PH12021550571A1 - Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor - Google Patents
Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile thereforInfo
- Publication number
- PH12021550571A1 PH12021550571A1 PH12021550571A PH12021550571A PH12021550571A1 PH 12021550571 A1 PH12021550571 A1 PH 12021550571A1 PH 12021550571 A PH12021550571 A PH 12021550571A PH 12021550571 A PH12021550571 A PH 12021550571A PH 12021550571 A1 PH12021550571 A1 PH 12021550571A1
- Authority
- PH
- Philippines
- Prior art keywords
- borehole
- prefabricated pile
- pile
- casing
- pile body
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D11/00—Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/08—Sinking workpieces into water or soil inasmuch as not provided for elsewhere
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
A grouting consolidation method for a full casing borehole guide prefabricated pile, comprising the following steps: S1, driving a drilling rig carrying a casing (1) to perform borehole construction, the borehole construction being performed to a preset hole depth to form a borehole (2); S2. the casing (1) being housed in the borehole (2); S3. implanting a prefabricated pile (4) into the borehole (2) so that the prefabricated pile (4) reaches a hole bottom of the borehole (2); S4. injecting a slurry (3) into the borehole (2); S5. pulling out the casing (1) so that the prefabricated pile (4) and an inner cavity of the borehole (2) are fixed and cemented into an integrated structure. Also provided is a prefabricated pile, comprising a pile body and a grouting channel (5) provided on the pile body, wherein a liquid inlet end (11) of the grouting channel (5) extends out from an upper end surface of the pile body and a liquid outlet end (12) of the grouting channel (5) extends out from a lower end surface of the pile body and/or a side surface of the pile body.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811091450.0A CN109295972A (en) | 2018-09-25 | 2018-09-25 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
PCT/CN2019/091230 WO2020062940A1 (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
Publications (1)
Publication Number | Publication Date |
---|---|
PH12021550571A1 true PH12021550571A1 (en) | 2021-10-25 |
Family
ID=65163301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PH12021550571A PH12021550571A1 (en) | 2018-09-25 | 2021-03-15 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
Country Status (9)
Country | Link |
---|---|
US (1) | US20210348355A1 (en) |
EP (1) | EP3839149A4 (en) |
JP (1) | JP2022502586A (en) |
KR (1) | KR20210058901A (en) |
CN (1) | CN109295972A (en) |
CO (1) | CO2021003362A2 (en) |
PH (1) | PH12021550571A1 (en) |
SG (1) | SG11202102769TA (en) |
WO (1) | WO2020062940A1 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295972A (en) * | 2018-09-25 | 2019-02-01 | 高永光 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
CN110896644B (en) * | 2018-09-25 | 2021-04-09 | 高永光 | Grouting consolidation method for full-casing drilling guide precast pile |
CN110565639B (en) * | 2019-09-11 | 2021-03-23 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN111997620A (en) * | 2020-07-28 | 2020-11-27 | 中铁第四勘察设计院集团有限公司 | Grouting construction system and method for karst collapse area |
CN113250238A (en) * | 2021-05-19 | 2021-08-13 | 中交第三航务工程局有限公司 | Rock-socketed construction method of marine ultra-large-diameter single pile based on loosening ring theory |
CN113309089A (en) * | 2021-06-11 | 2021-08-27 | 河北省水利规划设计研究院有限公司 | Prefabricated hollow pile and construction method for taking soil and planting pile |
CN114753376A (en) * | 2022-03-28 | 2022-07-15 | 中电建十一局工程有限公司 | Method for excavating supporting slurry for deep foundation pit in gravel stratum |
CN114562328B (en) * | 2022-04-02 | 2022-12-02 | 中国矿业大学 | Method for controlling surface subsidence by grouting and filling unconsolidated layer of bedrock top boundary |
CN115075238A (en) * | 2022-06-13 | 2022-09-20 | 陕西正诚路桥工程研究院有限公司 | Reinforcing method in bored pile construction based on overwater operation platform |
CN115288212B (en) * | 2022-07-05 | 2023-05-16 | 湖北工业大学 | Optical fiber implantation device and implantation method for existing pile wall |
CN115233685B (en) * | 2022-08-01 | 2023-07-14 | 中交四航工程研究院有限公司 | Recyclable grouting device for maintaining horizontal rigidity of pile foundation and construction method thereof |
CN115323999B (en) * | 2022-09-14 | 2024-02-27 | 赤峰中色白音诺尔矿业有限公司 | Sectional grouting construction device for culvert pipes of tailing pond and construction method thereof |
CN115478560A (en) * | 2022-09-28 | 2022-12-16 | 苏州枫石堂工程科技有限公司 | Wall cracking grouting reinforcement method |
KR102602249B1 (en) | 2023-02-14 | 2023-11-16 | 우창건설 주식회사 | Apparatus for guiding the casing and construction method using the same |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1865652A (en) * | 1929-09-20 | 1932-07-05 | Raymond Concrete Pile Co | Method and apparatus for placing concrete in piles |
JPH05132930A (en) * | 1991-11-07 | 1993-05-28 | Jiototsupu:Kk | Developing method of foundation pile with drain layer |
NL9301176A (en) * | 1993-07-05 | 1995-02-01 | Verstraeten Beheersmij Bv | Method for forming a foundation pile in the ground using a prefabricated pile shaft. |
JPH1171758A (en) * | 1997-08-27 | 1999-03-16 | Nippon Steel Corp | Method for driving pile to rock mass |
JP2000129669A (en) * | 1998-10-22 | 2000-05-09 | Asahi Chem Ind Co Ltd | Connecting method of prefabricated pile |
JP2000257062A (en) * | 1999-03-05 | 2000-09-19 | Taisei Corp | Steel pipe pile pitching method |
JP2002155531A (en) * | 2000-11-21 | 2002-05-31 | Yoshitada Miyake | Pile burial method |
US20050019104A1 (en) * | 2003-07-23 | 2005-01-27 | Derald Christians | Soil stabilization and pile formation method |
JP4667479B2 (en) * | 2008-03-03 | 2011-04-13 | 中国電力株式会社 | Pile attachment / detachment structure and pile construction method |
KR100964796B1 (en) * | 2010-02-26 | 2010-06-21 | 송기용 | Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction |
CN102002945B (en) * | 2010-03-25 | 2013-12-25 | 中国京冶工程技术有限公司 | Capsule type anti-corrosion device with pile shoe and anti-corrosion pile using same and construction method |
EP2527539B1 (en) | 2011-05-27 | 2013-09-11 | BAUER Maschinen GmbH | Submarine drilling assembly and method for inserting a foundation element into the soil of a body of water |
EP2650446B1 (en) | 2012-04-12 | 2014-06-18 | Herrenknecht AG | Method of creating a foundation for a offshore structure |
CN102691296B (en) * | 2012-05-22 | 2015-02-11 | 广州市建筑科学研究院有限公司 | Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof |
JP6260931B2 (en) * | 2013-12-04 | 2018-01-17 | 株式会社大林組 | Steel pipe pile and its embedding method |
EP2930275B1 (en) | 2014-04-08 | 2017-12-20 | Herrenknecht AG | System and method for producing a foundation for a building in water |
CN105442594A (en) * | 2015-12-04 | 2016-03-30 | 荣盛建设工程有限公司 | Hole reaming mud-jacking construction technology for prestress hollow square pile with built-in mud-jacking pipe |
CN107794925A (en) * | 2017-10-31 | 2018-03-13 | 浙江大学城市学院 | The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline |
CN109295972A (en) * | 2018-09-25 | 2019-02-01 | 高永光 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
-
2018
- 2018-09-25 CN CN201811091450.0A patent/CN109295972A/en not_active Withdrawn
-
2019
- 2019-06-14 WO PCT/CN2019/091230 patent/WO2020062940A1/en active Application Filing
- 2019-06-14 SG SG11202102769TA patent/SG11202102769TA/en unknown
- 2019-06-14 JP JP2021515169A patent/JP2022502586A/en active Pending
- 2019-06-14 KR KR1020217010783A patent/KR20210058901A/en not_active Application Discontinuation
- 2019-06-14 US US17/277,860 patent/US20210348355A1/en not_active Abandoned
- 2019-06-14 EP EP19865349.5A patent/EP3839149A4/en active Pending
-
2021
- 2021-03-15 PH PH12021550571A patent/PH12021550571A1/en unknown
- 2021-03-15 CO CONC2021/0003362A patent/CO2021003362A2/en unknown
Also Published As
Publication number | Publication date |
---|---|
CO2021003362A2 (en) | 2021-07-19 |
EP3839149A1 (en) | 2021-06-23 |
CN109295972A (en) | 2019-02-01 |
EP3839149A4 (en) | 2022-04-20 |
US20210348355A1 (en) | 2021-11-11 |
JP2022502586A (en) | 2022-01-11 |
SG11202102769TA (en) | 2021-04-29 |
WO2020062940A1 (en) | 2020-04-02 |
KR20210058901A (en) | 2021-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
PH12021550571A1 (en) | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor | |
CN107401393B (en) | Drainage and gas production integrated goaf gas extraction well body structure and construction method thereof | |
CN103867119B (en) | Coal seam reservoirs completion remodeling method | |
GB2444212A (en) | Method for drilling with a wellbore liner | |
GB201317567D0 (en) | Managed pressure drilling withrig heave compensation | |
KR101559962B1 (en) | Construction method for underground wall using pile | |
AU2013221032B2 (en) | Method for establishment of a new well path from an existing well | |
CN110185413A (en) | A method of stable slip casting channel is formed on easy collapse hole stratum | |
RU118649U1 (en) | PILE | |
US8430172B1 (en) | Buoyant ball assisted hydrocarbon lift system and method | |
RU2379492C2 (en) | Development method at wells re-entry and oil field in general | |
RU131061U1 (en) | TECHNOLOGICAL COMPLEX FOR DRILLING AND DEPRESSIONAL CLEANING OF THE SAND PLUG | |
US20140216753A1 (en) | Bernoulli Assisted Hydrocarbon Lift System and Method to Prohibit Water-Coning | |
JPH05112927A (en) | Ground improvement method in pressurized ground water and packer device of injection pipe | |
CN209482334U (en) | Increase friction pile construction safety degree temporarilly reduces slope underground water device | |
RU2524089C1 (en) | Construction of oil production well | |
CN105625482B (en) | Pattern and its application on underground engineering sole plate | |
RU2008132763A (en) | DRILLING AND COMPLETION OF WELLS WITH SMALL LATERAL BARKS | |
RU2392382C2 (en) | Method for reinforcement of saturated soils | |
RU172738U1 (en) | DEVICE FOR MANUFACTURING BORED PILES | |
RU2558090C1 (en) | Horizontal well operation method | |
CN204780856U (en) | Pre -buried tub of slip casting structure of guide hole | |
RU2626496C1 (en) | Plugs removing method from perforated shank holes while pumping horizontal well in bitumen deposit | |
CN111335368A (en) | Method for installing inclinometer pipe | |
CN110425004A (en) | The floated guide and construction method in the underwater goaf of paste body filling |