CH695568A5 - A method of laying a rail track. - Google Patents

A method of laying a rail track. Download PDF

Info

Publication number
CH695568A5
CH695568A5 CH00676/04A CH6762004A CH695568A5 CH 695568 A5 CH695568 A5 CH 695568A5 CH 00676/04 A CH00676/04 A CH 00676/04A CH 6762004 A CH6762004 A CH 6762004A CH 695568 A5 CH695568 A5 CH 695568A5
Authority
CH
Switzerland
Prior art keywords
track
rail
rails
bodies
yokes
Prior art date
Application number
CH00676/04A
Other languages
German (de)
Inventor
Peter Strolz
Ing Christian Schreiber
Dipl Ing Hubert Rhomberg
Original Assignee
Rte Technologie Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rte Technologie Gmbh filed Critical Rte Technologie Gmbh
Publication of CH695568A5 publication Critical patent/CH695568A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

CH 695 568 A5 CH 695 568 A5

Beschreibung description

[0001] Für die Herstellung von sogenannten «festen Fahrbahnen» mit Geleisen für Schienenfahrzeuge der verschiedensten Art ist es im Hinblick auf die heute angestrebten hohen Fahrgeschwindigkeiten erforderlich, das Gleisgestänge sowohl bezüglich Höhe als auch Richtung mit einer Genauigkeit von +/- 0,1 mm einzurichten und es in der eingerichteten Position für das Untergiessen mit einer Bindemittelmasse, insbesondere Beton oder Mörtel, exakt positioniert festzuhalten. For the production of so-called "solid lanes" with rails for rail vehicles of various kinds, it is necessary in view of the high speeds now sought, the track linkage both in terms of height and direction with an accuracy of +/- 0.1 mm set up and keep it in the set position for undercutting with a binder material, especially concrete or mortar, accurately positioned.

[0002] Ein diesbezügliches Verfahren ist z.B. aus der EP 894 898 B1 bereits bekannt. Bei diesem bekannten Verfahren geht man davon aus, dass als Untergrund für die feste Fahrbahn eine sehr exakt betonierte Betontragplatte (Höhentoleranz +5 mm -15 mm) hoher Ebenheit in der Neigung der jeweiligen Kurven-Querüberhöhung des herzustellenden Gleises zur Verfügung steht. A related method is e.g. already known from EP 894 898 B1. In this known method, it is assumed that a very precisely concreted concrete support plate (height tolerance +5 mm -15 mm) high evenness in the inclination of the respective curve transverse cant of the track to be produced is available as a foundation for the solid carriageway.

[0003] Es ist gemäss diesem Verfahren möglich, unter Einsatz standardisierter Betonstützkörper und darauf aufbauender Heberichtkeile mit ca. 25 mm Höhenverstellbarkeit und ca. ±15 mm seitlicher Verstellbarkeit das Gleis einzurichten. It is possible according to this method, set up using standardized concrete support body and based Hekeke wedges with about 25 mm height adjustment and about ± 15 mm lateral adjustability of the track.

[0004] Da dieses System insgesamt sehr kompakt ist, ist es z.B. für Richtgeräte, wie z.B. für aus dem Schotteroberbau bekannte Stopfmaschinen befahrbar, es ist nicht jedoch für hohe Belastungen, wie z.B. für Baustoff wie insbesondere Füll-Betontransporte bis zur Gleis-Einbaustelle geeignet. Diesbezügliche Anwendungen wurden bereits beim Einbau einer festen Fahrbahn auf der Neubaustrecke Hannover-Berlin mit Erfolg realisiert. Since this system is very compact as a whole, it is e.g. for straightening devices, such as suitable for tamping machines known from ballast superstructure, but it is not suitable for high loads, e.g. suitable for building materials such as in particular filling concrete transports up to the track installation point. Applications relating to this have already been successfully implemented with the installation of a fixed carriageway on the new Hannover-Berlin route.

[0005] Die Förderungen nacITtrhonung der hanrgeschwindigReiterTBengleichzeitiger Erhöhung dëTSicRerReit, sowie die im Laufe der praktischen Arbeiten im Streckenbau gemachten Erfahrungen führen zu neuen veränderten Anforderungen an die Gleisstrecke selbst und an die Herstellung der festen Fahrbahn, sowohl im Hinblick auf die Exaktheit der Verlegung der Geleise als auch im Hinblick auf die Produktivität, Flexibilität und die Wirtschaftlichkeit. [0005] The promotion of the high-speed, simultaneous increase in the reliability and the experience gained in the course of practical work in the field of track construction have led to new changes in the requirements for the track itself and the production of the fixed track, both with regard to the accuracy of the laying of the tracks also in terms of productivity, flexibility and cost-effectiveness.

[0006] So ist beispielsweise der Untergrund einer vom Tunnelrohbau übergebenen Tunnelsohle, welche sowohl Fahrrinnen von den schweren Baumaschinen und Transportfahrzeugen, als auch Betonausbrüche, z.B.: Schlaglöcher, aufweisen kann, sehr uneben, und es bedeutet einen hohen Aufwand, dieselbe, wie für den Aufbau der festen Fahrbahn bisher nötig, zu verebnen. Thus, for example, the surface of a pass from Tunnelrohbau tunnel sole, which can have both fairways of the heavy construction machinery and transport vehicles, as well as concrete outbreaks, eg: potholes, very uneven, and it means a lot of effort, the same as for the Construction of the fixed track so far necessary to level.

[0007] Die Toleranz der Höhe zwischen Schienenunterkante und Oberkante Auflager variiert somit sehr stark, sodass mit standardisierten Betonstützkörpern und darauf aufbauenden Hebe-Richtgeräten bzw. -Systemen die nötigen Höhenkorrekturen nicht mehr bewältigt werden können. Es wäre also bei wie eben beschriebenen «unebenen» Untergründen notwendig, Betonstützkörper mit unterschiedlichen, jeweils individuellen Höhen einzusetzen. Diese Anpassung bzw. Auswahl der Stützkörper könnte auf Grund der stark variierenden Gegebenheiten immer erst am Einbauort erfolgen und wäre daher sehr aufwendig. The tolerance of the height between rail lower edge and top edge support thus varies greatly, so that the necessary height corrections can no longer be handled with standardized concrete support bodies and based on lifting straightening or systems. So it would be necessary for just described "uneven" substrates to use concrete support with different, each individual heights. This adaptation or selection of the support body could always take place due to the greatly varying circumstances only at the installation site and would therefore be very expensive.

[0008] Zusätzlich ist bei diesen Gegebenheiten die Standfestigkeit, sowohl für das Richten als auch für das Befahren auf Grund der Unebenheiten nicht gegeben. In addition, the stability, both for straightening and for driving due to the bumps is not given in these circumstances.

[0009] Zusätzlich wird auch die Überhöhung des Gleises, z.B. bei Kurvenstrecken, mit Hilfe eines Stützsystems aufgebaut, wodurch sich zusätzliche Höhendifferenzen aus der Überhöhung des Geleises von bis zu 180 mm (entspricht bis zu 12% Querneigung) ergeben. In addition, the canting of the track, e.g. on curves, built with the help of a support system, resulting in additional height differences from the elevation of the track of up to 180 mm (equivalent to up to 12% bank angle).

[0010] Als weitere Forderung gilt, dass derart gestützte Gleise mit voller Achslast (22,5 bis 25 t) für die Versorgung der Baustelle mittels Bauzügen und mit den für die Herstellung des Unterbaus grossen Mengen an Füll- bzw. Vergussbeton sowie mit am Markt vorhandener Rangierlokomotiven belastbar sein sollen. As another requirement is that such supported tracks with full axle load (22.5 to 25 t) for the supply of the construction site by means of construction trains and with the large quantities of filling and Vergussbeton for the production of the substructure and on the market existing Rangierlokomotiven be resilient.

[0011] Dies ist vor allem bei der Verlegung von Geleisen in Eisenbahntunnels hoher Länge, wie z.B. im Lötschberg-Ba-sistunnel oder im Gotthard-Basistunnel, von wesentlicher Bedeutung. This is especially true in the laying of tracks in railway tunnels of high length, e.g. in the Lötschberg-Ba-sistunnel or in the Gotthard Base Tunnel.

[0012] Da auf Grund der erhöhten Anforderungen an die Tunnelsicherheit in Zukunft vermehrt eingleisige Tunnel gebaut werden, wird dieser Aspekt der Baustellenlogistik immer wichtiger. Es ist also gefordert, dass ein im Wesentlichen unmittelbar vorher und ohne gesonderte Vorbereitung des nach dem Bau eines Tunnel vorliegenden Untergrundes verlegtes Stück des Gleisstrangs nach seiner Verlegung möglichst bald für die Beförderung des an dessen vorderes freies Ende anzuschliessenden Gleisstrang-Stückes und für das Heranführen der für das endgültige Giessen der Fahrbahn notwendigen hohen Mengen an Bindemittelmasse, üblicherweise Regelbeton, zur Verfügung steht. Since due to the increased demands on tunnel safety in the future increasingly built single-track tunnel, this aspect of site logistics is becoming increasingly important. It is therefore required that a piece of the rail track laid essentially immediately before and without separate preparation of the underground present after the construction of a tunnel after its laying as soon as possible for the transport of the piece of track strand to be connected to the front free end and for the introduction of for the final casting of the roadway necessary high amounts of binder mass, usually regular concrete, is available.

[0013] Beim Einsatz von gesonderten Schwellen-Einzelblöcken für jede Schiene an Stelle von Schwellen mit jeweils zwei Schienenauflagern, ist es notwendig, den Abstand der Schienen des Gleises voneinander, also die Spur sowie die Neigung der Schienen durch zusätzliche Hilfsmittel einzustellen. When using separate threshold individual blocks for each rail instead of sleepers, each with two rail supports, it is necessary to set the distance of the rails of the track from each other, so the track and the inclination of the rails by additional aids.

[0014] Den oben erläuterten Anforderungen kann das bekannte Einbausystem gemäss der obengenannten EP 894 898 B1 jedoch wegen seiner geringen Belastbarkeit nicht gerecht werden. The above-explained requirements, the known installation system according to the above-mentioned EP 894 898 B1, however, because of its low load capacity do not do justice.

[0015] Eine wesentliche Aufgabe der vorliegenden Erfindung besteht nun darin, ein Gleis-Verlege- und Einbausystem derart auszubilden, dass die Spur und die Schienenneigung nach der Nutzung als Baugleis bei voller Last auf dem Stützsystem eingehalten werden kann und nach Benützung eingehalten wird und anschliessend feingerichtet werden kann. Die zu lösenden Aufgaben und Anforderungen sind kurz zusammengefasst die folgenden Befahrbarkeit des auf etwa 2 mm Genauigkeit vorgerichteten und in dieser Genauigkeit stabilisierten Gleises für den Transport der Gleisjoche sowie von Bau- bzw. Einbau-Hilfsgeräten. An essential object of the present invention is to provide a track laying and installation system in such a way that the track and the rail inclination can be maintained after use as Baugleis at full load on the support system and adhered to after use and then can be finished. Briefly summarized, the tasks and requirements to be solved are the following passability of the track, which has been prepared to an accuracy of about 2 mm and stabilized to this degree, for the transport of the track yokes as well as of construction and installation auxiliary equipment.

[0016] Befahrbarkeit der auf Stützkörpern verlegten Geleise mit voller Last bis zur Einbaustelle. Trafficability of laid on support rails tracks with full load to the installation point.

[0017] Positionierung der Gleisjoche auf einem Untergrund mit grossen Höhenunterschieden und Unebenheiten. Positioning the track yokes on a surface with large differences in height and bumps.

CH 695 568 A5 CH 695 568 A5

[0018] Exaktes Richten und Fixieren des Geleises auf etwa 0,5 mm Genauigkeit bzw. mit einer Stellgenauigkeit von etwa 0,1 mm vor dem endgültigen Festlegen der Geleise und dem Stabilisieren derselben durch Eingiessen der Schwellen bzw. Schwellenkörper mittels der die Gleislage letztlich dauerhaft fixierenden Verguss-Bindemittelmasse, vorzugsweise Regelbeton. Accurate straightening and fixing the track to about 0.5 mm accuracy or with a positioning accuracy of about 0.1 mm before the final setting of the tracks and stabilizing the same by pouring the thresholds or threshold body by means of the track position ultimately permanently fixing potting compound, preferably regular concrete.

[0019] Grösstmögliche Vereinfachung der Logistik durch weitestgehende Vorbereitung vor dem Einbau der Geleise an der Einbausteile, also z.B. im Fall langer Tunnels, Durchführung der Montage der Gleisjoche, abseits, jedoch eher in der Nähe der Einbausteile, wenn genügend Platz vorhanden ist, oder aber, wenn, wie bei Tunnelstrecken meist der Fall, vorteilhafterweise ausserhalb des Tunnels, sodass nur mehr möglichst wenige Arbeiten an der Einbaustelle, also z.B. im Bereich des offenen Gleisstrang-Endes im Tunnel selbst durchgeführt werden müssen. Im Fall des Baus eingleisiger Gleisstrecken in Tunnels ist hierbei der Vorteil der Vermeidung der besonders schlechten Arbeitsbedingungen bei den in langen Tunnels herrschenden hohen Temperaturen, der hohen Luftfeuchtigkeit und der durch Abgase belasteten Luft, sowie der Reduktion des Gefahrenpotentiales, das für Personen in Tunnels immer besteht, gegeben. The greatest possible simplification of the logistics by far as possible preparation before the installation of the tracks on the mounting parts, so e.g. in the case of long tunnels, carrying out the assembly of the track yokes, off, but more near the built-in parts, if there is enough space, or if, as is usually the case with tunnels, advantageously outside the tunnel, so only as few jobs as possible at the place of installation, eg in the area of the open end of the slipway in the tunnel itself. In the case of the construction of single-track railway tracks in tunnels, this has the advantage of avoiding the particularly bad working conditions in the high temperatures prevailing in long tunnels, the high humidity and the polluted by exhaust air, as well as the reduction of the risk potential that always exists for people in tunnels , given.

[0020] Gegenstand der vorliegenden Erfindung ist ein neues Verfahren zum Verlegen eines Gleisstranges im Zuge des Neu-, Um- oder Weiterbaus einer, gegebenenfalls mehrgleisigen, mit Schienenfahrzeugen, bevorzugt Eisenbahnen befahrbaren Fahrstrecke, insbesondere Tunnelstrecke bzw. einer eingleisigen, festen Fahrbahn gemäss dem Oberbegriff des Anspruches. The present invention is a new method for laying a rail track in the course of new, rebuilt or continued one, possibly multi-track, with rail vehicles, preferably railways passable route, especially tunnel route or a single-track, fixed carriageway according to the preamble of the claim.

[0021] Das neue Verfahren ist durch die im kennzeichnenden Teil des Anspruches 1 angeführten Merkmale charakteri--siert-unddefiniert; The new method is characterized and defined by the features set forth in the characterizing part of claim 1;

[0022] Das neue Gleis-Einbauverfahren ist im Wesentlichen als Handlungs- bzw. Arbeitsablauf-Kette mit folgenden Schritten zu sehen, die im Folgenden anhand des Baus einer Tunnelfahrstrecke erläutert werden sollen: The new track installation method is essentially to be seen as an action or work sequence chain with the following steps, which will be explained below with reference to the construction of a tunnel driving route:

[0023] Auf dem Montageplatz werden die Schienen an den mit ihnen einzubauenden Schwellen bzw. Schwellenkörper befestigt. Im Falle von auf Schwellen montierten Schienen werden diese mit Hilfe von speziellen Abstandshaltern zur Einstellung von Spur und Schienenneigung relativ zu den Schwellenkörpern miteinander zu einem Gleisjoch verbunden. An den Schienenfuss-Unterseiten werden die Hebe-Richtgeräte befestigt und an deren Unterseite die dann frei abwärts ragenden Stützkörper. Es wird also ein kompaktes Gleisjoch mit Stützkörpern und allen notwendigen Rieht- und Fixiervorrichtungen zusammengebaut. On the assembly site, the rails are attached to the sleepers or sleepers to be installed with them. In the case of rail mounted on sleepers, these are connected together by means of special spacers for adjusting track and rail inclination relative to the sleeper bodies to form a track yoke. The lifting straightening devices are fastened to the underside of the rail and the supporting bodies then project freely downwards on the underside of the rail. Thus, a compact track yoke is assembled with supporting bodies and all necessary directional and fixing devices.

[0024] Die auf diese Weise vorbereiteten bzw. vorgefertigten Gleisjoche werden nach erfolgtem Zusammenbau auf dem Montageplatz zwischengelagert und jeweils bei Bedarf für den Transport an die Gleis-Einbaustelle im Tunnel auf entsprechende Waggons verladen. The prepared in this way or prefabricated track yokes are stored after completion of assembly on the assembly site and each loaded as needed for transport to the track installation point in the tunnel to appropriate wagons.

[0025] Bevorzugterweise wird hierbei ein wie später noch näher zu erläuterndes Gleisjoch-Ladeschema angewandt, welches trotz der relativ hohen Bauhöhe der Gleisjoche mit den abwärts ragenden Stützsystemen aus Hebe-Richtgerät und Stützkörper durch jeweils seitlich versetzte Lagerung und Einsatz von die Schienen des Gleisjochs stützenden Auflagestreben od. dgl. den Transport von 4 bis 5 Jochen pro Waggon ermöglicht. Preferably, in this case, as later to be explained in greater detail Gleisjoch charging scheme is used, which in spite of the relatively high height of the track yokes with the downwardly projecting support systems of lifting straightener and supporting body by each laterally offset storage and use of the rails of the track yoke supporting Auflagestreben od. Like. The transport of 4 to 5 yokes per wagon allows.

[0026] Die Gleisjoche werden mit den Waggons, und zwar oft über kilometerlange Distanzen, z.B. von bis zu 40 km, im Tunnel bis an die Einbausteile transportiert. Dieser Transport erfolgt über weite Strecken zuerst über ein schon fertiggestelltes und fertig eingebautes Geleise mit im Beton eingegossenen Schwellen bzw. Schwellenkörper. Im Bereich von oft mehreren hundert Metern geht der Transport über ein vor der gerade aktuellen Einbaustelle nur noch bloss auf die Stützkörper gestütztes, jedoch durch Umgiessung der Stützkörper bzw. von deren Fuss-Bereichen mit Spezialbeton schon stabilisiertes Geleise. The track yokes are used with the wagons, often over miles of distance, e.g. of up to 40 km, transported in the tunnel to the components. This transport takes place over long distances, first over an already finished and completely built-in track with cast-in sleepers or sleeper bodies. In the area of often several hundred meters, the transport over a before the current installation site only on the supporting body supported, but by encapsulation of the supporting body or of their foot areas with special concrete already stabilized tracks.

[0027] An der Einbauspitze werden die Gleisjoche mittels Hebeeinrichtung, insbesondere Kran, vom Waggon abgehoben, zum jeweiligen Schienenstrang-Ende hin längs verfahren und auf der, wie oben schon erwähnt, rohen Tunnelsohle «abgelegt». Bevorzugterweise wird - für den Fall einer Kurvenstrecke - das Gleisjoch mit dem Kran in jeweils vorgesehener Schräglage aufgenommen und auf entsprechend vorbereitete Unterlagen auf der Tunnelsohle möglichst nahe der jeweiligen zukünftigen Sollposition abgelegt. At the mounting tip, the track yokes are lifted by means of lifting device, in particular crane, from the wagon, moved longitudinally to the respective rail track end and on the, as already mentioned above, raw tunnel sole «deposited». Preferably, in the case of a curved route, the track yoke is received in the respective inclined position by the crane and placed on suitably prepared documents on the tunnel sole as close as possible to the respective future setpoint position.

[0028] Anschliessend kommen an den Schwellen bzw. an den Schienen-Abstandshaltern befestigte, längenveränderliche, abwärts schwenkbare Hilfsstützen zum Einsatz, um das jeweils neu einzubauende Gleisjoch in eine möglichst genaue Position im Bereich von bis zu maximal +/-2 mm zur planmässig vorgesehenen Soll-Position zu bringen. Die Vermessung des Gleisjoches in diesem Vorstadium des Einbaus erfolgt nach bekannten gängigen Methoden, aufweiche hier nicht weiter eingegangen zu werden braucht. Then come to the thresholds or on the rail spacers fortified, variable-length, downwardly pivotable auxiliary supports used to the new track yoke to be installed in a position as accurate as possible in the range of up to a maximum of +/- 2 mm to plan provided To bring target position. The measurement of the track yoke in this preliminary stage of installation is carried out by known common methods, which need not be further discussed here.

[0029] Nach diesem ersten Richten des Gleisjoches werden um die unterseitig an die Schienen des Gleisjochs jeweils unter Zwischenschaltung des Hebe-Richtgerätes montierten, abwärts ragenden Stützkörper angeordnete, auf dem Untergrund, also insbesondere auf der Tunnelsohle aufsitzende Schalungen angeordnet, und die Fussbereiche der Stützkörper werden mittels schnellabbindendem Spezial-Beton bzw. Mörtel umgössen. After this first straightening the track yoke are arranged to the underside of the rails of the track yoke each mounted with the interposition of the lifting straightening, downwardly projecting support body arranged on the ground, so in particular seated on the tunnel sole formwork, and the foot portions of the support body are surrounded by quick-setting special concrete or mortar.

[0030] Die Schalung kann in einfachster Weise aus Holz oder mit entsprechenden Stahlelementen gebildet sein. The formwork can be formed in the simplest way from wood or with corresponding steel elements.

[0031] Der bevorzugterweise wenig viskose und daher alle Hohlräume, Fugen, Untergrundspalten u.dgl. exakt füllende Spezial-Beton bzw. -Mörtel für die Stabilisierung der Stützkörper kann z.B. am Bankett als Fertigmörtel aufbereitet und mittels Giesskannen oder Schlauchleitung in die vorbereitete Umschalungen der Stützkörper eingebracht werden. The preferably less viscous and therefore all cavities, joints, underground columns and the like. precisely filling special concrete or mortar for the stabilization of the support body can e.g. be prepared as a ready-mixed mortar on the banquet and introduced by Giesskannen or hose in the prepared Umschalungen the support body.

[0032] Die für das Erst-Stabilisieren der Gleisjoche verwendeten Spezial-Bindemittelmassen, also schnell-abbindende Betone bzw. Mörtel, entsprechen in ihrer Endqualität etwa der Qualität des zukünftig für das Eingiessen der Schwellen verwendeten Gleistragplatten-Vergussbindemittels, also insbesondere Regelbeton, wodurch die Homogenität des ferti3 The special binder compositions used for the initial stabilization of the track yokes, ie fast-setting concretes or mortars, correspond in their final quality about the quality of the future used for the pouring of the sleep track plate Vergussbindemittels, ie in particular regular concrete, whereby the Homogeneity of the ferti3

CH 695 568 A5 CH 695 568 A5

gen Gleistragbauwerkes nicht negativ beeinflusst wird. track-laying structure is not adversely affected.

[0033] Durch das Umgiessen der Fussbereiche der Gleisjoch-Stützkörper ist auch bei sehr unebenem Untergrund eine vollflächige satte Auflage des Stützkörpers auf dem und eine feste Verbindung desselben mit dem Untergrund sowohl in Längs- als auch in Querrichtung gesichert. By casting around the foot areas of the track yoke support body is a full-surface rich support of the support body on the and a firm connection of the same with the ground in both the longitudinal and in the transverse direction secured even with very uneven ground.

[0034] Nach Erhärten der Spezial-Bindemittelmasse werden die Hilfsstützen eingeklappt um den Raum für den Einbau der Verguss-Bindemittelmasse(n) frei zu haben. After hardening of the special binder mass, the auxiliary supports are folded to have the space for the installation of potting binder mass (s) free.

[0035] Die Schienenstösse zwischen den Jochen können mittels Befestigungslaschen der Hebe-Richtgeräte auf gleiches Niveau gebracht und zusätzlich, mittels Steglaschen gesichert werden. The rail joints between the yokes can be brought by means of fastening straps of the lifting straightening devices to the same level and additionally secured by means of web tabs.

[0036] Das sich derart auf den mittels Beton bzw. Mörtel umgossenen Stützkörpern abstützende und lage-stabilisierte Gleisjoch bzw. das aus mehreren solchen Jochen gebildete Gleisstrang-Stück kann nach dem Erhärten der speziellen Bindemittelmasse auf Basis von Schnell-Beton bzw. -Mörtel problemlos mit schweren Bau- bzw. Bautransportzügen befahren werden. The so supported on the concrete or mortar cast by supporting bodies and position-stabilized track yoke or formed from several such Jochen Gleisstrang piece can easily after hardening of the special binder composition based on quick-concrete or mortar be driven with heavy construction or construction transport trains.

[0037] Es kann somit dann das Giessen der Grund-Fahrbahn bis zu einem Niveau von bis etwa 5cm unterhalb der Schwellen erfolgen, wozu grosse Mengen an heranzutransportierender Verguss-Bindemittelmasse erforderlich sind. It may thus be done then to a level of up to about 5cm below the thresholds, which requires large amounts of heranzutransportierender potting binder mass are required.

[0038] Diese Verguss-Bindemittelmassen können direkt aus den auf den lagestabilisierten Gleisjochen fahrenden Fahrzeugen entladen und ohne weitere Zwischentransporte eingebaut werden. These potting binder masses can be unloaded directly from the moving on the track-stabilized track Jochen vehicles and installed without further intermediate transports.

~[0039]-Nach-Beendigung-der-Befahrung-derrwte-beschrtebenr«erst=stabiltsierteiv>-Geleise für das Herantransportieren-der Baustoffe, Schienenbestandteile usw. werden die Fixierungen der Hebe-Richtgeräte von den Stützkörpern gelöst, und es erfolgt ein finales Justieren bzw. Feinjustieren der Gleislage mit einer Genauigkeit im Bereich von +/- 0,5 mm. After the completion of the traversing-the first declarations-for the transporting-of the building materials, rail components, etc., the fixings of the lifting straightening devices are released from the supporting bodies, and a final is carried out Adjust or fine adjust the track position with an accuracy in the range of +/- 0.5 mm.

[0040] Für eine gesteuerte Rissbildung in der letztlich mit üblichem Beton gegossenen künftigen Fahrbahn ist es günstig, vor dem Giessen derselben Trennelemente aus Blech oder aus einem anderen Material anzuordnen, und zwar am besten dort, wo die schon Lage-stabilisierten und -fixierten Schienen-Stützkörper eingebaut sind. Durch die mit den Trennelementen erreichte Querschnittschwächung kann sichergestellt werden, dass die Verguss-Bindemittelmasse im Zuge des Abbindens genau dort reisst, wo ohnedies von vornherein hohe Stabilität gegeben ist womit das Auftreten unerwünschter Risse im Bereich der eingegossenen Betonschwellenkörper vermieden wird. For a controlled formation of cracks in the ultimately cast with conventional concrete future roadway, it is beneficial to arrange before pouring the same separator made of sheet metal or other material, and that is best where the already stabilized and -fixierten rails Support body are installed. Due to the cross-sectional weakening achieved with the separating elements, it can be ensured that the casting-binder mass breaks in the course of setting exactly where high stability is already provided from the outset, thus avoiding the occurrence of undesired cracks in the area of the cast-in concrete sleeper bodies.

[0041] Das endgültige Vergiessen des Gleises erfolgt dann durch Unter- und Umgiessen der Schwellen bzw. Schwellenkörper. The final casting of the track then takes place by under-molding and pouring the sleepers or threshold body.

[0042] Für den Herantransport der dafür vorgesehenen, dann nur mehr relativ geringen Mengen an Verguss-Bindemittelmasse, vorzugsweise Regel-Beton, kann das auf den Stützkörpern abgestützte, bereits feingerichtete Geleise vom Betoneinbau- bzw. Betonfertiger-Zug befahren werden. Es treten dabei wesentlich geringere Achslasten und Geschwindigkeiten auf, wodurch es möglich ist, auch das bereits exakt eingerichtete Geleise als Transport-Fahrweg zu benutzen. For the onward transport of the intended, then only relatively small amounts of potting binder mass, preferably rule-concrete, supported on the support bodies, already fine-tuned tracks can be traveled by Betoneinbau- or concrete paver train. Significantly lower axle loads and speeds occur, which makes it possible to use the already exactly set tracks as transport track.

[0043] Nach Erhärten der Verguss-Bindemittelmasse werden die eingeklappten Hilfsstützen zusammen mit den Abstandshaltern im Fall von Einzel-Schwellenkörpern und die am Schienenfuss befestigten Hebe-Richtgeräte entfernt. Üblicherweise werden auch die Schienen der vorher sozusagen als «Positionier-Schablonen» fungierenden Gleisjoche von den eingegossenen Schwellen bzw. Schwellenkörpern entfernt, und es werden in die Schienenbefestigungen auf denselben dann Langschienen als die eigentlichen Fahrschienen eingezogen. After hardening of the potting-binder mass, the folded auxiliary supports are removed together with the spacers in the case of single-threshold bodies and attached to the rail foot lifting straighteners. Usually, the rails of the previously functioning as "positioning templates" track bumps are removed from the cast-in sleepers or threshold bodies, and it will be drawn into the rail fasteners on the same then long rails as the actual rails.

[0044] Dabei ist es besonders vorteilhaft, wenn die Montageschienen zusammen mit den Abstandhaltern, den Hilfsstützen und den am Schienenfuss montierten Hebe-Richtgeräten als fix montierte Montageschablone ausgebaut und transportiert werden. It is particularly advantageous if the mounting rails are removed and transported together with the spacers, the auxiliary supports and the rail foot mounted lifting straightening devices as a fixed mounting template.

[0045] Die wie beschrieben ausgebauten Montageschienen - im Falle von Schwellenkörpern mit den Abstandshaltern -sowie die Hebe-Richtgeräte werden wiederum auf Waggons verladen und zum Montageplatz transportiert, wo sie wiederum zu Gleisjochen mit Stützkörpern für einen neuen Schienen-Verlegezyklus zusammenmontiert werden. The mounting rails removed as described - in the case of emerging bodies with the spacers - as well as the lifting straightening devices are in turn loaded onto wagons and transported to the assembly site, where they are in turn assembled to track yokes with supporting bodies for a new rail laying cycle.

[0046] Die gegebenenfalls weitab von der jeweiligen Einbaustelle des Stück um Stück wachsenden Gleisstranges, also z.B. vor dem Tunneleingang, wieder vormontierten Gleisjoche werden auf dem bereits fertiggestellten und vergossenen Geleise sowie auf dem gemäss dem erfindungsgemässen Verfahren auf den mit Schnellbeton lokal umgossenen Stützkörpern gestützten, letzten bzw. vorderen Gleisstrang-Stück insgesamt, über Distanzen von z.B. bis zu 40 km im Falle alpenunterquerender Basistunnel-Bauten bis in die Nähe der Bauspitze transportiert. [0046] The track length, which may be increased far from the respective installation location of the piece piece by piece, ie e.g. before the tunnel entrance, again pre-assembled track yokes are on the already completed and potted track and on the according to the inventive method supported on the quick-cast locally cast around supporting bodies, last or front track piece in total, over distances of e.g. up to 40 km in the case of alpenunterquerender base tunnel buildings transported to the vicinity of the construction tip.

[0047] Was den Kern der Erfindung betrifft, ist an dieser Stelle darauf zu verweisen, dass eine Stabilisierung von Gleisbauten mit rasch abbindender Bindemittelmasse im Bereich des Fahrstreckenbaus bzw. -ausbaus aus der EP 99 122 720.8 A1 an sich bekannt ist. Es werden hierbei jedoch nicht, wie erfindungsgemäss, die über die Hebe-Richtgeräte an die Schienen der Gleisjoche gebundenen Stützkörper, sondern die Schwellen bzw. Schwellenkörper selbst direkt lagestabilisiert. As far as the essence of the invention is concerned, it should be pointed out at this point that stabilization of track structures with rapidly setting binder mass in the area of the track construction or removal from EP 99 122 720.8 A1 is known per se. However, it is not, as in the present invention, the support bodies bound to the rails of the track yokes via the lifting straightening devices, but the sleepers or sleeper bodies themselves are directly position-stabilized.

[0048] Im Folgenden sollen die wichtigsten Vorteile des erfindungsgemässen Gleisbau-Verfahrens zusammengefasst werden: The most important advantages of the track construction method according to the invention are summarized below:

[0049] Es ermöglicht insbesondere auf langen eingleisigen Strecken, wie sie gemäss heutigen Standards besonders in Eisenbahntunnels vorliegen, eine hoch-effiziente logistische Versorgung der Einbauprozesse, da schon in einem besonders frühen Baustadium auch schon schwere Lasten über das gerade erst eingebaute Geleise nahe an die Einbausteilen transportiert werden können. It allows especially on long single-track routes, as present according to today's standards, especially in railway tunnels, a highly efficient logistical supply of installation processes, since already in a particularly early stage of construction even heavy loads on the newly built track close to the Mounting parts can be transported.

4 4

CH 695 568 A5 CH 695 568 A5

[0050] Durch das neue Verfahren lassen sich die beispielsweise beim Bau des Ärmelkanal-Tunnels für die Erstellung der festen Fahrbahn eingesetzten, sehr aufwendigen Sonderkonstruktionen vermeiden. By the new method can be used, for example, in the construction of the Channel tunnel for the creation of the fixed carriageway, very expensive special constructions avoided.

[0051] Das erfindungsgemässe Verfahren ermöglicht weitestgehend den Einsatz von auf dem Markt verfügbaren Komponenten, Bauteilen, Baumaschinen und -geräten und bietet daher neben verbesserten wirtschaftlichen Voraussetzungen eine höhere Flexibilität und Ausfallsicherheit als bisher bekannt gewordene, wesentlich mehr Aufwand erfordernde Geleise-Verlegemethoden. The inventive method largely allows the use of available on the market components, components, construction machinery and equipment and therefore offers not only improved economic conditions, a higher flexibility and reliability than previously known, much more effort requiring track laying methods.

[0052] Bei Einbau einer zusätzlichen Gleistragplatte, z.B. bei grossen Fahrbahnhöhen, kann die erste Lage des Betons z.B. bis etwa 5 cm unter Schwellenblock-Unterseite bzw. -kante direkt vom - über das mittels der Stützkörper «erst-stabilisierte» Geleise herangeführten - Waggon in den Raum unterhalb des Geleises gekippt bzw. abgelassen werden, was den Vorteil hat, dass zusätzliche Längstransporte der Verguss-Bindemittelmasse durch Förderleitungen bzw. -schlauche und die dafür erforderlichen Einrichtungen nicht notwendig sind. When installing an additional track plate, e.g. at high road heights, the first layer of the concrete may e.g. up to about 5 cm below the threshold block underside or edge directly from the - via the by means of the support body "first-stabilized" track brought - wagon in the space below the track tilted or drained, which has the advantage that additional longitudinal transports of Potting binder mass through conveyor lines or hoses and the necessary facilities are not necessary.

[0053] Das neue Verfahren macht es möglich, pro Arbeits-Schicht bis zu 400 m3 Beton - diese Begrenzung ist durch die Beton-Bereitungs- und Transportleistung bedingt - einzubauen. The new method makes it possible per work shift up to 400 m3 concrete - this limitation is due to the concrete preparation and transport performance - install.

[0054] Weiters ist der Vorteil gegeben, dass auch für die endgültige Festlegung des Geleises die Bindemittelmasse sehr nahe an die Einbaustelle herantransportiert werden kann. Furthermore, there is the advantage that even for the final determination of the track, the binder mass can be transported very close to the installation point.

[0055] Die letzten, etwa hundert Meter, also der Bereich des jeweils frisch eingebauten und somit jeweils abbindenden Betons, lassen sich mit dem oben schon erwähnten Kran oder anderen Fördermitteln, wie z.B. mittels Förderband oder Betonpumpe, überbrücken. The last, about one hundred meters, ie the area of each freshly installed and thus each setting concrete, can be with the above-mentioned crane or other funding, such as. by means of conveyor belt or concrete pump, bridge.

[0056] Dadurch, dass die Betoneinbau-Einrichtung selbst auf dem gerade vorher stabilisierten neuen Gleis geführt werden kann, ergeben sich insgesamt wesentliche Vereinfachungen in der Transport- und Bau-Logistik. The fact that the concrete installation device itself can be performed on the newly stabilized before new track, resulting in a total of significant simplifications in transport and construction logistics.

[0057] Was die im Rahmen des neuen Gleisbau-Verfahrens vorteilhafte, stabile und letztlich leicht lösbare, über die jeweils am Schienenfuss montierten Hebe-Richtgeräte vorgesehene Verbindung zwischen den Schienen der Gleisjoche und den Stützkörpern betrifft, gibt darüber der Anspruch 2 näher Auskunft. What is advantageous in the context of the new track-laying method, stable and ultimately easily detachable, provided on each mounted on the rail lifting straightening devices connection between the rails of the track yokes and the supporting bodies is about the claim 2 more information.

[0058] Der Anspruch 3 nennt zwei bevorzugterweise einzusetzende Grundformen der Schienenjoch-Stützkörper, welche den Vorteil haben, dass eine effektive Umgiessung mit der zu deren Stabilisierung vorgesehenen schnellabbindenden Spezial-Bindemittelmasse erfolgen kann, durch welche eine hochstabile Verankerung in dem erhärteten Bindemittel und eine satte Verbindung mit dem wie schon oben beschriebenen, rohen Untergrund gewährleistet ist. The claim 3 calls two preferably to be used basic shapes of the rail yoke support body, which have the advantage that an effective encapsulation with the provided for stabilizing fast-setting special binder mass can be done by which a highly stable anchoring in the hardened binder and a rich Connection with the as already described above, raw surface is guaranteed.

[0059] Dem Anspruch 4 ist eine - in der Praxis bewährte und daher bevorzugte - Ausführungsform der für den Zusammenbau der Gleisjoche im Falle des Vorliegens von jeweils nur eine Schiene des Geleises tragenden Schwellenkörpern vorgesehenen, die Relativlage der Schienen des Gleisjoches zueinander exakt einhaltenden, die Schienen miteinander verbindenden Abstandshalte-Balken zu entnehmen. Ihre besondere Form resultiert daraus, dass die von denselben zum Gleisjoch verbundenen Schienen nach dem Stabilisieren der Stützkörper und deren Bindung an den Untergrund voll befahrbar sein müssen, also dass die bzw. ihre Kontur sowohl auf die mechanische Belastung als auch beispielsweise auf den für die Radkränze der Transportzüge nötigen Freiraum abgestimmt sein muss. The claim 4 is a - proven in practice and therefore preferred - provided for the assembly of the track yokes in the case of the presence of only one rail of the track-bearing emerging bodies, the relative position of the rails of the track yoke exactly complied with each other, the To remove rails connecting spacers bar. Their special shape results from the fact that the rails connected by the same to the track yoke after stabilizing the support body and their binding to the ground must be fully passable, so that the or their contour both on the mechanical load and, for example, for the wheel rims the transport trains necessary clearance must be coordinated.

[0060] Der Anspruch 5 enthält Details der Befestigung der Schienen-Abstandshalter an den Innenflanken bzw. Innenseiten der Schienen der Gleisjoche wieder. The claim 5 includes details of the attachment of the rail spacers on the inner edges or inner sides of the rails of the track yokes again.

[0061] Die Ansprüche 6 und 7 zeigen vorteilhafte Lösungen für das Verladen der mit den abwärts ragenden Stützkörpern ausgestatteten, an sich daher recht sperrigen, vormontierten Gleisjoche auf die Waggons für deren Verbringung zur Einbaustelle auf. The claims 6 and 7 show advantageous solutions for loading the equipped with the downwardly projecting support bodies, in itself quite bulky, preassembled track yokes on the wagons for their shipment to the installation site.

[0062] Über eine im Rahmen der Erfindung vorteilhafte Abwicklung des Ablegens der von den Waggons abgeladenen Gleisjoche an der jeweiligen Einbaustelle bzw. des Positionierens derselben in einer bzw. einem der Einbauplanung möglichst angenäherten Stellung bzw. Verlauf, welches bevorzugterweise mit an den Schwellen oder an den oben erwähnten Schienen-Abstandshaltern angelenkten und von dort abklappbaren, längeneinstellbaren Hilfsstützbeinen erfolgt, gibt der Anspruch 8 näher Auskunft. About a advantageous in the context of the invention settlement of depositing the unloaded from the cars track berths at the respective installation point or the positioning of the same in one or the installation plan as approximate position or course, which preferably with at the thresholds or at The above-mentioned rail spacers articulated and from there hinged, adjustable-length auxiliary support legs is the claim 8 gives more information.

[0063] Um möglichst grosse Freiheit beim Feinrichten der Geleise nach dem Stabilisieren der Stützkörper der Gleisjoche zu gewährleisten, ist im Rahmen des erfindungsgemässen Einbauprozesses gemäss Anspruch 9 vorgesehen, in diesem Stadium die Schienenjoche so tiefliegend zu positionieren, dass sie in jedem Fall letztlich um einen geringen Betrag zu heben sind, wenn sie beim endgültigen Feinrichten mittels der zwischen den Schienen und den an den Untergrund gebundenen, stabilisierten Stützkörpern angeordneten Hebe-Richtgeräte in die bzw. den planmässig vorgesehene^) exakte(n) Position bzw. Verlauf gebracht werden. In order to ensure the greatest possible freedom in the fine tuning of the tracks after stabilizing the support body of the track yokes, is provided in the context of the inventive installation process according to claim 9, to position the Schienenjoche so low-lying at this stage that they ultimately in any case to a small amount are to be lifted if they are placed in the final or by means of arranged between the rails and the ground, stabilized support bodies lifting straightening devices in the planned or intended ^) exact (s) position or course.

[0064] Die Massnahme des Einbaus von Einlage-Paneelen gemäss Anspruch 10 dient einer gezielt gesteuerten Rissbildung in der erhärteten Verguss-Bindemittelmasse der festen Fahrbahn im Bereich der Stützkörper, womit eine solche im Bereich der Schwellen bzw. Schwellenkörper vermieden ist. The measure of the installation of insert panels according to claim 10 is a targeted controlled cracking in the hardened potting compound mass of the solid roadway in the region of the support body, whereby such in the threshold or threshold body is avoided.

[0065] Im Rahmen der Erfindung ist es bevorzugt, die, wie beschrieben, vormontierte Schienenjoche bzw. deren Schienen sozusagen als die exakte plangemässe Positionierung der Fahr-Geleise gewährleistende, immer wieder einzusetzende «Verlege-Lehren bzw. -Schablonen» zu verwenden, durch welche die letztlich mittels der Verguss-Bin-demittelmasse, also insbesondere mittels Regelbeton, umgossenen, Schwellen bzw. Schwellenkörper und die darauf montierten Schienenbefestigungen in einer - sich eigentlich am Schienenfuss bzw. an dessen Unterseite orientierenden Position festgelegt sind, womit die exakte Position der - nach Entfernen der Gleisjoch-Schienen aus den Schienenbefestigungen der Schwellen bzw. Schwellenkörper in dieselben einzuziehenden-Fahrschienen gewährleistet ist. Es ist da In the context of the invention, it is preferred that, as described, pre-assembled Schienenjoche or their rails, so to speak, as the exact plangemässe positioning of the driving tracks ensuring to use again and again «laying teachings or stencils» by which the ultimately by means of the Verguss-Bin-demittelmasse, so in particular by means of regular concrete, cast, threshold or threshold body and mounted thereon rail fasteners in a - are actually oriented on the rail foot or at the bottom oriented position, whereby the exact position of - After removal of the track yoke rails from the rail fastenings of the sleepers or threshold body is ensured in the same-retracting rails. It is there

CH 695 568 A5 CH 695 568 A5

zu insbesondere auf die Ansprüche 11 sowie 12 zu verweisen. to refer in particular to claims 11 and 12.

[0066] Der Anspruch 13 gibt über eine im Rahmen der Erfindung bevorzugte Praxis beim Verlegen der Gleisjoche an der Einbaustelle näher Auskunft. The claim 13 provides a preferred within the scope of the invention practice when laying the track berths at the installation point information.

[0067] Mit bevorzugten Praktiken der Vorbereitung für den Einbau der in den meisten Fällen als Fahrschienen vorgesehenen Langschienen nach Entfernung der Schienen der Gleisjoche im Falle von deren Einsatz als «Verlege-Lehren bzw. -Schablonen» beschäftigen sich die Ansprüche 14 und 15. With preferred practices of preparation for the installation of the rails provided in most cases as rails rails after removal of the rails of the track yokes in the case of their use as «laying gauges or -Schablonen» deal with the claims 14 and 15.

[0068] Anhand der Zeichnung wird die Erfindung näher erläutert: Reference to the drawing, the invention is explained in more detail:

[0069] Es zeigen die The figures show

Fig. 1a bis c jeweils in Drauf-, Seiten und Längs-Ansicht ein Gleisjoch in der erfindungsgemäss zum Einsatz kommenden Form bzw. Ausstattung, die Fig. 1a to c respectively in top, side and longitudinal view of a track yoke in the invention used according to the form or equipment, the

Fig. 2 a bis e Details der Verbindung der Schienen der Schienenjoche mit den an der Schienenfuss-Unterseite mit ihnen lösbar verbundenen Hebe-Richtgeräten und den an deren Unterseite gebundenen Stützkörpern sowie Details der Stellung der Hebe-Richtgeräte in ihrer hochbelastbaren Grundstellung und in einer Stellung während des Feinricht-Vorganges, die Fig. 2 a to e details of the connection of the rails of the rail yokes with the rail foot at the bottom releasably connected to them lifting straightening devices and the support bodies bound to the underside and details of the position of the lifting straightening devices in their heavy-duty basic position and in one position during the fine-tuning process, the

Fig. 3 eine zweite bevorzugte Ausführungsform eines Gleisjoch-Stützkörpers, die Fig. 3 shows a second preferred embodiment of a track yoke support body, the

Flg. 4 ein Schema für eine laderaumsparende~effektive~Verladung der m1t~den~Stützkörpern ausgestatteten Flg. 4 a scheme for a load-saving ~ effective ~ loading of the m1t ~ the support bodies equipped

Gleisjoche, die Track yokes, the

Fig. 5 eine bevorzugte Ausführungsform der für einen exakten Zusammenhalt der Schienen der Gleisjoche vorgesehenen Schienen-Abstandshalter, die Fig. 5 shows a preferred embodiment of the intended for an exact cohesion of the rails of the track yokes rail spacers, the

Fig. 6 die Situation der Verlegearbeit nach dem Stabilisieren der Stützkörper, die Fig. 6 shows the situation of laying work after stabilizing the support body, the

Fig. 7a bis c jeweils Ansichten eines Tunnelquerschnitts, in welchem der Antransport der Gleisjoche und deren Entladung mittels einer Portalkran-Einrichtung an der Baustelle erfolgt, und die Situation nach Fertigstellung der Fahrstrecke und deren Befahrung mit einem Zug und schliesslich die Fig. 7a-c are views of a tunnel cross-section, in which the transport of the track yokes and their discharge by means of a gantry crane device at the construction site, and the situation after completion of the route and their journey with a train and finally the

Fig. 7d die für den Transport und die Verlegung der Gleisjoche vorgesehene Portalkran-Einrichtung während der Verlegearbeit. Fig. 7d provided for the transport and installation of the track yokes gantry crane device during the laying work.

[0070] Die Fig. 1a bis c zeigen auf der Einbaustelle abgelegte und mit den Hilfsstützen 17 bzw. deren Hilfsstützfüssen 173 sich auf einem «unebenen» Untergrund 11 abstützende für den Einbau fertig vorbereitete Gleisjoche 1. Im Einzelnen sind hier die Montageschienen 12 mittels standardgemässen Schienenbefestigungen 135 (Fig. 4) mit den Schwellenkörpern 13 im vorgesehenen Schwellenabstand asw fertig montiert. Die Schienen 12 sind durch zwischen einem jeweils dritten und vierten Schwellenkörper 13 mittels dieselben in exakt vorgegebener Relativlage zueinander haltender Abstandshalter 16 miteinander verbunden. An die Unterseite des Schienenfusses 123 jeder Schiene 12 sind, jeweils um den Abstand ast von einander beabstandet, die Hebe-Richtgeräte 15 gebunden, welche ihrerseits unterseitig mit den hier steil-pyramidale Gestalt aufweisenden Stützkörpern 14 verbunden sind. Dieselben tragen zur Innenseite I hin Nuten 145 für das Einschieben von Einlagepaneelen oder Rissbildungs-Blechen 19 od. dgl. für eine gezielte Rissbildung in der letztlich fertig vergossenen Fahrbahn an den Stellen, wo die Stützkörper 14 angeordnet sind. Die Fig. 1b und 1c zeigen, wie die eine «mittlere Breite» bst aufweisenden Stützkörper 14 mit ihren Fussenden 143, jeweils von einer Schalung 90 umgeben, mit schnellabbindender Vergussmasse 9 umgössen sind, womit nach dessen Erhärtung das Gleisjoch 1 hoch belastbar befahrbar ist. Fig. 1a to c show at the installation site and stored with the auxiliary supports 17 and their Hilfsstützfüssen 173 on an "uneven" surface 11 supporting ready for installation track bumps 1. Specifically, here are the mounting rails 12 by means of standard Rail fasteners 135 (Fig. 4) with the threshold bodies 13 in the intended threshold distance asw completely assembled. The rails 12 are interconnected by a respective third and fourth threshold body 13 by means of the same in exactly predetermined relative position holding each other spacers 16. To the underside of the rail foot 123 of each rail 12, each spaced by the distance branch from each other, the lifting straightening devices 15 bound, which in turn are connected to the underside with the here-pyramidal shape having supporting bodies 14. The same carry towards the inside I grooves 145 for the insertion of insert panels or cracking sheets 19 od. Like. For a targeted cracking in the ultimately finished paved road at the points where the support body 14 are arranged. FIGS. 1b and 1c show how the support bodies 14 having a "middle width" bst with their foot ends 143, each surrounded by a formwork 90, are encapsulated with fast-setting potting compound 9, whereby after its hardening the track yoke 1 can be driven in a highly loadable manner.

[0071] Die Abstandshalter 16 stützen sich - siehe Fig. 1c - jeweils am Schienenkopf 121 und am Schienenfuss 123 ab und sind mittels Schrauben 165 mit dem Schienenhals 122 verschraubt. The spacers 16 are supported - see FIG. 1 c - in each case on the rail head 121 and on the rail foot 123 and are screwed by means of screws 165 to the rail neck 122.

[0072] Die hier dargestellten Gleisjoche 1 werden bevorzugterweise in einer Länge von 18 m eingesetzt. Sie werden in den meisten Fällen in - gegebenenfalls grosser - Entfernung von der Einbaustelle z.B. in einer Montagehalle vorbereitet. Wie hier dargestellt, werden sie als Ganzes an die Einbaustelle, z.B. in einem Tunnel unter Abstützung mittels der Hilfsstützen 17 mit an den Abstandshaltern 16 angelenkten, abwärtsgeschwenkten Teleskop-Stützbeinen 173 am unebenen Untergrund 11 abgestützt. The track yokes 1 shown here are preferably used in a length of 18 m. They are in most cases in - possibly greater - distance from the installation point, for. prepared in an assembly hall. As shown here, they are sent as a whole to the installation site, e.g. supported in a tunnel with support by means of the auxiliary supports 17 with the spacers 16 hinged, downwardly pivoted telescopic support legs 173 on uneven ground 11.

[0073] Am Schienenstoss sind die Hebe-Richtgeräte 15 vorteilhafterweise so ausgebildet, dass zwei aneinanderstos-sende Schienenenden jeweils aufeinanderfolgender Gleisjoche 1 gegen dieselben verspannt sind. The lifting straightening devices 15 are advantageously designed on the rail joint such that two adjoining rail ends of respective successive track yokes 1 are braced against the same.

[0074] Die Fig. 2a und 2b zeigen, wie die Hebe-Richtgeräte 15 mittels in im Stützkörper 14 angeordneten Dübeln 146 verankerten Schrauben 147 oder mittels den sich am entsprechend gestalteten Stützkörper 14 verhakenden Hakenenden von Haken-Schraubgewindebolzen 148 zwischen Stützkörper 14 und Schienenfuss 123 der Gleisjoch-Schiene 12 angeordnet und mittels Hilfsklammern 154 gehalten, mit dem Stützkörper 14 einerseits und der Gleisjoch-Schiene 12 andererseits lagefest sowie verschiebe- und verdrehsicher verbunden sind. 2a and 2b show how the lifting straightening devices 15 by means of anchored in the support body 14 dowels 146 screws 147 or by means of the correspondingly shaped support body 14 hooked hook ends of hook screw thread bolt 148 between the support body 14 and rail foot 123th arranged the track yoke rail 12 and held by means of auxiliary brackets 154, on the other hand, with the support body 14 on the one hand and the track rail 12 on the other position and displaceable and non-rotatably connected.

[0075] Die Fig. 2d zeigt weiters das Hebe-Richtgerät 15 in seiner für hohe Belastungen geeigneten, nicht ausgefahrenen Grundstellung und die Fig. 2e dasselbe in einer Gleisjoch-Feinricht-Stellung mit Hebung und Seitverschiebung. In diesem Zustand muss die Verschraubung und Verspannung zum Stützkörper 14 hin gelöst sein, und das feingerichtete Gleisjoch ist für den Betonfertiger befahrbar. Fig. 2d further shows the lifting straightener 15 in its suitable for high loads, non-extended basic position and Fig. 2e the same in a track yoke fine straightening position with elevation and lateral displacement. In this state, the screwing and tension must be solved to the support body 14 back, and the fine-tuned track yoke is passable for the concrete paver.

[0076] Schliesslich zeigt die Fig. 2c eine günstige, «kreuzweise versetzte» Anordnung der Schrauben 147 bzw. Haken Finally, FIG. 2c shows a favorable, "crosswise offset" arrangement of the screws 147 or hooks

CH 695 568 A5 CH 695 568 A5

bolzen 148 für die Befestigung des Stützkörpers 14 an der Schiene 12 einerseits und der Schrauben 157 für die davon unabhängige Befestigung des Hebe-Richtgerätes 15 an der Schiene 12 andererseits. bolt 148 for the attachment of the support body 14 on the rail 12 on the one hand and the screws 157 for independent thereof attachment of the lifting straightener 15 to the rail 12 on the other.

[0077] Das in den Fig. 2a bis 2e gezeigte Hebe-Richtgerät 15 ist in seiner konkreten Ausführungsform mit zwei Basisplatten, also mit Deck- und Bodenplatte, mit jeweils 20 mm Stärke und einer dazwischen angeordneten und in die beiden Platten eingreifenden Doppelspindel mit jeweils 20 mm Spindellänge und einen Spindeldurchmesser von etwa 60-80 mm Gewindedurchmesser, gebildet. The lifting straightener 15 shown in Figs. 2a to 2e is in its concrete embodiment with two base plates, ie with cover and bottom plate, each with 20 mm thickness and arranged therebetween and engaging in the two plates double spindle with each 20 mm spindle length and a spindle diameter of about 60-80 mm thread diameter formed.

[0078] Die Doppelspindel trägt ein Zahnrad, welches mittels eines kleinen Zahnrades an der Aussenseite des Hebe-Richtgerätes 15 angetrieben werden kann. Das kleine Zahnrad ist so positioniert, dass der manuelle oder maschinelle Antrieb von oberhalb, also etwa von einer Position neben dem Schienenfuss 123, z.B. mittels Ratsche od. dgl. erfolgen kann. The double spindle carries a gear which can be driven by means of a small gear on the outside of the lifting straightener 15. The small gear is positioned so that the manual or mechanical drive from above, that is approximately from a position next to the rail foot 123, e.g. od by ratchet. Like. Can be done.

[0079] Mit Hilfe der Doppelspindel ist es möglich, mit dem Hebe-Richtgerät etwa 25 mm Hub zu erzielen. In der maximalen Ausfahrstellung hat deren Gewinde noch einen Eingriff von etwa 8 mm, welcher aufgrund des grossen Gewindedurchmessers und der geringen Gewindehöhe von 1,5 bis 2 mm auch für die oben beschriebenen hohen Zug- und Druck-Belastungen ausreicht. Der Antrieb der Doppelspindel kann statt mittels der Zahnräder auch mittels einer Kette mit Zahnradscheiben erfolgen. Diese letztgenannte Ausbildungsform hat den Vorteil, dass der Antrieb und die Stellvorrichtung selbst flexibler einsetzbar sind und bei Bedarf auch ausserhalb der Querachse bzw. Querebene des Hebe-Richtgerätes 15 angeordnet werden kann. Mit dem Kettenantrieb können auch mehrere Spindeln angetrieben werden, wodurch die Stabilität des Hebe-Richtaerätes weiter verbessert wird. Weiters ist ein derartiger Kettenantrieb gegenüber Verschmutzung im Baustellenbetrieb wesentlich unempfindlicher als ein Zahnrad-Eingriff. With the help of the double spindle, it is possible to achieve about 25 mm stroke with the lifting straightener. In the maximum extended position whose thread still has an engagement of about 8 mm, which is sufficient due to the large thread diameter and the low thread height of 1.5 to 2 mm for the high tensile and compressive loads described above. The drive of the double spindle can be done by means of a chain with gear wheels instead of by means of the gears. This latter embodiment has the advantage that the drive and the adjusting device itself are more flexible and can be arranged outside the transverse axis or transverse plane of the lifting straightener 15 if required. With the chain drive and several spindles can be driven, whereby the stability of the lifting straightening device is further improved. Furthermore, such a chain drive to pollution in construction site operation is much less sensitive than a gear engagement.

[0080] Die seitliche Verschiebung des Hebe-Richtgerätes 15 wird durch Verschiebung von dessen Deckplatte gegen die beschriebene obere Spindelführung erzielt. Zu diesem Zweck ist eine Horizontalspindel, welche auf der gegenüberliegenden Seite der Vertikalspindel angeordnet ist, im inneren Gewindeblock geführt, womit die Deckplatte gegen diesen Gewindeblock nach links oder rechts verschoben werden kann. Auf diese Art und Weise sind seitliche Verschiebungen um +/-15 mm problemlos möglich. The lateral displacement of the lifting straightener 15 is achieved by displacement of the cover plate against the described upper spindle guide. For this purpose, a horizontal spindle, which is arranged on the opposite side of the vertical spindle, guided in the inner threaded block, whereby the cover plate can be moved against this threaded block to the left or right. In this way lateral displacements of +/- 15 mm are possible.

[0081] In der Deckplatte des Heberichtgerätes 15 sind vier Befestigungsöffnungen vorgesehen. Die Deckplatte selbst wird mittels der zwei diagonal angeordneten Befestigungen 147, 148 über die Spannklemmen 154 fix an den Schienenfuss 123 der Montageschienen 12 montiert. In der Deckplatte ist weiters eine Führungsnut od. dgl. für die Aufnahme des Schienenfusses 123 vorgesehen, um ein Verdrehen der Deckplatte des Gerätes 15 gegenüber demselben zu vermeiden. In the cover plate of the Heberichtgerätes 15 four mounting holes are provided. The cover plate itself is fixed by means of the two diagonally arranged fasteners 147, 148 via the clamping clamps 154 to the rail foot 123 of the mounting rails 12. In the cover plate is further a guide groove od. Like. Provided for receiving the rail foot 123 to prevent twisting of the cover plate of the device 15 relative to the same.

[0082] Die Öffnungen im Nahbereich der beiden Endpunkte der anderen Diagonale sind durch das Hebe-Richtgerät 15 hindurch geführt und setzen sich bis zu den Verankerungs-Dübeln 146 in den Stützkörpern 14 fort. Sie ermöglichen es, den Stützkörper 14 mittels der Schrauben 147 mit der oberen Platte des Hebe-Richtgerätes 15 zu verschrauben. The openings in the vicinity of the two end points of the other diagonal are passed through the lifting straightener 15 and continue up to the anchoring plugs 146 in the support bodies 14. They make it possible to screw the support body 14 by means of the screws 147 with the upper plate of the lifting straightener 15.

[0083] Es besteht die Möglichkeit, diese Schrauben 147 weiter nach oben zu ziehen und direkt mit einer Klemmplatte 154 am Schienenfuss 123 zu verankern. It is possible to further pull these screws 147 upwards and anchored directly with a clamping plate 154 on the rail foot 123.

[0084] Alternativ zur Befestigung des Stützkörpers 14 mit Dübel 146 und Schraube 147 kann derselbe auch mittels eines hakenförmigen Befestigungselementes 148 und einer Klammer 154 mit dem Hebe-Richtgerät 15 verspannt werden. Diese Art des Aufbaus hat den Vorteil, dass in den Stützkörper 14 keine Verankerungs-Löcher und -Dübel eingeformt bzw. eingebracht werden müssen. Alternatively to the attachment of the support body 14 with dowel 146 and screw 147, the same can also be clamped by means of a hook-shaped fastener 148 and a bracket 154 with the lifting straightener 15. This type of construction has the advantage that in the support body 14 no anchoring holes and dowels have to be formed or introduced.

[0085] Die Hebe-Richtgeräte 15 werden vorteilhaft in folgender Schritt-Folge eingesetzt: The lifting straighteners 15 are advantageously used in the following step sequence:

[0086] Zuerst erfolgt die Vorbereitung, indem das Gerät 15 auf minimalen bzw. Null-Hub gestellt wird, sich also dieses Gerät 15 in Grundstellung G befindet. Dabei ist ein echtes Aneinanderliegen von der Grund- und Deckplatte vorgesehen, sodass Lasten, welche in diesem Zustand auf das Hebe-Richtgerät 15 einwirken, nicht über die Hebe-Spindel bzw. deren Gewinde, sondern über den direkten Kontakt von Grund- und Deckplatte in den Untergrund abgeleitet werden können. Dies ist auch der Zustand, in dem die Gleisjoche 1 mit den an sie montierten Hebe-Richtgeräten 15 mit schweren Bau-Zügen, also mit 22,5 bis 251 Achslast, befahren werden können. First, the preparation is done by the device 15 is set to minimum or zero stroke, so this device 15 is in basic position G. In this case, a real juxtaposition of the base and cover plate is provided so that loads acting in this state on the lifting straightener 15, not on the lifting spindle or its thread, but on the direct contact of the base and cover plate in the background can be derived. This is also the state in which the track yokes 1 with the lifting straightening devices 15 mounted on them with heavy construction trains, so with 22.5 to 251 axle load, can be driven.

[0087] Die Seitenverstell-Einrichtung des Gerätes 15 wird ebenfalls auf 0 gestellt, das Gerät also auch diesbezüglich in die Grund- bzw. Mittelstellung verbracht. The lateral adjustment device of the device 15 is also set to 0, so the device spent in this regard also in the basic or middle position.

[0088] In diesem Zustand sind die Hebe-Richtgeräte 15 unverrückbar mit den Montageschienen 12 über die beiden in der Diagonale angeordneten Befestigungselemente 147,148 bzw. Klemmplatten 154 verbunden. In this state, the lifting straighteners 15 are immovably connected to the mounting rails 12 via the two arranged in the diagonal fastening elements 147,148 or clamping plates 154.

[0089] Über die beiden weiteren in der jeweils anderen Diagonale angeordneten Öffnungen ist der Stützkörper 14 mit dem Hebe-Richtgerät 15 und dem Schienenfuss 123 direkt verspannt. Diese Montage findet bei jedem Zusammenbau des Gleisjoches 1 an der jeweiligen Montagestelle statt. In diesem Stadium sind das Hebe-Richtgerät 15 der Stützkörper 14 fix mit der jeweiligen Montageschiene 12 und dem daraus zusammengestellten Gleisjoch 1 verbunden und für den Einbau, z.B. in einem Tunnel, vorbereitet. About the two other arranged in the other diagonal openings of the support body 14 with the lifting straightener 15 and the rail foot 123 is braced directly. This assembly takes place at each assembly of the track yoke 1 at the respective mounting location. At this stage, the lifting straightener 15 of the support bodies 14 are fixedly connected to the respective mounting rail 12 and the track yoke 1 assembled therefrom, and for installation, e.g. in a tunnel, prepared.

[0090] In der Folge wird dann, wie schon oben teilweise beschrieben, das gesamte Gleisjoch 1 an die Einbaustelle transportiert, und die Stützkörper 14 werden nach dem Grob- bzw. Vorrichten des Gleisjoches durch Umgiessen von deren Unterteilen mit Schnell-Beton stabilisiert. Um einen entsprechenden Spielraum beim Feinrichten sicherzustellen, wird das Gleisjoch 1 auf einer Höhe von etwa minus 5 mm und bei Grund-Mittellage des Hebe-Richtgerätes 15 vorgerichtet und stabilisiert, sodass mit Sicherheit immer ein genügender Hebevorrat für die letztlich vorzunehmende exakte Lage-Einstellung und Feinjustage des Gleisjoches 1 bzw. der Schienen 12 vorhanden ist. As a result, then, as already partially described above, the entire track yoke 1 is transported to the installation site, and the support body 14 are stabilized after coarse or Vorrichten the track yoke by casting around their parts with quick-concrete. In order to ensure a corresponding margin when fine-tuning, the track yoke 1 is prepared and stabilized at a level of about minus 5 mm and at the basic center position of the lifting straightener 15, so certainly always a sufficient lifting stock for the final exact position setting and Fine adjustment of the track yoke 1 and the rails 12 is present.

CH 695 568 A5 CH 695 568 A5

[0091] Im durch das Eingiessen der Stützkörper 14 stabilisierten Zustand kann das oben schon erwähnte Befahren des Gleises für Materialtransporte mit üblichen Material-Transport-Waggons 6 u.dgl. mit vollen Achslasten erfolgen. In the stabilized by the pouring of the support body 14 state, the above-mentioned driving the track for material transport with conventional material transport wagons 6 and the like. done with full axle loads.

[0092] Nach Abschluss der Bindemittel-Transporte zur Einbaustelle wird die Befestigung 147, 148, 154 des Hebe-Richtgerätes 15 zum Stützkörper 14 hin gelöst. Danach kann mittels des Hebe-Richtgerätes 15 das Geleise fein gerichtet werden. Nach dem Feinjustieren wird das lagestabilisierte Gleisjoch 1 bzw. eine Serie dieser Gleisjoche 1 mit dem Betonfertiger bei verringerten Achslasten und reduzierten Geschwindigkeiten für den Betoneinbau befahren. Die Hebe-Richtgeräte 15 mit der oben beschriebenen Doppelspindel sind für diese geringeren Lasten entsprechend ausgelegt, und sind denselben auch im Hub- und Seitverstellungs-Zustand F nach dem Feinjustieren gewachsen. After completion of the binder transports to the installation site, the attachment 147, 148, 154 of the lifting straightener 15 to the support body 14 is released. Thereafter, by means of the lifting straightening device 15, the tracks are fine. After fine adjustment, the position-stabilized track yoke 1 or a series of these track yokes 1 with the concrete paver is driven at reduced axle loads and reduced speeds for concrete installation. The lifting straighteners 15 with the double spindle described above are designed accordingly for these lower loads, and are the same grown in the stroke and lateral adjustment state F after fine adjustment.

[0093] Nach dem Erhärten der Vergussmasse 9' werden die Schienenbefestigungen 135 der Schienen 12 an den Be-ton-vergossenen Schwellenkörpern 13 gelöst und das die von den Abstandshaltern 16 gehaltenen Schienen umfassende Gleisjoch 1 wird jeweils als Ganzes abgehoben. Das Gleisjoch 1 wird schliesslich auf die Waggons 6 verladen und zum Montageplatz zurückgefahren und dort für den neuerlichen Einsatz vorbereitet. After hardening of the potting compound 9 ', the rail fasteners 135 of the rails 12 are released on the Be-tone-cast sleeper bodies 13 and the track yoke 1, which is held by the spacers 16, is lifted off as a whole. The track yoke 1 is finally loaded on the wagons 6 and moved back to the assembly site and prepared there for the renewed use.

[0094] Zur Ausbildung am Stoss der Schienen 12 von zwei aufeinanderfolgenden Montage-Gleisjochen 1 ist Folgendes auszuführen: To form the abutment of the rails 12 of two consecutive assembly track yokes 1, the following is to be carried out:

[0095] Am Schienenstoss ist die Schienenklemmung des Hebe-Richtgerätes 15 vorteilhaft so ausgeführt, dass dessen Deckplatte in Schienen-Richtung verlängert ist und mit zusätzlichen Spannklemmen zur Aufnahme der beiden Schienenenden ausgerüstet ist. At the rail joint, the rail clamping of the lifting straightener 15 is advantageously designed so that its cover plate is extended in the rail direction and is equipped with additional clamps for receiving the two rail ends.

[0096] Die für die letztlich exakt^eihzustellendéTzûkûhftige Gleisgeometrie massgebenden Anhaltepunkte befinden sich am Schienenfuss 123, denn diesen Punkten exakt entsprechend, ist die Lage und der Verlauf der anstelle der Schienen 12 des Gleisjoches 1 in die Schienenbefestigungen 135 auf den Schwellenkörpern 13 schliesslich einzuziehenden Fahrschienen. Es ist daher insbesondere am Schienenstoss wichtiger, die Geometrie am Schienenfuss 123 kontinuierlich zu halten, als am Schienenkopf 121. [0096] The stopping points which are decisive for the ultimately accurate track geometry are located on the rail foot 123, because these points correspond exactly, is the position and course of instead of the rails 12 of the track yoke 1 in the rail fasteners 135 on the sleepers 13 finally retracting rails , It is therefore more important, especially at the rail joint, to keep the geometry on the rail foot 123 continuously, as on the rail head 121.

[0097] Grundsätzlich soll an dieser Stelle erwähnt werden, dass sich das neue Gleisbau-Verfahren an der Höhen- und Seitenlage der Schienenfüsse 123 - und noch exakter ausgedrückt - der Schienenfuss-Basisflächen orientiert, welche ja gleichzeitig die Lage der Schwellenoberkanten und die Lage der Schienenbefestigungen 135 auf den Schwellen definieren. Basically, it should be mentioned at this point that the new track-laying method is based on the height and lateral position of the rail feet 123 - and more precisely - the rail foot base surfaces, which at the same time the position of the upper edges of the sleeper and the position of Define rail fasteners 135 on the thresholds.

[0098] Die Fig. 3 zeigt eine andere bevorzugte Ausführungsform der Gleis-Stützkörper 14 in Form eines inversen «T», wobei dessen den Stützkörperfuss bildender Horizontalbalken einerseits eine grosse Abstützfläche und andererseits eine besonders sichere Verankerung im Spezialbeton nach dem Umgiessen des Stützkörpers 14 bei der Erst-Stabilisierung des Gleisjoches 1 gewährleistet. Fig. 3 shows another preferred embodiment of the track support body 14 in the form of an inverse "T", wherein the Stützkörperfuss forming horizontal bars on the one hand a large support surface and on the other hand a particularly secure anchoring in special concrete after the casting of the support body 14 at the initial stabilization of the track yoke 1 guaranteed.

[0099] Die Fig. 4 zeigt - bei ansonsten gleichbleibenden Bezugszeichenbedeutungen - die ebene Ladefläche eines Flachwaggons 6 und zwei auf derselben übereinander und um einen etwa der etwa mittleren Breite bst der Schienen-joch-Stützkörper 14 entsprechenden Abstand vst von z.B. 40 bis 50 cm in Querrichtung gegeneinander versetzt angeordnete Gleisjoche 1 mit ihren, die Schienen 12 in exakter Relativlage haltenden und miteinander verbindenden Abstandshaltern 16 und den an dieselben angelenkten Hilfsstützen 17 - mit den Teleskopstützbeinen 173. Fig. 4 shows - with otherwise constant reference numerals - the flat loading surface of a flat wagon 6 and two on the same one above the other and about an approximately the average width bst of the rail yoke support body 14 corresponding distance vst of e.g. 40 to 50 cm offset transversely staggered track yokes 1 with their, the rails 12 in exact relative position holding and interconnecting spacers 16 and hinged to the same auxiliary supports 17 - with the telescopic support legs 173rd

[0100] Bei dieser Art der Verladung finden die Stützkörper 14 des jeweils oberen Gleisjoches 1 in dem Freiraum zwischen den Schwellenkörpern 13 des jeweils darunter liegenden Joches 1 Platz. Durch dieses versetzte Stapeln können 4 bis 5 Joche ineinander und übereinander auf dem Waggon 6 positioniert und transportiert werden. In this type of loading, the support bodies 14 of the respective upper track yoke 1 find room in the free space between the sleepers 13 of the respectively underlying yoke 1. By this staggered stacking, 4 to 5 yokes can be positioned and transported one inside the other and one above the other on the carriage 6.

[0101] Für die Ablage sind jeweils die Schienen 12 von unten her gestützt, in Schwellenfach-Querträger 63 eingezogen, welche an beidseitigen Halterungen 64 des Waggons 6 verankert sind und somit die gegebenenfalls über mehrere Dutzend km zu transportierenden Gleisjoche 1 auch bei hohen Geschwindigkeiten von z.B. 80-100 km/h sicher gehalten sind. For storage, the rails 12 are supported from below, fed into sleeper compartment cross member 63, which are anchored to both sides of brackets 64 of the wagon 6 and thus possibly over several dozen km to be transported track bails 1 even at high speeds of eg 80-100 km / h are kept safe.

[0102] Durch die Querträger 63 werden sowohl die Masse der Gleisjoche 1 als auch die Längskräfte bei Beschleunigung und Bremsung des Transportzuges aufgenommen, und sie stellen sicher, dass die jeweils darunterliegenden Joche 1 nicht durch die jeweils darüberliegenden Joche 1 belastet sind. Die Querträger 63 für die Gleisjoch-Halterung auf den Waggons 6 sind jeweils in den freibleibenden Schwellen-Zwischenfächern bzw. -räumen an Stellen eingefädelt, wo weder Stützkörper 14 und Hebe-Richtgeräte 15 noch sonstige für die Montage der Gleisjoche 1 vorgesehene Vorrichtungen eingebaut sind. Es steht dafür bevorzugterweise jedes dritte Schwellenfach zur Verfügung. By the cross member 63, both the mass of the track yokes 1 and the longitudinal forces are absorbed during acceleration and braking of the transport train, and they ensure that the respective underlying yokes 1 are not burdened by the respective overlying yokes. 1 The cross member 63 for the track yoke mounting on the cars 6 are threaded in each case in the remaining free-standing intermediate compartments or spaces at points where neither support body 14 and lifting straighteners 15 are still installed for the assembly of the track yokes 1 devices. It is preferred for every third threshold compartment available.

[0103] Die auf dem Waggon 6 beidseitig angeordneten Halterungen 64, für die Aufnahme der Querträger 63, sind vorteilhafterweise durch Verstrebungen in Längsrichtung versteift, sodass sie die oben angesprochenen Längskräfte aufnehmen können. Die Querträger können entweder nach Abladen des Gleisjoches 1 von Hand oder mittels eines später noch näher zu beschreibenden Portalkranes an der Einbaustelle abgenommen und auf den Waggons 6 für die Wiederverwendung an der Gleisjoch-Montagestelle zwischengelagert werden. The on the carriage 6 on both sides arranged brackets 64, for receiving the cross member 63 are advantageously stiffened by struts in the longitudinal direction, so that they can absorb the above-mentioned longitudinal forces. The cross member can be removed either after unloading the track yoke 1 by hand or by means of a later to be described in detail portal crane at the installation site and stored on the cars 6 for reuse at the track yoke mounting point.

[0104] Es besteht auch die Möglichkeit, die Querträger 63 abdrehbar zu machen, sodass das Abdrehen der Querträger 63 während des Längstransportes und Ablegen des Gleisjoches 1 ohne weitere Hilfsmittel vorgenommen werden kann und dadurch das Abladen eines jeweils darunterliegenden nächsten Gleisjoches 1 möglich ist. It is also possible to make the cross member 63 turnable, so that the twisting off of the cross member 63 during the longitudinal transport and laying of the track yoke 1 can be made without further aids and thereby the unloading of a respective underlying next track yoke 1 is possible.

[0105] Der schon bei der Erläuterung der Fig. 1 kurz genannte Schienen-Abstandshalter 16 hat gleichzeitig die Funktion einer Montagehilfe. The already briefly mentioned in the explanation of Fig. 1 rail spacers 16 also has the function of a mounting aid.

[0106] Die Fig. 5 zeigt im Detail, wie derselbe an der einzelnen Schiene 12 angreift und die Schienen 12 in exakter Relativlage zueinander hält. Fig. 5 shows in detail how the same acts on the single rail 12 and the rails 12 holds in exact relative position to each other.

8 8th

CH 695 568 A5 CH 695 568 A5

[0107] Dabei sind folgende Grundsätze beachtet: Das Verkippen der Gleisjoche 1 unter Belastung durch einen nach erfolgter Erst-Stabilisierung darüber rollenden Bauzug wird durch das Aufliegen an der Flanke 1232 des Schienenfusses 123 im Bereich A2 und durch die möglichst hoch angeordnete Verschraubung 125, 165 durch den Schienenhals 122 hindurch vermieden. Diese Verschraubung kann sowohl durch eine Schraube 125 in der bzw. in der Nähe der Mittelachse des Abstandshalters 16 als auch durch zwei Schrauben beidseitig derselben erfolgen. The following principles are observed: The tilting of the track yokes 1 under load by a after initial stabilization over rolling train is by resting on the edge 1232 of the rail foot 123 in the area A2 and by the highest possible screw 125, 165 avoided by the rail neck 122 therethrough. This screwing can be done both by a screw 125 in or near the central axis of the spacer 16 as well as by two screws on both sides thereof.

[0108] An der Innen-Unterseite des Schienenkopfes 121, etwa im Bereich A1, wird durch den Abstandshalter 16 das Gewicht des montierten Gleisjoches 1 mit dessen Stützkörpern aufgenommen. An der dortigen Innenkante 1211 des Schienenkopfes 121 wird in Verbindung mit der unteren Auflagefläche 1212 die Schienenneigung eingestellt. Der Auflagebereich A1 des Abstandshalters 16 endet in einem Maximum Max im Subabschnitt A1, wo die Oberkante des Abstandshalters 16 wieder nach innen I hin abfällt. On the inside underside of the rail head 121, approximately in the area A1, the weight of the mounted track yoke 1 with its supporting bodies is received by the spacer 16. At the local inner edge 1211 of the rail head 121, the rail inclination is set in conjunction with the lower support surface 1212. The contact area A1 of the spacer 16 ends in a maximum Max in the subsection A1, where the upper edge of the spacer 16 falls back inwards towards I.

[0109] Der Anlagebereich A2 an der Schienenfuss-Innenflanke ist für die Einstellung der Spurweite entsprechend der Herstelltoleranz des Schienenfusses 123 der Montageschiene 12 anzupassen. The contact area A2 on the inner end of the rail foot is to be adjusted to adjust the track width according to the manufacturing tolerance of the rail foot 123 of the mounting rail 12.

[0110] Ebenso ist die obere Seitenlänge im Bereich A1 entsprechend der Herstelltoleranz der Asymmetrie der Montageschienen 12 für jede derselben, also links und rechts, gesondert einzustellen. Also, the upper side length in the area A1 corresponding to the manufacturing tolerance of the asymmetry of the mounting rails 12 is set separately for each of them, that is, left and right.

[0111] An der seitlichen Schienenkopf 121-Anlage ist im Subabschnitt SA 1 ein Ausschnitt von mind. 36 mm unter Schienenoberkante und 60 mm Breite für die Spurkränze 62 der Räder 61 der Fahrzeuge 6 freizuhalten. At the lateral rail head 121 system, a cutout of at least 36 mm below the top rail edge and 60 mm width for the wheel flanges 62 of the wheels 61 of the vehicles 6 is to be kept free in the subsection SA 1.

werdend a der Spurkranz 62 peripher-aussen gerundet ist und es trotz dieser Anlagefläche im Subabschnitt SK 1 zu keinem Kontakt zwischen Abstandshalter 16 und Peripherie Pe des Spurkranzes 62 der Räder 61 der Schienen-Fahrzeuge kommt. expect a the flange 62 is peripherally rounded outside and there is no contact between spacer 16 and periphery Pe of the flange 62 of the wheels 61 of the rail vehicles despite this contact surface in the subsection SK.

[0113] Im Bereich A3 ist eine Kontur des Abstandshalters 16 vorgesehen, wo keine Anlage an die Schiene 12 erfolgt. In the region A3, a contour of the spacer 16 is provided, where no contact with the rail 12 takes place.

[0114] Es sind also zwischen den beiden Gleisjoch-Montageschienen 12, z.B. im Abstand von 1,80 m voneinander, entsprechend jeweils drei Schwellenfächern die Abstandshalter-Querstreben 16 eingebaut, welche sich gegen den Schienenfuss 123 und gegen die Unterkante 1211 des Schienenkopfes 121 hin abstützen. Thus, between the two track yoke mounting rails 12, e.g. at a distance of 1.80 m from each other, corresponding to three threshold compartments, the spacer cross braces 16 installed, which are supported against the rail foot 123 and against the lower edge 1211 of the rail head 121 out.

[0115] Gegen die Querstreben 16 ist die Schiene 12 mittels Verschraubung 125,165 verspannt. Against the cross struts 16, the rail 12 is clamped by means of screw 125,165.

[0116] Die Verspannung hat dabei folgende Funktionen: The bracing has the following functions:

[0117] Sie dient zur Aufnahme der Seitenkräfte aus der Führung des Rades 61 beim Befahren der Schienen 12 mit dem Bauzug mit voller Achslast. Dieser Lastfall verursacht die höchsten aufzunehmenden Kräfte. Es muss auf jeden Fall ein Auskanten der Schiene 12 unter dieser hohen Belastung vermieden werden. It serves to absorb the lateral forces from the leadership of the wheel 61 when driving the rails 12 with the train with full axle load. This load case causes the highest forces to be absorbed. It must be avoided in any case an edge of the rail 12 under this high load.

[0118] Die Seitenkräfte werden von einer Schiene 12 über die Verschraubung 125, 165 in den Abstandshalter 16 und von diesem in die jeweils zweite Schiene 12 abgeleitet. The lateral forces are derived from a rail 12 via the screw 125, 165 in the spacer 16 and from this into the respective second rail 12.

[0119] Die Ableitung der Seitenkräfte in den Untergrund findet über die Verspannung mit den vorher beschriebenen He-be-Richtgeräten 15 über die Stützkörper 14 und deren Stabilisierung mit Vergussmasse 9 zum Untergrund 11 hin statt, wobei in diesem Fall die Rahmensteifigkeit des Gleisjoches 1 bereits eine sehr hohe Dämpfung des Systems bewirkt. The derivation of the lateral forces in the ground takes place via the tension with the previously described He-be straightening devices 15 via the support body 14 and their stabilization with potting compound 9 to the ground 11 instead, in which case the frame stiffness of the track yoke 1 already causes a very high damping of the system.

[0120] Durch die Auflast der einzelnen Räder 61 der Waggons 6, Lokomotiven od.dgl. auf beide Schienen 12 erfolgt auch eine gleichmässige Verteilung der Seitenkräfte auf die Schienen 12 und die entsprechenden Stützen 14. By the load of the individual wheels 61 of the cars 6, locomotives or the like. On both rails 12, there is also a uniform distribution of the lateral forces on the rails 12 and the corresponding supports 14.

[0121] Die Abstandshalter 16 haben weiterhin die Aufgabe der Halterung der Schienen 12 mit allen daran montierten Lasten. The spacers 16 also have the task of mounting the rails 12 with all loads mounted thereon.

[0122] Für das provisorische Vorrichten und Stabilisieren des Gleises wird das Gleisjoch 1 z.B. an jedem zweiten Abstandshalter 16 mittels den schon oben beschriebenen, an denselben angelenkten Hilfsstützbeinen 173 gegen den Untergrund 11 hin abgestützt. For the temporary provision and stabilization of the track, the track yoke 1 is e.g. on each second spacer 16 by means of the already described above, hinged to the same auxiliary support legs 173 supported against the substrate 11 out.

[0123] Dafür sind in der Praxis folgende Lasten pro 3.60 m Gleisjoch-Länge zu übernehmen: In practice, the following loads per 3.60 m track yoke length are to be taken over:

[0124] Schiene mit 60,36 kg/m, Schwellen mit 100 kg je Block: alle 60 cm, Stützkörper mit 60 kg: alle 1,80 m, Heberichtgeräte mit 6 kg: alle 1,80m. Rail with 60.36 kg / m, sleepers with 100 kg per block: every 60 cm, supporting body with 60 kg: every 1.80 m, Heighters with 6 kg: every 1.80 m.

[0125] Diese diesbezüglichen Kräfte werden primär durch die Auflage des Schienenkopfes 121 am den Abstandshalter 16 übernommen. These forces in this regard are primarily taken over by the support of the rail head 121 on the spacer 16.

[0126] Ein Abgleiten des Schienenkopfes 121 von dem Abstandshalter wird durch die Verschraubung 125, 165, verhindert. A sliding of the rail head 121 of the spacer is prevented by the screw 125, 165.

[0127] Eine weitere wichtige Funktion des Abstandhalters 16 besteht in der Einstellung der exakten Gleisgeometrie (insbesondere Spurweite und Schienenneigung). Da vorgesehen ist, die Montageschienen 12 später gegen die endgültigen Fahrschienen 12' mit ihren beispielsweise 120 m Einbaulänge auszutauschen, ist für die Herstellung der Fahrbahn das Schienenauflager und damit der Schienenfuss 123 der Montagejoch-Schienen 12 die massgebende Geometrie. Another important function of the spacer 16 is the setting of the exact track geometry (in particular gauge and rail inclination). Since it is intended to replace the mounting rails 12 later against the final rails 12 'with their example 120 m installation length, the Schienenauflager and thus the rail foot 123 of the mounting yoke rails 12 is the authoritative geometry for the production of the roadway.

[0128] Die Abstandshalter müssen daher bei deren erster und jeder weiteren Montage folgendermassen angepasst und eingestellt werden: Spur am Schienenfuss 123, jeweils unter Berücksichtigung der Abweichung der Schienenfuss-Breite korrigiert; Schienenneigung am Schienenfuss, jeweils um Abweichungen, Schienenfuss-Breite und Schienenasymmetrie korrigiert. The spacers must therefore be adapted and adjusted at their first and each subsequent assembly as follows: track on the rail foot 123, each corrected taking into account the deviation of the rail foot width; Rail inclination on the rail foot, each corrected for deviations, rail foot width and rail asymmetry.

[0129] Die Herstellungstoleranz in der Schienenhöhe und in der Schienenkopfbreite kann an dieser Stelle ausser acht gelassen bleiben. Für das Vorrichten des Gleisjoches 1 vor dessen Verbindung mit dem Untergrund 11 und dessen Sta9 The manufacturing tolerance in the rail height and in the rail head width can be left out of consideration here. For the provision of the track yoke 1 before its connection to the ground 11 and its Sta9

CH 695 568 A5 CH 695 568 A5

bilisieren wird eine einfache Richteinrichtung mit drei Winden, die mit grossem Erfolg in der Praxis zum Einsatz gelangt ist, verwendet. Mit den beidseitig des Gleisjoches 1 und ausserhalb desselben angeordneten Vertikal-Winden werden die Geleise-Höhen und mit einer Horizontal-Spindel der Einrichtung die Seit-Lage der Geleise einjustiert. Bilisieren is a simple straightening device with three winches, which has been used with great success in practice, used. With the vertical winches arranged on both sides of the track yoke 1 and outside thereof, the track heights and with a horizontal spindle of the device the lateral position of the tracks are adjusted.

[0130] Mit Hilfe dieser Einrichtung ist es möglich, das Gleisjoch 1 bezüglich Höhenlage und Richtung sehr exakt in Position zu bringen. With the aid of this device, it is possible to bring the track yoke 1 very precisely in position with respect to altitude and direction.

[0131] Für die Fixierung der so eingestellten Gleisjoch-Lage sind an jeden zweiten Abstandshalter 16 die abklappbaren Hilfsstützbeine 173 angelenkt, welche jeweils über einen schraub-verstellbaren teleskopartigen Ausschub in jeder Länge bzw. Höhe verstellt werden können. Zur Fixierung der Lage der Hilfs-Stützbeine 173 ist vorteilhafterweise jeweils eine Fixierungs-Strebe (vgl. Fig. 1c) vorgesehen, welche je nach Anwendung in der eingeklappten Position bzw. in der ausgefahrenen Position durch eine Schraube od. dgl. gesichert wird. For fixing the track yoke position thus set hinged auxiliary support legs 173 are hinged to each second spacer 16, which can be adjusted in each case via a screw-adjustable telescopic extension in any length or height. In order to fix the position of the auxiliary support legs 173, a fixation strut (cf., Fig. 1c) is advantageously provided which, depending on the application, is secured in the folded-in position or in the extended position by a screw or the like.

[0132] Auf diese Weise ist es möglich, das mit Hilfe der zuvor beschriebenen einfachen Hebe-Richteinrichtung erstpositionierte Gleis 1 in der jeweils vorgesehenen Lage gegenüber dem Untergrund zu positionieren und abzustützen und in dieser Position exakt zu halten. In this way, it is possible to position the first track 1 with the aid of the above-described simple lifting straightening device in the respectively provided position relative to the ground and to support and to keep exact in this position.

[0133] Die Hilfsstützen 17 tragen jeweils nur das oben angegebene Eigengewicht des Gleisjoches 1 und dienen als Halterungen der Gleisjoch-Lage, bis die oben beschriebenen Stützkörper 14, von der Spezial-Bindemittelmasse umgössen, durch dieselbe stabilisiert wird. Nach erfolgtem Stabilisieren können Hilfs-Stützen 17, 173 eingeklappt und gesichert werden. The auxiliary supports 17 each carry only the above-stated weight of the track yoke 1 and serve as brackets of the track yoke position until the above-described support body 14, surrounded by the special binder mass, is stabilized by the same. After stabilization auxiliary supports 17, 173 can be folded and secured.

[0134] Die Hg. ö zeigt - bei ansonsten glëichblëibendèri~BezugszeichêivBëdeutungen - die Situation nachdem weiter oben schon beschriebenen, ersten Stabilisieren der Gleisjoche 1 durch Eingiessen der Stützkörper 14 in einem eingleisigen Tunnel, es ist dort deutlich die unterschiedliche Höhe der beidseitig der Fahrbahn verlaufenden Bankette, in deren linkem ein Kabelkanal verläuft, zu erkennen. The Hg. Ö shows - with otherwise glëichblëibendèri ~ BezugszeichêivBëdeutungen - the situation after already described above, first stabilizing the track yokes 1 by pouring the support body 14 in a single-track tunnel, it is there clearly the different height of both sides of the road running Banquets, in whose left a cable channel runs, to recognize.

[0135] Zu der in den Fig. 7a und 7d gezeigten Portalkran-Einrichtung 8 ist erläuternd auszuführen, dass für eine optimale Unterstützung des neuen Gleis-Bauverfahrens eine Ausrüstung bzw. Adaptierung von auf dem Markt verfügbaren Portalkränen nach folgenden Kriterien zu beachten sind: For the gantry crane device 8 shown in FIGS. 7a and 7d, it should be explained in an explanatory manner that for optimum support of the new track construction method, it is necessary to comply with the equipment or adaptation of gantry cranes available on the market in accordance with the following criteria:

[0136] Aufgrund üblicher Tunnelquerschnitte und der eher geringen Belastungsfähigkeit der dortigen Bankette können die heute im Gleisbau üblichen Portalkräne nicht zum Einsatz kommen. Due to conventional tunnel cross-sections and the rather low load capacity of the local banquets, the gantry cranes that are common today in track construction can not be used.

[0137] Wie in der Fig. 7a dargestellt, sind die der Portalkran-Einrichtung 8 auf dem Bankett positioniert. Da jedenfalls an einer Seite, wie aus der Fig. 6 ersichtlich, im Bankett ein Kabelkanal eingebaut ist, und diese nur mit geringen Lasten belastet werden darf, müssen die Kranschienen 12' in einem relativ grossen Abstand von den Bankettkanten aufgelegt werden. Daher ist es erforderlich, die Spurweite üblicher, im Bahnbau eingesetzter Portalkräne zu vergrössern und zusätzlich so zu gestalten, dass mit asymmetrisch langen Portalkran-Vertikalbalken gearbeitet werden kann. Die Anpassung an die grössere Spurweite kann durch eine einseitige Verlängerung des oberen Kran-Querbalkens erfolgen. Um die Kran-Einrichtung 8 zukünftig wieder als üblichen Kran im standardmässigen Gleisbau einsetzen zu können, kann diese Verlängerung als temporärer Einbau, z.B. in Form eines Zwischenstücks erfolgen. As shown in Fig. 7a, those of the gantry crane device 8 are positioned on the banquet. Since at least on one side, as shown in FIG. 6, in the banquet a cable duct is installed, and this may only be charged with light loads, the crane rails 12 'must be placed at a relatively large distance from the banquet edges. Therefore, it is necessary to increase the track width of conventional, used in railway construction gantry cranes and also to make it so that you can work with asymmetrically long gantry crane vertical beams. The adaptation to the larger gauge can be done by a one-sided extension of the upper crane crossbeam. In order to be able to use the crane device 8 again in the future as a standard crane in the standard track construction, this extension can be used as a temporary installation, e.g. take place in the form of an intermediate piece.

[0138] Da die seitlichen Bankette innerhalb der Tunnels meist unterschiedliche Höhen aufweisen, ist es zur Vermeidung von Schräglagen erforderlich, eine Seite des Portalkran-Fahrwerkes höhenmässig anpassbar zu gestalten. Diese hö-henmässige Anpassung kann vorteilhaft mittels hydraulischer Hebevorrichtung erfolgen, welche z.B. in ihren jeweiligen Höhen-Positionen durch einen Bolzen od. dgl. dauerhaft gesichert werden kann. Since the side banquets usually have different heights within the tunnels, it is necessary to avoid tilting to make one side of the gantry chassis height adjustable. This higher adaptation can advantageously be carried out by means of a hydraulic lifting device, which can be e.g. od in their respective height positions by a bolt. Like. Can be permanently secured.

[0139] Bei Arbeiten im Rampenbereich von Kurven kann eine gewisse Schräglage der Portalkran-Einrichtung 8 bei besonderen Arbeitsverhältnissen in Kauf genommen werden. Bei Verlassen eines solchen Bereiches wird die Höhe des Fahrwerkes dann wieder an die jeweiligen Erfordernisse angepasst, was höhere Geschwindigkeiten erlaubt. When working in the ramp area of curves, a certain inclination of the gantry crane device 8 can be accepted for special employment conditions. When leaving such an area, the height of the chassis is then adapted to the respective requirements, allowing higher speeds.

[0140] Für das Abladen der Gleisjoche 1 von den Gleisjoch-Transportwaggons und das Ablegen auf der Tunnelsohle ist die Lastaufnahme des Kranes 8 seitlich verfahrbar gestaltet. For unloading the track yokes 1 from the track yoke transport wagons and dropping them on the tunnel sole, the load-bearing capacity of the crane 8 is designed to be movable laterally.

[0141] Wie aus dem schon in der Fig. 4 gezeigten Verladeschema ersichtlich, ist es ja erforderlich, die Gleisjoche 1 vom Waggon 6 durchaus auch aussermittig versetzt aufnehmen zu können. Ebenso ist bei der Ablage eine seitliche Korrektur, insbesondere in Folge der asymmetrisch angeordneten Kranschienen 12' der Portalkran-Einrichtung 8 erforderlich. As can be seen from the loading diagram already shown in FIG. 4, it is indeed necessary to be able to receive the track yokes 1 from the wagon 6 quite eccentrically. Likewise, in the storage a lateral correction, in particular as a result of the asymmetrically arranged crane rails 12 'of the gantry crane device 8 is required.

Claims (15)

Patentansprücheclaims 1. Verfahren zum Verlegen eines Gleisstranges im Zuge des Neu-, Um- oder Weiterbaus einer mit Schienenfahrzeugen befahrbaren Fahrstrecke, wobei ein vormontiertes, die beiden auf den Schwellenkörpern montierten Schienen umfassendes Gleisjoch an die Einbaustelle verbracht und mittels auf sich am Untergrund abstützenden Gleisjoch-Stützkörpern jeweils zwischen den Oberseiten der Stützkörper und dem Schienenfuss der beiden Schienen angeordneten Hebe-Richtgeräten das Geleise in die vorgesehene exakte Höhen-, Kurvenüberhöhungs-, Seiten- und Verlaufslage eingerichtet wird, wonach die Schwellenkörper zur Lagestabilisierung des Gleisstranges mittels aushärtender Verguss-Bindemittelmasse unter- und umgössen werden, dadurch gekennzeichnet, dass1. A method for laying a rail track in the course of new, rebuilding or continuing a vehicle traversable with rolling stock, with a preassembled, the two mounted on the sleepers rails comprehensive track yoke spent at the installation site and by means supported on the ground track yoke support bodies in each case between the tops of the support body and the rail foot of the two rails arranged lifting straightening the tracks in the intended exact height, Kurvenüberhöhungs-, side and level position is set, after which the threshold body for stabilizing the position of the track rail by means of hardening potting binder mass under and be surrounded, characterized in that - für die Verlegung der Schienen (12, 12) von Fahrstrecken auf topografisch unregelmässigen und nicht der Überhöhung einer der Schienen (12,12') entsprechend ausgebildeten Untergünden (11)- for the laying of the rails (12, 12) of routes on topografisch irregular and not the elevation of one of the rails (12,12 ') correspondingly formed Untergünden (11) - vor der Verlegung an der Einbaustelle an einer Montagestelle- before laying at the installation site at a mounting point - die - entweder die beiden auf den Schwellenkörpern (13) befestigten Schienen (12) oder aber die beiden auf- The - either the two on the sleeper bodies (13) fixed rails (12) or the two on 1010 CH 695 568 A5CH 695 568 A5 Schwellenkörpern (13) befestigten Schienen (12) und diese in exakter vorgegebener Relativlage zueinander haltende und miteinander verbindende Abstandshalter (16) umfassende - vormontierten, für den Einbau vorgesehenen Gleisjoche (1)Sill bodies (13) fastened rails (12) and these in exactly predetermined relative position to each other holding and interconnecting spacers (16) comprising - pre-assembled, provided for the installation track yokes (1) - mit an die Unterseite des Schienenfusse (123) jeder der beiden Schienen (12) lagestabil, jedoch lösbar gebundenen Hebe-Richtgeräten (15) und selbst ebenfalls lösbar an die Schienen (12) gebundenen in - im Vergleich zu den Abständen (asw) der Schwellenkörper (13) voneinander - grösseren Abständen (ast) und jeweils im Zwischenraum zwischen den Schwellenkörpern (13) angeordneten Stützkörpern (14) ausgestattet werden,- With to the underside of the rail foot (123) of each of the two rails (12) position stable, but releasably bonded lifting straightening devices (15) and even releasably tied to the rails (12) in - compared to the distances (asw) of Sleeper body (13) from each other - greater distances (ast) and in the space between the threshold bodies (13) arranged supporting bodies (14) are equipped, - dass die derart mit den Stützkörpern (14) ausgestatteten Gleisjoche (1, 1", 1") nach Verbringung an die Einbaustelle in eine deren jeweiligen Anschluss an das freie Ende des schon bestehenden Schienenstranges ermöglichende und unter Einsatz von Hilfsstützen (17) zumindest grob positioniert und eingerichtet werden,- That the thus equipped with the supporting bodies (14) track yokes (1, 1 ", 1") after shipment to the installation site in one of their respective connection to the free end of the existing rail line and using auxiliary supports (17) at least roughly be positioned and set up, - wobei die Stützkörper (14) in ihrer frei abwärts zum Untergrund (11) hin ragenden Stellung unverändert belassen bleiben und mit ihren Fussenden (143) mit dem Untergrund (11) nicht in Kontakt gebracht werden,- Wherein the support body (14) remain in their free down to the ground (11) protruding position remain unchanged and with their foot ends (143) are not brought into contact with the substrate (11), - dass die genannten Fussenden (143) bzw. Fussendbereiche der Stützkörper (14) nach Umschalung mit jeweils vom Untergrund (11) ausgehend aufragender Schalung (90) zur Lagestabilisierung und -festlegung der Stützkörper (14) mit einer rasch abbindenden und exakt erhärtenden Vergussmasse (9), unter- und umgössen und in dieselbe eingebettet werden,- That said foot ends (143) or Fußendbereiche the support body (14) after Umschalung with each from the ground (11) starting upstanding formwork (90) for stabilizing the position and fixing the support body (14) with a rapidly setting and exactly hardening potting compound ( 9), submerged and surrounded and embedded in it, - dass nach dem Aushärten der Vergussmasse (9) auf dem auf diese Weise stabilisierten, vorläufig noch keinen weiteren Richtvorgängen unterworfenen, jedoch schon direkt mit hohen Lasten befahrbaren, neuen Gleisabschnitt- That after curing of the potting compound (9) on the stabilized in this way, provisionally subject to no further straightening, but already directly drivable with high loads, new track section —für-die-Herstellung-der Fahrbahn vorgesehene-Vergussmasse-(9)-herangeführt-wird-und direkt aus dero-jeweiligen Waggon derselben bis zu einer Schichthöhe von wenigen Zentimetern, vorzugsweise von etwa 5 cm, unterhalb der Unterkanten der Schwellenkörper (13) entladen und aufgeschichtet wird,Potting compound (9) provided for the manufacture of the carriageway, and directly from the respective carriage of the same, up to a layer height of a few centimeters, preferably of approximately 5 cm, below the lower edges of the sleeper bodies (13 ) is unloaded and piled up, - dass nach erfolgtem Aushärten der ebengenannten Vergussmasse (9) mittels der sich jeweils zwischen Schienenfuss (123) und Stützkörpern (14) angeordneten Hebe-Richtgeräte (15) das jeweilige Gleisjoch (1) und dessen Schienen (12) in die finale exakte Lage eingerichtet werden,- That after the curing of the aforementioned potting compound (9) by means of each between rail foot (123) and support members (14) arranged lifting straightening devices (15) the respective track yoke (1) and its rails (12) set up in the final exact position become, - dass danach zur Ausbildung der festen Fahrbahn die Schwellenkörper (13) mit der Vergussmasse (9') unter- und umgössen werden, und- That thereafter for the formation of the fixed roadway, the threshold body (13) with the potting compound (9 ') are under-and around, and - dass nach Aushärtung der Vergussmasse (9 ) die sich zwischen Schienenfuss (123) und Stützkörpern (14) befindlichen Hebe-Richtgeräte (15) ausgebaut und für einen neuerlichen Einbau an die Montagestelle verbracht werden.- That after hardening of the potting compound (9) between the rail foot (123) and supporting bodies (14) located lifting straightening devices (15) are removed and spent for a new installation at the installation site. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Stützkörper (14) für die Dauer, des gegebenenfalls notwendigen Transportes zur Einbaustelle, des Aufstellens, Einrichtens und Stabilisierens der Gleisjoche (1, 1 ', 1 ") mittels das zwischengeschaltete Hebe-Richtgerät (15) einschliessender, an den Schienenfuss (123) lösbar befestigbarer vor dem finalen Einrichten der Schienen (12) entfernbarer Klammern (154) oder Schraubverbindungen (147, 148) relativ-lagefest und -lagestabil unterseitig an die Schienen (12) der Gleisjoche (1,1 ', 1 ") gebunden bleiben.2. The method according to claim 1, characterized in that the supporting body (14) for the duration of any necessary transport to the installation site, the setting up, setting up and stabilizing the track yokes (1, 1 ', 1 ") by means of the intermediate lifting straightening device (15) enclosing, on the rail foot (123) releasably attachable before the final installation of the rails (12) removable brackets (154) or screw (147, 148) relatively stable and stable position on the underside of the rails (12) of the track yokes ( 1,1 ', 1 ") remain bound. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass genannte Stützkörper (14) mit im Wesentlichen die Form eines schlanken rechteckigen Pyramidenstumpfes oder eines T-Blocks mit unten liegendem Horizontal-Bal-ken aufweisender Gestalt eingesetzt werden.3. The method according to claim 1 or 2, characterized in that said support body (14) are used with substantially the shape of a slender rectangular truncated pyramid or a T-block with lying down horizontal Bal-ken gestaltungsender figure. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass4. The method according to any one of claims 1 to 3, characterized in that - die für den Fall der Verlegung von Gleisjochen (1) mit auf Schwellenkörpern (13) befestigten Schienen (12) vorgesehenen, die beiden Schienen (12) des Gleisjoches (1) miteinander verbindenden und dieselben in exakter Relativlage zueinander haltenden Abstandshalter (16)- provided in the case of the installation of track yokes (1) with on threshold bodies (13) rails (12), the two rails (12) of the track yoke (1) interconnecting and the same in exact relative position holding each other spacers (16) - in ihren für das exakte, seitliche Anliegen an die Schienen (12) vorgesehenen, beiden Anliegebereichen (A1, A2) eine Kontur (A3) mit einem im Bereich der unteren Wange (1211, 1212) des Schienenkopfes (121) und des dortigen Übergangs in den Schienenhals (122) konturkonform anliegenden Schienenkopf-Anliege-Abschnitt (A1) und einem die Höhe des innenseitigen Teils des Schienenfusses (123) überschreitenden, an die Flanke (1232) des Schienenfusses (123) anliegenden, linearen Fussflanken-Abschnitt (A2) und mit ansonsten von der Schienen-Innenkontur abgerücktem restlichem Kontur-Abschnitt (A3) ausgebildet ist,- In their for the exact, lateral concerns to the rails (12) provided, two abutment areas (A1, A2) a contour (A3) with a in the region of the lower cheek (1211, 1212) of the rail head (121) and the local transition in the rail neck (122) contour conforming rail head abutment portion (A1) and the height of the inside of the rail foot (123) bordering, on the flank (1232) of the rail foot (123) adjacent, linear flank section (A2) and with the remaining contour section (A3) otherwise being pulled away from the rail inner contour, - wobei sich der Schienenkopf-Anliege-Abschnitt (A1) nur so weit aufwärts in einen Schienenkopf-Innenflan-ken-Subabschnitt (SA1) hineinzieht, dass ein Kontakt mit den Radkränzen (62) der Räder (61) der die Geleise befahrenden Schienenfahrzeuge (6) ausgeschlossen ist, und dass dieser Subabschnitt (SA1) in einem Maximum (Max) endet, von dem aus die Kontur zur Innenseite (I) hin so weit abfällt, dass ein Kontakt mit der äussersten Peripherie (Pe) der Radkränze (62) der Räder (61) der Fahrzeuge (6) ebenfalls ausgeschlossen ist, und dieser Subabschnitt (SA1) schliesslich weiter zur Innenseite (I) hin in einen Horizontal-Verlauf übergeht.- wherein the rail head abutment portion (A1) draws only so far upwards in a rail head Innenflan- ken subsection (SA1) that a contact with the Radkränzen (62) of the wheels (61) of the railways running vehicles ( 6) is excluded, and that this subsection (SA1) ends in a maximum (Max), from which the contour drops off towards the inside (I) so far that contact with the outermost periphery (Pe) of the wheel rims (62) the wheels (61) of the vehicles (6) is also excluded, and this subsection (SA1) finally continues towards the inside (I) in a horizontal course. 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass zur Bildung der Gleisjoche (1) die auf Schwellenkörpern (13) montierten Schienen (12) der Gleisjoche (1) mittels in den Schienen-Abstandshaltern (16) verankerbarer, jeweils Öffnungen (125) im Schienenhals (122) durchsetzender Schrauben (165) mit dem Abstandshalter (16) verbunden und verspannt werden.5. The method according to any one of claims 1 to 4, characterized in that the formation of the track yokes (1) mounted on sleepers (13) rails (12) of the track yokes (1) by means of the rail spacers (16) anchored, respectively Openings (125) in the rail neck (122) passing through screws (165) are connected to the spacer (16) and clamped. 6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass jeweils eine Mehrzahl, vorzugsweise bis zu fünf, mit den unter Zwischenschaltung der Hebe-Richtgeräte (15) an die Schienen (12) lösbar gebundenen, abwärts ragenden Stützkörpern (14) ausgestattete Gleisjoche (1) an die jeweils um ein vorher eingebautes Gleisjoch (1) vorrückende Einbaustelle herangeführt wird.6. The method according to any one of claims 1 to 5, characterized in that in each case a plurality, preferably up to five, with the interposition of the lifting straightening devices (15) to the rails (12) releasably bonded, downwardly projecting supporting bodies (14) equipped track yokes (1) to each of a previously built track yoke (1) advancing installation point is introduced. 7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die mit den an die Schienenfüsse (123) unter jeweiliger Zwischenschaltung der Hebe-Richtgeräte (15) gebundenen und Relativlage-stabilisierten, nach abwärts ragenden Stützkörpern (14) ausgestatteten Gleisjoche (1, 1*, 1") jeweils zueinander seitlich im Wesentlichen7. The method according to any one of claims 1 to 6, characterized in that the to the rail feet (123) with respective interposition of the lifting straightening devices (15) bound and relative position-stabilized, downwardly projecting support bodies (14) equipped track yokes ( 1, 1 *, 1 ") in each case laterally substantially 1111 CH 695 568 A5CH 695 568 A5 um die Breite (bst) der an die Schienen (12) gebundenen Stützkörper (14) versetzt, gegebenenfalls jeweils auf Querträger (63) abgestützt und vertikal in geringem Abstand voneinander gehalten aufeinander geschichtet auf die Gleisjoch- Transportwaggons (6) verladen zur Einbaustelle verfahren werden.offset by the width (bst) of the rails (12) bound support body (14), optionally supported on cross member (63) and vertically spaced at a small distance from each other stacked on the Gleisjoch- transport wagons (6) loaded to be moved to the installation point , 8. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass für das erste Ablegen und Abstützen der an die Einbaustelle verbrachten Gleisjoche (1) in einer der geplanten Einbaulage nahekommenden Lage, vorzugsweise teleskopartig, längenveränderlich ausgebildete, und mittels Stabilisierstreben lagestabilisierbare genannte Hilfsstützen (17) eingesetzt werden, welche an die Schwellenkörper (13), bevorzugterweise an jeden fünften bis achten Schwellenkörper (13) oder vorzugsweise an jeden zweiten Schienen-Abstandshalter (16) der Gleisjoche (1) angelenkt sind und mit ihren freiendenden Teleskop-Beinen (173) zum Untergrund (11) hin abwärts geklappt werden und dort das Gleisjoch (1) abstützen, und dass die Hilfsstützen (17) nach dem Einrichten der Gleisjoche (1) und deren Stabilisierung durch Fixierung der Stützkörper (14) mittels schnell abbindender Vergussmasse (9) insbesondere Schnell-Beton oder Mörtel wieder zurückgeklappt und schliesslich von den Schwellenkörpern (13) abmontiert oder aber zusammen mit den Schienen-Abstandshaltern (16) ausgebaut und an die Montagestelle verbracht werden.8. The method according to any one of claims 1 to 7, characterized in that for the first depositing and supporting of the installation site spent track yokes (1) in one of the planned installation position close-fitting position, preferably telescopically, variable in length formed, and stabilized by Stabilisierstreben said auxiliary supports (17) which are hinged to the sleeper bodies (13), preferably to each fifth to eighth sleeper body (13) or preferably to each second rail spacer (16) of the track yokes (1) and to their free-end telescopic legs (13). 173) down to the ground (11) and there support the track yoke (1), and that the auxiliary supports (17) after setting up the track yokes (1) and their stabilization by fixing the support body (14) by means of fast-setting potting compound ( 9) in particular quick-concrete or mortar folded back and finally from the Schwellenk rpern (13) removed or can be removed together with the rail spacers (16) and transported to the assembly site. 9. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass die Gleisjoche (1) und deren Schienen (12) vor dem Unter- und Umgiessen der Fussbereiche (143) der Stützkörper (14) mit der schnell abbindenden Vergussmasse (9) und deren rascher Aushärtung - bei schon vorher planmässig eingerichteter, weitgehend exakter Seitenlage - in einer um eine über die gesamte Erstreckung der Gleisjoche (1) hinweg um einige mm bevorzugt um werden, wobei bevorzugterweise alle zwischen Schienenfuss (123) und Stützkörper (14) angeordneten Hebe-Richtgeräte (15) auf hoch-belastbare Null-Höhenlage-Stellung oder knapp daran gebracht sind, und dass die Schienen (12) der Gleisjoche (1) erst nach der Stabilisierung der Stützkörper (14) durch Unter- und Umgiessen mit der schnell abbindenden Vergussmasse (9) mittels der Hebe-Richtgeräte (15) in die planmässig vorgesehene Höhen-und Verlaufs-Lage angehoben und in die dementsprechend vorgesehene Richtung verschoben werden.9. The method according to any one of claims 1 to 8, characterized in that the track yokes (1) and their rails (12) prior to the under and over molding of the foot areas (143) of the support body (14) with the fast-setting potting compound (9) and their rapid hardening - in the case of a previously arranged, largely exact lateral position - in a by a mm over the entire extension of the track yoke (1) away by a few mm, preferably, all between rail foot (123) and supporting body (14) arranged Lifting straightening devices (15) are placed on high-loadable zero-altitude position or close to it, and that the rails (12) of the track yokes (1) only after the stabilization of the support body (14) by under-molding and fast with setting potting compound (9) by means of the lifting straightening devices (15) raised in the planned height and course position and be moved in the direction provided accordingly. 10. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Schienenjoch-Stützkörper (14) jeweils paarweise einander gegenüber von den Schienen (12) abwärts ragend angeordnet sind, und dass in an den einander nach innen hin zugewandten Seiten derselben angeordnete Einschub-Nuten (145) - vor dem Unter-Umgiessen und Eingiessen der (13) mit der Vergussmasse (9), bevorzugt Regel-Beton oder -Mörtel, Einlagepaneele (19) für eine gezielt lokalisierte Rissbildung in der mit der ausgehärteten Vergussmasse (9 ) gebildeten festen Fahrbahn, im Nahbereich der genannten Stützkörper (14) eingeschoben werden.10. The method according to any one of claims 1 to 9, characterized in that the rail yoke support body (14) are each arranged in pairs facing each other from the rails (12) projecting downwards, and arranged in the inwardly facing sides of the same Insertion grooves (145) - before the sub-casting and pouring the (13) with the potting compound (9), preferably rule concrete or mortar, insert panels (19) for a targeted localized cracking in the cured with the potting (9 ) formed solid roadway, in the vicinity of said support body (14) are inserted. 11. Verfahren nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass die Schienen-Abstandshalter (16) nach Fertigstellung eines jeweiligen, mit mehreren Gleisjochen (1) gebildeten Schienenstrang-Abschnittes gesondert demontiert und, im Falle der Benutzung der Gleisjoche (1) als Verlege-Lehren zusammen mit den von den mit Vergussmasse (9') unter- bzw. umgossenen Schwellenkörpern (13) demontierten Schienen (12) an die Montagestelle verbracht werden, und dass die ebenfalls dorthin - und zwar gesondert oder an den Schienen (12) montiert - verbrachten Hebe-Richtgeräte (15) für den Einbau in ein neues vormontiertes Gleisjoch (1) in ihre Grundposition, also in der Höhe vollständig eingefahren und bezüglich Seiteneinrichtung in Mittelstellung verstellt werden.11. The method according to any one of claims 1 to 10, characterized in that the rail spacers (16) after completion of a respective, with multiple track yokes (1) formed rail section separately disassembled and, in the case of use of the track yokes (1) as laying-teachings together with the by the casting compound (9 ') under or cast-over swell bodies (13) disassembled rails (12) are brought to the mounting site, and that also there - and separately or on the rails (12 ) mounted - spent lifting straightening devices (15) for installation in a new preassembled track yoke (1) in its basic position, ie fully retracted in height and adjusted with respect to side device in the center position. 12. Verfahren nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet,12. The method according to any one of claims 1 to 11, characterized - dass die mit den an die Schienenfüsse (123) unter jeweiliger Zwischenschaltung der Hebe-Richtgeräte (15) gebundenen, nach abwärts ragenden Stützkörpern (14) ausgestatteten Gleisjoche (1) als Verlege-Lehren für die Herstellung der zu errichtenden eingleisigen Fahrbahn eingesetzt und nach Fertigstellung eines aus einer Mehrzahl der fertig eingebauten Gleisjoche (1) gebildeten, neuen Schienenstrang-Abschnittes und nach Ausbau und Entfernen der Hebe-Richtgeräte (15) die relativ kurzen, aufeinander folgend verlegten, beispielsweise jeweils maximal 20 m langen, Schienen (12) der Gleisjoche (1, 1 ', 1 ") von den final eingebauten Schwellenkörpern (13) demontiert und entfernt und zur Bildung neuer, mit Schwellenkörpern (13) und mit den mit den Hebe-Richtgeräten (15) bestückten Stützkörpern (14) ausgestatteter Gleisjoche (1, 1 ', 1 ") an die Gleisjoch-Montagestelle zurück verbracht werden, und- That with the to the rail feet (123) under respective interposition of the lifting straightening devices (15) bound, downwardly projecting support bodies (14) equipped track yokes (1) used as laying teachings for the production of the single-track road to be built and after Completion of one of a plurality of finished track journals (1) formed new rail track section and after removal and removal of lifting straightening (15) the relatively short, successively laid, for example, each a maximum of 20 m long, rails (12) Track yokes (1, 1 ', 1 ") of the final built-in threshold bodies (13) disassembled and removed and to form new, with threshold bodies (13) and equipped with the lifting straightening devices (15) support bodies (14) equipped track yokes ( 1, 1 ', 1 ") are returned to the track yoke mounting point, and - dass an Stelle dieser Schienenjoch-Lehren die letztlich für den Fahrbetrieb vorgesehenen Fahr-Schienen (12') mit wesentlich höherer, vorzugsweise zumindest 100 m betragender, Länge in die Schienenbefestigungen (135) der fertig eingebauten Schwellenkörper (13) eingezogen werden.- That instead of these Schienenjoch teachings ultimately provided for the driving operation driving rails (12 ') with substantially higher, preferably at least 100 m betragender, length in the rail fasteners (135) of the fully installed threshold body (13) are recovered. 13. Verfahren nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass die Verbringung der mit den unter jeweiliger Zwischenschaltung der Hebe-Richtgeräte (15) an die Schienenfüsse (123) gebundenen, nach abwärts ragenden Stützkörpern (14) ausgestatteten Gleisjoche (1) vom jeweiligen Transportwaggon (6) an die Einbaustelle und deren Halterung bis zur Abstützung der Gleisjoche (1) am Untergrund (11) mittels der Hilfsstützen (17) mittels einer auf beidseitig im Abstand von der vorgesehenen Gleisstrecke verlegten Fahrschienen (12 ) verfahrbaren Portalkran-Einrichtung (8) vorgenommen wird.13. The method according to any one of claims 1 to 12, characterized in that the movement of the with the respective interposition of the lifting straightening devices (15) to the rail feet (123) bound to downwardly projecting support bodies (14) equipped track yokes (1) from the respective transport wagon (6) to the installation point and its support up to the support of the track yokes (1) on the ground (11) by means of the auxiliary supports (17) by means of a movable on both sides at a distance from the intended track track rails (12) movable gantry crane device (8). 14. Verfahren nach Anspruch 13, dadurch gekennzeichnet, dass die beidseitig neben dem gerade im Bau in Fertigstellung begriffenen bzw. fertiggestellten Schienenstrang-Bauabschnitt verlegten Fahr-Schienen (12') für die fahrbare Portalkran-Einrichtung (8) nach deren Verfahren zur weiter vorgerückten Einbaustelle an Stelle der demontierten Gleisjoch-Schienen (12) als Fahr-Schienen (12') in die Schienenbefestigungen (135) der final stabilisierten Schwellen bzw. Schwellenkörper (13) eingezogen werden.14. The method according to claim 13, characterized in that the both sides next to the currently under construction in completion or completed rail track construction section laid Fahr-rails (12 ') for the mobile gantry crane device (8) according to their method for further advanced Installation site in place of the dismantled track yoke rails (12) as driving rails (12 ') in the rail fasteners (135) of the final stabilized sleepers or threshold body (13) are retracted. 15. Verfahren nach einem der Ansprüche 13 bis 14, dadurch gekennzeichnet, dass schon nach dem Stabilisieren und Einrichten eines jeweiligen, vorzugsweise mit mehreren sich auf den Stützkörpern (14) mit den Hebe-Richtgeräten (15) abstützenden Gleisjochen (1, 1', 1") gebildeten, neuen Schienenstrang-Abschnittes die Portalkran-Einrichtung15. The method according to any one of claims 13 to 14, characterized in that after stabilizing and setting up a respective, preferably with a plurality on the support bodies (14) with the lifting straightening devices (15) supporting track yokes (1, 1 ', 1 ") formed the new rail track section the gantry crane facility 1212 CH 695 568 A5CH 695 568 A5 (8) in den nächsten zu erstellenden Schienenstrang-Bauabschnitt verfahren wird und die beidseitig neben dem gerade fertiggestellten Schienenstrang-Abschnitt verlegten, bisher von der Portalkran-Einrichtung (8) benutzten Langschienen (12') nach Demontage der Schienenjoch-Schienen 12 als an deren Stelle tretende Fahrschienen in die Schienenbefestigungen (135) der Schwellenkörper (13) eingezogen werden, um für das Heranführen eines Binde-mittel-Transport- und -Bereitungszuges an die Einbaustelle für das finale Um- und Eingiessen der Schwellenkörper (13) mit der Vergussmasse (9 ) zur finalen Bildung der festen Fahrbahn Platz zu machen.(8) is moved to the next to be created rail track construction section and laid on both sides next to the just finished rail track section, previously used by the gantry crane device (8) long rails (12 ') after dismantling the Schienenjoch rails 12 as at the Stepping rails are retracted into the rail fasteners (135) of the sleeper bodies (13) for bringing a binding agent transport and preparation train to the installation site for the final transfer of the sleeper bodies (13) with the grout ( 9) to make way for the final formation of the fixed carriageway. 1313
CH00676/04A 2003-04-23 2004-04-19 A method of laying a rail track. CH695568A5 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0061703A AT500982B8 (en) 2003-04-23 2003-04-23 METHOD FOR LAYING A TRACK OF A FIXED RAILWAY

Publications (1)

Publication Number Publication Date
CH695568A5 true CH695568A5 (en) 2006-06-30

Family

ID=33437377

Family Applications (1)

Application Number Title Priority Date Filing Date
CH00676/04A CH695568A5 (en) 2003-04-23 2004-04-19 A method of laying a rail track.

Country Status (3)

Country Link
AT (1) AT500982B8 (en)
CH (1) CH695568A5 (en)
DE (1) DE102004019083A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT503599B1 (en) * 2006-07-28 2007-11-15 Verkehrsbetr E Zuerich Method for manufacturing firm track for rail vehicles involves providing rail fastening plates on supports for supporting rails with anchor fittings for fixing rail at track support plate at distance

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418535B (en) * 2008-10-10 2012-05-23 中铁十一局集团第三工程有限公司 Construction method of monolithic road-bed in rail tunnel
ES2363849B1 (en) * 2009-06-16 2012-06-19 Fcc Contrucción, S.A. INSTALLATION PROCEDURE FOR PLATE ROAD IN BITUBO TUNNELS.
CN102021865B (en) * 2009-09-23 2015-07-08 塞斯特拉公司 Method for precasting rail support tie on precast span piece
DK2740842T3 (en) 2012-12-07 2018-01-08 Sonneville Ag Method of converting a ballast track to a fixed track
ES2592568R1 (en) * 2015-05-29 2017-01-27 Tecsa Empresa Constructora, S.A. PROCEDURE AND RAILWAY CONCRETE SYSTEM IN PLATE.
CN111485462B (en) * 2020-04-09 2021-09-14 中国铁建高新装备股份有限公司 Railway fastener disassembling and recycling system and equipment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2657096B1 (en) * 1990-01-17 1997-08-01 Sud Ouest Travaux METHOD AND APPARATUS FOR PRECISE ADJUSTMENT OF RAILWAYS PLACED ON CONCRETE PLATFORM.
FR2691484B1 (en) * 1992-05-22 1994-07-29 Vanotti Gerard METHOD OF CONSTRUCTING A RAILWAY IN CONCRETE.
DE19855350A1 (en) * 1998-12-01 2000-06-15 Bahnbau Wels Gmbh Wels Method to construct railway track on base plates of permanent ways uses setting stabilizer asphalt etc. to stabilizer sleepers, to which rails are fastened after setting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT503599B1 (en) * 2006-07-28 2007-11-15 Verkehrsbetr E Zuerich Method for manufacturing firm track for rail vehicles involves providing rail fastening plates on supports for supporting rails with anchor fittings for fixing rail at track support plate at distance
EP1882777A1 (en) 2006-07-28 2008-01-30 Stadt Zürich (Verkehrsbetriebe Zürich) Method for making a balastless track for a railway

Also Published As

Publication number Publication date
AT500982A4 (en) 2006-05-15
AT500982B1 (en) 2006-05-15
DE102004019083A1 (en) 2004-12-16
AT500982B8 (en) 2007-02-15

Similar Documents

Publication Publication Date Title
EP1039033B1 (en) Method for making a railway track
DE2754811A1 (en) MOBILE DEVICE FOR LAYING THRESHOLDS
EP0894898B1 (en) Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support
DE4324301A1 (en) Arrangement and method for producing a ballastless track superstructure
EP1026320B1 (en) Method for building a ballastless track
AT500982B1 (en) METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
CH700828B1 (en) Method for building track for railway vehicles in channel-shaped concrete road, involves approaching loose railroad tie blocks at free hanging rails at each rail and are clamped with them in force-fit and form-fit manner
DE10004194C2 (en) Process for the production of a fixed railroad track on a bridge
DE102011108093B4 (en) Precast lane for inclined conveyor system for mining trucks
EP1022386A2 (en) Method for fixing a railway track on supporting slabs of a substructure, as well as an apparatus and shuttering for applying this method
EP1169516B1 (en) Method for renewing railway lines
EP1048783A1 (en) Railway track and its construction method
AT390288B (en) DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE
AT500950A4 (en) METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES
AT505821B1 (en) METHOD AND ARRANGEMENT FOR ORIENTING PRE-CONCRETE CONCRETE AGGREGATE PLATES AND STRUCTURE BELT ELEMENT FOR USE IN THE PROCESS AND ARRANGEMENT
EP2166149B1 (en) Unit of railway structure part
DE19522478C2 (en) Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process
EP1191145B1 (en) Process and apparatus for connection of a track comprising rails and discrete bearing blocks with a fixed substructure of the track
AT500876B1 (en) METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY
DE69916641T2 (en) IMPROVEMENTS ON OR WITH REGARD TO RAILWAY RAILWAYS
DE19944783A1 (en) Slab track system
WO2005001203A1 (en) Method for producing a rail track for rail vehicles
AT413551B (en) Production of a fixed track for rail vehicles comprises fixing in position a guide bar forming a guide/curve template, and making a rail support together with channels for the rails from concrete or profiling the channels
EP1736599A1 (en) Method for construction of tracks for railways or the like
DE102022100899A1 (en) PROCESS FOR MANUFACTURING A PAPER EDGE

Legal Events

Date Code Title Description
PL Patent ceased