SG11202102769TA - Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor - Google Patents
Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile thereforInfo
- Publication number
- SG11202102769TA SG11202102769TA SG11202102769TA SG11202102769TA SG11202102769TA SG 11202102769T A SG11202102769T A SG 11202102769TA SG 11202102769T A SG11202102769T A SG 11202102769TA SG 11202102769T A SG11202102769T A SG 11202102769TA SG 11202102769T A SG11202102769T A SG 11202102769TA
- Authority
- SG
- Singapore
- Prior art keywords
- prefabricated pile
- therefor
- consolidation method
- full casing
- grouting consolidation
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D11/00—Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/08—Sinking workpieces into water or soil inasmuch as not provided for elsewhere
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811091450.0A CN109295972A (zh) | 2018-09-25 | 2018-09-25 | 全套管工法预制桩灌注浆和后注浆固结技术 |
PCT/CN2019/091230 WO2020062940A1 (zh) | 2018-09-25 | 2019-06-14 | 全套管钻孔导引预制桩的注浆固结方法及其预制桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
SG11202102769TA true SG11202102769TA (en) | 2021-04-29 |
Family
ID=65163301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG11202102769TA SG11202102769TA (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
Country Status (10)
Country | Link |
---|---|
US (1) | US20210348355A1 (ja) |
EP (1) | EP3839149A4 (ja) |
JP (1) | JP2022502586A (ja) |
KR (1) | KR20210058901A (ja) |
CN (1) | CN109295972A (ja) |
BR (1) | BR112021004781A2 (ja) |
CO (1) | CO2021003362A2 (ja) |
PH (1) | PH12021550571A1 (ja) |
SG (1) | SG11202102769TA (ja) |
WO (1) | WO2020062940A1 (ja) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110896644B (zh) * | 2018-09-25 | 2021-04-09 | 高永光 | 全套管钻孔导引预制桩的注浆固结方法 |
CN109295972A (zh) * | 2018-09-25 | 2019-02-01 | 高永光 | 全套管工法预制桩灌注浆和后注浆固结技术 |
CN110565639B (zh) * | 2019-09-11 | 2021-03-23 | 中船第九设计研究院工程有限公司 | 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法 |
CN111997620A (zh) * | 2020-07-28 | 2020-11-27 | 中铁第四勘察设计院集团有限公司 | 一种岩溶塌陷区的注浆施工系统及方法 |
CN113250238A (zh) * | 2021-05-19 | 2021-08-13 | 中交第三航务工程局有限公司 | 一种基于松动圈理论的海上超大直径单桩的嵌岩施工方法 |
CN113309089A (zh) * | 2021-06-11 | 2021-08-27 | 河北省水利规划设计研究院有限公司 | 预制空心桩及其取土植桩施工方法 |
CN114753376A (zh) * | 2022-03-28 | 2022-07-15 | 中电建十一局工程有限公司 | 一种砂砾石地层深基坑开挖支护浆方法 |
CN114562328B (zh) * | 2022-04-02 | 2022-12-02 | 中国矿业大学 | 基岩顶界松散层注浆充填控制地表沉降方法 |
CN115075238A (zh) * | 2022-06-13 | 2022-09-20 | 陕西正诚路桥工程研究院有限公司 | 基于水上作业平台的钻孔桩施工中的加固方法 |
CN115288212B (zh) * | 2022-07-05 | 2023-05-16 | 湖北工业大学 | 一种既有桩墙的光纤植入装置及植入方法 |
CN115233685B (zh) * | 2022-08-01 | 2023-07-14 | 中交四航工程研究院有限公司 | 一种维持桩基水平刚度的可循环注浆装置及其施工方法 |
CN115323999B (zh) * | 2022-09-14 | 2024-02-27 | 赤峰中色白音诺尔矿业有限公司 | 一种尾矿库涵管分段注浆施工装置及其施工方法 |
CN115478560A (zh) * | 2022-09-28 | 2022-12-16 | 苏州枫石堂工程科技有限公司 | 一种墙体开裂注浆加固方法 |
KR102602249B1 (ko) | 2023-02-14 | 2023-11-16 | 우창건설 주식회사 | 케이싱용 phc파일 근입 가이드장치 및 이를 이용한 시공 방법 |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1865652A (en) * | 1929-09-20 | 1932-07-05 | Raymond Concrete Pile Co | Method and apparatus for placing concrete in piles |
JPH05132930A (ja) * | 1991-11-07 | 1993-05-28 | Jiototsupu:Kk | ドレーン層付き基礎杭の造成方法 |
NL9301176A (nl) * | 1993-07-05 | 1995-02-01 | Verstraeten Beheersmij Bv | Werkwijze voor het vormen van een fundatiepaal in de grond onder toepassing van een geprefabriceerde paalschacht. |
JPH1171758A (ja) * | 1997-08-27 | 1999-03-16 | Nippon Steel Corp | 岩盤への杭の打ち込み工法 |
JP2000129669A (ja) * | 1998-10-22 | 2000-05-09 | Asahi Chem Ind Co Ltd | 既製杭の接続方法 |
JP2000257062A (ja) * | 1999-03-05 | 2000-09-19 | Taisei Corp | 鋼管杭建込み方法 |
JP2002155531A (ja) * | 2000-11-21 | 2002-05-31 | Yoshitada Miyake | 杭の埋設方法 |
US20050019104A1 (en) * | 2003-07-23 | 2005-01-27 | Derald Christians | Soil stabilization and pile formation method |
JP4667479B2 (ja) * | 2008-03-03 | 2011-04-13 | 中国電力株式会社 | 杭着脱構造及び杭施工方法 |
KR100964796B1 (ko) * | 2010-02-26 | 2010-06-21 | 송기용 | 암반 매립 일체화 구조의 강관-콘크리트 복합 말뚝 시공 방법 및 말뚝 구조물 |
CN102002945B (zh) * | 2010-03-25 | 2013-12-25 | 中国京冶工程技术有限公司 | 带桩靴的囊式防腐装置及使用该装置的防腐桩及施工方法 |
DK2527539T3 (da) | 2011-05-27 | 2013-09-30 | Bauer Maschinen Gmbh | Undervands-boreindretning og fremgangsmåde til anbringelse af et funderingselement i en havbund |
EP2650446B1 (de) | 2012-04-12 | 2014-06-18 | Herrenknecht AG | Verfahren zur Herstellung einer Gründung für eine Offshore-Anlage |
CN102691296B (zh) * | 2012-05-22 | 2015-02-11 | 广州市建筑科学研究院有限公司 | 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法 |
JP6260931B2 (ja) * | 2013-12-04 | 2018-01-17 | 株式会社大林組 | 鋼管杭及びその埋込み方法 |
EP2930275B1 (de) | 2014-04-08 | 2017-12-20 | Herrenknecht AG | System und Verfahren zum Herstellen einer Gründung für ein Bauwerk im Wasser |
CN105442594A (zh) * | 2015-12-04 | 2016-03-30 | 荣盛建设工程有限公司 | 内置压浆管预应力空心方桩扩孔压浆施工工艺 |
CN107794925A (zh) * | 2017-10-31 | 2018-03-13 | 浙江大学城市学院 | 一种预留注浆管路的后注浆现浇薄壁管桩及施工方法 |
CN109295972A (zh) * | 2018-09-25 | 2019-02-01 | 高永光 | 全套管工法预制桩灌注浆和后注浆固结技术 |
-
2018
- 2018-09-25 CN CN201811091450.0A patent/CN109295972A/zh not_active Withdrawn
-
2019
- 2019-06-14 KR KR1020217010783A patent/KR20210058901A/ko not_active Application Discontinuation
- 2019-06-14 BR BR112021004781-6A patent/BR112021004781A2/pt not_active IP Right Cessation
- 2019-06-14 JP JP2021515169A patent/JP2022502586A/ja active Pending
- 2019-06-14 US US17/277,860 patent/US20210348355A1/en not_active Abandoned
- 2019-06-14 WO PCT/CN2019/091230 patent/WO2020062940A1/zh active Application Filing
- 2019-06-14 SG SG11202102769TA patent/SG11202102769TA/en unknown
- 2019-06-14 EP EP19865349.5A patent/EP3839149A4/en active Pending
-
2021
- 2021-03-15 CO CONC2021/0003362A patent/CO2021003362A2/es unknown
- 2021-03-15 PH PH12021550571A patent/PH12021550571A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
US20210348355A1 (en) | 2021-11-11 |
BR112021004781A2 (pt) | 2021-10-13 |
CO2021003362A2 (es) | 2021-07-19 |
EP3839149A1 (en) | 2021-06-23 |
CN109295972A (zh) | 2019-02-01 |
PH12021550571A1 (en) | 2021-10-25 |
EP3839149A4 (en) | 2022-04-20 |
KR20210058901A (ko) | 2021-05-24 |
WO2020062940A1 (zh) | 2020-04-02 |
JP2022502586A (ja) | 2022-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG11202102769TA (en) | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor | |
ZA202100222B (en) | Prefabricated wall and assembly structure for prefabricated building, and construction method therefor | |
ZA202005442B (en) | Aquifer segmented grouting curtain water-preserved mining method | |
HUE061407T2 (hu) | Mobil elektromos áramgenerálás felszín alatti giológiai alakzatok hidraulikus repesztésére | |
BR112014008844A2 (pt) | método de executar uma operação de fraturamento sobre uma perfuração de poço de uma formação subterrânea, método de executar uma operação de estimulação para um poço ter um reservatório posicionado em uma formação subterrânea, método de executar uma operação de estimulação para um poço tendo um reservatório posicionado em uma formação subterrânea, e sistema para realizar uma operação de um estimulação para um local de poço tendo perfuração de poço penetrando uma formação subterrânea, a formação subterrânea tendo descontinuidades nela | |
HUE064862T2 (hu) | Eljárás a hidraulikus repedés magasság továbbfejlesztett megtervezésére egy földalatti rétegzett kõzet képzõdményben | |
GB2553471B (en) | One trip wellbore cleanup and setting a subterranean tool method | |
PL2836680T3 (pl) | Sposób wiercenia otworów w materiale ziemnym bądź skalnym i ustalania kotwy w wierconym otworze oraz urządzenie do tego sposobu | |
EP3155178C0 (en) | METHOD AND APPARATUS FOR PLACING AN UNDERGROUND CURTAIN BELOW THE SURFACE OF THE EARTH | |
PT3259405T (pt) | Procedimento para construção de uma fundação integrando uma mono-estaca de aço e uma peça de betão, e fundação associada para trabalho de construção | |
PL3249105T3 (pl) | Prefabrykowany betonowy pal fundamentowy, sposób jego iniekcji i wytwarzania | |
GB2576826B (en) | A siphonic underground reservoir water changing device and method | |
SG11201610580TA (en) | Reinforced concrete wall using triangular rebar net arrangement and method for installing same | |
GB2587110B (en) | Designing a wellbore cement sheath in compacting or subsiding formations | |
GB201602227D0 (en) | Method and apparatus for securing a foundation before grouting operations | |
SG11202003085XA (en) | Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile | |
EP3111253A4 (en) | Method for locating seismic diffractors in subsurface formations from a wellbore | |
NO344994B1 (en) | A wellbore fluid and a method for emplacing a wellbore fluid through an earthen formation | |
PL3091173T3 (pl) | Urządzenie wiertnicze do wytwarzania lub poszerzania otworu w gruncie i sposób sterowania napędem posuwu takiego urządzenia wiertniczego | |
KR101715359B9 (ko) | 콘크리트 충전 강관기둥을 이용한 기존 건축물의 내진보강 공법 | |
EP3803053C0 (en) | ROCK BOLT DRILLING APPARATUS AND METHOD RELATING TO A ROCK BOLT DRILLING APPARATUS | |
HUE044288T2 (hu) | Fúró- és betonozó berendezés és eljárás földbe mélyített betonoszlopok készítésére | |
GB2582271B (en) | Embedded subsea foundations | |
HUE063699T2 (hu) | Gyenge ásványi talajból álló aljzat tömörítési módszere | |
GB2571631B (en) | A subterranean excavation machine |