CN112257148A - Full process engineering cost consultation system based on BIM - Google Patents
Full process engineering cost consultation system based on BIM Download PDFInfo
- Publication number
- CN112257148A CN112257148A CN202011097382.6A CN202011097382A CN112257148A CN 112257148 A CN112257148 A CN 112257148A CN 202011097382 A CN202011097382 A CN 202011097382A CN 112257148 A CN112257148 A CN 112257148A
- Authority
- CN
- China
- Prior art keywords
- module
- bim
- real
- model
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010327 methods by industry Methods 0.000 title claims description 11
- 238000010276 construction Methods 0.000 claims abstract description 42
- 238000000034 method Methods 0.000 claims abstract description 30
- 238000005516 engineering process Methods 0.000 claims abstract description 21
- 238000011161 development Methods 0.000 claims abstract description 12
- 210000001503 joint Anatomy 0.000 claims abstract description 4
- 238000013461 design Methods 0.000 claims description 11
- 238000010586 diagram Methods 0.000 claims description 7
- 230000005540 biological transmission Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000019771 cognition Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Geometry (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Computer Hardware Design (AREA)
- Civil Engineering (AREA)
- Mathematical Optimization (AREA)
- Architecture (AREA)
- Game Theory and Decision Science (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Primary Health Care (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the technical field of construction cost, in particular to a BIM-based whole-process construction cost consultation system, which comprises a BIM model construction unit, a construction cost management unit and a user experience unit, wherein the BIM model construction unit consists of an information data acquisition module, a BIM database module and a Revit modeling module, the BIM database module is in butt joint with a background database to transmit data, the construction cost management unit comprises a project estimation module, a project approximate calculation module, a construction drawing budget module, a completion settlement module, a real-time price acquisition module and a project progress control module, the user experience unit comprises a real-time price change query module, a 3D model development module and a user feedback module, the real-time price change query module is carried out in a real-time information prompt mode, and the 3D model development module adopts a holographic projection technology. The invention not only can provide client with comprehensive consultation experience, but also can enable client to know real-time cost change condition in time.
Description
Technical Field
The invention relates to the technical field of construction cost, in particular to a BIM-based whole-process construction cost consultation system.
Background
With the rapid development of national economy, the engineering and building industry develops rapidly, and higher requirements are put forward on the quality and the comprehensive benefits of engineering construction. In order to shorten the engineering construction period and facilitate the digital management of projects, the BIM is applied to engineering design, and engineering information resources at different stages in the engineering are fused.
The project cost is the construction cost expected or actually paid out in the construction period of a construction project, but in the process of the project cost, the price is easy to change, people usually need to notify or inquire to know the change condition of the price, and at the present stage, the consultation is only based on plane cognition and lacks comprehensiveness in the consultation direction, so that a BIM-based whole-process project cost consultation system is urgently needed to solve the problems.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a BIM-based whole-process engineering cost consultation system.
In order to achieve the purpose, the invention adopts the following technical scheme:
a BIM-based whole-process engineering cost consultation system comprises a BIM model construction unit, a cost management unit and a user experience unit, wherein the BIM model construction unit consists of an information data acquisition module, a BIM database module and a Revit modeling module, the BIM database module is in butt joint with a background database to transmit data, the cost management unit comprises a project estimation module, a project approximation module, a construction drawing budget module, a completion settlement module, a real-time price acquisition module and a project progress control module, the user experience unit comprises a real-time price change query module, a 3D model development module and a user feedback module, the real-time price change query module is carried out in a real-time information prompting mode, and the 3D model development module adopts a holographic projection technology;
the real-time price acquisition module comprises the following processes:
the method comprises the following steps: acquiring price information;
step two: updating a background database;
step three: updating a system;
in addition, the real-time price acquisition module is connected with the real-time price change inquiry module in a wireless communication mode.
Preferably, the method for constructing the corresponding BIM model in the BIM model constructing unit includes the following three ways:
the method comprises the following steps: manual modeling: independently establishing a BIM three-dimensional model in BIM software according to a design drawing;
the second method comprises the following steps: and (3) conducting diagram modeling: importing a design drawing, and identifying and establishing a BIM three-dimensional model;
the third method comprises the following steps: receiving a model: directly receiving the built BIM three-dimensional model from the design unit.
Preferably, data transmission is carried out between the information data acquisition module and the BIM database module through a data interface, and the BIM database module and the Revit modeling module are connected and transmitted through a database connecting pool.
Preferably, the connection mode between the BIM database module and the background database is an ODBC technology.
Preferably, the real-time price acquisition module acquires the price information through the internet.
Preferably, the real-time price change query module and the mobile phone receive signals, and when the real-time price change query module changes the price, the real-time price change query module sends a message to the mobile phone to prompt.
Preferably, the 3D model is developed in the following manner: and sending a signal to a background database by a BIM model construction unit, and then projecting and displaying the model formed by the BIM technology by the background database through a holographic development technology.
Preferably, the wireless communication mode adopted between the real-time price acquisition module and the real-time price change inquiry module is a bluetooth technology.
The invention has the beneficial effects that:
the intelligent price change system is characterized in that modeling is carried out through a BIM technology, a 3D model which is built is displayed through a holographic projection technology, so that a client can conveniently carry out comprehensive consultation, in addition, price change information is collected through the Internet, and the changed information is transmitted to a mobile phone end through a Bluetooth technology, so that the client can know the price at that time in time.
Drawings
FIG. 1 is a system block diagram of a BIM-based total process engineering cost advisory system according to the present invention;
FIG. 2 is a block diagram of a BIM modeling construction unit of the BIM-based total process engineering cost consulting system according to the present invention;
FIG. 3 is a block diagram of the construction cost management unit of the BIM-based total process construction cost consulting system according to the present invention;
FIG. 4 is a flow chart of real-time price collection for a BIM-based total process engineering cost advisory system in accordance with the present invention;
FIG. 5 is a block diagram of the user experience unit of the BIM-based total process engineering cost consulting system according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-5, a BIM-based whole-process construction cost consultation system comprises a BIM model construction unit, a construction cost management unit and a user experience unit, wherein the BIM model construction unit is composed of an information data acquisition module, a BIM database module and a Revit modeling module, the BIM database module and a background database are in butt joint through ODBC technology to transmit data, the construction cost management unit comprises a project estimation module, a project approximation module, a construction drawing budget module, a completion settlement module, a real-time price acquisition module and a project progress control module, the user experience unit comprises a real-time price change query module, a 3D model development module and a user feedback module, the real-time price change query module is performed in a real-time information prompt mode, and the 3D model development module is performed by holographic projection technology;
the real-time price acquisition module comprises the following processes:
the method comprises the following steps: obtaining price information (obtained via the internet);
step two: updating a background database;
step three: updating a system;
in addition, the real-time price acquisition module is connected with the real-time price change inquiry module through a Bluetooth technology, the real-time price change inquiry module receives signals with the mobile phone terminal, and when the real-time price change inquiry module changes the price, the real-time price change inquiry module sends a message to the mobile phone terminal to prompt.
The method for constructing the corresponding BIM in the BIM model construction unit comprises the following three modes:
the method comprises the following steps: manual modeling: independently establishing a BIM three-dimensional model in BIM software according to a design drawing;
the second method comprises the following steps: and (3) conducting diagram modeling: importing a design drawing, and identifying and establishing a BIM three-dimensional model;
the third method comprises the following steps: receiving a model: directly receiving the built BIM three-dimensional model from the design unit.
In addition, data transmission is carried out between the information data acquisition module and the BIM database module through a data interface, and the BIM database module and the Revit modeling module are connected and transmitted through a database connecting pool.
In addition, the 3D model is developed as follows: and sending a signal to a background database by a BIM model construction unit, and then projecting and displaying the model formed by the BIM technology by the background database through a holographic development technology.
In this embodiment:
firstly, constructing a BIM model:
collecting information on site by a worker, designing a drawing, importing the design drawing into Revit software, identifying and establishing a BIM three-dimensional model, and performing data connection transmission on the BIM database and a background database through an ODBC technology;
secondly, cost management:
the construction cost management unit comprises a project estimation module, a project approximate calculation module, a construction drawing budget module, a completion settlement module, a real-time price acquisition module and a project progress control module, and is used for recording and updating in time in the whole process of a construction project;
thirdly, user experience:
leading out the BIM three-dimensional model into an FBX format through Revit software by a worker, carrying out 3D model standardization processing through deepexpansion software to obtain an international universal 3D file format, and leading a standardized 3D data file into holographic projection equipment to finish model display;
the system updates the cost information data in the background database along with the information of the Internet, synchronizes the change to the system through the background database, and sends a reminding message to the mobile phone end of the client through the Bluetooth technology when the cost is updated.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (8)
1. A BIM-based whole-process engineering cost consultation system is characterized by comprising a BIM model construction unit, a cost management unit and a user experience unit, wherein the BIM model construction unit consists of an information data acquisition module, a BIM database module and a Revit modeling module, the BIM database module is in butt joint with a background database to transmit data, the cost management unit comprises a project estimation module, a project approximation module, a construction drawing budget module, a completion settlement module, a real-time price acquisition module and a project progress control module, the user experience unit comprises a real-time price change query module, a 3D model development module and a user feedback module, the real-time price change query module is carried out in a real-time information prompting mode, and the 3D model development module adopts holographic projection technology;
the real-time price acquisition module comprises the following processes:
the method comprises the following steps: acquiring price information;
step two: updating a background database;
step three: updating a system;
in addition, the real-time price acquisition module is connected with the real-time price change inquiry module in a wireless communication mode.
2. The BIM-based total process construction cost consultation system according to claim 1, wherein the method for constructing the corresponding BIM model in the BIM model construction unit comprises the following three ways:
the method comprises the following steps: manual modeling: independently establishing a BIM three-dimensional model in BIM software according to a design drawing;
the second method comprises the following steps: and (3) conducting diagram modeling: importing a design drawing, and identifying and establishing a BIM three-dimensional model;
the third method comprises the following steps: receiving a model: directly receiving the built BIM three-dimensional model from the design unit.
3. The BIM-based total process engineering cost consultation system according to claim 1, wherein the information data acquisition module and the BIM database module are in data transmission through a data interface, and the BIM database module and the Revit modeling module are in connection transmission through a database connection pool.
4. The BIM-based total process engineering cost advisory system of claim 1 wherein the connection between the BIM database module and the background database is ODBC technology.
5. The BIM-based total process construction cost advisory system according to claim 1 wherein the real-time price collection module obtains the price information by way of internet.
6. The BIM-based total process construction cost consultation system according to claim 1, wherein the real-time price change inquiry module and the mobile phone end receive signals, and when the real-time price change inquiry module changes the price, the real-time price change inquiry module sends a message to the mobile phone end to prompt.
7. The BIM-based total process construction cost advisory system according to claim 1 wherein the 3D model is developed in the following manner: and sending a signal to a background database by a BIM model construction unit, and then projecting and displaying the model formed by the BIM technology by the background database through a holographic development technology.
8. The BIM-based total process construction cost consultation system according to claim 1, wherein the wireless communication mode adopted between the real-time price acquisition module and the real-time price change inquiry module is Bluetooth technology.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011097382.6A CN112257148A (en) | 2020-10-14 | 2020-10-14 | Full process engineering cost consultation system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011097382.6A CN112257148A (en) | 2020-10-14 | 2020-10-14 | Full process engineering cost consultation system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112257148A true CN112257148A (en) | 2021-01-22 |
Family
ID=74242239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011097382.6A Pending CN112257148A (en) | 2020-10-14 | 2020-10-14 | Full process engineering cost consultation system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112257148A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113592422A (en) * | 2021-06-18 | 2021-11-02 | 王锁荣 | Cost management method for building network + |
CN116071081A (en) * | 2023-02-21 | 2023-05-05 | 惠东县建纬工程造价事务所有限公司 | BIM-based cost consultation service feedback system |
CN116090692A (en) * | 2023-04-10 | 2023-05-09 | 北京中昌工程咨询有限公司 | Engineering cost management system and method based on BIM technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110189175A (en) * | 2019-05-29 | 2019-08-30 | 广东粤能工程管理有限公司 | A kind of project cost consulting system and method |
CN110544020A (en) * | 2019-08-15 | 2019-12-06 | 刘德建 | Building decoration project cost optimization management system and method based on BIM |
CN111191996A (en) * | 2018-11-14 | 2020-05-22 | 国网江苏电力设计咨询有限公司 | BIM-based dynamic cost management method for whole process of power transmission and transformation project |
CN111210162A (en) * | 2020-01-14 | 2020-05-29 | 中资锐诚工程项目管理有限公司 | BIM-based whole process engineering pricing management method and BIM-based whole process engineering management system |
-
2020
- 2020-10-14 CN CN202011097382.6A patent/CN112257148A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111191996A (en) * | 2018-11-14 | 2020-05-22 | 国网江苏电力设计咨询有限公司 | BIM-based dynamic cost management method for whole process of power transmission and transformation project |
CN110189175A (en) * | 2019-05-29 | 2019-08-30 | 广东粤能工程管理有限公司 | A kind of project cost consulting system and method |
CN110544020A (en) * | 2019-08-15 | 2019-12-06 | 刘德建 | Building decoration project cost optimization management system and method based on BIM |
CN111210162A (en) * | 2020-01-14 | 2020-05-29 | 中资锐诚工程项目管理有限公司 | BIM-based whole process engineering pricing management method and BIM-based whole process engineering management system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113592422A (en) * | 2021-06-18 | 2021-11-02 | 王锁荣 | Cost management method for building network + |
CN116071081A (en) * | 2023-02-21 | 2023-05-05 | 惠东县建纬工程造价事务所有限公司 | BIM-based cost consultation service feedback system |
CN116090692A (en) * | 2023-04-10 | 2023-05-09 | 北京中昌工程咨询有限公司 | Engineering cost management system and method based on BIM technology |
CN116090692B (en) * | 2023-04-10 | 2023-06-20 | 北京中昌工程咨询有限公司 | Engineering cost management system and method based on BIM technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112257148A (en) | Full process engineering cost consultation system based on BIM | |
CN105652830B (en) | A kind of bridge monitoring system based on BIM | |
CN108279023B (en) | Precision checking method and device for field data acquisition equipment, acquisition vehicle and field acquisition system | |
CN110472858B (en) | Construction engineering supervision information management method | |
CN104335560A (en) | Transmitting data from an automated assistant to an accessory | |
CN109345195A (en) | A kind of project supervision monitoring and managing method and system based on BIM | |
CN105701546A (en) | Electric power system defect processing method, apparatus and system thereof | |
CN113838231A (en) | Intelligent lock fault processing method and device based on intelligent sound box and readable medium | |
CN104639636A (en) | Mobile vehicle-based intelligent information management system | |
CN114282021A (en) | Three-dimensional big data visualization system | |
JP2002297707A (en) | Method and device for collecting and processing field information, and connection controller for electrically fused joint | |
CN101969599A (en) | Geographical position based system and implementation method thereof for acquiring weather forecast | |
CN115936616A (en) | Building engineering construction progress monitoring system integrated with BIM and using method thereof | |
CN115273012A (en) | Dotted lane line identification method and device, electronic equipment and computer readable medium | |
CN114662888A (en) | Job management method, job management apparatus, electronic device, and storage medium | |
CN112967164A (en) | Underground pipeline Augmented Reality (AR) application management system | |
CN114119973A (en) | Spatial distance prediction method and system based on image semantic segmentation network | |
CN111107317B (en) | Remote biological investigation command system based on Internet of things | |
CN109614692B (en) | Novel three-dimensional vector acquisition and editing method and device based on tilt model | |
CN112906094A (en) | Bridge maintenance reconstruction method and system based on informatization | |
CN110545520B (en) | Terminal matching method | |
CN118037829B (en) | Nuclear power plant conventional island flaw detection welded junction positioning system and method | |
CN116717628A (en) | Indoor pipe network laying system based on BIM model and application method thereof | |
CN110991672A (en) | Visual inspection system for underground cable | |
CN109815257A (en) | Scalable real-time High Availabitity portrait algorithm service method and its system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |