Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method Download PDF

Info

Publication number
EP1022386A2
EP1022386A2 EP19990122720 EP99122720A EP1022386A2 EP 1022386 A2 EP1022386 A2 EP 1022386A2 EP 19990122720 EP19990122720 EP 19990122720 EP 99122720 A EP99122720 A EP 99122720A EP 1022386 A2 EP1022386 A2 EP 1022386A2
Authority
EP
European Patent Office
Prior art keywords
sleepers
track
under
mass
threshold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19990122720
Other languages
German (de)
French (fr)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bahnbau Wels GmbH
Original Assignee
Bahnbau Wels GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bahnbau Wels GmbH filed Critical Bahnbau Wels GmbH
Publication of EP1022386A2 publication Critical patent/EP1022386A2/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails

Definitions

  • the invention relates to a method for installing a Rails and sleepers of existing track on support plates one fixed carriageway, the track initially with vertical and horizontal Adjustment means aligned vertically and horizontally and is supported on support means.
  • the invention further relates to a formwork and a conveying and installation device for feeding and installing one flowable, hardening stabilizing compound under the sleepers of a track on a solid track.
  • the track In the case of railroad tracks for railroad trains running at very high speed run, the track is on as a solid carriageway Base plates laid out of concrete or asphalt, with the sleepers of the track embedded in a filling concrete almost up to its upper edge and be firmly connected to the support plates. To one To achieve rapid construction progress, it is advisable to stop Prefabricate rails and sleepers and existing track grate the track with relatively large rail lengths on the Lay support plates and align them horizontally and vertically. Then the filling concrete between the sleepers and inserted the support plates, which is the final and permanent Connects between the track and the underground.
  • the object of the invention is to avoid these disadvantages and to design a method of the type explained in more detail above, that large rail lengths can be installed and a quicker Construction progress is achieved without position corrections during installation of the aligned track are required.
  • Thresholds after alignment by at least partially underfilling be stabilized with a hardening stabilizing compound, that then after the stabilizing compound has hardened sufficiently the rails on the sleepers loosened and only after the final and permanent attachment of the sleepers to the Carrier plates of the solid carriageway are fixed again with the sleepers get connected.
  • This configuration has the advantage that changes in length of the Rails due to changing temperature influences during installation the correct position of the aligned sleepers no longer can influence, since the rails after loosening the Rail fasteners on the sleepers in the longitudinal direction of the rail can move. Because to underfill the thresholds only small amounts of stabilizing compound are required the underfilling and stabilization of the sleepers is very quick. A very quickly hardening stabilizing compound is also useful used, which is sustainable after a short time and driving on the track just laid with transport and Installation equipment or a track laying and leveling machine allowed.
  • the adjusting means can also be used and / or the support means removed and at another Body can be reused.
  • pourable asphalt or Cement concrete used, which contains early high-strength binders.
  • the stabilizing compound can be applied to the whole of the sleepers Length can be arranged. As a rule, however, it is sufficient if the stabilizing mass under the sleepers is only of limited length is placed under the bearing points of the rails.
  • the thresholds are not subjected to bending when the track driven by a heavy track laying and leveling machine as is the case with single-track tunnel sections, for example the case is.
  • the stabilizing compound not only supports the thresholds from below, but also on their faces, so that the sleepers also against lateral displacement are secured.
  • the filling concrete that is introduced later must also fill the gap between the underside of the sleeper and the bottom of the support plates Fill in so that the thresholds are fully supported. Because this filling concrete may be introduced much later as the stabilizing compound, it is already hardened, before the filling concrete hardens and reaches its final shrinkage. It can then happen that individual thresholds in the finished condition only at their ends over the stabilizing compound Support on the support plates, but in their middle area lying hollow. To avoid this, a special suggestion goes the invention, under the ends of the sleepers in the area limited length in which the stabilizing mass is introduced will arrange a setting strip of compressible material its thickness is the shrinkage of the later under the threshold attached filling concrete corresponds.
  • This setting strip can from a glued or concreted on the underside of the threshold
  • Non-woven strips of plastic or textile material exist, which compresses under load, so that then the threshold along its entire length on the hardened and under certain circumstances, filler concrete that has become a little thinner.
  • the stabilizing mass is useful with a transport and Installation device supplied and installed on the laid Track moves along its alignment.
  • This promotion and Installation device consists of a train with light wagons, which storage containers for the stabilizing mass or its raw materials, an agitator or a mixer and the built-in devices for the masses and those of a small tractor, for example, a trolley moved in the longitudinal direction of the track become.
  • the tractor can also have an energy generator be equipped to drive the agitator or of the mixer and a pump or an injection unit for the To supply stabilizing mass with energy.
  • a lost formwork is provided, which in a Embodiment of a sack made of one for hardening Mass partially permeable material is formed.
  • the sack can from a coarse-mesh fabric, a fleece or a perforated Foil exist.
  • This sack is with an injection hose or an injection lance with which this can be connected Sack filled with the hardening mass from the mixer or agitator after being in the space between the Underside of the threshold to be stabilized and the Support plate was arranged.
  • the one filled in the sack with overpressure Stabilizing compound not only fills the sack, but also also partially emerges between the stitches of the fabric or the perforation of the film and also forms on the outside of the sack a layer consisting of the stabilizing mass, the combines well with the filling concrete to be introduced later, the is expediently produced on the same basis as the stabilizing compound, i.e. if the stabilizing mass is made of a cement concrete consists, the filling concrete is also a cement concrete. Will be against Asphalt concrete used as filling concrete is used as a stabilizing compound a bitumen-bound stabilizing compound is also useful.
  • the formwork is lost for installing a flowable, hardening mass under the Sleeper of a track on the supporting plates of a solid carriageway according to the invention from a formwork frame with side walls Made of expanded metal, which fits between the support plate and the threshold and over at least one side surface or a top surface of the Threshold protrudes.
  • Expanded metal walls can partially fill the stabilizing compound penetrate through the walls and get on well with the Interlock and connect the filling compound to be filled in later, so that Stabilizing compound and filling concrete in the final, hardened state form a monolithic body in which the thresholds of the track are firmly anchored.
  • the formwork frame can have two side walls and at least one Have front wall.
  • One end wall fills the distance at least approximately between the threshold and the support plate.
  • this first end wall expediently has a curved one Tab that lies under the threshold and thereby the Formwork frame stabilized at the head end of the threshold.
  • the sidewalls and, if necessary, a second end wall, which the formwork frame closes at the rear and also expediently made of expanded metal are higher than those below the threshold End wall of the formwork frame.
  • the to the top of the side walls filled stabilizing compound not only underfills the threshold at their ends, but also trims them at theirs End faces, so that these sleepers against side shift are secured.
  • 10 is a fixed track for a track 11, which consists essentially of prefabricated support plates 12 consists of reinforced concrete, which is on a hydraulically bound Base layer 13 are laid, which is the substructure of the railway line forms.
  • support plates 12 have a U-shaped cross section with laterally towering sidewalls 14.
  • the support plates could also formed by flat plates without sidewalls made of asphalt or concrete become.
  • the track 11 is made of concrete sleepers 15 and formed by rails 16 with fasteners 17, e.g. with sleeper screws on the sleepers 15 are releasably attached.
  • the track 11 is preassembled and in great lengths with a track installation machine in the laid from the support plates 12 formed trough.
  • the track is horizontal and vertical aligned and supported on the bottom 19 of the support plates 12.
  • FIG. 1 The alignment and support is shown in FIG. 1 in the area PH2. It is done either with the help of a track 11 moving track straightener, or as shown in Fig. 3, manually with individual straightening and supporting devices, such as Vertical spindles 19, the vertical holes 20 in the sleepers 15 penetrate and rest on the bottom 18 of the support plates 15 and with horizontal adjusting means 21 with which the Thresholds can be set in the horizontal direction.
  • This horizontal adjustment means 21 are also screw spindles, which engage in threaded sleeves 22, which in the head surfaces 23rd the thresholds are arranged. Support with the other end the horizontal screw spindles 21 on the side cheeks 14 the support plates 12 from.
  • This proppant 27 can be the vertical spindles 19 with which the Thresholds 15 have already been aligned in their altitude.
  • the support means however, special support spindles between the sleepers can be arranged directly under the rails. Instead of the support spindles can also support frames made of concrete, hydraulic rams or other height-adjustable supports are used become.
  • This construction phase is shown in FIG. 1 in the area PH3.
  • the lost formwork is the one shown in FIGS. 1 and 2 Embodiment bags 24 from a coarse-mesh Fabric, a fleece or a perforated film. you will be from a transport and installation device 25 with a hardening stabilizing mass 26 filled, as in the area PH4 is shown in Fig. 1.
  • this stabilizing compound 26 is a mastic asphalt or a flowable cement concrete, which is preferably a early high strength cement is added as a binder, so that the Stabilizing compound 26 soon after it is filled into the sacks 24 hardened.
  • the stabilizing mass 26 is using an injection lance or an injection hose 28 with excess pressure in the bag formwork 24 filled. This allows the air from the Bags 24 escape and after the bags are completely filled 14 can some stabilizing mass through the mesh or perforation of the sack to the outside and harden there. At the Subsequent pouring of the filling concrete connects it then with the outward stabilizing material and it gives a good interlock between the two materials.
  • Fig. 1 shown in phase PH4.
  • the stabilizing compound 26 has hardened to the extent that it Load of the track and the transport and installation equipment traveling over it can be transferred to the support plates 12 the fasteners 17 of the rails 16 solved so far that the rails 16 in their longitudinal direction on the concrete sleepers 15 can move and no longer transmit longitudinal forces, if they lengthen due to the effects of temperature or shorten it.
  • the vertical spindles can also be used 19, the horizontal adjustment means 21 or other support means be removed. This process section is in the area in FIG. 1 PH5 shown.
  • Fig.1 Installation device 25 consists of a train light wagons 29 and 30 by a small tractor 31, for example a draisine in the installation direction 32 over the just laid track 11 are pulled.
  • the carriage 29 carries a reservoir 33 for the stabilizing mass or its Starting materials, for example a mixture of dry additives and cement fed into a conveyor via a conveyor 34 Mixer 35 are given, together with a water tank 36 is arranged on the second carriage 30 and with the addition of Water creates the flowable stabilizing mass, which then filled into the formwork 24 through the injection hose 28 becomes.
  • Fig. 4 is the Formwork frame 38 slightly larger than the base of the threshold 15 so that it over the side surfaces 43 and the top surfaces 23rd the threshold 15 protrudes.
  • the formwork frame 38 can thereby can be easily filled from above, using the stabilizing compound 26 also somewhat over the side surfaces 43 and the top surfaces 23 climb the threshold 15 and this at the bottom also sideways may include (Fig. 4).
  • two formwork frames 38 are arranged under the sleepers 15, each of which has only a limited length l 1 and which are arranged under the sleepers 15 in the region of the rails 16.
  • the end walls 41 and 42 and a side wall 40 of these formwork frames are not higher than the distance a between the underside of a threshold 15 and the bottom 18 of the support plates 12 after the thresholds have been aligned.
  • these formwork frames fit between the support plate 12 and the threshold 15 and can be pushed from the side under the vertically aligned thresholds.
  • the second side wall 39 protrudes beyond the side surface of the threshold 15 and can also protrude somewhat beyond the lower edge thereof in order to facilitate filling with the stabilizing compound 26.
  • formwork frames 38 are arranged only at the threshold ends 44 and only reach under them in a narrow area of limited length l 2 .
  • the filled stabilizing mass 26 therefore fills the distance a between the bottom 18 of the trough and the underside 52 of the threshold only in the region of limited length l 2 .
  • a set strip 51 made of a nonwoven fabric is arranged under the ends 44 of the sleepers 15 in the areas of limited length l 2 , the thickness d of which corresponds at least to the shrinkage of the filler concrete 37 which is later installed under the threshold 15.
  • This setting strip 51 can be placed in the formwork in the formwork and concreted onto the threshold during the manufacture of the concrete sleeper, but it is also possible to glue these setting strips 51 under the finished sleepers 15.
  • the formwork frames 38 have two side walls 39 and 40 and an end wall 45 made of expanded metal.
  • the end wall 45 fills the distance a between the threshold 15 and the support plate 12 and has at its upper edge 46 a bent tab 47, which is made in one piece with the end wall 45 and lies under the threshold when the formwork frame is installed.
  • the side walls 39 and 40 of the formwork frames 38 extend to the inner surfaces 48 of the side cheeks 14 of the support plates 12 and are connected to one another at their lower corners 49 by a spar 50. If the support plates 12 have no side walls 14, the formwork frame 38 is also provided on its rear side with a second end wall made of expanded metal.
  • the formwork frames can easily be made of expanded metal and, at their relatively low height, are also sufficiently stable to absorb the liquid pressure of the stabilizing composition filled. With a suitable consistency, this can partially pass through between the ribs of the expanded metal walls and also harden on the outer sides of the formwork frames and form a rough surface there, which interlocks with the filling concrete that will later be filled in between the sleepers.
  • the invention is not based on the described method and the illustrated and described embodiments of the used Formwork, facilities and equipment limited, but several additions and changes are possible without the Leave the scope of the invention.
  • other hardening stabilizing materials for example plastic-modified concretes or bitumen-bound masses use that are installed hot and harden when they cool down.
  • the thresholds are pushed.
  • the thresholds for the final state are also fixed in another way to connect the subsurface, for example screwing it into dowels, which are arranged in the support plates of the slab track become.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

Verfahren zum Einbauen eines Gleises (11) auf Tragplatten (12) einer festen Fahrbahn (10), bei dem die Schwellen (15) zunächst mit einer erhärtenden Stabilisiermasse (26) stabilisiert werden, dann die Schienen (16) auf den Schwellen (15) gelöst und erst bei/oder nach dem endgültigen Befestigen der Schwellen (15) auf den Tragplatten (12) wieder fest mit den Schwellen (15) verbunden werden, um Längenänderungen der Schienen (16) infolge von Temperaturänderungen nicht auf die ausgerichteten Schwellen (15) einwirken zu lassen, bevor diese fest mit dem Untergrund verbunden sind und solche Kräfte aufnehmen können. <IMAGE>Method for installing a track (11) on support plates (12) of a solid track (10), in which the sleepers (15) are first stabilized with a hardening stabilizing mass (26), then the rails (16) on the sleepers (15) loosened and only firmly connected to the sleepers (15) when / or after the final fastening of the sleepers (15) on the support plates (12) in order to prevent changes in length of the rails (16) due to temperature changes on the aligned sleepers (15) allow to act before they are firmly connected to the surface and can absorb such forces. <IMAGE>

Description

Die Erfindung betrifft ein Verfahren zum Einbauen eines aus Schienen und Schwellen bestehenden Gleises auf Tragplatten einer festen Fahrbahn, wobei das Gleis zunächst mit vertikalen und horizontalen Einstellmitteln vertikal und horizontal ausgerichtet und an Stützmitteln abgestützt wird.The invention relates to a method for installing a Rails and sleepers of existing track on support plates one fixed carriageway, the track initially with vertical and horizontal Adjustment means aligned vertically and horizontally and is supported on support means.

Die Erfindung betrifft ferner eine Schalung und eine Beförderungs- und Einbaueinrichtung zum Zuführen und Einbauen einer fließfähigen, erhärtenden Stabilisiermasse unter den Schwellen eines Gleises auf einer festen Fahrbahn.The invention further relates to a formwork and a conveying and installation device for feeding and installing one flowable, hardening stabilizing compound under the sleepers of a track on a solid track.

Bei Schienenwegen für Eisenbahnzüge, die mit sehr hoher Geschwindigkeit verkehren, wird das Gleis als feste Fahrbahn auf Tragplatten aus Beton oder Asphalt verlegt, wobei die Schwellen des Gleises fast bis zu ihrer Oberkante in einem Füllbeton eingebettet und fest mit den Tragplatten verbunden werden. Um einen raschen Baufortschritt zu erzielen, ist es zweckmäßig, den aus Schienen und Schwellen bestehenden Gleisrost vorzufertigen und das Gleis mit verhältnismäßig großen Schienenlängen auf die Tragplatten zu legen und dort horizontal und vertikal auszurichten. Danach wird dann der Füllbeton zwischen den Schwellen und den Tragplatten eingebracht, der die endgültige und dauerhafte Verbindung zwischen dem Gleis und dem Untergrund herstellt.In the case of railroad tracks for railroad trains running at very high speed run, the track is on as a solid carriageway Base plates laid out of concrete or asphalt, with the sleepers of the track embedded in a filling concrete almost up to its upper edge and be firmly connected to the support plates. To one To achieve rapid construction progress, it is advisable to stop Prefabricate rails and sleepers and existing track grate the track with relatively large rail lengths on the Lay support plates and align them horizontally and vertically. Then the filling concrete between the sleepers and inserted the support plates, which is the final and permanent Connects between the track and the underground.

Es ist bekannt, das Gleis mit Einstellspindeln auszurichten, mit denen die einzelnen Schwellen in der Höhe und seitlich gegenüber den Tragplatten verstellt werden können (DE 43 35 877 A1). Der Gleisrost wird dann mit diesen Spindeln oder anderen, unter den Schienen angeordneten Stützmitteln auf den Tragplatten abgestützt, bis die endgültige Verbindung der Schwellen mit den Tragplatten der testen Fahrbahn hergestellt ist.It is known to align the track with adjusting spindles with opposite the individual thresholds in height and sideways the support plates can be adjusted (DE 43 35 877 A1). The Track rust is then with these spindles or others, among the Support means arranged on rails supported on the support plates, until the final connection of the sleepers with the Carrier plates of the test roadway is made.

Bei dieser Arbeitsweise besteht die Schwierigkeit, daß das genau ausgerichtete Gleis seine Lage bis zum Einbringen und Erhärten des Füllbetons nicht beibehält, sondern Lageänderungen eintreten, die von Formänderungen der Schienen herrühren, die diese aufgrund von Änderungen der Umgebungstemperatur während des Einbaues erleiden. Aus diesem Grunde muß der Zeitraum vom Verlegen des Gleises bis zum Einbringen des Füllbetons, insbesondere an heißen Tagen, sehr kurz bemessen werden. Hierdurch wird der Baufortschritt gehemmt, und es entstehen viele Schienenstöße, die geschweißt werden müssen, was hohe Kosten verursacht.The difficulty with this mode of operation is that it is accurate aligned track its position until insertion and hardening of the filling concrete, but changes in position occur, which result from changes in the shape of the rails, these due to changes in the ambient temperature during installation suffer. For this reason, the period from relocating of the track until the filling concrete is brought in, in particular hot days, very short. This will make the construction progress inhibited, and there are many rail joints that have to be welded, which causes high costs.

Aufgabe der Erfindung ist es, diese Nachteile zu vermeiden und ein Verfahren der eingangs näher erläuterten Art so auszubilden, daß große Schienenlängen eingebaut werden können und ein rascher Baufortschritt erzielt wird, ohne daß während des Einbaues Lagekorrekturen des einmal ausgerichteten Gleises erforderlich sind.The object of the invention is to avoid these disadvantages and to design a method of the type explained in more detail above, that large rail lengths can be installed and a quicker Construction progress is achieved without position corrections during installation of the aligned track are required.

Diese Aufgabe wird mit der Erfindung dadurch gelöst, daß die Schwellen nach dem Ausrichten durch mindestens teilweises Unterfüllen mit einer erhärtenden Stabilisiermasse stabilisiert werden, daß dann nach dem ausreichenden Erhärten der Stabilisiermasse die Schienen auf den Schwellen gelöst und erst nach dem endgültigen und dauerhaften Befestigen der Schwellen auf den Tragplatten der festen Fahrbahn wieder fest mit den Schwellen verbunden werden.This object is achieved with the invention in that the Thresholds after alignment by at least partially underfilling be stabilized with a hardening stabilizing compound, that then after the stabilizing compound has hardened sufficiently the rails on the sleepers loosened and only after the final and permanent attachment of the sleepers to the Carrier plates of the solid carriageway are fixed again with the sleepers get connected.

Diese Ausgestaltung hat den Vorteil, daß Längenänderungen der Schienen infolge von wechselnden Temperatureinflüssen beim Einbau die richtige Lage der ausgerichteten Schwellen nicht mehr beeinflussen können, da sich die Schienen nach dem Lockern der Schienenbefestigungsmittel auf den Schwellen in Schienenlängsrichtung verschieben können. Da zum Unterfüllen der Schwellen nur geringe Mengen an Stabilisiermasse erforderlich sind, geht das Unterfüllen und Stabilisieren der Schwellen sehr rasch vonstatten. Zweckmäßig wird auch eine sehr rasch erhärtende Stabilisiermasse verwendet, die schon nach kurzer Zeit tragfähig ist und ein Befahren des soeben verlegten Gleises mit Beförderungs- und Einbaueinrichtungen oder einer Gleisverlege- und -richtmaschine erlaubt.This configuration has the advantage that changes in length of the Rails due to changing temperature influences during installation the correct position of the aligned sleepers no longer can influence, since the rails after loosening the Rail fasteners on the sleepers in the longitudinal direction of the rail can move. Because to underfill the thresholds only small amounts of stabilizing compound are required the underfilling and stabilization of the sleepers is very quick. A very quickly hardening stabilizing compound is also useful used, which is sustainable after a short time and driving on the track just laid with transport and Installation equipment or a track laying and leveling machine allowed.

Nach dem Erhärten der Stabilisiermasse können auch die Einstellmittel und/oder die Stützmittel wieder entfernt und an anderer Stelle wiederverwendet werden.After the stabilizing compound has hardened, the adjusting means can also be used and / or the support means removed and at another Body can be reused.

Als Stabilisiermasse wird zweckmäßig gießfähiger Asphalt- oder Zementbeton verwendet, der frühhochfeste Bindemittel enthält.As a stabilizing mass, pourable asphalt or Cement concrete used, which contains early high-strength binders.

Die Stabilisiermasse kann unter den Schwellen auf deren ganzer Länge angeordnet werden. In der Regel reicht es jedoch aus, wenn die Stabilisiermasse unter den Schwellen nur in begrenzter Länge unter den Lagerstellen der Schienen angeordnet wird. Die Schwellen werden dann nicht auf Biegung beansprucht, wenn das Gleis von einer schweren Gleisverlege- und -richtmaschine befahren wird, wie dies beispielsweise bei eingleisigen Tunnelstrecken der Fall ist.The stabilizing compound can be applied to the whole of the sleepers Length can be arranged. As a rule, however, it is sufficient if the stabilizing mass under the sleepers is only of limited length is placed under the bearing points of the rails. The thresholds are not subjected to bending when the track driven by a heavy track laying and leveling machine as is the case with single-track tunnel sections, for example the case is.

Bei der Herstellung zweigleisiger Eisenbahnstrecken, bei denen ein Gleis von dem bereits hergestellten Nachbargleis aus hergestellt wird, ist es zweckmäßig, die Stabilisiermasse unter den Schwellen nur in begrenzter Länge unter den Enden und vor einem Teil der Kopfflächen der Schwellen anzuordnen. Die Stabilisiermasse unterstützt die Schwellen dann nicht nur von unten her, sondern auch an ihren Stirnseiten, so daß die Schwellen auch gegen seitliche Verschiebung gesichert sind.In the production of double-track railway lines, in which a track is made from the neighboring track already made is, it is appropriate to stabilize the mass under Thresholds only a limited length under the ends and in front of you To arrange part of the top surfaces of the sleepers. The stabilizing compound not only supports the thresholds from below, but also on their faces, so that the sleepers also against lateral displacement are secured.

Wenn die Stabilisiermasse nur unter den Schwellenenden angeordnet wird, muß der später eingebrachte Füllbeton auch den Spalt zwischen der Schwellenunterseite und dem Boden der Tragplatten satt ausfüllen, damit die Schwellen vollflächig unterstützt werden. Da dieser Füllbeton unter Umständen sehr viel später eingebracht wird als die Stabilisiermasse, ist diese bereits erhärtet, bevor der Füllbeton erhärtet und sein Endschwindmaß erreicht. Es kann dann geschehen, daß einzelne Schwellen sich im fertigen Zustand nur an ihren Enden über die Stabilisiermasse auf den Tragplatten abstützen, in ihrem mittleren Bereich jedoch hohl liegen. Um dies zu vermeiden, geht ein besonderer Vorschlag der Erfindung dahin, unter den Enden der Schwellen in dem Bereich begrenzter Länge, in der die Stabilisiermasse eingebracht wird, einen Setzstreifen aus zusammendrückbarem Material anzuordnen, dessen Dicke dem Schwindmaß des später unter der Schwelle angebrachten Füllbetons entspricht. Dieser Setzstreifen kann aus einem auf der Schwellenunterseite aufgeklebten oder einbetonierten Faservliesstreifen aus Kunststoff oder Textilmaterial bestehen, der sich unter Belastung zusammendrückt, so daß sich dann die Schwelle auf ihrer ganzen Länge auf den erhärteten und unter Umständen etwas dünner gewordenen Füllbeton auflegen kann.If the stabilizing mass is only placed under the sleeper ends , the filling concrete that is introduced later must also fill the gap between the underside of the sleeper and the bottom of the support plates Fill in so that the thresholds are fully supported. Because this filling concrete may be introduced much later as the stabilizing compound, it is already hardened, before the filling concrete hardens and reaches its final shrinkage. It can then happen that individual thresholds in the finished condition only at their ends over the stabilizing compound Support on the support plates, but in their middle area lying hollow. To avoid this, a special suggestion goes the invention, under the ends of the sleepers in the area limited length in which the stabilizing mass is introduced will arrange a setting strip of compressible material its thickness is the shrinkage of the later under the threshold attached filling concrete corresponds. This setting strip can from a glued or concreted on the underside of the threshold Non-woven strips of plastic or textile material exist, which compresses under load, so that then the threshold along its entire length on the hardened and under certain circumstances, filler concrete that has become a little thinner.

Die Stabilisiermasse wird zweckmäßig mit einer Beförderungs- und Einbaueinrichtung zugeführt und eingebaut, die auf dem verlegten Gleis nach dessen Ausrichtung entlangfährt. Diese Beförderungs- und Einbaueinrichtung besteht aus einem Zug mit leichten Wagen, welche Vorratsbehälter für die Stabilisiermasse oder deren Ausgangsstoffe, ein Rührwerk oder einen Mischer und die Einbaugeräte für die Masse tragen und die von einer kleinen Zugmaschine, beispielsweise einer Draisine in Längsrichtung des Gleises bewegt werden. Hierbei kann die Zugmaschine auch mit einem Energieerzeuger ausgerüstet sein, um den Antrieb des Rührwerks oder des Mischers und eine Pumpe oder ein Einspritzaggregat für die Stabilisiermasse mit Energie zu versorgen.The stabilizing mass is useful with a transport and Installation device supplied and installed on the laid Track moves along its alignment. This promotion and Installation device consists of a train with light wagons, which storage containers for the stabilizing mass or its raw materials, an agitator or a mixer and the built-in devices for the masses and those of a small tractor, for example, a trolley moved in the longitudinal direction of the track become. Here, the tractor can also have an energy generator be equipped to drive the agitator or of the mixer and a pump or an injection unit for the To supply stabilizing mass with energy.

Um die Menge der einzubauenden Stabilisiermasse in Grenzen zu halten, wird eine verlorene Schalung vorgesehen, die bei einer Ausführungsform von einem Sack aus einem für die erhärtende Masse teildurchlässigen Material gebildet wird. Der Sack kann aus einem grobmaschigen Gewebe, einem Vlies oder einer perforierten Folie bestehen. Dieser Sack ist mit einem Injektionsschlauch oder einer Injektionslanze verbindbar, mit der dieser Sack vom Mischer oder Rührwerk aus mit der erhärtenden Masse gefüllt werden kann, nachdem er in dem Zwischenraum zwischen der Unterseite der jeweils zu stabilisierenden Schwelle und der Tragplatte angeordnet wurde. Die in den Sack mit Überdruck eingefüllte Stabilisiermasse füllt nicht nur den Sack, sondern tritt auch teilweise zwischen den Maschen des Gewebes oder aus der Perforation der Folie aus und bildet auch auf der Außenseite des Sackes eine aus der Stabilisiermasse bestehende Schicht, die sich gut mit dem später einzubringenden Füllbeton verbindet, der zweckmäßig auf der gleichen Basis hergestellt wird wie die Stabilisiermasse, d.h., wenn die Stabilisiermasse aus einem Zementbeton besteht, ist auch der Füllbeton ein Zementbeton. Wird dagegen Asphaltbeton als Füllbeton verwendet, benutzt man als Stabilisiermasse ebenfalls zweckmäßig eine bitumengebundene Stabilisiermasse.To limit the amount of stabilizing compound to be installed hold, a lost formwork is provided, which in a Embodiment of a sack made of one for hardening Mass partially permeable material is formed. The sack can from a coarse-mesh fabric, a fleece or a perforated Foil exist. This sack is with an injection hose or an injection lance with which this can be connected Sack filled with the hardening mass from the mixer or agitator after being in the space between the Underside of the threshold to be stabilized and the Support plate was arranged. The one filled in the sack with overpressure Stabilizing compound not only fills the sack, but also also partially emerges between the stitches of the fabric or the perforation of the film and also forms on the outside of the sack a layer consisting of the stabilizing mass, the combines well with the filling concrete to be introduced later, the is expediently produced on the same basis as the stabilizing compound, i.e. if the stabilizing mass is made of a cement concrete consists, the filling concrete is also a cement concrete. Will be against Asphalt concrete used as filling concrete is used as a stabilizing compound a bitumen-bound stabilizing compound is also useful.

Bei einer anderen Ausführungsform besteht die verlorene Schalung zum Einbauen einer fließfähigen, erhärtenden Masse unter den Schwellen eines Gleises auf den Tragplatten einer festen Fahrbahn nach der Erfindung aus einem Schalungsrahmen mit Seitenwänden aus Streckmetall, der zwischen Tragplatte und Schwelle paßt und über mindestens eine Seitenfläche oder eine Kopffläche der Schwelle vorsteht. Auch bei einem solchen Schalungsrahmen mit Streckmetallwänden kann die eingefüllte Stabilisiermasse teilweise durch die Wände nach außen dringen und sich gut mit der später einzufüllenden Füllmasse verzahnen und verbinden, so daß Stabilisiermasse und Füllbeton im endgültigen, erhärteten Zustand einen monolitischen Körper bilden, in dem die Schwellen des Gleises fest verankert sind.In another embodiment, the formwork is lost for installing a flowable, hardening mass under the Sleeper of a track on the supporting plates of a solid carriageway according to the invention from a formwork frame with side walls Made of expanded metal, which fits between the support plate and the threshold and over at least one side surface or a top surface of the Threshold protrudes. Even with such a formwork frame Expanded metal walls can partially fill the stabilizing compound penetrate through the walls and get on well with the Interlock and connect the filling compound to be filled in later, so that Stabilizing compound and filling concrete in the final, hardened state form a monolithic body in which the thresholds of the track are firmly anchored.

Der Schalungsrahmen kann zwei Seitenwände und mindestens eine Stirnwand aufweisen. Hierbei füllt die eine Stirnwand den Abstand zwischen Schwelle und Tragplatte wenigstens annähernd aus. Am oberen Rand hat diese erste Stirnwand zweckmäßig eine abgebogene Lasche, die sich unter die Schwelle legt und hierdurch den Schalungsrahmen am Kopfende der Schwelle stabilisiert. Die Seitenwände und ggf. eine zweite Stirnwand, die den Schalungsrahmen nach hinten hin abschließt und zweckmäßig ebenfalls aus Streckmetall besteht, sind höher als die unter die Schwelle reichende Stirnwand des Schalungsrahmens. Die bis zur Oberkante der Seitenwände eingefüllte Stabilisiermasse unterfüllt dann nicht nur die Schwelle an ihren Enden, sondern stutzt diese auch an ihren Stirnseiten ab, so daß diese Schwellen gegen Seitenverschiebung gesichert sind.The formwork frame can have two side walls and at least one Have front wall. One end wall fills the distance at least approximately between the threshold and the support plate. At the upper edge, this first end wall expediently has a curved one Tab that lies under the threshold and thereby the Formwork frame stabilized at the head end of the threshold. The sidewalls and, if necessary, a second end wall, which the formwork frame closes at the rear and also expediently made of expanded metal are higher than those below the threshold End wall of the formwork frame. The to the top of the side walls filled stabilizing compound not only underfills the threshold at their ends, but also trims them at theirs End faces, so that these sleepers against side shift are secured.

Weitere Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden Beschreibung und den Zeichnungen, in denen das erfindungsgemäße Verfahren und bevorzugte Ausführungsformen der hierbei verwendeten Schalung und der Beförderungs- und Einbaueinrichtung an Beispielen näher erläutert sind. Es zeigt:

Fig. 1
ein auf einer festen Fahrbahn verlegtes Gleis mit Betonschwellen in verschiedenen Phasen des erfindungsgemäßen Verfahrens mit einem darüberfahrenden leichten Zug der Beförderungs- und Einbaueinrichtung teilweise im Längsschnitt und teilweise in einer Seitenansicht;
Fig. 2
die feste Fahrbahn mit dem Gleis in einer dritten Einbauphase in einem Querschnitt nach Linie II-II;
Fig. 3
einen der Fig. 2 analogen Querschnitt einer etwas anderen Ausführungsform in der Ausrichtungsphase;
Fig. 4
den Gegenstand der Fig. 3 nach dem Einbringen der Stabilisiermasse, wobei die vertikalen Einstell- und Stützmittel und eine der horizontalen Einstellmittel bereits ausgebaut sind;
Fig. 5
eine der Fig. 4 analoge Darstellung einer anderen Ausführungsform von Schalungen für die Stabilisiermittel;
Fig. 6
eine der Fig. 4 analoge Darstellung einer weiteren Ausführungsform mit Stabilisiermasse und Schalungen unter den stirnseitigen Enden der Schwellen und
Fig. 7
einen der für die Schwellenstabilisierung nach Fig. 6 verwendeten Schalungsrahmen aus Streckmetall in einer perspektivischen Darstellung.
Further features and advantages of the invention result from the following description and the drawings, in which the method according to the invention and preferred embodiments of the formwork used here and the conveying and installation device are explained in more detail using examples. It shows:
Fig. 1
a track laid on a solid carriageway with concrete sleepers in various phases of the method according to the invention with a light train of the conveying and installation device traveling over it, partly in longitudinal section and partly in a side view;
Fig. 2
the fixed carriageway with the track in a third installation phase in a cross section according to line II-II;
Fig. 3
one of FIG. 2 cross-section analogous to a somewhat different embodiment in the alignment phase;
Fig. 4
the subject of Figure 3 after the introduction of the stabilizing mass, the vertical adjustment and support means and one of the horizontal adjustment means are already removed.
Fig. 5
one of the 4 analog representation of another embodiment of formwork for the stabilizing agent;
Fig. 6
one of FIG. 4 analog representation of a further embodiment with stabilizing mass and formwork under the front ends of the sleepers and
Fig. 7
one of the formwork frames made of expanded metal used for the threshold stabilization according to FIG. 6 in a perspective view.

In den Zeichnungen ist mit 10 eine feste Fahrbahn für ein Gleis 11 bezeichnet, die im wesentlichen aus vorgefertigten Tragplatten 12 aus Stahlbeton besteht, die auf einer hydraulisch gebundenen Tragschicht 13 verlegt sind, welche den Unterbau der Bahntrasse bildet. Bei dem dargestellten Ausführungsbeispiel haben die Tragplatten 12 einen U-förmigen Querschnitt mit seitlich aufragenden Seitenwangen 14. Die Tragplatten könnten aber auch von ebenen Platten ohne Seitenwangen aus Asphalt oder Beton gebildet werden.In the drawings, 10 is a fixed track for a track 11, which consists essentially of prefabricated support plates 12 consists of reinforced concrete, which is on a hydraulically bound Base layer 13 are laid, which is the substructure of the railway line forms. Have in the illustrated embodiment the support plates 12 have a U-shaped cross section with laterally towering sidewalls 14. The support plates could also formed by flat plates without sidewalls made of asphalt or concrete become.

Bei dem erfindungsgemäßen Verfahren wird das Gleis 11 von Betonschwellen 15 und von Schienen 16 gebildet, die mit Befestigungsmitteln 17, z.B. mit Schwellenschrauben auf den Schwellen 15 lösbar befestigt sind.In the method according to the invention, the track 11 is made of concrete sleepers 15 and formed by rails 16 with fasteners 17, e.g. with sleeper screws on the sleepers 15 are releasably attached.

Bei dem erfindungsgemäßen Verfahren wird das Gleis 11 vormontiert und in großen Längen mit einer Gleiseinbaumaschine in dem von den Tragplatten 12 gebildeten Trog gelegt. Hierbei können die Schwellen 15 unmittelbar auf dem Boden 18 des Troges aufliegen, sie können aber auch mit einem im Bereich der Schienen auf den Boden der Tragplatten gelegten Auflagestreifen in geringem Abstand vom Boden des Troges gehalten werden, die hier jedoch nicht dargestellt sind.In the method according to the invention, the track 11 is preassembled and in great lengths with a track installation machine in the laid from the support plates 12 formed trough. Here you can the sleepers 15 rest directly on the floor 18 of the trough, but you can also use one in the area of the rails the base of the support plates placed in a small amount Distance from the bottom of the trough should be kept, but here are not shown.

Nach dem Einlegen des Gleises 11, welches die erste Phase des erfindungsgemäßen Verfahrens darstellt und in Fig. 1 im Bereich PH1 dargestellt ist, wird das Gleis horizontal und vertikal ausgerichtet und auf dem Boden 19 der Tragplatten 12 abgestützt.After inserting the track 11, which is the first phase of the represents method according to the invention and in Fig. 1 in the area PH1 is shown, the track is horizontal and vertical aligned and supported on the bottom 19 of the support plates 12.

Das Ausrichten und Abstützen ist in Fig. 1 im Bereich PH2 dargestellt. Es erfolgt entweder mit Hilfe einer über das Gleis 11 hinwegfahrenden Gleisrichtmaschine, oder wie in Fig. 3 dargestellt, manuell mit einzelnen Richt- und Stützvorrichtungen, wie Vertikalspindeln 19, die vertikale Löcher 20 in den Schwellen 15 durchdringen und sich auf dem Boden 18 der Tragplatten 15 abstützen und mit horizontalen Einstellmitteln 21, mit denen die Schwellen in horizontaler Richtung eingestellt werden. Diese horizontalen Einstellmittel 21 sind ebenfalls Schraubenspindeln, die in Gewindehülsen 22 eingreifen, die in den Kopfflächen 23 der Schwellen angeordnet sind. Mit ihrem andern Ende stützen sich die horizontalen Schraubspindeln 21 auf den Seitenwangen 14 der Tragplatten 12 ab.The alignment and support is shown in FIG. 1 in the area PH2. It is done either with the help of a track 11 moving track straightener, or as shown in Fig. 3, manually with individual straightening and supporting devices, such as Vertical spindles 19, the vertical holes 20 in the sleepers 15 penetrate and rest on the bottom 18 of the support plates 15 and with horizontal adjusting means 21 with which the Thresholds can be set in the horizontal direction. This horizontal adjustment means 21 are also screw spindles, which engage in threaded sleeves 22, which in the head surfaces 23rd the thresholds are arranged. Support with the other end the horizontal screw spindles 21 on the side cheeks 14 the support plates 12 from.

Nach dem horizontalen und vertikalen Ausrichten, das in Fig. 1 in dem Bereich PH2 dargestellt ist, wird das Gleis 11 mit Stützmitteln 27 auf dem Boden 18 des Troges abgestützt. Diese Stützmittel 27 können die Vertikalspindeln 19 sein, mit denen die Schwellen 15 bereits in ihrer Höhenlage ausgerichtet wurden. Bei dem in Fig. 1 dargestellten Ausführungsbeispiel sind die Stützmittel jedoch besondere Tragspindeln, die zwischen den Schwellen direkt unter den Schienen angeordnet werden. Anstelle der Tragspindeln können auch Stützböcke aus Beton, Hydraulikstempel oder andere, in der Höhe verstellbare Stützeinrichtungen verwendet werden.After the horizontal and vertical alignment shown in Fig. 1 is shown in the area PH2, the track 11 with support means 27 supported on the floor 18 of the trough. This proppant 27 can be the vertical spindles 19 with which the Thresholds 15 have already been aligned in their altitude. At the embodiment shown in Fig. 1 are the support means however, special support spindles between the sleepers can be arranged directly under the rails. Instead of the support spindles can also support frames made of concrete, hydraulic rams or other height-adjustable supports are used become.

Nach dem horizontalen und vertikalen Ausrichten des Gleises werden unter den Schwellen verlorene Schalungen 24 in Stellung gebracht. Diese Bauphase ist in Fig. 1 im Bereich PH3 dargestellt.After aligning the track horizontally and vertically formwork 24 lost under the sleepers. This construction phase is shown in FIG. 1 in the area PH3.

Die verlorenen Schalungen sind bei dem in den Fig. 1 und 2 dargestellten Ausführungsbeispiel Säcke 24 aus einem grobmaschigen Gewebe, einem Vlies oder aus einer perforierten Folie. Sie werden von einer Beförderungs- und Einbaueinrichtung 25 aus mit einer erhärtenden Stabilisiermasse 26 gefüllt, wie dies im Bereich PH4 in Fig. 1 dargestellt ist.The lost formwork is the one shown in FIGS. 1 and 2 Embodiment bags 24 from a coarse-mesh Fabric, a fleece or a perforated film. you will be from a transport and installation device 25 with a hardening stabilizing mass 26 filled, as in the area PH4 is shown in Fig. 1.

Je nach Art der Fahrbahn ist diese Stabilisiermasse 26 ein Gußasphalt oder ein fließfähiger Zementbeton, dem vorzugsweise ein frühhochfester Zement als Bindemittel zugegeben ist, so daß die Stabilisiermasse 26 schon bald nach ihrem Einfüllen in die Säcke 24 erhärtet. Die Stabilisiermasse 26 wird mit Hilfe einer Injektionslanze oder eines Injektionsschlauches 28 mit Überdruck in die Sackschalungen 24 gefüllt. Hierdurch kann die Luft aus den Säcken 24 entweichen und nach dem vollständigen Füllen der Säcke 14 kann etwas Stabilisiermasse durch die Maschen oder die Perforation des Sackes nach außen dringen und dort erhärten. Beim nachfolgenden Einbringen des Füllbetons verbindet sich dieser dann mit dem nach außen gedrungenen Stabilisiermaterial und es gibt eine gute Verzahnung zwischen beiden Materialien.Depending on the type of roadway, this stabilizing compound 26 is a mastic asphalt or a flowable cement concrete, which is preferably a early high strength cement is added as a binder, so that the Stabilizing compound 26 soon after it is filled into the sacks 24 hardened. The stabilizing mass 26 is using an injection lance or an injection hose 28 with excess pressure in the bag formwork 24 filled. This allows the air from the Bags 24 escape and after the bags are completely filled 14 can some stabilizing mass through the mesh or perforation of the sack to the outside and harden there. At the Subsequent pouring of the filling concrete connects it then with the outward stabilizing material and it gives a good interlock between the two materials.

Durch das Einbringen des Stabilisiermaterials mit Überdruck wird erreicht, daß sich die Stabilisiermasse 26 dicht unter die Schwelle legt und eine gewisse Vorspannung des Stabilisiermaterials erreicht wird, die ein späteres Setzen des Gleises verhindert.By introducing the stabilizing material with overpressure achieved that the stabilizing mass 26 just below the Threshold sets and a certain preload of the stabilizing material is reached, which prevents later setting of the track.

Das Einfüllen der Stabilisiermasse in die Schalungen ist in Fig. 1 im Bauabschnitt PH4 dargestellt.The filling of the stabilizing compound into the formwork is shown in Fig. 1 shown in phase PH4.

Sobald die Stabilisiermasse 26 soweit erhärtet ist, daß sie die Last des Gleises und der darüberfahrenden Beförderungs- und Einbaueinrichtung auf die Tragplatten 12 übertragen kann, werden die Befestigungsmittel 17 der Schienen 16 soweit gelöst, daß sich die Schienen 16 in ihrer Längsrichtung auf den Betonschwellen 15 bewegen können und auf diese keine Längskräfte mehr übertragen, wenn sie sich infolge von Temperatureinwirkungen längen oder verkürzen. Anschließend können auch die Vertikalspindeln 19, die horizontalen Einstellmittel 21 oder andere Stützmittel entfernt werden. Dieser Verfahrensabschnitt ist in Fig. 1 im Bereich PH5 dargestellt.As soon as the stabilizing compound 26 has hardened to the extent that it Load of the track and the transport and installation equipment traveling over it can be transferred to the support plates 12 the fasteners 17 of the rails 16 solved so far that the rails 16 in their longitudinal direction on the concrete sleepers 15 can move and no longer transmit longitudinal forces, if they lengthen due to the effects of temperature or shorten it. Then the vertical spindles can also be used 19, the horizontal adjustment means 21 or other support means be removed. This process section is in the area in FIG. 1 PH5 shown.

Die in Fig.1 nur schematisch dargestellte Beförderungs- und Einbaueinrichtung 25 besteht aus zu einem Zug zusammengestellten leichten Wagen 29 und 30, die von einer kleinen Zugmaschine 31, beispielsweise einer Draisine in Einbaurichtung 32 über das soeben verlegte Gleis 11 gezogen werden. Der Wagen 29 trägt einen Vorratsbehälter 33 für die Stabilisiermasse oder deren Ausgangsstoffe, beispielsweise eine Mischung aus trockenen Zuschlagstoffen und Zement, die über einen Förderer 34 in einen Mischer 35 gegeben werden, der zusammen mit einem Wassertank 36 auf dem zweiten Wagen 30 angeordnet ist und unter Zugabe von Wasser die fließfähige Stabilisiermasse herstellt, die dann durch den Injektionsschlauch 28 in die Schalungen 24 eingefüllt wird.The transport and shown only schematically in Fig.1 Installation device 25 consists of a train light wagons 29 and 30 by a small tractor 31, for example a draisine in the installation direction 32 over the just laid track 11 are pulled. The carriage 29 carries a reservoir 33 for the stabilizing mass or its Starting materials, for example a mixture of dry additives and cement fed into a conveyor via a conveyor 34 Mixer 35 are given, together with a water tank 36 is arranged on the second carriage 30 and with the addition of Water creates the flowable stabilizing mass, which then filled into the formwork 24 through the injection hose 28 becomes.

Nach dem vollständigen Erhärten der Stabilisiermasse 26 kann das Gleis 11 dann von einer schweren Betonmisch- und -fülleinrichtung befahren werden, die den Füllbeton 37 zwischen den Schwellen 15 und den Seitenwangen 14 der Tragplatten 12 einbringt. Die Schienenbefestigungsmittel 17 können bei günstiger Witterung, d.h. wenn nur geringe Temperaturdifferenzen während des Einbringens des Füllbetons 37 zu erwarten sind, schon unmittelbar vor dem Einbringen des Füllbetons wieder festgezogen werden, an heißen Tagen ist es jedoch zweckmäßiger, mit dem Festziehen der Schienenbefestigungsmittel und dem Verschweißen der Schienenstöße solange zu warten, bis der Füllbeton 37 vollständig erhärtet ist und auch die von den Schienen auf die Schwellen ausgeübten Längskräfte aufnehmen kann. Diese letzte Bauphase des erfindungsgemäßen Verfahrens ist in Fig. 1 im Bereich PH6 dargestellt.After the stabilizing compound 26 has completely hardened, this can be done Track 11 then from a heavy concrete mixing and filling device be driven, the filling concrete 37 between the thresholds 15 and the side cheeks 14 of the support plates 12. The Rail fasteners 17 can with favorable weather, i.e. if only slight temperature differences during insertion of the filling concrete 37 are to be expected, immediately before the filling concrete are tightened again, called hot Days, however, it is more convenient to tighten the Rail fasteners and the welding of the rail joints to wait until the filling concrete 37 hardens completely is and also those exerted by the rails on the sleepers Can absorb longitudinal forces. This last construction phase of the invention The method is shown in FIG. 1 in the area PH6.

In den Fig. 4 bis 7 sind andere Ausführungsformen dargestellt, bei denen die verlorene Schalung unter den Schwellen 15 nicht von Säcken, sondern von Schalungsrahmen 38 gebildet wird, die jeweils zwei Seitenwände 39 und 40 und Stirnwände 41 und 42 aufweisen. Die Seitenwände 39 und 40 und die Stirnwände 41 und 42 bestehen aus Streckmetall.4 to 7 show other embodiments, where the lost formwork under the thresholds 15 is not of bags, but is formed by formwork frame 38, the each have two side walls 39 and 40 and end walls 41 and 42. The side walls 39 and 40 and the end walls 41 and 42 consist of expanded metal.

Bei dem in Fig. 4 dargestellten Ausführungsbeispiel ist der Schalungsrahmen 38 etwas größer als die Grundfläche der Schwelle 15, so daß er über die Seitenflächen 43 und die Kopfflächen 23 der Schwelle 15 vorsteht. Der Schalungsrahmen 38 kann hierdurch leicht von oben her befüllt werden, wobei die Stabilisiermasse 26 auch etwas über die Seitenflächen 43 und die Kopfflächen 23 der Schwelle 15 hochsteigen und diese am unteren Rand auch seitlich umfassen kann (Fig. 4). In the embodiment shown in Fig. 4 is the Formwork frame 38 slightly larger than the base of the threshold 15 so that it over the side surfaces 43 and the top surfaces 23rd the threshold 15 protrudes. The formwork frame 38 can thereby can be easily filled from above, using the stabilizing compound 26 also somewhat over the side surfaces 43 and the top surfaces 23 climb the threshold 15 and this at the bottom also sideways may include (Fig. 4).

Bei der Ausführungsform nach Fig. 5 sind unter den Schwellen 15 zwei Schalungsrahmen 38 angeordnet, die jeder nur eine begrenzte Länge l 1 haben und die im Bereich der Schienen 16 unter den schwellen 15 angeordnet sind. Die Stirnwände 41 und 42 sowie eine Seitenwand 40 dieser Schalungsrahmen sind nicht höher als der Abstand a zwischen der Unterseite einer Schwelle 15 und dem Boden 18 der Tragplatten 12 nach dem Ausrichten der Schwellen. Hierdurch passen diese Schalungsrahmen zwischen Tragplatte 12 und Schwelle 15 und können von der Seite her unter die in der Höhe ausgerichteten Schwellen geschoben werden. Die zweite Seitenwand 39 steht über die Seitenfläche der Schwelle 15 vor und kann auch etwas über deren Unterkante hinausragen, um das Befüllen mit Stabilisiermasse 26 zu erleichtern.In the embodiment according to FIG. 5, two formwork frames 38 are arranged under the sleepers 15, each of which has only a limited length l 1 and which are arranged under the sleepers 15 in the region of the rails 16. The end walls 41 and 42 and a side wall 40 of these formwork frames are not higher than the distance a between the underside of a threshold 15 and the bottom 18 of the support plates 12 after the thresholds have been aligned. As a result, these formwork frames fit between the support plate 12 and the threshold 15 and can be pushed from the side under the vertically aligned thresholds. The second side wall 39 protrudes beyond the side surface of the threshold 15 and can also protrude somewhat beyond the lower edge thereof in order to facilitate filling with the stabilizing compound 26.

Die Ausführungsform nach Fig. 5 hat den Vorteil, daß alle Schwellen im Bereich der Schienen unterstützt werden und die auf die Schienen ausgeübten Radlasten, ebenso wie bei der in Fig. 4 dargestellten Ausführungsform auch, unmittelbar in den Untergrund eingeleitet werden.5 has the advantage that all Thresholds in the field of rails are supported and on the wheel loads exerted on the rails, as in the case of FIG. 4 illustrated embodiment also, directly into the underground be initiated.

Bei der in den Fig. 6 und 7 dargestellten Ausführungsform sind Schalungsrahmen 38 nur an den Schwellenenden 44 angeordnet und untergreifen diese nur in einem schmalen Bereich begrenzter Länge l2. Die eingefüllte Stabilisiermasse 26 füllt den Abstand a zwischen dem Boden 18 des Troges und der Schwellenunterseite 52 deshalb nur in dem Bereich begrenzter Länge l2 aus.In the embodiment shown in FIGS. 6 and 7, formwork frames 38 are arranged only at the threshold ends 44 and only reach under them in a narrow area of limited length l 2 . The filled stabilizing mass 26 therefore fills the distance a between the bottom 18 of the trough and the underside 52 of the threshold only in the region of limited length l 2 .

Da nach dem späteren, vollständigen Unterfüllen der Schwelle 15 mit Füllbeton 37 zwischen den Stabilisierbetonplomben 26 ein Schwinden des erhärteten Füllbetons zu erwarten ist, wird unter den Enden 44 der Schwellen 15 in den Bereichen begrenzter Länge l2 je ein Setzstreifen 51 aus einem Faservlies angeordnet, dessen Dicke d mindestens dem Schwindmaß des später unter der Schwelle 15 angebrachten Füllbetons 37 entspricht. Dieser Setzstreifen 51 kann beim Herstellen der Betonschwelle in deren Schalung eingelegt und an die Schwelle anbetoniert werden, es ist aber auch möglich, diese Setzstreifen 51 unter die fertigen Schwellen 15 zu kleben. Since after the later complete underfilling of the threshold 15 with filler concrete 37 between the stabilizing concrete seals 26, a hardening of the hardened filler concrete is to be expected, a set strip 51 made of a nonwoven fabric is arranged under the ends 44 of the sleepers 15 in the areas of limited length l 2 , the thickness d of which corresponds at least to the shrinkage of the filler concrete 37 which is later installed under the threshold 15. This setting strip 51 can be placed in the formwork in the formwork and concreted onto the threshold during the manufacture of the concrete sleeper, but it is also possible to glue these setting strips 51 under the finished sleepers 15.

Die Schalungsrahmen 38 haben zwei Seitenwände 39 und 40 und eine Stirnwand 45 aus Streckmetall. Die Stirnwand 45 füllt den Abstand a zwischen Schwelle 15 und Tragplatte 12 aus und hat an ihrem oberen Rand 46 eine abgebogene Lasche 47, die mit der Stirnwand 45 aus einem Stück besteht und beim Einbau des Schalungsrahmens sich unter die Schwelle legt. Wie aus Fig. 6 hervorgeht, reichen die Seitenwände 39 und 40 der Schalungsrahmen 38 bis an die Innenflächen 48 der Seitenwangen 14 der Tragplatten 12 und sind an ihren unteren Ecken 49 durch einen Holm 50 miteinander verbunden. Wenn die Tragplatten 12 keine Seitenwangen 14 haben, ist der Schalungsrahmen 38 auch an seiner Rückseite mit einer zweiten Stirnwand aus Streckmetall versehen. Man erkennt, daß die Schalungsrahmen aus Streckmetall leicht hergestellt werden können und bei ihrer verhältnismäßig geringen Höhe auch ausreichend stabil sind, um den Flüssigkeitsdruck der eingefüllten Stabilisiermasse aufzunehmen. Diese kann bei geeigneter Konsistenz zwischen den Rippen der Streckmetallwände teilweise hindurchtreten und auch auf den Außenseiten der Schalungsrahmen erhärten und dort eine rauhe Oberfläche bilden, die sich mit dem später zwischen die Schwellen einzufüllenden Füllbeton verzahnt.The formwork frames 38 have two side walls 39 and 40 and an end wall 45 made of expanded metal. The end wall 45 fills the distance a between the threshold 15 and the support plate 12 and has at its upper edge 46 a bent tab 47, which is made in one piece with the end wall 45 and lies under the threshold when the formwork frame is installed. As can be seen from FIG. 6, the side walls 39 and 40 of the formwork frames 38 extend to the inner surfaces 48 of the side cheeks 14 of the support plates 12 and are connected to one another at their lower corners 49 by a spar 50. If the support plates 12 have no side walls 14, the formwork frame 38 is also provided on its rear side with a second end wall made of expanded metal. It can be seen that the formwork frames can easily be made of expanded metal and, at their relatively low height, are also sufficiently stable to absorb the liquid pressure of the stabilizing composition filled. With a suitable consistency, this can partially pass through between the ribs of the expanded metal walls and also harden on the outer sides of the formwork frames and form a rough surface there, which interlocks with the filling concrete that will later be filled in between the sleepers.

Die Erfindung ist nicht auf das beschriebene Verfahren und die dargestellten und beschriebenen Ausführungsbeispiele der verwendeten Schalungen, Einrichtungen und Geräte beschränkt, sondern es sind mehrere Ergänzungen und Änderungen möglich, ohne den Rahmen der Erfindung zu verlassen. Beispielsweise ist es möglich, andere erhärtende Stabilisiermaterialien, beispielsweise kunststoffmodifizierte Betone oder bitumengebundene Massen zu verwenden, die heiß eingebaut werden und bei ihrer Abkühlung erhärten. Ferner können zum Füllen und Instellungbringen der als verlorene Schalung dienenden Säcke Injektionslanzen verwendet werden, auf welche die Säcke aufgesteckt und mit denen sie unter die Schwellen geschoben werden. Schließlich ist es auch möglich, die Schwellen für den Endzustand auch auf andere Weise fest mit dem Untergrund zu verbinden, beispielsweise in Dübeln festzuschrauben, die in den Tragplatten der festen Fahrbahn angeordnet werden.The invention is not based on the described method and the illustrated and described embodiments of the used Formwork, facilities and equipment limited, but several additions and changes are possible without the Leave the scope of the invention. For example, it is possible other hardening stabilizing materials, for example plastic-modified concretes or bitumen-bound masses use that are installed hot and harden when they cool down. Furthermore, for filling and positioning the as Injection lances used for lost formwork sacks on which the sacks are placed and with which they are placed the thresholds are pushed. Finally, it is also possible the thresholds for the final state are also fixed in another way to connect the subsurface, for example screwing it into dowels, which are arranged in the support plates of the slab track become.

Claims (16)

Verfahren zum Einbauen eines aus Schienen und Schwellen bestehenden Gleises auf Tragplatten einer festen Fahrbahn, wobei das Gleis zunächst mit vertikalen und horizontalen Einstellmitteln vertikal und horizontal ausgerichtet und an Stützmitteln abgestützt wird, dadurch gekennzeichnet, daß die Schwellen (15) nach dem Ausrichten durch mindestens teilweises Unterfüllen mit einer erhärtenden Stabilisiermasse (26) stabilisiert werden, daß dann die Schienen (16) auf den Schwellen (15) gelöst und erst bei oder nach dem endgültigen und dauerhaften Befestigen der Schwellen (15) auf den Tragplatten (12) der festen Fahrbahn (10) wieder fest mit den Schwellen (15) verbunden werden.Method for installing a track consisting of rails and sleepers on supporting plates of a fixed carriageway, the track being first aligned vertically and horizontally with vertical and horizontal adjusting means and supported on support means, characterized in that the sleepers (15) after alignment by at least partially Underfilling with a hardening stabilizing compound (26) are stabilized so that the rails (16) on the sleepers (15) are released and only after or after the final and permanent fastening of the sleepers (15) on the support plates (12) of the solid carriageway ( 10) are firmly connected to the sleepers (15) again. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Einstellmittel (19, 21) und/oder die Stützmittel (27) nach dem Erhärten der Stabilisiermasse (26) wieder entfernt werden.Method according to Claim 1, characterized in that the setting means (19, 21) and / or the support means (27) are removed again after the stabilizing composition (26) has hardened. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß als Stabilisiermasse (26) gießfähiger Asphalt- oder Zementbeton verwendet wird.Method according to claim 1 or 2, characterized in that pourable asphalt or cement concrete is used as the stabilizing mass (26). Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Stabilisiermasse (26) unter den Schwellen (15) auf deren ganzer Länge angeordnet wird.Method according to one of claims 1 to 3, characterized in that the stabilizing mass (26) is arranged under the sleepers (15) over their entire length. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Stabilisiermasse (26) unter den Schwellen (15) nur in begrenzter Länge (l1) unter den Lagerstellen der Schienen (16) angeordnet wird.Method according to one of claims 1 to 3, characterized in that the stabilizing mass (26) is arranged under the sleepers (15) only to a limited length (l 1 ) under the bearing points of the rails (16). Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Stabilisiermasse (26) unter den Schwellen (15) nur in begrenzter Länge (l2) unter den Enden (44) und vor einem Teil der Kopfflächen (23) der Schwellen (15) angeordnet wird. Method according to one of claims 1 to 3, characterized in that the stabilizing mass (26) under the sleepers (15) is only of limited length (l 2 ) under the ends (44) and in front of part of the head surfaces (23) of the sleepers ( 15) is arranged. Verfahren nach Anspruch 6, dadurch gekennzeichnet, daß unter den Enden (44) der Schwellen (15) in den Bereichen begrenzter Länge (l2) Setzstreifen (51) aus zusammendrückbarem Material angeordnet werden, deren Dicke (d) mindestens ebenso groß ist wie das Schwindmaß des später unter der Schwelle (15) angebrachten Füllbetons (37).A method according to claim 6, characterized in that under the ends (44) of the sleepers (15) in the areas of limited length (l 2 ), setting strips (51) of compressible material are arranged, the thickness (d) of which is at least as great as that Shrinkage of the filling concrete (37), which was later installed under the threshold (15). Verfahren nach Anspruch 7, dadurch gekennzeichnet, daß die Setzstreifen (51) aus auf der Schwellenunterseite (52) aufgeklebten oder einbetonierten Faservliesstreifen bestehen.A method according to claim 7, characterized in that the setting strips (51) consist of non-woven fiber strips glued or concreted on to the underside of the threshold (52). Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß die Stabilisiermasse (26) mit einer Beförderungs- und Einbaueinrichtung (25) zugeführt und eingebaut wird, die auf dem verlegten Gleis (11) nach dessen Ausrichtung entlangfährt.Method according to one of claims 1 to 8, characterized in that the stabilizing mass (26) is fed and installed with a conveying and installation device (25) which travels along the laid track (11) after its alignment. Verlorene Schalung zum Einbauen einer erhärtenden, fließfähigen Masse unter den Schwellen eines Gleises auf einer festen Fahrbahn, gekennzeichnet durch einen Sack (24) aus einem für die erhärtende Masse (26) teildurchlässigen Material.Lost formwork for installing a hardening, flowable mass under the sleepers of a track on a solid carriageway, characterized by a sack (24) made of a material which is partially permeable to the hardening mass (26). Schalung nach Anspruch 10, dadurch gekennzeichnet, daß der Sack (24) aus einem grobmaschigen Gewebe, einem Vlies oder einer perforierten Folie besteht.Formwork according to claim 10, characterized in that the sack (24) consists of a coarse-mesh fabric, a fleece or a perforated film. Schalung nach Anspruch 10 oder 11, dadurch gekennzeichnet, daß der Sack (24) mit einem Injektionsschlauch (28) oder einer Injektionslanze verbindbar ist, die ihn mit der erhärtenden Masse (26) füllt.Formwork according to claim 10 or 11, characterized in that the sack (24) can be connected to an injection hose (28) or an injection lance which fills it with the hardening mass (26). Verlorene Schalung zum Einbauen einer fließfähigen, erhärtenden Masse unter den Schwellen eines Gleises auf den Tragplatten einer festen Fahrbahn, gekennzeichnet durch einen Schalungsrahmen (38) mit Seitenwänden (39, 40) aus Streckmetall, der zwischen Tragplatte (12) und Schwelle (15) paßt und über mindestens eine Seitenfläche (43) oder eine Kopffläche (23) der Schwelle (15) vorsteht.Lost formwork for installing a flowable, hardening mass under the sleepers of a track on the support plates of a solid carriageway, characterized by a formwork frame (38) with side walls (39, 40) made of expanded metal, which fits between the support plate (12) and the threshold (15) and protrudes beyond at least one side surface (43) or a top surface (23) of the threshold (15). Schalung nach Anspruch 13, dadurch gekennzeichnet, daß der Schalungsrahmen (38) zwei Seitenwände (39, 40) und mindestens eine Stirnwand (45) aufweist und daß die Stirnwand (45) den Abstand (a) zwischen Schwelle (15) und Tragplatte (12) wenigstens annähernd ausfüllt und am oberen Rand eine abgebogene Lasche (47) aufweist, die sich unter die Schwelle (15) legt und daß die Seitenwände (39, 40) und ggf. eine zweite Stirnwand höher sind als die unter die Schwelle (15) reichende Stirnwand (45) des Schalungsrahmens (38).Formwork according to claim 13, characterized in that the formwork frame (38) has two side walls (39, 40) and at least one end wall (45) and that the end wall (45) the distance ( a ) between the threshold (15) and the support plate (12 ) at least approximately fills and has a bent tab (47) on the upper edge, which lies under the threshold (15) and that the side walls (39, 40) and possibly a second end wall are higher than those under the threshold (15) reaching end wall (45) of the formwork frame (38). Beförderungs- und Einbaueinrichtung zum Zuführen und Einbauen einer fließfähigen, erhärtenden Stabilisiermasse unter den Schwellen eines Gleises auf einer festen Fahrbahn, gekennzeichnet durch zu einem Zug zusammengestellte, leichte Wagen (29, 30), die auf dem verlegten, ausgerichteten Gleis (11) fahren und welche Vorratsbehälter (33) für die Masse (26) oder deren Ausgangsstoffe, ein Rührwerk oder einen Mischer (35) und die Einbaugeräte (28) für die Masse (26) tragen und von einer kleinen Zugmaschine (31) und ggf. Energieerzeuger in Einbaurichtung (32) des Gleises (11) bewegt werden.Transport and installation device for supplying and installing a flowable, hardening stabilizing mass under the sleepers of a track on a solid carriageway, characterized by light carriages (29, 30) assembled to form a train, which travel on the laid, aligned track (11) and which storage containers (33) for the mass (26) or their starting materials, an agitator or a mixer (35) and the built-in devices (28) for the mass (26) and a small tractor (31) and possibly energy generator in the direction of installation (32) of the track (11) can be moved. Beförderungs- und Einbaueinrichtung nach Anspruch 15, dadurch gekennzeichnet, daß die Zugmaschine (31) eine Draisine ist.Transport and installation device according to claim 15, characterized in that the tractor (31) is a trolley.
EP19990122720 1998-12-01 1999-11-16 Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method Withdrawn EP1022386A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE1998155350 DE19855350A1 (en) 1998-12-01 1998-12-01 Method to construct railway track on base plates of permanent ways uses setting stabilizer asphalt etc. to stabilizer sleepers, to which rails are fastened after setting
DE19855350 1998-12-01

Publications (1)

Publication Number Publication Date
EP1022386A2 true EP1022386A2 (en) 2000-07-26

Family

ID=7889592

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19990122720 Withdrawn EP1022386A2 (en) 1998-12-01 1999-11-16 Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method

Country Status (2)

Country Link
EP (1) EP1022386A2 (en)
DE (1) DE19855350A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT500982B1 (en) * 2003-04-23 2006-05-15 Rte Technologie Gmbh METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
JP2016223239A (en) * 2015-06-03 2016-12-28 神東塗料株式会社 Bag body for forming filling layer
JP2016223240A (en) * 2015-06-03 2016-12-28 神東塗料株式会社 Bag body for forming filling layer

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1048783A1 (en) 1999-04-29 2000-11-02 Bahnbau Wels GmbH Railway track and its construction method
DE10039493C1 (en) * 2000-08-12 2002-01-31 Bahnbau Wels Gmbh Wels Method, for manufacturing fixed track for railway vehicle, involves using support bodies to support support elements for rails and connecting them to rail sub-construction by concrete casting
DE10046479B4 (en) * 2000-09-20 2004-05-27 Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg Two-block concrete sleeper for fixed rail tracks
WO2003002817A1 (en) * 2001-05-16 2003-01-09 Peter Gunter Kusel Panels or beams for tubular railway track
DE10343628B4 (en) * 2003-09-20 2007-08-09 Heitkamp Rail Gmbh Device for lifting and aligning track grids
DE102005027758B3 (en) * 2005-06-15 2007-03-08 Rte Technologie Gmbh Method of renewing a track laid by means of sleepers and a threshold for use in the method
DE102006044970B4 (en) * 2006-09-23 2012-06-21 FITR-Gesellschaft für Innovation im Tief- und Rohrleitungsbau Weimar mbH Method for sealing endangered dyke areas and embankments in the event of flooding
CN111218860A (en) * 2020-03-02 2020-06-02 中铁二院工程集团有限责任公司 Ballastless track railway deformation adjusting embankment structure and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4947756A (en) * 1988-08-18 1990-08-14 Peter G. Kusel Laying railway track
DE3901347A1 (en) * 1989-01-18 1990-07-26 Heilit & Woerner Bau Ag METHOD AND DEVICE FOR MANUFACTURING A GRAVEL-FREE TRACK CONSTRUCTION
DE4324301A1 (en) * 1993-07-20 1995-01-26 Heilit & Woerner Bau Ag Arrangement and method for producing a ballastless track superstructure
DE4335877A1 (en) * 1993-10-18 1995-04-20 Betonwerk Rethwisch Gmbh Ballast-less superstructure with concrete sleepers
DE4340440A1 (en) * 1993-11-27 1995-06-01 Weiss Gmbh & Co Leonhard Adjusting and firmly fixing rail and sleeper track over solid way
DE4430769C2 (en) * 1994-08-30 2001-05-03 Dyckerhoff & Widmann Ag Railway superstructure with a track grating supported on a continuous support plate made of reinforced concrete

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT500982B1 (en) * 2003-04-23 2006-05-15 Rte Technologie Gmbh METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
JP2016223239A (en) * 2015-06-03 2016-12-28 神東塗料株式会社 Bag body for forming filling layer
JP2016223240A (en) * 2015-06-03 2016-12-28 神東塗料株式会社 Bag body for forming filling layer

Also Published As

Publication number Publication date
DE19855350A1 (en) 2000-06-15

Similar Documents

Publication Publication Date Title
DE2639812C3 (en) Prefabricated building element for the production of ceilings and / or walls as well as method and device for the production thereof
DE69924777T2 (en) Method for producing a track superstructure
DE2306428A1 (en) RAILWAY TRACK
EP1022386A2 (en) Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method
EP0635603A1 (en) Method and device for constructing a ballastless superstructure
EP0894898B1 (en) Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support
DE10004194C2 (en) Process for the production of a fixed railroad track on a bridge
DE2614036A1 (en) EQUIPMENT FOR MANUFACTURING PRE-FABRICATED ELEMENTS FROM STRENGTHENED CONCRETE WITH IMMEDIATE BONDING
DE4442498A1 (en) Mobile concreting machine
EP1169516B1 (en) Method for renewing railway lines
EP1576240B1 (en) Method for constructing a rigid track and a communication track
DE19627468A1 (en) Grooved rail for tram track embedded in street - is enclosed by polyurethane reaction mixture introduced into formwork
DE102012009284B4 (en) Process for the rehabilitation of a solid road / solidified gravel railway
DE10312351A1 (en) Method and device for the production of a particularly solid track for rail vehicles
AT500982B1 (en) METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
EP1191145B1 (en) Process and apparatus for connection of a track comprising rails and discrete bearing blocks with a fixed substructure of the track
AT500950A4 (en) METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES
DE19522478C2 (en) Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process
DE3047650A1 (en) METHOD AND DEVICE FOR PRODUCING A CONCRETE PANEL
DE102012103001A1 (en) Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway
EP1636424A1 (en) Method for producing a rail track for rail vehicles
EP1736599A1 (en) Method for construction of tracks for railways or the like
AT512274B1 (en) DEVICES AND METHOD FOR THE CONTINUOUS RENOVATION OF A TRAVEL BED AND ITS UNDERBUILDING
DE102022100899A1 (en) PROCESS FOR MANUFACTURING A PAPER EDGE
EP0751259B1 (en) Method and device for making recesses in asphalt layers

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20020601