CN107146065A - Railway engineering management platform system - Google Patents

Railway engineering management platform system Download PDF

Info

Publication number
CN107146065A
CN107146065A CN201710165837.5A CN201710165837A CN107146065A CN 107146065 A CN107146065 A CN 107146065A CN 201710165837 A CN201710165837 A CN 201710165837A CN 107146065 A CN107146065 A CN 107146065A
Authority
CN
China
Prior art keywords
module
management
information
construction
railway engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710165837.5A
Other languages
Chinese (zh)
Inventor
王万齐
王辉麟
解亚龙
卢文龙
郭歌
王志华
牛宏睿
梁策
钱进
杨兴磊
智鹏
刘伟
刘红峰
王超
郭晓翠
张松峰
赵馨
赵一馨
刘雨娜
王鹏程
陈杰
郝蕊
鲍榴
索宁
白平
刘北胜
王荣波
张敬涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Institute of Computing Technologies of CARS
Beijing Jingwei Information Technology Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Institute of Computing Technologies of CARS
Beijing Jingwei Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Institute of Computing Technologies of CARS, Beijing Jingwei Information Technology Co Ltd filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201710165837.5A priority Critical patent/CN107146065A/en
Publication of CN107146065A publication Critical patent/CN107146065A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9024Graphs; Linked lists
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0029Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Remote Sensing (AREA)
  • Quality & Reliability (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of railway engineering management platform system, including infrastructure layer, data resource layer, service application layer and access layer, wherein:Infrastructure layer, collection, transmission and storage for railway engineering parameter;Data resource layer, for the railway engineering parameter to be handled and stored according to default processing type;Service application layer, for the management to railway engineering integrated information, the control to construction of railway project process and the management according to the railway engineering parameter to railway engineering field apparatus;Access layer, the authentication entrance for providing system.Railway engineering management platform system described in the embodiment of the present invention, by the way that one integrated, standardization, intellectuality, serviceization, the unified and open management platform for being adapted to modern railways informatization, promote Standardization Construction, effectively supervise work progress, take precautions against quality safety risk, Construction Project Management level is lifted, the orderly efficient propulsion of construction project is realized.

Description

Railway engineering management platform system
Technical field
The present invention relates to information technology and management science field, more particularly to a kind of railway engineering management platform system.
Background technology
The fast development of information technology and management science over nearly 30 years, is domestic and international project Construction Project Management information system Exploitation, using there is provided good condition.Therebetween, domestic and international software company and using unit develop many different types, The Construction Project Management information system of different class.Internationally recognizable P3 (Primavera Project Planner), The Project Management Softwares such as Project enter Mobile state management and control to construction program, resource, cost in many countries uses Fixture has preferable effect.Some domestic application systems, for example Three Gorges Projects information management system (TGPMS) is to its engineering construction Management and control has also reached better effects.These enrich one's knowledge resource and accumulation, for Environment in Railway Engineering Construction management system research and development and Data platform construction has support and reference role well.But, the work of these general project management systems or other field Thread management system can not show railway engineering feature and management characteristic and bring into play, it is impossible to adapt to railway systems engineering completely The need for implementation management.
Railway projects construction quality requires that height, technical sophistication, completion time of project are nervous, and project management is that railway construction is obtained into The important guarantee of work(, especially in the process of construction of high-speed railway and Line for Passenger Transportation.Project management (Project Management) it is exactly planning, tissue, the control carried out to project in the overall process (life cycle of project) that project is carried out The activities such as system, commander and coordination.The target of project management is exactly to make project successful, that is, is ensured in required quality, institute Under defined time limit, the expense budget planned, the project is completed.
As a huge, complicated system engineering, Railway Construction Projects management has railway parent company, undertakes the construction of unit and prison Li Deng units of taking part in building;There are the systems such as tissue, plan, resource and the control of project;There are quality, cost and security control etc. a series of Important elements.Thus these information occurred are contacted closely to each other, and the multistage intersects in length and breadth, and this is accomplished by explicitly defining each The generation of bar information and process, classify and integrate while being combed to it, and then to its comprehensive analysis and processing, be according to each System or classification carry out classification processing to these information, so as to build relatively independent module, on this basis, then carry out Integrated integration, and then integrated network information system is built on same information platform, so as to reach information Both relative independentabilities operation, can be shared and be transmitted again, be subject to integrated application, with gradually with modern Project Management Specific requirement is mutually adapted.Set up one to concentrate and unified data processing centre, Railway Construction Projects management is related to Fang Fang in terms of information carry out centralized collection, storage, analysis with handle, reflect and show early-stage preparations, the engineering of construction project The aspect situation of progress construction quality, cost control and risk profile etc., is effectively docked to each unit system, so that shared Information resources, make correct decisions for management level and provide strong fact basis and technical support, meanwhile, it is carried out in time Effective supervision and check and control, the more reasonable standard for becoming organizing construction's activity and project management flow.
Therefore, a set of actual, close contract of basing oneself upon railway engineering feature and implementation management is built in Environment in Railway Engineering Construction field Field management demand is closed, meeting the user's requests at different levels such as supervision unit, construction unit, unit in charge of construction, there is provided railway systems knowledge Exchange and shared place, build the communication bridge between service supplier and user, realize the standardization of engineering site application Unified, open, integrated engineering construction information system management platform, is a job that is very urgent and being significant.
The content of the invention
The present invention provides a kind of railway engineering management platform system, reaches and bases oneself upon railway engineering feature and implementation management reality Border, agrees with field management demand closely, meets the purpose of the user's requests at different levels such as supervision unit, construction unit, unit in charge of construction.
The present invention provides a kind of railway engineering management platform system, including infrastructure layer, data resource layer, service application Layer and access layer, wherein:
Infrastructure layer, collection, transmission and storage for railway engineering parameter;
Data resource layer, it is described for the railway engineering parameter to be handled and stored according to default processing type Handling type includes construction, tissue, positioning, classification, coding, retrieval, renewal and safeguards;
Service application layer, for the management to railway engineering integrated information, the control to construction of railway project process and Management according to the railway engineering parameter to railway engineering field apparatus;
Access layer, the authentication entrance for providing system.
Preferably, the service application layer includes workbench, service platform and knowledge platform, wherein:
The service platform includes e-commerce system, Web- Based Training and examination system;
The knowledge platform includes all kinds of knowledge learning systems;
The workbench includes total management system, Process Control System and field management system;
The total management system is used for the management to railway engineering integrated information;
The Process Control System is used for the control to construction of railway project process;
The field management system is used for the management according to the railway engineering parameter to railway engineering field apparatus.
Preferably, the total management system includes material management module, information issuing module, office module, project letter Module, personnel's mechanism module and credit system module are ceased, wherein:
Material management module, input, storage and inquiry for data information;
Information issuing module, the issue for engineering information;
Office module, the regular job for clerical workforce;
Project information module, input, storage and inquiry for project life cycle information;
Personnel's mechanism module, the maintenance for personnel and organizations' information;
Credit system module, resume storehouse and credit interchange for setting up engineering staff.
Preferably, the Process Control System includes dispatch control module, construction organization module, tests work valuation module, applies Work log pattern, construction drawing auditing module, earth clearance module and problem library module, wherein:
Dispatch control module, for dispatch command upload and assign;
Construction organization module, typing and issue for construction organization information;
Work valuation module is tested, typing and issue for testing work valuation progress msg;
Builder's diary module, typing and issue for builder's diary;
Construction drawing auditing module, typing and issue for construction drawing msu message;
Earth clearance module, typing and issue for earth clearance progress msg;
Problem library module, registration and issue for construction problem.
Preferably, the field management system includes mixing station management information system, laboratory's management information system, Liang Chang Production management system, plate a production management system, tunnel surrounding monitoring measurement system, settlement observation system, advance geologic prediction System, roadbed continuous debulking systems, continuous beam linear monitoring system, track slab precision adjustment system, bridge visualization system and tunnel Visualization system, wherein:
Mixing station management information system, for being analyzed and processed according to the mixing station creation data gathered in real time, and root Actuation of an alarm is performed according to analysis result;
Laboratory's management information system, collection, record and upload for Test Information;
Beam production management system, statistics and monitoring for beam creation data;
Plate production management system, monitoring and early warning for plate manufacturing schedule information;
Tunnel surrounding monitoring measurement system, for the record of rock deformation information, analysis and early warning;
Settlement observation system, for roadbed, bridges and culverts, the collection of the settling data in tunnel, analysis and early warning;
Advanced geology prediction system, for the engineering geology in front of tunnel excavation working face and hydrogeologic condition and not Engineering properties, position, occurrence, the scale of good geologic body carry out detection collection, analysis and forecast;
Roadbed continuous debulking systems, for the detection to roadbed Continuous compacting condition information, collection and analysis;
Continuous beam linear monitoring system, for continuous beam linear monitoring data to be carried out with wiping machine, analysis and is controlled;
Track slab precision adjustment system, for counting and dividing to track slab construction information, track slab precision adjustment and repetition measurement deviation data Analysis;
Bridge visualizes system, the elevation for completely showing and decomposing displaying bridge structure;
Tunnel visualizes system, plan time, actual construction time, deduction duration, area for completely showing a tunnel Face mileage, two lining journeys, inverted arch mileage and wall rock's level section deployment scenarios.
Preferably, the infrastructure layer includes the field apparatus and mobile terminal, nothing for gathering the railway engineering parameter Line transmission equipment and storage device.
Preferably, the field apparatus include Temperature Humidity Sensor, pressure sensor, photoelectric sensor, magnetic sensor, Pickoff, acceleration sensor, bar code, electronic tag, RFID radio-frequency apparatus, GPS location equipment, hand-held reading device and It is a variety of in video monitoring equipment.
Preferably, the radio transmission apparatus includes Radio Transmission Technology, general classification wireless service technology, mobile communication It is a variety of in technology, virtual private network technology, mobile interchange technology and satellite communication technology.
Preferably, the storage device includes one kind of fibre channel storage, IP storage devices and DAS storage devices Or it is a variety of.
Preferably, the access layer is each by safe socket character layer VPN, global wide area network, mobile interchange technology Unit of taking part in building's user's access platform provides unified entrance.
As shown from the above technical solution, the railway engineering management platform system described in the embodiment of the present invention, from railway construction The angle of project quality, safety and progress management and control is set out, with reference to the actual conditions of Existing Railway Line, devise one it is integrated, Standardization, intellectuality, serviceization, the unified and open management platform for being adapted to modern railways informatization, promote standardization to build If effectively supervising work progress, quality safety risk is taken precautions against, Construction Project Management level is lifted, realizes the orderly of construction project Efficiently promote.Meanwhile, build one and build inexpensive, efficient ecology service circle towards railway construction field and knowledge is whole Close and increment place.
Brief description of the drawings
Fig. 1 is the Technical Architecture figure of railway engineering management platform system provided in an embodiment of the present invention;
Fig. 2 is the business structure figure of railway engineering management platform system provided in an embodiment of the present invention.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Figures 1 and 2 show that a kind of railway engineering management platform system provided in an embodiment of the present invention, including infrastructure Layer, data resource layer, service application layer and access layer, wherein:
Infrastructure layer, collection, transmission and storage for railway engineering parameter;
Data resource layer, it is described for the railway engineering parameter to be handled and stored according to default processing type Handling type includes construction, tissue, positioning, classification, coding, retrieval, renewal and safeguards;
Service application layer, for the management to railway engineering integrated information, the control to construction of railway project process and Management according to the railway engineering parameter to railway engineering field apparatus;
Access layer, the authentication entrance for providing system.
For above-mentioned infrastructure layer, data resource layer, service application layer and access layer, this plateform system is solved Release explanation:
1st, the infrastructure layer includes gathering the field apparatus and mobile terminal of the railway engineering parameter, is wirelessly transferred Equipment and storage device.
The field apparatus includes Temperature Humidity Sensor, pressure sensor, photoelectric sensor, magnetic sensor, electromechanical biography Sensor, acceleration sensor, bar code, electronic tag, RFID radio-frequency apparatus, GPS location equipment, hand-held reading device and video prison Control a variety of in equipment.The field apparatus is arranged in the Work machine for railway engineering, using artificial in work progress Plus automatic mode, dynamic realtime, which intelligently recognizes, perceives, positioning, tracking, gathering, monitoring, manage Environment in Railway Engineering Construction refers to Wave, construct, management, third party detection etc. field data, provide timely, accurate data for platform.In embodiments of the present invention, The data that field apparatus is collected can be connected with mobile terminal used in Field Force, by mobile terminal using wireless biography Transfer device uploads to platform.
In embodiments of the present invention, radio transmission apparatus can using Radio Transmission Technology, general classification wireless service technology, It is a variety of in mobile communication technology, virtual private network technology, mobile interchange technology and satellite communication technology.For the upper of platform data Pass and assigning for follow-up dispatch command provides real-time passage, realize that managers at different levels pass through fixed terminal, mobile terminal Deng acquisition data, sound, video and warning message whenever and wherever possible, while guarantee is had inconvenient traffic, communicated, the area of weak foundation leads to Cross the up-downgoing data transfer that the technologies such as satellite communication realize emergent burst information.
In embodiments of the present invention, the storage device includes fibre channel storage, IP storage devices and DAS storages The one or more of equipment.The system realizes the storage of data using above-mentioned storage device, and passes through cluster application, grid With the technology such as distributed file system, realize the logical Virtual management of cloud storage central apparatus, multi-link redundancy management and assist Condition monitoring and Breakdown Maintenance are carried out with work, and to hardware device, the Operational Visit of data storage is provided place.
2nd, data resource layer utilizes computer hardware technique, and effective collection, storage are being carried out to railway engineering parameter On the basis of to the construction of Railway Construction data, tissue, positioning, classification, coding, retrieval, update and safeguard etc..
In data resource layer, platform, using coding schemes such as WBS, EBS, PBS, OBS, is that Environment in Railway Engineering Construction project is each The application of link provides unified coding standard, and technical interface has been reserved for operation transfer.
According to Chinese Railway engineering construction actual features, railway engineering entity STRUCTURE DECOMPOSITION guide EBS, engineering project are proposed Decompose guide PBS, engineering mechanism and decompose guide OBS and work structure decomposition guide WBS.Coding scheme cover project code, Bid section coding, work area coding, work point coding, entity's coding etc., coding scheme substantially meets Environment in Railway Engineering Construction demand.
Railway engineering entity decomposition texture (EBS) is on the basis of work breakdown structure, according to railway line length, specialty The features such as many, construction scale is big, technical standard is high, construction speed is fast, using method of bisector principle, with《Engineering Quantity List Pricing refers to South》Based on, with reference to《Construction quality accident standard》, each professional entity engineering of railway engineering is divided, is formed and is adapted to iron The reasonable unit of road project management, meets the demand of engineering design, construction, construction, operation management.
Simultaneously according to railway engineering feature, individual works, engineering component, engineering work item, project stage, personnel angle are added The classification forms such as color, organizational roles, engineering product, engineering characteristic, expand railway engineering geographic element and engineering geology information.
Chart database is also applied to Environment in Railway Engineering Construction basic platform by platform, and basic platform is stored using the structure of figure Personnel, tissue, project relationship, can be efficiently real when in face of railway basic data relation that is complicated, largely, frequently handling Now inquire about and change management.Unified service bus is formed simultaneously, providing unified security certificate certification, flow for each application draws Hold up, search engine, Report Engine, messenger service, log services, short message service, the public operation service such as interface service.
3rd, the service application layer includes workbench, service platform and knowledge platform, wherein:
The service platform includes e-commerce system, Web- Based Training and examination system, but is not limited to this.For with Family provide value-added service, build the communication bridge between service supplier and user, towards railway construction field build low cost, Efficient ecology service circle.
The knowledge platform includes all kinds of knowledge learning systems, such as laws and regulations, technique engineering method and journal article, but not office It is limited to this.Towards railway information management user, advised by the journal article of railway systems, construction, Policy Act and technology The exchange of chapter is shared, and builds Knowledge Integration and increment place, builds knowledge sharing, scientific and technical innovation, the atmosphere of communication exchange, promotes Technology in industry improves the propagation with high and new technology.
The workbench includes total management system, Process Control System and field management system;
The total management system is used for the management to railway engineering integrated information;
The Process Control System is used for the control to construction of railway project process;
The field management system is used for the management according to the railway engineering parameter to railway engineering field apparatus.
Workbench, service platform and knowledge platform, be specially:
31st, the total management system includes material management module, information issuing module, office module, project information mould Block, personnel's mechanism module and credit system module, wherein:
Material management module, input, storage and inquiry for data information;
Information issuing module, the issue for engineering information;
Office module, the regular job for clerical workforce;
Project information module, input, storage and inquiry for project life cycle information;
Personnel's mechanism module, the maintenance for personnel and organizations' information;
Credit system module, resume storehouse and credit interchange for setting up engineering staff.
The business modules such as data management, information issue, office are integrated with total management system, to assist each unit of taking part in building Highlight issue, displaying, routine office work automation, personnel and organizations' maintenance of information, set up practitioner's resume storehouse and letter With the safety storage of storehouse and the e-file information for realizing engineering construction Life cycle, efficient shared, standardized administration.
32nd, the Process Control System includes dispatch control module, construction organization module, tests work valuation module, construction day Will module, construction drawing auditing module, earth clearance module and problem library module, wherein:
Dispatch control module, for dispatch command upload and assign;
Construction organization module, typing and issue for construction organization information;
Work valuation module is tested, typing and issue for testing work valuation progress msg;
Builder's diary module, typing and issue for builder's diary;
Construction drawing auditing module, typing and issue for construction drawing msu message;
Earth clearance module, typing and issue for earth clearance progress msg;
Problem library module, registration and issue for construction problem.
Be integrated with Process Control System dispatch control, earth clearance, construction organization, test work valuation, electronics builder's diary Deng business module, to assist construction unit to carry out tissue propulsion work, stress progress control, red line management, realize scheduling electronics Change to upload to assign and opened between timely transmission, standard construction organization activity, auxiliary construction, design and the consulting unit of emergency event Exhibition construction drawing examination & verification synergetic office work, the weight difficulties and four electric problems that report in time in earth clearance, realization valuation people employee Make office automation, accelerate to test work valuation examination & approval progress, realize the registration of management organization's problems at different levels, classify, handle and rectify and improve Whole Course Management, effectively improve work progress managerial skills and live control ability.
33rd, the field management system includes mixing station management information system, laboratory's management information system, Liang Chang productions Management system, plate production management system, tunnel surrounding monitoring measurement system, settlement observation system, advanced geology prediction system, Roadbed continuous debulking systems, continuous beam linear monitoring system, track slab precision adjustment system, bridge visualization system and tunnel visualization System, wherein:
Mixing station management information system, for being analyzed and processed according to the mixing station creation data gathered in real time, and root Actuation of an alarm is performed according to analysis result;
Laboratory's management information system, collection, record and upload for Test Information;
Beam production management system, statistics and monitoring for beam creation data;
Plate production management system, monitoring and early warning for plate manufacturing schedule information;
Tunnel surrounding monitoring measurement system, for the record of rock deformation information, analysis and early warning;
Settlement observation system, for roadbed, bridges and culverts, the collection of the settling data in tunnel, analysis and early warning;
Advanced geology prediction system, for the engineering geology in front of tunnel excavation working face and hydrogeologic condition and not Engineering properties, position, occurrence, the scale of good geologic body carry out detection collection, analysis and forecast;
Roadbed continuous debulking systems, for the detection to roadbed Continuous compacting condition information, collection and analysis;
Continuous beam linear monitoring system, for continuous beam linear monitoring data to be carried out with wiping machine, analysis and is controlled;
Track slab precision adjustment system, for counting and dividing to track slab construction information, track slab precision adjustment and repetition measurement deviation data Analysis;
Bridge visualizes system, the elevation for completely showing and decomposing displaying bridge structure;
Tunnel visualizes system, plan time, actual construction time, deduction duration, area for completely showing a tunnel Face mileage, two lining journeys, inverted arch mileage and wall rock's level section deployment scenarios.
In embodiments of the present invention, each system under field management system needs to use in work progress in detection process Field apparatus and mobile terminal described in the present embodiment rationally coordinate, and reach the mesh of collection, analysis, early warning and the control of data , it is as follows in detail:
A, mixing station management information system:For realizing that each disk mixing time of mixer, material mixture ratio deviation are carried out Automatic data collection and the closed loop management of analysis alarm, are grasped at the condition of production and alarm closed loop of blending station in real time by mobile terminal Put.
B, laboratory's management information system:For realizing that, to automatic data collection and analysis, test report, record are automatic raw Into test data is uploaded in real time.
C, beam a production management system:It is using mobile Internet, with reference to GIS (GIS-Geographic Information System) technology, to Liang Chang It is managed with beam body construction, including the beam condition of production, manufacturing schedule, material information safeguard statistics etc., realize that Liang Chang is produced Non-support cable, specification beam body manufacture craft, facilitates all levels of management personnel to monitor in real time and data analysis, it is ensured that manufacturing schedule and Quality.
D, plate a production management system:It is using radio frequency identification (RFID), information-based and database technology, to work progress In plate-making, bed board technique carry out information system management.Push forward the process control and standardized management of track plates comprehensively, enter to advance Early warning is spent, supervision plate production promotes Work Flow Optimizing, aids in production management.
E, tunnel surrounding monitoring measurement system:For specification in-site measurement human users, deflection, deformation speed are effectively carried out The exceeded SMS alarm of rate and alarm, record alarm treatment overall process, reduce safety for tunnel engineering risk, improve risk Management and control ability.In measurement process can use tunnel wall rock deformation warning algorithm, with solve in the prior art can not logarithm it is believed that The problem of ceasing instant, effective and continuous management.
F, settlement observation system:For carrying out settlement observation to roadbed, bridges and culverts, tunnel, realize that field operation measurement data is real-time Collection, encryption are sent, wet environment real-time early warning closed loop management.
G, advanced geology prediction system:For to the engineering geology in front of tunnel excavation working face and hydrogeologic condition and Engineering properties, position, occurrence, scale of unfavorable geologic body etc. are detected, analyze interpretation and forecast, and propose that technical measures are built View.
H, roadbed continuous debulking systems:For the compaction quality of complete detection roadbed, detect, be accurately positioned in real time, to not Ftercompction measure is taken in qualified region in time, prevents that roadbed is under-voltage, overvoltage.The data of detection are uploaded to flat in real time by mobile network Platform is shared.
In addition, big-dipper satellite location technology can be used, it can facilitate, be accurately positioned road roller position, rather than limitation pressure Physical circuit seat in the plane is put, and will support freely to exercise completion rolling operation.Terminal and platform realize interaction using wireless technology, can be effective Instruct compacting machine operation.
I, continuous beam linear monitoring system:It is using the information-based means such as mobile Internet, with reference to electronic level, whole station Instrument determines next section mould absolute altitude, instructs next step to construct to monitoring each stage and the deviation of desired value, specification continuous beam Linear monitoring measurement tasks, strengthening deviation transfinites control, realizes continuous beam linear monitoring measurement information, it is ensured that continuous beam is smooth Closure.
J, track slab precision adjustment system:For the more convenient accurate grasp of auxiliary construction unit, construction unit and work tube hub Track slab precision adjustment and situations such as repetition measurement deviation data statistics and analysis when track slab construction information, site operation.
During track slab precision adjustment, system-wide can be provided using RFID as information carrier for each track plates Uniquely " identity card ", Unified coding (the i.e. initialization of electronic tag and hair are carried out to the EPC regions inside RFID Row process).So that track plates are just combined as a whole since the reinforcing bar colligation stage with RFID, the life of track record plate The links of production, coordinate with plate Information software, complete track plates number, " No. two unifications " of tag number, realize track plates The monitoring of production process and the unified upload of track plates information.
K, bridge visualization system:Elevation for completely showing the special construction of some in bridge, by using color To represent that special construction decomposes the construction speed of subdivisional work, provide aid decision to construction and management unit in time and support.
L, tunnel visualization system:Plan time, actual construction time, deduction duration, the palm for completely showing a tunnel Sub- face mileage, two lining journeys, inverted arch mileage and wall rock's level section deployment scenarios, machine is reminded by introducing progress and step pitch early warning System, provides aid decision to construction and management unit in time and supports.
4th, access layer passes through SSL VPN (safe socket character layer VPN), WEB (global wide area network), mobile interchange etc. Technology provides unified entrance for each unit of taking part in building user access platform, realizes the flat of the different modes such as browser, mobile client Platform is accessed.
Plateform system of the present invention also includes basic platform, and the basic platform is the thinking according to master data, is formed Unified coding of each operating information system of railway engineering to identify railway construction element, forms support railway engineering management platform The basic information resources normally run include project, tissue, personnel, form the related standard gauge of Environment in Railway Engineering Construction basic data Model includes coding standard, Data element standard, data criteria for classification, and the basic number of standard, specification is provided for each business application system According to, common data dictionary, meanwhile, provide unified security certificate certification, flow engine, messenger service, daily record clothes for each application The public operation service such as business, short message service, interface service.
Railway engineering management platform system described in the embodiment of the present invention, from Railway Construction Projects quality, safety and progress The angle of management and control is set out, with reference to the actual conditions of Existing Railway Line, devise that one integrated, standardization, intelligent, service Change, be adapted to the unified and open management platform of modern railways informatization, promote Standardization Construction, effectively supervision was constructed Journey, takes precautions against quality safety risk, lifts Construction Project Management level, realizes the orderly efficient propulsion of construction project.Meanwhile, build One builds inexpensive, efficient ecology service circle and Knowledge Integration and increment place towards railway construction field.
Although in addition, it will be appreciated by those of skill in the art that some embodiments described herein include other embodiments In included some features rather than further feature, but the combination of the feature of be the same as Example does not mean in of the invention Within the scope of and form different embodiments.For example, in the following claims, times of embodiment claimed One of meaning mode can be used in any combination.
It should be noted that the present invention will be described rather than limits the invention for above-described embodiment, and ability Field technique personnel can design alternative embodiment without departing from the scope of the appended claims.In the claims, Any reference symbol between bracket should not be configured to limitations on claims.Word "comprising" is not excluded the presence of not Element or step listed in the claims.Word "a" or "an" before element does not exclude the presence of multiple such Element.The present invention can be by means of including the hardware of some different elements and coming real by means of properly programmed computer It is existing.In if the unit claim of equipment for drying is listed, several in these devices can be by same hardware branch To embody.The use of word first, second, and third does not indicate that any order.These words can be explained and run after fame Claim.
One of ordinary skill in the art will appreciate that:Various embodiments above is merely illustrative of the technical solution of the present invention, and It is non-that it is limited;Although the present invention is described in detail with reference to foregoing embodiments, one of ordinary skill in the art It should be understood that:It can still modify to the technical scheme described in foregoing embodiments, or to which part or All technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this hair Bright claim limited range.

Claims (10)

1. a kind of railway engineering management platform system, it is characterised in that including infrastructure layer, data resource layer, service application Layer and access layer, wherein:
Infrastructure layer, collection, transmission and storage for railway engineering parameter;
Data resource layer, for the railway engineering parameter to be handled and stored, the processing according to default processing type Type includes construction, tissue, positioning, classification, coding, retrieval, renewal and safeguarded;
Service application layer, for the management to railway engineering integrated information, the control to construction of railway project process and according to Management of the railway engineering parameter to railway engineering field apparatus;
Access layer, the authentication entrance for providing system.
2. system according to claim 1, it is characterised in that the service application layer includes workbench, service platform And knowledge platform, wherein:
The service platform includes e-commerce system, Web- Based Training and examination system;
The knowledge platform includes all kinds of knowledge learning systems;
The workbench includes total management system, Process Control System and field management system;
The total management system is used for the management to railway engineering integrated information;
The Process Control System is used for the control to construction of railway project process;
The field management system is used for the management according to the railway engineering parameter to railway engineering field apparatus.
3. system according to claim 2, it is characterised in that the total management system includes material management module, letter Release module, office module, project information module, personnel's mechanism module and credit system module are ceased, wherein:
Material management module, input, storage and inquiry for data information;
Information issuing module, the issue for engineering information;
Office module, the regular job for clerical workforce;
Project information module, input, storage and inquiry for project life cycle information;
Personnel's mechanism module, the maintenance for personnel and organizations' information;
Credit system module, resume storehouse and credit interchange for setting up engineering staff.
4. system according to claim 2, it is characterised in that the Process Control System includes dispatch control module, applied Work molded tissue block, work valuation module, builder's diary module, construction drawing auditing module, earth clearance module and problem library module are tested, Wherein:
Dispatch control module, for dispatch command upload and assign;
Construction organization module, typing and issue for construction organization information;
Work valuation module is tested, typing and issue for testing work valuation progress msg;
Builder's diary module, typing and issue for builder's diary;
Construction drawing auditing module, typing and issue for construction drawing msu message;
Earth clearance module, typing and issue for earth clearance progress msg;
Problem library module, registration and issue for construction problem.
5. system according to claim 2, it is characterised in that the field management system includes mixing station agrment information system System, laboratory's management information system, beam production management system, plate production management system, tunnel surrounding monitoring measurement system, Settlement observation system, advanced geology prediction system, roadbed continuous debulking systems, continuous beam linear monitoring system, track slab precision adjustment System, bridge visualization system and tunnel visualization system, wherein:
Mixing station management information system, for being analyzed and processed according to the mixing station creation data that gathers in real time, and according to dividing Analyse result and perform actuation of an alarm;
Laboratory's management information system, collection, record and upload for Test Information;
Beam production management system, statistics and monitoring for beam creation data;
Plate production management system, monitoring and early warning for plate manufacturing schedule information;
Tunnel surrounding monitoring measurement system, for the record of rock deformation information, analysis and early warning;
Settlement observation system, for roadbed, bridges and culverts, the collection of the settling data in tunnel, analysis and early warning;
Advanced geology prediction system, for the engineering geology in front of tunnel excavation working face and hydrogeologic condition and poorly Engineering properties, position, occurrence, the scale of plastid carry out detection collection, analysis and forecast;
Roadbed continuous debulking systems, for the detection to roadbed Continuous compacting condition information, collection and analysis;
Continuous beam linear monitoring system, for continuous beam linear monitoring data to be carried out with wiping machine, analysis and is controlled;
Track slab precision adjustment system, for track slab construction information, track slab precision adjustment and repetition measurement deviation data statistics and analysis;
Bridge visualizes system, the elevation for completely showing and decomposing displaying bridge structure;
Tunnel visualizes system, for the completely plan time in one tunnel of displaying, actual construction time, deduces in duration, face Journey, two lining journeys, inverted arch mileage and wall rock's level section deployment scenarios.
6. system according to claim 1, it is characterised in that the infrastructure layer includes gathering the railway engineering ginseng Several field apparatus and mobile terminal, radio transmission apparatus and storage device.
7. system according to claim 6, it is characterised in that the field apparatus includes Temperature Humidity Sensor, pressure and passed Sensor, photoelectric sensor, magnetic sensor, pickoff, acceleration sensor, bar code, electronic tag, RFID radio frequencies are set It is a variety of in standby, GPS location equipment, hand-held reading device and video monitoring equipment.
8. system according to claim 6, it is characterised in that the radio transmission apparatus includes Radio Transmission Technology, led to With in classification wireless service technology, mobile communication technology, virtual private network technology, mobile interchange technology and satellite communication technology It is a variety of.
9. system according to claim 6, it is characterised in that the storage device includes fibre channel storage, IP The one or more of storage device and DAS storage devices.
10. system according to claim 1, it is characterised in that the access layer by safe socket character layer VPN, Global wide area network, mobile interchange technology provide unified entrance for each unit of taking part in building user access platform.
CN201710165837.5A 2017-03-20 2017-03-20 Railway engineering management platform system Pending CN107146065A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710165837.5A CN107146065A (en) 2017-03-20 2017-03-20 Railway engineering management platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710165837.5A CN107146065A (en) 2017-03-20 2017-03-20 Railway engineering management platform system

Publications (1)

Publication Number Publication Date
CN107146065A true CN107146065A (en) 2017-09-08

Family

ID=59783447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710165837.5A Pending CN107146065A (en) 2017-03-20 2017-03-20 Railway engineering management platform system

Country Status (1)

Country Link
CN (1) CN107146065A (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108108917A (en) * 2018-01-17 2018-06-01 中国铁路郑州局集团有限公司 Railway communication production scheduling command system
CN108446847A (en) * 2018-03-20 2018-08-24 长安大学 A kind of Freeway Informationization Construction faces connected applications method and management system forever
CN108681781A (en) * 2018-07-06 2018-10-19 南京航空航天大学 A kind of subway operation management information system and method based on three-dimensional technology of Internet of things
CN108952815A (en) * 2018-08-24 2018-12-07 中国十九冶集团有限公司 Tunnel safety construction management and control system
CN109918810A (en) * 2019-03-14 2019-06-21 吉林省交通规划设计院 Based on BIM technology to the method and system of expressway construction management
CN109977159A (en) * 2019-03-27 2019-07-05 新疆畺路交通科技有限公司 A kind of civil engineering test detection system based on cloud computing technology
CN110020731A (en) * 2018-12-29 2019-07-16 青岛理工大学 Subway third-party monitoring system and method
CN110147417A (en) * 2019-03-29 2019-08-20 福建省高速公路信息科技有限公司 Expressway works construction supervision unified platform
CN110210051A (en) * 2019-04-20 2019-09-06 青岛理工大学 Geotechnical engineering cloud micro-informatization technology
CN110222102A (en) * 2019-03-18 2019-09-10 成都国营锦江机器厂 The data management system and method for rocket engine ground test
CN110276530A (en) * 2019-05-31 2019-09-24 江苏普信达智能交通有限公司 A kind of intelligent engineering operation and maintenance supervising method
CN110442965A (en) * 2019-08-02 2019-11-12 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway customer service information machine room implementation management system and method based on BIM
CN110533293A (en) * 2019-07-29 2019-12-03 河北远东通信系统工程有限公司 A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal
CN110847963A (en) * 2019-10-08 2020-02-28 中国铁建重工集团股份有限公司 Data interaction system for railway tunnel construction
CN110910288A (en) * 2019-11-29 2020-03-24 江苏安一信息科技有限公司 Intelligent safe bottom-crossing system
CN111241231A (en) * 2019-12-31 2020-06-05 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway construction project document bus system
CN111539658A (en) * 2020-06-24 2020-08-14 中铁二院工程集团有限责任公司 Automatic design system of railway engineering construction organization
CN111724499A (en) * 2020-05-14 2020-09-29 中国铁道科学研究院集团有限公司电子计算技术研究所 Method and device for rapidly displaying monitoring information of urban rail transit equipment in batches
CN112016906A (en) * 2020-09-25 2020-12-01 中铁第六勘察设计院集团有限公司 Method for unifying multiple coding systems of BIM management platform in tunnel construction
CN112150105A (en) * 2020-09-09 2020-12-29 济南轨道交通集团有限公司 BIM-based collaborative method and system for track construction project archive management
CN112270422A (en) * 2020-11-19 2021-01-26 广东电网有限责任公司电力调度控制中心 Knowledge service-based electricity maintenance auxiliary system and method
CN112347215A (en) * 2020-11-06 2021-02-09 中铁第一勘察设计院集团有限公司 Method for building three-dimensional railway construction organization design management system
CN112990784A (en) * 2021-05-07 2021-06-18 中铁一局集团有限公司 Engineering management system based on Internet of things
CN113988790A (en) * 2021-10-26 2022-01-28 基建通(三亚)国际科技有限公司 Comprehensive progress management system for tunnels, bridges and roadbeds
CN114186967A (en) * 2021-12-08 2022-03-15 中铁二十一局集团第五工程有限公司 Engineering information management system and method based on WBS
CN114201799A (en) * 2021-12-07 2022-03-18 浙江华东工程建设管理有限公司 Visual tunnel construction progress management analysis system
CN115600716A (en) * 2022-12-13 2023-01-13 河北电力工程监理有限公司(Cn) Artificial intelligence supervision system and method for electric power engineering site
CN116629696A (en) * 2023-06-06 2023-08-22 广东云下汇金科技有限公司 Data center engineering construction stage construction quality management system platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100971123B1 (en) * 2009-09-03 2010-07-20 주식회사 용마엔지니어링 Earthwork management system for intelligence excavator
CN102567922A (en) * 2012-01-17 2012-07-11 南昌工程学院 Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system
CN202838435U (en) * 2012-01-17 2013-03-27 南昌工程学院 Construction project management system platform based on BIM (Building Information Modeling) network technology
CN104766155A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 Engineering project element management method and system based on BIM
CN105631154A (en) * 2016-01-11 2016-06-01 中铁隧道集团有限公司 Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN106405596A (en) * 2016-08-26 2017-02-15 中国铁道科学研究院电子计算技术研究所 Railway roadbed continuous compaction detection system based on Beidou satellite positioning and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100971123B1 (en) * 2009-09-03 2010-07-20 주식회사 용마엔지니어링 Earthwork management system for intelligence excavator
CN102567922A (en) * 2012-01-17 2012-07-11 南昌工程学院 Construction project management system platform based on BIM (Building Information Modeling) network technology and application method of construction project management system
CN202838435U (en) * 2012-01-17 2013-03-27 南昌工程学院 Construction project management system platform based on BIM (Building Information Modeling) network technology
CN104766155A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 Engineering project element management method and system based on BIM
CN105631154A (en) * 2016-01-11 2016-06-01 中铁隧道集团有限公司 Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN106405596A (en) * 2016-08-26 2017-02-15 中国铁道科学研究院电子计算技术研究所 Railway roadbed continuous compaction detection system based on Beidou satellite positioning and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
沈东升等: "我国铁路行业BIM实施路径的思考", 《铁路技术创新》 *
王万齐: "基于BIM技术的铁路工程建设信息化全寿命周期管理研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
王万齐: "铁路工程管理基础平台方案设计研究", 《铁路技术创新》 *

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108108917A (en) * 2018-01-17 2018-06-01 中国铁路郑州局集团有限公司 Railway communication production scheduling command system
CN108446847A (en) * 2018-03-20 2018-08-24 长安大学 A kind of Freeway Informationization Construction faces connected applications method and management system forever
CN108681781A (en) * 2018-07-06 2018-10-19 南京航空航天大学 A kind of subway operation management information system and method based on three-dimensional technology of Internet of things
CN108681781B (en) * 2018-07-06 2024-01-30 南京航空航天大学 Subway operation and maintenance management information system and method based on three-dimensional Internet of things technology
CN108952815A (en) * 2018-08-24 2018-12-07 中国十九冶集团有限公司 Tunnel safety construction management and control system
CN110020731A (en) * 2018-12-29 2019-07-16 青岛理工大学 Subway third-party monitoring system and method
CN109918810A (en) * 2019-03-14 2019-06-21 吉林省交通规划设计院 Based on BIM technology to the method and system of expressway construction management
CN110222102A (en) * 2019-03-18 2019-09-10 成都国营锦江机器厂 The data management system and method for rocket engine ground test
CN109977159A (en) * 2019-03-27 2019-07-05 新疆畺路交通科技有限公司 A kind of civil engineering test detection system based on cloud computing technology
CN110147417B (en) * 2019-03-29 2022-05-31 福建省高速公路信息科技有限公司 Highway engineering construction supervision integration platform
CN110147417A (en) * 2019-03-29 2019-08-20 福建省高速公路信息科技有限公司 Expressway works construction supervision unified platform
CN110210051A (en) * 2019-04-20 2019-09-06 青岛理工大学 Geotechnical engineering cloud micro-informatization technology
CN110276530A (en) * 2019-05-31 2019-09-24 江苏普信达智能交通有限公司 A kind of intelligent engineering operation and maintenance supervising method
CN110533293A (en) * 2019-07-29 2019-12-03 河北远东通信系统工程有限公司 A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal
CN110442965A (en) * 2019-08-02 2019-11-12 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway customer service information machine room implementation management system and method based on BIM
CN110847963B (en) * 2019-10-08 2021-11-30 中国铁建重工集团股份有限公司 Data interaction system for railway tunnel construction
CN110847963A (en) * 2019-10-08 2020-02-28 中国铁建重工集团股份有限公司 Data interaction system for railway tunnel construction
CN110910288A (en) * 2019-11-29 2020-03-24 江苏安一信息科技有限公司 Intelligent safe bottom-crossing system
CN111241231A (en) * 2019-12-31 2020-06-05 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway construction project document bus system
CN111241231B (en) * 2019-12-31 2023-09-12 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway construction project document bus system
CN111724499A (en) * 2020-05-14 2020-09-29 中国铁道科学研究院集团有限公司电子计算技术研究所 Method and device for rapidly displaying monitoring information of urban rail transit equipment in batches
CN111724499B (en) * 2020-05-14 2022-09-20 中国铁道科学研究院集团有限公司电子计算技术研究所 Method and device for rapidly displaying monitoring information of urban rail transit equipment in batches
CN111539658B (en) * 2020-06-24 2022-09-02 中铁二院工程集团有限责任公司 Automatic design system of railway engineering construction organization
CN111539658A (en) * 2020-06-24 2020-08-14 中铁二院工程集团有限责任公司 Automatic design system of railway engineering construction organization
CN112150105A (en) * 2020-09-09 2020-12-29 济南轨道交通集团有限公司 BIM-based collaborative method and system for track construction project archive management
CN112016906A (en) * 2020-09-25 2020-12-01 中铁第六勘察设计院集团有限公司 Method for unifying multiple coding systems of BIM management platform in tunnel construction
CN112347215A (en) * 2020-11-06 2021-02-09 中铁第一勘察设计院集团有限公司 Method for building three-dimensional railway construction organization design management system
CN112347215B (en) * 2020-11-06 2024-02-27 中铁第一勘察设计院集团有限公司 Construction method of three-dimensional railway construction organization design management system
CN112270422A (en) * 2020-11-19 2021-01-26 广东电网有限责任公司电力调度控制中心 Knowledge service-based electricity maintenance auxiliary system and method
CN112990784A (en) * 2021-05-07 2021-06-18 中铁一局集团有限公司 Engineering management system based on Internet of things
CN113988790A (en) * 2021-10-26 2022-01-28 基建通(三亚)国际科技有限公司 Comprehensive progress management system for tunnels, bridges and roadbeds
CN113988790B (en) * 2021-10-26 2024-09-27 基建通(三亚)国际科技有限公司 Comprehensive progress management system for tunnels, bridges and roadbeds
CN114201799A (en) * 2021-12-07 2022-03-18 浙江华东工程建设管理有限公司 Visual tunnel construction progress management analysis system
CN114186967A (en) * 2021-12-08 2022-03-15 中铁二十一局集团第五工程有限公司 Engineering information management system and method based on WBS
CN115600716A (en) * 2022-12-13 2023-01-13 河北电力工程监理有限公司(Cn) Artificial intelligence supervision system and method for electric power engineering site
CN116629696A (en) * 2023-06-06 2023-08-22 广东云下汇金科技有限公司 Data center engineering construction stage construction quality management system platform

Similar Documents

Publication Publication Date Title
CN107146065A (en) Railway engineering management platform system
CN108591104B (en) A kind of Research on Fan Fault Forecasting based on cloud platform and health management system arranged, method
CN108520342A (en) Platform of internet of things management method based on BIM and its system
CN103390255B (en) A kind of building site digital management system and its application process
CN103824340B (en) Unmanned plane power transmission line intelligent cruising inspection system and method for inspecting
CN103984333B (en) A kind of power plant monitoring and control management system
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN108898360A (en) A kind of power engineering wisdom building site integrated control information system
CN208888869U (en) It is a kind of based on internet+external coordination construction team safety control platform
CN112462696A (en) Intelligent manufacturing workshop digital twin model construction method and system
CN106598000A (en) Production scheduling and safety management and control system
CN109447286A (en) A kind of power transformation O&M Intelligent mobile job platform based on Internet of Things
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN107480954A (en) A kind of petroleum works LIMS
Lytvyn et al. Aviation aircraft planning system project development
CN104820901A (en) Method for evaluating skill of clothing employees at production line based on production on-site data
CN107301498A (en) Generalized information management system for the military service monitoring of high-speed railway wheel rail relation
CN103903088A (en) High-speed railway construction project quality risk control system and method
CN115470940A (en) Building engineering operation and maintenance management system based on BIM technology
Cao et al. A digital twin (DT) framework at design and construction phases
CN109325646A (en) A kind of turnaround of unit scene high-risk operations dynamic control method
US20140058963A1 (en) Facility control system (fcs-c2) (introduction of traveler form) to manage assets planning, design, construction, fabrication, operating, maintence and products fabrication
Archetti et al. Data science and environmental management in smart cities.
CN115048450A (en) Display system of wisdom business recruitment
CN105184497A (en) Bearing capacity analysis method and system based on overall business and production capacity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 2, Da Liu Shu Road, Haidian District, Beijing

Applicant after: INSTITUTE OF COMPUTING TECHNOLOGIES, CARS

Applicant after: BEIJING JINGWEI INFORMATION TECHNOLOGY Co.,Ltd.

Applicant after: CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.

Address before: No. 2, Da Liu Shu Road, Haidian District, Beijing

Applicant before: INSTITUTE OF COMPUTING TECHNOLOGY, CHINA ACADEMY OF RAILWAY SCIENCES

Applicant before: BEIJING JINGWEI INFORMATION TECHNOLOGY Co.,Ltd.

Applicant before: CHINA ACADEMY OF RAILWAY SCIENCES

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Tongjun

Inventor after: Qian Jin

Inventor after: Yang Xinglei

Inventor after: Zhipeng

Inventor after: Liu Wei

Inventor after: Liu Hongfeng

Inventor after: Wang Chao

Inventor after: Guo Xiaocui

Inventor after: Zhang Songfeng

Inventor after: Zhao Yixin

Inventor after: Liu Yuna

Inventor after: Wang Wanqi

Inventor after: Wang Pengcheng

Inventor after: Chen Jie

Inventor after: Hao Rui

Inventor after: Bao Liu

Inventor after: Suo Ning

Inventor after: Bai Ping

Inventor after: Liu Beisheng

Inventor after: Wang Rongbo

Inventor after: Zhang Jinghan

Inventor after: Wang Huilin

Inventor after: Xie Yalong

Inventor after: Lu Wenlong

Inventor after: Guo Ge

Inventor after: Wang Zhihua

Inventor after: Niu Hongrui

Inventor after: Liang Ce

Inventor before: Wang Wanqi

Inventor before: Yang Xinglei

Inventor before: Zhipeng

Inventor before: Liu Wei

Inventor before: Liu Hongfeng

Inventor before: Wang Chao

Inventor before: Guo Xiaocui

Inventor before: Zhang Songfeng

Inventor before: Zhao Yixin

Inventor before: Liu Yuna

Inventor before: Wang Pengcheng

Inventor before: Wang Huilin

Inventor before: Chen Jie

Inventor before: Hao Rui

Inventor before: Bao Liu

Inventor before: Suo Ning

Inventor before: Bai Ping

Inventor before: Liu Beisheng

Inventor before: Wang Rongbo

Inventor before: Zhang Jinghan

Inventor before: Xie Yalong

Inventor before: Lu Wenlong

Inventor before: Guo Ge

Inventor before: Wang Zhihua

Inventor before: Niu Hongrui

Inventor before: Liang Ce

Inventor before: Qian Jin

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908