CN109295972A - 全套管工法预制桩灌注浆和后注浆固结技术 - Google Patents

全套管工法预制桩灌注浆和后注浆固结技术 Download PDF

Info

Publication number
CN109295972A
CN109295972A CN201811091450.0A CN201811091450A CN109295972A CN 109295972 A CN109295972 A CN 109295972A CN 201811091450 A CN201811091450 A CN 201811091450A CN 109295972 A CN109295972 A CN 109295972A
Authority
CN
China
Prior art keywords
prefabricated pile
pile
mortar
full
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811091450.0A
Other languages
English (en)
Chinese (zh)
Inventor
高永光
高云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811091450.0A priority Critical patent/CN109295972A/zh
Publication of CN109295972A publication Critical patent/CN109295972A/zh
Priority to KR1020217010783A priority patent/KR20210058901A/ko
Priority to CN201980000859.3A priority patent/CN110896644B/zh
Priority to US17/277,860 priority patent/US20210348355A1/en
Priority to EP19865349.5A priority patent/EP3839149A4/en
Priority to JP2021515169A priority patent/JP2022502586A/ja
Priority to BR112021004781-6A priority patent/BR112021004781A2/pt
Priority to SG11202102769TA priority patent/SG11202102769TA/en
Priority to PCT/CN2019/091230 priority patent/WO2020062940A1/zh
Priority to CONC2021/0003362A priority patent/CO2021003362A2/es
Priority to PH12021550571A priority patent/PH12021550571A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
CN201811091450.0A 2018-09-25 2018-09-25 全套管工法预制桩灌注浆和后注浆固结技术 Withdrawn CN109295972A (zh)

Priority Applications (11)

Application Number Priority Date Filing Date Title
CN201811091450.0A CN109295972A (zh) 2018-09-25 2018-09-25 全套管工法预制桩灌注浆和后注浆固结技术
PCT/CN2019/091230 WO2020062940A1 (zh) 2018-09-25 2019-06-14 全套管钻孔导引预制桩的注浆固结方法及其预制桩
EP19865349.5A EP3839149A4 (en) 2018-09-25 2019-06-14 INJECTION PACKING METHOD FOR A SURFACED PILE GUIDE WITH PREFABRICATED PILE AND PREFABRICATED PILE THEREFOR
CN201980000859.3A CN110896644B (zh) 2018-09-25 2019-06-14 全套管钻孔导引预制桩的注浆固结方法
US17/277,860 US20210348355A1 (en) 2018-09-25 2019-06-14 Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
KR1020217010783A KR20210058901A (ko) 2018-09-25 2019-06-14 풀 케이싱 천공 가이드조립식 파일의 그라우팅 고결 방법 및 그 조립식 파일
JP2021515169A JP2022502586A (ja) 2018-09-25 2019-06-14 オールケーシング掘削を案内とした既製杭のグラウチング固結方法、及びその既製杭
BR112021004781-6A BR112021004781A2 (pt) 2018-09-25 2019-06-14 Método de consolidação de grauteamento para estaca pré-fabricada de guia de poço de invólucro completo e estaca pré-fabricada para o mesmo
SG11202102769TA SG11202102769TA (en) 2018-09-25 2019-06-14 Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
CONC2021/0003362A CO2021003362A2 (es) 2018-09-25 2021-03-15 Método de consolidación de la lechada para pilote prefabricado con guía de revestimiento de pozo completo y pilote prefabricado para ello
PH12021550571A PH12021550571A1 (en) 2018-09-25 2021-03-15 Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811091450.0A CN109295972A (zh) 2018-09-25 2018-09-25 全套管工法预制桩灌注浆和后注浆固结技术

Publications (1)

Publication Number Publication Date
CN109295972A true CN109295972A (zh) 2019-02-01

Family

ID=65163301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811091450.0A Withdrawn CN109295972A (zh) 2018-09-25 2018-09-25 全套管工法预制桩灌注浆和后注浆固结技术

Country Status (10)

Country Link
US (1) US20210348355A1 (ja)
EP (1) EP3839149A4 (ja)
JP (1) JP2022502586A (ja)
KR (1) KR20210058901A (ja)
CN (1) CN109295972A (ja)
BR (1) BR112021004781A2 (ja)
CO (1) CO2021003362A2 (ja)
PH (1) PH12021550571A1 (ja)
SG (1) SG11202102769TA (ja)
WO (1) WO2020062940A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565639A (zh) * 2019-09-11 2019-12-13 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN110896644A (zh) * 2018-09-25 2020-03-20 高永光 全套管钻孔导引预制桩的注浆固结方法及其预制桩
WO2020062940A1 (zh) * 2018-09-25 2020-04-02 高永光 全套管钻孔导引预制桩的注浆固结方法及其预制桩
CN114753376A (zh) * 2022-03-28 2022-07-15 中电建十一局工程有限公司 一种砂砾石地层深基坑开挖支护浆方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997620A (zh) * 2020-07-28 2020-11-27 中铁第四勘察设计院集团有限公司 一种岩溶塌陷区的注浆施工系统及方法
CN113250238A (zh) * 2021-05-19 2021-08-13 中交第三航务工程局有限公司 一种基于松动圈理论的海上超大直径单桩的嵌岩施工方法
CN113309089A (zh) * 2021-06-11 2021-08-27 河北省水利规划设计研究院有限公司 预制空心桩及其取土植桩施工方法
CN114562328B (zh) * 2022-04-02 2022-12-02 中国矿业大学 基岩顶界松散层注浆充填控制地表沉降方法
CN115075238A (zh) * 2022-06-13 2022-09-20 陕西正诚路桥工程研究院有限公司 基于水上作业平台的钻孔桩施工中的加固方法
CN115288212B (zh) * 2022-07-05 2023-05-16 湖北工业大学 一种既有桩墙的光纤植入装置及植入方法
CN115233685B (zh) * 2022-08-01 2023-07-14 中交四航工程研究院有限公司 一种维持桩基水平刚度的可循环注浆装置及其施工方法
CN115323999B (zh) * 2022-09-14 2024-02-27 赤峰中色白音诺尔矿业有限公司 一种尾矿库涵管分段注浆施工装置及其施工方法
CN115478560A (zh) * 2022-09-28 2022-12-16 苏州枫石堂工程科技有限公司 一种墙体开裂注浆加固方法
KR102602249B1 (ko) 2023-02-14 2023-11-16 우창건설 주식회사 케이싱용 phc파일 근입 가이드장치 및 이를 이용한 시공 방법

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1865652A (en) * 1929-09-20 1932-07-05 Raymond Concrete Pile Co Method and apparatus for placing concrete in piles
JPH05132930A (ja) * 1991-11-07 1993-05-28 Jiototsupu:Kk ドレーン層付き基礎杭の造成方法
NL9301176A (nl) * 1993-07-05 1995-02-01 Verstraeten Beheersmij Bv Werkwijze voor het vormen van een fundatiepaal in de grond onder toepassing van een geprefabriceerde paalschacht.
JPH1171758A (ja) * 1997-08-27 1999-03-16 Nippon Steel Corp 岩盤への杭の打ち込み工法
JP2000129669A (ja) * 1998-10-22 2000-05-09 Asahi Chem Ind Co Ltd 既製杭の接続方法
JP2000257062A (ja) * 1999-03-05 2000-09-19 Taisei Corp 鋼管杭建込み方法
JP2002155531A (ja) * 2000-11-21 2002-05-31 Yoshitada Miyake 杭の埋設方法
US20050019104A1 (en) * 2003-07-23 2005-01-27 Derald Christians Soil stabilization and pile formation method
JP4667479B2 (ja) * 2008-03-03 2011-04-13 中国電力株式会社 杭着脱構造及び杭施工方法
KR100964796B1 (ko) * 2010-02-26 2010-06-21 송기용 암반 매립 일체화 구조의 강관-콘크리트 복합 말뚝 시공 방법 및 말뚝 구조물
CN102002945B (zh) * 2010-03-25 2013-12-25 中国京冶工程技术有限公司 带桩靴的囊式防腐装置及使用该装置的防腐桩及施工方法
DK2527539T3 (da) 2011-05-27 2013-09-30 Bauer Maschinen Gmbh Undervands-boreindretning og fremgangsmåde til anbringelse af et funderingselement i en havbund
EP2650446B1 (de) 2012-04-12 2014-06-18 Herrenknecht AG Verfahren zur Herstellung einer Gründung für eine Offshore-Anlage
CN102691296B (zh) * 2012-05-22 2015-02-11 广州市建筑科学研究院有限公司 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法
JP6260931B2 (ja) * 2013-12-04 2018-01-17 株式会社大林組 鋼管杭及びその埋込み方法
EP2930275B1 (de) 2014-04-08 2017-12-20 Herrenknecht AG System und Verfahren zum Herstellen einer Gründung für ein Bauwerk im Wasser
CN105442594A (zh) * 2015-12-04 2016-03-30 荣盛建设工程有限公司 内置压浆管预应力空心方桩扩孔压浆施工工艺
CN107794925A (zh) * 2017-10-31 2018-03-13 浙江大学城市学院 一种预留注浆管路的后注浆现浇薄壁管桩及施工方法
CN109295972A (zh) * 2018-09-25 2019-02-01 高永光 全套管工法预制桩灌注浆和后注浆固结技术

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110896644A (zh) * 2018-09-25 2020-03-20 高永光 全套管钻孔导引预制桩的注浆固结方法及其预制桩
WO2020062940A1 (zh) * 2018-09-25 2020-04-02 高永光 全套管钻孔导引预制桩的注浆固结方法及其预制桩
CN110896644B (zh) * 2018-09-25 2021-04-09 高永光 全套管钻孔导引预制桩的注浆固结方法
CN110565639A (zh) * 2019-09-11 2019-12-13 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN110565639B (zh) * 2019-09-11 2021-03-23 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN114753376A (zh) * 2022-03-28 2022-07-15 中电建十一局工程有限公司 一种砂砾石地层深基坑开挖支护浆方法

Also Published As

Publication number Publication date
US20210348355A1 (en) 2021-11-11
SG11202102769TA (en) 2021-04-29
BR112021004781A2 (pt) 2021-10-13
CO2021003362A2 (es) 2021-07-19
EP3839149A1 (en) 2021-06-23
PH12021550571A1 (en) 2021-10-25
EP3839149A4 (en) 2022-04-20
KR20210058901A (ko) 2021-05-24
WO2020062940A1 (zh) 2020-04-02
JP2022502586A (ja) 2022-01-11

Similar Documents

Publication Publication Date Title
CN109295972A (zh) 全套管工法预制桩灌注浆和后注浆固结技术
CN103967031B (zh) 一种加固地基的沉箱与桩组合基础及其施工方法
CN101962958B (zh) 一种沉井与桩组成的桥梁复合基础及施工方法
CN101591914B (zh) 一种用灌注桩和搅拌桩咬合的基坑支护结构的施工方法
CN104499479B (zh) 一种穿越砂砾石回填层的挖孔桩施工方法
CN101130991A (zh) 基于基床升浆的沉箱围堰及其施工方法
WO2015135471A1 (zh) 水上平台结构水底固定用空心筒墩及其安装施工方法
CN203213136U (zh) 一种加固地基的沉箱与桩组合基础
CN107386285A (zh) 一种新型钢管桩基岩钻孔锚固方法
CN107514006A (zh) 一种用于浅海或浅河桥梁基础的筑岛作业施工方法
CN101260664A (zh) 一种软土地基大型钢浮箱闸首的施工方法
CN103911993B (zh) 一种pha锚杆及其施工方法
CN105714748A (zh) 一种碎石沙土层中的调压井开挖施工方法
CN204311435U (zh) 一种旋挖咬合钢筋混凝土防渗墙
CN102002945A (zh) 带桩靴的囊式防腐装置及使用该装置的防腐桩及施工方法
CN107338790A (zh) 旋喷搅拌复合桩施工方法
CN108360542A (zh) 桩间止水帷幕结合桩侧袖阀管注浆止水施工方法
CN201459749U (zh) 一种深水钢管桩施工平台稳定结构
CN106192987B (zh) 一种对桩周边破碎地质加固的施工方法
CN104563100A (zh) 水泥土搅拌桩后植压灌桩支护结构及施工方法
CN211113714U (zh) 一种适用于岩石地基的薄壁全围嵌入式基础
CN110424441A (zh) 一种适用于岩石地基的薄壁全围嵌入式基础及其施工方法
CN216664152U (zh) 锚碇支护的封水结构
CN102444137B (zh) 一种真空预压泥浆封闭墙的施工方法
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 102600 Beijing Daxing District Kangzhuang Road No. 9 Central Railway Fifth Courtyard District B Building 703

Applicant after: Gao Yongguang

Applicant after: Gao Yunfei

Address before: 100012 Huayu City, Tiejian, China 9-1-302, Shuiban South Street, Chaoyang District, Beijing

Applicant before: Gao Yongguang

Applicant before: Gao Yunfei

CB02 Change of applicant information
WW01 Invention patent application withdrawn after publication

Application publication date: 20190201

WW01 Invention patent application withdrawn after publication