CN110599245A - Engineering project cost data management system - Google Patents
Engineering project cost data management system Download PDFInfo
- Publication number
- CN110599245A CN110599245A CN201910832597.9A CN201910832597A CN110599245A CN 110599245 A CN110599245 A CN 110599245A CN 201910832597 A CN201910832597 A CN 201910832597A CN 110599245 A CN110599245 A CN 110599245A
- Authority
- CN
- China
- Prior art keywords
- information
- module
- project
- engineering
- processing unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013523 data management Methods 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 55
- 238000012545 processing Methods 0.000 claims abstract description 42
- 238000007689 inspection Methods 0.000 claims abstract description 34
- 238000005070 sampling Methods 0.000 claims abstract description 32
- 238000013461 design Methods 0.000 claims abstract description 18
- 238000010586 diagram Methods 0.000 claims abstract description 17
- 238000004891 communication Methods 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims abstract description 4
- 238000012544 monitoring process Methods 0.000 claims description 23
- 230000002159 abnormal effect Effects 0.000 claims description 18
- 238000012937 correction Methods 0.000 claims description 9
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 238000012502 risk assessment Methods 0.000 claims description 5
- 230000005856 abnormality Effects 0.000 claims 3
- 238000002372 labelling Methods 0.000 claims 2
- 238000013475 authorization Methods 0.000 claims 1
- 238000007728 cost analysis Methods 0.000 description 7
- 238000011156 evaluation Methods 0.000 description 6
- 238000012550 audit Methods 0.000 description 4
- 230000002349 favourable effect Effects 0.000 description 3
- 230000001276 controlling effect Effects 0.000 description 2
- 238000007405 data analysis Methods 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 238000010801 machine learning Methods 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Marketing (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Primary Health Care (AREA)
- Tourism & Hospitality (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a project cost data management system, which comprises a data acquisition module, a central processing unit, a storage module and a settlement module, wherein the data acquisition module is used for acquiring data; the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit lists important parts in the engineering project as a plurality of key nodes; the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to the key node; the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit; and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
Description
Technical Field
The invention relates to the technical field of construction cost, in particular to a construction project cost data management system.
Background
The construction cost refers to the construction price of the project, and refers to the total sum of all the expenses expected or actually required for completing the construction of one project. At present, cost budgets, bid quotations and settlement audits of most projects in China are manually collected, summarized and calculated by cost workers according to market prices, adjustment indexes, construction costs and primary design project lists of various materials regularly issued by cost management departments of provinces, cities and autonomous regions.
However, the data of each project cost is huge, and the basis for influencing the project cost is found from a large amount of data and data, so that most of the working time and energy of company cost personnel are occupied. Meanwhile, data and data collected manually are easy to lose, so that the accuracy of cost analysis data is influenced, and the fairness and the scientificity of cost level analysis are influenced.
Disclosure of Invention
The invention aims to provide a project cost data management system, which collects and stores project information and is convenient for extracting data according to the project cost requirement, thereby improving the cost analysis efficiency and accuracy.
The above object of the present invention is achieved by the following technical solutions: a project cost data management system comprises a data acquisition module, a central processing unit, a storage module and a settlement module;
the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit is used for listing important parts in the engineering project as a plurality of key nodes;
the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to a key node;
the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit;
and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
By adopting the technical scheme, the data acquisition module is used for acquiring information in the engineering construction and uploading the acquired information to the central processing unit for processing, so that favorable evidence is provided for settlement of the construction cost in the later period, the information influencing the construction cost is not acquired after the engineering is finished, and at the moment, materials, structures and the like in the engineering construction are difficult to acquire; after the project is finished, cost personnel can directly call the required information from the storage module to settle accounts and audit, so that the efficiency and the accuracy of cost analysis are improved, the workload of calling and influencing the project cost information can be reduced, and the condition of missing is not easy to occur.
The invention is further configured to: the central processing unit comprises an abnormal data marking module, and when the influence information or the sampling inspection information is abnormal with the standard of the engineering design model diagram, the abnormal data marking module marks the abnormal influence information or the sampling inspection information.
By adopting the technical scheme, the abnormal information is marked through the abnormal data marking module, namely the abnormal information is marked during data acquisition, so that all data deviating from the construction cost budget can be directly called during the settlement of the construction cost, and the construction cost analysis efficiency is further improved.
The invention is further configured to: and when the influence information or the sampling inspection information is abnormal with the standard of the engineering design model diagram, mapping and marking on the engineering design model diagram through the central processing unit.
By adopting the technical scheme, the engineering project data and data are effectively associated through the central processing unit, and the actual engineering is displayed by utilizing the engineering design model diagram, so that the construction cost personnel can quickly locate and find the data and data corresponding to a certain key node, thereby improving the processing efficiency, reducing the operation complexity of the construction cost personnel and promoting the construction cost personnel.
The invention is further configured to: the central processing unit comprises a comparison module and a reminding module, the comparison module is used for comparing newly uploaded influence information or sampling inspection information with influence information or sampling inspection information stored in the storage module, and if the influence information or sampling inspection information is identical, monitoring personnel uploading the influence information or sampling inspection information are reminded through the reminding module; and if the result is not the same, the influence information or the sampling inspection information is saved in the storage module.
By adopting the technical scheme, the acquired information is compared through the comparison module, the condition that monitoring personnel does not carefully acquire data or mistakenly upload the previously acquired data to the central processing unit is reduced, so that the acquired data of the whole project are more accurate, and the accuracy of project cost accounting is facilitated.
The invention is further configured to: the central processing unit further comprises a correction module, and the correction module is used for correcting, authorizing and recording the modification influence information or the sampling inspection information of the monitoring personnel by the administrator.
By adopting the technical scheme, the modification information of the monitoring personnel is authorized through the modification module, so that the situation that the monitoring personnel modify the uploaded acquired data randomly and the uploaded acquired data is not allowed to be unfairly is avoided; when the uploaded data is wrong, a monitoring person is required to provide error explanation or evidence to allow the correction.
The invention is further configured to: the central processing unit further comprises a risk evaluation module, and the risk evaluation module is used for carrying out automatic risk evaluation on the project in a delayed or advanced mode according to the influence information or the sampling inspection information, automatically issuing early warning and intelligently adjusting the project progress schedule.
By adopting the technical scheme, the completion time of each construction node is intelligently adjusted through the risk assessment module, so that the construction nodes are compactly connected, and the project completion efficiency is improved; the intelligent regulation project progress timetable is used for automatically evaluating the risk and the reason of the project delay or the risk generated in advance by a central processing unit through a machine learning data analysis report, and intelligently regulating and optimizing the project progress timetable.
The invention is further configured to: the influence information comprises image information and video information of a construction site and a working log of monitoring personnel.
By adopting the technical scheme, the image and the video of the construction site are collected through the intelligent terminal, and the work logs describing the image and the video by monitoring personnel are combined, so that more detailed data can be provided for the engineering cost accounting.
The invention is further configured to: the spot inspection information comprises image information and video information of a construction site and a working log of monitoring personnel.
By adopting the technical scheme, the image and the video of the construction site are collected through the intelligent terminal, and the work logs describing the image and the video by monitoring personnel are combined, so that more detailed data can be provided for the engineering cost accounting.
In conclusion, the beneficial technical effects of the invention are as follows: the data acquisition module is used for acquiring information in the engineering construction and uploading the acquired information to the central processing unit for processing, so that favorable evidence is provided for settlement of the construction cost in the later period, the information influencing the construction cost is not acquired after the engineering is finished, and at the moment, materials, structures and the like in the engineering construction are often difficult to acquire; after the project is finished, cost personnel can directly call the required information from the storage module to settle accounts and audit, so that the efficiency and the accuracy of cost analysis are improved, the workload of calling and influencing the project cost information can be reduced, and the condition of missing is not easy to occur.
Drawings
FIG. 1 is a system block diagram of an embodiment of the invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A project cost data management system, as shown in figure 1, comprises a data acquisition module, a central processing unit, a storage module and a settlement module; the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit lists important parts in the engineering project as a plurality of key nodes; the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to the key node; the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit; and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
The data acquisition module is used for acquiring information in the engineering construction and uploading the acquired information to the central processing unit for processing, so that favorable evidence is provided for settlement of the construction cost in the later period, the information influencing the construction cost is not acquired after the engineering is finished, and at the moment, materials, structures and the like in the engineering construction are often difficult to acquire; after the project is finished, cost personnel can directly call the required information from the storage module to settle accounts and audit, so that the efficiency and the accuracy of cost analysis are improved, the workload of calling and influencing the project cost information can be reduced, and the condition of missing is not easy to occur.
The central processing unit comprises an abnormal data marking module, and when the influence information or the sampling inspection information and the standard of the engineering design model diagram are abnormal, the abnormal data marking module marks the abnormal influence information or the sampling inspection information; the abnormal information is marked through the abnormal data marking module, namely the abnormal information is marked during data acquisition, so that all data deviating from the construction cost budget can be directly called during settlement of construction cost, and the construction cost analysis efficiency is further improved.
When the standard of the influence information or the sampling inspection information and the engineering design model diagram is abnormal, mapping and marking are carried out on the engineering design model diagram through a central processing unit; the engineering project data and data are effectively associated through the central processing unit, and the actual engineering is displayed by utilizing the engineering design model diagram, so that the construction personnel can quickly locate and find the data and data corresponding to a certain key node, the processing efficiency is improved, the operation complexity of the construction personnel is reduced, and the construction personnel is promoted. The influence information comprises image information and video information of a construction site and a working log of monitoring personnel, and the selective inspection information comprises the image information and the video information of the construction site and the working log of the monitoring personnel; the intelligent terminal is used for collecting images and videos of a construction site, and work logs describing the images and videos are combined with monitoring personnel, so that more detailed data can be provided for engineering cost accounting.
The central processing unit comprises a comparison module and a reminding module, wherein the comparison module is used for comparing newly uploaded influence information or sampling inspection information with influence information or sampling inspection information stored in the storage module, and if the influence information or sampling inspection information is similar to the sampling inspection information, monitoring personnel uploading the influence information or sampling inspection information are reminded through the reminding module; and if the result is not the same, storing the influence information or the sampling inspection information into a storage module. The acquired information is compared through the comparison module, the condition that monitoring personnel do not acquire data seriously or upload the data acquired in front to the central processing unit by mistake is reduced, so that the data acquired by the whole project is more accurate, and the accuracy of project cost accounting is facilitated.
The central processing unit also comprises a correction module, and the correction module is used for correcting, authorizing and recording the modification influence information or the sampling inspection information of the monitoring personnel by the administrator; the modification information of the monitoring personnel is authorized through the modification module, so that the situation that the monitoring personnel modify the uploaded acquired data randomly to cause the data loss is avoided; when the uploaded data is wrong, a monitoring person is required to provide error explanation or evidence to allow the correction. The central processing unit also comprises a risk evaluation module, wherein the risk evaluation module is used for carrying out automatic risk evaluation on the project in a delayed or advanced way according to the influence information or the sampling inspection information, automatically issuing early warning and intelligently adjusting the project progress schedule; the completion time of each construction node is intelligently adjusted through the risk assessment module, so that the construction nodes are compactly connected, and the project completion efficiency is improved; the intelligent regulation project progress timetable is used for automatically evaluating the risk and the reason of the project delay or the risk generated in advance by a central processing unit through a machine learning data analysis report, and intelligently regulating and optimizing the project progress timetable.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.
Claims (8)
1. A project cost data management system is characterized by comprising a data acquisition module, a central processing unit, a storage module and a settlement module;
the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit is used for listing important parts in the engineering project as a plurality of key nodes;
the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to a key node;
the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit;
and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
2. The project cost data management system of claim 1, wherein the central processor includes an abnormal data labeling module, and when there is an abnormality in the influence information or the spot check information and the standard of the project design model map, the abnormal data labeling module labels the influence information or the spot check information where the abnormality occurs.
3. The project cost data management system of claim 2, wherein when there is an abnormality in the influence information or the spot check information and the standard of the project model map, the central processing unit maps and marks on the project model map.
4. The engineering project cost data management system of claim 1, wherein the central processing unit comprises a comparison module and a reminding module, the comparison module is used for comparing newly uploaded influence information or sampling inspection information with influence information or sampling inspection information stored in the storage module, and if the influence information or sampling inspection information is similar to the sampling inspection information, monitoring personnel uploading the influence information or sampling inspection information are reminded through the reminding module; and if the result is not the same, the influence information or the sampling inspection information is saved in the storage module.
5. The project cost data management system of claim 4, wherein the central processor further comprises a correction module, and the correction module is used for a manager to perform correction authorization and record on the monitoring personnel modification influence information or the spot check information.
6. The project cost data management system of claim 1, wherein the central processor further comprises a risk assessment module, the risk assessment module is used for carrying out automatic risk assessment on project postponing or in advance according to influence information or sampling inspection information, automatically issuing early warning, and intelligently adjusting project progress schedules.
7. An engineering project cost data management system according to claim 1 wherein the impact information includes image information, video information of the construction site and a work log of monitoring personnel.
8. An engineering project cost data management system according to claim 1 wherein said spot check information includes image information, video information and a work log of monitoring personnel at the construction site.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910832597.9A CN110599245A (en) | 2019-09-04 | 2019-09-04 | Engineering project cost data management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910832597.9A CN110599245A (en) | 2019-09-04 | 2019-09-04 | Engineering project cost data management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110599245A true CN110599245A (en) | 2019-12-20 |
Family
ID=68857725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910832597.9A Pending CN110599245A (en) | 2019-09-04 | 2019-09-04 | Engineering project cost data management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110599245A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111612523A (en) * | 2020-04-26 | 2020-09-01 | 四川同兴达建设咨询有限公司 | Evaluation method and evaluation system for construction engineering cost operation |
CN111667210A (en) * | 2020-04-21 | 2020-09-15 | 国网浙江省电力有限公司 | Intelligent warehouse management method and device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
CN107871004A (en) * | 2017-11-14 | 2018-04-03 | 国家电网公司 | A kind of power distribution network analysis of prices management system |
CN108388711A (en) * | 2018-02-07 | 2018-08-10 | 深圳群伦项目管理有限公司 | A kind of engineering design based on BIM and management system |
CN109754176A (en) * | 2018-12-28 | 2019-05-14 | 四川华信工程造价咨询事务所有限责任公司 | A kind of project cost progress control system |
CN109840701A (en) * | 2019-01-24 | 2019-06-04 | 四汇建设集团有限公司 | A kind of engineering construction quality control system |
CN109858706A (en) * | 2019-02-21 | 2019-06-07 | 蔡小青 | A kind of project cost data management system and method |
CN109902888A (en) * | 2017-12-07 | 2019-06-18 | 株洲中车时代电气股份有限公司 | A kind of project cost method and system |
CN110189175A (en) * | 2019-05-29 | 2019-08-30 | 广东粤能工程管理有限公司 | A kind of project cost consulting system and method |
-
2019
- 2019-09-04 CN CN201910832597.9A patent/CN110599245A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
CN107871004A (en) * | 2017-11-14 | 2018-04-03 | 国家电网公司 | A kind of power distribution network analysis of prices management system |
CN109902888A (en) * | 2017-12-07 | 2019-06-18 | 株洲中车时代电气股份有限公司 | A kind of project cost method and system |
CN108388711A (en) * | 2018-02-07 | 2018-08-10 | 深圳群伦项目管理有限公司 | A kind of engineering design based on BIM and management system |
CN109754176A (en) * | 2018-12-28 | 2019-05-14 | 四川华信工程造价咨询事务所有限责任公司 | A kind of project cost progress control system |
CN109840701A (en) * | 2019-01-24 | 2019-06-04 | 四汇建设集团有限公司 | A kind of engineering construction quality control system |
CN109858706A (en) * | 2019-02-21 | 2019-06-07 | 蔡小青 | A kind of project cost data management system and method |
CN110189175A (en) * | 2019-05-29 | 2019-08-30 | 广东粤能工程管理有限公司 | A kind of project cost consulting system and method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111667210A (en) * | 2020-04-21 | 2020-09-15 | 国网浙江省电力有限公司 | Intelligent warehouse management method and device |
CN111612523A (en) * | 2020-04-26 | 2020-09-01 | 四川同兴达建设咨询有限公司 | Evaluation method and evaluation system for construction engineering cost operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110212645B (en) | Power consumption information acquisition terminal power failure event reporting method and device | |
CN106846176B (en) | Electricity charge accounting system | |
CN108495329B (en) | Method and device for evaluating reliability of base station | |
CN110728836A (en) | Concentrator meter reading abnormity analysis method and system | |
CN104346839B (en) | A kind of employee's electronic attendance system based on LAN | |
CN110599245A (en) | Engineering project cost data management system | |
CN111553633A (en) | Engineering cost management system and method | |
CN111612523A (en) | Evaluation method and evaluation system for construction engineering cost operation | |
CN106709665A (en) | Enterprise internal economic management and control system | |
CN110991979A (en) | Attendance management method, device and equipment for intelligent construction site and computer storage medium | |
CN112734394A (en) | Project supervision information management method based on Internet of things | |
CN112528742A (en) | State checking method and device for transformer substation pressure plate | |
CN109389697A (en) | Recording method, equipment and the readable storage medium storing program for executing of underground inspection data inputting time | |
CN103020721A (en) | Method for evaluating real-time data processing efficiency of power grid dispatching automation system | |
CN114360222A (en) | State early warning method, device, equipment and medium for rental equipment | |
CN107871344B (en) | Anti-substitute-printing attendance checking method for intelligent monitoring management | |
CN113570075A (en) | Remote monitoring software system for water meter | |
CN110514898B (en) | Power grid power supply capacity metering system based on 0.4KV client | |
CN111645730B (en) | Locomotive operation efficiency analysis system | |
CN112508438A (en) | Scheduling dependence calculation method based on electric power big data | |
CN117114365A (en) | Inspection task management method, equipment and readable storage medium | |
CN117093943A (en) | Power consumption monitoring and early warning method and device | |
CN117037530A (en) | Dynamic supervision and analysis method for parking resources | |
CN111882693A (en) | Information processing method and device for employee outwork, electronic equipment and medium | |
CN113052417A (en) | Resource allocation method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191220 |
|
WD01 | Invention patent application deemed withdrawn after publication |