CN109840701A - A kind of engineering construction quality control system - Google Patents

A kind of engineering construction quality control system Download PDF

Info

Publication number
CN109840701A
CN109840701A CN201910070217.2A CN201910070217A CN109840701A CN 109840701 A CN109840701 A CN 109840701A CN 201910070217 A CN201910070217 A CN 201910070217A CN 109840701 A CN109840701 A CN 109840701A
Authority
CN
China
Prior art keywords
module
construction
information
engineering
cloud platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910070217.2A
Other languages
Chinese (zh)
Inventor
黄仁东
张�杰
朱宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SIHUI CONSTRUCTION GROUP CO Ltd
Original Assignee
SIHUI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIHUI CONSTRUCTION GROUP CO Ltd filed Critical SIHUI CONSTRUCTION GROUP CO Ltd
Priority to CN201910070217.2A priority Critical patent/CN109840701A/en
Publication of CN109840701A publication Critical patent/CN109840701A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of engineering construction quality control systems, including the cloud platform being managed by server and intelligent terminal;Cloud platform includes expected construction information generation module and the real-time acquisition module of construction information, expected information generation module is established engineering construction model by BIM technology, is simulated to engineering construction organization scheme and main working procedure, to obtain the expection construction information of engineering;The real-time acquisition module of construction information is exported for carrying out the core construction information for node time instance of constructing after summarizing arrangement with text, diagrammatic form;Intelligent terminal includes communication module, locating module, recording module and photographing module, intelligent terminal is carried out data transmission by communication module and cloud platform, locating module is used for the acquisition of construction site position information, recording module is not finished on schedule for construction site or there are typing is carried out when quality and safety problem with text, photographing module is used for construction site Image Acquisition.Construction information transmitting is convenient, improves engineering efficiency.

Description

A kind of engineering construction quality control system
Technical field
The present invention relates to the technical fields of construction project, more particularly, to a kind of engineering construction quality control system.
Background technique
With the rapid development of social economy, construction business enters the high-speed developing period.Engineering construction matter at present Measure that regulatory level is lower, what quality control in construction site still generallyd use artificial paper record quality problems settles mode, mainly By the traditional artificial management mode of " live quality inspection personnel find the problem-send the rectification of rectification notice-construction team ", by matter Personnel exchange information and rectify and improve the uncertain factors such as reply speed and are affected between inspection, rectification link, and there is the rectification periods Long, responsibility is indefinite and the uneven congruent disadvantage of data, seriously constrains the smooth implementation of engineering construction, economic benefit and society imitate Benefit is bad.In addition, construction site quality management is difficult to realize informationization, become the isolated island of enterprise information system, enterprise is difficult to reality When control field condition, be unfavorable for managing.
Summary of the invention
The object of the present invention is to provide a kind of engineering construction quality control systems, have construction information transmitting convenient, The advantages of improving engineering efficiency.
Foregoing invention purpose of the invention has the technical scheme that a kind of engineering construction quality Management system, including the cloud platform being managed by server and intelligent terminal;
The cloud platform includes expected construction information generation module and the real-time acquisition module of construction information, and the expected information generates Module is established engineering construction model by BIM technology, is simulated to engineering construction organization scheme and main working procedure, to obtain Take the expection construction information of engineering;Core construction information of the real-time acquisition module of construction information for the node time instance that will construct It carries out after summarizing arrangement, is exported with text, diagrammatic form;
The intelligent terminal includes communication module, locating module, recording module and photographing module, and the intelligent terminal passes through communication Module carries out data transmission with cloud platform, and the locating module is used for the acquisition of construction site position information, the recording module It does not finish on schedule for construction site or there are typing is carried out when quality and safety problem with text, the photographing module is for applying The acquisition of work live image.
By adopting the above technical scheme, using BIM ancillary technique coordinated management, engineering construction organization scheme can be examined It looks into, reduces the probability of " Wrong, missing is touched, lacked " in drawing, solve quality problems rectification week in the management of Traditional project construction quality Phase is long, and the uneven congruent disadvantage of data, can cut down the number of intermediate links time-consuming, and it is convenient to have the advantages that construction information transmits;Realize construction The qualitative problems of construction that scene is submitted is stored with the synchronous of particulars such as safety problems, is reduced manual operation amount, is improved engineering Efficiency.
The present invention is further arranged to: the recording module includes that problem checks unit and problem log unit, described to ask Storage is into problem log module after topic investigation unit explains the image that photographing module acquires, and passes through the communication mould Block uploads in cloud platform.
The present invention is further arranged to: it further include supervisor's terminal, supervisor's terminal and the cloud platform communication link Connect, it is contemplated that construction information can in supervisor's terminal real-time display, supervisor according to expected construction information to construction site into Row engineering construction progress and safe mass inspection.
By adopting the above technical scheme, supervisor can go to construction existing according to the expection construction information that supervisor's terminal is shown Field checks the quality and safety of engineering, and verifies the time schedule of project director's typing, so that Project director payes attention to the quality and safety of engineering.
The present invention is further arranged to: the cloud platform further includes risk evaluation module and reminding module, and the risk is commented Module is estimated for carrying out automatic risk assessment to the exception and reason found, and issues early warning automatically, while adjustment is pre- Phase construction information;The reminding module is used to send the management for expected construction information when expected construction information is updated People's terminal simultaneously reminds supervisor.
By adopting the above technical scheme, adjustment is carried out by deadline of the risk evaluation module to each construction node, So that respectively constructing, node is compact to be connected, so that improving engineering completes efficiency;By reminding module to the complete of each construction node At being reminded, is conducive to supervisor and reaches construction site in time.
The present invention is further arranged to: the reminding module is short message reminding module and/or pop-up reminding module and/or electricity Talk about reminding module.
By adopting the above technical scheme, according to different situations, it can be reminded, be applicable in using different reminding modules In various environment, the validity of prompting is improved.
The present invention is further arranged to: adjustment embodiment is to be analyzed by the cloud platform by machine learning data Report, automatic evaluation item it is overdue or there are the problem of generated risk and its reason, and adjustment and Optimizing construction meter It draws.
The present invention is further arranged to: the intelligent terminal further includes problem statistical analysis module, can be occurred to daily The problem of quantity generate statistical graph.
In conclusion advantageous effects of the invention are as follows: the coordinated management of BIM ancillary technique is applied, it can be to engineering construction Organization scheme is examined, reduces the probability of " Wrong, missing is touched, lacked " in drawing, solves in the management of Traditional project construction quality The quality problems rectification period is long, and the uneven congruent disadvantage of data, can cut down the number of intermediate links time-consuming, have construction information transmitting convenient and fast Advantage;It realizes that the qualitative problems of construction that construction site is submitted is stored with the synchronous of particulars such as safety problems, reduces artificial make Industry amount improves engineering efficiency.
Detailed description of the invention
Fig. 1 is the structure flow chart of the embodiment of the present invention.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of engineering construction quality control system, as shown in Figure 1, include the cloud platform that is managed by server and Intelligent terminal;Cloud platform includes expected construction information generation module and the real-time acquisition module of construction information, it is contemplated that information generates mould Block is established engineering construction model by BIM technology, is simulated to engineering construction organization scheme and main working procedure, to obtain The expection construction information of engineering;The real-time acquisition module of construction information is for converging the core construction information for node time instance of constructing After total arrangement, exported with text, diagrammatic form;Intelligent terminal includes communication module, locating module, recording module and camera shooting mould Block, intelligent terminal are carried out data transmission by communication module and cloud platform, and locating module is adopted for construction site position information Collection, recording module do not finish on schedule for construction site or there are typing is carried out when quality and safety problem with text, image mould Block is used for construction site Image Acquisition.
Using BIM ancillary technique coordinated management, engineering construction organization scheme can be examined, in reduction drawing " wrong, Leak, touch, lacking " probability, solve in the management of Traditional project construction quality that the quality problems rectification period is long, the uneven congruent disadvantage of data Disease, can cut down the number of intermediate links time-consuming, and it is convenient to have the advantages that construction information transmits;The construction quality for realizing that construction site is submitted is asked Storage synchronous with the particulars such as safety problem is inscribed, manual operation amount is reduced, improves engineering efficiency.
Recording module includes problem investigation unit and problem log unit, the figure that problem investigation unit acquires photographing module It is uploaded in cloud platform into problem log module, and through communication module as being stored after explaining.Intelligent terminal further includes Problem statistical analysis module can generate statistical graph to daily problem quantity.
It further include supervisor's terminal, supervisor's terminal and cloud platform communicate to connect, it is contemplated that construction information can be at supervisor's end Real-time display is held, supervisor carries out engineering construction progress and safe mass inspection to construction site according to expected construction information;Prison Managing people can go to construction site to examine the quality of engineering and safety according to the expection construction information that supervisor's terminal is shown It looks into, and the time schedule of project director's typing is verified, so that quality and peace of the project director to engineering Paid attention to entirely.
Cloud platform further includes risk evaluation module and reminding module, and risk evaluation module is used for the exception and original found Because carrying out automatic risk assessment, and early warning is issued automatically, while the expected construction information of adjustment;Reminding module is used for when expection When construction information updates, supervisor's terminal is sent by expected construction information and supervisor is reminded.Pass through risk assessment Module carries out adjustment to the deadline of each construction node, so that respectively constructing, node is compact to be connected, to improve work Journey completes efficiency;The completion of each construction node is reminded by reminding module, is conducive to supervisor and reaches construction in time now ?.
Reminding module is short message reminding module and/or pop-up reminding module and/or phone alerts module, according to different feelings Condition can be reminded using different reminding modules, be suitable for various environment, improve the validity of prompting.Adjustment Embodiment is by cloud platform by machine learning data analytical statement, automatic evaluation item it is overdue or there are the problem of it is produced Risk and its reason, and adjustment and Optimizing construction plan.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (7)

1. a kind of engineering construction quality control system, which is characterized in that including the cloud platform that is managed by server and Intelligent terminal;
The cloud platform includes expected construction information generation module and the real-time acquisition module of construction information, and the expected information generates Module is established engineering construction model by BIM technology, is simulated to engineering construction organization scheme and main working procedure, to obtain Take the expection construction information of engineering;Core construction information of the real-time acquisition module of construction information for the node time instance that will construct It carries out after summarizing arrangement, is exported with text, diagrammatic form;
The intelligent terminal includes communication module, locating module, recording module and photographing module, and the intelligent terminal passes through communication Module carries out data transmission with cloud platform, and the locating module is used for the acquisition of construction site position information, the recording module It does not finish on schedule for construction site or there are typing is carried out when quality and safety problem with text, the photographing module is for applying The acquisition of work live image.
2. a kind of engineering construction quality control system according to claim 1, which is characterized in that the recording module Unit and problem log unit are checked including problem, after described problem investigation unit explains the image that photographing module acquires It stores in problem log module, and is uploaded in cloud platform by the communication module.
3. a kind of engineering construction quality control system according to claim 1, which is characterized in that further include supervisor Terminal, supervisor's terminal and the cloud platform communicate to connect, it is contemplated that construction information can be shown in real time in supervisor's terminal Show, supervisor carries out engineering construction progress and safe mass inspection to construction site according to expected construction information.
4. a kind of engineering construction quality control system according to claim 3, which is characterized in that the cloud platform is also Including risk evaluation module and reminding module, the risk evaluation module is used to carry out automatic wind to the exception and reason found Danger assessment, and early warning is issued automatically, while the expected construction information of adjustment;The reminding module is used for when expected construction information When update, supervisor's terminal is sent by expected construction information and supervisor is reminded.
5. a kind of engineering construction quality control system according to claim 4, which is characterized in that the reminding module For short message reminding module and/or pop-up reminding module and/or phone alerts module.
6. a kind of engineering construction quality control system according to claim 4, which is characterized in that adjustment is implemented Scheme is by the cloud platform by machine learning data analytical statement, automatic evaluation item it is overdue or there are the problem of it is produced Risk and its reason, and adjustment and Optimizing construction plan.
7. a kind of engineering construction quality control system according to claim 1, which is characterized in that the intelligent terminal Further include problem statistical analysis module, statistical graph can be generated to daily problem quantity.
CN201910070217.2A 2019-01-24 2019-01-24 A kind of engineering construction quality control system Withdrawn CN109840701A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910070217.2A CN109840701A (en) 2019-01-24 2019-01-24 A kind of engineering construction quality control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910070217.2A CN109840701A (en) 2019-01-24 2019-01-24 A kind of engineering construction quality control system

Publications (1)

Publication Number Publication Date
CN109840701A true CN109840701A (en) 2019-06-04

Family

ID=66884107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910070217.2A Withdrawn CN109840701A (en) 2019-01-24 2019-01-24 A kind of engineering construction quality control system

Country Status (1)

Country Link
CN (1) CN109840701A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363876A (en) * 2019-07-16 2019-10-22 安徽求是工程建设咨询有限公司 A kind of intelligent monitor system for project supervision
CN110378674A (en) * 2019-07-20 2019-10-25 深圳市实瑞建筑技术有限公司 A kind of project delivery method information management system
CN110599245A (en) * 2019-09-04 2019-12-20 四川中道诚建设项目管理有限公司 Engineering project cost data management system
CN111369217A (en) * 2020-03-05 2020-07-03 刘哲生 Old city transformation project engineering construction management system
CN111539690A (en) * 2020-04-28 2020-08-14 悉地(苏州)勘察设计顾问有限公司 Construction project collaborative management method and system based on BIM
CN113076582A (en) * 2021-03-30 2021-07-06 贵州数智联云工程科技有限公司 Multi-party collaborative engineering management system and method based on BIM
CN113128843A (en) * 2021-03-26 2021-07-16 深圳市邦迪工程顾问有限公司 Remote visual supervision system and supervision method for project supervision
CN116629696A (en) * 2023-06-06 2023-08-22 广东云下汇金科技有限公司 Data center engineering construction stage construction quality management system platform

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363876A (en) * 2019-07-16 2019-10-22 安徽求是工程建设咨询有限公司 A kind of intelligent monitor system for project supervision
CN110378674A (en) * 2019-07-20 2019-10-25 深圳市实瑞建筑技术有限公司 A kind of project delivery method information management system
CN110599245A (en) * 2019-09-04 2019-12-20 四川中道诚建设项目管理有限公司 Engineering project cost data management system
CN111369217A (en) * 2020-03-05 2020-07-03 刘哲生 Old city transformation project engineering construction management system
CN111539690A (en) * 2020-04-28 2020-08-14 悉地(苏州)勘察设计顾问有限公司 Construction project collaborative management method and system based on BIM
CN113128843A (en) * 2021-03-26 2021-07-16 深圳市邦迪工程顾问有限公司 Remote visual supervision system and supervision method for project supervision
CN113076582A (en) * 2021-03-30 2021-07-06 贵州数智联云工程科技有限公司 Multi-party collaborative engineering management system and method based on BIM
CN116629696A (en) * 2023-06-06 2023-08-22 广东云下汇金科技有限公司 Data center engineering construction stage construction quality management system platform

Similar Documents

Publication Publication Date Title
CN109840701A (en) A kind of engineering construction quality control system
CN103941745B (en) For without the mobile substation of man-machine polling transmission line and method of work
CN103824340B (en) Unmanned plane power transmission line intelligent cruising inspection system and method for inspecting
CN103823449B (en) For Centralized Monitoring subsystem and the method for supervising of unmanned plane polling transmission line
CN111598379A (en) Project management method, platform, device, computer equipment and storage medium
CN110276530A (en) A kind of intelligent engineering operation and maintenance supervising method
CN109614697A (en) A kind of bridge management system based on BIM
CN107515953A (en) One kind welding overall process quality tracing and analysis system
CN112232761B (en) Infrastructure application system and method
CN102034370B (en) System for automated and simulated competency assessment for thermal power station
CN109857080B (en) Intelligent ship lock operation and maintenance system based on BIM
CN208888869U (en) It is a kind of based on internet+external coordination construction team safety control platform
CN108469752A (en) A kind of security management and control system and method based on GPS positioning and BIM models
CN108694513A (en) A kind of assay calibration laboratory certificate management system and method
CN110334942A (en) Construction Supervision Work procedure information management system
CN107222523A (en) Data processing method, the device and system of terminal
CN109784622A (en) Power grid project process monitoring method and system based on geographical wiring diagram
CN112540975B (en) Multi-source heterogeneous data quality detection method and system based on petri net
CN111178680A (en) Wind power plant engineering quality overall process management system, method and equipment
CN108848337A (en) Long-range auditing method, device, terminal and the computer storage medium of line project
CN109636312A (en) Land control engineering online monitoring and management system
CN111369220A (en) Teacher's cloud platform is built to wisdom
CN106952078A (en) SMS safety management systems based on BPM flow engines
CN111144589A (en) Maintenance equipment management system
CN109214907A (en) A kind of financial audit system Internet-based

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190604