DE102012103001A1 - Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway - Google Patents
Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway Download PDFInfo
- Publication number
- DE102012103001A1 DE102012103001A1 DE102012103001A DE102012103001A DE102012103001A1 DE 102012103001 A1 DE102012103001 A1 DE 102012103001A1 DE 102012103001 A DE102012103001 A DE 102012103001A DE 102012103001 A DE102012103001 A DE 102012103001A DE 102012103001 A1 DE102012103001 A1 DE 102012103001A1
- Authority
- DE
- Germany
- Prior art keywords
- rail
- elements
- track
- recesses
- potting compound
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
- E01B2/003—Arrangement of tracks on bridges or in tunnels
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/02—Fastening rails, tie-plates, or chairs directly on sleepers or foundations; Means therefor
- E01B9/28—Fastening on wooden or concrete sleepers or on masonry with clamp members
Abstract
Mit der Erfindung wird eine neuartige Bauform für eine feste Fahrbahn (10) für Schienenfahrzeuge vorgeschlagen, bei der auf einem Untergrund (11) eine Grundschicht (12), vorzugsweise aus Asphalt und auf der Grundschicht eine Vielzahl von Tragelementen aufgelagert wird, die an ihrer Oberseite jeweils mindestens eine Aussparung aufweisen. Während die Grundschicht und die Tragelemente von unten nach oben (Bottom-Up) errichtet werden und man hierbei große Toleranzen in Kauf nehmen kann, werden im anschließenden Verfahrensschritt in die Aussparungen (17) in den Tragelementen (13) von oben (Top-Down) Schienenbefestigungselemente (20) eingesetzt und nach ihrer Höhen- und Seitenausrichtung mittels einer aushärtenden Vergussmasse (22) arretiert. Die Vergussmasse wird dabei bevorzugt durch mindestens einen das Schienenbefestigungselement vertikal durchsetzenden Einfüllkanal (38) eingefüllt und füllt die unter dem jeweiligen Schienenbefestigungselement befindliche Aussparung (17) sowie den nach der Ausrichtung verbleibenden Spalt (46) zwischen Tragelement und Schienenbefestigungselement aus, wobei der Materialbedarf an Vergussmasse insgesamt gering ist.With the invention, a novel design for a fixed track (10) for rail vehicles is proposed in which on a substrate (11) a base layer (12), preferably of asphalt and on the base layer a plurality of supporting elements is superimposed on its upper side each have at least one recess. While the base layer and the support elements are built from bottom to top and you can tolerate large tolerances, in the subsequent step in the recesses (17) in the support elements (13) from above (top-down) Rail fastening elements (20) used and locked according to their height and side alignment by means of a curing potting compound (22). The potting compound is preferably filled by at least one of the rail fastening element vertically passing through filling channel (38) and filling the under the respective rail fastening element located recess (17) and remaining after the alignment gap (46) between the support element and rail fastening element, the material requirement of potting compound overall is low.
Description
Die Erfindung betrifft eine feste Fahrbahn für Schienenfahrzeuge und ist ferner auf ein Schienenbefestigungselement gerichtet, das für eine feste Fahrbahn insbesondere der erfindungsgemäßen Art geeignet und bestimmt ist. The invention relates to a solid track for rail vehicles and is further directed to a rail fastener, which is suitable and intended for a fixed roadway in particular of the inventive type.
Beim Bau von Eisenbahnwegen stellte der klassische Schotteroberbau über einen langen Zeitraum von ca. 200 Jahren die Regellösung dar, denn die Hauptkomponenten für im Schotterbett verlegte Gleise sind einfach und verhältnismäßig preisgünstig. Insbesondere mit der starken Entwicklung jedoch des Hochgeschwindigkeitsverkehrs sind die Anforderungen an den Eisenbahnoberbau erheblich gestiegen und die "schwimmende Lagerung" eines im Schotterbett verlegten Gleises stößt in vielen Bereichen an ihre technischen und wirtschaftlichen Grenzen. Es sind daher in den vergangenen Jahrzehnten verschiedene Konzepte für schotterlose Gleisbauarten mit fester Lagerung entwickelt worden, die unter dem Oberbegriff "Feste Fahrbahn" subsumiert werden. Dabei gibt es viele verschiedene Fahrbahn-Konzepte, Bauarten und -Einbaumethoden, denen an sich nur gemein ist, dass ein in fester Fahrbahn verlegtes Gleis eben keine schwimmende Lagerung wie im Schotterbett aufweist. During the construction of railways, the classic ballast superstructure over a long period of about 200 years represented the standard solution, because the main components for tracks laid in the ballast bed are simple and relatively inexpensive. In particular, with the strong development of high-speed traffic, the requirements for the railway superstructure have increased significantly and the "floating storage" of a track laid in a ballast bed in many areas reaches its technical and economic limits. Therefore, in recent decades, various concepts have been developed for ballastless track types with fixed bearings, which are subsumed under the generic term "slab track". There are many different roadway concepts, types of construction and installation methods, which in themselves have only one thing in common, that a track laid in a fixed track just does not have a floating bearing as in a ballast bed.
Bei den verschiedenen Aufbauprinzipien für ein Gleis in fester Fahrbahn reicht die Bandbreite von nahezu komplett werkseitig vorfabrizierten Fahrbahnsegmenten bis hin zu Lösungen, die praktisch vollständig an der Baustelle hergestellt werden. Bei den Einbauprinzipien lassen sich grundsätzlich zwei Hauptkategorien unterscheiden. Beim Einbau des Gleises von oben nach unten (Top-Down-Prinzip) werden die Fahrschienen sowie ein an ihnen angehängter Teil der Gleisstruktur (Schwellen) mit speziellen Vorrichtungen exakt in die gewünschte Höhen- und Seitenlage ausgerichtet. Anschließend wird der zwischen diesem Gleisrost und dem Unterbau verbleibende Freiraum mit flüssigen, aushärtenden Baustoffen ausgefüllt. Dabei können zwar alle beim Einbau der unteren Tragschichten des Gleises entstandenen Ungenauigkeiten in dem letzten, entscheidenden Arbeitsschritt, nämlich dem Unterguss des Gleisrostes neutralisiert werden. Es besteht aber ein Problem darin, dass man unmittelbar nach der präzisen Ausrichtung des Gleisrostes und damit unter meist beträchtlichem Zeitdruck häufig massive, grobe Arbeitsschritte ausführen muss, die die zuvor exakt eingestellte Gleislage gefährden können. Solche groben Arbeitsschritte können beispielsweise größere Transporte und der Einbau von Ortbeton zum Unterfüllen des Gleisrostes sein. Diese Problematik verschärft sich noch weiter, wenn das einzubauende Gleis auch als Weg zur Baustellenversorgung dienen soll, was häufig in Tunnelprojekten der Fall ist. Nach dem Unterfüllen des Gleisrostes ist das Gleis über vergleichsweise lange Zeit nicht oder nur eingeschränkt befahrbar, weil die zur Unterfüllung eingesetzten Baustoffe – in der Regel Beton – zum Teil mehrere Tage benötigen, um eine ausreichende Festigkeit für die Befahrbarkeit des Gleises zu erreichen. In the various construction principles for a track in a fixed track, the range extends from almost completely factory-prefabricated roadway segments to solutions that are almost completely manufactured at the construction site. Basically, two main categories can be distinguished in the installation principles. When installing the track from top to bottom (top-down principle), the rails and attached to them part of the track structure (sleepers) are aligned with special devices exactly in the desired height and side position. Subsequently, the remaining between this track grid and the substructure space is filled with liquid, hardening materials. Although all inaccuracies resulting from the installation of the lower supporting layers of the track can be neutralized in the last decisive step, namely the lower casting of the track grid. However, there is a problem that immediately after the precise alignment of the track grating and thus under usually considerable time pressure must often perform massive, rough steps that can jeopardize the previously exactly adjusted track position. Such rough steps can be, for example, larger transports and the installation of in-situ concrete for underfilling the track grate. This problem is exacerbated even further when the track to be installed is to serve as a route to site supply, which is often the case in tunnel projects. After underfilling the track grid, the track over a comparatively long time is not or only partially accessible, because the materials used for underfilling - usually concrete - sometimes require several days to achieve sufficient strength for the negotiability of the track.
Bei der zweiten Hauptkategorie der Einbaumethoden werden alle Tragschichten und Komponenten von unten nach oben schrittweise aufeinander gebaut (Bottom-Up-Prinzip). Dabei versucht man, mit jedem weiteren Schritt exakter zu arbeiten, damit nach der abschließenden Montage der Fahrschienen die Gleisgenauigkeit allen Anforderungen entspricht. Dieses Aufbauprinzip einer festen Fahrbahn von unten nach oben erlaubt zwar beim Einbau des Gleises viele Freiheiten, denn die einzelnen Arbeitsschritte sind verhältnismäßig einfach und zeitlich unabhängig voneinander durchzuführen und erlauben einen hohen Mechanisierungsgrad. Außerdem kann das einzubauende Gleis in fast allen Bauphasen relativ gut und auch kurzfristig als Transportweg genutzt werden. Das Prinzip findet daher insbesondere dort bevorzugt Anwendung, wo keine seitliche Materialversorgung zum Beispiel über das Nachbargleis möglich ist. Der Nachteil dieser Bauweise ist aber, dass sie verhältnismäßig ungenau ist und dass daher in den meisten Fällen trotz großer Bemühungen und Fertigungsgenauigkeit eine nachträgliche Lage- und vor allem Höhenanpassung der Fahrschienen an den Schienenbefestigungselementen vorgenommen werden muss. Diese Anpassungen sind nicht nur aufwendig, sondern führen dazu, dass die vom Bauherrn für die spätere Betriebsphase geforderten Möglichkeiten einer Nachjustierung der Gleislage schon bei der erstmaligen Einrichtung ausgenutzt werden müssen und dann später nicht oder nicht im geforderten Umfang mehr zur Verfügung stehen. In the second main category of installation methods, all the base layers and components are built step-by-step from bottom to top (bottom-up principle). It tries to work more precisely with each further step, so that the track accuracy meets all requirements after the final assembly of the rails. Although this construction principle of a fixed track from bottom to top allows the installation of the track many freedoms, because the individual steps are relatively simple and time independently perform and allow a high degree of mechanization. In addition, the track to be installed in almost all stages of construction can be used relatively well and at short notice as a transport route. The principle is therefore particularly preferred where no lateral supply of material, for example on the neighboring track is possible. The disadvantage of this design, however, is that it is relatively inaccurate and that therefore in most cases despite great efforts and manufacturing accuracy a subsequent Lage- and especially height adjustment of the rails must be made to the rail fastening elements. These adjustments are not only costly, but also lead to the fact that the possibilities for readjustment of the track position required by the client for the later operating phase have to be exploited already during the initial setup and then later not available or not available to the required extent.
Aufgabe der Erfindung ist es, ein System für eine feste Fahrbahn zu schaffen, mit dem sich diese einfach, schnell und mit hoher Genauigkeit einbauen lässt. Erfindungsgemäß wird diese Aufgabe durch eine feste Fahrbahn für Schienenfahrzeuge gelöst, die aufweist:
- – eine auf einem Untergrund angeordnete oder vom Untergrund gebildete Grundschicht;
- – eine Vielzahl von auf der Grundschicht aufgelagerten, an ihrer Oberseite jeweils mindestens eine Aussparung aufweisende Tragelemente; und
- – in die Aussparungen in den Tragelementen von oben einsetzbare oder eingesetzte und nach ihrer Höhen- und Seitenausrichtung mittels einer aushärtenden Vergussmasse arretierte oder arretierbare Schienenbefestigungselemente.
- - An arranged on a substrate or from the ground layer formed;
- - A plurality of superimposed on the base layer, on its upper side in each case at least one recess having support elements; and
- - In the recesses in the support elements can be used from above or used and locked after their height and side alignment by means of a curing potting or lockable rail fasteners.
Diese erfindungsgemäße Kombination verbindet in besonders vorteilhafter Weise die Einbauprinzipien einerseits von unten nach oben (Bottom-Up) und andererseits von oben nach unten (Top-Down) indem zunächst auf dem Fahrbahnuntergrund im "Bottom-Up"-Bauprinzip die Grundschicht errichtet wird, die bevorzugt eine Asphaltschicht oder auch eine hydraulisch gebundene Tragschicht sein kann. Anschließend werden auf dieser Grundschicht ebenfalls im "Bottom-Up"-Bauprinzip die Tragelemente neben- bzw. hintereinander aufgelagert, wobei beide Arbeitsschritte mit vergleichsweise großen Toleranzen ausgeführt werden können. Die Hauptanforderung an die Grundschicht besteht nämlich vornehmlich darin, die geforderte Tragfähigkeit für das Gleis zu gewährleisten, was von dem für die Grundschicht vorzugsweise eingebauten Asphalt oder Beton erreicht wird, ohne dass die Schicht millimetergenau eingerichtet wird. Auch die auf der Grundschicht aufgelagerten Tragelemente müssen für die Erfindung nicht mit höchster Maßgenauigkeit gefertigt sein, sondern müssen vornehmlich eine geforderte Festigkeit aufweisen, wozu sie als Fertigbauteile unter Beachtung der geforderten Werkstoffqualitäten, aber eben mit vergleichsweise großen Toleranzen hinsichtlich ihrer Abmessungen hergestellt werden können. Während also die untere Grundschicht und die darauf abgelegten Tragelemente eine Lage- und Höhengenauigkeit mit vergleichsweise großen Toleranzen haben können, die im Zentimeterbereich liegen, wird bei der erfindungsgemäßen Fahrbahn die geforderte hohe Endgenauigkeit erst zum Schluss der durchzuführenden Arbeiten, nachdem alle groben Arbeiten abgeschlossen sind, mit verhältnismäßig geringem Aufwand erreicht, indem dann nämlich die Schienenbefestigungselemente nach dem Bauprinzip von oben nach unten in die Aussparungen in den Tragelementen eingesetzt, in die gewünschte Höhen- und Seitenlage ausgerichtet und dann in dieser Lage fixiert werden, indem eine aushärtende Vergussmasse unter die Schienenbefestigungselemente und in die Aussparungen eingebracht wird. Dabei ist auch die Menge der einzusetzenden Vergussmasse deutlich geringer als in Fällen, in denen ein ganzer Gleisrost aus Schienen und Schwellen vollständig mit Ortbeton untergossen wird, wie dies bei bekannten "Top-Down"-Bauverfahren regelmäßig der Fall ist. Aufgrund der vergleichsweise geringen Menge Vergussmasse, die zum Einsatz kommt, ist es wirtschaftlich vertretbar, hierfür auch teure Werkstoffe einzusetzen, die gegenüber herkömmlichem Ortbeton den Vorteil höherer Festigkeiten und schnellerer Aushärtung haben können. This combination of the invention combines in a particularly advantageous manner, the installation principles on the one hand from the bottom up (bottom-up) and the other from top to bottom (top-down) by first on the road surface In the "bottom-up" construction principle, the base layer is erected, which may preferably be an asphalt layer or a hydraulically bound support layer. Subsequently, the supporting elements are also next to or behind each other superimposed on this base layer also in the "bottom-up" construction principle, both steps can be performed with comparatively large tolerances. Namely, the main requirement of the base layer is primarily to ensure the required load-bearing capacity for the track, which is achieved by the asphalt or concrete, which is preferably installed for the base layer, without the layer being set up with millimeter precision. The superimposed on the base layer support elements must not be made for the invention with the highest dimensional accuracy, but must primarily have a required strength, for which they can be manufactured as prefabricated components in compliance with the required material qualities, but just with comparatively large tolerances in terms of their dimensions. Thus, while the lower base layer and the support elements deposited thereon can have a positional and vertical accuracy with comparatively large tolerances, which are in the centimeter range, the required high final accuracy is only at the end of the work to be carried out in the carriageway according to the invention, after all rough work is completed, achieved with relatively little effort by then namely the rail fasteners used according to the construction principle from top to bottom in the recesses in the support elements, aligned in the desired height and lateral position and then fixed in this position by a curing potting compound under the rail fasteners and is introduced into the recesses. The amount of potting compound to be used is also significantly lower than in cases where a complete track grid of rails and sleepers is completely underpoured with in-situ concrete, as is the case regularly with known "top-down" construction methods. Due to the comparatively small amount of potting compound used, it is economically justifiable to use expensive materials for this, which may have the advantage of higher strengths and faster curing compared to conventional in-situ concrete.
Es ist möglich, dass wenigstens ein Teil der Tragelemente von quer zur Längsrichtung der Fahrbahn ausgerichteten, schwellenartigen Quertragelementen gebildet wird, die an ihrer Oberseite mit paarweise für Schienenbefestigungselemente einer rechten und einer linken Schiene des Gleises bestimmten Aussparungen versehen sind. Es ist aber auch möglich, dass wenigstens ein Teil der Tragelemente von in Längsrichtung der Fahrbahn ausgerichteten, unterhalb einer rechten bzw. einer linken Schiene des Gleises angeordneten Längstragelementen gebildet wird, wobei jedes der Längstragelemente mehrere Aussparungen für Schienenbefestigungselemente zur Befestigung der linken oder der rechten Schiene aufweist. Häufig wird man für eine erfindungsgemäße feste Fahrbahn als Tragelemente sowohl Quertragelemente als auch Längstragelemente zum Einsatz bringen. It is possible that at least a part of the support elements is formed by transversely to the longitudinal direction of the roadway aligned, swell-like transverse support elements, which are provided on their upper side with pairs of rail fasteners of a right and a left rail of the track specific recesses. But it is also possible that at least a part of the support elements is aligned in the longitudinal direction of the roadway, arranged below a right or a left rail of the track longitudinal support elements, each of the longitudinal support elements a plurality of recesses for rail fastening elements for attaching the left or the right rail having. Often you will bring for a solid pavement according to the invention as support elements both Quertragelemente and longitudinal support elements used.
Als besonders vorteilhaft hat es sich erwiesen, wenn die Schienenbefestigungselemente einen in den Aussparungen oder oberhalb von diesen angeordneten oder anordbaren Montage-Grundkörper und mindestens einen mit diesem an der Grundkörperoberseite formschlüssig zusammenwirkenden Schienenhalter aufweisen, wobei es erfindungsgemäß besonders vorteilhaft ist, wenn der Montage-Grundkörper mit wenigstens einem ihn im Wesentlichen vertikal durchsetzenden Einfüllkanal versehen ist. Durch diesen Einfüllkanal hindurch kann die Vergussmasse eingefüllt und hierdurch besonders zuverlässig in den Zwischenraum zwischen dem Montage-Grundkörper und dem darunterliegenden Tragelement bzw. die darin vorgesehene Aussparung eingefüllt werden, womit es möglich wird, die Menge der eingesetzten Vergussmasse auf ein Minimum zu beschränken. Der Montage-Grundkörper kann an seiner Unterseite mit Versteifungsrippen versehen sein, die zwischen sich mindestens eine von unten wenigstens teilweise mit Vergussmasse verfüllbare Kammer begrenzen, wobei die Rippen nach Aushärten der Vergussmasse von dieser vorzugsweise allseitig umschlossen werden und hierdurch eine besonders feste Verbindung zwischen dem Montage-Grundkörper und dem darunterliegenden Tragelement gewährleisten. It has proved to be particularly advantageous if the rail fastening elements have a mounting base body arranged or arrangeable in the recesses or above them and at least one rail holder which interacts with it on the main body top, wherein it is particularly advantageous according to the invention if the mounting base body is particularly advantageous is provided with at least one him substantially vertically interspersed filling channel. Through this filling channel through the potting compound filled and thereby particularly reliable in the space between the mounting base and the underlying support element or the recess provided therein are filled, making it possible to limit the amount of potting compound used to a minimum. The mounting base body may be provided on its underside with stiffening ribs which delimit between them at least one from below at least partially fillable chamber with grout, the ribs are preferably enclosed on all sides after curing of the potting compound of this and thus a particularly strong connection between the assembly -Basic body and ensure the underlying support element.
Der Montage-Grundkörper weist vorzugsweise an der Grundkörperoberseite eine den oder die Schienenhalter quer zur Schienenlängsrichtung formschlüssig aufnehmende Halterführung auf, die dafür sorgt, dass die auf die mit den Schienenbefestigungselementen befestigten Schienen wirkenden Querkräfte zuverlässig in den Montage-Grundkörper und von diesem in die Tragelemente und den weiteren Gleisunterbau abgetragen werden. The mounting base body preferably has on the main body top a rail holder or transversely to the rail longitudinal direction positively receiving retainer guide, which ensures that acting on the rails fastened with the rail fastening elements transverse forces reliably in the mounting base body and of this in the support elements and be removed from the other track substructure.
Die Schienenbefestigungselemente können mit nach unten vorstehenden Dübelelementen versehen sein, die in die Aussparungen von oben einfassen. Die Anordnung ist dabei bevorzugt so getroffen, dass die Dübelelemente im Wesentlichen von Dübelhülsen für die Schienenhalter und Montage-Grundkörper durchsetzende Schwellenschrauben gebildet werden. The rail fasteners may be provided with downwardly projecting dowel elements which engage in the recesses from above. The arrangement is preferably made such that the dowel elements are formed essentially by dowel sleeves for the rail holder and mounting base body passing through sleeper screws.
Für eine weitere Festigkeitserhöhung der Verbindung zwischen den Tragelementen und den Schienenbefestigungselementen können in den Aussparungen vorgesehene Anschlussbewehrungen dienen, die nach der Fertigstellung des Gleises von der Vergussmasse umschlossen sind. Um die Menge der für die Unterfüllung der Schienenbefestigungselemente erforderlichen Vergussmasse weiter zu reduzieren, kann vorgesehen sein, dass die Aussparungen in mehrere, vorzugsweise zwei Kammern unterteilt sind, so dass das gesamte auszufüllende Volumen auf ein Mindestmaß beschränkt werden kann. Um das Einfüllen von Vergussmasse in die Aussparungen zu begünstigen, können diese an wenigstens einer Randseite mit Angussschrägen versehen sein. For a further increase in strength of the connection between the support elements and the rail fastening elements provided in the recesses connecting reinforcements serve, after the completion of the track enclosed by the potting compound. In order to further reduce the amount of potting compound required for underfilling the rail fastening elements, it can be provided that the recesses are subdivided into a plurality of, preferably two, chambers, so that the entire volume to be filled can be kept to a minimum. In order to favor the filling of potting compound in the recesses, they can be provided on at least one edge side with sprue bevels.
Das erfindungsgemäße, bevorzugt bei einer festen Fahrbahn nach der Erfindung einsetzbare Schienenbefestigungselement besteht somit, wie bereits angedeutet, im Wesentlichen aus einem Montage-Grundkörper und mindestens einem mit diesem an der Grundkörperoberseite formschlüssig zusammenwirkenden Schienenhalter, wobei der Montage-Grundkörper mit wenigstens einem ihn im wesentlichen vertikal durchsetzenden Einfüllkanal für die zu seiner Arretierung einfüllbare Vergussmasse versehen ist, so dass es möglich wird, entlang der Randseiten der Schienenbefestigungselemente bzw. deren Montage-Grundkörpern oberhalb der Aussparung in den Tragelementen Schalungselemente anzuordnen, die dann beim Eingießen der Vergussmasse durch den Einfüllkanal einen seitlichen Austritt von Vergussmasse aus dem Zwischenraum zwischen Tragelement und Schienenbefestigungselement unterhalb des Montage-Grundkörpers verhindern. Die Vergussmasse fließt dabei in die unterhalb des jeweiligen Schienenbefestigungselements vorgesehene Aussparung und den von den Schalungselementen begrenzten Zwischenraum zwischen Tragelement und Unterseite des Montage-Grundkörpers, wobei dort auch die von unten zugänglichen, von den Versteifungsrippen begrenzten Kammern mit Vergussmasse verfüllt werden. As already indicated, the rail fastening element according to the invention, which can preferably be used on a solid road surface according to the invention, essentially consists of a mounting base body and at least one rail holder which interacts positively with it on the main body upper side, the mounting base body having at least one substantially vertically passing through filling channel is provided for the filling compound to be inserted into its locking, so that it is possible to arrange along the edge sides of the rail fastening elements or their mounting bases above the recess in the support elements formwork elements, which then a lateral when pouring the potting compound through the filling channel Prevent escape of potting compound from the intermediate space between the support element and rail fastening element below the mounting base body. The potting compound flows into the recess provided below the respective rail fastening element and the intermediate space bounded by the formwork elements between the support element and underside of the mounting base body, where the chambers accessible from below and bounded by the stiffening ribs are also filled with potting compound there.
Die an der Grundkörperoberseite des Montage-Grundkörpers bevorzugt ausgebildete, den oder die Schienenhalter quer zur Schienenlängsrichtung formschlüssig aufnehmende Halterführung verjüngt sich in bevorzugter Ausgestaltung nach unten und ist seitlich durch schräge Führungsflächen begrenzt, während der oder die Schienenhalter mit in ihrer Neigung an die Führungsflächen angepassten Konterschrägflächen versehen ist/sind. Hierdurch erreicht man eine Selbstzentrierung der Schienenhalter bei ihrer Montage an der Halterführung, wenn die Schienenhalter zur Befestigung der Schiene mittels der Schwellenschrauben o.dgl. angezogen werden. Die Halterführung kann dabei wenigstens eine an der Grundkörperoberseite ausgebildete, in Schienenlängsrichtung verlaufende Führungsnut aufweisen, in die ein am Schienenhalter ausgebildeter, angepasster Führungsvorsprung formschlüssig einfasst. The preferably formed on the main body top of the mounting base body, the rail holder or transversely to the rail longitudinally receiving holder guide tapers in a preferred embodiment down and is bounded laterally by oblique guide surfaces, while the rail holder or with adapted in their inclination to the guide surfaces counter bevels is / are. This achieves a self-centering of the rail holder in its mounting on the holder guide, if the rail holder for fixing the rail by means of the sleeper screws or the like. be attracted. The holder guide can have at least one guide groove formed on the main body upper side extending in the longitudinal direction of the rail, into which an adapted guide projection formed on the rail holder engages in a form-fitting manner.
Jedes der Schienenbefestigungselemente kann bevorzugt zwei Schienenhalter aufweisen, die zwischen sich eine Aufnahme für den Schienenfuß einer Schiene sowie ggf. für unterhalb des Schienenfußes auf der Grundkörperoberseite anzuordnende Einstell- und/oder Ausgleichsplatten freilassen. Each of the rail fastening elements may preferably have two rail holders, which leave free between them a receptacle for the rail foot of a rail and possibly for below the rail foot on the main body top adjusting and / or compensating plates.
Die Erfindung schafft ein Verfahren zur Errichtung eines Gleises in fester Fahrbahn, wobei verfahrensgemäß zunächst eine Grundschicht vorgesehen wird, die bevorzugt als Asphaltschicht auf einem Untergrund angeordnet oder von dem – beispielsweise als hydraulisch gebundene Tragschicht ausgebildeten – Untergrund gebildet wird. Im nächsten Verfahrensschritt werden auf der Grundschicht eine Vielzahl Tragelemente aufgelagert, die an ihrer Oberseite jeweils mindestens eine Aussparung aufweisen. Diese Tragelemente, die als quer zur Längsrichtung der Fahrbahn ausgerichtete, schwellenartige Quertragelemente oder aber auch als in Längsrichtung der Fahrbahn ausgerichtete, unterhalb einer rechten oder linken Schiene des Gleises angeordneten Längstragelemente ausgebildet sein können, sind bevorzugt Fertigbauteile, an deren Maßtoleranzen keine allzu hohen Anforderungen gestellt werden müssen. Auf diesem somit von unten nach oben (Bottom-Up) errichteten Gleisunterbau kann dann ein Gleisrost, der aus den beiden Fahrschienen, diese untereinander verbindenden (ggf. temporären) Spurstangen und an den Schienen angeschlossenen Schienenbefestigungselementen bestehen kann, in seiner Höhen- und Seitenlage so ausgerichtet werden, dass sich die Schienenbefestigungselemente oberhalb der Aussparungen in den Tragelementen befinden und zumindest teilweise von oben in diese einfassen. Nachdem die gewünschte Höhen- und Seitenausrichtung des Gleises auf dem im "Bottom-Up"-Verfahren errichteten Gleisunterbau erfolgt ist, werden die Schienenbefestigungselemente durch Einbringen einer aushärtenden Vergussmasse in die sich zwischen den Schienenbefestigungselementen und den Tragelementen verbleibende Zwischenräume und in die Aussparungen arretiert. The invention provides a method for the construction of a track in a fixed lane, wherein according to the method initially a base layer is provided which is preferably arranged as an asphalt layer on a substrate or of the - formed for example as a hydraulically bound support layer - substrate. In the next method step, a plurality of support elements are superimposed on the base layer, each having at least one recess on its upper side. These support elements, which may be designed as transversely to the longitudinal direction of the roadway aligned, swell-like Quertragelemente or as aligned in the longitudinal direction of the roadway, arranged below a right or left rail of the track longitudinal support elements are preferably prefabricated components, placed on the dimensional tolerances not too high demands Need to become. On this thus from bottom to top built track substructure can then a track rust, which may consist of the two rails, these interconnecting (possibly temporary) tie rods and rail fastening elements connected to the rails, in its height and side position so be aligned, that the rail fastening elements are located above the recesses in the support elements and at least partially border from above in this. After the desired height and lateral alignment of the track has been made on the track substructure constructed in the "bottom-up" method, the rail fasteners are locked into the recesses by inserting a hardening potting compound into the spaces left between the rail fasteners and the support elements.
Weitere Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden Beschreibung und der Zeichnung, worin bevorzugte Ausführungsformen der Erfindungen beispielhaft erläutert und dargestellt sind. Es zeigt: Further features and advantages of the invention will become apparent from the following description and the drawings, wherein preferred embodiments of the invention are exemplified and illustrated. It shows:
Die Fahrbahn
Die in
Wendet man sich nun den
Die Schienen
In den Führungsflanschen
Damit die durch den Einfüllkanal
Es ist ersichtlich, dass zur Arretierung der Schienenbefestigungselemente
Es versteht sich, dass die Schienenbefestigungselemente
Mit der erfindungsgemäßen Anordnung werden in vorteilhafter Weise Arbeitsschritte unterschiedlicher Bauverfahren miteinander kombiniert, indem die auf dem Untergrund
Claims (17)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012103001A DE102012103001A1 (en) | 2012-04-05 | 2012-04-05 | Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway |
PL13726273T PL2834413T3 (en) | 2012-04-05 | 2013-04-04 | Rail fastening element for a fixed slab track |
PCT/IB2013/052705 WO2013150482A1 (en) | 2012-04-05 | 2013-04-04 | Fixed slab track for rail vehicles, and rail fastening element therefore |
EP13726273.9A EP2834413B1 (en) | 2012-04-05 | 2013-04-04 | Rail fastening element for a fixed slab track |
DK13726273.9T DK2834413T3 (en) | 2012-04-05 | 2013-04-04 | RAIL MOUNTING ELEMENT FOR A FIXED TRACK |
ES13726273T ES2841068T3 (en) | 2012-04-05 | 2013-04-04 | Rail fastening element for a track without fixed sleepers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012103001A DE102012103001A1 (en) | 2012-04-05 | 2012-04-05 | Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102012103001A1 true DE102012103001A1 (en) | 2013-10-10 |
Family
ID=48539308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102012103001A Withdrawn DE102012103001A1 (en) | 2012-04-05 | 2012-04-05 | Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP2834413B1 (en) |
DE (1) | DE102012103001A1 (en) |
DK (1) | DK2834413T3 (en) |
ES (1) | ES2841068T3 (en) |
PL (1) | PL2834413T3 (en) |
WO (1) | WO2013150482A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014037838A1 (en) | 2012-09-04 | 2014-03-13 | Rte Technologie Gmbh | Locating pin arrangement for aligning railway slabs on a base plate |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114808557B (en) * | 2022-03-22 | 2023-09-01 | 上海市城市建设设计研究总院(集团)有限公司 | Fixing structure and construction method of tramcar anti-vage reinforcing mesh |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1922055A1 (en) * | 1969-04-30 | 1970-11-05 | Lechler Bautenschutzchemie Kg | Elastic rail bed |
DE2659161A1 (en) * | 1976-12-28 | 1978-07-06 | Zueblin Ag | BALLLESS RAILWAY CONSTRUCTION |
DE19517112A1 (en) * | 1994-12-22 | 1996-07-04 | Heilit & Woerner Bau Ag | Track superstructure with continuous support plate and individual fastening devices for the rails |
DE19824395C1 (en) * | 1998-05-30 | 1999-07-22 | Hochtief Ag Hoch Tiefbauten | Method for manufacture of railway bed |
DE19944783A1 (en) * | 1999-02-08 | 2000-08-10 | Hochtief Ag Hoch Tiefbauten | Slab track system |
DE19919506A1 (en) * | 1999-04-29 | 2000-11-30 | Thyssen Krupp Materials & Serv | Elastic rail mounting for tracks on permanent ways has base plate supported on side contact faces of sleeper or sub base |
DE10248037B3 (en) * | 2002-10-15 | 2004-05-06 | Walter - Heilit Verkehrswegebau Gmbh | Secondary treatment method for railway track with extraction of fastening bolts from sleepers, drilling of sleeper, and filling of space with synthetic resin or cement suspension |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4616395A (en) * | 1983-06-30 | 1986-10-14 | Perini Corporation | Railroad track fixation method and apparatus |
DE4411889A1 (en) * | 1994-04-07 | 1995-10-12 | Hochtief Ag Hoch Tiefbauten | Ballastless track system for at least one railroad track and method of manufacture |
DE4415363C1 (en) * | 1994-05-02 | 1995-09-28 | Walter Bau Ag | A permanent way superstructure for railways, especially for bridges and processes for its manufacture |
DE4419877C1 (en) * | 1994-06-07 | 1995-11-02 | Zueblin Ag | Sleeperless top construction for rail tracks, partic. for bridges |
DE19620731A1 (en) * | 1996-05-23 | 1997-11-27 | Strabag Hoch Und Ingenieurbau | Rigid track for rail vehicles across bridges |
DE29902595U1 (en) * | 1999-02-13 | 1999-04-29 | Friedrich Hagans Plastverarbei | Vibration-damping intermediate layer for rail support on a solid base |
DE19932991A1 (en) * | 1999-07-14 | 2000-06-21 | Friedrich Hagans Plastverarbei | Elastic supports for rail track consist of single blocks of resin shaped to hold rail base and incorporate filling made of recycled rubber chips |
DE10328895A1 (en) * | 2003-06-26 | 2005-01-20 | Rte Technologie Gmbh | Method for producing a rail track for rail vehicles |
EP1709249B1 (en) * | 2004-01-29 | 2013-08-21 | Wirthwein AG | Highly elastic electrically insulating rail support point |
AT12185U1 (en) * | 2010-08-09 | 2011-12-15 | Naumov Boris Vladimilenovich | SUPPORTING SUPPORT AND BUILDING OF A RAIL TRACK |
-
2012
- 2012-04-05 DE DE102012103001A patent/DE102012103001A1/en not_active Withdrawn
-
2013
- 2013-04-04 DK DK13726273.9T patent/DK2834413T3/en active
- 2013-04-04 PL PL13726273T patent/PL2834413T3/en unknown
- 2013-04-04 EP EP13726273.9A patent/EP2834413B1/en active Active
- 2013-04-04 ES ES13726273T patent/ES2841068T3/en active Active
- 2013-04-04 WO PCT/IB2013/052705 patent/WO2013150482A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1922055A1 (en) * | 1969-04-30 | 1970-11-05 | Lechler Bautenschutzchemie Kg | Elastic rail bed |
DE2659161A1 (en) * | 1976-12-28 | 1978-07-06 | Zueblin Ag | BALLLESS RAILWAY CONSTRUCTION |
DE19517112A1 (en) * | 1994-12-22 | 1996-07-04 | Heilit & Woerner Bau Ag | Track superstructure with continuous support plate and individual fastening devices for the rails |
DE19824395C1 (en) * | 1998-05-30 | 1999-07-22 | Hochtief Ag Hoch Tiefbauten | Method for manufacture of railway bed |
DE19944783A1 (en) * | 1999-02-08 | 2000-08-10 | Hochtief Ag Hoch Tiefbauten | Slab track system |
DE19919506A1 (en) * | 1999-04-29 | 2000-11-30 | Thyssen Krupp Materials & Serv | Elastic rail mounting for tracks on permanent ways has base plate supported on side contact faces of sleeper or sub base |
DE10248037B3 (en) * | 2002-10-15 | 2004-05-06 | Walter - Heilit Verkehrswegebau Gmbh | Secondary treatment method for railway track with extraction of fastening bolts from sleepers, drilling of sleeper, and filling of space with synthetic resin or cement suspension |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014037838A1 (en) | 2012-09-04 | 2014-03-13 | Rte Technologie Gmbh | Locating pin arrangement for aligning railway slabs on a base plate |
Also Published As
Publication number | Publication date |
---|---|
PL2834413T3 (en) | 2021-05-17 |
DK2834413T3 (en) | 2021-01-04 |
EP2834413B1 (en) | 2020-10-14 |
EP2834413A1 (en) | 2015-02-11 |
ES2841068T3 (en) | 2021-07-07 |
WO2013150482A1 (en) | 2013-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10138803A1 (en) | Process for the continuous storage of a rail on a fixed carriageway, and adjusting device and fixed carriageway | |
EP1888843A1 (en) | Ballastless track for rail vehicles | |
EP3460125B1 (en) | Railway track construction | |
EP0894898B1 (en) | Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support | |
DE10004194C2 (en) | Process for the production of a fixed railroad track on a bridge | |
DE102018121332A1 (en) | Track construction and running rail | |
DE4205192C2 (en) | platform | |
EP1039030A1 (en) | Ballastless railway system | |
DE102012103001A1 (en) | Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway | |
DE102007028978B4 (en) | Rail track for rail vehicles | |
EP3617404B1 (en) | Rail and track structure with the rail | |
EP2837738A1 (en) | Railway track covering of fixed tracks and method for their production | |
AT521653B1 (en) | Switch arrangement with elastically mounted switch support plates | |
DE4325476A1 (en) | Method for producing a substructure for a track for rail vehicles | |
DE102004019083A1 (en) | Method for laying rail track on uneven ground especially in tunnels using integral alignment means which are removed after the sleepers are secured with poured concrete | |
EP1216326A1 (en) | Method for producing a soundproofed track | |
EP2800833B1 (en) | Slab track | |
CH715209B1 (en) | Track transition unit between a ballast track section and a ballastless track section. | |
AT262366B (en) | Superstructure with track cover for road roller systems, level crossings, etc. like | |
EP3792396B1 (en) | Frame for a railway covering for a solid track | |
DE10310754B4 (en) | Method for producing a solid rail track; Fixed railroad track | |
AT505821A2 (en) | METHOD AND ARRANGEMENT FOR ORIENTING PRE-CONCRETE CONCRETE AGGREGATE PLATES AND STRUCTURE BELT ELEMENT FOR USE IN THE PROCESS AND ARRANGEMENT | |
DE102021127502A1 (en) | Track for track-guided rail vehicles and method for its construction | |
AT500876B1 (en) | METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY | |
DE1220879B (en) | Underpass structure and procedure for its subsequent installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R082 | Change of representative |
Representative=s name: BUSCHHOFF-HENNICKE-ALTHAUS, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |