CN116629696A - Data center engineering construction stage construction quality management system platform - Google Patents
Data center engineering construction stage construction quality management system platform Download PDFInfo
- Publication number
- CN116629696A CN116629696A CN202310662432.8A CN202310662432A CN116629696A CN 116629696 A CN116629696 A CN 116629696A CN 202310662432 A CN202310662432 A CN 202310662432A CN 116629696 A CN116629696 A CN 116629696A
- Authority
- CN
- China
- Prior art keywords
- module
- output end
- input end
- construction
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 85
- 238000003326 Quality management system Methods 0.000 title claims abstract description 21
- 238000004891 communication Methods 0.000 claims abstract description 26
- 238000009430 construction management Methods 0.000 claims abstract description 18
- 238000012545 processing Methods 0.000 claims abstract description 16
- 238000012502 risk assessment Methods 0.000 claims abstract description 10
- 238000007726 management method Methods 0.000 claims description 56
- 238000007689 inspection Methods 0.000 claims description 16
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000006243 chemical reaction Methods 0.000 claims description 8
- 238000002347 injection Methods 0.000 claims description 8
- 239000007924 injection Substances 0.000 claims description 8
- 238000012795 verification Methods 0.000 claims description 8
- 238000013500 data storage Methods 0.000 claims description 6
- 230000010354 integration Effects 0.000 claims description 6
- 238000012544 monitoring process Methods 0.000 claims description 6
- 230000002457 bidirectional effect Effects 0.000 claims description 5
- 238000012937 correction Methods 0.000 abstract description 8
- 230000007547 defect Effects 0.000 abstract description 6
- 230000008520 organization Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 230000007812 deficiency Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 7
- 230000009471 action Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000003908 quality control method Methods 0.000 description 3
- 230000001360 synchronised effect Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the technical field of construction engineering, in particular to a construction quality management system platform in a data center engineering construction stage, which comprises a construction management unit and a central processing unit, wherein the output end of the construction management unit is connected with the input end of an intelligent cloud platform, the output end of the intelligent cloud platform is connected with the input end of a wireless communication module, and the wireless communication unit comprises an anti-shielding receiver, a management port and a WAF firewall. The data center engineering construction stage construction quality management system platform can carry out collaborative management by applying an ECC management platform auxiliary technology, can inspect an engineering construction organization scheme, reduces the probability of mistakes, omission, collision and deficiency in drawings, solves the defects of long quality problem correction period, incomplete data and the like in the traditional engineering construction quality management, can reduce the time consumption of intermediate links, and can carry out corresponding number distinction on a plurality of construction management events by combining a risk assessment unit.
Description
Technical Field
The invention relates to the technical field of construction engineering, in particular to a construction quality management system platform for a data center engineering construction stage.
Background
With the rapid development of socioeconomic performance, construction industry has entered a period of rapid development. At present, construction engineering construction quality control has a low level, and the construction site quality control still generally adopts a drop mode of manual paper recording quality problems, and mainly relies on a traditional manual management mode of on-site quality inspection personnel to find problems, send a correction notice and correct by construction teams.
The Chinese patent publication No. CN107818402A discloses a quality control system for construction engineering, which comprises a system management background and a mobile phone end, wherein the system management background and the mobile phone end are managed by a server, the system management background and the mobile phone end are used for carrying out data transmission through a network, the system management background is used for receiving data transmitted by the mobile phone end and managing and analyzing the data and sending instructions to the mobile phone end, and the system and the method solve the defects of long quality problem correction period, undefined responsibility, incomplete data and the like in the traditional quality management, can reduce the time consumption of intermediate links, clearly define responsibility people for quality inspection and correction links, and effectively feed back the correction effect; the synchronous storage of the engineering quality problems submitted by the construction site, the quality correction and the like is realized, the manual workload is reduced, and the work efficiency is improved.
But this system still has the following problems:
the construction quality management of the construction site generally depends on the safety officer, the supervision and the construction organization to carry out multiple management and control, however, the problems that rework clearly occurs and responsibility positioning is not clear due to the fact that the inspection is not careful, omission and the like are generally caused when people go to carry out the management and control.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the invention provides a construction quality management system platform for a data center engineering construction stage, which has the advantages of accurate information, distinguishing, improving quality management efficiency and the like, and solves the problems that the construction quality management of a construction site generally depends on the safety of a construction unit, supervision and the multiple management and control of the construction unit, however, the manual management and control generally has the problems of clear reworking and unclear responsibility positioning caused by the scrutiny, omission and the like.
(II) technical scheme
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a data center engineering construction stage construction quality management system platform, includes construction management unit and central processing unit, construction management unit's output and intelligent cloud platform's input are connected, intelligent cloud platform's output and wireless communication module's input are connected, wireless communication unit is including preventing shielding receiver, management port and WAF and prevent the wall, prevent shielding receiver's output and management port's input and be connected, management port's output and WAF are prevented the wall's input and are connected, wireless communication unit passes through the two-way electricity of electric signal with central processing unit, central processing unit passes through the two-way electricity of electric signal with risk evaluation unit and is connected, central processing unit and operation data unit two-way electricity are connected, operation data unit's output and ECC management platform's input are connected, ECC management platform's output and information storage unit's input are connected, information storage unit's output and basic station's input are connected, basic station's output and mobile terminal device's input are connected.
Preferably, the construction management unit comprises a data processing module, an image-text collection module, an intelligent ordering module and a monitoring uploading module, wherein the output end of the data processing module is connected with the input end of the image-text collection module, the output end of the image-text collection module is connected with the input end of the intelligent ordering module, and the output end of the intelligent ordering module is connected with the input end of the monitoring uploading module.
Preferably, the intelligent cloud platform comprises an environment positioning module, a data input module and a basic database, wherein the output end of the environment positioning module is connected with the input end of the data input module, and the output end of the data input module is connected with the input end of the basic database.
Preferably, the intelligent cloud platform comprises a supervision terminal, wherein the supervision terminal comprises a problem statistics module, a camera module, an information communication module and a team management module, the output end of the problem statistics module is connected with the input end of the camera module, the output end of the camera module is connected with the input end of the information communication module, and the output end of the information communication module is connected with the input end of the team management module.
Preferably, the risk assessment unit comprises an operation numbering module, a risk estimation module, an information reminding module, an expected construction information generation module and a construction information acquisition module, wherein the output end of the operation numbering module is connected with the input end of the wind direction estimation module, the output end of the operation numbering module is connected with the input end of the risk estimation module, the output end of the risk estimation module is connected with the input end of the information reminding module, the output end of the information reminding module is connected with the input end of the expected construction information generation module, and the output end of the expected construction information generation module is connected with the input end of the construction information acquisition module.
Preferably, the operation data unit includes a numerical module, a state discrimination module, a time node module and a problem checking module.
Preferably, the ECC management platform includes a configuration information module, an information injection verification module, an information exchange module to be tested, an inspection comparison module, and an interruption/uploading pulse information module, where an output end of the configuration information module is connected with an input end of the information injection verification module, an output end of the information injection verification module is connected with an input end of the information exchange module to be tested, an output end of the information exchange module to be tested is connected with an input end of the inspection comparison module, and an output end of the inspection comparison module is connected with an input end of the interruption/uploading pulse information module.
Preferably, the information storage unit comprises a data storage module, a category integration module, a data conversion module and an information transmission module, wherein the output end of the data storage module is connected with the input end of the category integration module, the output end of the category integration module is connected with the input end of the data conversion module, and the output end of the data conversion module is connected with the input end of the information transmission module.
Preferably, the mobile terminal device comprises a management port, a central lattice point and a remote communication device, wherein the output end of the management port is connected with the input end of the central lattice point, and the output end of the central lattice point is connected with the input end of the remote communication device.
(III) beneficial effects
Compared with the prior art, the invention provides a data center engineering construction stage construction quality management system platform, which has the following beneficial effects:
the construction quality management system platform for the engineering construction stage of the data center can carry out examination on engineering construction organization schemes by applying ECC management platform auxiliary technology to carry out collaborative management, reduces the probability of mistakes, omission, collision and deficiency in drawings, solves the defects of long quality problem correction period, incomplete data and the like in the traditional engineering construction quality management, can reduce the time consumption of intermediate links, and the data input module in the intelligent cloud platform, combines a risk assessment unit, can carry out corresponding number distinction on a plurality of construction management events, can carry out the situation that reworking clearly occurs and responsibility positioning is unclear due to the fact that the examination is not careful, omission and the like, carries out the situation that construction responsibility information is detailed to personnel, has the advantage of accurate construction information transmission, realizes the synchronous storage of detailed information such as engineering quality problems submitted on construction sites and safety problems, reduces the manual work amount, improves the engineering efficiency, and improves the engineering quality management efficiency by creating a quality management flow system from problem positioning, finding problems, to data or picture management and control for finally solving the problems.
Drawings
FIG. 1 is a schematic flow chart of a platform of a construction quality management system in a data center engineering construction stage;
FIG. 2 is a schematic flow chart of an ECC management platform system according to the present invention;
fig. 3 is a schematic flow chart of a construction management unit system according to the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-3, a construction quality management system platform for a data center engineering construction stage comprises a construction management unit, wherein the construction management unit comprises a data processing module, a graphic collection module, an intelligent ordering module and a monitoring uploading module, the output end of the data processing module is connected with the input end of the graphic collection module, the output end of the graphic collection module is connected with the input end of the intelligent ordering module, the output end of the intelligent ordering module is connected with the input end of the monitoring uploading module, the output end of the construction management unit is connected with the input end of an intelligent cloud platform, the intelligent cloud platform comprises an environment positioning module, a data input module and a basic database, the output end of the environment positioning module is connected with the input end of the data input module, the output end of the data input module is connected with the input end of the basic database, the intelligent cloud platform comprises a supervision terminal, wherein the supervision terminal comprises a problem statistics module, a camera module, an information communication module and a team management module, the output end of the problem statistics module is connected with the input end of the camera module, the output end of the camera module is connected with the input end of the information communication module, the output end of the information communication module is connected with the input end of the team management module, the output end of the intelligent cloud platform is connected with the input end of a wireless communication module, the wireless communication unit comprises an anti-shielding receiver, a management port and a WAF firewall, the output end of the anti-shielding receiver is connected with the input end of the management port, the output end of the management port is connected with the input end of the WAF firewall, the wireless communication unit is electrically connected with a central processor in a bidirectional mode through an electric signal, the central processor is electrically connected with a risk assessment unit in a bidirectional mode through an electric signal, and the risk assessment unit comprises an operation number module, the system comprises a risk estimation module, an information reminding module, an expected construction information generation module and a construction information acquisition module, wherein the output end of an operation numbering module is connected with the input end of an air direction estimation module, the output end of the operation numbering module is connected with the input end of the risk estimation module, the output end of the risk estimation module is connected with the input end of the information reminding module, the output end of the information reminding module is connected with the input end of the expected construction information generation module, the output end of the expected construction information generation module is connected with the input end of the construction information acquisition module, a central processing unit is electrically connected with an operation data unit in a bidirectional manner, the operation data unit comprises a numerical module, a state discrimination module, a time node module and a problem checking module, the output end of the operation data unit is connected with the input end of an ECC management platform, the ECC management platform comprises a configuration information module, an information injection verification module, an information exchange module, an inspection comparison module, an interruption/uploading pulse information module, the output end of the configuration information module is connected with the input end of the information injection verification module, the output end of the information exchange module is connected with the input end of the information exchange module, the output end of the inspection comparison module is connected with the input end of the inspection module, the input end of the inspection module is connected with the input end of the inspection module, the inspection module is connected with the input end of the data conversion module, the data storage module is connected with the input end of the data storage module, the output end of the data conversion module is connected with the input end of the information transmission module, the output end of the information storage unit is connected with the input end of the base station, the output end of the base station is connected with the input end of the mobile terminal equipment, the mobile terminal equipment comprises a management port, a central lattice point and remote communication equipment, the output end of the management port is connected with the input end of the central lattice point, and the output end of the central lattice point is connected with the input end of the remote communication equipment.
In summary, the data center engineering construction stage construction quality management system platform can carry out collaborative management by applying the ECC management platform auxiliary technology, can inspect an engineering construction organization scheme, reduces the probability of errors, leaks, bumps and defects in drawings, solves the defects of long quality problem correction period, incomplete data and the like in the traditional engineering construction quality management, can reduce the time consumption of intermediate links, and the data input module in the intelligent cloud platform, combines a risk assessment unit, can distinguish corresponding numbers of a plurality of construction management events, can solve the problems of clear reworking occurrence, unclear responsibility positioning and the like caused by the prior inspection, has the advantage of accurate construction information transmission, realizes the synchronous storage of detailed data such as engineering quality problems and safety problems submitted by construction sites, reduces the manual work load, improves the engineering efficiency, and improves the engineering construction quality management through establishing a quality management flow system from problem positioning to finding problems until the final problem solving by using data or picture management.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (9)
1. The utility model provides a data center engineering construction stage construction quality management system platform, includes construction management unit and central processing unit, its characterized in that: the construction management system comprises a construction management unit, a risk assessment unit, an intelligent cloud platform, an ECC management platform, an information storage unit, a base station and a risk assessment unit, wherein the construction management unit is characterized in that the output end of the construction management unit is connected with the input end of the intelligent cloud platform, the output end of the intelligent cloud platform is connected with the input end of the wireless communication module, the wireless communication unit comprises an anti-shielding receiver, a management port and a WAF firewall, the output end of the anti-shielding receiver is connected with the input end of the management port, the output end of the management port is connected with the input end of the WAF firewall, the wireless communication unit is electrically connected with the central processing unit through electric signals in a bidirectional mode, the central processing unit is electrically connected with the risk assessment unit through electric signals in a bidirectional mode, the central processing unit is electrically connected with an operation data unit, the output end of the operation data unit is connected with the input end of the ECC management platform, the output end of the ECC management platform is connected with the input end of the information storage unit, the output end of the information storage unit is connected with the input end of the base station, and the output end of the mobile terminal equipment is connected.
2. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the construction management unit comprises a data processing module, an image-text collecting module, an intelligent sorting module and a monitoring uploading module, wherein the output end of the data processing module is connected with the input end of the image-text collecting module, the output end of the image-text collecting module is connected with the input end of the intelligent sorting module, and the output end of the intelligent sorting module is connected with the input end of the monitoring uploading module.
3. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the intelligent cloud platform comprises an environment positioning module, a data input module and a basic database, wherein the output end of the environment positioning module is connected with the input end of the data input module, and the output end of the data input module is connected with the input end of the basic database.
4. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the intelligent cloud platform comprises a supervision terminal, wherein the supervision terminal comprises a problem statistics module, a camera module, an information communication module and a team management module, the output end of the problem statistics module is connected with the input end of the camera module, the output end of the camera module is connected with the input end of the information communication module, and the output end of the information communication module is connected with the input end of the team management module.
5. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the risk assessment unit comprises an operation numbering module, a risk estimation module, an information reminding module, an expected construction information generation module and a construction information acquisition module, wherein the output end of the operation numbering module is connected with the input end of the wind direction estimation module, the output end of the operation numbering module is connected with the input end of the risk estimation module, the output end of the risk estimation module is connected with the input end of the information reminding module, the output end of the information reminding module is connected with the input end of the expected construction information generation module, and the output end of the expected construction information generation module is connected with the input end of the construction information acquisition module.
6. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the operation data unit comprises a numerical value module, a state judging module, a time node module and a problem checking module.
7. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the ECC management platform comprises a configuration information module, an information injection verification module, an information exchange module to be tested, an inspection comparison module and an interruption/uploading pulse information module, wherein the output end of the configuration information module is connected with the input end of the information injection verification module, the output end of the information injection verification module is connected with the input end of the information exchange module to be tested, the output end of the information exchange module to be tested is connected with the input end of the inspection comparison module, and the output end of the inspection comparison module is connected with the input end of the interruption/uploading pulse information module.
8. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the information storage unit comprises a data storage module, a category integration module, a data conversion module and an information transmission module, wherein the output end of the data storage module is connected with the input end of the category integration module, the output end of the category integration module is connected with the input end of the data conversion module, and the output end of the data conversion module is connected with the input end of the information transmission module.
9. The data center engineering construction phase construction quality management system platform according to claim 1, wherein: the mobile terminal device comprises a management port, a central lattice point and a remote communication device, wherein the output end of the management port is connected with the input end of the central lattice point, and the output end of the central lattice point is connected with the input end of the remote communication device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310662432.8A CN116629696A (en) | 2023-06-06 | 2023-06-06 | Data center engineering construction stage construction quality management system platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310662432.8A CN116629696A (en) | 2023-06-06 | 2023-06-06 | Data center engineering construction stage construction quality management system platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116629696A true CN116629696A (en) | 2023-08-22 |
Family
ID=87621122
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310662432.8A Pending CN116629696A (en) | 2023-06-06 | 2023-06-06 | Data center engineering construction stage construction quality management system platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116629696A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107146065A (en) * | 2017-03-20 | 2017-09-08 | 中国铁道科学研究院电子计算技术研究所 | Railway engineering management platform system |
CN107295008A (en) * | 2017-08-01 | 2017-10-24 | 广东云下汇金科技有限公司 | A kind of connection method for building up under enterprise's mixing cloud computing environment |
CN107818402A (en) * | 2017-09-30 | 2018-03-20 | 中国建筑第七工程局有限公司 | A kind of construction quality control system and method |
CN109840701A (en) * | 2019-01-24 | 2019-06-04 | 四汇建设集团有限公司 | A kind of engineering construction quality control system |
KR102065507B1 (en) * | 2018-12-28 | 2020-01-13 | 이지연 | Realtime construction work management apparatus |
CN112506730A (en) * | 2020-11-10 | 2021-03-16 | 中国人民解放军战略支援部队信息工程大学 | Verification platform and verification method suitable for network switching chip ECC function verification |
WO2021056791A1 (en) * | 2019-09-23 | 2021-04-01 | 济南轨道交通集团有限公司 | Smart management platform for integrated construction and maintenance of rail transport engineering, and method |
CN113111333A (en) * | 2021-04-15 | 2021-07-13 | 广东省林业科学研究院 | Remote interaction system for quick inspection platform |
CN116151755A (en) * | 2022-11-18 | 2023-05-23 | 深圳市东宝信息技术有限公司 | Personnel information intelligent evaluation analysis system |
-
2023
- 2023-06-06 CN CN202310662432.8A patent/CN116629696A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107146065A (en) * | 2017-03-20 | 2017-09-08 | 中国铁道科学研究院电子计算技术研究所 | Railway engineering management platform system |
CN107295008A (en) * | 2017-08-01 | 2017-10-24 | 广东云下汇金科技有限公司 | A kind of connection method for building up under enterprise's mixing cloud computing environment |
CN107818402A (en) * | 2017-09-30 | 2018-03-20 | 中国建筑第七工程局有限公司 | A kind of construction quality control system and method |
KR102065507B1 (en) * | 2018-12-28 | 2020-01-13 | 이지연 | Realtime construction work management apparatus |
CN109840701A (en) * | 2019-01-24 | 2019-06-04 | 四汇建设集团有限公司 | A kind of engineering construction quality control system |
WO2021056791A1 (en) * | 2019-09-23 | 2021-04-01 | 济南轨道交通集团有限公司 | Smart management platform for integrated construction and maintenance of rail transport engineering, and method |
CN112506730A (en) * | 2020-11-10 | 2021-03-16 | 中国人民解放军战略支援部队信息工程大学 | Verification platform and verification method suitable for network switching chip ECC function verification |
CN113111333A (en) * | 2021-04-15 | 2021-07-13 | 广东省林业科学研究院 | Remote interaction system for quick inspection platform |
CN116151755A (en) * | 2022-11-18 | 2023-05-23 | 深圳市东宝信息技术有限公司 | Personnel information intelligent evaluation analysis system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112701790B (en) | Intelligent joint debugging platform and joint debugging method for transformer substation and master station | |
CN109857075B (en) | Mobile terminal-based operation maintenance management system for water resource monitoring platform | |
CN111160791A (en) | Abnormal user identification method based on GBDT algorithm and factor fusion | |
CN110618349B (en) | Ammeter line anomaly detection method, power terminal and power grid system | |
US20240142063A1 (en) | Method for troubleshooting potential safety hazards of compressor in smart gas pipeline network and internet of things system thereof | |
CN109473945B (en) | Relay protection model data verification and automatic configuration method | |
CN103631245A (en) | Power distribution terminal defect diagnostic system and method | |
US6671636B2 (en) | Apparatus, method and article of manufacture for utility monitoring | |
CN112712606B (en) | Automatic inspection management method and system based on operation and maintenance service | |
CN212990152U (en) | Agricultural sewage management system | |
CN111861246B (en) | Rail transit energy-saving assessment method and system based on space-time big data | |
CN117614115A (en) | Substation debugging and acceptance checking system and method based on artificial intelligence | |
CN116629696A (en) | Data center engineering construction stage construction quality management system platform | |
CN111062825A (en) | Low-voltage fault diagnosis and rapid power restoration method based on mobile App | |
CN111369777A (en) | Maintenance method and maintenance system for low-voltage user electricity consumption information acquisition system | |
CN115913891A (en) | Big data analysis-based advanced operation and maintenance system and operation and maintenance method | |
CN113825162B (en) | Method and device for positioning fault reasons of telecommunication network | |
CN113610358A (en) | Remote water quality risk early warning system based on cloud platform | |
CN114760332A (en) | Efficient equipment monitoring and analyzing method | |
CN210111696U (en) | Novel acquisition terminal with platform area diagnosis and self-diagnosis functions | |
CN109035110B (en) | Geological disaster reporting method based on mobile terminal | |
CN116743618B (en) | Data acquisition and analysis method, equipment and medium of station remote equipment | |
TWI748672B (en) | Automatic meter reading abnormality analysis system and method thereof | |
CN113643155B (en) | Block chain voting system based on multi-data analysis | |
CN215679427U (en) | Meteorological data operation monitoring management system on duty |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |