CN107386285A - 一种新型钢管桩基岩钻孔锚固方法 - Google Patents
一种新型钢管桩基岩钻孔锚固方法 Download PDFInfo
- Publication number
- CN107386285A CN107386285A CN201710653892.9A CN201710653892A CN107386285A CN 107386285 A CN107386285 A CN 107386285A CN 201710653892 A CN201710653892 A CN 201710653892A CN 107386285 A CN107386285 A CN 107386285A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- transferred
- steel
- pile foundation
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 32
- 239000010959 steel Substances 0.000 title claims abstract description 32
- 239000011435 rock Substances 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000004873 anchoring Methods 0.000 claims abstract description 16
- 230000000694 effects Effects 0.000 claims abstract description 5
- 238000009408 flooring Methods 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims abstract description 4
- 239000011248 coating agent Substances 0.000 claims description 4
- 238000000576 coating method Methods 0.000 claims description 4
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 230000005611 electricity Effects 0.000 abstract 1
- 238000005553 drilling Methods 0.000 description 6
- 238000007569 slipcasting Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及钢管桩锚固领域,具体为一种新型钢管桩基岩钻孔锚固方法。一种新型钢管桩基岩钻孔锚固方法,包括以下步骤:先施工靠近岸边河床覆盖层较厚处的栈桥或平台,铺设好桥面板,形成作业平台;利用作业平台先下放钢管,先下放的钢管形成作业空间,使用施工套管钻在钢管正下方的基岩上钻锚杆孔,钻锚杆孔后下放锚固钢筋并注浆固结,再在钢管内回填碎石或混凝土后形成锚固钢筋体与钢管共同作用的锚固体,达到稳定的效果。本发明可以同时使用多台钻机进行锚固作业,施工进度有保证,投入较少,对临时用电线路的负荷增加不多,不需要专门布设线路。
Description
技术领域
本发明涉及钢管桩锚固领域,具体为一种新型钢管桩基岩钻孔锚固方法。
背景技术
铁路或公路桥梁跨越水道或港口时,需要在覆盖层较薄,甚至没有覆盖层的浅滩或水深较浅且河床下伏卵石的水域处修建栈桥及水上作业平台等涉水结构物,涉水结构物大多采用插打各种型号的钢管桩作为基础,而钢管桩又无法打入覆盖层下方的基岩中,在施工时经常会遇见钢管桩打入深度不足,无法满足抗冲刷要求的情况,此时需要对钢管桩进行桩底锚固作业,桩底锚固作业多数情况需要采用冲击钻冲孔后再打入钢管桩并在桩内灌注混凝土。而采用“冲击钻冲孔锚固”方式存在的问题有:1)需要使用冲击钻机,增加机械设备投入,钻机需要反复进出工作面,增加了交叉作业工序,安全风险加大;2)必须在搭设的大型临时施工平台上冲击成孔,冲击施工时安全风险高,多数为高空作业,需要精确对位,施工难度较大;3)每次只能冲击一个孔位,待完成后再施工下一个孔位,耗时长,冲击施工时其余施工工序均需要等待。
发明内容
本发明为了解决上述问题,提供了一种新型钢管桩基岩钻孔锚固方法。
本发明是采用如下的技术方案实现的:一种新型钢管桩基岩钻孔锚固方法,包括以下步骤:先施工靠近岸边河床覆盖层较厚处的栈桥或平台,铺设好桥面板,形成作业平台;利用作业平台先下放钢管,先下放的钢管形成作业空间,使用施工套管钻在钢管正下方的基岩上钻锚杆孔,钻锚杆孔后下放锚固钢筋并注浆固结,此时锚固钢筋的下部分插入锚杆孔,上部分裸露在钢管内,再在钢管内回填碎石或混凝土后形成锚固钢筋体与钢管共同作用的锚固体,达到稳定的效果。
本发明与现有技术方案比较,解决了以下几项问题:
(1)采用施工套管钻在钢管桩内钻孔,机械设备简单、体积小、进出场方便、施工速度快、不需要大型施工平台;
(2)施工锚固钻孔不影响栈桥或平台的继续搭设或正常使用,可以同时安排不同工序同时施工,可以提高水上施工作业面有限空间的利用率;
(3)增加的锚固钢筋与混凝土或碎石的结合体,大大增加了基岩与钢管桩之间的连接强度,增加了锚固长度,确保了结构的整体性、稳定性、抗冲刷性能,提高了安全系数。
附图说明
图1为本发明的锚固方法示意图。
图2为图1的A-A剖视图。
图中:1-基岩,2-锚杆孔,3-锚固钢筋,4-碎石或混凝土,5-钢管。
具体实施方式
一种新型钢管桩基岩钻孔锚固方法,包括以下步骤:先施工靠近岸边河床覆盖层较厚处的栈桥或平台,铺设好桥面板,形成作业平台;利用作业平台先下放Φ630mm钢管,先下放的Φ630mm钢管形成作业空间,使用施工套管钻在钢管正下方的基岩1上钻锚杆孔2,钻锚杆孔后下放锚固钢筋3并注浆固结,再在Φ630mm钢管内回填碎石或混凝土4后形成锚固钢筋体与钢管共同作用的锚固体,达到稳定的效果。
在施工时栈桥、平台等临时结构本身已满足承载力要求,在锚固钢管桩的同时可以继续向前搭设其他结构物,不影响临时结构物的搭设进度;锚固施工占地少,不影响车辆通行,可选择在施工搭设过程中锚固,亦可选择在全部临时结构完成后再锚固,不会影响主体结构物施工;可以同时使用多台钻机进行锚固作业,施工进度有保证,投入较少,对临时用电线路的负荷增加不多,不需要专门布设线路。
锚固一根钢管桩需要钻孔3个(平均深度为5米)、下放锚固钢筋9根、注浆、灌注管内混凝土4道工序,各工序耗时为:钻孔:3*60分钟+接钻杆+换孔位=300分钟;下放锚固钢筋:20分钟;注浆:60分钟;灌注管内混凝土:30分钟;总计410分钟(约7个小时)即可完成一根钢管桩的锚固作业。
Claims (1)
1.一种新型钢管桩基岩钻孔锚固方法,其特征在于包括以下步骤:先施工靠近岸边河床覆盖层较厚处的栈桥或平台,铺设好桥面板,形成作业平台;利用作业平台先下放钢管(5),先下放的钢管(5)形成作业空间,使用施工套管钻在钢管正下方的基岩(1)上钻锚杆孔(2),钻锚杆孔后下放锚固钢筋(3)并注浆固结,再在钢管内回填碎石或混凝土(4)后形成锚固钢筋体与钢管共同作用的锚固体,达到稳定的效果。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710653892.9A CN107386285A (zh) | 2017-08-03 | 2017-08-03 | 一种新型钢管桩基岩钻孔锚固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710653892.9A CN107386285A (zh) | 2017-08-03 | 2017-08-03 | 一种新型钢管桩基岩钻孔锚固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107386285A true CN107386285A (zh) | 2017-11-24 |
Family
ID=60343177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710653892.9A Pending CN107386285A (zh) | 2017-08-03 | 2017-08-03 | 一种新型钢管桩基岩钻孔锚固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107386285A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625365A (zh) * | 2018-06-20 | 2018-10-09 | 湖南建工交通建设有限公司 | 提高钢栈桥抗倾覆的预加应力与栽桩组合结构及施工方法 |
CN110847047A (zh) * | 2019-11-21 | 2020-02-28 | 中交第二航务工程局有限公司 | 一种外海裸岩栈桥施工方法 |
CN111254918A (zh) * | 2020-03-19 | 2020-06-09 | 浙江省大成建设集团有限公司 | 一种桩底锚杆加固的钢栈桥钢管桩锚固方法 |
CN111364492A (zh) * | 2020-03-11 | 2020-07-03 | 中国建筑第六工程局有限公司 | 一种深水浅覆盖层钢管锚固施工装置及方法 |
CN111411641A (zh) * | 2020-03-26 | 2020-07-14 | 中国五冶集团有限公司 | 一种钢栈桥桩顶结构及钢栈桥加固方法 |
CN113309132A (zh) * | 2021-05-07 | 2021-08-27 | 中铁十一局集团第一工程有限公司 | 一种基于钢栈桥锚固桩的施工方法 |
CN114753357A (zh) * | 2022-04-08 | 2022-07-15 | 中铁七局集团有限公司 | 水中钻孔桩的施工方法 |
CN115305975A (zh) * | 2022-08-31 | 2022-11-08 | 湖北工业大学 | 一种补偿下段桩抗拔力不足的反向自平衡试桩法 |
CN116043906A (zh) * | 2022-12-07 | 2023-05-02 | 保利长大工程有限公司 | 一种水下裸岩区钢管桩锚固施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2629847A1 (fr) * | 1988-04-12 | 1989-10-13 | Leduc Ste Nle | Procede pour l'ancrage d'un organe allonge, notamment une palplanche dans un sol en terrain dur |
CN102953341A (zh) * | 2012-12-13 | 2013-03-06 | 中铁上海工程局有限公司 | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 |
CN203049443U (zh) * | 2012-12-14 | 2013-07-10 | 中铁上海工程局有限公司 | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 |
CN103898910A (zh) * | 2014-03-10 | 2014-07-02 | 中交一航局第三工程有限公司 | 海底岩石裸露地貌上栈桥钢管桩锚固方法 |
-
2017
- 2017-08-03 CN CN201710653892.9A patent/CN107386285A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2629847A1 (fr) * | 1988-04-12 | 1989-10-13 | Leduc Ste Nle | Procede pour l'ancrage d'un organe allonge, notamment une palplanche dans un sol en terrain dur |
CN102953341A (zh) * | 2012-12-13 | 2013-03-06 | 中铁上海工程局有限公司 | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 |
CN203049443U (zh) * | 2012-12-14 | 2013-07-10 | 中铁上海工程局有限公司 | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 |
CN103898910A (zh) * | 2014-03-10 | 2014-07-02 | 中交一航局第三工程有限公司 | 海底岩石裸露地貌上栈桥钢管桩锚固方法 |
Non-Patent Citations (2)
Title |
---|
朱明权: "《浅覆盖层栈桥钢管桩桩底锚固施工技术》", 《安徽建筑》 * |
王雪元: "《桩底锚固技术在钢管桩栈桥施工中的应用》", 《北方交通》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625365A (zh) * | 2018-06-20 | 2018-10-09 | 湖南建工交通建设有限公司 | 提高钢栈桥抗倾覆的预加应力与栽桩组合结构及施工方法 |
CN110847047A (zh) * | 2019-11-21 | 2020-02-28 | 中交第二航务工程局有限公司 | 一种外海裸岩栈桥施工方法 |
CN110847047B (zh) * | 2019-11-21 | 2021-11-26 | 中交二航局第一工程有限公司 | 一种外海裸岩栈桥施工方法 |
CN111364492A (zh) * | 2020-03-11 | 2020-07-03 | 中国建筑第六工程局有限公司 | 一种深水浅覆盖层钢管锚固施工装置及方法 |
CN111254918A (zh) * | 2020-03-19 | 2020-06-09 | 浙江省大成建设集团有限公司 | 一种桩底锚杆加固的钢栈桥钢管桩锚固方法 |
CN111411641A (zh) * | 2020-03-26 | 2020-07-14 | 中国五冶集团有限公司 | 一种钢栈桥桩顶结构及钢栈桥加固方法 |
CN113309132A (zh) * | 2021-05-07 | 2021-08-27 | 中铁十一局集团第一工程有限公司 | 一种基于钢栈桥锚固桩的施工方法 |
CN114753357A (zh) * | 2022-04-08 | 2022-07-15 | 中铁七局集团有限公司 | 水中钻孔桩的施工方法 |
CN115305975A (zh) * | 2022-08-31 | 2022-11-08 | 湖北工业大学 | 一种补偿下段桩抗拔力不足的反向自平衡试桩法 |
CN116043906A (zh) * | 2022-12-07 | 2023-05-02 | 保利长大工程有限公司 | 一种水下裸岩区钢管桩锚固施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107386285A (zh) | 一种新型钢管桩基岩钻孔锚固方法 | |
CN101086164B (zh) | 围堰高效快速防渗堵漏方法 | |
CN105442623B (zh) | 一种无栈桥的水上桥梁桩基及承台施工方法 | |
CN104631438B (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN107642041A (zh) | 超大直径空心群桩锚碇 | |
CN102979039A (zh) | 一种在深水急流无覆盖层陡峭裸岩上的高位栈桥施工方法 | |
CN104963346A (zh) | 复杂地质的深基坑围护施工方法 | |
CN103924602A (zh) | 深厚软土基坑施工方法 | |
CN108625369A (zh) | 岩溶地区硬切割法咬合桩施工方法 | |
CN103015429A (zh) | 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法 | |
CN102561406A (zh) | 控制沉井后背土体变形的施工方法 | |
CN106758759B (zh) | 一种用于深水裸岩河床的栈桥桩基及其锚固方法 | |
CN204311435U (zh) | 一种旋挖咬合钢筋混凝土防渗墙 | |
CN203049443U (zh) | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 | |
CN205576957U (zh) | 桩底桩结构 | |
CN105239573B (zh) | 型钢栈桥的内植管锚岩施工方法 | |
CN105133641A (zh) | 一种薄壁型连续墙式地基基础加固结构及方法 | |
CN107642040A (zh) | 超大直径空心群桩锚碇的施工方法碇 | |
CN101481913A (zh) | 嵌岩地下连续墙冲孔槽段施工方法 | |
CN207582471U (zh) | 一种设有深层预应力锚索的双排桩支护结构 | |
CN207484290U (zh) | 超大直径空心群桩锚碇 | |
CN101545256B (zh) | 钢筋笼护筒在淤泥层地质条件下处理钻孔桩塌孔方法 | |
CN108729461A (zh) | 深孔防渗墙施工中针对架空漏失地层的施工结构及施工方法 | |
CN103410098B (zh) | 近岸水中钢管桩施工平台的分步跟进搭建方法 | |
CN110258526A (zh) | 预制式地下连续墙以及施工地下室外墙和楼板的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |
|
RJ01 | Rejection of invention patent application after publication |