CN102444137B - 一种真空预压泥浆封闭墙的施工方法 - Google Patents

一种真空预压泥浆封闭墙的施工方法 Download PDF

Info

Publication number
CN102444137B
CN102444137B CN201110349209.5A CN201110349209A CN102444137B CN 102444137 B CN102444137 B CN 102444137B CN 201110349209 A CN201110349209 A CN 201110349209A CN 102444137 B CN102444137 B CN 102444137B
Authority
CN
China
Prior art keywords
whitewashing
mixer
pile
construction method
enclosing wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110349209.5A
Other languages
English (en)
Other versions
CN102444137A (zh
Inventor
彭建华
唐海峰
胡志刚
王晓
宋宝强
康景文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN201110349209.5A priority Critical patent/CN102444137B/zh
Publication of CN102444137A publication Critical patent/CN102444137A/zh
Application granted granted Critical
Publication of CN102444137B publication Critical patent/CN102444137B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种真空预压泥浆封闭墙的施工方法,先根据预先设计的桩位采用双排水泥粘土搅拌机进行上下搅拌,并同步喷入相应需求量的水泥浆,以0.3~0.5m/min的均匀速度提升搅拌机,搅拌桩相互搭接200mm,在完成第一次提升搅拌程序后再次进行重复搅拌、重复下沉及提升搅拌操作直至成桩结束即形成具有较强密封性能的水泥浆封闭墙。

Description

一种真空预压泥浆封闭墙的施工方法
技术领域
本发明属于建筑施工领域,特别是涉及一种真空预压泥浆封闭墙的施工方法。
背景技术
真空预压法最早是由瑞典皇家地质学院W.Kjellman教授于1952年提出。它属于一种静力排水固结法,是在地基表面铺设密封膜,通过相应的设备抽真空,使在密封膜下砂垫层内(厚约40-50cm)和土体中垂直排水通道内形成负压,加速孔隙水排出,从而使土体固结、强度提高的软土地基加固方法。主要适用于淤泥、淤泥质土和其他能够排水固结而且能形成负超静水压力边界条件的软粘土。
在真空预压法最初应用于工程实践时,由于抽真空设备效率、气水分离技术、密封技术等关键问题未能很好解决,故很长一段时间该法没有得到推广应用。直到20世纪80年代以后,我国在真空预压法的理论和实践上取得了突破性进展。交通部一航局科研所在塘沽新港进行了几次现场试验并获得成功,并于1985年12月通过国家技术鉴定,之后真空预压法才逐渐开始应用于工程实践。目前真空预压法现已被广泛应用于工程建设中,并取得了良好的经济效益和社会效益,成为加固软土地基领域一个行之有效的实用方法。对于大面积真空预压来说,一般多采用分区施工,并且沿海场地表部土层多含中、细砂或粉细砂层。从真空预压法的加固机理可见,真空预压密封的问题起着控制真空预压效果的重要作用。而比较常用的方法是采用水泥搅拌桩或粘土搅拌桩形成密封墙进行密封处理。目前所采用的施工方法均是先在桩位中整体大量灌注泥浆,然后采用混凝土震动器进行反复震动,以增强混凝土的密度,但是由于采用大量灌浆后期震动方式,在桩位的某些区域震动棒不能全面涉及,即使在一引起震动棒涉及的区域,也会存在因震动强度不够而导致泥浆封密墙上形成汽孔,不利于后期对施工区域进行抽取真空,而且施工周期较长。
发明内容
为了解决现有泥浆封闭墙施工方法的不足,本发明提供一种真空预压泥浆封闭墙的施工方法,该施工方法不仅便于施工,而且可以提高泥浆封密墙的密封效果。
本发明是通过下述技术方案来实现的:真空预压泥浆封闭墙的施工方法按下述步骤进行。
①确定合理的桩位,桩位偏差不大于5cm。
②将搅拌机用钢丝绳吊挂在起重机上,再用输浆胶管将储料罐、砂浆泵与搅拌机接通,然后开动电机,搅拌机叶片相向而转,借设备自重下沉进行搅拌。
③以0.3~0.5m/min的均匀速度提升搅拌机,同时开动砂浆泵将浆液从搅拌机中心管不断压入土中,由搅拌机将浆液与深层的软土共同搅拌,边搅拌边喷浆提升,当钻头距设计桩顶标高0.5m时停止提升,持续搅拌喷浆10~20s,确保桩头均匀密实,喷浆搅拌提升时控制喷浆量在30L/min。
④按喷浆成桩操作要求进行重复搅拌、重复下沉和上升搅拌操作。再次搅拌下沉至设计深度,如喷浆量达到实际要求时,只需重复搅拌提升,不再送浆。施工灌浆面要高出桩顶设计标高0.5m,待凝固后,将高出部分挖除。
本发明的有益效果是:不仅可以显著缩短施工周期,而且可以提高泥浆封闭墙的密封效果,施工方法简便易操作,便于推广使用。
具体实施方式
真空预压泥浆封闭墙则按下述施工方法和步骤进行施工。
①、桩机就位:测量人员放出桩位,偏差不大于5cm,使用细竹扦(竹尖涂有红油漆)作为桩位标志。桩机移位时特别注意桩位标志,以防细竹扦折断或偏移。由专人指挥,利用桩机底部步履装置移动桩机,并且用水平尺和定位测锤校正准确。桩机必须保持水平,使搅拌桩机垂直,垂直度偏差不大于1%。为了保证桩位准确,必须使用定位卡,桩位对中误差不大于5m。桩机支撑要稳固,确保施工过程中不发生偏斜。
②、预搅喷浆:桩机就位后,将搅拌机用钢丝绳吊挂在起重机上,再用输浆胶管将储料罐、砂浆泵与搅拌机接通。然后开动电机,搅拌机叶片相向而转,借设备自重下沉。搅拌头边回转边下沉,控制下沉的电机工作不大于70A,保证钻头以0.38~0.75m/min的速度钻孔至设计桩底0.5m,钻进喷浆到设计桩长后,原位喷浆30s,再反转均匀提升,喷浆深度误差不得大于5.0cm。要求搅拌桩相互搭接宽度为200mm,而桩长和桩径则根据实际情况确定。
③、喷浆搅拌提升:以0.3~0.5m/min的均匀速度提升搅拌机(恢复供浆时再喷浆提升),同时开动砂浆泵将浆液从搅拌机中心管不断压入土中,由搅拌机将浆液与深层的软土共同搅拌,边搅拌边喷浆提升。当钻头距设计桩顶标高0.5m时停止提升,持续搅拌喷浆10~20s,确保桩头均匀密实,喷浆搅拌提升时控制喷浆量在30L/min。
④、复搅下沉、二次喷浆搅拌提升:按喷浆成桩操作要求进行重复搅拌、重复下沉和上升搅拌操作。再次搅拌下沉至设计深度,如喷浆量达到实际要求时,只需重复搅拌提升,不再送浆。施工灌浆面要高出桩顶设计标高0.5m,待凝固后,将高出部分挖除。施工中应设专人详细记录搅拌机下沉或提升每延米的时间、供浆与停浆的时间,记录深度误差不得大于5s,在施工中发生的问题及处理情况均应加以记录和说明。
重复上述步骤完成其它桩的施工。

Claims (1)

1.一种真空预压泥浆封闭墙的施工方法,其特征是:泥浆封闭墙的施工方法按下述步骤进行:
①测量人员放出桩位,桩位偏差不大于5cm;
②将搅拌机用钢丝绳吊挂在起重机上,再用输浆胶管将储料罐、水泥浆泵与搅拌机接通,然后开动电机,搅拌机叶片相向而转,借设备自重下沉进行搅拌,控制下沉的电机工作不大于70A,保证钻头以0.38~0.75m/min的速度钻孔至设计桩底0.5m,钻进喷浆到设计桩长后,原位喷浆30s;
③以0.3~0.5m/min的均匀速度反转提升搅拌机,同时开动水泥浆泵将浆液从搅拌机中心管不断压入土中,由搅拌机将浆液与深层的软土共同搅拌,边搅拌边喷浆提升,当钻头距设计桩顶标高0.5m时停止提升,持续搅拌喷浆10~20s,确保桩头均匀密实,喷浆搅拌提升时控制喷浆量在30L/min;
④按喷浆成桩操作要求进行重复搅拌、重复下沉及提升搅拌操作,再次搅拌下沉至设计深度,如喷浆量达到实际要求时,只需要重复搅拌提升,不再送浆,施工灌浆面要高出桩顶设计标高0.5m,待凝固后,将高出部分挖除。
CN201110349209.5A 2011-11-08 2011-11-08 一种真空预压泥浆封闭墙的施工方法 Active CN102444137B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110349209.5A CN102444137B (zh) 2011-11-08 2011-11-08 一种真空预压泥浆封闭墙的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110349209.5A CN102444137B (zh) 2011-11-08 2011-11-08 一种真空预压泥浆封闭墙的施工方法

Publications (2)

Publication Number Publication Date
CN102444137A CN102444137A (zh) 2012-05-09
CN102444137B true CN102444137B (zh) 2015-07-08

Family

ID=46007046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110349209.5A Active CN102444137B (zh) 2011-11-08 2011-11-08 一种真空预压泥浆封闭墙的施工方法

Country Status (1)

Country Link
CN (1) CN102444137B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898891B (zh) * 2012-12-27 2016-01-06 上海建工七建集团有限公司 真空预压密封墙及其施工方法
CN103790155B (zh) * 2014-03-10 2016-03-02 凌志伟 高速搅拌成桩方法
CN114293579A (zh) * 2022-01-26 2022-04-08 中国铁建港航局集团有限公司 真空预压地基处理粘土密封墙施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4100137A1 (de) * 1991-01-04 1992-07-16 Dyckerhoff & Widmann Ag Verfahren zum herstellen einer aus pfahlfoermigen elementen bestehenden dichtwand im boden
CN101182709A (zh) * 2007-11-30 2008-05-21 陈江涛 复合电渗、真空降水和真空预压加固地基的方法及其装置
CN101634140A (zh) * 2009-08-19 2010-01-27 上海港湾软地基处理工程有限公司 一种软土地基固结方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4100137A1 (de) * 1991-01-04 1992-07-16 Dyckerhoff & Widmann Ag Verfahren zum herstellen einer aus pfahlfoermigen elementen bestehenden dichtwand im boden
CN101182709A (zh) * 2007-11-30 2008-05-21 陈江涛 复合电渗、真空降水和真空预压加固地基的方法及其装置
CN101634140A (zh) * 2009-08-19 2010-01-27 上海港湾软地基处理工程有限公司 一种软土地基固结方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
真空预压技术在软基处理方面的应用;朱西庆;《杨凌职业技术学院学报》;20070616(第02期);第49-51页 *
真空预压超软弱土下卧透水层新密封方法探讨;孙田磊等;《水利水电科技进展》;20091020(第05期);第74-77页 *

Also Published As

Publication number Publication date
CN102444137A (zh) 2012-05-09

Similar Documents

Publication Publication Date Title
AU2020376449B2 (en) Construction method of pressurized grouting pile based on reinforcing fiber and metakaolin
CN101429766B (zh) 一种地基加固的高压旋喷桩施工工艺
CN101591914B (zh) 一种用灌注桩和搅拌桩咬合的基坑支护结构的施工方法
CN103015413B (zh) 内植刚性体嵌入硬持力层复合桩的施工方法
CN104612179B (zh) 贯穿超厚粉砂层的地下连续墙的施工方法
CN102660952B (zh) 可控粘土膏浆灌浆方法
CN102286984A (zh) 一种止水帷幕及其施工方法
CN106894430A (zh) 一种三轴搅拌桩止水帷幕施工方法
CN106812149A (zh) 一种桩基的施工方法
CN104314082A (zh) 一种岩溶地质条件下的深基坑支护结构及其施工方法
CN105569071A (zh) 一种水泥基材料水下注浆或压浆块石基础施工方法
CN102444137B (zh) 一种真空预压泥浆封闭墙的施工方法
CN102304915B (zh) 钻孔桩桩顶质量控制新方法
CN103243721B (zh) 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法
CN105019913A (zh) 基岩隆起区盾构换刀原位加固方法
CN102235008B (zh) 软土地基防工程桩偏位结构及预处理法
CN103821140B (zh) 一种加固松软土地基的施工方法
CN104480932B (zh) 盐碱性淤泥质软基水泥搅拌桩施工方法
CN108071110A (zh) 复杂地质条件下旋挖钻机嵌岩桩施工方法
CN106638646B (zh) 一种沉井二次封底结构的施工方法
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
CN106192987B (zh) 一种对桩周边破碎地质加固的施工方法
CN101793024B (zh) 基坑多头小直径深搅和高喷组合防渗墙的建造方法
CN110318392A (zh) 一种大直径水泥土桩建造方法
CN102605775B (zh) 一种柔性桩与刚性桩上下同体组合桩及成桩方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant