DE10102328A1 - Concrete foundation pouring machine for construction of foundation for edge of railway platform uses hopper with strickle board attached to frame sliding along track - Google Patents

Concrete foundation pouring machine for construction of foundation for edge of railway platform uses hopper with strickle board attached to frame sliding along track

Info

Publication number
DE10102328A1
DE10102328A1 DE10102328A DE10102328A DE10102328A1 DE 10102328 A1 DE10102328 A1 DE 10102328A1 DE 10102328 A DE10102328 A DE 10102328A DE 10102328 A DE10102328 A DE 10102328A DE 10102328 A1 DE10102328 A1 DE 10102328A1
Authority
DE
Germany
Prior art keywords
concrete
planer according
tracks
edge
planer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE10102328A
Other languages
German (de)
Other versions
DE10102328B4 (en
Inventor
Ralf Rughase
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ems Gleisbau & Co KG GmbH
Original Assignee
Ems Gleisbau & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ems Gleisbau & Co KG GmbH filed Critical Ems Gleisbau & Co KG GmbH
Priority to DE10102328A priority Critical patent/DE10102328B4/en
Publication of DE10102328A1 publication Critical patent/DE10102328A1/en
Application granted granted Critical
Publication of DE10102328B4 publication Critical patent/DE10102328B4/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F1/00Construction of station or like platforms or refuge islands or like islands in traffic areas, e.g. intersection or filling-station islands; Kerbs specially adapted for islands in traffic areas

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Milling, Drilling, And Turning Of Wood (AREA)
  • Foundations (AREA)

Abstract

The machine has a first hopper (16) remote from the track, filled with cement or concrete. The concrete flows out of the bottom of the hopper and is smoothed by the lower edge (21) of a strickle board (22) at the bottom of the rear wall (19) of the hopper. A second hopper (24) between the first hopper and the track is filled with gravel, to make a strip of gravel between the concrete foundation strip and the track. The hoppers are constrained to move (12) parallel to the track by L-shaped guide members (14) which fit onto the top surfaces of the rails (13) and slide along them. Transverse beams (11) fasten the guide rails to the hoppers. Buffers (25) are provided on the rear beam to enable the assembly to be pushed along the track.

Description

Die Erfindung betrifft einen Abziehhobel für ein Bahnsteigkantenfundament aus Beton entlang eines Gleiskörpers.The invention relates to a planer for a Platform edge foundation made of concrete along one Track body.

Es ist an Bahnhöfen erforderlich, neben dem Gleiskörper auf wenigstens einer Seite einen Bahnsteig zu errichten. Dieser Bahnsteig wird auf einem Betonfundament in einem gleichbleibenden Abstand zum Gleiskörper errichtet. Der Bahnsteig wird in der Regel an bestehenden Gleiskörpern ausgerichtet. Dazu wird zunächst ein Fundamentgraben ausgeschachtet und mit einer Randschalung versehen. Der Beton wird eingebracht und verdichtet, näherungsweise auf Höhe gebracht und anschließend plan abgezogen.It is required at train stations, next to the track body to build a platform on at least one side. This platform is on a concrete foundation in one constant distance to the track body erected. The Platform is usually on existing track bodies aligned. To do this, first a foundation trench excavated and provided with edge formwork. The Concrete is poured in and compacted, approximately on Brought up and then deducted flat.

Nach der Betonaushärtung wird die Randschalung ausgebaut und die Bahnsteigfertigteile aufgesetzt und ausgerichtet. Dazu ist es erforderlich, die Bahnsteigfertigteile mit Hartholzkeilen auf Höhe zu bringen. Die Bahnsteigfertigteile werden anschließend mit Zementmörtel unterstopft, nach dessen Aushärtung die Hartholzkeile entfernt werden können. Anschließend werden die Bahnsteigfertigteile mit dem Betonfundament über Schubbewährungseisen verbunden.After the concrete has hardened, the edge formwork is removed and the precast platform parts are placed and aligned. To do this, it is necessary to take the precast platform parts with Bring hardwood wedges to height. The Precast platform parts are then cement mortar supports the hardwood wedges after it has hardened can be removed. Then the Prefabricated platform parts with the concrete foundation above Shear-test iron connected.

Es ist offensichtlich, daß diese Vorgehensweise mit einem sehr hohen Aufwand verbunden ist. Insbesondere ist es erforderlich, während des Ausschachtens des Fundamentgrabens, des Einbauens der Randschalung und des Einbringen des Betons das Gleis zu sperren, da teilweise der Schotter des Gleisunterbaus entfernt werden muß. Der Bau eines mehreren hundert Meter langen Bahnsteigs erfordert daher mehrere Tage, da eine Gleisstrecke jeweils nur zur Nachzeit gesperrt werden kann. Ferner ist das Setzen und Ausrichten der Bahnsteigfertigteile auf dem ausgehärteten Betonfundament sehr aufwendig. Schließlich erfordert das Bohren einer Bohrung für die Schubbewährungseisen in den ausgehärteten Beton einen erhöhten Materialverschleiß.It is obvious that this procedure with a is very expensive. In particular it is required while excavating the Foundation trench, the installation of the edge formwork and the Applying the concrete to block the track, since partially  the ballast of the track substructure must be removed. The Construction of a platform several hundred meters long therefore requires several days since there is a track can only be blocked at night. Further is the setting and alignment of the platform precast elements the hardened concrete foundation is very complex. After all, drilling a hole requires for that Shear proof iron in the hardened concrete increased material wear.

Der Erfindung liegt die Aufgabe zugrunde, einen Abziehhobel zum Herstellen eines Betonfundamentes entlang eines Gleiskörpers bereitzustellen, mit dem ein Betonfundament schnell neben einem Gleiskörper hergestellt und auf Höhe gebracht werden kann.The invention has for its object a Scraper to make a concrete foundation along provide a track body with which a Concrete foundation quickly next to a track body can be produced and brought to height.

Die Aufgabe wird gemäß der Erfindung dadurch gelöst, daß der Abziehhobel mit wenigstens einem Führungsrahmen versehen ist, der auf den Gleisen des Gleiskörpers in Arbeitsrichtung geführt ist. Es ist ein erster Zuführschacht zum Einfüllen des Betons vorgesehen, welcher Zuführschacht mit einem unteren Auslaß versehen ist, dessen in Arbeitsrichtung hintere Begrenzungswandung eine Hobelkante aufweist, die einen vorbestimmbaren vertikalen Abstand zu den Gleisen besitzt, um den durch den ersten Zuführschacht eingebrachten Beton auf eine vorbestimmte Höhe relativ zum Gleiskörper zu bringen. Die Ausbildung eines derartigen Abziehhobels hat den Vorteil, daß die Gleise des Gleiskörpers selbst zum Ausrichten des Betonfundaments herangezogen werden kann. Es ist lediglich erforderlich, während der Bewegung des Abziehhobels in Arbeitsrichtung ausreichend Beton in den Zuführschacht einzufüllen, damit ein kontinuierliches Betonfundament erzeugt wird. Die hintere Hobelkante verläuft im wesentlichen horizontal und zieht den überschüssigen Beton plan ab. Es entsteht ein Betonfundament mit einer im wesentlichen ebenen Oberfläche mit einer exakten Höhe relativ zum Gleiskörper.The object is achieved according to the invention in that the planer with at least one guide frame is provided, which on the tracks of the track body in Direction of work is guided. It is a first Feed chute provided for filling the concrete, which feed shaft has a lower outlet is its rear boundary wall in the working direction has a planing edge that has a predeterminable vertical distance from the tracks to the through placed the first concrete feed chute on a bring predetermined height relative to the track body. The Forming such a planer has the advantage that the tracks of the track body itself for aligning the Concrete foundations can be used. It is only required during the movement of the Plow in the working direction with enough concrete in the Filling the feed shaft so that a continuous Concrete foundation is created. The back edge of the plane runs essentially horizontally and pulls the  Excess concrete plan off. It arises Concrete foundation with an essentially flat Surface with an exact height relative to the Track body.

Es kann zweckmäßig sein, wenn die Hobelkante in vertikaler Richtung verstellbar ist. Dadurch wird erreicht, daß die Höhe des Betonfundaments relativ zum Gleiskörper frei gewählt werden kann. Insbesondere ist es möglich, beispielsweise für unterschiedlich hohe Bahnsteigfertigteile die Höhe des Betonfundaments individuell anzupassen.It may be useful if the edge of the plane is in is adjustable in the vertical direction. This will achieved that the height of the concrete foundation relative to Track body can be chosen freely. In particular it is possible, for example for different heights Precast platform parts the height of the concrete foundation individually adaptable.

Gemäß einer bevorzugten Ausführungsform der Erfindung ist vorgesehen, daß wenigstens ein seitlicher Anschlag vorhanden ist, der mit den Gleisen zusammenwirkt, um den Auslaß des ersten Zuführschachts in einem vorgebbaren horizontalen Abstand zum Gleiskörper zu halten. Dies hat den Vorteil, daß das Fundament nicht nur in Bezug auf Höhe, sondern auch in Bezug auf den Abstand zum Gleiskörper in nur einem Arbeitsgang exakt ausgerichtet werden kann. Dabei ist es zweckmäßig, wenn der seitliche Anschlag in horizontaler Richtung verstellbar ist. Hierdurch kann der Abstand des fertigen Bahnsteiges zum Gleiskörper verändert werden.According to a preferred embodiment of the invention provided that at least one side stop is present, which interacts with the tracks around the Outlet of the first feed shaft in a predeterminable keep horizontal distance to the track body. this has the advantage that the foundation not only in terms of Height, but also in relation to the distance to the Track body precisely aligned in just one operation can be. It is useful if the side Stop is adjustable in the horizontal direction. This allows the distance of the finished platform to Track body can be changed.

Es kann vorgesehen werden, daß der seitliche Anschlag wenigstens ein Gleis zwischen sich einschließt, um eine Bewegung des Abziehhobels quer zu den Gleisen zu verhindern. Dadurch wird eine Fixierung des Abziehhobel quer zum Gleiskörper erreicht, so daß das Betonfundament mit großer Genauigkeit eingebaut werden kann. Weiterhin kann es zweckmäßig sein, wenn der seitliche Anschlag mit Rollen versehen ist, die entlang den Gleisen abrollen. It can be provided that the side stop encloses at least one track between them to one Movement of the planer across the tracks prevent. This will fix the planer reached across the track body, so that the concrete foundation can be installed with great accuracy. Farther it may be useful if the side stop with Rollers are provided, which roll along the tracks.  

Dadurch wird der Reibungswiderstand beim Betrieb und bei der Bewegung in Arbeitsrichtung verringert.This makes the frictional resistance during operation and at movement in the working direction is reduced.

Gemäß einer weitergehenden Ausführungsform der Erfindung ist der erste Zuführschacht mit seitlichen Wandungen versehen, von denen die untere Kante zumindest der den Gleisen zugewandten Wandung tiefer liegt, als die Hobelkante. Dadurch kann der Beton auf der dem Gleis zugewandten Seite glatt abgezogen werden.According to a further embodiment of the invention is the first feed chute with side walls provided, of which the lower edge at least the The wall facing the track is lower than that Planing edge. This allows the concrete on the track facing side can be pulled off smoothly.

Gemäß einer bevorzugten Ausführungsform ist die den Gleisen zugewandte Seitenwandung mit einem sich im wesentlichen entlang dieser Seitenwandung erstreckenden Zuführkanal für eine Schalung versehen, der zumindest teilweise tiefer liegt, als die Hobelkante. Durch diese Maßnahme wird erreicht, daß die Schalung unmittelbar beim Einbringen des Betons eingelegt werden kann, um einen Absacken des hergestellten Betonfundaments zu verhindern. Es ist lediglich erforderlich, die zugeführte Schalung zumindest in Abständen gegen den Gleiskörper abzustützen.According to a preferred embodiment, the Sidewalls facing the rails with a extending substantially along this side wall Supply channel for formwork provided, at least is partly lower than the planing edge. Through this Measure is achieved that the formwork immediately at Pouring the concrete can be inserted to a Prevent the manufactured concrete foundation from sagging. All that is required is the supplied formwork to be supported against the track body at least at intervals.

Gemäß einer besonders vorteilhaften Ausführungsform der Erfindung ist ein zweiter Zuführschacht zwischen dem ersten Zuführschacht und dem Gleiskörper vorgesehen, durch den Schotter und/oder Kies neben den eingebrachten Beton geschüttet werden kann. Hierbei ist vorgesehen, daß der Zuführkanal für die Schalung zwischen den Auslässen des ersten und zweiten Trichters angeordnet ist, um die Schalung zwischen Schotter und Beton zu führen. Diese Ausbildung des Abziehhobels hat den Vorteil, daß die Schalung zum einen unmittelbar bei der Vorwärtsbewegung eingebracht werden kann. Zum anderen wird die Abstützung der Schalung gegen den Gleiskörper unmittelbar durch den eingebrachten Schotter und/oder Kies bewirkt. Das Fundament ist somit unmittelbar abgestützt. Die Schalung ist vorzugsweise eine verlorene Schalung aus relativ dünnen Material, beispielsweise Preßpappe. Es hat sich gezeigt, daß diese dünne Schalung vollkommen ausreichend ist, den Beton bis zu dessen Aushärtung zu halten.According to a particularly advantageous embodiment of the Invention is a second feed chute between the provided the first feed shaft and the track body, through the gravel and / or gravel next to the introduced Concrete can be poured. It is provided that the feed channel for the formwork between the outlets of the first and second funnels is arranged around the Formwork between gravel and concrete. This Training the planer has the advantage that the Formwork, on the one hand, immediately during the forward movement can be introduced. The other is the support the formwork against the track body directly through the brought gravel and / or gravel. The The foundation is thus supported immediately. The formwork  is preferably a lost formwork from relative thin material, for example pressed cardboard. It has shown that this thin formwork is perfectly adequate is to hold the concrete until it hardens.

Grundsätzlich ist es möglich, daß der Führungsrahmen unmittelbar auf den Gleisen in Arbeitsrichtung geschoben wird. Hierzu kann ein Zweiwegebagger vorgesehen werden, der ohnehin für das Ausschachten des Fundamentgrabens und für das Einbringen des Betons und/oder Schotters eingesetzt wird. Grundsätzlich ist es natürlich möglich, daß der Führungsrahmen mit Rollen versehen ist, die auf den Gleisen abrollen. Dadurch kann der Reibungswiderstand erheblich reduziert werden.Basically, it is possible that the guide frame pushed directly on the tracks in the working direction becomes. A two-way excavator can be provided for this, anyway for excavating the foundation trench and for placing the concrete and / or ballast is used. In principle, it is of course possible that the guide frame is provided with rollers on roll off the tracks. This can cause frictional resistance be significantly reduced.

Weiterhin kann vorgesehen werden, daß die Rollen jeweils als Schienenrad ausgebildet sind, um sowohl eine vertikale als auch eine horizontale Führung des Abziehhobels auf den Gleisen zu ermöglichen. Die Schienenräder können dabei quer zur Arbeitsrichtung verschiebbar am Führungsrahmen gehalten sein. Dadurch wird erreicht, daß ein leicht bewegbares und dennoch exakt geführtes Arbeitsgerät zur Verfügung steht.Furthermore, it can be provided that the roles in each case are designed as a rail wheel to both vertical as well as horizontal guidance of the Allow planers on the tracks. The Rail wheels can run across the working direction be slidably held on the guide frame. Thereby is achieved that an easily movable yet precisely guided work equipment is available.

Es ist offensichtlich, daß mit dem Hobel der oben erläuterten Art ein Betonfundament für einen Bahnsteig mit hoher Genauigkeit sowohl in vertikaler Richtung als auch in horizontaler Richtung hergestellt werden kann. Es ist daher möglich, unmittelbar auf den noch nicht ausgehärteten Beton die Bahnsteigfertigteile aufzusetzen. Ferner ist es möglich, unmittelbar die Schubbewährungseisen in den frischen Beton zu drücken. Dadurch werden insbesondere die aufwendigen Arbeitsschritte, wie Aufsetzen und Ausrichten der Bahnsteigfertigteile auf Hartholzkeilen einerseits und Einbringen von Bohrungen in den ausgehärteten Beton zum Einführen der Schubbewährungseisen andererseits, vermieden. Die Erstellungszeit eines Bahnsteigs kann somit wesentlich reduziert werden.It is obvious that with the planer of the above explained kind of a concrete foundation for a platform with high accuracy both in the vertical direction and can also be produced in the horizontal direction. It is therefore possible not directly on the hardened concrete to place the platform precast elements. It is also possible to directly the Push shear iron into the fresh concrete. This makes the elaborate in particular Steps such as setting up and aligning the Precast platform parts on hardwood wedges on the one hand and  Drilling holes in the hardened concrete for Inserting the shear test iron on the other hand, avoided. The creation time of a platform can thus be significantly reduced.

Die Erfindung wird im folgenden anhand der schematischen Zeichnung näher erläutert, deren einzige Figur einen Abziehhobel gemäß der Erfindung in perspektivischer Darstellung zeigt.The invention is based on the schematic Drawing explained in more detail, the only figure one Planer according to the invention in perspective Representation shows.

Der in der Zeichnung dargestellte Abziehhobel weist einen Führungsrahmen 11 auf, der in Arbeitsrichtung 12 auf den Gleisen 13 eines Gleiskörpers 10 verschoben werden kann. Es sind seitliche Anschläge 14 vorgesehen, die die Gleise 13 zwischen sich einschließen, so daß der Abziehhobel quer zu den Gleisen nicht verschoben werden kann. Die seitlichen Anschläge können beispielsweise als L-Träger ausgebildet sein, deren einer Steg am Führungsrahmen 11 über Langlöcher 15 gehalten ist, und deren anderer Steg den Anschlag bildet. Durch diese Anordnung wird der Führungsrahmen 11 stets in gleicher relativer Lage zum Gleiskörper gehalten.The planer shown in the drawing has a guide frame 11 which can be moved in the working direction 12 on the tracks 13 of a track body 10 . Lateral stops 14 are provided which enclose the tracks 13 between them, so that the planer cannot be moved transversely to the tracks. The side stops can be designed, for example, as an L-beam, one web of which is held on the guide frame 11 via elongated holes 15 , and the other web of which forms the stop. With this arrangement, the guide frame 11 is always held in the same relative position to the track body.

Es ist ein erster Zuführschacht 16 vorgesehen, der am Führungsrahmen derart angebracht ist, daß er seitlich zum Gleiskörper verläuft. Der Zuführschacht 16 weist eine Einfüllöffnung und seitliche Begrenzungswandungen 17 sowie eine vordere und hintere Begrenzungswandung 18, 19 auf. Die Wandungen begrenzen einen unteren Auslaß 20, durch den oben in den Zuführschacht eingefüllter Beton ausgetragen werden kann. Die hintere Begrenzungswandung 19 weist eine Hobelkante 21 auf, die in einem vordefinierten vertikalen Abstand zum Gleiskörper verläuft. Die Hobelkante 21 ist beim dem gezeigten Ausführungsbeispiel Bestandteil einer vertikal verschiebbaren Platte 22, um die Höhe des mit dem Abziehhobels erzeugten Betonfundaments einstellen zu können. Es kann auch vorgesehen werden, daß die Neigung der Hobelkante 21 quer zu den Gleisen 13 einstellbar ist, um auch bei geneigtem Gleiskörper 10 ein horizontales Betonfundament zu erzeugen.A first feed shaft 16 is provided, which is attached to the guide frame in such a way that it runs laterally to the track body. The feed shaft 16 has a filling opening and lateral boundary walls 17 and a front and rear boundary wall 18 , 19 . The walls delimit a lower outlet 20 , through which concrete filled into the feed shaft can be discharged. The rear boundary wall 19 has a planing edge 21 which runs at a predefined vertical distance from the track body. In the exemplary embodiment shown, the planing edge 21 is part of a vertically displaceable plate 22 in order to be able to adjust the height of the concrete foundation produced with the pulling plane. It can also be provided that the inclination of the planing edge 21 can be adjusted transversely to the tracks 13 in order to produce a horizontal concrete foundation even when the track body 10 is inclined.

Weiterhin weist der Abziehhobel einen Zuführkanal 23 für eine seitliche Schalung auf, der entlang der den Gleisen 13 zugewandten Seitenwandung verläuft. Durch diesen Zuführkanal 23 kann eine Schalung eingeführt werden, um den eingebrachten Beton seitlich abzustützen und um ein Absacken des Fundaments zu verhindern.Furthermore, the planer has a feed channel 23 for lateral formwork, which runs along the side wall facing the rails 13 . Formwork can be introduced through this feed channel 23 in order to support the introduced concrete laterally and to prevent the foundation from sagging.

Ferner ist ein zweiter Zuführschacht 24 vorgesehen, durch den während des Betriebs Schotter und/oder Kies neben den eingebrachten Beton geschüttet werden kann. Im einzelnen ist die Anordnung so getroffen, daß der zweite Zuführschacht 24 zwischen dem ersten Zuführschacht 16 und dem Gleiskörper 10 angeordnet ist. Der Zuführkanal 23 verläuft zwischen den Auslässen der jeweiligen Zuführschächte. Dadurch ist es möglich, während der Arbeitsbewegung die Schalung unmittelbar zwischen dem eingebrachten Beton einerseits und dem eingeschüttetem Schotter andererseits anzuordnen. Der Schotter stützt somit die Schalung unmittelbar gegen den Gleiskörper 10 ab, so daß das Betonfundament den erforderlichen seitlichen Halt bis zu dessen Aushärtung erhält.Furthermore, a second feed shaft 24 is provided, through which ballast and / or gravel can be poured next to the introduced concrete during operation. In detail, the arrangement is such that the second feed shaft 24 is arranged between the first feed shaft 16 and the track body 10 . The feed channel 23 runs between the outlets of the respective feed chutes. This makes it possible to arrange the formwork directly between the inserted concrete on the one hand and the poured in ballast on the other hand during the working movement. The ballast thus supports the formwork directly against the track body 10 , so that the concrete foundation receives the required lateral support until it has hardened.

Zum Herstellen eines Betonfundaments für einen Bahnsteig mittels des dargestellten Abziehhobels wird zunächst der Fundamentgraben neben dem Gleiskörper 10 ausgeschachtet. Anschließend wird der Abziehhobel auf die Gleise 13 des Gleiskörpers 10 aufgesetzt. Die Höhe des herzustellenden Fundaments wird durch eine entsprechende Verstellung der beweglichen Platte 22 erzeugt. Der seitliche Abstand des Betonfundaments zum Gleiskörper 10 wird durch eine entsprechende Verschiebung des Führungsrahmens 11 relativ zu den seitlichen Anschlägen 14 eingestellt, die über Langlöcher 15 miteinander verbunden sind.To produce a concrete foundation for a platform by means of the puller shown, the foundation trench next to the track body 10 is first excavated. The planer is then placed on the tracks 13 of the track body 10 . The height of the foundation to be produced is generated by a corresponding adjustment of the movable plate 22 . The lateral distance between the concrete foundation and the track body 10 is set by a corresponding displacement of the guide frame 11 relative to the lateral stops 14 , which are connected to one another via elongated holes 15 .

Anschließend wird der Abziehhobel in Arbeitsrichtung 12 bewegt. Währenddessen wird im wesentlichen kontinuierlich oder quasi-kontinuierlich Beton in den ersten Zuführschacht 16 eingefüllt. Der Beton wird aus dem Auslaß 20 ausgetragen und durch die Bewegung in Arbeitsrichtung 12 durch die Hobelkante 21 auf eine exakte Höhe relativ zu den Gleisen plan abgezogen. Gleichzeitig wird durch den Zuführkanal 23 eine seitliche Schalung eingebracht, um das frisch gegossene Betonfundament seitlich zu halten. Der erforderliche seitliche Halt der Schalung wird durch Schotter erzeugt, der ebenfalls kontinuierlich oder quasi-kontinuierlich durch den zweiten Zuführschacht 24 neben dem frisch erzeugten Betonfundament eingebracht wird. Es ist offensichtlich, daß mit einem derartigen Abziehhobel in nur einem Arbeitsgang ein gegenüber dem Gleiskörper seitlich abgestütztes und exakt ausgerichtetes Betonfundament geschaffen werden kann.The planer is then moved in the working direction 12 . In the meantime, concrete is poured into the first feed shaft 16 essentially continuously or quasi-continuously. The concrete is discharged from the outlet 20 and pulled flat by the movement in the working direction 12 through the planing edge 21 to an exact height relative to the tracks. At the same time, a lateral formwork is introduced through the feed channel 23 in order to hold the freshly poured concrete foundation laterally. The required lateral hold of the formwork is generated by gravel, which is also introduced continuously or quasi-continuously through the second feed shaft 24 next to the freshly created concrete foundation. It is obvious that such a planer can be used to create a concrete foundation that is laterally supported and precisely aligned with respect to the track body in only one work step.

Grundsätzlich wird die Hobelkante 21 tiefer als der Gleiskörper 10 verlaufen. Es kann aber auch vorgesehen werden, daß die Oberseite des fertigen Betonfundamentes auf einer Höhe oder höher ist als der Gleiskörper 10. Durch die seitliche Anordnung des ersten und zweiten Zuführschachtes wird der Abziehhobel dazu neigen, seitlich weg zu kippen. Der Führungsrahmen 11 bietet auf der anderen, auf den Gleisen 13 liegenden Seite ausreichend Raum für ein entsprechendes Gegengewicht, das in der Zeichnung der Übersichtlichkeit halber nicht dargestellt ist. Der Abziehhobel kann aus groben Material, insbesondere Stahlträgern zusammengeschweißt sein.Basically, the plane edge 21 will run lower than the track body 10 . However, it can also be provided that the top of the finished concrete foundation is at a height or higher than the track body 10 . Due to the lateral arrangement of the first and second feed chutes, the planer will tend to tilt sideways. The guide frame 11 on the other side lying on the tracks 13 offers sufficient space for a corresponding counterweight, which is not shown in the drawing for the sake of clarity. The planer can be welded together from coarse material, in particular steel girders.

Bei dem in der Zeichnung dargestellten Ausführungsbeispiel liegt der Abziehhobel auf der gesamten Länge der seitlichen Stahlträger 14 auf. Es ist möglich, die Stahlträger 14 unmittelbar über die Schienen mittels eines Zweiwegebaggers zu schieben. Grundsätzlich kann der Abziehhobel auch mit den Stahlträgern 11 aufliegen und über die Gleise gezogen werden. Dazu können Anschlagelemente 25 vorgesehen sein, durch die der Abziehhobel geschoben oder gezogen werden kann.In the embodiment shown in the drawing, the planer lies on the entire length of the side steel beams 14 . It is possible to push the steel beams 14 directly over the rails by means of a two-way excavator. In principle, the planer can also rest with the steel beams 11 and be pulled over the tracks. For this purpose, stop elements 25 can be provided, through which the planer can be pushed or pulled.

Das Arbeitsgerät ist sehr robust aufgebaut, und kann die Zeit zum Herstellen eines Betonfundaments und insbesondere zum Fertigstellen des fertigen Bahnsteigs erheblich reduzieren.The implement is very robust, and can Time to make a concrete foundation and especially for finishing the finished platform reduce significantly.

Claims (13)

1. Abziehhobel für ein Bahnsteigkantenfundament aus Beton entlang eines Gleiskörpers (10) mit wenigstens einem Führungsrahmen (11), der auf den Gleisen (13) des Gleiskörpers in Arbeitsrichtung (12) geführt ist, mit einem ersten Zuführschacht (16) zum Einfüllen des Betons, welcher Zuführschacht mit einem unteren Auslaß (20) versehen ist, dessen in Arbeitsrichtung hintere Begrenzungswandung (19) eine Hobelkante (21) aufweist, die in einem vorbestimmbaren vertikalen Abstand zu den Gleisen (13) verläuft, um den durch den ersten Zuführschacht eingebrachten Beton auf eine vorbestimmte Höhe relativ zum Gleiskörper zu bringen.1. scraper for a platform edge foundation made of concrete along a track body ( 10 ) with at least one guide frame ( 11 ) which is guided on the tracks ( 13 ) of the track body in the working direction ( 12 ) with a first feed shaft ( 16 ) for filling the concrete Which feed shaft is provided with a lower outlet ( 20 ), the rear boundary wall ( 19 ) of which in the working direction has a planing edge ( 21 ) which extends at a predeterminable vertical distance from the tracks ( 13 ) around the concrete introduced through the first feed shaft to bring to a predetermined height relative to the track body. 2. Abziehhobel nach Anspruch 1, dadurch gekennzeichnet, daß die Hobelkante (21) in vertikaler Richtung verstellbar ist.2. planer according to claim 1, characterized in that the planing edge ( 21 ) is adjustable in the vertical direction. 3. Abziehhobel nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß wenigstens ein seitlicher Anschlag (14) vorgesehen ist, der mit den Gleisen zusammenwirkt, um den Auslaß (20) des ersten Zuführschachts (16) in einen vorgebbaren horizontalen Abstand zum Gleiskörper zu halten.3. planer according to claim 1 or 2, characterized in that at least one lateral stop ( 14 ) is provided which cooperates with the tracks to keep the outlet ( 20 ) of the first feed shaft ( 16 ) at a predeterminable horizontal distance from the track body . 4. Abziehhobel nach Anspruch 3, dadurch gekennzeichnet, daß der seitliche Anschlag (14) in horizontaler Richtung verstellbar ist. 4. planer according to claim 3, characterized in that the lateral stop ( 14 ) is adjustable in the horizontal direction. 5. Abziehhobel nach Anspruch 3 oder 4, dadurch gekennzeichnet, daß der seitliche (14) Anschlag wenigstens ein Gleis zwischen sich einschließt, um eine Bewegung des Abziehhobels quer zu den Gleisen (13) zu verhindern.5. planer according to claim 3 or 4, characterized in that the lateral ( 14 ) stop includes at least one track between them to prevent movement of the planer transversely to the tracks ( 13 ). 6. Abziehhobel nach einem der Ansprüche 3 bis 5, dadurch gekennzeichnet, daß der seitliche Anschlag mit Rollen versehen ist, die entlang den Gleisen abrollen.6. planer according to one of claims 3 to 5, characterized characterized that the side stop with rollers is provided, which roll along the tracks. 7. Abziehhobel nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß der erste Zuführschacht (16) mit seitlichen Wandungen (17) versehen ist, und daß die untere Kante zumindest der den Gleisen zugewandte Wandung tiefer liegt als die Hobelkante (21).7. planer according to one of claims 1 to 6, characterized in that the first feed shaft ( 16 ) is provided with side walls ( 17 ), and that the lower edge at least the wall facing the rails is lower than the planing edge ( 21 ). 8. Abziehhobel nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß zumindest die den Gleisen (13) zugewandte Seitenwandung mit einem sich im wesentlich entlang der Seitenwandung erstreckenden Zuführkanal (23) für eine Schalung versehen ist, der zumindest teilweise tiefer liegt als die Hobelkante (21).8. planer according to one of claims 1 to 7, characterized in that at least the rails ( 13 ) facing side wall is provided with a substantially along the side wall extending feed channel ( 23 ) for a formwork which is at least partially lower than that Planing edge ( 21 ). 9. Abziehhobel nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß ein zweiter Zuführschacht (24) zwischen dem ersten Zuführschacht (16) und dem Gleiskörper (10) vorgesehen ist, durch den Schotter und/oder Kies neben den eingebrachten Beton geschüttet werden kann.9. planer according to one of claims 1 to 8, characterized in that a second feed shaft ( 24 ) between the first feed shaft ( 16 ) and the track body ( 10 ) is provided, are poured through the ballast and / or gravel next to the introduced concrete can. 10. Abziehhobel nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, daß der Zuführkanal (23) für die Schalung zwischen den Auslässen des ersten und zweiten Zuführschachts angeordnet ist, um die Schalung zwischen Schotter und Beton zu führen. 10. Planer according to one of claims 1 to 9, characterized in that the feed channel ( 23 ) for the formwork is arranged between the outlets of the first and second feed chutes to guide the formwork between ballast and concrete. 11. Abziehhobel nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß der Führungsrahmen mit Rollen versehen ist, die auf den Gleisen abrollen.11. planer according to one of claims 1 to 10, characterized in that the guide frame with rollers is provided, which roll on the tracks. 12. Abziehhobel nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, daß die Rollen jeweils als Schienenrad ausgebildet sind, um sowohl eine vertikale als auch eine horizontale Führung zu ermöglichen.12. planer according to one of claims 1 to 11, characterized in that the roles each as Rail wheel are designed to be both vertical as well as to enable horizontal guidance. 13. Abziehhobel nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, daß die Schienenräder quer zur Arbeitsrichtung verschiebbar am Führungsrahmen gehalten sind.13. planer according to one of claims 1 to 12, characterized in that the rail wheels transverse to Working direction slidably held on the guide frame are.
DE10102328A 2000-02-24 2001-01-19 Puller for a platform edge foundation Expired - Lifetime DE10102328B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE10102328A DE10102328B4 (en) 2000-02-24 2001-01-19 Puller for a platform edge foundation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE20003403U DE20003403U1 (en) 2000-02-24 2000-02-24 Scraper for a platform edge foundation
DE10102328A DE10102328B4 (en) 2000-02-24 2001-01-19 Puller for a platform edge foundation

Publications (2)

Publication Number Publication Date
DE10102328A1 true DE10102328A1 (en) 2001-10-04
DE10102328B4 DE10102328B4 (en) 2005-03-10

Family

ID=7937855

Family Applications (2)

Application Number Title Priority Date Filing Date
DE20003403U Expired - Lifetime DE20003403U1 (en) 2000-02-24 2000-02-24 Scraper for a platform edge foundation
DE10102328A Expired - Lifetime DE10102328B4 (en) 2000-02-24 2001-01-19 Puller for a platform edge foundation

Family Applications Before (1)

Application Number Title Priority Date Filing Date
DE20003403U Expired - Lifetime DE20003403U1 (en) 2000-02-24 2000-02-24 Scraper for a platform edge foundation

Country Status (1)

Country Link
DE (2) DE20003403U1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20210179U1 (en) * 2002-07-02 2003-11-13 Maier Siegfried Device for creating a defined trigger strip
DE10329353B3 (en) * 2003-06-30 2004-11-25 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Track-mounted guidance device for rail track construction or maintenance device has transverse frame secured to track rails via cooperating stop elements
DE10329355A1 (en) * 2003-06-30 2005-01-27 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Device for moving construction unit along tracks has motor driven frame which supports winch with a traction cable which by fastening device is fastened further forward on rail or sill in working direction of device
DE10329356A1 (en) * 2003-06-30 2005-02-03 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Device for setting up concrete foundation along rails includes compacting device on frame of insert shaft for concrete to compact concrete as it is introduced
DE102004020236A1 (en) * 2004-04-22 2005-12-08 Siegfried Maier Puller for floor or wall tiles, has mobile carriage that moves along slot of longitudinal guide rail, and tile holder coupled to guide rail
DE102009007224A1 (en) * 2009-02-03 2010-08-05 Zürcher, Ralf Method for laying U-shaped channel elements next to the track of a railway line
DE102009007226A1 (en) * 2009-02-03 2010-08-12 Zürcher, Ralf Method for creating a drainage device next to the glass of a railway line
CN101191777B (en) * 2006-11-28 2011-09-28 鞍钢股份有限公司 Test sample holder for preparing great crystal particle thin plate material pole figure measuring sample and textile analysis
DE102013113442A1 (en) * 2013-12-04 2015-06-11 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Method and device for laying cover stones on platform edge stones
CN113882649A (en) * 2021-12-08 2022-01-04 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10337977B3 (en) * 2003-06-30 2004-12-16 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Arrangement for producing excavation and laying cable channel along tracks has movable with jib, bucket that protrudes into ground with profile inclined forwards and downwards in working direction
CN104164975B (en) * 2013-05-20 2016-11-23 佛山市奥马迪科技有限公司 A kind of construction concrete robotic watering unit
CN107042578B (en) * 2017-05-26 2019-02-01 上海君道住宅工业有限公司 Material distributing machine automatic plastering device
CN111188498B (en) * 2020-01-14 2021-08-20 广州华隧威预制件有限公司 Construction method of evacuation platform
CN111364769A (en) * 2020-04-20 2020-07-03 中国一冶集团有限公司 Assembled conveyer suitable for original narrow pavement pipeline is buried underground
CN113931453A (en) * 2021-11-25 2022-01-14 广东蕉岭建筑工程集团有限公司 Construction tool for pouring template
CN116397886B (en) * 2023-04-14 2023-11-07 新疆喀特建设工程有限责任公司 Temporary pouring equipment and pouring construction process for prefabricated wall of fabricated building

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3436271A1 (en) * 1984-10-03 1986-04-10 Gerhard Ludwig 4422 Ahaus Pieper Mobile machine with devices for producing and continuously laying concrete stones
FR2741091B1 (en) * 1995-11-13 1998-02-06 Regie Autonome Transports MOBILE INSTALLATION FOR MAINTENANCE AND REPAIR OF RAILWAYS

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20210179U1 (en) * 2002-07-02 2003-11-13 Maier Siegfried Device for creating a defined trigger strip
DE10329356B4 (en) * 2003-06-30 2009-06-25 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Device for creating a foundation along tracks
DE10329356A1 (en) * 2003-06-30 2005-02-03 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Device for setting up concrete foundation along rails includes compacting device on frame of insert shaft for concrete to compact concrete as it is introduced
DE10329353B3 (en) * 2003-06-30 2004-11-25 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Track-mounted guidance device for rail track construction or maintenance device has transverse frame secured to track rails via cooperating stop elements
DE10329355B4 (en) * 2003-06-30 2009-06-25 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Device for moving a construction device along tracks
DE10329355A1 (en) * 2003-06-30 2005-01-27 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Device for moving construction unit along tracks has motor driven frame which supports winch with a traction cable which by fastening device is fastened further forward on rail or sill in working direction of device
DE102004020236A1 (en) * 2004-04-22 2005-12-08 Siegfried Maier Puller for floor or wall tiles, has mobile carriage that moves along slot of longitudinal guide rail, and tile holder coupled to guide rail
DE102004020236B4 (en) * 2004-04-22 2009-06-04 Siegfried Maier puller
CN101191777B (en) * 2006-11-28 2011-09-28 鞍钢股份有限公司 Test sample holder for preparing great crystal particle thin plate material pole figure measuring sample and textile analysis
DE102009007224A1 (en) * 2009-02-03 2010-08-05 Zürcher, Ralf Method for laying U-shaped channel elements next to the track of a railway line
DE102009007226A1 (en) * 2009-02-03 2010-08-12 Zürcher, Ralf Method for creating a drainage device next to the glass of a railway line
DE102009007226B4 (en) * 2009-02-03 2012-11-22 Ralf Zürcher Method for creating a drainage device next to the track of a railway line
DE102013113442A1 (en) * 2013-12-04 2015-06-11 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Method and device for laying cover stones on platform edge stones
CN113882649A (en) * 2021-12-08 2022-01-04 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN113882649B (en) * 2021-12-08 2022-02-08 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method

Also Published As

Publication number Publication date
DE10102328B4 (en) 2005-03-10
DE20003403U1 (en) 2000-06-21

Similar Documents

Publication Publication Date Title
DE10102328A1 (en) Concrete foundation pouring machine for construction of foundation for edge of railway platform uses hopper with strickle board attached to frame sliding along track
DE4411889A1 (en) Ballastless track system for at least one railroad track and method of manufacture
DE10000227A1 (en) Permanent way production method comprises producing running section consisting of rails and sleepers, inserting rods into concrete bearing layer, adjusting running section, fixing it to rods, pouring upper bearing layer and adding revetment
DE3924486C1 (en) Side-rail fixing system - is for electromagnetic railway and uses recesses in sides of concrete beam folded with poured concrete
DE2422942C2 (en) Process for the production of railway superstructures as well as prefabricated parts and device for carrying out the process
DE2246125A1 (en) FORMWORK DEVICE FOR PACKING PIT DRAINING MATERIAL
DE10004194C2 (en) Process for the production of a fixed railroad track on a bridge
DE4205192C2 (en) platform
DE4230533C2 (en) Device for exchanging soil material, especially next to traffic routes and buildings
EP1169516B1 (en) Method for renewing railway lines
EP1022386A2 (en) Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method
EP1061176B1 (en) Process for equalisation of the vertical displacements of structural track elements of a fixed railway track
DE10312351A1 (en) Method and device for the production of a particularly solid track for rail vehicles
DE19848655A1 (en) Method for preparing track of high speed railway
DE19808812C2 (en) Process for making a solid carriageway
DE102004019083A1 (en) Method for laying rail track on uneven ground especially in tunnels using integral alignment means which are removed after the sleepers are secured with poured concrete
AT505821B1 (en) METHOD AND ARRANGEMENT FOR ORIENTING PRE-CONCRETE CONCRETE AGGREGATE PLATES AND STRUCTURE BELT ELEMENT FOR USE IN THE PROCESS AND ARRANGEMENT
CH715209A2 (en) Track body transition unit between a ballast track section and a ballastless track section.
DE3803120C2 (en)
EP0048444A2 (en) Method and shuttering element for producing slit walls in the ground
DE10124069C1 (en) Process for laying pipe and media lines in narrow trenches comprises sinking a pipe or media line in the trench without touching the bottom of the trench, and fixing with liquid mortar or filling composition
DE102006047875B3 (en) Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer
DE2922154C2 (en) Slipform paver for laying a concrete layer on a substructure
DE10329356B4 (en) Device for creating a foundation along tracks
DE3432706A1 (en) Method for the subsequent placement of an additional seal in trench walls and device for carrying out the method

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8364 No opposition during term of opposition
R071 Expiry of right