CN110189175A - A kind of project cost consulting system and method - Google Patents
A kind of project cost consulting system and method Download PDFInfo
- Publication number
- CN110189175A CN110189175A CN201910457545.8A CN201910457545A CN110189175A CN 110189175 A CN110189175 A CN 110189175A CN 201910457545 A CN201910457545 A CN 201910457545A CN 110189175 A CN110189175 A CN 110189175A
- Authority
- CN
- China
- Prior art keywords
- module
- price
- valuation
- project
- artificial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 9
- 238000004364 calculation method Methods 0.000 claims abstract description 27
- 238000012545 processing Methods 0.000 claims abstract description 17
- 238000009434 installation Methods 0.000 claims description 34
- 239000000463 material Substances 0.000 claims description 34
- 238000010276 construction Methods 0.000 claims description 14
- 238000012937 correction Methods 0.000 claims description 6
- 230000006855 networking Effects 0.000 claims description 4
- 238000011017 operating method Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000012935 Averaging Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000013179 statistical model Methods 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000011234 economic evaluation Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 201000004792 malaria Diseases 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0278—Product appraisal
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The present invention relates to project management fields, it is intended to provide a kind of project cost consulting system and method, its key points of the technical solution are that including modeling module, calculation amount module, parameter module and valuation module, the modeling module is established model according to engineering drawing and is inputted in the calculation amount module, the calculation amount module statistics summarizes the project amount on model and inputs in the valuation module, the parameter module is for updating processing information valence and inputting in the valuation module, the valuation module calculates the expense of engineering according to the result that the parameter module and the calculation amount module input.The present invention is suitable for project cost.
Description
Technical field
The present invention relates to project management fields, more specifically, it relates to a kind of project cost consulting system and side
Method.
Background technique
Cost refers to the construction price of engineering, is the construction to complete an engineering, it is contemplated that or actually required whole take
Use summation.Wherein, engineering includes fitting-out work, improvement project, road engineering, renovation project etc..
Engineering Cost Consulting, which gears to the needs of the society, to be accepted commission, undertakes overall process, the dynamic Cost Management of construction project, including
Feasibility study, investment estimate, economic evaluation of a project, Budgetary Estimates, budget, Engineering Settlement, auditing for construction completion account, calling for tenders of project
The base number of a tender, the establishment of offer by tender and audit are monitored to project cost and provide the industry such as related software in project cost data
Business.
But existing project cost consulting system, which needs to carry out during use market, looks into valence, to obtain
The composite price in special time period such as artificial price, material installation price, mechanical price, also known as information valence are built in reflection,
Using as the budgetary price in Cost System, and monthly to update publication primary for this price, needs operator in time in system
The interior loading for carrying out information updates.When operator, which forgets to be loaded into, to be updated, it will lead to the result estimated and generate deviation, influence pre-
Estimate the accuracy of result.
Summary of the invention
The object of the present invention is to provide a kind of project cost consulting system and methods, can update processing information valence simultaneously
When calculating engineering cost every time, treated that information valence is calculated according to updating, and forgets in system to avoid operator
The information that timely updates valence, impacts the result that system is estimated, high degree of automation.
One of technical purpose of the invention has the technical scheme that a kind of project cost
Consulting system, including modeling module, calculation amount module, parameter module and valuation module, the modeling module are built according to engineering drawing
Formwork erection type simultaneously inputs in the calculation amount module, and the calculation amount module statistics summarizes the project amount on model and inputs the valuation mould
In block, the parameter module is for updating processing information valence and inputting in the valuation module, and the valuation module is according to
Parameter module and the result of calculation amount module input calculate the expense of engineering.
By using above-mentioned technical proposal, engineering drawing is imported, modeling module establishes model, calculation amount mould according to engineering drawing
Project amount on block statistical model, parameter module update processing information valence, and valuation module calculates work according to project amount and information valence
The expense of journey, and then project cost consulting system can update processing information valence and when calculating engineering cost every time according to more
Newly treated, and information valence is calculated, and is forgotten the information valence that timely updates in system to avoid operator, is estimated to system
Result impact, high degree of automation.
Preferably, the parameter module includes that the letters such as artificial price, material installation price, mechanical price are built for typing
The recording module of breath and mean module for being handled the data information of typing.
By using above-mentioned technical proposal, artificial price, material installation price, mechanical price etc. are built in parameter module typing
Data information, and averaging operation is carried out to typing information within a preset period of time, to realize the purpose for updating processing information valence.
Preferably, the recording module continues the data letters such as the artificial price of typing building, material installation price, mechanical price
Breath, until building artificial price, material installation price, the quantity of mechanical price equal samples is respectively at least three.
By using above-mentioned technical proposal, recording module is believed artificial price, material installation price, mechanical price etc. is built
Breath is at least sampled three times, to improve the accuracy of data, is conducive to the calculating of information valence.
Preferably, the mean module to the information such as the artificial price of the building of typing, material installation price, mechanical price into
Row sort operation, and successively the artificial price of building, material installation price, mechanical price etc. are given up most according to classified catalogue
Big value and minimum value take the operation of mean value again.
By using above-mentioned technical proposal, mean module carries out sort operation to sample data and is given up most to data
The processing of big value and minimum value gives up the biggish data of deviation with screening, improves the confidence level of data, be conducive to the meter of information valence
It calculates.
Preferably, by networking with local cost net, synchronized update typing is local for the project cost consulting system
The data informations such as the artificial price of building, material installation price, mechanical price that cost net is networked.
By using above-mentioned technical proposal, project cost consulting system and local cost net are networked, to directly acquire
The information such as artificial price, material installation price, mechanical price are built, it is easy to operate.
Preferably, the inputting date that record compares parameter module typing processing data information is provided in the valuation module
With the calibration module of the real time date of valuation module, inputting date and the date of the valuation module up to the calibration module
When identical, the parameter module exports result to the valuation module.
By using above-mentioned technical proposal, the input time of the data information of calibration module recording parameters module and with valuation
Whether the real-time time in module is compared, exported in time after typing with the data of certificate parameter module, and then engineering item
Mesh cost consultation system when calculating engineering cost every time can treated that information valence is calculated according to updating, it is as a result more quasi-
Really.
Preferably, the modeling module is corrected module and inputs in the calculation amount module, and the correction module is according to construction
The information such as scale, structural property, device type are modified to model, are adjusted.
By using above-mentioned technical proposal, module is corrected according to the model that engineering drawing is established and constantly modifies, adjust, with
So that the model established more is met engineering demand, is conducive to the expense for more accurately calculating engineering.
Second technical purpose of the invention has the technical scheme that a kind of project cost is consulted
The operating method of inquiry system, comprising the following steps:
(1) according to existing data, the full payment that construction project future occurs is predicted and is estimated, and according to engineering drawing
Paper establishes model;
(2) it with modifying, changing to construction scale, structural property, device type etc., adjusts model and inputs calculation amount
In module;
(3) binding model, statistics summarize the type and quantity of project amount on model, and input is valuated in module;
(4) simultaneously, artificial valence is built in the data synchronization updating project cost consulting system networked by local cost net, typing
The information such as lattice, material installation price, mechanical price, the artificial price of at least typing 3 buildings, material installation price, mechanical price
Data sample, successively carry out giving up maximum to building artificial price, material installation price, mechanical price etc. according to classified catalogue
Value and minimum value take the operation of mean value again;
(5) on the final updated date for the calibration module record data valuated in module, compared with the real time date of valuation module
Compared with when the date is identical, in the operating result input valuation module of parameter module;
(6) valuation module utilizes the operating result of parameter module and calculation amount module, calculates the expense of engineering.
By using above-mentioned technical proposal, project cost consulting system is being established, after correction model, inputs calculation amount mould
Statistics summarizes the project amount on model in block, meanwhile, take mean value to grasp again by the data synchronization updating system that local cost net is networked
Make, until parameter module is exported to valuation module when the date of the input time of calibration module is identical as the valuation date of module
As a result, the operating result of valuation module incorporating parametric module and calculation amount module calculates the expense of engineering, information valence is handled to update
And when calculating engineering cost every time, treated that information valence is calculated according to updating, and operator is avoided to forget in system
The information that timely updates valence, impacts the result that system is estimated, high degree of automation.
In conclusion the invention has the following advantages:
1, project cost consulting system can update processing information valence and be handled when calculating engineering cost every time according to update
Information valence afterwards is calculated, and forgets the information valence that timely updates in system to avoid operator, the result estimated to system
It impacts, high degree of automation;
2, parameter module carries out averaging operation to typing information within a preset period of time, updates processing information valence;
3, recording module is at least sampled three times to the information such as artificial price, material installation price, mechanical price are built, data
Accuracy improve;
4, by with local cost net network, directly acquire the data information used, it is easy to operate;
5, it is calculated when calculating engineering cost every time using the information valence handled on the day of system, it is as a result more acurrate;
6, correction module is constantly modified, adjusts model, so that the model established more meets engineering demand, is conducive to more accurately count
Calculate the expense of engineering.
Detailed description of the invention
Fig. 1 is the flow chart of a kind of project cost consulting system and method.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Referring to Fig.1, it is a kind of project cost consulting system disclosed by the invention and method, including modeling module, repairs
Positive module, calculation amount module, parameter module and valuation module.
Modeling module imports engineering drawing in project cost consulting system, establishes model and Introduced Malaria module
It is interior.
Correction module is modified to model according to information such as the construction scale of engineering, structural property, device types, is adjusted
It is whole, until be located in preset error range according to the analog result value that model is calculated, then by model adjusted and defeated
Enter in calculation amount module.
The type and quantity of project amount on calculation amount module statistical model, then summarize in input valuation module, it is used as valuation
The calculating data of module.
Parameter module and local cost net networking, the artificial price of building networked with synchronized update typing locality cost net,
The data informations such as material installation price, mechanical price.
Parameter module includes that the data informations such as artificial price, material installation price, mechanical price are built for typing
Recording module and mean module for being handled the data information of typing.
The data informations such as the artificial price of typing 5 buildings, 5 material installation prices, 5 mechanical prices in recording module,
Mean module classifies by name to data informations such as the artificial price of 5 buildings, 5 material installation prices, 5 mechanical prices
Operation, and successively the artificial price of building, material installation price, mechanical price etc. are carried out giving up maximum value and minimum according to classification
Value takes the processing of mean value again.
The typings such as artificial price, material installation price, mechanical price will be built treated data information input valuation mould
In block.
Inputting date and valuation module that record compares parameter module typing processing data information are provided in valuation module
Real time date calibration module.
When the inputting date of typing processing data information is identical as the real time date of module of valuating, parameter module is to valuation
Module exports the processing result of logging data, and valuation module calculates engineering according to the result that parameter module and calculation amount module input
Expense realizes the purpose for calculating the whole cost for completing an engineering construction.
A kind of operating method of project cost consulting system, comprising the following steps:
(1) according to existing data, the full payment that construction project future occurs is predicted and is estimated, and according to engineering drawing
Paper establishes model;
(2) it with modifying, changing to construction scale, structural property, device type etc., adjusts model and inputs calculation amount
In module;
(3) binding model, statistics summarize the type and quantity of project amount on model, and input is valuated in module;
(4) simultaneously, artificial valence is built in the data synchronization updating project cost consulting system networked by local cost net, typing
The information such as lattice, material installation price, mechanical price, at least 3 buildings artificial prices, material installation price, mechanical price
Data sample successively gives up the data informations such as the artificial price of building, material installation price, mechanical price according to classified catalogue
It abandons maximum value and minimum value takes the operation of mean value again;
(5) on the final updated date for the calibration module record data valuated in module, compared with the real time date of valuation module
Compared with when the date is identical, in the operating result input valuation module of parameter module;
(6) valuation module utilizes the input results of parameter module and calculation amount module, calculates the expense of engineering.
The present embodiment has the beneficial effect that:
1, project cost consulting system can update processing information valence and be handled when calculating engineering cost every time according to update
Information valence afterwards is calculated, and forgets the information valence that timely updates in system to avoid operator, the result estimated to system
It impacts, high degree of automation;
2, parameter module includes recording module, to data informations point such as the artificial price of building, material installation price, mechanical prices
It does not sample at least three times, reduces the unreasonable situation of data, the selection of data is more acurrate;
3, mean module handles sample data, to improve the confidence level of data;
4, project cost consulting system directly network from local cost net obtain build artificial price, material installation price,
The data informations such as mechanical price, it is easy to operate;
5, the letter that calibration module is handled on the day of making project cost consulting system when calculating engineering cost every time using system
Breath valence is calculated, as a result more acurrate;
6, correction module makes the model established more meet engineering demand, is conducive to the expense for more accurately calculating engineering.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of project cost consulting system, it is characterized in that: including modeling module, calculation amount module, parameter module and valuation
Module, the modeling module are established model according to engineering drawing and are inputted in the calculation amount module, and the calculation amount module statistics is converged
Project amount on total model simultaneously inputs in the valuation module, and the parameter module is for updating described in processing information valence and input
In module of valuating, the valuation module calculates taking for engineering according to the result that the parameter module and the calculation amount module input
With.
2. a kind of project cost consulting system according to claim 1, it is characterized in that: the parameter module includes using
The recording module of the information such as artificial price, material installation price, mechanical price is built in typing and for the data letter to typing
Cease the mean module handled.
3. a kind of project cost consulting system according to claim 2, it is characterized in that: the recording module is persistently recorded
Enter to build the information such as artificial price, material installation price, mechanical price, until building artificial price, material installation price, machinery
The quantity of price equal samples is respectively at least three.
4. a kind of project cost consulting system according to claim 3, it is characterized in that: the mean module is to typing
The artificial price of building, material installation price, the information such as mechanical price carry out sort operation, and according to classified catalogue successively to building
Artificial price, material installation price, mechanical price etc. is built to carry out giving up the operation that maximum value and minimum value take mean value again.
5. a kind of project cost consulting system according to claim 1, it is characterized in that: the project cost is consulted
Inquiry system with local cost net by networking, the artificial price of building of synchronized update typing locality cost net networking, material installation
The data informations such as price, mechanical price.
6. a kind of project cost consulting system according to claim 1, it is characterized in that: setting in the valuation module
There is record to compare the calibration module of the inputting date of parameter module typing processing data information and the real time date of valuation module, directly
To the calibration module inputting date it is identical as the valuation date of module when, the parameter module is to the valuation module
Export result.
7. a kind of project cost consulting system according to claim 1, it is characterized in that: the modeling module is corrected
Module inputs in the calculation amount module, and the correction module is according to information such as construction scale, structural property, device types to model
It modifies, adjust.
8. a kind of operating method of project cost consulting system is based on the described in any item engineering projects of claim 1 to 7
Cost consultation system engineering Project Cost consulting system, it is characterized in that: the following steps are included:
(1) according to existing data, the full payment that construction project future occurs is predicted and is estimated, and according to engineering drawing
Paper establishes model;
(2) it with modifying, changing to construction scale, structural property, device type etc., adjusts model and inputs calculation amount
In module;
(3) binding model, statistics summarize the project amount on model;
(4) simultaneously, artificial valence is built in the data synchronization updating project cost consulting system networked by local cost net, typing
The information such as lattice, material installation price, mechanical price, randomly select at least three and build artificial price, material installation price, machinery
The data sample of price successively gives up the artificial price of building, material installation price, mechanical price etc. according to classified catalogue
Maximum value and minimum value take the operation of mean value again;
(5) the final updated time for the calibration module record data valuated in module, compared with the real-time time of valuation module
Compared with when the date is identical, in the operating result input valuation module of parameter module;
(6) valuation module utilizes the operating result of parameter module and calculation amount module, calculates the expense of engineering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910457545.8A CN110189175A (en) | 2019-05-29 | 2019-05-29 | A kind of project cost consulting system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910457545.8A CN110189175A (en) | 2019-05-29 | 2019-05-29 | A kind of project cost consulting system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110189175A true CN110189175A (en) | 2019-08-30 |
Family
ID=67718488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910457545.8A Pending CN110189175A (en) | 2019-05-29 | 2019-05-29 | A kind of project cost consulting system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110189175A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110599245A (en) * | 2019-09-04 | 2019-12-20 | 四川中道诚建设项目管理有限公司 | Engineering project cost data management system |
CN111401688A (en) * | 2020-02-17 | 2020-07-10 | 温州电力设计有限公司 | Engineering cost system and device based on geological estimation |
CN111461526A (en) * | 2020-03-30 | 2020-07-28 | 北京中一鼎合工程造价咨询有限公司 | Construction cost consultation service implementation method and system |
CN111476542A (en) * | 2020-04-08 | 2020-07-31 | 中德华建(北京)国际工程技术有限公司 | Professional division cooperative landing operation scheme for construction cost business |
CN111709067A (en) * | 2020-05-13 | 2020-09-25 | 上海大学 | Assembly type frame structure automatic splitting optimization program based on LINGO software |
CN111738486A (en) * | 2020-05-09 | 2020-10-02 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid inviting and consultation |
CN111985894A (en) * | 2020-08-15 | 2020-11-24 | 武汉华胜工程建设科技有限公司 | Construction engineering project consultation cost management method and system and intelligent terminal |
CN112116382A (en) * | 2020-09-01 | 2020-12-22 | 上海康诚建设工程咨询有限公司 | Engineering cost method, system, computer equipment and medium |
CN112257148A (en) * | 2020-10-14 | 2021-01-22 | 广东展诚工程咨询有限公司 | Full process engineering cost consultation system based on BIM |
CN112307098A (en) * | 2020-10-15 | 2021-02-02 | 上海东方投资监理有限公司 | Cost consultation management method, system, electronic equipment and computer readable storage medium |
CN113034190A (en) * | 2021-03-30 | 2021-06-25 | 重庆渝高科技产业(集团)股份有限公司 | Pricing management system for engineering project |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103366284A (en) * | 2013-07-18 | 2013-10-23 | 北京今达标正软件开发有限公司 | Tender offer and expense control system |
US20140278568A1 (en) * | 2013-03-15 | 2014-09-18 | Eagle View Technologies, Inc. | Price estimation model |
CN104484424A (en) * | 2014-12-19 | 2015-04-01 | 浪潮通用软件有限公司 | Establishing method for resource price information base of construction enterprise based on internet |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN106022649A (en) * | 2016-06-13 | 2016-10-12 | 四川省兴华工程项目管理有限公司 | Comprehensive management system for engineering project supervision, cost, bidding, and consultation |
CN107229791A (en) * | 2017-05-27 | 2017-10-03 | 联合建管(北京)国际工程科技有限责任公司 | Cost of construction metering method and device |
CN109064024A (en) * | 2018-08-02 | 2018-12-21 | 广东展诚工程咨询有限公司 | A kind of engineering Whole Process Cost dynamic management approach and system |
-
2019
- 2019-05-29 CN CN201910457545.8A patent/CN110189175A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278568A1 (en) * | 2013-03-15 | 2014-09-18 | Eagle View Technologies, Inc. | Price estimation model |
CN103366284A (en) * | 2013-07-18 | 2013-10-23 | 北京今达标正软件开发有限公司 | Tender offer and expense control system |
CN104484424A (en) * | 2014-12-19 | 2015-04-01 | 浪潮通用软件有限公司 | Establishing method for resource price information base of construction enterprise based on internet |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN106022649A (en) * | 2016-06-13 | 2016-10-12 | 四川省兴华工程项目管理有限公司 | Comprehensive management system for engineering project supervision, cost, bidding, and consultation |
CN107229791A (en) * | 2017-05-27 | 2017-10-03 | 联合建管(北京)国际工程科技有限责任公司 | Cost of construction metering method and device |
CN109064024A (en) * | 2018-08-02 | 2018-12-21 | 广东展诚工程咨询有限公司 | A kind of engineering Whole Process Cost dynamic management approach and system |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110599245A (en) * | 2019-09-04 | 2019-12-20 | 四川中道诚建设项目管理有限公司 | Engineering project cost data management system |
CN111401688A (en) * | 2020-02-17 | 2020-07-10 | 温州电力设计有限公司 | Engineering cost system and device based on geological estimation |
CN111461526A (en) * | 2020-03-30 | 2020-07-28 | 北京中一鼎合工程造价咨询有限公司 | Construction cost consultation service implementation method and system |
CN111476542A (en) * | 2020-04-08 | 2020-07-31 | 中德华建(北京)国际工程技术有限公司 | Professional division cooperative landing operation scheme for construction cost business |
CN111738486B (en) * | 2020-05-09 | 2024-03-01 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid-inviting and consultation |
CN111738486A (en) * | 2020-05-09 | 2020-10-02 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid inviting and consultation |
CN111709067A (en) * | 2020-05-13 | 2020-09-25 | 上海大学 | Assembly type frame structure automatic splitting optimization program based on LINGO software |
CN111985894A (en) * | 2020-08-15 | 2020-11-24 | 武汉华胜工程建设科技有限公司 | Construction engineering project consultation cost management method and system and intelligent terminal |
CN112116382A (en) * | 2020-09-01 | 2020-12-22 | 上海康诚建设工程咨询有限公司 | Engineering cost method, system, computer equipment and medium |
CN112257148A (en) * | 2020-10-14 | 2021-01-22 | 广东展诚工程咨询有限公司 | Full process engineering cost consultation system based on BIM |
CN112307098A (en) * | 2020-10-15 | 2021-02-02 | 上海东方投资监理有限公司 | Cost consultation management method, system, electronic equipment and computer readable storage medium |
CN113034190A (en) * | 2021-03-30 | 2021-06-25 | 重庆渝高科技产业(集团)股份有限公司 | Pricing management system for engineering project |
CN113034190B (en) * | 2021-03-30 | 2023-11-07 | 重庆渝高科技产业(集团)股份有限公司 | Nuclear price management system for engineering project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110189175A (en) | A kind of project cost consulting system and method | |
CN114511202B (en) | BIM-based full-period engineering project management method and platform | |
CN108932589B (en) | Enterprise informatization project implementation management system | |
CN107123982B (en) | Power distribution network reliability economic benefit analysis method based on equipment transaction | |
CN109816328A (en) | Power engineering Project Technical economic information system | |
CN110910092A (en) | Highway construction information management platform | |
CN109685558B (en) | Power engineering cost evaluation system based on BIM technology | |
CN105574673A (en) | System and method for man-hour management of design company | |
CN107909280A (en) | A kind of electricity power engineering managing and control system and its control method based on bill of quantities | |
CN111882202A (en) | Group building synchronous construction risk management system based on BP neural network | |
CN109636616B (en) | Method for realizing project group progress master control management | |
CN114971356A (en) | Electric power engineering project progress prediction system and method | |
CN111429100A (en) | Construction project cost system and cost method | |
CN106997524A (en) | A kind of cold rolled automobile sheet product design and development system | |
CN105867341A (en) | Online equipment health state self-detection method and system for tobacco processing equipment | |
CN103761618A (en) | Control method and system of science and technology item | |
CN115187039A (en) | Construction progress management method and system based on BIM | |
CN113837730B (en) | Three-rate-in-one-based multidimensional collaborative management and control system for project of main grid of power grid infrastructure | |
Chang et al. | The use of a multiple risk level model to tackle the duration of risk for construction activity | |
CN107194536A (en) | The power supply reliability negative benefit appraisal procedure and device of a kind of project investment | |
CN107563626B (en) | Cost measuring, calculating and monitoring system based on prepreg in process manufacturing process | |
CN116775672B (en) | BIM-based engineering cost data dynamic correction method and system | |
JP2003288476A (en) | Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line | |
CN111461526A (en) | Construction cost consultation service implementation method and system | |
CN111859522A (en) | BIM-based highway engineering rapid construction cost method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190830 |