DE102006047875B3 - Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer - Google Patents
Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer Download PDFInfo
- Publication number
- DE102006047875B3 DE102006047875B3 DE200610047875 DE102006047875A DE102006047875B3 DE 102006047875 B3 DE102006047875 B3 DE 102006047875B3 DE 200610047875 DE200610047875 DE 200610047875 DE 102006047875 A DE102006047875 A DE 102006047875A DE 102006047875 B3 DE102006047875 B3 DE 102006047875B3
- Authority
- DE
- Germany
- Prior art keywords
- crane
- crane runway
- track
- rail
- runway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C7/00—Runways, tracks or trackways for trolleys or cranes
- B66C7/08—Constructional features of runway rails or rail mountings
Abstract
Description
Die Erfindung betrifft eine, in der Art eines Schienenauflagers mit einer eine obenliegende Schiene tragenden Kranbahn, welche in der Form eines langen Balkens aus Beton ausgebildet ist und auf einer Tragschicht aufliegt.The Invention relates to a, in the manner of a Schienenauflagers with a crane rail carrying an overhead rail, which in the Form of a long beam of concrete is formed and on one Supporting layer rests.
Große Kräne, insbesondere Portalkräne, beispielsweise auf Verlade- und Umschlagplätzen für Container, werden üblicherweise auf Schienen geführt, die im Unterschied zu Zugschienen einen sehr großen Abstand voneinander aufweisen. Aufgrund dieses Umstandes, weicht der Aufbau von Gleisen für derartige Großkräne grundsätzlich von einem Gleisaufbau für einen Zug ab, da die Schienen der Krangleise auf voneinander getrennten, nicht durch zwischen den Schienen angeordnete Schwellen miteinander verbundenen Auflagern aufliegen. Da die Großkräne bis zu 100 t und mehr heben können, besitzen die Schienenauflager eine große Auflagerfläche, welche beispielsweise in Form einer sogenannten festen Fahrbahn durchgehend längs der auf Ihnen anzubringenden Schienen ausgebildet sind. Eine feste Fahrbahn zeichnet sich dabei dadurch aus, dass eine Schwelle fest mit einem Gleisbett verbunden ist und das Gleisbett nicht wie üblicherweise aus Schotter besteht. Hergestellt werden feste Fahrbahnen üblicherweise aus einzelnen, bis zu 18 m langen und in einem Betonfertigteilwerk hergestellten, stirnseitig aneinander angrenzend verlegten Balken. Eine Verbindung der einzelnen Balken wird dabei über eine stirnendseitig der Balken abstehende Bewehrung bewirkt, welche eine Bewehrung des Nachbarbalkens übergreift und mit Ortbeton vergossen ist.Big cranes, in particular Gantry cranes, for example at loading and transhipment points for containers, become common guided on rails, which in contrast to train rails have a very large distance from each other. Due to this circumstance, the construction of tracks deviates for such Main cranes basically from a track layout for a train as the rails of the crane tracks are separated not by between the rails arranged sleepers with each other rest on connected supports. As the big cranes lift up to 100 t and more can, The rail supports have a large bearing surface, which for example, in the form of a so-called solid lane continuous along the are formed on rails to be mounted. A solid lane characterized by the fact that a threshold fixed with a Track bed is connected and the track bed is not as usual Gravel exists. Solid roadways are usually made individual, up to 18 m long and manufactured in a precast concrete factory, the front side Beams laid adjacent to each other. A connection of the individual Bar is over a front end of the bar protruding reinforcement causes which a reinforcement of the neighboring beam overlaps and with in-situ concrete is shed.
Bei den obengenannten, hohen Belastungen, welche bei Großkränen, insbesondere in einem Hafenbereich, auftreten können, kann nicht ausgeschlossen werden, dass es nach einer gewissen Kranbetriebsdauer zu ungewollten Absenkungen der Kranbahn kommt, wodurch im Extremfall die Stabilität des Krans gefährdet sein kann. Dabei werden insbesondere bei Kranbahnen, welche auf setzungsempfindlichen Böden errichtet sind, bereits bei der Errichtung der Kranbahn Maßnahmen eingeplant, mit denen Setzungen behoben werden können, das heißt Maßnahmen, durch welche die abgesenkte Kranbahn wieder auf ihre ursprüngliche Solllage angehoben werden kann. Ist die Kranbahn auf eine vorher bestimmte Solllage angehoben, so wird sie in dieser angehobenen Position fixiert und zwar dadurch, dass durch in der Kranbahn bereits bei der Fertigung beziehungsweise Verlegung vorgesehene, die Kranbahn von oben nach unten durchgreifende Füllöffnungen, Füllmaterial in die durch das Anheben der Kranbahn unter dieser entstehenden Freiräume eingefüllt wird. Stellen sie jedoch nach einem ersten Anheben beziehungsweise Ausrichten erneut Setzungen ein, kann es jedoch je nach verwendetem Füllmaterial zu Schwierigkeiten kommen, eine erneute Ausgleichsschicht unter der Kranbahn einzubringen. Ebenfalls oftmals schwierig gestaltet sich das Anheben selbst, da hierfür aufwändige Halteeinrichtungen an der Kranbahn vorgesehen werden müssen, welche bei einem nicht nur temporären Anbringen potentielle Stolperfallen bilden können.at the above, high loads, which in large cranes, in particular in a port area, can occur can not be ruled out become too unwanted after a certain crane operating time Lowering the crane track comes, which in extreme cases, the stability of the crane endangered can be. In particular, crane runways, which are on settlement-sensitive soils are already erected during the construction of the crane runway measures planned, with which settlements can be remedied, that is measures, through which the lowered crane runway back to its original Target position can be raised. Is the crane runway on one before raised certain target position, it will be raised in this Position fixed and indeed by that already in the crane runway intended for the production or installation, the crane runway from top to bottom sweeping filling openings, filling material in by the Lifting the crane runway is filled under this resulting clearances. However, do it after a first lifting or aligning Again settling, but it may vary depending on the filler used come to difficulties, a new compensation layer under to bring in the crane runway. Also often difficult the lifting itself, as this elaborate holding devices the crane runway must be provided, which in case of not only temporary attachment potential pitfalls can form.
Aus
der
Aus
der
Aus
der
Der Erfindung liegt die Aufgabe zugrunde, für eine gattungsgemäße Kranbahn eine verbesserte Ausführungsform anzugeben, welche zu einem nachträglichen betriebsgerechten Ausrichten einfach Handzuhaben ist.Of the Invention is the object of a generic crane runway an improved embodiment specify which is to be subsequently adjusted for operational purposes easy to handle.
Diese wird durch den Gegenstand des unabhängigen Anspruchs 1 gelöst. Vorteilhaften Ausführungsformen sind Gegenstand der abhängigen Ansprüche.These is solved by the subject matter of independent claim 1. beneficial embodiments are the subject of the dependent Claims.
Die Erfindung beruht auf dem allgemeinen Gedanken, bei einer, in der Art eines Schienenauflagers mit einer eine obenliegende Schiene tragenden Kranbahn, bereits werksseitig versenkte Halteeinrichtungen vorzusehen, welche bei einem nachträglichen Richten zum Ausgleich von Setzungen ein einfaches Anheben der Kranbahn und dadurch ein einfaches Unterfüllen derselben erlauben. Gleichzeitig verhindert die versenkte Anordnung der Halteeinrichtung, dass beim üblichen Betrieb der Kranbahn die Halteeinrichtung gefährlich über eine sichtbare Oberfläche der Kranbahn hinaussteht und dadurch eine potentielle Stolperfalle bildet. Die Kranbahn ist dabei in der Form eines langen Balkens aus Beton ausgebildet und üblicherweise auf einer Tragschicht, insbesondere auf einer Splittschicht, verlegt. Die versenkte Halteeinrichtung ist dabei in einer, in einer sichtbaren Oberfläche der einsatzbereiten starren Kranbahn vorgesehenen Ausnehmung angeordnet, wobei die Ausnehmung vorzugsweise so ausgebildet ist, dass beim nachträglichen Anheben zum Ausgleich von Setzungen ein entsprechender Greifer schnell und einfach mit der Halteeinrichtung verbunden werden kann, diese aber im Nichtgebrauchszustand versteckt beziehungsweise versenkt innerhalb der Ausnehmung angeordnet ist. Darüber hinaus weist die Kranbahn Füllöffnungen auf, welche die Kranbahn in im wesentlichen vertikaler Richtung durchdringen und einem Verpressen von Füllmaterial zu einer Ausgleichsschicht unter der Kranbahn dienen. Die Füllöffnungen werden dabei bereits im Fertigteilwerk beispielsweise mittels eines Leerrohres vorgesehen und links und rechts der später auf der Kranbahn zu montierenden Schiene angeordnet. Dies bietet den großen Vorteil, dass bei einem späteren Anheben der Kranbahn ein Hebewerkzeug einfach mit den Halteeinrichtungen verbunden werden kann, wodurch sich der Instandsetzungsvorgang insge samt vereinfacht und dadurch kostengünstiger gestalten lässt.The The invention is based on the general idea, in one in which Type of rail support with an overhead rail carrying crane track, already factory-countersunk holding devices provide, which in a subsequent straightening to compensate settling a simple lifting of the crane runway and thereby one simple underfilling allow the same. At the same time prevents the sunk arrangement the holding device that the usual Operation of the crane runway the holding device dangerously over a visible surface of the Craneway protrudes and thereby forms a potential trip hazard. The crane runway is in the form of a long concrete beam trained and usually laid on a base course, in particular on a chip layer. The recessed holding device is in one, in a visible surface of the ready-to-use rigid crane runway provided recess arranged wherein the recess is preferably formed so that when later Lift to compensate settlements a corresponding gripper quickly and can be easily connected to the holding device, this but hidden or sunk when not in use is disposed within the recess. In addition, the crane runway points filling openings on which the crane runway in a substantially vertical direction penetrate and a compression of filler material to a leveling layer serve under the crane runway. The filling openings be already in the precast plant, for example by means of a Empty pipe provided and left and right of the later on the crane runway to be mounted rail. This offers the huge Advantage that at a later Lift the crane track a lifting tool easily with the holding devices can be connected, resulting in the entire repair process simplified and thus more cost-effective let shape.
Zweckmäßig sind die Ausnehmungen halbkugelartig und die Halteeinrichtungen pollerartig ausgebildet. Die pollerartig ausgebildeten Halteeinrichtungen bieten dabei den großen Vorteil, dass sie eine einfache Anbindung von hebewerkzeugseitigen Greifern erlauben, welche zum einen sicher und schnell mit der pollerartigen Halteeinrichtung verbunden und auch wieder von dieser gelöst werden können. Eine Verbindung zwischen Hebewerkzeug und Halteeinrichtung stellt sich dadurch besonders einfach dar, wodurch der Aufwand und damit die Kosten reduziert werden können. Die halbkugelartig ausgebildeten Ausnehmungen hingegen bieten den großen Vorteil, dass diese schalungstechnisch einfach herzustellen sind und zugleich durch ihre Form ein Verbinden eines hebewerkzeugseitigen Greifers mit der Halteeinrichtung unterstützen, da ein Verkanten in der halbkugelartig ausgebildeten Ausnehmung zumindest erschwert ist.Are useful the recesses hemispherical and the holding devices bollardike educated. The bollard-like holding devices provide while the big one Advantage that they have a simple connection of lifting tool side Grippers allow, for a safe and fast with the bollard-like Holding device connected and also released from this again can. A connection between the lifting tool and holding device provides This makes it particularly easy, so the effort and thus the costs can be reduced. The hemispherical recesses on the other hand offer the huge Advantage that these formwork are simple to produce and at the same time by their form connecting a tool on the handle side Gripper support with the holding device, as a tilting in the hemispherical recess formed at least difficult.
Bei einer vorteilhaften Weiterbildung der Lösung ist die Halteeinrichtung mit der Bewehrung der Kranbahn verbunden. Da bei einem späteren Ausrichten der Kranbahn zum Ausgleich von Setzungen die Kranbahn angehoben werden muss, entstehen insbesondere im Bereich der Halteeinrichtung nicht zu unterschätzende Zugspannungen, welche vom Beton alleine nicht aufgenommen werden können. Hierzu dient die im Beton verlegte Bewehrung, welche es der Kranbahn erlaubt, auch erhebliche Zugspannung, wie sie beispielsweise bei einem punktuel len Anheben auftreten können, auszuhalten. Durch die Anbindung der Halteeinrichtung an die Bewehrung der Kranbahn kann ein Weiterleiten der in die Halteeinrichtung eingeleiteten Zugkräfte an die Bewehrung erreicht werden, wodurch ein gefahrloses Anheben der Kranbahn ermöglicht wird.at An advantageous development of the solution is the holding device connected to the reinforcement of the crane runway. As with a later alignment the craneway to compensate for subsidence the crane runway raised must be, arise in particular in the field of holding device not to be underestimated Tensile stresses that are not absorbed by the concrete alone can. For this serves the concrete laid in the reinforcement, which allows the crane runway, also considerable tension, as for example at a punktuel len Lifting can occur unbearable. By the connection of the holding device to the reinforcement the crane runway can be a forwarding of the introduced into the holding device tensile forces to the reinforcement, whereby a safe lifting allows the crane runway becomes.
Bei einer weiteren vorteilhaften Ausführungsform der Lösung ist eine Unterseite der Kranbahn zumindest adhäsionsarm ausgebildet, so dass sich die Kranbahn bei einem Anheben zum nachträglichen Ausrichten derselben oder zum Ausgleich von Setzungen von der darunterliegenden Ausgleichsschicht löst. Wie eingangs erwähnt, wird zum Ausgleich von Setzungen, die Kranbahn angehoben und danach durch die, die Kranbahn in im wesentlichen vertikaler Richtung durchdringenden Füllöffnungen Füllmaterial unter die Kranbahn gepresst, welches dort eine erste Ausgleichsschicht bildet. Je nach Betriebsdauer und je nach der Setzungsneigung des Bodens, in welchem die Kranbahn verlegt ist, kann es jedoch nach einiger Zeit erneut erforderlich werden, die Kranbahn anzuheben, beziehungsweise auszurichten. Durch die adhäsionsarm ausgebildete Unterseite der Kranbahn löst sich diese bei einem erneuten Anheben von der darunterliegenden ersten Ausgleichsschicht, so dass eine zweite Ausgleichsschicht nunmehr zwischen die Unterseite der Kranbahn und die Oberseite der ersten Ausgleichsschicht eingebracht werden kann. Eine feste Verbindung zwischen erster oder zweiter Ausgleichsschicht mit der Unterseite der Kranbahn wird dabei nicht erreicht, so dass bei jedem erneuten Anheben der Kranbahn, die sich jeweils direkt darunter befindliche Ausgleichsschicht leicht von der Unterseite der Kranbahn löst.at a further advantageous embodiment of the solution an underside of the crane track is formed at least with low adhesion, so that the crane runway during a lifting for subsequent alignment of the same or to compensate for subsidence of the underlying leveling layer solves. As mentioned in the beginning, is raised to compensate for subsidence, the crane runway and afterwards by penetrating the crane runway in a substantially vertical direction Filling holes filling material pressed under the crane runway, which there a first leveling layer forms. Depending on the duration of operation and depending on the subsidence tendency of the soil, in which the crane runway is laid, it can, however, after some Time again to raise the crane runway, respectively align. Due to the low adhesion trained underside of the crane runway dissolves in a renewed Lifting from the underlying first leveling layer so that a second leveling layer now between the bottom of Crane track and the top of the first leveling layer introduced can be. A firm connection between first or second Compensation layer with the underside of the crane runway is not achieved, so that with each new lifting of the crane runway, which itself each directly underneath leveling layer slightly from the underside of the crane runway releases.
Weitere Merkmale und Vorteile der Erfindung sind in den Unteransprüchen, in den Zeichnungen und in der zugehörigen Figurenbeschreibung anhand der Zeichnungen erläutert.Further Features and advantages of the invention are set forth in the subclaims, in the drawings and in the associated Description of the figures explained with reference to the drawings.
Bevorzugte Ausführungsbeispiele der Erfindung sind in den Zeichnungen dargestellt und werden in der nachfolgenden Beschreibung näher erläutert, wobei sich gleiche Bezugszeichen auf gleiche oder ähnliche oder funktional gleiche Bestandteile beziehen.Preferred embodiments of the invention are illustrated in the drawings and will be elucidated in the following description tert, where the same reference numerals refer to the same or similar or functionally identical components.
Dabei zeigen, jeweils schematisch,there show, in each case schematically,
Entsprechend
In
regelmäßigen Abständen sind
in einer sichtbaren Oberfläche
Denkbar
ist auch, dass diese mit sogenannten Kopfbolzen in der Kranbahn
Des
weiteren weist die Kranbahn
Während einem
normalen Betriebszustand der Kranbahn
Da
die Kranbahn
Nach
einem Ausrichten beziehungsweise Anheben der Kranbahn
Dabei
ist eine Unterseite
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200610047875 DE102006047875B3 (en) | 2006-10-10 | 2006-10-10 | Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200610047875 DE102006047875B3 (en) | 2006-10-10 | 2006-10-10 | Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102006047875B3 true DE102006047875B3 (en) | 2008-02-21 |
Family
ID=38955150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200610047875 Expired - Fee Related DE102006047875B3 (en) | 2006-10-10 | 2006-10-10 | Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102006047875B3 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2659161A1 (en) * | 1976-12-28 | 1978-07-06 | Zueblin Ag | BALLLESS RAILWAY CONSTRUCTION |
WO2002022957A1 (en) * | 2000-09-12 | 2002-03-21 | Max Bögl Bauunternehmung Gmbh & Co Kg | Method and device for correcting the position of a slab construction consisting of precast concrete slabs |
EP1270813A2 (en) * | 2001-06-29 | 2003-01-02 | Pfleiderer Infrastrukturtechnik GmbH & Co. KG | Portal for adjusting the track |
DE202006011142U1 (en) * | 2006-07-19 | 2006-10-05 | Thyssenkrupp Gft Gleistechnik Gmbh | Support system for railway track especially in load transfer sites has the rails supported on concrete support beams via vertical bolts and support plates |
-
2006
- 2006-10-10 DE DE200610047875 patent/DE102006047875B3/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2659161A1 (en) * | 1976-12-28 | 1978-07-06 | Zueblin Ag | BALLLESS RAILWAY CONSTRUCTION |
WO2002022957A1 (en) * | 2000-09-12 | 2002-03-21 | Max Bögl Bauunternehmung Gmbh & Co Kg | Method and device for correcting the position of a slab construction consisting of precast concrete slabs |
EP1270813A2 (en) * | 2001-06-29 | 2003-01-02 | Pfleiderer Infrastrukturtechnik GmbH & Co. KG | Portal for adjusting the track |
DE202006011142U1 (en) * | 2006-07-19 | 2006-10-05 | Thyssenkrupp Gft Gleistechnik Gmbh | Support system for railway track especially in load transfer sites has the rails supported on concrete support beams via vertical bolts and support plates |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10000227A1 (en) | Permanent way production method comprises producing running section consisting of rails and sleepers, inserting rods into concrete bearing layer, adjusting running section, fixing it to rods, pouring upper bearing layer and adding revetment | |
EP0894898B1 (en) | Construction method for a railway track and device for adjusting the height of the rails as well as for their temporary support | |
DE10102328A1 (en) | Concrete foundation pouring machine for construction of foundation for edge of railway platform uses hopper with strickle board attached to frame sliding along track | |
EP1317582B1 (en) | Method for correcting the position of a slab construction consisting of precast concrete slabs | |
EP1026320B1 (en) | Method for building a ballastless track | |
DE2422942A1 (en) | Railway track construction with steel concrete base support - has anchors projecting from lower surface into foundation plate | |
DE4205192C2 (en) | platform | |
EP0894897A1 (en) | Process for making a track structure | |
EP1048783A1 (en) | Railway track and its construction method | |
EP1061176B1 (en) | Process for equalisation of the vertical displacements of structural track elements of a fixed railway track | |
WO2013011083A2 (en) | Finished-part track for an inclined conveyor system for mining trucks | |
EP3752680A1 (en) | Shoring equipment | |
DE102006047875B3 (en) | Crane track for supporting overhead rail in rail clamp, has filling openings arranged on left and right sides of rail and penetrate in vertical direction of track for guiding filling material in adjustment layer | |
DE19916586A1 (en) | Process for renewing a track system | |
EP1740771B1 (en) | Device for adjusting a track structure and switches | |
DE4324329A1 (en) | Track section-adjusting apparatus | |
DE102004019083A1 (en) | Method for laying rail track on uneven ground especially in tunnels using integral alignment means which are removed after the sleepers are secured with poured concrete | |
DE3419449C2 (en) | ||
EP0905319A2 (en) | Railway track and its construction method | |
DE102011107918B4 (en) | Superstructure cover, arrangement of the superstructure cover, bored pile and plug-in girder, as well as a temporary bridge-free method for the rapid connection of traffic routes and routes of a bridge or underpass structure using a cover construction | |
EP1608813B1 (en) | Method and adjusting means for adjusting the position of a precast concrete slab and a corresponding precast concrete slab | |
CH715209A2 (en) | Track body transition unit between a ballast track section and a ballastless track section. | |
DE19944783A1 (en) | Slab track system | |
DE10064748B4 (en) | Method and device for correcting the position of a slab construction made of precast concrete slabs | |
DE202004006904U1 (en) | Jig for aligning rail track prior to applying ballast has a base plate with height control spindles and with a horizontal adjuster with a tilt support under the base of the rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8364 | No opposition during term of opposition | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |