AT500982B1 - METHOD FOR LAYING A TRACK OF A FIXED RAILWAY - Google Patents

METHOD FOR LAYING A TRACK OF A FIXED RAILWAY Download PDF

Info

Publication number
AT500982B1
AT500982B1 AT0061703A AT6172003A AT500982B1 AT 500982 B1 AT500982 B1 AT 500982B1 AT 0061703 A AT0061703 A AT 0061703A AT 6172003 A AT6172003 A AT 6172003A AT 500982 B1 AT500982 B1 AT 500982B1
Authority
AT
Austria
Prior art keywords
rail
track
rails
yokes
yoke
Prior art date
Application number
AT0061703A
Other languages
German (de)
Other versions
AT500982B8 (en
AT500982A4 (en
Inventor
Peter Strolz
Christian Ing Schreiber
Hubert Dipl Ing Rhomberg
Original Assignee
Rte Technologie Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rte Technologie Gmbh filed Critical Rte Technologie Gmbh
Priority to AT0061703A priority Critical patent/AT500982B8/en
Priority to CH00676/04A priority patent/CH695568A5/en
Priority to DE200410019083 priority patent/DE102004019083A1/en
Application granted granted Critical
Publication of AT500982B1 publication Critical patent/AT500982B1/en
Publication of AT500982A4 publication Critical patent/AT500982A4/en
Publication of AT500982B8 publication Critical patent/AT500982B8/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

2 AT 500 982 B1 Für die Herstellung von sogenannten "festen Fahrbahnen" mit Geleisen für Schienenfahrzeuge der verschiedensten Art ist es im Hinblick auf die heute angestrebten hohen Fahrgeschwindigkeiten erforderlich, das Gleisgestänge sowohl bezüglich Höhe als auch Richtung mit einer Genauigkeit von +/- 0,1 mm einzurichten und es in der eingerichteten Position für das Untergie-5 ßen mit einer Bindemittelmasse, insbesondere Beton oder Mörtel, exakt positioniert festzuhalten.2 AT 500 982 B1 For the production of so-called " fixed carriageways " with rails for rail vehicles of various kinds, it is necessary in view of today high speeds aimed to set up the track linkage both in height and direction with an accuracy of +/- 0.1 mm and it in the set position for the under-5 ßen with a binder material, in particular concrete or mortar, accurately positioned hold.

Es sind schon verschiedene Verfahren zur Verlegung von Geleisen mit festen Fahrbahnen bekannt geworden: 10Various methods have already been known for laying tracks with fixed tracks: 10

So beschreibt die US 5285964 A ein Verfahren zum Verlegen von Geleisen, wobei die Geleise in einer vertieften Trasse positioniert, und dann deren Schwellen zur Befestigung mit Beton umgegossen werden, wobei Schwellen mit Mitteln zur Einstellung von deren Länge eingesetzt werden und dieselben auf dem Grund der Trasse jeweils in einer Lage abgelegt werden, welche 15 dem jeweils gewünschten Schweilenabstand entspricht. Dann werden die Schienen auf provisorischen Unterlageblöcke od. dgl. abgelegt, mit deren Hilfe eine vorläufige Roh-Horizontal- und -Vertikal-Positionierung derselben vorgenommen wird, wonach die Schwellen angehoben und an den Schienen mittels Schwellenschrauben mit von den Schwellen nach unten ragenden Verankerungsdübeln gehaltenen Schienenbefestigungsteilen befestigt werden. In die Schwellen 20 werden Vertikal- bzw. Höhenpositions-Einstellschrauben eingeschraubt, unterhalb von deren Enden, auf dem Grund der Trasse Tragplatten für die Abstützung dieser Einstell-Schrauben angeordnet sind. Danach werden die Gleise mittels der genannten Vertikal-Einstellschrauben in die jeweils vorgesehene Stellung gebracht, wonach die Spurweite des Geleises mittels der Längen-Einstellmittel der Schwellen eingestellt wird, und schließlich werden die Schwellen mit 25 Beton umgossen, nach dessen Erhärtung die Höhenpositions-Einstellschrauben entfernt werden.Thus, US Pat. No. 5,285,964 A describes a method for laying tracks, wherein the tracks are positioned in a recessed line, and then their sleepers are recasted for attachment to concrete, wherein sleepers are employed with means for adjusting their length and the same at the bottom Path are stored in each case in a position which corresponds to 15 each desired Schweilabstand. Then the rails od on provisional pad blocks. Like. Placed, with the help of a preliminary raw horizontal and vertical positioning of the same is made, after which the thresholds raised and held on the rails by means of sleeper screws with anchoring dowels down from the thresholds Rail fastening parts are attached. In the thresholds 20 vertical or height adjustment screws are screwed, below the ends, are arranged at the bottom of the route support plates for supporting these adjustment screws. Thereafter, the tracks are brought by means of said vertical adjusting screws in the respective intended position, after which the track of the track is adjusted by means of the length adjustment of the thresholds, and finally the sleepers are encapsulated with 25 concrete, after the hardening of the height position adjustment screws removed become.

Die FR 2657096 A1 beschreibt eine Einrichtung zum Verlegen und insbesondere zum Richten von Eisenbahngeleisen, welche zwei quer zum Verlauf der Schienen anzuordnende, relativ 30 zueinander kontrolliert linear-verschiebbare Führungselemente, umfasst, deren erstes sich auf einem z.B. mit Beton gebildeten Untergrund oder einer derartigen Plattform abstützend ausgebildet ist, und deren zweites mit Platten für die Aufnahme der Schienenfüße gebildet ist, wobei das letztgenannte Führungselement mittels Mutter/Schrauben-Abstandsregulierorgan in eine jeweils vorgesehene Relativstellung zum erstgenannten verbringbar ist. Die zwischen den an 35 den Geleisen unterseitig montierten Schwellenblöcken angeordnete Richt-Einrichtung wird mittels schraub-höhenverstellbaren Abstützfüßen gegen den Untergrund abgestützt, und mit dieser Richt-Einrichtung werden die Geleise mit den an denselben unterseitig schon montierten Schwellenblöcken einerseits im eine jeweils vorgesehene Horizontal- und Vertikal- bzw. Höhenposition gebracht und dort gehalten, wobei die Kontrolle von Seitenlage, Schienenabstand und 40 Höhenlage des zu verlegenden Gleises mittels computer-gestützter Messeinrichtung erfolgt. Sind die Geleise gemäß den Vorgaben positioniert, so erfolgt schließlich das Umgießen der Schwellenblöcke mit Beton zur Bildung einer festen Fahrbahn unter Fixierung der Geleise.FR 2657096 A1 describes a device for laying and in particular for straightening railroad irons, which comprises two guide elements, which can be arranged transversely to the course of the rails, relatively controlled linearly displaceable guide elements, the first of which lies on a rail. formed with concrete substrate or such a platform is formed supporting, and the second is formed with plates for receiving the rail feet, wherein the latter guide member by means of nut / screw Abstandsregulierorgan in each case provided relative position to the former can be brought. The arranged between the at 35 the tracks underside mounted threshold blocks straightening device is supported by means of screw-height adjustable Abstützfüßen against the ground, and with this straightening device the tracks with the same on the underside already mounted threshold blocks on the one hand in a respectively provided horizontal and Vertical and height position brought and held there, with the control of lateral position, track distance and 40 altitude of the track to be laid by means of computer-aided measuring device. If the tracks are positioned according to the specifications, finally the casting of the sleeper blocks with concrete takes place to form a solid track with fixation of the tracks.

Weiters ist in der EP-1022366 A2 ein Verfahren zum Einbau eines Gleises auf Tragplatten einer 45 festen Fahrbahn beschrieben, wobei das Gleis zunächst mit vertikalen und horizontalen Einstellmitteln vertikal und horizontal ausgerichtet und an Stützmitteln abgestützt wird, dann die Schwellen nach dem Ausrichten durch zumindest teilweises Unterfüllen mit einer erhärtenden Stabilisiermasse, insbesondere Beton, stabilisiert werden, dann die Schienen auf den Schwellen gelöst und erst bei oder nach dem endgültigen und dauerhaften Befestigen der Schwellen so auf den Tragplatten der festen Fahrbahn wieder fest mit den Schwellen verbunden werden. Die vorher erwähnten Einstellmittel, und/oder die Stützmittel werden nach dem Erhärten der Stabilisiermasse entfernt.Furthermore, EP-1022366 A2 describes a method for installing a track on support plates of a fixed track, wherein the track is first aligned vertically and horizontally with vertical and horizontal adjustment means and supported on support means, then the sleepers after alignment by at least partial Underfills are stabilized with a hardening stabilizer, in particular concrete, then the rails are released on the sleepers and only when or after the final and permanent fixing of the sleepers on the support plates of the fixed carriageway are firmly connected to the thresholds again. The aforementioned adjustment means, and / or the support means are removed after hardening of the stabilizer.

Ein weiteres diesbezügliches Verfahren ist z.B. aus der EP 894898 B1 bekannt geworden. Bei 55 diesem bekannten Verfahren geht man davon aus, dass als Untergrund für die feste Fahrbahn 3 AT 500 982 B1 eine sehr exakt betonierte Betontragplatte (Höhentoleranz +5 mm -15 mm) hoher Ebenheit in der Neigung der jeweiligen Kurven-Querüberhöhung des herzustellenden Gleises zur Verfügung steht. 5 Es ist gemäß diesem Verfahren möglich, unter Einsatz standardisierter Betonstützkörper und darauf aufbauender Heberichtkeile mit ca. 25 mm Höhenverstellbarkeit und ca. ± 15 mm seitlicher Verstellbarkeit das Gleis einzurichten.Another related method is e.g. became known from EP 894898 B1. In this known method, it is assumed that as a substrate for the fixed track 3 AT 500 982 B1 a very precisely concreted concrete slab (height tolerance +5 mm -15 mm) high flatness in the inclination of the respective curve transverse cant of the track to be produced Available. 5 According to this method, it is possible to set up the track by using standardized concrete support bodies and subsequent lifting wedges with approx. 25 mm height adjustability and approx. ± 15 mm lateral adjustability.

Da dieses System insgesamt sehr kompakt ist, ist es z.B. für Richtgeräte, wie z.B. für aus dem io Schotteroberbau bekannte Stopfmaschinen befahrbar, es ist jedoch nicht für hohe Belastungen, wie z.B. für Baustoff - wie insbesondere Füll-Betontransporte bis zur Gleis-Einbaustelle geeignet. Reale Anwendung gefunden hat dieses bekannte Verfahren bereits beim Einbau einer festen Fahrbahn auf der Neubaustrecke Hannover-Berlin. is Die Forderungen nach Erhöhung der Fahrgeschwindigkeiten bei gleichzeitiger Erhöhung der Sicherheit, sowie die im Laufe der praktischen Arbeiten im Streckenbau gemachten Erfahrungen führen zu neuen veränderten Anforderungen an die Gleisstrecke selbst und an die Herstellung der festen Fahrbahn, sowohl im Hinblick auf die Exaktheit der Verlegung der Geleise als auch im Hinblick auf Produktivität, Flexibilität und Wirtschaftlichkeit. 20Since this system is very compact overall, it is e.g. for straightening devices, such as for tamping machines known from ballasted superstructure passable, but it is not for high loads, such as. for building materials - such as in particular filling concrete transports to the track installation site suitable. Real application found this known method already in the installation of a fixed carriageway on the new line Hanover-Berlin. The demands for increasing the speeds while increasing safety, as well as the experience gained in the course of practical work in the track construction lead to new changes in the requirements of the track itself and the production of the fixed carriageway, both in terms of the accuracy of the installation Rails as well as in terms of productivity, flexibility and efficiency. 20

So ist beispielsweise der Untergrund einer vom Tunnelrohbau übergebenen Tunnelsohle, welche sowohl Fahrrinnen von den schweren Baumaschinen und Transportfahrzeugen, als auch Betonausbrüche, z.B.: Schlaglöcher, aufweisen kann, sehr uneben, und es bedeutet einen hohen Aufwand, dieselbe, wie für den Aufbau der festen Fahrbahn bisher nötig, zu verebnen. 25Thus, for example, the surface of a transferred from Tunnelrohbau tunnel sole, which can have both fairways of the heavy construction machinery and transport vehicles, as well as concrete eruptions, eg: potholes, very uneven, and it means a lot of effort, the same as for the construction of solid Roadway so far necessary to level. 25

Die Toleranz der Höhe zwischen Schienenunterkante und Oberkante Auflager variiert somit sehr stark, sodass mit standardisierten Betonstützkörpem und darauf aufbauenden Hebe-Richtgeräten bzw. -Systemen die nötigen Höhenkorrekturen nicht mehr bewältigt werden können. Es wäre also bei wie eben beschriebenen "unebenen" Untergründen notwendig, Beton-30 stützkörper mit unterschiedlichen, jeweils individuellen Höhen einzusetzen. Diese Anpassung bzw. Auswahl der Stützkörper könnte auf Grund der stark variierenden Gegebenheiten durch den roh belassenen Untergrund immer erst am Einbauort erfolgen und wäre daher sehr aufwendig. 35 Zusätzlich ist bei diesen Gegebenheiten die nötige Standfestigkeit, sowohl für das Richten als auch für das Befahren auf Grund der Unebenheiten nicht gegeben.The tolerance of the height between the lower edge of the rail and the upper edge of the support therefore varies greatly, so that the required height corrections can no longer be met with standardized concrete support bodies and lifting straightening devices or systems based thereon. So it would be at as just described " uneven " Substrates necessary to use concrete support structures with different, each individual heights. This adaptation or selection of the support body could always be done only at the installation site due to the greatly varying conditions through the raw surface left and would therefore be very expensive. 35 In addition, in these circumstances, the necessary stability, both for straightening and for driving on the bumps not given.

Zusätzlich wird auch die Überhöhung des Gleises, z.B. bei Kurvenstrecken, mit Hilfe eines Stützsystems aufgebaut, wodurch sich zusätzliche Höhendifferenzen aus der Überhöhung des 40 Geleises von bis zu 180 mm (entspricht bis zu 12% Querneigung) ergeben.In addition, the cant of the track, e.g. on curves, built with the help of a support system, resulting in additional height differences from the increase of the 40 track of up to 180 mm (equivalent to up to 12% bank angle).

Als weitere Forderung gilt, dass derart gestützte Gleise mit voller Achslast (22,5 bis 251) für die Versorgung der Baustelle mittels Bauzügen und mit den für die Herstellung des Unterbaus großen Mengen an Füll- bzw. Vergussbeton sowie mit den üblichen Rangierlokomotiven belast-45 bar sein sollen.Another requirement is that such supported tracks with full axle load (22.5 to 251) for the supply of the construction site by means of construction trains and with the production of the substructure large amounts of filling or Vergussbeton as well as the usual shunting locomotives -45 should be bar.

Dies ist vor allem bei der Verlegung von Geleisen in Eisenbahntunnels hoher Länge, wie z.B. im Lötschberg-Basistunnel oder im Gotthard-Basistunnel, von wesentlicher Bedeutung. 50 Da auf Grund der erhöhten Anforderungen an die Tunnelsicherheit in Zukunft vermehrt eingleisige Tunnel gebaut werden, wird dieser Aspekt der Baustellenlogistik immer wichtiger. Es ist also gefordert, dass ein im Wesentlichen unmittelbar vorher und ohne gesonderte Vorbereitung des nach dem Bau eines Tunnel vorliegenden Untergrundes verlegtes Stück des Gleisstrangs nach seiner Verlegung möglichst bald für die Beförderung des an dessen vorderes freies Ende 55 anzuschließenden Gleisstrang-Stückes und für das Heranführen der für das endgültige Gießen 4 AT 500 982 B1 der Fahrbahn notwendigen hohen Mengen an Bindemittelmasse, üblicherweise Regelbeton, zur Verfügung steht.This is especially true when laying tracks in long-length railway tunnels, e.g. in the Lötschberg Base Tunnel or in the Gotthard Base Tunnel. 50 Due to the increased demands on tunnel safety, as more single-track tunnels are built in the future, this aspect of construction site logistics is becoming increasingly important. It is therefore required that a piece of the rail track laid essentially immediately before and without separate preparation of the underground present after the construction of a tunnel after its laying as soon as possible for the carriage of the piece of track strand to be connected to the front free end 55 and for the lead the necessary for the final casting 4 AT 500 982 B1 of the roadway high amounts of binder material, usually regular concrete, is available.

Beim Einsatz von gesonderten Schwellen-Einzelblöcken für jede Schiene an Stelle von Schwel-5 len mit jeweils zwei Schienenauflagern, ist es notwendig, den Abstand der Schienen des Gleises voneinander, also die Spur sowie die Neigung der Schienen durch zusätzliche Hilfsmittel einzustellen.When using separate threshold blocks for each rail instead of Schwel-5 len with two rail supports, it is necessary to adjust the distance of the rails of the track from each other, so the track and the inclination of the rails by additional aids.

Den oben erläuterten Anforderungen kann das bekannte Einbausystem gemäß der obenge-io nannten EP-B1 jedoch wegen seiner geringen Belastbarkeit nicht gerecht werden.However, the known installation system according to the abovementioned EP-B1 can not meet the above-described requirements because of its low load capacity.

Eine wesentliche Aufgabe der vorliegenden Erfindung besteht nun darin, ein Gleis- Verlege-und Einbausystem derart auszubilden, dass die Spur und die Schienenneigung nach der Nutzung als Baugleis bei voller Last auf dem Stützsystem eingehalten werden kann und nach 15 Benützung auch eingehalten wird und anschließend feingerichtet werden kann.An essential object of the present invention is to provide a track laying and installation system in such a way that the track and the rail inclination can be maintained after use as Baugleis at full load on the support system and after 15 use is complied with and then fine can be.

Die zu lösenden Aufgaben und Anforderungen sind kurz zusammengefasst die folgenden:The tasks and requirements to be solved are briefly summarized the following:

Befahrbarkeit des auf etwa 2 mm Genauigkeit vorgerichteten und in dieser Genauigkeit stabili-20 sierten Gleises für den Transport der Gleisjoche sowie von Bau- bzw. Einbau-Hilfsgeräten.Trafficability of the track, which has been prepared to an accuracy of about 2 mm and stabilized in this accuracy, for the transport of the track yokes as well as construction and installation auxiliary equipment.

Befahrbarkeit der auf Stützkörpem verlegten Geleise mit voller Last bis zur Einbaustelle.Trafficability of tracks laid on supporting bodies with full load up to the place of installation.

Positionierung der Gleisjoche auf einem Untergrund mit großen Höhenunterschieden und Un-25 ebenheiten.Positioning the track bumps on a surface with large differences in height and 25 unevenness.

Exaktes Richten und Fixieren des Geleises auf etwa 0,5 mm Genauigkeit bzw. mit einer Stellgenauigkeit von etwa 0,1 mm vor dem endgültigen Festlegen der Geleise und dem Stabilisieren derselben durch Eingießen der Schwellen bzw. Schwellenkörper mittels der die Gleislage letzt-30 lieh dauerhaft fixierenden Verguss-Bindemittelmasse, vorzugsweise Regelbeton.Precise straightening and fixing of the track to about 0.5 mm accuracy or with a positioning accuracy of about 0.1 mm before the final setting of the tracks and stabilizing the same by pouring the threshold or sleeper body by means of which the track last lent permanently fixing potting compound, preferably regular concrete.

Größtmögliche Vereinfachung der Logistik durch weitestgehende Vorbereitung vor dem Einbau der Geleise an der Einbaustelle, also z.B. im Fall langer Tunnels, Durchführung der Montage der Gleisjoche, abseits, jedoch eher in der Nähe der Einbaustelle, wenn genügend Platz vor-35 handen ist, oder aber, wenn, wie bei Tunnelstrecken meist der Fall, vorteilhafterweise außerhalb des Tunnels, sodass nur mehr möglichst wenige Arbeiten an der Einbaustelle, also z.B. im Bereich des offenen Gleisstrang-Endes im Tunnel selbst durchgeführt werden müssen. Im Fall des Baus eingleisiger Gleisstrecken in Tunnels ist hierbei der Vorteil der Vermeidung der besonders schlechten Arbeitsbedingungen bei den in langen Tunnels herrschenden hohen Tem-40 peraturen, der hohen Luftfeuchtigkeit und der durch Abgase belasteten Luft, sowie der Reduktion des Gefahrenpotentiales, das für Personen in Tunnels immer besteht, gegeben.Greatest possible simplification of logistics through the greatest possible preparation prior to the installation of the tracks at the place of installation, e.g. in the case of long tunnels, carrying out the installation of the track yokes, off the beaten track, but near the place of installation, if there is enough space, or if, as is usually the case with tunnels, advantageously outside the tunnel, so only more as few works as possible at the installation site, eg in the area of the open end of the slipway in the tunnel itself. In the case of the construction of single-track railway tracks in tunnels, the advantage of avoiding particularly bad working conditions is the high temperatures prevailing in long tunnels, the high humidity and the air polluted by exhaust gases, and the reduction of the risk potential for persons in Tunnels always exists, given.

Gegenstand der vorliegenden Erfindung ist ein neues Verfahren zum Verlegen eines Gleisstranges einer festen Fahrbahn im Zuge des Neu-, Um- oder Weiterbaus einer, gegebenenfalls 45 mehrgleisigen, mit Schienenfahrzeugen, bevorzugt Eisenbahnen, befahrbaren Fahrstrecke, insbesondere Tunnelstrecke bzw. einer eingleisigen Fahrstrecke gemäß dem Oberbegriff des Anspruches 1, welches die im kennzeichnenden Teil dieses Anspruches geoffenbarte Kombination von Merkmalen umfasst. so Das neue Gleis-Einbauverfahren ist im Wesentlichen als Handlungs- bzw. Arbeitsablauf-Kette mit folgenden Schritten zu sehen, die im Folgenden anhand des Baus einer Tunnelfahrstrecke erläutert werden sollen:The present invention is a new method for laying a rail track of a fixed carriageway in the course of new, rebuilding or continuing a, possibly 45 mehrgleisigen, with rail vehicles, preferably railways, driveable route, especially tunnel route or a single-track route according to the preamble of claim 1, which comprises the combination of features disclosed in the characterizing part of this claim. The new track installation procedure is essentially to be seen as an action or work sequence chain with the following steps, which are explained below with reference to the construction of a tunnel driving route:

Auf dem Montageplatz werden die Schienen an den mit ihnen einzubauenden Schwellen bzw. 55 Schwellenkörper befestigt. Im Falle von auf Schwellenblöcken montierten Schienen werden 5 AT 500 982 B1 diese mit Hilfe von speziellen Abstandshaltem zur Einstellung .von Spur und Schienenneigung relativ zu den Schwellenblöcken miteinander zu einem Gleisjoch verbunden. An den Schienenfuß-Unterseiten werden die Hebe-Richtgeräte befestigt und an deren Unterseite die dann frei abwärts ragenden Stützkörper. Es wird also ein kompaktes Gleisjoch mit Stützkörpern und allen s notwendigen Rieht- und Fixiervorrichtungen zusammengebaut.On the assembly site, the rails are attached to the thresholds or 55 sleepers to be installed with them. In the case of rails mounted on sleeper blocks, these are connected together to form a track yoke by means of special spacers for adjusting track and rail inclination relative to the threshold blocks. The lifting straightening devices are fastened to the underside of the rail and the support bodies then project freely downwards on their underside. So it is a compact track yoke assembled with supporting bodies and all s necessary directional and fixing devices.

Die auf diese Weise vorbereiteten bzw. vorgefertigten Gleisjoche werden nach erfolgtem Zusammenbau auf dem Montageplatz zwischengelagert und jeweils bei Bedarf für den Transport an die Gleis-Einbaustelle im Tunnel auf entsprechende Waggons verladen. 10The track bumpers prepared or prefabricated in this way are temporarily stored on the assembly site after assembly and, if necessary, loaded onto suitable wagons for transport to the track installation point in the tunnel. 10

Bevorzugterweise wird hierbei ein wie später noch näher zu erläuterndes Gleisjoch-Ladeschema angewandt, welches trotz der relativ hohen Bauhöhe der Gleisjoche mit den abwärts ragenden Stützsystemen aus Hebe-Richtgerät und Stützkörper durch jeweils seitlich versetzte Lagerung und Einsatz von die Schienen des Gleisjochs stützenden Auflagestreben 15 od. dgl. den Transport von 4 bis 5 Jochen pro Waggon ermöglicht.Preferably, this is a later to be explained in more detail track yoke charging scheme which, despite the relatively high height of the track yokes with the downwardly projecting support systems of lifting straightener and support body by each laterally offset storage and use of the rails of the track yoke supporting support struts 15 od Like. The transport of 4 to 5 yokes per wagon allows.

Die Gleisjoche werden mit den Waggons, und zwar oft über kilometerlange Distanzen, z.B. von bis zu 40 km, im Tunnel bis an die Einbaustelle transportiert. Dieser Transport erfolgt über weite Strecken zuerst über ein schon fertiggestelltes und fertig eingebautes Geleise mit im Beton 20 eingegossenen Schwellen bzw. Schwellenkörper. Im Bereich von oft mehreren hundert Metern geht der Transport über ein vor der gerade aktuellen Einbaustelle nur noch bloß auf die Stützkörper gestütztes, jedoch durch Umgießung der Stützkörper bzw. von deren Fuß-Bereichen mit Spezialbeton schon stabilisiertes Geleise. 25 An der Einbauspitze werden die Gleisjoche mittels Hebeeinrichtung, insbesondere Kran, vom Waggon abgehoben, zum jeweiligen Schienenstrang-Ende hin längs verfahren und auf der, wie oben schon erwähnt, rohen Tunnelsohle "abgelegt". Bevorzugterweise wird - für den Fall einer Kurvenstrecke - das Gleisjoch mit dem Kran in jeweils vorgesehener Schräglage aufgenommen . und auf entsprechend vorbereitete Unterlagen auf der Tunnelsohle möglichst nahe der jeweili-30 gen zukünftigen Sollposition abgelegt.The track bumpers are used with the wagons, often over miles of distance, e.g. of up to 40 km, transported in the tunnel to the place of installation. This transport takes place over long distances, first over an already completed and completely built-in track with embedded in the concrete 20 sleepers or threshold body. In the range of often several hundred meters, the transport via a front of the current installation site only on the support body supported, but already by Umgießung the support body or of their foot areas with special concrete already stabilized tracks. 25 At the installation tip, the track yokes are lifted off the wagon by means of a lifting device, in particular a crane, longitudinally moved towards the respective rail track end and "deposited" on the raw tunnel sole, as already mentioned above. Preferably, in the case of a curved route, the track yoke is received by the crane in the respective inclined position. and placed on appropriately prepared documents on the tunnel sole as close as possible to the respective future target position.

Anschließend kommen an den Schwellen bzw. an den Schienen-Abstandshaltem befestigte, längenveränderliche, abwärts schwenkbare Hilfsstützen zum Einsatz, um das jeweils neu einzubauende Gleisjoch in eine möglichst genaue Position im Bereich von bis zu maximal +1-2 mm 35 zur planmäßig vorgesehenen Soll-Position zu bringen. Die Vermessung des Gleisjoches in diesem Vorstadium des Einbaus erfolgt nach bekannten gängigen Methoden, auf welche hier nicht weiter eingegangen zu werden braucht.Subsequently, variable-length, downwardly pivotable auxiliary supports fastened to the sleepers or to the rail spacers are used to move the track yoke, which is to be newly installed, into a position as accurate as possible in the range of up to a maximum of + 1-2 mm 35 to the planned nominal value. Position. The measurement of the track yoke in this preliminary stage of installation is carried out according to known common methods, which need not be discussed further here.

Nach diesem ersten Richten des Gleisjoches werden um die unterseitig an die Schienen des 40 Gleisjochs jeweils unter Zwischenschaltung des Hebe-Richtgerätes montierten, abwärts ragenden Stützkörper angeordnete, auf dem Untergrund, also insbesondere auf der Tunnelsohle aufsitzende Schalungen angeordnet, und die Fußbereiche der Stützkörper werden mittels schnellabbindendem Spezial-Beton bzw. -Mörtel umgossen. 45 Die Schalung kann in einfachster Weise aus Holz oder mit entsprechenden Stahlelementen gebildet sein.After this first straightening of the track yoke are arranged around the underside of the rails of the 40 track yoke each mounted with the interposition of the lifting straightening, downwardly projecting support body arranged on the ground, so in particular on the tunnel sole formwork, and the foot portions of the support body by means quick-setting special concrete or mortar poured around. 45 The formwork can be formed in the simplest way from wood or with appropriate steel elements.

Der bevorzugterweise wenig viskose und daher alle Hohlräume, Fugen, Untergrundspalten u.dgl. exakt füllende Spezial-Beton bzw. -Mörtel für die Stabilisierung der Stützkörper kann z.B. so am Bankett als Fertigmörtel aufbereitet und mittels Gießkannen oder Schlauchleitung in die vorbereitete Umschalungen der Stützkörper eingebracht werden.The preferably less viscous and therefore all cavities, joints, underground columns and the like. precisely filling special concrete or mortar for the stabilization of the support body can e.g. so prepared at the banquet as ready-mixed mortar and introduced by means of watering cans or hose in the prepared Umschalungen the support body.

Die für die das Erst-Stabilisieren der Gleisjoche verwendeten Spezial-Bindemittelmassen, also schnell-abbindende Betone bzw. Mörtel, entsprechen in ihrer Endqualität etwa der Qualität des 55 zukünftig für das Eingießen der Schwellen verwendeten Gleistragplatten-Vergussbindemittels, 6 AT 500 982 B1 also insbesondere Regelbeton, wodurch die Homogenität des fertigen Gleistragbauwerkes nicht negativ beeinflusst wird.The special binder compositions used for the initial stabilization of the track yokes, ie fast-setting concretes or mortars, correspond in their final quality approximately to the quality of the track slab potting binder used in the future for pouring in the sleepers, ie in particular Regular concrete, whereby the homogeneity of the finished track-laying structure is not adversely affected.

Durch das Umgießen der Fußbereiche der Gleisjoch-Stützkörper ist auch bei sehr unebenem 5 Untergrund eine vollflächige satte Auflage des Stützkörpers auf dem und eine feste Verbindung desselben mit dem Untergrund sowohl in Längs- als auch in Querrichtung gesichert.By casting around the foot areas of the track yoke support body, a full-surface rich support of the support body on the and a firm connection of the same with the ground is secured both in the longitudinal and in the transverse direction, even in very uneven 5 underground.

Nach Erhärten der Spezial-Bindemittelmasse werden die Hilfsstützen eingeklappt, um den Raum für den Einbau der Verguss-Bindemittelmasse(n) frei zu haben. 10After hardening of the special binder mass, the auxiliary supports are folded in order to free the space for the installation of the casting-binder mass (s). 10

Die Schienenstöße zwischen den Jochen können mittels Befestigungslaschen der Hebe-Richtgeräte auf gleiches Niveau gebracht und zusätzlich, mittels Steglaschen gesichert werden.The rail joints between the yokes can be brought to the same level by means of fastening straps of the lifting straightening devices and additionally secured by means of web straps.

Das sich derart auf den mittels Beton bzw. Mörtel umgossenen Stützkörpern abstützende und 15 lage-stabilisierte Gleisjoch bzw. das aus mehreren solchen Jochen gebildete Gleisstrang-Stück kann nach dem Erhärten der speziellen Bindemittelmasse auf Basis von Schnell-Beton bzw. -Mörtel problemlos mit schweren Bau- bzw. Bautransportzügen befahren werden.The so supported on the means of concrete or mortar supporting bodies and 15 position-stabilized track yoke or formed from several such Jochen Gleisstrang piece can easily after hardening of the special binder composition based on quick-concrete or mortar with heavy Construction or construction transport trains are driven.

Es kann somit dann das Gießen der Grund-Fahrbahn bis zu einem Niveau von bis etwa 5 cm 20 unterhalb der Schwellen erfolgen, wozu große Mengen an heranzutransportierender Verguss-Bindemittelmasse erforderlich sind.Thus, it may then be the casting of the ground roadway to a level of up to about 5 cm below the thresholds 20, for which large quantities of heranzutransportierender potting binder mass are required.

Diese Verguss-Bindemittelmassen können direkt aus den auf den lagestabilisierten Gleisjochen fahrenden Fahrzeugen entladen und ohne weitere Zwischentransporte eingebaut werden. 25These potting binder masses can be unloaded directly from the vehicles running on the track-stabilized track-yokes and installed without further intermediate transports. 25

Nach Beendigung der Befahrung der, wie beschrieben, "erst-stabilisierten" Geleise für das Herantransportieren der Baustoffe, Schienenbestandteile usw. werden die Fixierungen der Hebe-Richtgeräte von den Stützkörpem gelöst, und es erfolgt ein finales Justieren bzw. Feinjustieren der Gleislage mit einer Genauigkeit im Bereich von +/- 0,5 mm. 30 Für eine gesteuerte Rissbildung in der letztlich mit üblichem Beton gegossenen künftigen Fahrbahn ist es günstig, vor dem Gießen derselben Trennelemente aus Blech oder aus einem anderen Material anzuordnen, und zwar am besten dort, wo die schon lage-stabilisierten und -fixierten Schienen-Stützkörper eingebaut sind. Durch die mit den Trennelementen erreichte 35 Querschnittschwächung kann sichergestellt werden, dass die Verguss-Bindemittelmasse im Zuge des Abbindens genau dort reißt, wo ohnedies von vornherein hohe Stabilität gegeben ist womit das Auftreten unerwünschter Risse im Bereich der eingegossenen Betonschwellenblöcke vermieden wird. 40 Das endgültige Vergießen des Gleises erfolgt dann durch Unter- und Umgießen der Schwellen bzw. Schwellenblöcke. Für den Herantransport der dafür vorgesehenen, dann nur mehr relativ geringen Mengen an Verguss-Bindemittelmasse, vorzugsweise Regel-Beton, kann das auf den Stützkörpem abge-45 stützte, bereits feingerichtete Geleise vom Betoneinbau- bzw. Betonfertiger-Zug befahren werden. Es treten dabei wesentlich geringere Achslasten und Geschwindigkeiten auf, wodurch es möglich ist, auch das bereits exakt eingerichtete Geleise als Transport-Fahrweg zu benutzen.Upon completion of the traversal, as described, " first-stabilized " Rails for the transportation of building materials, rail components, etc., the fixations of the lifting straightening devices are solved by the Stützkörpem, and there is a final adjustment or fine adjustment of the track position with an accuracy in the range of +/- 0.5 mm. For controlled cracking in the future pavement ultimately cast with conventional concrete, it is beneficial to place the same sheet metal or other material separators prior to casting, and most preferably where the already-stabilized and fixed rail support bodies are installed. Due to the cross-sectional weakening achieved with the separating elements, it can be ensured that the casting-binder mass breaks exactly in the course of setting, which in any case gives high stability from the outset, thus avoiding the occurrence of undesirable cracks in the area of the cast-in concrete sleeper blocks. 40 The final casting of the track is then carried out by under- and overmolding the sleepers or threshold blocks. For the transport of the intended, then only relatively small amounts of potting binder mass, preferably rule-concrete, the on the Stützkörpem abge-45 supported, already fine-lined tracks can be traveled by Betoneinbau- or concrete paver train. Significantly lower axle loads and speeds occur, which makes it possible to use the already exactly set tracks as transport track.

Nach Erhärten der Verguss-Bindemittelmasse werden die eingeklappten Hilfsstützen zusam-50 men mit den Abstandshaltem im Fall von Einzel-Schwellenblöcken und die am Schienenfuß befestigten Hebe-Richtgeräte entfernt. Üblicherweise werden auch die Schienen der vorher sozusagen als "Positionier-Schablonen" fungierenden Gleisjoche von den eingegossenen Schwellen bzw. Schwellenkörpem entfernt, und es werden in die Schienenbefestigungen auf denselben dann Langschienen als die eigentlichen Fahrschienen eingezogen. 55 7 AT 500 982 B1After hardening of the potting compound, the collapsed auxiliary supports are removed together with the spacers in the case of single sleeper blocks and the lifting straighteners attached to the rail base. Usually, the rails of the before so-called as "positioning templates". acting track yokes are removed from the cast-in sleepers or Schwellenkörpem, and it will be drawn into the rail fasteners on the same then long rails as the actual rails. 55 7 AT 500 982 B1

Dabei ist es besonders vorteilhaft, wenn die Montageschienen zusammen mit den Abstandhal-tern, den Hilfsstützen und den am Schienenfuß montierten Hebe-Richtgeräten als fix montierte Montageschablone ausgebaut und transportiert werden. 5 Die wie beschrieben ausgebauten Montageschienen - im Falle von Schwellenkörpern mit den Abstandshaltem - sowie die Hebe-Richtgeräte werden wiederum auf Waggons verladen und zum Montageplatz transportiert, wo sie wiederum zu Gleisjochen mit Stützkörpem für einen neuen Schienen-Verlegezyklus zusammenmontiert werden. io Die gegebenenfalls weitab von der jeweiligen Einbaustelle des Stück um Stück wachsenden Gleisstranges, also z.B. vor dem Tunneleingang, wieder vormontierten Gleisjoche werden auf dem bereits fertiggestellten und vergossenen Geleise sowie auf dem gemäß dem erfindungs-gemäßen Verfahren auf den mit Schnellbeton lokal umgossenen Stützkörpem gestützten, letzten bzw. vorderen Gleisstrang-Stück insgesamt, über Distanzen von z.B. bis zu 40 km im Falle 15 alpenunterquerender Basistunnel-Bauten bis in die Nähe der Bauspitze transportiert.It is particularly advantageous if the mounting rails are removed and transported together with the Abstandhal- tern, the auxiliary supports and mounted on the rail foot lifting straighteners as a permanently mounted mounting template and transported. 5 The mounting rails removed as described - in the case of sleepers with the Abstandhaltem - and the lifting straightening devices are in turn loaded onto wagons and transported to the assembly site, where they are in turn assembled to track yokes with Stützkörpem for a new rail laying cycle. io The track length, which may be increased far from the respective place of installation of the piece, eg. before the tunnel entrance, again pre-assembled track yokes are on the already completed and potted track as well as on the according to the inventive method supported on the quick-cast locally casted Stützkörpem supported last or front track section in total, over distances of e.g. up to 40 km in case of 15 alpenunterquerender base tunnel buildings transported to the vicinity of the construction tip.

Was den Kern der Erfindung betrifft, ist an dieser Stelle darauf zu verweisen, dass eine Stabilisierung von Gleisbauten mit rasch abbindender Bindemittelmasse im Bereich des Fahrstreckenbaus bzw. -ausbaus aus der EP 1 022 386 A1 an sich bekannt ist. Es werden hierbei je-20 doch nicht, wie erfindungsgemäß, die über die Hebe-Richtgeräte an die Schienen der Gleisjoche gebundenen Stützkörper, sondern die Schwellen bzw. Schwellenkörper selbst direkt lagestabilisiert.As far as the core of the invention is concerned, it should be pointed out at this point that stabilization of track structures with rapidly setting binder mass in the area of the track construction or removal from EP 1 022 386 A1 is known per se. In this case, depending on the invention, the supporting bodies which are bound to the rails of the track yokes via the lifting straightening devices are not directly position-stabilized, but the sleepers or sleeper bodies themselves are not directly stabilized.

Im Folgenden sollen die wichtigsten Vorteile des erfindungsgemäßen Gleisbau-Verfahrens 25 zusammengefasst werden:The most important advantages of the track construction method 25 according to the invention are summarized below:

Es ermöglicht insbesondere auf langen eingleisigen Strecken, wie sie gemäß heutigen Standards besonders in Eisenbahntunnels vorliegen, eine hoch-effiziente logistische Versorgung der Einbauprozesse, da schon in einem besonders frühen Baustadium auch schon schwere Lasten 30 über das gerade erst eingebaute Geleise nahe an die Einbaustellen transportiert werden können.It allows especially on long single-track routes, as present in railway tunnels according to today's standards, a highly efficient logistical supply of installation processes, since even at a particularly early stage of construction even heavy loads 30 transported over the newly built track close to the installation sites can be.

Durch das neue Verfahren lassen sich die beispielsweise beim Bau des Ärmelkanal-Tunnels für die Erstellung der festen Fahrbahn eingesetzten, sehr aufwendigen Sonderkonstruktionen 35 vermeiden.The new method makes it possible to avoid the very expensive special constructions 35 used, for example, in the construction of the Channel Tunnel for the creation of the fixed carriageway.

Das erfindungsgemäße Verfahren ermöglicht weitestgehend den Einsatz von auf dem Markt verfügbaren Komponenten, Bauteilen, Baumaschinen und -geräten und bietet daher neben verbesserten wirtschaftlichen Voraussetzungen eine höhere Flexibilität und Ausfallsicherheit als 40 bisher bekannt gewordene, wesentlich mehr Aufwand erfordernde Geleise-Veriegemethoden.The inventive method largely allows the use of available on the market components, components, construction machinery and equipment and therefore offers not only improved economic conditions, a higher flexibility and reliability than 40 previously known, much more effort requiring track-Veriegemethoden.

Bei Einbau einer zusätzlichen Gleistragplatte, z.B. bei großen Fahrbahnhöhen, kann die erste Lage des Betons z.B. bis etwa 5 cm unter Schwellenblock-Unterseite bzw. -kante direkt vom - über das mittels der Stützkörper "erst-stabilisierte" Geleise herangeführten - Waggon in den 45 Raum unterhalb des Geleises gekippt bzw. abgelassen werden, was den Vorteil hat, dass zusätzliche Längstransporte der Verguss-Bindemittelmasse durch Förderleitungen bzw. -Schläuche und die dafür erforderlichen Einrichtungen nicht notwendig sind.When installing an additional track plate, e.g. at high road heights, the first layer of the concrete may e.g. up to about 5 cm below the threshold block bottom or edge directly from - via the first-stabilized by means of the support body. Track brought up - wagon be tipped or drained in the space below the track, which has the advantage that additional longitudinal transport of the casting-binder mass through delivery lines or hoses and the necessary facilities are not necessary.

Das neue Verfahren macht es möglich, pro Arbeits-Schicht bis zu 400 m3 Beton - diese Begren-50 zung ist durch die Beton-Bereitungs- und Transportleistung bedingt - einzubauen.The new process makes it possible to install up to 400 m3 of concrete per work shift - this limit is due to the concrete preparation and transport performance.

Weiters ist der Vorteil gegeben, dass auch für die endgültige Festlegung des Geleises die Bindemittelmasse sehr nahe an die Einbaustelle herantransportiert werden kann. 55 Die letzten, etwa hundert Meter, also der Bereich des jeweils frisch eingebauten und somit δ ΑΤ 500 982 Β1 jeweils abbindenden Betons, lassen sich mit dem oben schon erwähnten Kran oder anderen Fördermitteln, wie z.B. mittels Förderband oder Betonpumpe, überbrücken.Furthermore, the advantage is given that even for the final determination of the track, the binder mass can be transported very close to the installation point. 55 The last, about one hundred meters, ie the area of each newly installed concrete and thus δ ΑΤ 500 982 Β1 each setting concrete can be with the above-mentioned crane or other funding, such as. by means of conveyor belt or concrete pump, bridge.

Dadurch, dass die Betoneinbau-Einrichtung selbst auf dem gerade vorher stabilisierten neuen 5 Gleis geführt werden kann, ergeben sich insgesamt wesentliche Vereinfachungen in der Transport- und Bau-Logistik.The fact that the concrete installation device itself can be performed on the just stabilized before new 5 track, resulting in a total of significant simplifications in transport and construction logistics.

Was die im Rahmen des neuen Gleisbau-Verfahrens vorteilhafte, stabile und letztlich leicht lösbare, über die jeweils am Schienenfuß montierten Hebe-Richtgeräte vorgesehene Verbin-io düng zwischen den Schienen der Gleisjoche und den Stützkörpern betrifft, gibt darüber der Anspruch 2 näher Auskunft.As regards the advantageous in the context of the new track-laying process, stable and ultimately easily detachable, provided on the respectively mounted on the rail Hebe straightening devices Verbin-io fertil between the rails of the track yokes and the supporting bodies concerns about claim 2 in more detail.

Der Anspruch 3 nennt zwei bevorzugterweise einzusetzende Grundformen der Schienenjoch-Stützkörper, welche den Vorteil haben, dass eine effektive Umgießung mit der zu deren Stabili-15 sierung vorgesehenen schneilabbindenden Spezial-Bindemittelmasse erfolgen kann, durch welche eine hochstabile Verankerung in dem erhärteten Bindemittel und eine satte Verbindung mit dem wie schon oben beschriebenen, rohen Untergrund gewährleistet ist.The claim 3 calls two preferably to be used basic shapes of the rail yoke support body, which have the advantage that an effective Umgießung with the stabilization provided for stabilizing her 17-tailing special binder mass can be done by which a highly stable anchoring in the hardened binder and a rich Connection with the as already described above, raw surface is guaranteed.

Dem Anspruch 4 ist eine - in der Praxis bewährte und daher bevorzugte Ausführungsform der 20 für den Zusammenbau der Gleisjoche im Falle des Vorliegens von jeweils nur eine Schiene des Geleises tragenden Schwellenblöcken vorgesehenen, die Relativlage der Schienen des Gleisjoches zueinander exakt einhaltenden, die Schienen miteinander verbindenden Abstandshalte-Baiken zu entnehmen. Ihre besondere Form resultiert daraus, dass die von denselben zum Gleisjoch verbundenen Schienen nach dem Stabilisieren der Stützkörper und deren Bindung an 25 den Untergrund voll befahrbar sein müssen, also dass die bzw. ihre Kontur sowohl auf die mechanische Belastung als auch beispielsweise auf den für die Radkränze der Transportzüge nötigen Freiraum abgestimmt sein muss.The claim 4 is a - proven in practice and therefore preferred embodiment of the 20 provided for the assembly of the track yokes in the presence of only one rail of the track bearing threshold blocks, the relative position of the rails of the track yoke exactly to each other, the rails connecting together Remove spacer bays. Their special form results from the fact that the rails connected by the same to the track yoke after stabilizing the support body and their binding to the ground must be fully navigable, so that the or their contour both on the mechanical load and for example on the for Wheel rims of the transport trains necessary clearance must be coordinated.

Der Anspruch 5 enthält Details der Befestigung der Schienen-Abstandshalter an den Innenflan-30 ken bzw. Innenseiten der Schienen der Gleisjoche wieder.The claim 5 includes details of the attachment of the rail spacers on the Innenflan 30 ken or inner sides of the rails of the track yokes again.

Die Ansprüche 6 und 7 zeigen vorteilhafte Lösungen für das Verladen der mit den abwärts ragenden Stützkörpem ausgestatteten, an sich daher recht sperrigen, vormontierten Gleisjoche auf die Waggons für deren Verbringung zur Einbaustelle auf. 35 Über eine im Rahmen der Erfindung vorteilhafte Abwicklung des Ablegens der von den Waggons abgeladenen Gleisjoche an der jeweiligen Einbaustelle bzw. des Positionierens derselben in einer bzw. einem der Einbauplanung möglichst angenäherten Stellung bzw. Verlauf, welches bevorzugterweise mit an den Schwellen oder an den oben erwähnten Schienen-Abstands-40 haltern angelenkten und von dort abklappbaren, längeneinstellbaren Hilfsstützbeinen erfolgt, gibt der Anspruch 8 näher Auskunft.The claims 6 and 7 show advantageous solutions for loading the equipped with the downwardly projecting Stützkörpem, in itself quite bulky, preassembled track yokes on the cars for their shipment to the installation site. 35 About an advantageous in the context of the invention settlement of depositing the unloaded from the wagons track berths at the respective installation point or positioning the same in one or the installation planning as approximate position or course, which preferably with at the thresholds or at the top mentioned rail distance-40 holders hinged and from there hinged, adjustable-length auxiliary support legs, the claim 8 gives details.

Um möglichst große Freiheit beim Feinrichten der Geleise nach dem Stabilisieren der Stützkörper der Gleisjoche zu gewährleisten, ist im Rahmen des erfindungsgemäßen Einbauprozesses 45 gemäß Anspruch 9 vorgesehen, in diesem Stadium die Schienenjoche so tiefliegend zu positionieren, dass sie in jedem Fall letztlich um einen geringen Betrag zu heben sind, wenn sie beim endgültigen Feinrichten mittels der zwischen den Schienen und den an den Untergrund gebundenen, stabilisierten Stützkörpem angeordneten Hebe-Richtgeräte in die bzw. den planmäßig vorgesehene(n) exakte(n) Position bzw. Verlauf gebracht werden. 50In order to ensure the greatest possible freedom in the fine adjustment of the tracks after stabilizing the support body of the track yokes is provided as part of the installation process according to the invention 45 according to claim 9, to position the Schienenjoche so low-lying at this stage, that they ultimately in any case by a small amount are to be lifted when they are placed in the final or by the scheduled provided exact / s position or course by the arranged between the rails and the stabilized Stützkörpem bound to the ground lifting straightening. 50

Die Maßnahme des Einbaus von Einlage-Paneelen gemäß Anspruch 10 dient einer gezielt gesteuerten Rissbildung in der erhärteten Verguss-Bindemittelmasse der festen Fahrbahn im Bereich der Stützkörper, womit eine solche im Bereich der Schwellen bzw. Schwellenkörper vermieden ist. 55 9 AT 500 982 B1The measure of the installation of insert panels according to claim 10 serves a purposeful controlled crack formation in the hardened potting compound mass of the solid roadway in the region of the support body, whereby such in the region of the threshold or threshold body is avoided. 55 9 AT 500 982 B1

Im Rahmen der Erfindung ist es bevorzugt, die, wie beschrieben, vormontierten Schienenjoche bzw. deren Schienen sozusagen als die exakte plangemäße Positionierung der Fahr-Geleise gewährleistende, immer wieder einzusetzende "Verlege-Lehren bzw. -Schablonen" zu verwenden, durch welche die letztlich mittels der Verguss-Bindemittelmasse, also insbesondere mittels s Regelbeton, umgossenen, Schwellen bzw. Schwellenkörper und die darauf montierten Schienenbefestigungen in einer - sich eigentlich am Schienenfuß bzw. an dessen Unterseite orientierenden Position festgelegt sind, womit die exakte Position der - nach Entfernen der Gleisjoch-Schienen aus den Schienenbefestigungen der Schwellen bzw. Schwellenkörper in dieselben einzuziehenden-Fahrschienen gewährleistet ist. Es ist dazu insbesondere auf die Ansprüche 11 io sowie 12 zu verweisen.Within the scope of the invention, it is preferred that the rail yokes or their rails, which are preassembled as described, provide, as it were, "laying teachings or stencils" which can be used over and over again to ensure the exact, plan-appropriate positioning of the drive tracks. be used by which the ultimately by means of the potting binder mass, ie in particular by means of s rule concrete, cast, threshold or threshold body and mounted thereon rail fasteners in a - are actually oriented on the rail or on its underside orientation position, whereby the exact Position of - is ensured after removal of the track yoke rails from the rail fastenings of the threshold or threshold body in the same retracting rails. Reference is made in particular to claims 11 and 12.

Der Anspruch 13 gibt über eine im Rahmen der Erfindung bevorzugte Praxis beim Verlegen der Gleisjoche an der Einbaustelle näher Auskunft. 15 Mit bevorzugten Praktiken der Vorbereitung für den Einbau der in den meisten Fällen als Fahrschienen vorgesehenen Langschienen nach Entfernung der Schienen der Gleisjoche im Falle von deren Einsatz als 'Verlege-Lehren bzw. -Schablonen" beschäftigen sich die Ansprüche 14 und 15. 20 Anhand der Zeichnung wird die Erfindung näher erläutert:The claim 13 provides a preferred within the scope of the invention practice when laying the track berths at the installation point information. 15 With preferred practices of preparing for the installation of the long rails, in most cases as rails, after removal of the rails of the track yokes in case of their use as 'laying gauges'; deal with the claims 14 and 15. 20 With reference to the drawings, the invention is explained in more detail:

Es zeigen die Fig. 1a bis c jeweils in Drauf-, Seiten und Längs-Ansicht ein Gleisjoch in der erfindungsgemäß zum Einsatz kommenden Form bzw. Ausstattung, die Fig. 2a bis e Details der Verbindung der Schienen der Schienenjoche mit den an der Schienenfuß-Unterseite mit ihnen 25 lösbar verbundenen Hebe-Richtgeräten und den an deren Unterseite gebundenen Stützkörpem sowie Details der Stellung der Hebe-Richtgeräte in ihrer hochbelastbaren Grundstellung und in einer Stellung während des Feinricht-Vorganges, die Fig. 3 eine zweite bevorzugte Ausführungsform eines Gleisjoch-Stützkörpers, die Fig. 4 ein Schema für eine laderaumsparende effektive Verladung der mit den Stützkörpem ausgestatteten Gleisjoche, die Fig. 5 eine bevör-30 zugte Ausführungsform der für einen exakten Zusammenhalt der Schienen der Gleisjoche vorgesehenen Schienen-Abstandshalter, die Fig. 6 die Situation der Verlegearbeit nach dem Stabilisieren der Stützkörper, die Fig. 7a bis c jeweils Ansichten eines Tunnelquerschnitts, in welchem der Antransport der Gleisjoche und deren Entladung mittels einer Portalkran-Einrichtung an der Baustelle erfolgt, und die Situation nach Fertigstellung der Fahrstrecke und 35 deren Befahrung mit einem Zug und schließlich die Fig. 7d die für den Transport und die Verlegung der Gleisjoche vorgesehene Portalkran-Einrichtung während der Veriegearbeit.1a to c in plan, side and longitudinal view of a track yoke in accordance with the invention used in the form or equipment, Fig. 2a to e details of the connection of the rails of the rail yokes with those at the rail foot Bottom with them 25 releasably connected lifting straightening devices and bound to the underside Stützkörpem and details of the position of the lifting straightening devices in their heavy-duty basic position and in a position during the fine straightening process, Fig. 3 shows a second preferred embodiment of a track yoke support body 4 shows a scheme for a load-saving effective loading of the track yokes equipped with the supporting bodies, FIG. 5 shows an embodiment of the rail spacers provided for exact cohesion of the rails of the track yokes, FIG Laying work after stabilizing the support body, Figs. 7a-c are views of each Tunnel cross-section, in which the transport of the track yokes and their discharge by means of a gantry crane device at the site, and the situation after completion of the route and 35 their journey with a train and finally Fig. 7d for the transport and the laying of the track yokes provided portal crane facility during the Veriegearbeit.

Die Fig. 1a bis c zeigen auf der Einbaustelle abgelegtes und mit den Hilfsstützen 17 bzw. deren Hilfsstützfüßen 173 sich auf einem "unebenen" Untergrund 11 abstützenden, für den Einbau 40 fertig vorbereiteten Gleisjoches 1. Im einzelnen sind hier die Montageschienen 12 mittels standardgemäßen Schienenbefestigungen 135 mit den Schwellenblöcken 13 im vorgesehenen Schwellenabstand asw fertig montiert. Die Schienen 12 sind durch zwischen einem jeweils dritten und vierten Schwellenkörper 13 mittels dieselben in exakt vorgegebener Relativlage zueinander haltender Abstandshalter 16 miteinander verbunden. An die Unterseite des Schie-45 nenfußes 123 jeder Schiene 12 sind, jeweils um den Abstand ast von einander beabstandet, die Hebe-Richtgeräte 15 gebunden, welche ihrerseits unterseitig mit den hier steil-pyramidale Gestalt aufweisenden Stützkörpem 14 verbunden sind. Dieselben tragen zur Innenseite I hin Nuten 145 für das Einschieben von Rissbildungs-Blechen 19 od. dgi. für eine gezielte Rissbildung in der letztlich fertig vergossenen Fahrbahn an den Stellen, wo die Stützkörper 14 angeordnet so sind. Die Fig. 1b und 1c zeigen, wie die eine "mittlere Breite" bst aufweisenden Stützkörper 14 mit ihren Fußenden 143, jeweils von einer Schalung 90 umgeben, mit schneilabbindendem Spezialbeton 9 umgossen sind, womit nach dessen Erhärtung das Gleisjoch 1 hoch belastbar befahrbar ist. 55 Die Abstandshalter 16 stützen sich - siehe Fig. 1c - jeweils am Schienenkopf 121 und am Schie- 10 AT 500 982 B1 nenfuß 123 ab und sind mittels Schrauben 165 mit dem Schienenhals 122 verschraubt.1a to c show at the installation point and with the auxiliary supports 17 and their auxiliary support feet 173 are on a "uneven". Underground 11 supporting, ready for installation 40 Gleisjoches 1. Specifically, here the mounting rails 12 are mounted by means of standard rail fasteners 135 with the threshold blocks 13 in the intended threshold distance asw finished. The rails 12 are interconnected by a respective third and fourth threshold body 13 by means of the same in exactly predetermined relative position holding each other spacers 16. To the underside of the sliding base 121 of each rail 12, the hoisting straighteners 15 are bound, in each case at a distance from each other, which in turn are connected to the supporting bodies 14, which have a steeply pyramidal shape on the underside. The same carry towards the inside I grooves 145 for the insertion of cracking sheets 19 od. Dgi. for a targeted cracking in the ultimately finished paved road at the points where the support body 14 are arranged so. Figures 1b and 1c show how the " mean width " Bst having supporting body 14 with their foot ends 143, each surrounded by a formwork 90, are covered with schneilabbindendem special concrete 9, which after hardening the track yoke 1 is highly resilient passable. The spacers 16 are supported - as shown in FIG. 1c - on the rail head 121 and on the sliding rail 123 and are screwed to the rail neck 122 by means of screws 165.

Die hier dargestellten Gleisjoche 1 werden bevorzugterweise in einer Länge von 18 m eingesetzt. Sie werden in den meisten Fällen in - gegebenenfalls großer - Entfernung von der Einbaustelle z.B. in einer Montagehalle vorbereitet. Wie hier dargestellt, werden sie als Ganzes an 5 die Einbaustelle, z.B. in einem Tunnel unter Abstützung mittels der Hilfsstützen 17 mit an den Abstandshaltem 16 angelenkten, abwärts-geschwenkten Teleskop-Stützbeinen 173 am unebenen Untergrund 11 abgestützt.The track yokes 1 shown here are preferably used in a length of 18 m. In most cases they are located in - possibly large - distance from the installation site, e.g. prepared in an assembly hall. As shown here, as a whole they become the place of installation, e.g. supported in a tunnel under support by means of the auxiliary supports 17 with the distance support 16 hinged, down-tilted telescopic support legs 173 on uneven ground 11.

Am Schienenstoß sind die Hebe-Richtgeräte 15 vorteilhafterweise so ausgebildet, dass zwei io aneinanderstoßende Schienenenden jeweils aufeinanderfolgender Gleisjoche 1 gegen dieselben verspannt sind.At the rail joint the lifting straighteners 15 are advantageously designed so that two io abutting rail ends of each successive track yokes 1 are braced against the same.

Die Fig. 2a und 2b zeigen, wie die Hebe-Richtgeräte 15 mittels in im Stützkörper 14 angeordneten Dübeln 14b verankerten Schrauben 147 oder mittels den sich am entsprechend gestalteten 15 Stützkörper 14 verhakenden Hakenenden von Haken-Schraubgewindebolzen 148 zwischen Stützkörper 14 und Schienenfuß 123 der Gleisjoch-Schiene 12 angeordnet und mittels Hilfeklammern 154 gehalten, mit dem Stützkörper 14 einerseits und der Gleisjoch-Schiene 12 andererseits lagefest sowie verschiebe- und verdrehsicher verbunden sind. 20 Die Fig. 2d zeigt weiters das Hebe-Richtgerät 15 in seiner für hohe Belastungen geeigneten, nicht ausgefahrenen Grundstellung und die Fig. 2e dasselbe in einer Gleisjoch-Feinricht-Stellung mit Hebung und Seitverschiebung. In diesem Zustand muss die Verschraubung und Verspannung zum Stützkörper 14 hin gelöst sein, und das feingerichtete Gleisjoch ist für den Betonfertiger befahrbar. 252a and 2b show how the lifting straighteners 15 by means of anchored in the support body 14 anchors 14b anchored screws 147 or by means of the correspondingly shaped 15 support body 14 hooked hook ends of hook screw thread bolt 148 between the support body 14 and rail 123 of the track yoke Rail 12 arranged and held by means of auxiliary brackets 154, on the other hand, with the support body 14 on the one hand and the track rail 12 on the other hand, fixed in position and are displaceable and secured against rotation. 20 Fig. 2d shows further the lifting straightening device 15 in its suitable for high loads, non-extended basic position and Fig. 2e the same in a track yoke fine straightening position with elevation and lateral displacement. In this state, the screwing and tension must be solved to the support body 14 back, and the fine-tuned track yoke is passable for the concrete paver. 25

Schließlich zeigt die Fig. 2c eine günstige, "kreuzweise versetzte" Anordnung der Schrauben 147 bzw. Hakenbolzen 148 für die Befestigung des Stützkörpers 14 an der Schiene 12 einerseits und der Schrauben 157 für die davon unabhängige Befestigung des Hebe-Richtgerätes 15 an der Schiene 12 andererseits. 30 -Finally, Fig. 2c shows a favorable " crosswise " Arrangement of the screws 147 and hook bolts 148 for the attachment of the support body 14 to the rail 12 on the one hand and the screws 157 for the independent fixing of the lifting straightening device 15 on the rail 12 on the other. 30 -

Das in den Fig. 2a bis 2e gezeigte Hebe-Richtgerät 15 ist in seiner konkreten Ausführungsform mit zwei Basisplatten, also mit Deck- und Bodenplatte, mit jeweils 20 mm Stärke und einer dazwischen angeordneten und in die beiden Platten eingreifenden Doppelspindel mit jeweils 20 mm Spindellänge und einen Spindeldurchmesser von etwa 60 - 80 mm Gewindedurchmesser, 35 gebildet.The lifting straightener 15 shown in Figs. 2a to 2e is in its concrete embodiment with two base plates, ie with top and bottom plate, each with 20 mm thickness and an interposed and engaging in the two plates double spindle with 20 mm spindle length and a spindle diameter of about 60-80 mm thread diameter, 35 formed.

Die Doppelspindel trägt ein Zahnrad, welches mittels eines kleinen Zahnrades an der Außenseite des Hebe-Richtgerätes 15 angetrieben werden kann. Das kleine Zahnrad ist so positioniert, dass der manuelle oder maschinelle Antrieb von oberhalb, also etwa von einer Position neben 40 dem Schienenfuß 123, z.B. mittels Ratsche od. dgl. erfolgen kann.The double spindle carries a gear which can be driven by means of a small gear on the outside of the lifting straightener 15. The small gear is positioned so that the manual or mechanical drive from above, that is approximately from a position next to the rail foot 123, e.g. od by ratchet. Like. Can be done.

Mit Hilfe der Doppelspindel ist es möglich, mit dem Hebe-Richtgerät etwa 25 mm Hub zu erzielen. In der maximalen Ausfahrstellung hat deren Gewinde noch einen Eingriff von etwa 8 mm, welcher aufgrund des großen Gewindedurchmessers und der geringen Gewindehöhe von 1,5 45 bis 2 mm auch für die oben beschriebenen hohen Zug- und Druck-Belastungen ausreicht. Der Antrieb der Doppelspindel kann statt mittels der Zahnräder auch mittels einer Kette mit Zahnradscheiben erfolgen. Diese letztgenannte Ausbildungsform hat den Vorteil, dass der Antrieb und die Stellvorrichtung selbst flexibler ersetzbar sind und bei Bedarf auch außerhalb der Querachse bzw. Querebene des Hebe-Richtgerätes 15 angeordnet werden kann. Mit dem so Kettenantrieb können auch mehrere Spindeln angetrieben werden, wodurch die Stabilität den Hebe-Richtgerätes weiter verbessert wird. Weiters ist ein derartiger Kettenantrieb gegenüber Verschmutzung im Baustellenbetrieb wesentlich unempfindlicher als ein Zahnrad-Eingriff.With the help of the double spindle, it is possible to achieve about 25 mm stroke with the lifting straightener. In the maximum extended position whose thread still has an engagement of about 8 mm, which is sufficient for the high tensile and compressive loads described above due to the large thread diameter and low thread height of 1.5 45 to 2 mm. The drive of the double spindle can be done by means of a chain with gear wheels instead of by means of the gears. This last-mentioned embodiment has the advantage that the drive and the adjusting device itself are more flexibly replaceable and, if required, can also be arranged outside the transverse axis or transverse plane of the lifting straightener 15. With the chain drive so also several spindles can be driven, whereby the stability of the lifting straightening device is further improved. Furthermore, such a chain drive to pollution in construction site operation is much less sensitive than a gear engagement.

Die seitliche Verschiebung des Hebe-Richtgerätes 15 wird durch Verschiebung von dessen 55 Deckplatte gegen die beschriebene obere Spindelführung erzielt. Zu diesem Zweck ist eine 1 1 AT 500 982 B1The lateral displacement of the lifting straightener 15 is achieved by displacement of its cover plate 55 against the described upper spindle guide. For this purpose, a 1 1 AT 500 982 B1

Horizontalspindel, welche auf der gegenüberliegenden Seite der Vertikalspindel angeordnet ist, im inneren Gewindeblock geführt, womit die Deckplatte gegen diesen Gewindeblock nach links oder rechts verschoben werden kann. Auf diese Art und Weise sind seitliche Verschiebungen um +/-15 mm problemlos möglich. 5Horizontal spindle, which is arranged on the opposite side of the vertical spindle, guided in the inner threaded block, whereby the cover plate can be moved against this threaded block to the left or right. In this way lateral displacements of +/- 15 mm are possible. 5

In der Deckplatte des Heberichtgerätes 15 sind vier Befestigungsöffnungen vorgesehen. Die Deckplatte selbst wird mittels der zwei diagonal angeordneten Befestigungen 147, 148 über die Spannklemmen 154 fix an den Schienenfuß 123 der Montageschienen 12 montiert. In der Deckplatte ist weiters eine Führungsnut od. dgl. für die Aufnahme des Schienenfußes 123 io vorgesehen, um ein Verdrehen der Deckplatte des Gerätes 15 gegenüber demselben zu vermeiden.In the cover plate of the Heberichtgerätes 15 four mounting holes are provided. The cover plate itself is fixedly mounted to the rail foot 123 of the mounting rails 12 by means of the two diagonally arranged fasteners 147, 148 via the tensioning clamps 154. In the cover plate is further a guide groove od. Like. Provided for receiving the rail foot 123 io to prevent twisting of the cover plate of the device 15 relative to the same.

Die Öffnungen im Nahbereich der beiden Endpunkte der anderen Diagonale sind durch das Hebe-Richtgerät 15 hindurch geführt und setzen sich bis zu den Verankerungs-Dübeln 146 in 15 den Stützkörpern 14 fort. Sie ermöglichen es, den Stützkörper 14 mittels der Schrauben 147 mit der oberen Platte des Hebe-Richtgerätes 15 zu verschrauben.The openings in the vicinity of the two end points of the other diagonal are passed through the lifting straightener 15 and continue up to the anchoring plugs 146 in FIG. 15, the supporting bodies 14. They make it possible to screw the support body 14 by means of the screws 147 with the upper plate of the lifting straightener 15.

Es besteht die Möglichkeit, diese Schrauben 147 weiter nach oben zu ziehen und direkt mit einer Klemmplatte 154 am Schienenfuß 123 verankern. 20It is possible to further pull these screws 147 upwards and anchored directly to the rail foot 123 with a clamping plate 154. 20

Alternativ zur Befestigung des Stützkörpers 14 mit Dübel 146 und Schraube 147 kann derselbe auch mittels eines hakenförmigen Befestigungselementes 148 und einer Klammer 154 mit dem Hebe-Richtgerät 15 verspannt werden. Diese Art des Aufbaus hat den Vorteil, dass in den Stützkörper 14 keine Verankerungs-Löcher und -Dübel eingeformt bzw. eingebracht werden 25 müssen.Alternatively to the attachment of the support body 14 with dowel 146 and screw 147, the same can also be clamped by means of a hook-shaped fastening element 148 and a bracket 154 with the lifting straightener 15. This type of construction has the advantage that in the support body 14 no anchoring holes and dowels have to be formed or introduced 25.

Die Hebe-Richtgeräte 15 werden vorteilhaft in folgender Schritt-Folge eingesetzt:The lifting straighteners 15 are advantageously used in the following step sequence:

Zuerst erfolgt die Vorbereitung, indem das Gerät 15 auf minimalen bzw. Null-Hub gestellt wird, 30 sich also dieses Gerät 15 in Grundstellung G befindet. Dabei ist ein echtes Aneinanderliegen von der Grund- und Deckplatte vorgesehen, sodass Lasten, welche in diesem Zustand auf das Hebe-Richtgerät 15 einwirken, nicht über die Hebe-Spindel bzw. deren Gewinde, sondern über den direkten Kontakt von Grund- und Deckplatte in den Untergrund abgeleitet werden können. Dies ist auch der Zustand, in dem die Gleisjoche 1 mit den an sie montierten Hebe-Richtgeräten 35 15 mit schweren Bau-Zügen, also mit 22,5 bis 251 Achslast, befahren werden können.First, the preparation is done by the device 15 is set to minimum or zero stroke, so this device 15 is in basic position G. In this case, a real juxtaposition of the base and cover plate is provided so that loads acting in this state on the lifting straightener 15, not on the lifting spindle or its thread, but on the direct contact of the base and cover plate in the background can be derived. This is also the state in which the track yokes 1 with the mounted on them lifting straightening 35 15 with heavy construction trains, so with 22.5 to 251 axle load, can be driven.

Die Seitenverstell-Einrichtung des Gerätes 14 wird ebenfalls auf 0 gestellt, das Gerät also auch diesbezüglich in die Grund- bzw. Mittelstellung verbracht. 40 In diesem Zustand sind die Hebe-Richtgeräte 14 unverrückbar mit den Montageschienen 12 über die beiden in der Diagonale angeordneten Befestigungselemente 147, 148 bzw. Klemmplatten 154 verbunden. Über die beiden weiteren in der jeweils anderen Diagonale angeordneten Öffnungen ist der 45 Stützkörper 14 mit dem Hebe-Richtgerät 15 und dem Schienenfuß 122 direkt verspannt. Diese Montage findet bei jedem Zusammenbau des Gleisjoches 1 an der jeweiligen Montagestelle statt. In diesem Stadium sind das Hebe-Richtgerät 14 und der Stützkörper 15 fix mit der jeweiligen Montageschiene 12 und dem daraus zusammengestellten Gleisjoch 1 verbunden und für den Einbau, z.B. in einem Tunnel, vorbereitet. 50The Seitenverstell device of the device 14 is also set to 0, so the device spent in this regard also in the basic or middle position. 40 In this state, the lifting straighteners 14 are immovably connected to the mounting rails 12 via the two arranged in the diagonal fastening elements 147, 148 and clamping plates 154. About the two other arranged in the other diagonal openings of the support body 14 with the lifting straightener 15 and the rail 122 is clamped directly. This assembly takes place at each assembly of the track yoke 1 at the respective mounting location. At this stage, the lifting straightener 14 and the support body 15 are fixedly connected to the respective mounting rail 12 and the track yoke 1 assembled therefrom, and for installation, e.g. in a tunnel, prepared. 50

In der Folge wird dann, wie schon oben teilweise beschrieben, das gesamte Gleisjoch 1 an die Einbaustelle transportiert, und die Stützkörper 14 werden nach dem Grob- bzw. Vorrichten des Gleisjoches durch Umgießen von deren Unterteilen mit Schnell-Beton stabilisiert. Um einen entsprechenden Spielraum beim Feinrichten sicherzustellen, wird das Gleisjoch 1 auf einer 55 Höhe von etwa minus 5 mm und bei Grund-Mittellage des Hebe-Richtgerätes 15 vorgerichtet 1 2 AT 500 982 B1 und stabilisiert, sodass mit Sicherheit immer ein genügender Hebevorrat für die letztlich vorzunehmende exakte Lage-Einstellung und Feinjustage des Gleisjoches 1 bzw. der Schienen 12 vorhanden ist. 5 Im durch das Eingießen der Stützkörper 14 stabilisierten Zustand kann das oben schon erwähnte Befahren des Gleises für Materialtransporte mit üblichen Material-Transport-Waggons 6 u. dgl. mit vollen Achslasten erfolgen.As a result, then, as already partially described above, the entire track yoke 1 is transported to the installation site, and the support body 14 are stabilized after coarse or Vorrichten the track yoke by molding of their sub-parts with quick-concrete. In order to ensure a corresponding margin when fine-tuning, the track yoke 1 is prepared at a height 55 about minus 5 mm and at the basic center position of the lifting straightener 15 1 2 AT 500 982 B1 and stabilized, so certainly always a sufficient Hebeauforrat for Ultimately to be made exact position adjustment and fine adjustment of the track yoke 1 and the rails 12 is present. In the stabilized by the pouring of the support body 14 state, the above-mentioned driving the track for material transport with conventional material transport wagons 6 u. Like. done with full axle loads.

Nach Abschluss der Bindemittel-Transporte zur Einbaustelle wird die Befestigung 147, 148, 154 io des Hebe-Richtgerät 15 zum Stützkörper 14 hin gelöst. Danach kann mittels des Hebe-Richtgerätes 15 das Geleise fein gerichtet werden. Nach dem Feinjustieren wird das lagestabilisierte Gleisjoch 1 bzw. eine Serie dieser Gleisjoche 1 mit dem Betonfertiger bei verringerten Achslasten und reduzierten Geschwindigkeiten für den Betoneinbau befahren. Die Hebe-Richtgeräte 12 mit der oben beschriebenen Doppelspindel sind für diese geringeren Lasten 15 entsprechend ausgelegt, und sind denselben auch im Hub- und Seitverstellungs-Zustand F nach dem Feinjustieren gewachsen.After completion of the binder transports to the installation site, the attachment 147, 148, 154 io of the lifting straightener 15 to the support body 14 is released. Thereafter, by means of the lifting straightening device 15, the tracks are fine. After fine adjustment, the position-stabilized track yoke 1 or a series of these track yokes 1 with the concrete paver is driven at reduced axle loads and reduced speeds for concrete installation. The lifting straighteners 12 with the double spindle described above are designed accordingly for these lower loads 15, and are the same grown in the lifting and lateral adjustment state F after fine adjustment.

Nach dem Erhärten des Gleisweg-Vergussbetons 9' werden die Schienenbefestigungen 135 der Schienen 12 an den beton-vergossenen Schwellenkörpem 13 gelöst und das die von den 20 Abstandshaltern 16 gehaltenen Schienen umfassende Gleisjoch 1 wird jeweils als Ganzes abgehoben. Das Gleisjoch 1 wird schließlich auf die Waggons 6 verladen und zum Montageplatz zurückgefahren und dort für den neuerlichen Einsatz vorbereitet.After hardening the Gleisweg-Vergussbetons 9 ', the rail fasteners 135 of the rails 12 are released at the concrete-molded Schwellenkörpem 13 and the track of the 20 spacers 16 held rails comprising yoke 1 is lifted in each case as a whole. The track yoke 1 is finally loaded onto the wagons 6 and moved back to the assembly site and prepared there for renewed use.

Zur Ausbildung am Stoß der Schienen 12 von zwei aufeinanderfolgenden Montage-Gleisjochen 25 1 ist folgendes auszuführen:To form at the joint of the rails 12 of two consecutive assembly track 25 1 yo is to carry out the following:

Am Schienenstoß ist die Schienenklemmung des Hebe-Richtgerätes 15 vorteilhaft so ausgeführt, dass dessen Deckplatte in Schienen-Richtung verlängert ist und mit zusätzlichen Spannklemmen zur Aufnahme der beiden Schienenenden ausgerüstet ist. 30At the rail joint rail clamping of the lifting straightener 15 is advantageously designed so that its cover plate is extended in the rail direction and is equipped with additional clamps for receiving the two rail ends. 30

Die für die letztlich exakt einzustellende, zukünftige Gleisgeometrie maßgebenden Anhaltepunkte befinden sich am Schienenfuß 123, denn diesen Punkten exakt entsprechend, ist die Lage und der Verlauf der anstelle der Schienen 12 des Gleisjoches 1 in die Schienenbefestigungen 135 auf den Schwellenblöcken 13 schließlich einzuziehenden Fahrschienen T. Es ist 35 daher insbesondere am Schienenstoß wichtiger, die Geometrie am Schienenfuß 123 kontinuierlich zu halten, als am Schienenkopf 121.The stopping points which are decisive for the future track geometry which ultimately must be precisely set are located on the rail foot 123, because these points correspond exactly, the position and course of the rails T to be finally taken in on the sleeper blocks 13 instead of the rails 12 of the track yoke 1. It is therefore more important, in particular at the rail joint, to keep the geometry at the rail base 123 continuous, than at the rail head 121.

Grundsätzlich soll an dieser Stelle erwähnt werden, dass sich das neue Gleisbau-Verfahren an der Höhen- und Seitenlage der Schienenfüße 123 - und noch exakter ausgedrückt - der Schie-40 nenfuß-Basisflächen orientiert, welche ja gleichzeitig die Lage der Schwellenoberkanten und die Lage der Schienenbefestigungen 135 auf den Schwellen definieren.Basically, it should be mentioned at this point that the new track construction method is based on the height and lateral position of the rail feet 123 - and more precisely expressed - the sliding 40 nenfuß base surfaces, which at the same time the position of the upper edges of the sleeper and the position of the Define rail fasteners 135 on the thresholds.

Die Fig. 3 zeigt eine andere bevorzugte Ausführungsform der Gleis-Stützkörper 14 in Form eines inversen ’T", wobei dessen den Stützkörperfuß bildender Horizontalbalken einerseits eine 45 große Abstützfläche und andererseits eine besonders sichere Verankerung im Spezialbeton nach dem Umgießen des Stützkörpers 14 bei der Erst-Stabilisierung des Gleisjoches 1 gewährleistet.Fig. 3 shows another preferred embodiment of the track support body 14 in the form of an inverted 'T', wherein the horizontal body forming the Stützkörperfuß on the one hand a 45 large support surface and on the other hand a particularly secure anchoring in special concrete after the casting of the support body 14 at the first Stabilization of the track yoke 1 guaranteed.

Die Fig. 4 zeigt - bei ansonsten gleichbleibenden Bezugszeichenbedeutungen - die ebene so Ladefläche eines Flachwaggons 6 und zwei auf derselben übereinander und um einen etwa der etwa mittleren Breite bst der Schienenjoch-Stützkörper 14 entsprechenden Abstand vst von z.B. 40 bis 50 cm in Querrichtung gegeneinander versetzt angeordnete Gleisjoche 1 mit ihren, die Schienen 12r in exakter Relativlage haltenden und miteinander verbindenden Abstandshaltem 16 und den an dieselben angelenkten Hilfsstützen 17 - mit den Teleskopstützbeinen 173. 55 13 AT 500 982 B1Fig. 4 shows - with otherwise constant reference numerals - the flat so loading surface of a flat car 6 and two on the same and one above the other about an approximately the middle width bst of the rail yoke support body 14 corresponding distance vst of e.g. 40 to 50 cm offset in the transverse direction staggered track yokes 1 with their, the rails 12r in exact relative position holding and interconnecting Abstandshaltem 16 and hinged to the same auxiliary supports 17 - with the telescopic support legs 173. 55 13 AT 500 982 B1

Bei dieser Art der Verladung finden die hohen Stützkörper 14 in jeweils in dem Freiraum zwischen den Schwellenkörpem 13 des jeweils darunter liegenden Joches 1 Platz. Durch dieses versetzte Stapeln können 4 bis 5 Joche ineinander und übereinander auf dem Waggon 6 positioniert und transportiert werden. 5 Für die Ablage sind jeweils die Schienen 12 von unten her gestützt, in Schwellenfach-Querträger 63 eingezogen, welche an beidseitigen Halterungen 64 des Waggons 6 verankert sind und somit die gegebenenfalls über mehrere Dutzend km zu transportierenden Gleisjoche 1 auch bei hohen Geschwindigkeiten von z.B. 80-100 km/h sicher gehalten sind. 10In this type of loading, the high support body 14 in each place in the space between the Schwellenkörpem 13 of each underlying yoke 1 place. By this staggered stacking, 4 to 5 yokes can be positioned and transported one inside the other and one above the other on the carriage 6. For the tray, the rails 12 are respectively supported from below, pulled into sleeper-compartment cross members 63, which are anchored to both-sided brackets 64 of the wagon 6 and thus the track bumps 1, optionally to be transported over several tens of kilometers, even at high speeds of e.g. 80-100 km / h are kept safe. 10

Durch die Querträger 63 werden sowohl die Masse der Gleisjoche 1 als auch die Längskräfte bei Beschleunigung und Bremsung des Transportzuges aufgenommen, und sie stellen sicher, dass die jeweils darunterliegenden Joche 1 nicht durch die jeweils darüberliegenden Joche 1 belastet sind. Die Querträger 63 für die Gleisjoch-Halterung auf den Waggons 6 sind jeweils in 15 den freibleibenden Schwellen-Zwischenfächern bzw. -räumen an Stellen eingefädelt, wo weder Stützkörper 14 und Hebe-Richtgeräte 15 noch sonstigen für die Montage der Gleisjoche 1 vorgesehene Vorrichtungen eingebaut sind. Es steht dafür bevorzugterweise jedes dritte Schwellenfach zur Verfügung. 20 Die auf dem Waggon 6 beidseitig angeordneten Rungen 64, für die Aufnahme der Querträger 63, sind vorteilhafterweise durch Verstrebungen in Längsrichtung versteift, sodass sie die oben angesprochenen Längskräfte aufnehmen können. Die Querträger können entweder nach Abladen des Gleisjoches 1 händisch oder mittels eines später noch näher zu beschreibenden Portalkranes an der Einbaustelle abgenommen und auf den Waggons 6 für die Wiederverwendung 25 an der Gleisjoch-Montagestelle zwischengelagert werden.By the cross member 63, both the mass of the track yokes 1 and the longitudinal forces are absorbed during acceleration and braking of the transport train, and they ensure that the respective underlying yokes 1 are not burdened by the respective overlying yokes 1. The cross member 63 for the track yoke mounting on the cars 6 are threaded in each case in 15 the remaining threshold intermediate compartments or spaces in places where neither support body 14 and lifting straighteners 15 nor other provided for the installation of the track yokes 1 devices are installed , It is preferred for every third threshold compartment available. 20 on both sides of the carriage 6 arranged stanchions 64, for receiving the cross member 63 are advantageously stiffened by struts in the longitudinal direction, so that they can absorb the above-mentioned longitudinal forces. The cross member can be removed either by unloading the track yoke 1 manually or by means of a later to be described in detail portal crane at the installation site and stored on the cars 6 for reuse 25 at the track yoke mounting point.

Es besteht auch die Möglichkeit, die Querträger 63 abdrehbar zu machen, sodass das Abdrehen der Querträger 63 während des Längstransportes und Ablegen des Gleisjoches 1 ohne weitere Hilfsmittel vorgenommen werden kann und dadurch das Abladen eines jeweils darunter-30 liegenden nächsten Gleisjoches 1 möglich ist.It is also possible to make the cross member 63 turnable, so that the twisting off of the cross member 63 during the longitudinal transport and laying of the track yoke 1 can be made without further aids and thereby the unloading of each below-lying lying next track yoke 1 is possible.

Der schon bei der Erläuterung der Fig. 1 kurz genannte Schienen-Abstandshalter 16 hat gleichzeitig die Funktion einer Montagehilfe. 35 Die Fig. 5 zeigt im Detail, wie derselbe an der einzelnen Schiene 12 angreift und die Schienen 12 in exakter Relativlage zueinander hält.The already briefly mentioned in the explanation of Fig. 1 rail spacers 16 also has the function of a mounting aid. Fig. 5 shows in detail how the same acts on the single rail 12 and holds the rails 12 in exact relative position to each other.

Dabei sind folgende Grundsätze beachtet: Das Verkippen der Schienen 1 unter Belastung durch einen nach erfolgter Erst-Stabilisierung darüber rollenden Bauzug wird durch das Auflie-40 gen an der Flanke 1232 des Schienenfußes 123 im Bereich A2 und durch die möglichst hoch angeordnete Verschraubung 125, 165 durch den Schienensteg 122 hindurch vermieden. Diese Verschraubung kann sowohl durch eine Schraube 125 in der bzw. in der Nähe der Mittelachse des Abstandshalters 16 als auch durch zwei Schrauben beidseitig derselben erfolgen. 45 An der Innen-Unterseite des Schienenkopfes 121, etwa im Bereich A1, wird durch den Abstandshalter 16 das Gewicht des montierten Gleisjoches 1 mit dessen Stützkörpem aufgenommen. An der dortigen Innenkante 1211 des Schienenkopfes 121 wird in Verbindung mit der unteren Auflagefläche 1212 die Schienenneigung eingestellt. Der Auflagebereich A1 des Abstandshalters 16 endet in einem Maximum Max im Subabschnitt A1, wo die Oberkante des 50 Abstandshalters 16 wieder nach innen I hin abfällt.The following principles are observed: The tilting of the rails 1 under load by a after initial stabilization over rolling train is by the Auflie-40 gene on the flank 1232 of the rail foot 123 in the area A2 and by the highest possible screw 125, 165 avoided by the rail web 122 therethrough. This screwing can be done both by a screw 125 in or near the central axis of the spacer 16 as well as by two screws on both sides thereof. On the inner underside of the rail head 121, approximately in the area A1, the weight of the mounted track yoke 1 with its supporting bodies is received by the spacer 16. At the local inner edge 1211 of the rail head 121, the rail inclination is set in conjunction with the lower support surface 1212. The support area A1 of the spacer 16 ends in a maximum Max in the subsection A1, where the top of the 50 spacer 16 again falls inward I out.

Der Anlagebereich A2 an der Schienenfuß-Innenflanke ist für die Einstellung der Spurweite entsprechend der Herstelltoleranz des Schienenfußes 123 der Montageschiene 12 anzupassen. 55 Ebenso ist die obere Seitenlänge im Bereich A1 entsprechend der Herstelltoleranz der Asym- 14 AT 500 982 B1 metrie der Montageschienen 12 für jede derselben, also links und rechts, gesondert einzustellen.The contact area A2 on the inside end of the rail foot is to be adjusted to adjust the track width according to the manufacturing tolerance of the rail foot 123 of the mounting rail 12. Likewise, the upper side length in the area A1 must be set separately for each of them, ie left and right, according to the manufacturing tolerance of the Asym-14 AT 500 982 B1 metrie of the mounting rails 12.

An der seitlichen Schienenkopf 121 - Anlage ist im Bereich A1 ein Ausschnitt von mind. 36 mm 5 unter Schienenoberkante und 60 mm Breite für die Spurkränze 62 der Räder 61 der Fahrzeuge 6 freizuhalten.At the lateral rail head 121 system, a cutout of at least 36 mm 5 below the rail upper edge and 60 mm width for the wheel flanges 62 of the wheels 61 of the vehicles 6 is to be kept clear in the area A1.

Dieser Freiraum kann unmittelbar an der Schienenkopf-Innen-Unterkante 1211 für die seitliche Anlage genutzt werden, da der Spurkranz 62 peripher-außen gerundet ist und es trotz dieser io Anlagefläche im Bereich A1 zu keinem Kontakt zwischen Abstandshalter 16 und Peripherie Pe des Spurkranzes 62 der Räder 61 der Schienen-Fahrzeuge kommt.This space can be used directly on the rail head inner bottom edge 1211 for the lateral system, since the flange 62 is rounded peripherally outside and despite this io contact surface in the area A1 to no contact between spacer 16 and periphery Pe of the flange 62 of the Wheels 61 of the rail vehicles comes.

Im Bereich A3 ist eine Kontur des Abstandshalters 16 vorgesehen, wo keine Anlage an die Schiene 12 erfolgt. 15In the area A3, a contour of the spacer 16 is provided, where no contact with the rail 12 takes place. 15

Es sind also zwischen den beiden Gleisjoch-Montageschienen 12, z.B. im Abstand von 1,80 m voneinander, entsprechend jeweils drei Schwellenfächem die Abstandshalter-Querstreben 16 eingebaut, welche sich gegen den Schienenfuß 121 und gegen die Unterkante 1211 des Schienenkopfes 11 hin abstützen. 20Thus, between the two track yoke mounting rails 12, e.g. at a distance of 1.80 m from each other, corresponding to each three threshold subjects the spacer cross braces 16 installed, which are supported against the rail 121 and against the lower edge 1211 of the rail head 11 out. 20

Gegen die Querstreben 16 ist die Schiene 12 mittels Verschraubung 125,165 verspannt.Against the cross struts 16, the rail 12 is clamped by means of screw 125,165.

Die Verspannung hat dabei folgende Funktionen: 25 Sie dient zur Aufnahme der Seitenkräfte aus der Führung des Rades 61 beim Befahren der Schienen 12 mit dem Bauzug mit voller Achslast. Dieser Lastfall verursacht die höchsten aufzunehmenden Kräfte. Es muss auf jeden Fall ein Auskanten der Schiene 12 unter dieser hohen Belastung vermieden werden. 30 Die Seitenkräfte werden von einer Schiene 12 über die Verschraubung 125, 165 in den Abstandshalter 16 und von diesem in die jeweils zweite Schiene 12 abgeleitet.The bracing has the following functions: 25 It serves to absorb the lateral forces from the guide of the wheel 61 when driving the rails 12 with the train with full axle load. This load case causes the highest forces to be absorbed. It must be avoided in any case an edge of the rail 12 under this high load. The lateral forces are derived from a rail 12 via the screw 125, 165 in the spacer 16 and from this into the respective second rail 12.

Die Ableitung der Seitenkräfte in den Untergrund findet über die Verspannung mit den vorher beschriebenen Hebe-Richtgeräten 15 über die Stützkörper 14 und deren Stabilisierung mit 35 Spezialbeton 9 zum Untergrund 11 hin statt, wobei in diesem Fall die Rahmensteifigkeit des Gleisjoches 1 bereits eine sehr hohe Dämpfung des Systems bewirkt.The derivation of the lateral forces in the ground takes place via the tension with the previously described lifting straighteners 15 on the support body 14 and their stabilization with 35 special concrete 9 to the ground 11 out, in which case the frame stiffness of the track yoke 1 already a very high attenuation of the system.

Durch die Auflast der einzelnen Räder 61 der Waggons 6, Lokomotiven od.dgl. auf beide Schienen 12 erfolgt auch eine gleichmäßige Verteilung der Seitenkräfte auf die Schienen 12 und die 40 entsprechenden Stützen 14.By the load of the individual wheels 61 of the wagons 6, locomotives or the like. On both rails 12 is also a uniform distribution of the lateral forces on the rails 12 and 40 corresponding supports 14th

Die Abstandshalter 16 haben weiterhin die Aufgabe der Halterung der Schienen 12 mit allen daran montierten Lasten. 45 Für das provisorische Vorrichten und Stabilisieren des Gleises wird das Gleisjoch 1 z.B. an jedem zweiten Abstandshalter 16 mittels den schon oben beschriebenen, an denselben angelenkten Hilfsstützbeinen 173 gegen den Untergrund 11 hin abgestützt.The spacers 16 also have the task of mounting the rails 12 with all loads mounted thereon. For the temporary provision and stabilization of the track, the track yoke 1 is e.g. on each second spacer 16 by means of the already described above, hinged to the same auxiliary support legs 173 supported against the substrate 11 out.

Dafür sind in der Praxis folgende Lasten pro 3.60 m Gleisjoch-Länge zu übernehmen: 50In practice, the following loads per 3.60 m track yoke length have to be taken over: 50

Schiene mit 60,36 kg/m, Schwellen mit 100 kg je Block: alle 60 cm, Stützkörper mit 60 kg: alle 1,80 m, Heberichtgeräte mit 6 kg: alle 1,80 m.Rail with 60.36 kg / m, sleepers with 100 kg per block: every 60 cm, supporting body with 60 kg: every 1.80 m, lifting equipment with 6 kg: every 1.80 m.

Diese diesbezüglichen Kräfte werden primär durch die Auflage des Schienenkopfes 121 am 55 den Abstandshalter 16 übernommen. 15 AT 500 982 B1These related forces are primarily taken over by the support of the rail head 121 on 55, the spacer 16. 15 AT 500 982 B1

Ein Abgleiten des Schienenkopfes 121 von dem Abstandshalter wird durch die Verschraubung 125,165, verhindert.A sliding of the rail head 121 of the spacer is prevented by the screw 125,165.

Eine weitere wichtige Funktion des Schienenhalters 16 besteht in der Einstellung der exakten 5 Gleisgeometrie (insbesondere Spurweite und Schienenneigung). Da vorgesehen ist, die Montageschienen 12 später gegen die endgültigen Fahrschienen 12' mit ihren beispielsweise 120 m Einbaulänge auszutauschen, ist für die Herstellung der Fahrbahn das Schienenauflager und damit der Schienenfluss 123 der Montagejoch-Schienen 12 die maßgebende Geometrie. io Die Abstandshalter müssen daher bei deren erster und jeder weiteren Montage folgendermaßen angepasst und eingestellt werden: Spur am Schienenfuß 123, jeweils unter Berücksichtigung der Abweichung der Schienenfuß-Breite korrigiert; Schienenneigung am Schienenfuß, jeweils um Abweichungen, Schienenfuß-Breite und Schienenasymmetrie korrigiert. 15 Die Herstellungstoleranz in der Schienenhöhe und in der Schienenkopfbreite kann an dieser Stelle außer acht gelassen bleiben. Für das Vorrichten des Gleisjoches 1 vor dessen Verbindung mit dem Untergrund 11 und dessen Stabilisieren wird eine einfache Richteinrichtung mit drei Winden, die mit großem Erfolg in der Praxis zum Einsatz gelangt ist, verwendet. Mit den beidseitig des Gleisjoches 1 und außerhalb desselben angeordneten Vertikal-Winden werden 20 die Geleise-Höhen und mit einer Horizontal-Spindel der Einrichtung die Seit-Lage der Geleise einjustiert.Another important function of the rail holder 16 is the setting of the exact track geometry (in particular gauge and rail inclination). Since it is envisaged to exchange the mounting rails 12 later against the final rails 12 'with their example 120 m installation length, the Schienenauflager and thus the rail flow 123 of the mounting yoke rails 12 is the relevant geometry for the production of the road. The spacers must therefore be adapted and adjusted as follows during their first and subsequent assembly: Track on rail foot 123, corrected in each case taking into account the deviation of the rail foot width; Rail inclination at the rail foot corrected by deviations, rail foot width and rail asymmetry. 15 The manufacturing tolerance in rail height and rail head width can be ignored here. For the provision of the track yoke 1 before its connection to the substrate 11 and its stabilization, a simple straightening device with three winches, which has been used with great success in practice, is used. With the vertical winches arranged on both sides of the track yoke 1 and outside thereof, the track heights are adjusted and the lateral position of the tracks is adjusted with a horizontal spindle of the device.

Mit Hilfe dieser Einrichtung ist es möglich, das Gleisjoch 1 bezüglich Höhenlage und Richtung sehr exakt in Position zu bringen. 25 Für die Fixierung der so eingestellten Gleisjoch-Lage sind an jeden zweiten Abstandshalter 16 die abklappbaren Hilfsstützbeine 173 angelenkt, welche jeweils über einen schraubverstellbaren teleskopartigen Ausschub in jeder Länge bzw. Höhe verstellt werden können. Zur Fixierung der Lage der Hilfs-Stützbejne 173 ist vorteilhafterweise jeweils eine Fixierungs-Strebe 30 vorgesehen, welche je nach Anwendung in der eingeklappten Position bzw. in der ausgefahrenen Position durch eine Schraube od. dgl. gesichert wird.With the help of this device, it is possible to bring the track yoke 1 with respect to altitude and direction very accurately in position. 25 For fixing the track yoke position thus set the hinged auxiliary support legs 173 are hinged to each second spacer 16, which can be adjusted in each case via a schraubverstellbaren telescopic extension in any length or height. To fix the position of the auxiliary Stützbejne 173 advantageously a fixing strut 30 is provided, which od depending on the application in the retracted position or in the extended position by a screw. Like. Is secured.

Auf diese Weise ist es möglich, das mit Hilfe der zuvor beschriebenen einfachen Hebe-Richteinrichtung erst-positionierte Gleis 1 in der jeweils vorgesehenen Lage gegenüber dem 35 Untergrund zu positionieren und abzustützen und in dieser Position exakt zu halten.In this way it is possible to position and support the track 1 positioned in the respectively provided position with respect to the ground using the simple lifting straightening device described above and to hold it exactly in this position.

Die Hilfsstützen 17 tragen jeweils nur das oben angegeben Eigengewicht des Gleisjoches 1 und dienen als Halterungen der Gleisjoch-Lage, bis die oben beschriebenen Stützkörper 14, von der Spezial-Bindemittelmasse umgossen, durch dieselbe stabilisiert wird. Nach erfolgtem Stabilisie-40 ren können Hilfs-Stützen 17,173 eingeklappt und gesichert werden.The auxiliary supports 17 each carry only the above-stated weight of the track yoke 1 and serve as brackets of the track yoke position until the above-described support body 14, encapsulated by the special binder composition, is stabilized by the same. After stabilization has taken place, auxiliary supports 17.173 can be folded in and secured.

Die Fig. 6 zeigt - bei ansonsten gleichbleibenden Bezugszeichen-Bedeutungen - die Situation nach dem weiter oben schon beschriebenen, ersten Stabilisieren der Gleisjoche 1 durch Eingießen der Stützkörper 14 in einem eingleisigen Tunnel, es ist dort deutlich die unterschiedliche 45 Höhe der beidseitig der Fahrbahn verlaufenden Bankette, in deren linkem ein Kabelkanal verläuft, zu erkennen.Fig. 6 shows - with otherwise constant reference numerals meanings - the situation after the already described above, first stabilizing the track yokes 1 by pouring the support body 14 in a single-track tunnel, there is clearly the different 45 height extending on both sides of the roadway Banquets, in whose left a cable channel runs, to recognize.

Zu der in den Fig. 7a und 7d gezeigten Portalkran-Einrichtung 8 ist erläuternd auszuführen, dass für eine optimale Unterstützung des neuen Gleis-Bauverfahrens eine Ausrüstung bzw. so Adaptierung von auf dem Markt verfügbaren Portalkränen nach folgenden Kriterien zu beachten sind:For the gantry crane device 8 shown in FIGS. 7a and 7d, it should be explained by way of explanation that for optimal support of the new track construction method, equipment or adaptation of gantry cranes available on the market must be observed according to the following criteria:

Aufgrund üblicher Tunnelquerschnitte und der eher geringen Belastungsfähigkeit der dortigen Bankette können die heute im Gleisbau üblichen Portalkräne nicht zum Einsatz kommen. 55Due to common tunnel cross-sections and the rather low load capacity of the local banquets, the gantry cranes that are common today in track construction can not be used. 55

Claims (15)

16 AT 500 982 Bi Wie in der Fig. 7a dargestellt, sind die Verfahr-Schienen 1' der Portalkran-Einrichtung 8 auf dem Bankett positioniert. Da jedenfalls an einer Seite, wie aus der Fig. 6 ersichtlich, im Bankett ein Kabelkanal eingebaut ist, und diese nur mit geringen Lasten belastet werden darf, müssen die Kranschienen 1' in einem relativ großen Abstand von den Bankettkanten aufgelegt werden. 5 Daher ist es erforderlich, die Spurweite üblicher, im Bahnbau eingesetzter Portaikräne zu vergrößern und zusätzlich so zu gestalten, dass mit asymmetrisch langen Portalkran-Vertikalbalken gearbeitet werden kann. Die Anpassung an die größere Spurweite kann durch eine einseitige Verlängerung des oberen Kran-Querbalkens erfolgen. Um die Kran-Einrichtung 8 zukünftig wieder als üblichen Kran im standardmäßigen Gleisbau einsetzen zu können, kann io diese Verlängerung als temporärer Einbau, z.B. in Form eines Zwischenstücks erfolgen. Da die seitlichen Bankette innerhalb der Tunnels meist unterschiedlicher Höhe aufweisen, ist es zur Vermeidung von Schräglagen erforderlich, eine Seite des Portalkran-Fahrwerkes höhenmäßig anpassbar zu gestalten. Diese höhenmäßige Anpassung kann vorteilhaft mittels hydrauli-15 scher Hebevorrichtung erfolgen, welche z.B. in ihren jeweiligen Höhen-Positionen durch einen Bolzen od. dgl. dauerhaft gesichert werden kann. Bei Arbeiten im Rampenbereich von Kurven kann eine gewisse Schräglage der Portalkran-Einrichtung 8 bei besonderen Arbeitsverhältnissen in Kauf genommen werden. Bei Verlassen 20 eines solchen Bereiches wird die Höhe des Fahrwerkes dann wieder an die jeweiligen Erfordernisse angepasst, was höhere Geschwindigkeiten erlaubt. Für das Abladen der Gleisjoche 1 von den Gleisjoch-Transportwaggons und das Ablegen auf der Tunnelsohle ist die Lastaufnahme des Kranes 8 seitlich verfahrbar gestaltet. 25 Wie aus dem schon in der Fig. 4 gezeigten Verladeschema ersichtlich, ist es ja erforderlich, die Gleisjoche 1 vom Waggon 6 durchaus auch außermittig versetzt aufnehmen zu können. Ebenso ist bei der Ablage eine seitliche Korrektur, insbesondere in Folge der asymmetrisch angeordneten Fahrschienen T der Portalkran-Einrichtung 8 erforderlich. 30 Patentansprüche: 1. Verfahren zum Verlegen eines Gleisstranges einer festen Fahrbahn im Zuge des Neu-, 35 Um- oder Weiterbaus einer, gegebenenfalls mehrgleisigen, mit Schienenfahrzeugen, bevorzugt Eisenbahnen, befahrbaren Fahrstrecke, insbesondere Tunnelstrecke bzw. einer eingleisigen, festen Fahrbahn, wobei - ausgehend von dem freien bzw. offenen vorderen Ende eines schon bestehenden oder vorher verlegten und stabilisierten Gleisstranges ein -bevorzugterweise jeweils an einer von der Einbaustelle entfernten Montagestelle, z.B. im 40 Bereich eines Tunneleingangs, vormontiertes, die beiden auf den Schienentragelementen, insbesondere Schwellen, montierten Schienen umfassendes Gleisjoch bzw. Gleisgestänge an die Einbaustelle am genannten freien Ende des Gleisstranges bzw. im Bereich desselben verbracht, und mittels - auf sich am Untergrund abstützenden, bevorzugt aus Beton gefertigten, Schienenjoch-Stützkörpem angeordneten, jeweils zwischen den Oberseiten 45 der Stützkörper und dem Schienenfuß der beiden Schienen angeordneten Hebe-Richtgeräten das Geleise in die bzw. den vorgesehene exakte Höhen-, Kurvenüberhö-hungs- und Seitenlage und -verlauf eingerichtet wird, wonach die Schienen-Tragelemente zur Lagestabilisierung des Gleisstranges mittels aushärtender Verguss-Bindemittelmasse, insbesondere Beton, unter- und umgossen bzw. in dieselben eingegossen werden, dato durch gekennzeichnet, dass - für die Verlegung der Geleise (12,12') von, insbesondere eingleisigen, Fahrstrecken auf topografisch unregelmäßigen und nicht der Überhöhung des Gleises, z.B. in Kurvenabschnitten, entsprechend ausgebildeten Untergründen (11), wie beispielsweise auf der im Wesentlichen nicht verebneten und bloß grob horizontalen Sohle eines Tunnels, 55 - unter Verzicht auf die Herstellung einer festen, ebenen Unterlagsbahn, wie beispiels- 5 10 15 20 25 30 35 40 45 50 17 AT 500 982 B1 weise aus vorgefertigten, über eine Tragschicht auf Basis von Beton od. dgl. an den Untergrund (11) gebundenen Tragplatten als Unterlage für die Schienenjoch- bzw. Schie-nen-Stützkörper (14) vor der Verlegung an der Einbaustelle am jeweiligen freien Ende des schon bestehenden Gleisstranges oder des vorher verlegten Gleisstrang-Abschnitts, entweder im Nahbereich der Einbaustelle oder aber an der obengenannten, von der Einbaustelle entfernten Montagestelle die - entweder die beiden auf den Schwellen befestigten Schienen (12) oder aber einen die beiden auf Schwellenblöcken (13) befestigten Schienen (12) in exakter vorgegebener Relativlage zueinander haltenden und miteinander verbindenden Abstandshalter (16) umfassende(n) - vormontierten, für den Einbau vorgesehenen Gleisjoche (1) mit - jeweils über an die Unterseite des Schienenfußes (123) jeder der beiden Schienen (12) lagestabil, jedoch lösbar gebundene, sich bevorzugterweise in ihrer hochbelastbaren Grundposition befindliche, Hebe-Richtgeräte (15) - selbst ebenfalls lösbar an die Schienen (12) gebundenen in - im Vergleich zu den Abständen (asw) der Schwellen bzw. Schwellenkörper (13) voneinander - größeren Abständen (ast) und jeweils im Zwischenraum zwischen den Schwellen bzw. Schwellenkörpem (13) angeordneten, vom genannten Gleisjoch (1, 1', T'...) bzw. von den Schienen (12) im Wesentlichen senkrecht, bzw. in der Neigung der Schienen, z.B. mit 1/40 bzw. 1/20 Neigung nach innen, abwärts ragenden - Schienenjoch-Stützkörpem (14) ausgestattet werden, dass die derart mit den Stützkörpem (14) ausgestatteten Gleisjoche (1, T, 1"....) - nach Verbringung an die Einbaustelie im Falle der Vor-Montage an einer von der Einbaustelle entfernten Montagestelle in eine deren jeweiligen Anschluss an das freie Ende des schon bestehenden bzw. vorher verlegten, Schienenstranges ermöglichende und unter Einsatz von Hilfsstützen (17) od. dgl. in - der bzw. dem jeweils planmäßig vorgegebenen Lage, Ausrichtung bzw. Verlauf im Wesentlichen zumindest grob entsprechender bzw. entsprechendem Lage, Ausrichtung bzw. Verlauf positioniert und eingerichtet werden, wobei die Stützkörper (14) in ihrer frei abwärts zum Untergrund (11) hin ragenden Stellung unverändert belassen bleiben und mit ihren Fußenden (143) mit dem Untergrund (11) nicht in Kontakt gebracht werden, dass die genannten Fußenden (143) bzw. Fußendbereiche der Stützkörper (14) nach Umschalung mit vom Untergrund (11) ausgehend aufragender Schalung (90) zur Lagestabilisierung und -festlegung der Stützkörper (14) mit einer rasch abbindenden und exakt erhärtenden (Spezial-)Bindemittelmasse (9), insbesondere Schnell-Beton bzw. -Mörtel, unter- und umgossen und in dieselbe eingebettet werden, dass nach dem Aushärten der Masse (9) auf dem auf diese Weise stabilisierten - noch keinen weiteren Richtvorgängen unterworfenen, jedoch schon direkt mit hohen Lasten befahrbaren, neuen Gleisabschnitt für die Herstellung der Fahrbahn vorgesehene Verguss-Bindemittelmasse (9), insbesondere Regelbeton, mittels Beton-Transport- bzw. -Bereitungsseinrichtung herangeführt wird und direkt aus dem jeweiligen Waggon derselben bis zu einer Schichthöhe von wenigen Zentimetern, vorzugsweise etwa 5 cm, unterhalb der Unterkanten der Schwellen bzw. Schwellenblöcke (13) entladen und aufgeschichtet wird, dass nach dem Aushärten der ebengenannten Verguss-Bindemittelmasse (9) mittels der sich jeweils zwischen Schienenfuß (123) und Stützkörpern (14) angeordneten Hebe-Richtgeräte (15) das jeweilige Gleisjoch (1) bzw. dessen Schienen (12) in die bzw. den, der bzw. dem planmäßig vorgesehene(n) Lage, Ausrichtung und Verlauf entsprechend, nunmehr finale(n) exakte(n) Lage, Ausrichtung bzw. Verlauf eingerichtet werden, dass danach zur Ausbildung der festen Fahrbahn (8) die Schwellen bzw. Schwellenkörper (13) mit der - bevorzugt mittels einer auf dem mit mehreren, in der beschriebenen Weise stabilisierten und eingerichteten und im Wesentlichen voll fahrbetriebsbelastbaren Geleisejochen (1, 1', 1",...) gebildeten Schienenstrang-Abschnitt in die unmittelbare Nähe der Einbaustelle herangeführten Bindemittel-Transport- und Bereitungseinrichtung herantransportierten - Verguss-Bindemittelmasse (9‘) unter- und 55 18 AT 500 982 B1 umgossen werden, und - dass nach Aushärtung der Verguss-Bindemittelmasse (9') die sich zwischen Schienenfuß (123) und Stützkörpern (14) befindlichen Hebe-Richtgeräte (15) zusammen mit den oder getrennt von den Montageschienen ausgebaut und für einen neuerlichen Einbau 5 an die Gleisjoch-Montagestelle verbracht werden.16 AT 500 982 Bi As shown in Fig. 7a, the traversing rails 1 'of the gantry crane device 8 are positioned on the banquet. Since at least on one side, as shown in FIG. 6, in the banquet a cable duct is installed, and this may be charged only with light loads, the crane rails 1 'must be placed at a relatively large distance from the banquet edges. 5 Therefore, it is necessary to increase the gauge of common, used in railway construction portaicräne and in addition to make so that you can work with asymmetrically long gantry vertical beam. The adaptation to the larger gauge can be done by a one-sided extension of the upper crane crossbeam. In order to be able to use the crane device 8 again in the future as a standard crane in standard track construction, this extension can be used as a temporary installation, e.g. take place in the form of an intermediate piece. Since the lateral banquets within the tunnels usually have different heights, it is necessary to avoid tilting to make one side of the gantry crane chassis height adjustable. This height adjustment can advantageously be effected by means of a hydraulic lifting device, which can be e.g. od in their respective height positions by a bolt. Like. Can be permanently secured. When working in the ramp area of curves, a certain inclination of the gantry crane device 8 can be accepted in special employment conditions. When leaving such a range, the height of the landing gear is then adjusted again to the respective requirements, which allows higher speeds. For the unloading of the track yokes 1 of the Gleisjoch transport waggons and the placing on the tunnel sole the load suspension of the crane 8 is designed to be movable laterally. As can be seen from the loading diagram already shown in FIG. 4, it is indeed necessary to be able to receive the track yokes 1 from the wagon 6 in an off-center offset manner. Likewise, in the storage a lateral correction, especially as a result of the asymmetrically arranged rails T of the gantry crane device 8 is required. 35. A method for laying a rail track of a fixed carriageway in the course of new, 35 rebuilding or continuing a, possibly multi-tracked, with rail vehicles, preferably railways, driveable route, especially tunnel route or a single-track, fixed carriageway, starting from the free or open front end of an already existing or previously installed and stabilized rail track - preferably each at a remote from the installation point mounting location, eg in the area of a tunnel entrance, preassembled, the two on the rail support members, in particular sleepers mounted rails comprehensive track yoke or track link at the installation point at the said free end of the rail track or in the same spent, and by means of - supported on the ground, preferably arranged concrete, Schienenjoch Stützkörpem arranged, respectively between the tops 45 of the support body and the rail of the two rails arranged lifting straightening the tracks in the intended or exact height, Kurvenüberhö- hungs- and lateral position and course is set up according to which the rail support elements for stabilizing the position of the rail track by means of curing potting compound, especially concrete, under and poured or poured into the same, characterized in that - for the laying of the tracks (12,12 ') of, in particular single-track , Routes on topographically imprecise and not the overhang of the track, e.g. in curved sections, correspondingly formed bases (11), such as on the substantially not leveled and only roughly horizontal sole of a tunnel, 55 - waiving the preparation of a solid, flat underlay, such as for example 45 50 17 AT 500 982 B1, from prefabricated support plates bonded to the base (11) via a base layer based on concrete or the like, as a support for the rail yoke or rail support bodies (14) prior to laying the installation point at the respective free end of the existing track or the previously laid track-rail section, either in the vicinity of the installation or at the above-mentioned, from the installation site remote mounting the - either the two mounted on the threshold rails (12) or one the two mounted on threshold blocks (13) rails (12) in exact predetermined relative position to each other holding un the spacer bars (16) interconnecting spacers (16) - preassembled track sleepers (1) intended for installation with - in each case via the underside of the rail foot (123) of each of the two rails (12) stable in position but releasably bonded, preferably in their highly resilient basic position located, lifting straightening devices (15) - even releasably to the rails (12) bound in - compared to the distances (asw) of the threshold or threshold body (13) from each other - larger distances (ast) and in each case Space between the sleepers or Schwellenkörpem (13) arranged by said track yoke (1, 1 ', T' ...) or by the rails (12) substantially perpendicular, or in the inclination of the rails, eg with 1/40 or 1/20 inclination inwards, downwardly projecting - Schienenjoch Stützkörpem (14) are equipped so that the thus equipped with the Stützkörpem (14) track yokes (1, T, 1 "....) - after Shipment to the installation film in the case of pre-assembly at a mounting point remote from the installation point in a respective connection to the free end of the already existing or previously laid, rail track enabling and using auxiliary supports (17) od. Like. the respectively scheduled position, orientation or course of substantially at least roughly corresponding or corresponding position, alignment or course are positioned and set up, wherein the support body (14) in its free downward to the ground (11) projecting position remain unchanged and with their foot ends (143) are not brought into contact with the substrate (11), that said foot ends (143) and Fußendbereiche the Stützkörp he (14) after Umschalung with from the substrate (11) starting upstanding formwork (90) for stabilizing the position and fixing the support body (14) with a rapidly setting and exactly hardening (special) binder mass (9), in particular quick-concrete or -Mortel, under and overcast and embedded in the same, that after curing of the mass (9) in the stabilized in this way - yet subjected to further straightening, but already directly loadable with high loads, new track section for the production of the road provided potting binder mass (9), in particular regular concrete, by means of concrete transport or preparation device is introduced and directly from the respective wagon of the same up to a layer height of a few centimeters, preferably about 5 cm, below the lower edges of the threshold or threshold blocks (13) unloaded and piled up that after curing of the above-mentioned casting-binder mass (9) m Ittels of each between rail (123) and supporting bodies (14) arranged lifting straightening devices (15) the respective track yoke (1) or its rails (12) in the or, the planned or planned location (s) , Orientation and course accordingly, now final (s) exact (n) location, alignment or course are set up, that thereafter for the formation of the fixed track (8), the thresholds or threshold body (13) with the - preferably by means of on the with a plurality of track rail sections formed and stabilized in the way described above and constructed and substantially fully operationally loadable (1, 1 ', 1 ", ...) transported into the binding agent transport and preparation device brought into the immediate vicinity of the installation point; Binder material (9 ') under and 55 18 AT 500 982 B1 are encapsulated, and - that after hardening of the casting-binder mass (9') between the rail foot (123) and Stut (4) located lifting straightening devices (15) together with or separated from the mounting rails and spent for a new installation 5 to the track yoke mounting point. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Schienen-Stützkörper (14) für die Dauer, des gegebenenfalls notwendigen Transportes zur Einbaustelle, des Aufstellens, Einrichtens und Stabilisierens der Schienenjoche io (1, T, 1",...) mittels das zwischengeschaltete Hebe-Richtgerät (15) einschließender, an den Schienenfuß (123) lösbar befestigbarer bzw. denselben oberseitig übergreifender, vor dem finalen Einrichten der Schienen (12) bzw. Schienenjoche (1,1', 1") entfembaren Klammem (154) od. dgl. oder Schraubverbindungen (147, 148) relativ-lagefest und -lagestabil unterseitig an die Schienen (12) der Schienenjoche (1, T, 1",...) gebunden bleiben. 152. The method according to claim 1, characterized in that the rail support body (14) for the duration of any necessary transport to the installation site, the setting up, setting up and stabilizing the rail yokes io (1, T, 1 ", ...) by means of the intermediate lifting straightener (15) enclosing, on the rail foot (123) releasably attachable or the same upper side cross over, before the final establishment of the rails (12) or Schienenjoche (1,1 ', 1 ") removable Klammem (154 ) or the like or screw connections (147, 148) remain relatively fixed in position and stable in position on the underside of the rails (12) of the rail yokes (1, T, 1 ",...). 15 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass Stützkörper (14) mit im Wesentlichen die Form von eines schlanken rechteckigen Pyramidenstumpfes oder eines T-Blocks mit unten liegendem Horizontal-Balken aufweisender Gestalt eingesetzt werden. 203. The method according to claim 1 or 2, characterized in that support body (14) are used with substantially the shape of a slender rectangular truncated pyramid or a T-block with lying down horizontal bar-shaped figure. 20 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass - die für den Fall der Verlegung von Gleisjochen (1) mit auf Einzel-Schwellenkörpem (13) befestigten Schienen (12) vorgesehenen, die beiden Schienen (12) des Gleisjoches (1) miteinander verbindenden und dieselben in exakter Relativlage zueinander haltenden 25 Abstandshalter (16) - in ihren für das exakte, seitliche Anliegen an die Schienen (12) vorgesehenen, beiden Anliegebereichen (A1, A2) eine Kontur (A3) mit einem im Bereich der unteren Wange (1211, 1212) des Schienenkopfes (121) und des dortigen Übergangs in den Schienenhals (122) konturkonform anliegenden Schienenkopf-Anliege-Abschnitt (A1) und einem 30 die Höhe (hsf) des innenseitigen Teils des Schienenfußes (123) überschreitenden, an die Flanke (1232) des Schienenfußes (123) anliegenden, linearen Fußflanken-Abschnitt (A2) und mit ansonsten von der Schienen-Innenkontur abgerücktem bzw. beabstande-tem restlichem Kontur-Abschnitt (A3) ausgebildet ist, - wobei sich der Schienenkopf-Anliege-Abschnitt (A1) nur so weit aufwärts in einen 35 Schienenkopf-Innenflanken-Subabschnitt (SA1) hineinzieht, dass ein Kontakt mit den Radkränzen (62) der Räder (61) der die Geleise befahrenden Schienenfahrzeuge (6) bzw. mit den peripherie-nahen Bereichen der Radkränze (62) ausgeschlossen ist, und dass dieser Subabschnitt (SA1) in einem Maximum (Max) endet, von dem aus die Kontur zur Innenseite (I) hin so weit abfällt, dass ein Kontakt mit der äußersten Peripherie 40 (Pe) der Radkränze (62) der Räder (61) der Fahrzeuge (6) ebenfalls ausgeschlossen ist, und dieser Subabschnitt (SA1) schließlich weiter zur Innenseite I hin in einen Hori-zontal-Veriauf übergeht.4. The method according to any one of claims 1 to 3, characterized in that - provided in the case of the installation of track yokes (1) mounted on single Schwellenkörpem (13) rails (12), the two rails (12) of the track yoke (1) interconnecting and the same in exact relative position holding each other 25 spacers (16) - in their for the exact, lateral concerns to the rails (12) provided, two abutment areas (A1, A2) a contour (A3) with a in the area the lower cheek (1211, 1212) of the rail head (121) and the local transition in the rail neck (122) contour conforming rail head abutment portion (A1) and a 30 the height (hsf) of the inside part of the rail foot (123) bordering , on the flank (1232) of the rail foot (123) adjacent, linear Fußflanken section (A2) and with otherwise from the rail inner contour abgerücktem or spaced tem residual contour section (A3) - the rail head abutting portion (A1) extends only so far upwards into a rail head inner flank subsection (SA1) that contact with the wheel rims (62) of the wheels (61) of the tracks Rail vehicles (6) or with the peripheral-near areas of the wheel rims (62) is excluded, and that this subsection (SA1) ends in a maximum (Max), from which the contour to the inside (I) so far away, that contact with the outermost periphery 40 (Pe) of the wheel rims (62) of the wheels (61) of the vehicles (6) is also excluded, and this subsection (SA1) eventually merges further towards the inside I in a horizontal direction , 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, zur Bildung der 45 Schienenjoche (1) die auf Schweden-Blöcken (13) montierten Schienen (12) der Schienen joche (1) mittels in den Schienen-Abstandshaltem (16) verankerbarer, jeweils Öffnungen (125) im Schienensteg (122) durchsetzender Schrauben (165) mit dem Abstandshalter (16) verbunden und verspannt werden. so5. The method according to any one of claims 1 to 4, characterized in that for forming the 45 rail yokes (1) on Sweden blocks (13) mounted rails (12) of the rail yokes (1) by means of the rail Abstandshaltem (16). anchored, each openings (125) in the rail (122) passing through screws (165) are connected to the spacer (16) and clamped. so 6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass jeweils eine Mehrzahl, vorzugsweise bis zu fünf, mit den unter Zwischenschaltung der Hebe-Richtgeräte (15) an die Schienen (12) lösbar gebundenen, abwärts ragenden Stütz-körpem (14) aufgestattete Gleisjoche (1) an die jeweils um ein, wie im Anspruch 1 be-55 schrieben, vorher eingebautes, Gleisjoch (1) vorrückende Einbaustelle herangeführt wird 1 9 AT 500 982 B1 bzw. werden.6. The method according to any one of claims 1 to 5, characterized in that in each case a plurality, preferably up to five, with the interposition of the lifting straightening devices (15) to the rails (12) releasably bound, downwardly projecting support body ( 14) equipped track sleepers (1) to the in each case by a, as described in claim 1 written-55, previously built, the track yoke (1) advancing mounting point is introduced 1 9 AT 500 982 B1 or be. 7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, 5 dass die mit den - an die Schienenfüße (123) unter jeweiliger Zwischenschaltung der He be-Richtgeräte (15) gebundenen und relativlage-stabilisierten, nach abwärts ragenden Stützkörpern (14) ausgestatteten Gleisjoche (1, 1', 1",...), jeweils zueinander seitlich im Wesentlichen um die Breite (bst) der an die Schienen (12) gebundenen Stützkörper (14) versetzt, gegebenenfalls jeweils auf Querträger (63) abgestützt und vertikal in geringem io Abstand voneinander gehalten, über- bzw. aufeinander geschlichtet auf die Gleisjoch-Transportwaggons (6) verladen zur Einbaustelle verfahren werden.7. The method according to any one of claims 1 to 6, characterized in that 5 with the - to the rail feet (123) with respective interposition of He He straightening devices (15) bound and relativlage-stabilized, downwardly projecting support bodies (14) equipped track yokes (1, 1 ', 1 ", ...), in each case laterally substantially offset by the width (bst) of the rails (12) bound supporting body (14), optionally supported respectively on cross member (63) and vertically spaced slightly apart, superimposed on each other or on the Gleisjoch transport wagons (6) and transported to the installation site. 8. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, 15 dass für das erste Ablegen und Abstützen der an die Einbaustelle verbrachten Gleisjoche (1) in einer der geplanten Einbaulage nahekommenden Lage, vorzugsweise teleskopartig, längenveränderlich ausgebildete, und mittels Stabilisierstreben lagestabilisierbare Hilfsstützen (17) eingesetzt werden, welche an die Schwellen, bevorzugterweise an jede fünfte bis achte Schwelle oder an die, vorzugsweise an jeden zweiten, Schienen-Abstandshalter (16) 20 der Gleisjoche (1) angelenkt sind und mit ihren freiendenden Teleskop-Beinen (173) zum Untergrund (11) hin abwärts geschwenkt- bzw. geklappt werden und dort das Gleisjoch (1) abstützen, und dass die Hilfsstützen (17) nach dem Einrichten der Gleisjoche (1) und deren Stabilisierung durch Fixierung der Stützkörper (14) mittels schnell abbindender Bindemittelmasse (9), insbesondere Schnell-Beton oder -Mörtel wieder zurückgeklappt und schließ-25 lieh von den Schwellen abmontiert oder aber zusammen mit den Schienen-Abstandshaltem (16) ausgebaut und an die Gleisjoch-Montagestelle verbracht werden.8. The method according to any one of claims 1 to 7, characterized in that 15 for the first depositing and supporting the mounted on the installation site track bumps (1) in a planned installation position close-fitting position, preferably telescopically, variable in length formed, and stabilized by Stabilisierstreben auxiliary supports (17) which are hinged to the sleepers, preferably at every fifth to eighth threshold or to the, preferably at every other, rail spacers (16) 20 of the track yokes (1) and with their free-end telescopic legs (173 ) to the ground (11) down pivoted or folded and there support the track yoke (1), and that the auxiliary supports (17) after setting up the track yokes (1) and their stabilization by fixing the support body (14) by means of fast setting binder composition (9), in particular quick-concrete or mortar folded back and closing lent from the Schwe or dismantled together with the rail spacers (16) and transported to the track yoke mounting point. 9. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, 30 dass die Schienenjoche (1) bzw. deren Schienen (12) vor dem Unter- und Umgießen der Fußbereiche (143) der Schienen-Stützkörper (14) mit der schnell abbindenden Bindemittelmasse (9) und deren rascher Aushärtung - bei schon vorher planmäßig eingerichteter, weitgehend exakter Seitenlage - in einer um eine über die gesamte Erstreckung der Schienenjoche (1) hinweg einige, bevorzugt um 2 bis 5 mm, gegenüber der planmäßig vorgese-35 henen Höhen-Lage abgesenkten Lage angeordnet und gehalten werden, wobei bevorzug terweise alle zwischen Schienenfuß (123) und Stützkörper (14) angeordneten Hebe-Richtgeräte (15) auf hoch-belastbare Null-Höhenlage-Stellung oder knapp daran gebracht bzw. gehalten sind, und dass die Schienen (12) der Schienenjoche (1) erst nach der Stabilisierung der Stützkörper (14) durch Unter- und Umgießen mit der schnell abbindenden 40 Bindemittelmasse (9) mittels der Hebe-Richtgeräte (15) in die planmäßig vorgesehene Höhen- und Verlaufs-Lage angehoben und in die dementsprechend vorgesehene Richtung verschoben werden.9. The method according to any one of claims 1 to 8, characterized in that the rail yokes (1) or their rails (12) before the under and over molding of the foot areas (143) of the rail support body (14) with the fast setting Binder mass (9) and their rapid hardening - at already arranged according to plan, largely exact lateral position - in a one over the entire extent of the Schienenjoche (1) away a few, preferably by 2 to 5 mm, compared to the planned vorgese 35 heights -Lage lowered position can be arranged and held, preferably preferred all between rail (123) and support body (14) arranged lifting straightening devices (15) are placed on high-resilient zero-altitude position or close to it or held, and that the rails (12) of the Schienenjoche (1) only after the stabilization of the support body (14) by under-molding and with the fast-setting binder 40 (9) by means of lifting straightening devices (15) raised in the planned height and gradient position and be moved in the direction provided accordingly. 10. Verfahren nach einem der Ansprüche 1 bis 9, 45 dadurch gekennzeichnet, dass die Schienenjoch-Stützkörper (14) jeweils paarweise einander gegenüber von den Schienen (12) abwärts ragend angeordnet sind, und dass in an den einander nach innen hin zugewandten Seiten derselben angeordnete Einschub-Nuten (145) - vor dem Unter-Umgießen und Eingießen der Schwellen bzw. Schwellenkörper (13) mit der Verguss-50 Bindemittelmasse (9), bevorzugt Regel-Beton oder -Mörtel, Einlagepaneele (19) bzw. -bleche für eine gezielt lokalisierte Rissbildung in der mit dem ausgehärteten Bindemittel (9') gebildeten festen Fahrbahn, im Nahbereich der genannten Stützkörper (14) eingeschoben werden.10. The method according to any one of claims 1 to 9, 45, characterized in that the rail yoke supporting body (14) are each arranged in pairs facing each other from the rails (12) projecting downwards, and in that at the mutually inwardly facing sides of the same arranged insertion grooves (145) - before the sub-encapsulation and pouring the thresholds or threshold body (13) with the potting compound 50 (9), preferably rule concrete or mortar, insert panels (19) or sheets for a targeted localized crack formation in the solid roadway formed with the cured binder (9 '), in the vicinity of said support body (14) are inserted. 11. Verfahren nach einem der Ansprüche 1 bis 10, 20 AT 500 982 B1 dadurch gekennzeichnet, dass die Schienen-Abstandshalter (16) nach Fertigstellung eines jeweiligen, mit mehreren Schienenjochen (1) gebildeten Schienenstrang-Abschnittes gesondert demontiert und, im Falle der Benutzung der Schienenjoche (1) als Verlege-Lehren bzw. -Schablonen, zusam-5 men mit den von den mit Bindemittel (9‘) unter- bzw. umgossenen Schwellen (13) demontierten Schienen (12) an die Schienenjoch-Montagestelle verbracht werden, und dass die ebenfalls dorthin - und zwar gesondert oder an den Schienen montiert - verbrachten Hebe-Richtgeräte (15) für den Einbau in ein neues vor-montiertes Schienenjoch (1) in ihre Grundposition, also in der Höhe vollständig eingefahren und bezüglich Seiteneinrichtung in io Mittelstellung, zurück- bzw. verstellt werden.11. The method according to any one of claims 1 to 10, 20 AT 500 982 B1, characterized in that the rail spacers (16) after completion of a respective, with several rail yokes (1) formed rail section separately disassembled and, in the case of use the rail yokes (1) as laying teachings or stencils, together with the rails (12) dismantled by the sleepers (9 ') with or without cast-over ties (13), are brought to the rail yoke mounting point, and that the also there - and separately or mounted on the rails - spent lifting straightening devices (15) for installation in a new pre-assembled rail yoke (1) in its basic position, ie in height completely retracted and with respect page device in io Middle position, to be moved back or adjusted. 12. Verfahren nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, - dass die mit den an die Schienenfüße (123) unter jeweiliger Zwischenschaltung der He- 15 be-Richtgeräte (15) gebundenen, nach abwärts ragenden Stützkörpern (14) ausgestat teten Gleisjoche (1) als "Verlege-Lehren bzw. -Schablonen" für die Herstellung der zu errichtenden eingleisigen Fahrbahn eingesetzt und nach Fertigstellung eines aus einer Mehrzahl der gemäß einem der vorangegangenen Ansprüche fertig eingebauten Schienenjoche (1) gebildeten, neuen Schienenstrang-Abschnittes und nach Ausbau und Ent- 20 fernen der Hebe-Richtgeräte (15) die relativ kurzen, aufeinander folgend verlegten, bei spielsweise jeweils maximal 20 m langen, Schienen (12) der Gleisjoche (1,1', 1",...) von den final eingebauten Schwellen bzw. Schwellenkörpem (13) demontiert und entfernt und zur Bildung neuer, mit Schwellen bzw. Schwellenkörpem (13) und - mit den mit den Hebe-Richtgeräten bestückten - Stützkörpern (14) ausgestatteter Gleisjoche (1, 1', 25 1",...) an die Gleisjoch-Montagestelle zurück verbracht werden, und - dass an Stelle dieser Schienenjoch-Lehren- bzw. -Schablonen-Schienen (12) die letztlich für den Fährbetrieb vorgesehenen Fahr-Schienen (12') mit wesentlich höherer, vorzugsweise zumindest 100 m betragender, Länge in die Schienenbefestigungen (135) der fertig eingebauten Schwellen bzw. Schwellenkörper (13) eingezogen werden. 3012. The method according to any one of claims 1 to 11, characterized in that - connected to the rail feet (123) with respective interposition of He-15 be-straightening devices (15), downwardly projecting support bodies (14) ausgestat ended track yokes (1) as " laying lessons " " used for the production of the single-track carriageway to be built and after completion of a new rail track section formed from a plurality of the rail yokes (1) built in according to one of the preceding claims and after removal and removal of the lifting straightening devices (15) relatively short, consecutively laid, for example, each maximum of 20 m long, rails (12) of the track yokes (1,1 ', 1 ", ...) of the final built thresholds or threshold bodies (13) disassembled and removed and Formation of new, with sleepers or Schwellenkörpem (13) and - equipped with the lifting straightening devices - support bodies (14) equipped track yokes (1, 1 ', 25 1 ", ...) are returned to the track yoke mounting point , And - that instead of these rail yoke-gauge or -Schablonen rails (12), the ultimately intended for ferry operation driving rails (12 ') with much higher, preferably at least 100 m Length, in the rail fasteners (135) of the built-in threshold or threshold body (13) are retracted. 30 13. Verfahren nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass die Verbringung der mit den unter jeweiliger Zwischenschaltung der Hebe-Richtgeräte (15) an die Schienenfüße (123) gebundenen, nach abwärts ragenden Stützkörpern (14) 35 ausgestatteten Gleisjoche (1) vom jeweiligen Transportwaggon (6) an bzw. über die Einbaustelle und deren Halterung bis zur Abstützung der Gleisjoche (1) am Untergrund (11) mittels der Hilfsstützen (17) od. +dgl. mittels einer auf beidseitig im Abstand von der vorgesehenen Gleisstrecke verlegten Lang-Schienen (12') verfahrbaren Portalkran-Einrichtung (8) vorgenommen wird. 4013. The method according to any one of claims 1 to 12, characterized in that the movement of the with the respective interposition of the lifting straightening devices (15) to the rail feet (123) bound, downwardly projecting support bodies (14) 35 equipped track yokes (1 ) from the respective transport wagon (6) at or above the installation point and their support to the support of the track yokes (1) on the ground (11) by means of the auxiliary supports (17) od. +. Like. by means of a movable on both sides at a distance from the intended railway track long rails (12 ') movable gantry crane device (8) is made. 40 14. Verfahren nach einem der Ansprüche 1 bis 13, dadurch gekennzeichnet, dass die beidseitig neben dem gerade im Bau in Fertigstellung begriffenen bzw. fertiggestellten Schienenstrang-Bauabschnitt verlegten Langschienen (12') für die fahrbare Portal-45 kran-Einrichtung (8) nach deren Verfahren zur weiter vorgerückten Einbaustelle an Stelle der demontierten Gleisjoch-Schienen (12) als Fahrschienen (12') in die Schienenbefestigungen (131) der final stabilisierten Schwellen bzw. Schwellenkörper (13) eingezogen werden. so14. The method according to any one of claims 1 to 13, characterized in that on both sides next to the currently under construction in completion or completed rail track construction section laid long rails (12 ') for the mobile portal 45 crane device (8) their method for further advanced installation site instead of the dismantled track yoke rails (12) as rails (12 ') in the rail fasteners (131) of the final stabilized sleepers or threshold body (13) are retracted. so 15. Verfahren nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, dass schon nach dem Stabilisieren und Einrichten eines jeweiligen, vorzugsweise mit mehreren sich auf den Stützkörpem (14) mit den Hebe-Richtgeräten (15) abstützenden Gleisjochen (1, T, 1",...) gebildeten, neuen Schienenstrang-Abschnittes die Portalkran-Einrichtung 55 (8) in den nächsten zu erstellenden Schienenstrang-Bauabschnitt verfahren wird und die 21 AT 500 982 B1 beidseitig neben dem gerade fertiggestellten Schienenstrang-Abschnitt verlegten, bisher von der Portalkran-Einrichtung (8) benutzten Langschienen (12’) nach Demontage der Schienenjoch-Schienen 12 als an deren Stelle tretende Fahrschienen in die Schienenbefestigungen (135) der Schwellen bzw. Schwellenkörper (13) eingezogen werden, um für 5 das Heranführen eines Bindemittel-Transport- und -Bereitungszuges an die Einbaustelle für das finale Um- und Eingießen der Schwellen bzw. Schwellenkörper (13) mit der Verguss-Bindemittelmasse (9') zur finalen Bildung der festen Fahrbahn Platz zu machen. io Hiezu 5 Blatt Zeichnungen 15 20 25 30 35 40 45 50 5515. The method according to any one of claims 1 to 14, characterized in that after stabilizing and setting up a respective, preferably with a plurality on the Stützkörpem (14) with the lifting straightening devices (15) supporting track yokes (1, T, 1 ";, ...) formed, new rail track section the gantry crane device 55 (8) is moved to the next to be created rail track construction section and the 21 AT 500 982 B1 laid on both sides next to the just completed rail track section, previously from the Portal crane device (8) used long rails (12 ') after disassembly of the rail yoke rails 12 as passing in their place rails in the rail fasteners (135) of the threshold or threshold body (13) are retracted to 5 for the introduction of a binder Transport and preparatory train to the installation site for the final transfer and pouring the thresholds or threshold body (13) with the encapsulant-binder measure e (9 ') to make way for the final formation of the fixed carriageway. For this purpose, 5 sheets of drawings 15 20 25 30 35 40 45 50 55
AT0061703A 2003-04-23 2003-04-23 METHOD FOR LAYING A TRACK OF A FIXED RAILWAY AT500982B8 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AT0061703A AT500982B8 (en) 2003-04-23 2003-04-23 METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
CH00676/04A CH695568A5 (en) 2003-04-23 2004-04-19 A method of laying a rail track.
DE200410019083 DE102004019083A1 (en) 2003-04-23 2004-04-20 Method for laying rail track on uneven ground especially in tunnels using integral alignment means which are removed after the sleepers are secured with poured concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0061703A AT500982B8 (en) 2003-04-23 2003-04-23 METHOD FOR LAYING A TRACK OF A FIXED RAILWAY

Publications (3)

Publication Number Publication Date
AT500982B1 true AT500982B1 (en) 2006-05-15
AT500982A4 AT500982A4 (en) 2006-05-15
AT500982B8 AT500982B8 (en) 2007-02-15

Family

ID=33437377

Family Applications (1)

Application Number Title Priority Date Filing Date
AT0061703A AT500982B8 (en) 2003-04-23 2003-04-23 METHOD FOR LAYING A TRACK OF A FIXED RAILWAY

Country Status (3)

Country Link
AT (1) AT500982B8 (en)
CH (1) CH695568A5 (en)
DE (1) DE102004019083A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT503599B1 (en) 2006-07-28 2007-11-15 Verkehrsbetr E Zuerich Method for manufacturing firm track for rail vehicles involves providing rail fastening plates on supports for supporting rails with anchor fittings for fixing rail at track support plate at distance
CN101418535B (en) * 2008-10-10 2012-05-23 中铁十一局集团第三工程有限公司 Construction method of monolithic road-bed in rail tunnel
ES2363849B1 (en) * 2009-06-16 2012-06-19 Fcc Contrucción, S.A. INSTALLATION PROCEDURE FOR PLATE ROAD IN BITUBO TUNNELS.
CN102021865B (en) * 2009-09-23 2015-07-08 塞斯特拉公司 Method for precasting rail support tie on precast span piece
EP2740842B1 (en) * 2012-12-07 2017-09-27 Sonneville AG Method for converting a gravel track into a solid track
ES2592568R1 (en) * 2015-05-29 2017-01-27 Tecsa Empresa Constructora, S.A. PROCEDURE AND RAILWAY CONCRETE SYSTEM IN PLATE.
CN111485462B (en) * 2020-04-09 2021-09-14 中国铁建高新装备股份有限公司 Railway fastener disassembling and recycling system and equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2657096A1 (en) * 1990-01-17 1991-07-19 Sud Ouest Travaux Method and apparatus for accurate adjustment of a railway track placed on a concrete platform
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
EP1022386A2 (en) * 1998-12-01 2000-07-26 Bahnbau Wels GmbH Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2657096A1 (en) * 1990-01-17 1991-07-19 Sud Ouest Travaux Method and apparatus for accurate adjustment of a railway track placed on a concrete platform
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
EP1022386A2 (en) * 1998-12-01 2000-07-26 Bahnbau Wels GmbH Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method

Also Published As

Publication number Publication date
AT500982B8 (en) 2007-02-15
DE102004019083A1 (en) 2004-12-16
AT500982A4 (en) 2006-05-15
CH695568A5 (en) 2006-06-30

Similar Documents

Publication Publication Date Title
EP0379148B1 (en) Method of and device for constructing a ballastless superstructure
EP1039033B1 (en) Method for making a railway track
DE2754811A1 (en) MOBILE DEVICE FOR LAYING THRESHOLDS
EP0894898B1 (en) Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support
DE4324301A1 (en) Arrangement and method for producing a ballastless track superstructure
AT500982B1 (en) METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
EP1026320B1 (en) Method for building a ballastless track
EP2397605A2 (en) Method for creating a track for railway vehicles in a channel-shaped concrete road
EP1169516B1 (en) Method for renewing railway lines
DE19956474A1 (en) Method of making a solid carriageway and apparatus for use therein
EP1048783A1 (en) Railway track and its construction method
DE19849266C2 (en) Fixed carriageway for a tram
AT390288B (en) DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE
AT500950A4 (en) METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES
EP0715022B1 (en) Method of manufacture or installation of exactly positioned rail supporting points and machine-system for executing the method
EP2166149B1 (en) Unit of railway structure part
AT500876B1 (en) METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY
AT505821B1 (en) METHOD AND ARRANGEMENT FOR ORIENTING PRE-CONCRETE CONCRETE AGGREGATE PLATES AND STRUCTURE BELT ELEMENT FOR USE IN THE PROCESS AND ARRANGEMENT
DE19522478C2 (en) Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process
DE19944783A1 (en) Slab track system
AT413551B (en) Production of a fixed track for rail vehicles comprises fixing in position a guide bar forming a guide/curve template, and making a rail support together with channels for the rails from concrete or profiling the channels
DE102005027758B3 (en) Method of renewing a track laid by means of sleepers and a threshold for use in the method
DE3122892C2 (en)
DE102022100899A1 (en) PROCESS FOR MANUFACTURING A PAPER EDGE
EP1533420A2 (en) Method for making a ballastless railway track