CN107194536A - The power supply reliability negative benefit appraisal procedure and device of a kind of project investment - Google Patents

The power supply reliability negative benefit appraisal procedure and device of a kind of project investment Download PDF

Info

Publication number
CN107194536A
CN107194536A CN201710238790.0A CN201710238790A CN107194536A CN 107194536 A CN107194536 A CN 107194536A CN 201710238790 A CN201710238790 A CN 201710238790A CN 107194536 A CN107194536 A CN 107194536A
Authority
CN
China
Prior art keywords
power supply
project
investment
supply reliability
negative benefit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710238790.0A
Other languages
Chinese (zh)
Inventor
胡丽娟
刁赢龙
盛万兴
刘科研
孟晓丽
贾东梨
董伟杰
何开元
叶学顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201710238790.0A priority Critical patent/CN107194536A/en
Publication of CN107194536A publication Critical patent/CN107194536A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of power supply reliability negative benefit appraisal procedure of project investment, and this method includes:Based on power supply area statistical item total investment and equipment alteration information per year, and calculate the drop-out value of power supply reliability index caused by Distribution Network Equipment unusual fluctuation and equipment construction investment totle drilling cost, the characteristics of threshold value is less than or equal to according to the difference of project investment total value and the estimated value of equipment construction investment totle drilling cost, going out equipment alteration information and project investment total value based on neural metwork training has the power supply reliability negative benefit assessment models of correlation, and Project Investment is inputted into the model determines power supply reliability negative benefit.The power supply reliability negative benefit appraisal procedure that the present invention is provided, the differentiation for not only realizing the different reliability level power distribution network project investments of different power supply areas is assessed, also realize that the input amount of money is analyzed the quantization influence of power supply reliability index, the problem of project investment can not be associated with outage information in actual production is solved, the investment construction of power distribution network is instructed.

Description

The power supply reliability negative benefit appraisal procedure and device of a kind of project investment
Technical field
The present invention relates to distribution network reliability field, the negative effect of in particular to a kind of power supply reliability of project investment Beneficial appraisal procedure and device.
Background technology
Gradually stepped up with the continuous social and economic development with living standards of the people, people can to power supply quality and power supply Require higher by property, inject capital into more and more, such as how minimum resource consumption, provide the user safe and reliable and high-quality Electric energy, realize operation benefits maximize be current power distribution network production management emphasis.And in current power distribution network, due to for Power network weak spot and key link assurance are inaccurate, there are problems that being difficult to the economy of equipment investment, so as to cause The phenomenon such as input and income imbalance, certain customers' overinvestment, power grid construction be unbalanced, has a strong impact on power distribution network and sends out comprehensively Exhibition, further, since project implementation process needs power failure operation, during project construction, will cause under power supply reliability index Drop, i.e. project input produce power supply reliability negative benefit, and power supply reliability negative benefit is an important side for assessing returns of investment Face, qualitative assessment is carried out to it can more accurately assess the cost economic benefit of power distribution network project investment.
In actual electric network construction and operation maintenance, actual investment is often carried out in units of project, different types of project, Different to the lifting effect of distribution network reliability index, in the project implementation process, the degree such as loss of outage for causing of constructing is not yet Together, thus, for certain investment, its reliability benefit is also different, is the reliability cost benefit of clear and definite items of different types, So as to the investment of more preferable guide item, and then the reliability and economy of power distribution network are more effectively improved, need research project to invest Power supply reliability cost benefit estimation method, for the lifting effect of positive benefit, i.e. project investment to power supply reliability at a specified future date, Study more at present, and decline for construction period power supply reliability index caused by project investment and be often ignored.
Therefore, finding a kind of power supply reliability negative benefit appraisal procedure of project investment so that its more preferable guide item Investment, more effectively improve power distribution network reliability and economy, as those skilled in the art it is in the urgent need to address the problem of.
The content of the invention
In order to solve the above-mentioned deficiency in the presence of prior art, the present invention provides a kind of power supply reliability of project investment Negative benefit appraisal procedure and device.The appraisal procedure includes:
I, based on power supply area statistical item total investment per year;
II, equipment alteration information is counted per year, and calculate power supply reliability caused by equipment alteration described in power distribution network and refer to Target drop-out value;
III, according to the unusual fluctuation equipment, computing device construction investment totle drilling cost;
IV, setting deviation threshold, the difference for the estimated value for investing totle drilling cost according to project investment total value and equipment construction are less than The characteristics of equal to the threshold value, going out equipment alteration information based on neural metwork training has the confession of correlation with project investment total value Electric reliability negative benefit assessment models;
V, based on the power supply reliability negative benefit assessment models, the negative effect of power supply reliability is determined according to Project Investment Benefit.
It is preferred that, the putting equipment in service time field of matching unit unusual action information and the phase same date in distribution network reliability with Construction power failure termination time field, calculates the drop-out value of the power supply reliability index of the step II.
It is preferred that, the power supply reliability index of the step II includes:Total amount when having a power failure and total caused by equipment alteration Lack delivery.
It is preferred that, amount is calculated as follows during total power failure caused by the equipment alteration:
Always lack delivery M caused by the equipment alterationiIt is calculated as follows:
In formula, m:The frequency of power cut caused by equipment alteration is constructed;zij:Customer interrupted number when having a power failure every time; rij:Refer to What is had a power failure every time restores electricity the time;j∈(1,2,…,m);I ∈ (1,2,3 ..., n), which sample represented;Mij:Stop every time The always scarce delivery of electricity.
It is preferred that, project related to the power supply reliability step I includes:Major repair project, technological transformation project, capital construction Project, move and change project and power distribution automation project.
It is preferred that, the distribution network construction investment totle drilling cost of the step III includes:Original equipment cost and replacing equipment construction Take;
The original equipment cost is calculated by the device type and unit type of unusual fluctuation equipment and obtained.
It is preferred that, the step IV large deviations threshold value is x%, wherein x≤10.
It is preferred that, the power supply reliability negative benefit assessment models of the step IV include:Will be related to power supply reliability The investment amount of project is as input, and power supply reliability negative benefit builds power supply reliability negative benefit assessment models as output.
It is preferred that, the capital project of the step V includes:Total investment.
A kind of power supply reliability negative benefit apparatus for evaluating of project investment, including:Data acquisition module, input module, number According to processing module, reliability negative benefit evaluation module and output module;
The data acquisition module is used for the equipment alteration information for gathering power distribution network;
The input module is used for the data transfer of the data collecting module collected to data processing module;
The data processing module is used to be classified the equipment alteration information, and calculating is supplied caused by equipment alteration Electric reliability negative benefit and distribution network construction invest totle drilling cost;
The reliability negative benefit evaluation module using capital project as input, power supply reliability negative benefit as output, Using neural metwork training go out equipment alteration information and capital project there is the feature of correlation to set up the power supply of capital project can By property negative benefit assessment models;
The pre- capital project of project that the output module output is assessed by the power supply reliability negative benefit assessment models Reliability negative benefit.
It is preferred that, the capital project includes:Total investment.
Compared with prior art, beneficial effects of the present invention are:
(1) present invention presses territorial classification, and the assessment models of different zones are generated respectively, different power supply areas can be achieved different The differentiation of reliability level power distribution network project investment is assessed;
(2) present invention is based on the existing standard such as equipment alteration information and engineering construction budget level, goods and materials budgetary price File, estimation distribution network construction investment totle drilling cost, can accurately estimate the project that influence is produced on distribution network reliability Investment amount, so as to can realize that the input amount of money is analyzed the quantization influence of power supply reliability index;
(3) present invention is estimated using data fusion method to the power supply reliability benefit of project investment, can be avoided multiple Miscellaneous Analytic modeling, so as to greatly simplify analysis process;
(4) it is proposed by the present invention to utilize each intermediate item actual investment total value and the foundation of investment one based on equipment alteration estimation The feature of cause, the method for generating the reliability negative benefit qualitative assessment model of project investment can the investment of quantitative analysis disparity items Influence of the scheme to distribution network reliability, solves the problem of project investment can not be associated with outage information in actual production, So as to preferably instruct the investment construction of power distribution network.
Brief description of the drawings
Fig. 1 is the power supply reliability negative benefit appraisal procedure flow chart of the project investment of the present invention;
Fig. 2 is the power supply reliability negative benefit assessment models schematic diagram based on neutral net of the invention.
Embodiment
For a better understanding of the present invention, present disclosure is done further with reference to Figure of description and example Explanation.
As shown in Figure 1, the present invention influences different for power distribution network disparity items input on distribution network reliability Problem, proposes a kind of power supply reliability negative benefit appraisal procedure of project investment.Specifically include following steps:
I, based on power supply area statistical item total investment per year
Power supply area and analysis year are determined, with the power supply reliability phase in the analysis year of the statistics power supply area The project investment total value of pass;
By power distribution network project investment region according to《Distribution network planning designing technique directive/guide》Closed in (Q/ GDW1738-2012) Divided in the requirement of the power supply zone criteria for classifying, choose A classes region, B classes region, C classes region, the class of D classes region four difference Analyzed respectively.
Using a certain class power supply area as analysis object, using year as the cycle, count related to power supply reliability in certain region Project investment total value, project is classified, rough segmentation is major repair project, technological transformation project, construction project, moves and change project, distribution The major class of automation projects five, counts all kinds of investment amounts respectively, forms a capital project, i-th of investor in A classes region Case sample is designated as:
Ai=[A1i,A2i,A3i,A4i,A5i] (1)
Wherein, i ∈ (1,2,3 ..., n), A1i、A2i、A3i、A4i、A5iA certain power supply area in A classes region is represented respectively Major repair project in 1 year, technological transformation project, construction project, move and change project, the investment amount of power distribution automation project.
II, equipment alteration information is counted per year, and calculate power supply reliability caused by equipment alteration described in power distribution network and refer to Target drop-out value
To capital project A in step 1i, according to its region and the year of analysis, the power supply is obtained from PMS2.0 systems The equipment alteration information of power distribution network in the year of region, then by matching PMS2.0 systems and Electric Power Quality On-line Monitor System " putting equipment in service time " field of middle phase same date and " construction power failure termination time " field, by equipment alteration information and power distribution network Power supply reliability is connected, amount total amount when lacking delivery total amount caused by equipment alteration in statistical analysis year and having a power failure, So as to obtain the data message that has a power failure caused by equipment alteration.
Using year as analytical cycle, for capital project Ai, because equipment alteration construct caused by frequency of power cut m, stop every time Customer interrupted number when electric is zij, rijRefer to that what is had a power failure every time restores electricity the time, the always scarce delivery having a power failure every time is Mij。 Amount Z during total power failure caused by equipment alterationiFor:
In formula, and j ∈ (1,2, L, m).
Always lack delivery M caused by equipment alterationiFor:
m:The frequency of power cut caused by equipment alteration is constructed;zij:Customer interrupted number when having a power failure every time;rij:Finger stops every time Electric restores electricity the time;j∈(1,2,…,m);I ∈ (1,2,3 ..., n), which sample represented; Mij:Have a power failure every time Always lack delivery.
III, according to the unusual fluctuation equipment, computing device construction investment totle drilling cost
Foundation《20KV and following distribution network engineering build budget compilation with calculating standard》、《State's net Power Material budget valency Lattice》File is provided, based on the equipment alteration information counted in step 2, passes through " device type ", " equipment type of unusual fluctuation equipment Number ", the Installed capital cost of computing device unusual fluctuation, and then calculate the distribution network construction investment totle drilling cost for obtaining analysis year.
Distribution network construction investment totle drilling cost is made up of installing engineering expense, original equipment cost, other fees and activity charge, i.e., 1 grade is divided into installing engineering expense, original equipment cost, other fees and the major class of activity charge 4, per class be subdivided into 2 grades classification, 3 grades of classification, 4 grades of classification, are refined, general expenses content refers to table 1 with calculation formula step by step.
Table 1:Distribution network construction cost of investment general expenses content and calculation formula full edition
IV, setting deviation threshold, the difference for the estimated value for investing totle drilling cost according to project investment total value and equipment construction are less than The characteristics of equal to the threshold value, going out equipment alteration information based on neural metwork training has the confession of correlation with project investment total value Electric reliability negative benefit assessment models
Using in analysis year, by the difference between the calculated gross investment of equipment alteration and actual investment in deviation Feature in threshold value, the difference between the overall cost of ownership of gained in all kinds of project investment amount of money in step I and step IV is existed Capital project in threshold value, will by the data formation multiple samples of capital project of multiple regions, different year as a sample Capital project be the investment amount of each intermediate item as input, power supply reliability negative benefit is as output, using neural network Train the power supply reliability negative benefit assessment models of Project Investment.
V, based on the power supply reliability negative benefit assessment models, the negative effect of power supply reliability is determined according to Project Investment Benefit
Estimation flow as shown in Figure 2 based on neutral net, by Project Investment to be assessed, i.e., the throwing of each intermediate item Power supply reliability negative benefit assessment models obtained by capital amount input step IV, calculate the power supply reliability under different capital projects Negative benefit.
A kind of power supply reliability negative benefit apparatus for evaluating of project investment, including:Data acquisition module, input module, number According to processing module, reliability negative benefit evaluation module and output module;
Data acquisition module is used for the equipment alteration information for gathering power distribution network;
Input module is used for the data transfer of the data collecting module collected to data processing module;
Data processing module is used to be classified equipment alteration information, calculates the power supply reliability caused by equipment alteration Negative benefit and distribution network construction investment totle drilling cost;
Reliability negative benefit evaluation module is using capital project as input, and power supply reliability negative benefit is used as output Neural metwork training goes out the power supply reliability that there is the feature of correlation to set up capital project for equipment alteration information and capital project Negative benefit assessment models;
Output module output by the power supply reliability negative benefit assessment models assessment the pre- capital project of project can By property negative benefit.
Capital project includes:Total investment.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the application can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the application can be used in one or more computers for wherein including computer usable program code The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is the flow with reference to method, equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
Embodiments of the invention are these are only, are not intended to limit the invention, it is all in the spirit and principles in the present invention Within, any modification, equivalent substitution and improvements done etc., be all contained in apply pending scope of the presently claimed invention it It is interior.

Claims (11)

1. the power supply reliability negative benefit appraisal procedure of a kind of project investment, it is characterised in that methods described includes:
I, based on power supply area statistical item total investment per year;
II, statistics equipment alteration information, and calculate power supply reliability index caused by equipment alteration described in power distribution network per year Drop-out value;
III, according to the unusual fluctuation equipment, computing device construction investment totle drilling cost;
IV, setting deviation threshold, the difference for the estimated value for investing totle drilling cost according to project investment total value and equipment construction are less than or equal to The characteristics of threshold value, going out equipment alteration information and project investment total value based on neural metwork training has the power supply of correlation can By property negative benefit assessment models;
V, based on the power supply reliability negative benefit assessment models, power supply reliability negative benefit is determined according to Project Investment.
2. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that matching unit The putting equipment in service time field and construction power failure termination time field, meter of unusual action information and the phase same date in distribution network reliability Calculate the drop-out value of the power supply reliability index of the step II.
3. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that the step II power supply reliability index includes:Amount lacks delivery with total during total power failure caused by equipment alteration.
4. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 3, it is characterised in that the equipment Amount is calculated as follows during total power failure caused by unusual fluctuation:
<mrow> <msub> <mi>Z</mi> <mi>i</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>z</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
Always lack delivery M caused by the equipment alterationiIt is calculated as follows:
<mrow> <msub> <mi>M</mi> <mi>i</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>M</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
In formula, m:The frequency of power cut caused by equipment alteration is constructed;zij:Customer interrupted number when having a power failure every time;rij:Finger stops every time Electric restores electricity the time;j∈(1,2,…,m);I ∈ (1,2,3 ..., n), which sample represented;Mij:What is had a power failure every time is total Lack delivery.
5. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that the step Project related to the power supply reliability I includes:Major repair project, technological transformation project, construction project, move and change project and distribution is automatic Change project.
6. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that the step III distribution network construction investment totle drilling cost includes:Original equipment cost and replacing equipment construction take;
The original equipment cost is calculated by the device type and unit type of unusual fluctuation equipment and obtained.
7. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that the step IV large deviations threshold value is x%, wherein x≤10.
8. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that the step IV power supply reliability negative benefit assessment models include:Using the investment amount of the project related to power supply reliability as input, Power supply reliability negative benefit builds power supply reliability negative benefit assessment models as output.
9. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 1, it is characterised in that the step V capital project includes:Total investment.
10. a kind of power supply reliability negative benefit apparatus for evaluating of project investment, it is characterised in that including:It is data acquisition module, defeated Enter module, data processing module, reliability negative benefit evaluation module and output module;
The data acquisition module is used for the equipment alteration information for gathering power distribution network;
The input module is used for the data transfer of the data collecting module collected to data processing module;
The data processing module is used to be classified the equipment alteration information, and power supply can caused by equipment alteration for calculating By property negative benefit and distribution network construction investment totle drilling cost;
The reliability negative benefit evaluation module is using capital project as input, and power supply reliability negative benefit is used as output Neural metwork training goes out the power supply reliability that there is the feature of correlation to set up capital project for equipment alteration information and capital project Negative benefit assessment models;
The pre- capital project of project that output module output passes through power supply reliability negative benefit assessment models assessment can By property negative benefit.
11. the power supply reliability negative benefit appraisal procedure of project investment as claimed in claim 10, it is characterised in that the throwing Capital's case includes:Total investment.
CN201710238790.0A 2017-04-12 2017-04-12 The power supply reliability negative benefit appraisal procedure and device of a kind of project investment Pending CN107194536A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710238790.0A CN107194536A (en) 2017-04-12 2017-04-12 The power supply reliability negative benefit appraisal procedure and device of a kind of project investment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710238790.0A CN107194536A (en) 2017-04-12 2017-04-12 The power supply reliability negative benefit appraisal procedure and device of a kind of project investment

Publications (1)

Publication Number Publication Date
CN107194536A true CN107194536A (en) 2017-09-22

Family

ID=59870935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710238790.0A Pending CN107194536A (en) 2017-04-12 2017-04-12 The power supply reliability negative benefit appraisal procedure and device of a kind of project investment

Country Status (1)

Country Link
CN (1) CN107194536A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255553A (en) * 2018-10-09 2019-01-22 国网浙江省电力有限公司 A kind of grid company sale of electricity enterprise power supply reliability rewards and punishments method and system
CN112085459A (en) * 2020-07-24 2020-12-15 华北电力大学 Wind power project investment estimation method and device
CN112330121A (en) * 2020-10-28 2021-02-05 广东电网有限责任公司佛山供电局 Power distribution network automation construction investment benefit evaluation method
CN112990584A (en) * 2021-03-19 2021-06-18 山东大学 Automatic production decision system and method based on deep reinforcement learning

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255553A (en) * 2018-10-09 2019-01-22 国网浙江省电力有限公司 A kind of grid company sale of electricity enterprise power supply reliability rewards and punishments method and system
CN112085459A (en) * 2020-07-24 2020-12-15 华北电力大学 Wind power project investment estimation method and device
CN112085459B (en) * 2020-07-24 2024-03-22 华北电力大学 Wind power project investment estimation method and device
CN112330121A (en) * 2020-10-28 2021-02-05 广东电网有限责任公司佛山供电局 Power distribution network automation construction investment benefit evaluation method
CN112990584A (en) * 2021-03-19 2021-06-18 山东大学 Automatic production decision system and method based on deep reinforcement learning
CN112990584B (en) * 2021-03-19 2022-08-02 山东大学 Automatic production decision system and method based on deep reinforcement learning

Similar Documents

Publication Publication Date Title
US20170308934A1 (en) Management method of power engineering cost
CN107123982B (en) Power distribution network reliability economic benefit analysis method based on equipment transaction
CN111178680B (en) Wind power plant engineering quality overall process management system, method and equipment
Sardjono et al. The application of the factor analysis method to determine the performance of IT implementation in companies based on the IT balanced scorecard measurement method
CN107194536A (en) The power supply reliability negative benefit appraisal procedure and device of a kind of project investment
Kulikova et al. Planning of technological development of new products and its impact on the economic performance of the enterprise
Helgesen et al. From linking to integration of energy system models and computational general equilibrium models–effects on equilibria and convergence
CN108846691A (en) Regional grain and oil market price monitoring analysing and predicting system and monitoring method
Chen et al. Green financial risk management based on intelligence service
CN107818386A (en) Power grid enterprises&#39; Operating profit Forecasting Methodology
CN112446534A (en) Construction period prediction method and device for power transmission and transformation project
Karplus et al. Herding cats: Firm non-compliance in China’s industrial energy efficiency program
CN110991985A (en) Project progress data processing method
CN108734567A (en) A kind of asset management system and its appraisal procedure based on big data artificial intelligence air control
Wang Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS‐RBS and Membership Degree Methods
Liu et al. Construction quality risk management of projects on the basis of rough set and neural network
Zhang et al. A PLM components monitoring framework for SMEs based on a PLM maturity model and FAHP methodology
Xiong et al. Design and improvement of KPI system for materials management in Power Group Enterprise
Gu et al. IERs in reverse supply chain: be worth lowering or not
Pi et al. Institutional change and wage inequality
CN114462705A (en) Method and device for generating measurement material verification plan
Zhang et al. Research on Key Performance Evaluation Method Based on Fuzzy Analytic Hierarchy Process
CN107194529A (en) A kind of distribution network reliability analysis method of economic benefit based on Text Mining Technology
CN111768282A (en) Data analysis method, device, equipment and storage medium
Asphjell et al. Sequentiality versus simultaneity: Interrelated factor demand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication