PH12021550571A1 - Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor - Google Patents

Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor

Info

Publication number
PH12021550571A1
PH12021550571A1 PH12021550571A PH12021550571A PH12021550571A1 PH 12021550571 A1 PH12021550571 A1 PH 12021550571A1 PH 12021550571 A PH12021550571 A PH 12021550571A PH 12021550571 A PH12021550571 A PH 12021550571A PH 12021550571 A1 PH12021550571 A1 PH 12021550571A1
Authority
PH
Philippines
Prior art keywords
borehole
prefabricated pile
pile
casing
pile body
Prior art date
Application number
PH12021550571A
Other languages
English (en)
Inventor
Yongguang Gao
Yunfei Gao
Original Assignee
Beijing Kuruihengji Construction Tech Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kuruihengji Construction Tech Development Co Ltd filed Critical Beijing Kuruihengji Construction Tech Development Co Ltd
Publication of PH12021550571A1 publication Critical patent/PH12021550571A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
PH12021550571A 2018-09-25 2021-03-15 Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor PH12021550571A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201811091450.0A CN109295972A (zh) 2018-09-25 2018-09-25 全套管工法预制桩灌注浆和后注浆固结技术
PCT/CN2019/091230 WO2020062940A1 (zh) 2018-09-25 2019-06-14 全套管钻孔导引预制桩的注浆固结方法及其预制桩

Publications (1)

Publication Number Publication Date
PH12021550571A1 true PH12021550571A1 (en) 2021-10-25

Family

ID=65163301

Family Applications (1)

Application Number Title Priority Date Filing Date
PH12021550571A PH12021550571A1 (en) 2018-09-25 2021-03-15 Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor

Country Status (10)

Country Link
US (1) US20210348355A1 (ja)
EP (1) EP3839149A4 (ja)
JP (1) JP2022502586A (ja)
KR (1) KR20210058901A (ja)
CN (1) CN109295972A (ja)
BR (1) BR112021004781A2 (ja)
CO (1) CO2021003362A2 (ja)
PH (1) PH12021550571A1 (ja)
SG (1) SG11202102769TA (ja)
WO (1) WO2020062940A1 (ja)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110896644B (zh) * 2018-09-25 2021-04-09 高永光 全套管钻孔导引预制桩的注浆固结方法
CN109295972A (zh) * 2018-09-25 2019-02-01 高永光 全套管工法预制桩灌注浆和后注浆固结技术
CN110565639B (zh) * 2019-09-11 2021-03-23 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN111997620A (zh) * 2020-07-28 2020-11-27 中铁第四勘察设计院集团有限公司 一种岩溶塌陷区的注浆施工系统及方法
CN113250238A (zh) * 2021-05-19 2021-08-13 中交第三航务工程局有限公司 一种基于松动圈理论的海上超大直径单桩的嵌岩施工方法
CN113309089A (zh) * 2021-06-11 2021-08-27 河北省水利规划设计研究院有限公司 预制空心桩及其取土植桩施工方法
CN114753376A (zh) * 2022-03-28 2022-07-15 中电建十一局工程有限公司 一种砂砾石地层深基坑开挖支护浆方法
CN114562328B (zh) * 2022-04-02 2022-12-02 中国矿业大学 基岩顶界松散层注浆充填控制地表沉降方法
CN115075238A (zh) * 2022-06-13 2022-09-20 陕西正诚路桥工程研究院有限公司 基于水上作业平台的钻孔桩施工中的加固方法
CN115288212B (zh) * 2022-07-05 2023-05-16 湖北工业大学 一种既有桩墙的光纤植入装置及植入方法
CN115233685B (zh) * 2022-08-01 2023-07-14 中交四航工程研究院有限公司 一种维持桩基水平刚度的可循环注浆装置及其施工方法
CN115323999B (zh) * 2022-09-14 2024-02-27 赤峰中色白音诺尔矿业有限公司 一种尾矿库涵管分段注浆施工装置及其施工方法
CN115478560A (zh) * 2022-09-28 2022-12-16 苏州枫石堂工程科技有限公司 一种墙体开裂注浆加固方法
KR102602249B1 (ko) 2023-02-14 2023-11-16 우창건설 주식회사 케이싱용 phc파일 근입 가이드장치 및 이를 이용한 시공 방법

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1865652A (en) * 1929-09-20 1932-07-05 Raymond Concrete Pile Co Method and apparatus for placing concrete in piles
JPH05132930A (ja) * 1991-11-07 1993-05-28 Jiototsupu:Kk ドレーン層付き基礎杭の造成方法
NL9301176A (nl) * 1993-07-05 1995-02-01 Verstraeten Beheersmij Bv Werkwijze voor het vormen van een fundatiepaal in de grond onder toepassing van een geprefabriceerde paalschacht.
JPH1171758A (ja) * 1997-08-27 1999-03-16 Nippon Steel Corp 岩盤への杭の打ち込み工法
JP2000129669A (ja) * 1998-10-22 2000-05-09 Asahi Chem Ind Co Ltd 既製杭の接続方法
JP2000257062A (ja) * 1999-03-05 2000-09-19 Taisei Corp 鋼管杭建込み方法
JP2002155531A (ja) * 2000-11-21 2002-05-31 Yoshitada Miyake 杭の埋設方法
US20050019104A1 (en) * 2003-07-23 2005-01-27 Derald Christians Soil stabilization and pile formation method
JP4667479B2 (ja) * 2008-03-03 2011-04-13 中国電力株式会社 杭着脱構造及び杭施工方法
KR100964796B1 (ko) * 2010-02-26 2010-06-21 송기용 암반 매립 일체화 구조의 강관-콘크리트 복합 말뚝 시공 방법 및 말뚝 구조물
CN102002945B (zh) * 2010-03-25 2013-12-25 中国京冶工程技术有限公司 带桩靴的囊式防腐装置及使用该装置的防腐桩及施工方法
DK2527539T3 (da) 2011-05-27 2013-09-30 Bauer Maschinen Gmbh Undervands-boreindretning og fremgangsmåde til anbringelse af et funderingselement i en havbund
EP2650446B1 (de) 2012-04-12 2014-06-18 Herrenknecht AG Verfahren zur Herstellung einer Gründung für eine Offshore-Anlage
CN102691296B (zh) * 2012-05-22 2015-02-11 广州市建筑科学研究院有限公司 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法
JP6260931B2 (ja) * 2013-12-04 2018-01-17 株式会社大林組 鋼管杭及びその埋込み方法
EP2930275B1 (de) 2014-04-08 2017-12-20 Herrenknecht AG System und Verfahren zum Herstellen einer Gründung für ein Bauwerk im Wasser
CN105442594A (zh) * 2015-12-04 2016-03-30 荣盛建设工程有限公司 内置压浆管预应力空心方桩扩孔压浆施工工艺
CN107794925A (zh) * 2017-10-31 2018-03-13 浙江大学城市学院 一种预留注浆管路的后注浆现浇薄壁管桩及施工方法
CN109295972A (zh) * 2018-09-25 2019-02-01 高永光 全套管工法预制桩灌注浆和后注浆固结技术

Also Published As

Publication number Publication date
US20210348355A1 (en) 2021-11-11
SG11202102769TA (en) 2021-04-29
BR112021004781A2 (pt) 2021-10-13
CO2021003362A2 (es) 2021-07-19
EP3839149A1 (en) 2021-06-23
CN109295972A (zh) 2019-02-01
EP3839149A4 (en) 2022-04-20
KR20210058901A (ko) 2021-05-24
WO2020062940A1 (zh) 2020-04-02
JP2022502586A (ja) 2022-01-11

Similar Documents

Publication Publication Date Title
PH12021550571A1 (en) Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
CN107401393B (zh) 排水采气一体化采空区瓦斯抽采井井身结构及其施工方法
CN103867119B (zh) 煤储层完井改造方法
GB2444212A (en) Method for drilling with a wellbore liner
GB201317567D0 (en) Managed pressure drilling withrig heave compensation
KR101559962B1 (ko) 파일을 이용한 지중벽체 시공방법
AU2013221032B2 (en) Method for establishment of a new well path from an existing well
CN110185413A (zh) 一种在易塌孔地层形成稳定注浆通道的方法
Aleksandrovich Bottomhole formation zone completion through ultra deep multibranch channels: experimental research of a new technology
US8430172B1 (en) Buoyant ball assisted hydrocarbon lift system and method
US20140216753A1 (en) Bernoulli Assisted Hydrocarbon Lift System and Method to Prohibit Water-Coning
RU2379492C2 (ru) Способ разработки при расконсервации скважин и нефтяной залежи в целом
CN101245597A (zh) 护壁式钻孔灌注桩施工方法及其桩机
RU131061U1 (ru) Технологический комплекс для разбуривания и депрессионной очистки песчаной пробки
CN111335368B (zh) 一种测斜管安装方法
JPH05112927A (ja) 地下水の被圧化における地盤改良工法および注入管のパツカー装置
CN209482334U (zh) 增加抗滑桩施工安全度的临时降低边坡地下水装置
RU2524089C1 (ru) Способ строительства нефтедобывающей скважины
CN105625482B (zh) 地下工程基础底板上的布孔方式及其应用
RU2008132763A (ru) Бурение и заканчивание скважин с малыми боковыми стволами
ITMI20002641A1 (it) Metodo migliorato per la perforazione della fase iniziale di pozzi petroliferi in acque profonde con testa pozzo sottomarina
RU2392382C2 (ru) Способ усиления водонасыщенных грунтов
RU172738U1 (ru) Устройство для изготовления буронабивной сваи
RU2558090C1 (ru) Способ эксплуатации горизонтальной скважины
CN204780856U (zh) 导孔预埋管注浆结构