 corresponds to SOC 30% is stored in the ROM 31 of the cell controller 30 based on a previously obtained "storage amount - voltage correlation map" showing a correspondence relationship between a value of the storage amount of the lithium ion secondary cell 100 and a value of the voltage V between terminals.
- the cell controller 30 can determine that the voltage V between terminals of the lithium ion secondary cell 100 has lowered to the first predetermined value.
- step SA of FIGs. 7 and 14 and steps U5A and V5E of FIGs. 16 and 18 it may be determined whether the voltage V between terminals of the lithium ion secondary cell 100 has reached the second predetermined value (a voltage value V2 between terminals when the storage amount of the lithium ion secondary cell 100 corresponds to SOC 60%). Also, in step T6 of FIG. 14 , it may be determined whether the voltage V between terminals of the lithium ion secondary cell 100 has reached the predetermined splitting value (a voltage value V3 between terminals when the storage amount of the lithium ion secondary cell 100 corresponds to SOC 45%).
- step SA whether the storage amount of the lithium ion secondary cell 100 has reached the second predetermined value is determined in step SA (see, FIG. 7 ). Alternately, it may be determined whether the second split charging period KC2 has elapsed. Namely, the length tc of the second split charging period KC2 is set to 67.5 seconds, whereby it may be determined whether 67.5 seconds have elapsed after the restart of charging in step S9.
- an equivalent constant current (specifically, 40A) is supplied to the lithium ion secondary cell 100.
- the lithium ion secondary cell 100 may be charged with a constant current in such a manner that the current values are differentiated between the first and second split charging periods KC1 and KC2.
- the cell temperature of the lithium ion secondary cell 100 is detected, whereby the lithium ion secondary cell 100 may be charged so that the current value is fluctuated according to the fluctuation of the cell temperature.
- step U52 and V52 whether the first split charging period has elapsed is determined in steps U52 and V52 (see FIGs. 16 and 18 ). Specifically, the length of the first split charging period is set to 120 seconds, and whether 120 seconds have elapsed after the start of charging is determined in steps U52 and V52.
- the first predetermined splitting value is set to the storage amount corresponding to SOC 40%.
- the estimated SOC estimated by the cell controller 30 has reached 40%, it can be determined that the storage amount of the lithium ion secondary cell 100 has reached the predetermined splitting value.
- the flow may proceed to steps U53 and V53, respectively.
- the second predetermined splitting value is set to the storage amount corresponding to SOC 50%.
- the flow may proceed to steps U57 and V59, respectively.
- charging of the lithium ion secondary cell 100 is temporarily suspended in the non-charging period as the charging suspension period.
- the lithium ion secondary cell 100 may be temporarily discharged in the non-charging period as the discharging period.
- the lithium ion secondary cell 100 is charged with a constant current of 80A (16C) under the temperature environment of 0°C until the voltage reaches 4.3 V as the final voltage, and thereafter charged at a constant voltage of 4.3 V, whereby the lithium ion secondary cell 100 is charged so that the SOC reaches approximately 100%. Thereafter, the processing is suspended for 180 seconds. Then, the lithium ion secondary cell 100 is discharged with a constant current of 1A until the voltage reaches 3.726 V as the final voltage, and thereafter discharged at a constant voltage of 3.726 V, whereby the lithium ion secondary cell 100 is regulated so that the SOC reaches approximately 60%. Thereafter, the processing is suspended for 420 seconds. Such a charging and discharging cycle is determined as 1 cycle and repeated for 3092 cycles.
- the discharge capacities in each of the cycles 200, 482, 861, 1389, 2049, 2702, and 3092 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 200, 482, 861, 1389, 2049, 2702, and 3092 were 99.69%, 99.08%, 98.26%, 97.15%, 95.07%, 92.52%, and 91.63%, respectively. This result is indicated by the dashed line and black circles in FIG. 19 .
- the reference example 2 is different from the reference example 1 only in that discharging was performed with a constant current of 5A for one second before each charging and discharging cycle, and other conditions in the reference example 2 were the same as those in the reference example 1.
- the discharge capacities in each of the cycles 650, 1412, 2166, 2528, and 2944 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 650, 1412, 2166, 2528, and 2944 were 99.4%, 99.9%, 97.7%, 96.6%, and 94.8%, respectively. This result is indicated by the chain line and black triangles in FIG. 19 .
- the reference example 3 is different from the reference example 1 only in that discharging was performed with a constant current of 40A for one second before each charging and discharging cycle, and other conditions in the reference example 3 were the same as those in the reference example 1.
- the discharge capacities in each of the cycles 651, 1416, 2172, 2535, and 2951 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 651, 1416, 2172, 2535, and 2951 were 99.4%, 98.8%, 98.1%, 97.4%, and 96.7%, respectively. This result is indicated by the solid line and white squares in FIG. 19 .
- the reference example 4 is different from the reference example 1 only in that discharging was performed with a constant current of 40A for 5 seconds before each charging and discharging cycle, and other conditions in the reference example 4 were the same as those in the reference example 1.
- the discharge capacities in each of the cycles 641, 1395, 2140, 2497, and 2905 were measured and the percentages of each of the discharge capacities relative to the initial capacity were calculated as the capacity maintenance ratio (%).
- the capacity maintenance ratios in each of the cycles 641, 1395, 2140, 2497, and 2905 were 99.7%, 99.3%, 98.6%, 98.5%, and 98.4%, respectively. This result is indicated by the chain double-dashed line and black diamonds in FIG. 19 .
- the length tr of the charging suspension period is 30 seconds.
- the discharging period was only 1 second, it was possible to significantly enhance the capacity maintenance ratio relative to the reference example 1. Based on this fact, it is considered that in the method for charging of the present invention, when the non-charging period is the discharging period, compared with the case where the non-charging period is the charging suspension period, the non-charging period can be substantially shortened and furthermore, the reduction of the electrical capacity can be further suppressed.
- the lithium ion secondary cell 100 with the storage amount lowered to the first predetermined value can be rapidly charged so that the storage amount is restored to the second predetermined value.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Power Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Automation & Control Theory (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Claims (12)
- Verfahren zum Laden einer sekundären Lithium-Ionen-Zelle (100), die als eine Leistungsquelle zum Fahren verwendet wird und in einem elektrischen Hybridfahrzeug (1) montiert ist, wobei in dem Schritt des Ladens eine Periode, während der die sekundäre Lithium-Ionen-Zelle geladen wird, in zwei oder mehr aufgeteilte Ladungsperioden und Nicht-Ladeperioden aufgeteilt wird, die zwischen den aufgeteilten Ladungsperi-oden bereitgestellt sind, und ein Laden in der aufgeteilten Ladungsperiode (KC1, KC2) durchgeführt wird, und zumindest eines von einem Hemmen des Ladens und einem Entladen in der Nicht-Ladeperiode (KR) durchgeführt wird, dadurch gekennzeichnet, dass das Verfahren die Schritte aufweist:Bestimmen (S1), ob ein Wert einer physikalischen Größe, die einer Speichermenge der sekundären Lithium-Ionen-Zelle entspricht, auf einen ersten vorbestimmten Wert verringert wurde;Bestimmen (S2), ob das elektrische Hybridfahrzeug in einem angehaltenen Zustand ist; und,wenn bestimmt wird, dass der Wert der physikalischen Größe, die der Speichermenge der sekundären Lithium-Ionen-Zelle entspricht, auf den ersten vorbestimmten Wert verringert wurde und wenn zusätzlich bestimmt wird, dass das elektrische Hybridfahrzeug in dem angehaltenen Zustand ist, das Laden (S5, U5, V5) der sekundären Lithium-Ionen-Zelle bis der Wert der physikalischen Größe, die der Speichermenge der sekundären Lithium-Ionen-Zelle entspricht, einen zweiten vorbestimmten Wert erreicht, während das elektrische Hybridfahrzeug nicht fährt, und wobeidie Länge von jeder der aufgeteilten Ladungsperioden nicht weniger als 40 Sekunden ist.
- Verfahren zum Laden einer sekundären Lithium-Ionen-Zelle nach Anspruch 1, wobei die Nicht-Ladeperiode eine Ladungshemmungsperiode ist, während der das Laden der sekundären Lithium-Ionen-Zelle gehemmt ist, und
ein Verhältnis tr/tc zwischen der Länge tc von jeder der aufgeteilten Ladungsperioden und der Länge tr der Ladungshemmungsperiode unmittelbar nach der aufgeteilten Ladungsperiode nicht weniger als 0,14 und nicht mehr als 0,9 ist. - Verfahren zum Laden einer sekundären Lithium-Ionen-Zelle nach Anspruch 1, wobei die Nicht-Ladeperiode eine Entladeperiode ist, während der die sekundäre Lithium-Ionen-Zelle entladen wird.
- Verfahren zum Laden einer sekundären Lithium-Ionen-Zelle nach Anspruch 1, wobei jede der Nicht-Ladeperioden eine Ladungshemmungsperiode ist, während der ein Laden der sekundären Lithium-Ionen-Zelle gehemmt ist, und eine Entladeperiode, während der die sekundäre Lithium-Ionen-Zelle entladen wird.
- Verfahren zum Laden einer sekundären Lithium-Ionen-Zelle nach einem der Ansprüche 1 bis 4, ferner mit den Schritten;
Bestimmen, ob ein Motor, der in dem elektrischen Hybridfahrzeug montiert ist, in einem Betriebszustand ist; und
Anweisen eines Starts des Betriebs des Motors, wenn bestimmt wird, dass der Motor nicht arbeitet,
wobei in dem Schritt des Ladens in einem Zustand, in dem ein in dem elektrischen Hybridfahrzeug montierter Generator durch den Betrieb des Motors betrieben wird, eine durch den Generator erzeugte elektrische Leistung der sekundären Lithium-Ionen-Zelle zugeführt wird, um die sekundäre Lithium-Ionen-Zelle zu laden. - Verfahren zum Laden einer sekundären Lithium-Ionen-Zelle nach einem der Ansprüche 1 bis 5, wobei die sekundäre Lithium-Ionen-Zelle in dem Schritt des Ladens mit einem Strom geladen wird, der eine Größe von nicht weniger als 2C hat, wobei 1C als ein Stromwert definiert ist, der eine theoretische elektrische Kapazität ermöglicht, die in einer Stunde geladen wird, die theoretisch maximal in einem aktiven positiven Elektrodenmaterial gespeichert werden kann, das in der sekundären Lithium-Ionen-Zelle enthalten ist.
- Elektrisches Hybridfahrzeug (1) mit:einer sekundären Lithium-Ionen-Zelle (100), die als eine Leistungsquelle zum Fahren verwendet wird und in dem elektrischen Hybridfahrzeug montiert ist, undeiner Ladungssteuerungseinrichtung (30) die eine Periode, während der die sekundäre Lithium-Ionen-Zelle geladen wird, in zwei oder mehr aufgeteilte Ladungsperioden (KC1, KC2) und Nicht-Ladeperioden (KR) aufteilt, die zwischen den aufgeteilten Ladungsperioden bereitgestellt sind, und ein Laden in der aufgeteilten Ladungsperiode durchführt und zumindest eines von einem Hemmen des Ladens und einem Entladen in der Nicht-Ladeperiode durchführt,gekennzeichnet durcheine erste Bestimmungseinrichtung (30), die bestimmt, ob ein Wert einer physikalischen Größe, die einer Speichermenge der sekundären Lithium-Ionen-Zelle entspricht, auf einen ersten vorbestimmten Wert verringert wurde;eine Anhaltzustandbestimmungseinrichtung (30), die bestimmt, ob das elektrische Hybridfahrzeug in einem angehaltenen Zustand ist; wobeidie Ladungsteuerungseinrichtung (30) ein Laden der sekundären Lithium-Ionen-Zelle steuert, bis der Wert der physikalischen Größe, die der Speichermenge der sekundären Lithium-Ionen-Zelle entspricht, einen zweiten vorbestimmten Wert erreicht, während das elektrische Hybridfahrzeug angehalten ist, wenn bestimmt ist, dass der Wert der physikalisehen Größe, die der Speichermenge der sekundären Lithium-Ionen-Zelle entspricht, auf den ersten vorbestimmten Wert verringert wurde und wenn zusätzlich bestimmt wurde, dass das elektrische Hybridfahrzeug in dem angehaltenen Zustand ist, und wobeidie Länge von jeder der aufgeteilten Ladungsperioden nicht weniger als 40 Sekunden ist.
- Elektrisches Hybridfahrzeug nach Anspruch 7,
wobei die Ladungssteuerungseinrichtung so konfiguriert ist, dass die Nicht-Ladeperiode eine Ladungshemmungsperiode ist, während der ein Laden der sekundären Lithium-Ionen-Zelle gehemmt ist, und dass ein Verhältnis tr/tc zwischen der Länge tc von jeder der aufgeteilten Ladungsperioden und der Länge tr der Ladungshemmungsperiode unmittelbar nach der aufgeteilten Ladungsperiode nicht weniger als 0,14 und nicht mehr als 0,9 ist, und die Ladungssteuerungseinrichtung ein Laden der sekundären Lithium-Ionen-Zelle steuert. - Elektrisches Hybridfahrzeug nach Anspruch 7,
wobei die Ladungssteuerungseinrichtung so konfiguriert ist, dass die Nicht-Ladeperiode eine Entladeperiode ist, während der die sekundäre Lithium-Ionen-Zelle entladen wird. - Elektrisches Hybridfahrzeug nach Anspruch 7,
wobei die Ladungssteuerungseinrichtung so konfiguriert ist, dass jede der Nicht-Ladeperioden eine Ladungshemmungsperiode, während der ein Laden der sekundären Lithium-Ionen-Zelle gehemmt ist, und eine Entladeperiode ist, während der die sekundäre Lithium-Ionen-Zelle entladen wird. - Elektrisches Hybridfahrzeug nach einem der Ansprüche 7 bis 10, ferner mit:einer Motorbetriebsbestimmungseinrichtung, die bestimmt, ob ein in dem elektrischen Hybridfahrzeug montierter Motor arbeitet; undeiner Motorbetriebsanweisungseinrichtung, die einen Start des Betriebs des Motors anweist, wenn bestimmt wird, dass der Motor nicht arbeitet,wobei die Ladungssteuerungseinrichtung die Steuerung so durchführt, dass in einem Zustand, in dem ein Generator, der in dem elektrischen Hybridfahrzeug montiert ist, durch den Betrieb des Motors betrieben wird, eine elektrische Leistung, die durch den Generator erzeugt wird, der sekundären Lithium-Ionen-Zelle zugeführt wird, um die sekundäre Lithium-Ionen-Zelle zu laden.
- Elektrisches Hybridfahrzeug nach einem der Ansprüche 7 bis 11,
wobei die Ladungssteuerungseinrichtung die Steuerung so durchführt, dass die sekundäre Lithium-Ionen-Zelle mit einem Strom geladen wird, der eine Größe von nicht weniger als 2C hat, wobei 1C als ein Stromwert definiert ist, der es ermöglicht, dass eine theoretische elektrische Kapazität in einer Stunde geladen wird, die theoretisch maximal in einem aktiven positiven Elektrodenmaterial gespeichert werden kann, das in der sekundären Lithium-Ionen-Zelle enthalten ist.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008005116 | 2008-01-14 | ||
PCT/JP2009/050208 WO2009090913A1 (ja) | 2008-01-14 | 2009-01-09 | リチウムイオン二次電池の充電方法、及び、ハイブリッド自動車 |
Publications (4)
Publication Number | Publication Date |
---|---|
EP2230124A1 EP2230124A1 (de) | 2010-09-22 |
EP2230124A4 EP2230124A4 (de) | 2014-08-06 |
EP2230124B1 true EP2230124B1 (de) | 2015-10-07 |
EP2230124B9 EP2230124B9 (de) | 2016-05-11 |
Family
ID=40885304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09702790.8A Not-in-force EP2230124B9 (de) | 2008-01-14 | 2009-01-09 | Verfahren zur ladung einer lithiumsekundärzelle und hybridfahrzeug |
Country Status (9)
Country | Link |
---|---|
US (1) | US8310198B2 (de) |
EP (1) | EP2230124B9 (de) |
JP (1) | JP4572998B2 (de) |
KR (1) | KR101160755B1 (de) |
CN (1) | CN101909929B (de) |
BR (1) | BRPI0907218B1 (de) |
CA (1) | CA2701160C (de) |
RU (1) | RU2471276C2 (de) |
WO (1) | WO2009090913A1 (de) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9252622B2 (en) | 2010-12-13 | 2016-02-02 | Panasonic Intellectual Property Management Co., Ltd. | Charging apparatus, power storage apparatus, and power source apparatus |
JP5521151B2 (ja) * | 2011-02-09 | 2014-06-11 | アイシン・エーアイ株式会社 | 車両の動力伝達制御装置 |
JP2013071551A (ja) * | 2011-09-27 | 2013-04-22 | Aisin Seiki Co Ltd | ハイブリッド車両の制御装置 |
KR101360500B1 (ko) * | 2011-12-14 | 2014-02-10 | 기아자동차주식회사 | 하이브리드 전기 자동차의 배터리 충전 방법 |
US20140091748A1 (en) * | 2012-09-28 | 2014-04-03 | Quantumscape Corporation | Battery control systems |
JP2014110666A (ja) * | 2012-11-30 | 2014-06-12 | Toyota Motor Corp | 放電制御システム及び放電装置 |
JP5812032B2 (ja) * | 2013-03-22 | 2015-11-11 | トヨタ自動車株式会社 | 蓄電システム及び蓄電装置の満充電容量推定方法 |
US9583279B2 (en) * | 2013-07-01 | 2017-02-28 | Samsung Sdi Co., Ltd. | Secondary battery |
US9731617B2 (en) * | 2014-12-04 | 2017-08-15 | Ford Global Technologies, Llc | Pattern based charge scheduling |
CA3000605C (en) * | 2015-10-02 | 2022-06-21 | Nissan Motor Co., Ltd. | Vehicle power supply control method and vehicle power supply control device |
CN106891743B (zh) * | 2015-12-18 | 2019-11-08 | 比亚迪股份有限公司 | 电动汽车及其车载充电器和车载充电器的控制方法 |
JP6614453B2 (ja) * | 2016-09-26 | 2019-12-04 | トヨタ自動車株式会社 | リチウムイオン二次電池の回復処理方法 |
JP6895452B2 (ja) * | 2016-11-10 | 2021-06-30 | 株式会社エンビジョンAescジャパン | 制御装置、制御方法、及びプログラム |
KR101776763B1 (ko) | 2016-11-11 | 2017-09-08 | 현대자동차 주식회사 | 마일드 하이브리드 차량의 저전압 배터리 충전 방법 및 장치 |
US11923516B2 (en) | 2017-07-21 | 2024-03-05 | Quantumscape Battery, Inc. | Active and passive battery pressure management |
DE102017009850B4 (de) | 2017-10-23 | 2020-04-02 | Benning CMS Technology GmbH | Verfahren zum Auf- und Entladen eines Energiespeichers |
EP4101048A1 (de) * | 2020-02-07 | 2022-12-14 | EnerSys Delaware Inc. | Verfahren, systeme und vorrichtungen zum laden fortgeschrittener dichter bleisäurebatterien |
EP4315556A1 (de) * | 2021-05-04 | 2024-02-07 | Exro Technologies Inc. | Batteriesteuerungssysteme und -verfahren |
EP4324089A4 (de) | 2021-05-13 | 2024-10-23 | Exro Tech Inc | Verfahren und vorrichtung zum antreiben von spulen einer mehrphasigen elektrischen maschine |
CA3223051A1 (en) | 2021-07-08 | 2023-01-12 | Eric HUSTEDT | Dynamically reconfigurable power converter utilizing windings of electrical machine |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0636803A (ja) | 1992-07-17 | 1994-02-10 | Mitsubishi Cable Ind Ltd | Li二次電池の充電方法 |
JP3365431B2 (ja) | 1993-05-18 | 2003-01-14 | ソニー株式会社 | リチウムまたはリチウムイオン2次電池の充電方法および装置並びにリチウムまたはリチウムイオン2次電池装置 |
JP3311500B2 (ja) | 1994-07-29 | 2002-08-05 | 三洋電機株式会社 | リチウムイオン二次電池の充電方法 |
JPH0974611A (ja) * | 1995-09-01 | 1997-03-18 | Mitsubishi Motors Corp | 充電制御装置 |
JP3439013B2 (ja) * | 1996-02-29 | 2003-08-25 | 三洋電機株式会社 | 二次電池のパルス充電方法 |
US6818352B2 (en) * | 1999-03-07 | 2004-11-16 | Teijin Limited | Lithium secondary cell, separator, cell pack, and charging method |
US6366056B1 (en) * | 1999-06-08 | 2002-04-02 | Enrev Corporation | Battery charger for lithium based batteries |
JP3545972B2 (ja) * | 1999-08-02 | 2004-07-21 | 日本電信電話株式会社 | バックアップ用二次電池パックの充電方法 |
KR20020049256A (ko) * | 2000-12-19 | 2002-06-26 | 이계안 | 하이브리드 자동차의 배터리 충방전 제어방법 |
CN1559098A (zh) * | 2001-10-03 | 2004-12-29 | ���Ͽع�����˾ | 用于电池充电的系统和方法 |
RU2293417C2 (ru) * | 2002-03-26 | 2007-02-10 | Сергей Николаевич Разумов | Устройство для питания нагрузки |
JP4710212B2 (ja) * | 2002-11-19 | 2011-06-29 | 日本電気株式会社 | リチウムイオン二次電池システムおよびリチウムイオン二次電池の運転方法 |
JP2005140080A (ja) * | 2003-11-10 | 2005-06-02 | Hino Motors Ltd | ハイブリッド自動車 |
JP2005138791A (ja) * | 2003-11-10 | 2005-06-02 | Nsk Ltd | 衝撃吸収式ステアリングコラム装置 |
JP2007134130A (ja) * | 2005-11-09 | 2007-05-31 | Tsubakimoto Chain Co | 無人搬送車の電池充放電管理システム |
-
2009
- 2009-01-09 WO PCT/JP2009/050208 patent/WO2009090913A1/ja active Application Filing
- 2009-01-09 EP EP09702790.8A patent/EP2230124B9/de not_active Not-in-force
- 2009-01-09 CN CN2009801021534A patent/CN101909929B/zh not_active Expired - Fee Related
- 2009-01-09 RU RU2010127442/11A patent/RU2471276C2/ru active
- 2009-01-09 BR BRPI0907218-7A patent/BRPI0907218B1/pt active IP Right Grant
- 2009-01-09 US US12/740,434 patent/US8310198B2/en active Active
- 2009-01-09 CA CA2701160A patent/CA2701160C/en active Active
- 2009-01-09 KR KR1020107013041A patent/KR101160755B1/ko active IP Right Grant
- 2009-01-09 JP JP2009550005A patent/JP4572998B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
KR20100087383A (ko) | 2010-08-04 |
EP2230124B9 (de) | 2016-05-11 |
RU2010127442A (ru) | 2012-02-27 |
US8310198B2 (en) | 2012-11-13 |
EP2230124A1 (de) | 2010-09-22 |
JPWO2009090913A1 (ja) | 2011-05-26 |
CA2701160C (en) | 2013-10-01 |
US20100259219A1 (en) | 2010-10-14 |
KR101160755B1 (ko) | 2012-06-28 |
CA2701160A1 (en) | 2009-07-23 |
CN101909929A (zh) | 2010-12-08 |
RU2471276C2 (ru) | 2012-12-27 |
BRPI0907218B1 (pt) | 2022-08-23 |
BRPI0907218A2 (pt) | 2022-03-29 |
WO2009090913A1 (ja) | 2009-07-23 |
EP2230124A4 (de) | 2014-08-06 |
BRPI0907218A8 (pt) | 2022-06-28 |
CN101909929B (zh) | 2012-09-05 |
JP4572998B2 (ja) | 2010-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2230124B9 (de) | Verfahren zur ladung einer lithiumsekundärzelle und hybridfahrzeug | |
JP5407893B2 (ja) | 二次電池システム、及びハイブリッド車両 | |
US9475480B2 (en) | Battery charge/discharge control device and hybrid vehicle using the same | |
US8981729B2 (en) | Charging control apparatus and charging control method for battery | |
WO2010079595A1 (ja) | 非水電解液型二次電池システム及び車両 | |
WO2008016129A1 (fr) | Dispositif de commande de charge/décharge de batterie secondaire et véhicule hybride l'utilisant | |
JP2004025979A (ja) | 走行車両用電源システム | |
CN110311431B (zh) | 锂离子二次电池的控制装置以及车辆 | |
JP2009072039A (ja) | 電源システム | |
JP2004032871A (ja) | 走行車両用電源システム | |
CN116250110A (zh) | 电池充电方法、控制器、电池管理系统、电池和用电装置 | |
JP2010049882A (ja) | 車両 | |
CN109655753B (zh) | 一种电池组soc的估算方法 | |
CN111038328A (zh) | 一种基于辅助功率的sop控制方法 | |
CN112805898A (zh) | 用于控制电动车辆的牵引电池的电荷水平的方法和装置 | |
EP1138554A3 (de) | Stromversorgungssystem und Verfahren zum Bereitstellen des Ladezustands | |
CN117013145A (zh) | 电池包自加热方法、电池包、用电装置及车辆 | |
JP2020087772A (ja) | 充電システム | |
JP6699533B2 (ja) | 電池システム | |
JP2000030749A (ja) | 車両搭載用二次電池の充電方法 | |
JP5786423B2 (ja) | 非水電解液型二次電池システムおよびハイブリッド車両 | |
JP4513917B2 (ja) | 二次電池システム | |
JP2009176602A (ja) | 電池システム、及び、自動車 | |
JP2002051471A (ja) | 走行車輌用電源システム及び該システムにおける充電状態推定方法 | |
JP2013055005A (ja) | 二次電池装置および二次電池装置の制御方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20100331 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: TOYOTA JIDOSHA KABUSHIKI KAISHA |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20140709 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B60L 11/18 20060101AFI20140703BHEP Ipc: H02J 7/00 20060101ALI20140703BHEP Ipc: H01M 10/44 20060101ALI20140703BHEP Ipc: B60W 10/26 20060101ALI20140703BHEP Ipc: B60W 20/00 20060101ALI20140703BHEP Ipc: H02J 7/04 20060101ALI20140703BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20150430 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 753524 Country of ref document: AT Kind code of ref document: T Effective date: 20151015 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602009034016 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 753524 Country of ref document: AT Kind code of ref document: T Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160107 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160207 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160131 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160108 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160208 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602009034016 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160109 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
26N | No opposition filed |
Effective date: 20160708 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R084 Ref document number: 602009034016 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160131 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 746 Effective date: 20161027 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20090109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151007 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602009034016 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: B60L0011180000 Ipc: B60L0050500000 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20211217 Year of fee payment: 14 Ref country code: GB Payment date: 20211206 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20211130 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20211213 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602009034016 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20230109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230109 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230801 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230109 |