CN110599245A - Engineering project cost data management system - Google Patents

Engineering project cost data management system Download PDF

Info

Publication number
CN110599245A
CN110599245A CN201910832597.9A CN201910832597A CN110599245A CN 110599245 A CN110599245 A CN 110599245A CN 201910832597 A CN201910832597 A CN 201910832597A CN 110599245 A CN110599245 A CN 110599245A
Authority
CN
China
Prior art keywords
information
module
project
engineering
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910832597.9A
Other languages
Chinese (zh)
Inventor
杨雨辉
宋波
吴忠金
张婷婷
李邵鑫
李亚萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhongdaocheng Construction Project Management Co Ltd
Original Assignee
Sichuan Zhongdaocheng Construction Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Zhongdaocheng Construction Project Management Co Ltd filed Critical Sichuan Zhongdaocheng Construction Project Management Co Ltd
Priority to CN201910832597.9A priority Critical patent/CN110599245A/en
Publication of CN110599245A publication Critical patent/CN110599245A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a project cost data management system, which comprises a data acquisition module, a central processing unit, a storage module and a settlement module, wherein the data acquisition module is used for acquiring data; the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit lists important parts in the engineering project as a plurality of key nodes; the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to the key node; the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit; and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.

Description

Engineering project cost data management system
Technical Field
The invention relates to the technical field of construction cost, in particular to a construction project cost data management system.
Background
The construction cost refers to the construction price of the project, and refers to the total sum of all the expenses expected or actually required for completing the construction of one project. At present, cost budgets, bid quotations and settlement audits of most projects in China are manually collected, summarized and calculated by cost workers according to market prices, adjustment indexes, construction costs and primary design project lists of various materials regularly issued by cost management departments of provinces, cities and autonomous regions.
However, the data of each project cost is huge, and the basis for influencing the project cost is found from a large amount of data and data, so that most of the working time and energy of company cost personnel are occupied. Meanwhile, data and data collected manually are easy to lose, so that the accuracy of cost analysis data is influenced, and the fairness and the scientificity of cost level analysis are influenced.
Disclosure of Invention
The invention aims to provide a project cost data management system, which collects and stores project information and is convenient for extracting data according to the project cost requirement, thereby improving the cost analysis efficiency and accuracy.
The above object of the present invention is achieved by the following technical solutions: a project cost data management system comprises a data acquisition module, a central processing unit, a storage module and a settlement module;
the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit is used for listing important parts in the engineering project as a plurality of key nodes;
the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to a key node;
the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit;
and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
By adopting the technical scheme, the data acquisition module is used for acquiring information in the engineering construction and uploading the acquired information to the central processing unit for processing, so that favorable evidence is provided for settlement of the construction cost in the later period, the information influencing the construction cost is not acquired after the engineering is finished, and at the moment, materials, structures and the like in the engineering construction are difficult to acquire; after the project is finished, cost personnel can directly call the required information from the storage module to settle accounts and audit, so that the efficiency and the accuracy of cost analysis are improved, the workload of calling and influencing the project cost information can be reduced, and the condition of missing is not easy to occur.
The invention is further configured to: the central processing unit comprises an abnormal data marking module, and when the influence information or the sampling inspection information is abnormal with the standard of the engineering design model diagram, the abnormal data marking module marks the abnormal influence information or the sampling inspection information.
By adopting the technical scheme, the abnormal information is marked through the abnormal data marking module, namely the abnormal information is marked during data acquisition, so that all data deviating from the construction cost budget can be directly called during the settlement of the construction cost, and the construction cost analysis efficiency is further improved.
The invention is further configured to: and when the influence information or the sampling inspection information is abnormal with the standard of the engineering design model diagram, mapping and marking on the engineering design model diagram through the central processing unit.
By adopting the technical scheme, the engineering project data and data are effectively associated through the central processing unit, and the actual engineering is displayed by utilizing the engineering design model diagram, so that the construction cost personnel can quickly locate and find the data and data corresponding to a certain key node, thereby improving the processing efficiency, reducing the operation complexity of the construction cost personnel and promoting the construction cost personnel.
The invention is further configured to: the central processing unit comprises a comparison module and a reminding module, the comparison module is used for comparing newly uploaded influence information or sampling inspection information with influence information or sampling inspection information stored in the storage module, and if the influence information or sampling inspection information is identical, monitoring personnel uploading the influence information or sampling inspection information are reminded through the reminding module; and if the result is not the same, the influence information or the sampling inspection information is saved in the storage module.
By adopting the technical scheme, the acquired information is compared through the comparison module, the condition that monitoring personnel does not carefully acquire data or mistakenly upload the previously acquired data to the central processing unit is reduced, so that the acquired data of the whole project are more accurate, and the accuracy of project cost accounting is facilitated.
The invention is further configured to: the central processing unit further comprises a correction module, and the correction module is used for correcting, authorizing and recording the modification influence information or the sampling inspection information of the monitoring personnel by the administrator.
By adopting the technical scheme, the modification information of the monitoring personnel is authorized through the modification module, so that the situation that the monitoring personnel modify the uploaded acquired data randomly and the uploaded acquired data is not allowed to be unfairly is avoided; when the uploaded data is wrong, a monitoring person is required to provide error explanation or evidence to allow the correction.
The invention is further configured to: the central processing unit further comprises a risk evaluation module, and the risk evaluation module is used for carrying out automatic risk evaluation on the project in a delayed or advanced mode according to the influence information or the sampling inspection information, automatically issuing early warning and intelligently adjusting the project progress schedule.
By adopting the technical scheme, the completion time of each construction node is intelligently adjusted through the risk assessment module, so that the construction nodes are compactly connected, and the project completion efficiency is improved; the intelligent regulation project progress timetable is used for automatically evaluating the risk and the reason of the project delay or the risk generated in advance by a central processing unit through a machine learning data analysis report, and intelligently regulating and optimizing the project progress timetable.
The invention is further configured to: the influence information comprises image information and video information of a construction site and a working log of monitoring personnel.
By adopting the technical scheme, the image and the video of the construction site are collected through the intelligent terminal, and the work logs describing the image and the video by monitoring personnel are combined, so that more detailed data can be provided for the engineering cost accounting.
The invention is further configured to: the spot inspection information comprises image information and video information of a construction site and a working log of monitoring personnel.
By adopting the technical scheme, the image and the video of the construction site are collected through the intelligent terminal, and the work logs describing the image and the video by monitoring personnel are combined, so that more detailed data can be provided for the engineering cost accounting.
In conclusion, the beneficial technical effects of the invention are as follows: the data acquisition module is used for acquiring information in the engineering construction and uploading the acquired information to the central processing unit for processing, so that favorable evidence is provided for settlement of the construction cost in the later period, the information influencing the construction cost is not acquired after the engineering is finished, and at the moment, materials, structures and the like in the engineering construction are often difficult to acquire; after the project is finished, cost personnel can directly call the required information from the storage module to settle accounts and audit, so that the efficiency and the accuracy of cost analysis are improved, the workload of calling and influencing the project cost information can be reduced, and the condition of missing is not easy to occur.
Drawings
FIG. 1 is a system block diagram of an embodiment of the invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A project cost data management system, as shown in figure 1, comprises a data acquisition module, a central processing unit, a storage module and a settlement module; the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit lists important parts in the engineering project as a plurality of key nodes; the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to the key node; the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit; and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
The data acquisition module is used for acquiring information in the engineering construction and uploading the acquired information to the central processing unit for processing, so that favorable evidence is provided for settlement of the construction cost in the later period, the information influencing the construction cost is not acquired after the engineering is finished, and at the moment, materials, structures and the like in the engineering construction are often difficult to acquire; after the project is finished, cost personnel can directly call the required information from the storage module to settle accounts and audit, so that the efficiency and the accuracy of cost analysis are improved, the workload of calling and influencing the project cost information can be reduced, and the condition of missing is not easy to occur.
The central processing unit comprises an abnormal data marking module, and when the influence information or the sampling inspection information and the standard of the engineering design model diagram are abnormal, the abnormal data marking module marks the abnormal influence information or the sampling inspection information; the abnormal information is marked through the abnormal data marking module, namely the abnormal information is marked during data acquisition, so that all data deviating from the construction cost budget can be directly called during settlement of construction cost, and the construction cost analysis efficiency is further improved.
When the standard of the influence information or the sampling inspection information and the engineering design model diagram is abnormal, mapping and marking are carried out on the engineering design model diagram through a central processing unit; the engineering project data and data are effectively associated through the central processing unit, and the actual engineering is displayed by utilizing the engineering design model diagram, so that the construction personnel can quickly locate and find the data and data corresponding to a certain key node, the processing efficiency is improved, the operation complexity of the construction personnel is reduced, and the construction personnel is promoted. The influence information comprises image information and video information of a construction site and a working log of monitoring personnel, and the selective inspection information comprises the image information and the video information of the construction site and the working log of the monitoring personnel; the intelligent terminal is used for collecting images and videos of a construction site, and work logs describing the images and videos are combined with monitoring personnel, so that more detailed data can be provided for engineering cost accounting.
The central processing unit comprises a comparison module and a reminding module, wherein the comparison module is used for comparing newly uploaded influence information or sampling inspection information with influence information or sampling inspection information stored in the storage module, and if the influence information or sampling inspection information is similar to the sampling inspection information, monitoring personnel uploading the influence information or sampling inspection information are reminded through the reminding module; and if the result is not the same, storing the influence information or the sampling inspection information into a storage module. The acquired information is compared through the comparison module, the condition that monitoring personnel do not acquire data seriously or upload the data acquired in front to the central processing unit by mistake is reduced, so that the data acquired by the whole project is more accurate, and the accuracy of project cost accounting is facilitated.
The central processing unit also comprises a correction module, and the correction module is used for correcting, authorizing and recording the modification influence information or the sampling inspection information of the monitoring personnel by the administrator; the modification information of the monitoring personnel is authorized through the modification module, so that the situation that the monitoring personnel modify the uploaded acquired data randomly to cause the data loss is avoided; when the uploaded data is wrong, a monitoring person is required to provide error explanation or evidence to allow the correction. The central processing unit also comprises a risk evaluation module, wherein the risk evaluation module is used for carrying out automatic risk evaluation on the project in a delayed or advanced way according to the influence information or the sampling inspection information, automatically issuing early warning and intelligently adjusting the project progress schedule; the completion time of each construction node is intelligently adjusted through the risk assessment module, so that the construction nodes are compactly connected, and the project completion efficiency is improved; the intelligent regulation project progress timetable is used for automatically evaluating the risk and the reason of the project delay or the risk generated in advance by a central processing unit through a machine learning data analysis report, and intelligently regulating and optimizing the project progress timetable.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. A project cost data management system is characterized by comprising a data acquisition module, a central processing unit, a storage module and a settlement module;
the central processing unit is respectively in communication connection with the data acquisition module, the storage module and the settlement module and is used for controlling each module to work normally, and the central processing unit is used for listing important parts in the engineering project as a plurality of key nodes;
the storage module is used for storing engineering project information, and the engineering project information comprises an engineering design model diagram and an acquisition standard specification corresponding to a key node;
the data acquisition module is used for acquiring influence information of a construction site according to an acquisition standard specification when a project enters each key node, randomly acquiring spot check information of the construction site in the engineering construction process, and uploading the influence information and the spot check information to the central processing unit;
and the settlement module is used for calculating to obtain the cost result information of the current project according to the engineering design model diagram, the influence information and the sampling inspection information and outputting the cost result information.
2. The project cost data management system of claim 1, wherein the central processor includes an abnormal data labeling module, and when there is an abnormality in the influence information or the spot check information and the standard of the project design model map, the abnormal data labeling module labels the influence information or the spot check information where the abnormality occurs.
3. The project cost data management system of claim 2, wherein when there is an abnormality in the influence information or the spot check information and the standard of the project model map, the central processing unit maps and marks on the project model map.
4. The engineering project cost data management system of claim 1, wherein the central processing unit comprises a comparison module and a reminding module, the comparison module is used for comparing newly uploaded influence information or sampling inspection information with influence information or sampling inspection information stored in the storage module, and if the influence information or sampling inspection information is similar to the sampling inspection information, monitoring personnel uploading the influence information or sampling inspection information are reminded through the reminding module; and if the result is not the same, the influence information or the sampling inspection information is saved in the storage module.
5. The project cost data management system of claim 4, wherein the central processor further comprises a correction module, and the correction module is used for a manager to perform correction authorization and record on the monitoring personnel modification influence information or the spot check information.
6. The project cost data management system of claim 1, wherein the central processor further comprises a risk assessment module, the risk assessment module is used for carrying out automatic risk assessment on project postponing or in advance according to influence information or sampling inspection information, automatically issuing early warning, and intelligently adjusting project progress schedules.
7. An engineering project cost data management system according to claim 1 wherein the impact information includes image information, video information of the construction site and a work log of monitoring personnel.
8. An engineering project cost data management system according to claim 1 wherein said spot check information includes image information, video information and a work log of monitoring personnel at the construction site.
CN201910832597.9A 2019-09-04 2019-09-04 Engineering project cost data management system Pending CN110599245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910832597.9A CN110599245A (en) 2019-09-04 2019-09-04 Engineering project cost data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910832597.9A CN110599245A (en) 2019-09-04 2019-09-04 Engineering project cost data management system

Publications (1)

Publication Number Publication Date
CN110599245A true CN110599245A (en) 2019-12-20

Family

ID=68857725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910832597.9A Pending CN110599245A (en) 2019-09-04 2019-09-04 Engineering project cost data management system

Country Status (1)

Country Link
CN (1) CN110599245A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111612523A (en) * 2020-04-26 2020-09-01 四川同兴达建设咨询有限公司 Evaluation method and evaluation system for construction engineering cost operation
CN111667210A (en) * 2020-04-21 2020-09-15 国网浙江省电力有限公司 Intelligent warehouse management method and device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies
CN107871004A (en) * 2017-11-14 2018-04-03 国家电网公司 A kind of power distribution network analysis of prices management system
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN109754176A (en) * 2018-12-28 2019-05-14 四川华信工程造价咨询事务所有限责任公司 A kind of project cost progress control system
CN109840701A (en) * 2019-01-24 2019-06-04 四汇建设集团有限公司 A kind of engineering construction quality control system
CN109858706A (en) * 2019-02-21 2019-06-07 蔡小青 A kind of project cost data management system and method
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN110189175A (en) * 2019-05-29 2019-08-30 广东粤能工程管理有限公司 A kind of project cost consulting system and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies
CN107871004A (en) * 2017-11-14 2018-04-03 国家电网公司 A kind of power distribution network analysis of prices management system
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN109754176A (en) * 2018-12-28 2019-05-14 四川华信工程造价咨询事务所有限责任公司 A kind of project cost progress control system
CN109840701A (en) * 2019-01-24 2019-06-04 四汇建设集团有限公司 A kind of engineering construction quality control system
CN109858706A (en) * 2019-02-21 2019-06-07 蔡小青 A kind of project cost data management system and method
CN110189175A (en) * 2019-05-29 2019-08-30 广东粤能工程管理有限公司 A kind of project cost consulting system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111667210A (en) * 2020-04-21 2020-09-15 国网浙江省电力有限公司 Intelligent warehouse management method and device
CN111612523A (en) * 2020-04-26 2020-09-01 四川同兴达建设咨询有限公司 Evaluation method and evaluation system for construction engineering cost operation

Similar Documents

Publication Publication Date Title
CN110212645B (en) Power consumption information acquisition terminal power failure event reporting method and device
CN106846176B (en) Electricity charge accounting system
CN108495329B (en) Method and device for evaluating reliability of base station
CN110728836A (en) Concentrator meter reading abnormity analysis method and system
CN104346839B (en) A kind of employee's electronic attendance system based on LAN
CN110599245A (en) Engineering project cost data management system
CN111553633A (en) Engineering cost management system and method
CN111612523A (en) Evaluation method and evaluation system for construction engineering cost operation
CN106709665A (en) Enterprise internal economic management and control system
CN110991979A (en) Attendance management method, device and equipment for intelligent construction site and computer storage medium
CN112734394A (en) Project supervision information management method based on Internet of things
CN112528742A (en) State checking method and device for transformer substation pressure plate
CN109389697A (en) Recording method, equipment and the readable storage medium storing program for executing of underground inspection data inputting time
CN103020721A (en) Method for evaluating real-time data processing efficiency of power grid dispatching automation system
CN114360222A (en) State early warning method, device, equipment and medium for rental equipment
CN107871344B (en) Anti-substitute-printing attendance checking method for intelligent monitoring management
CN113570075A (en) Remote monitoring software system for water meter
CN110514898B (en) Power grid power supply capacity metering system based on 0.4KV client
CN111645730B (en) Locomotive operation efficiency analysis system
CN112508438A (en) Scheduling dependence calculation method based on electric power big data
CN117114365A (en) Inspection task management method, equipment and readable storage medium
CN117093943A (en) Power consumption monitoring and early warning method and device
CN117037530A (en) Dynamic supervision and analysis method for parking resources
CN111882693A (en) Information processing method and device for employee outwork, electronic equipment and medium
CN113052417A (en) Resource allocation method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191220

WD01 Invention patent application deemed withdrawn after publication