CN108932589B - Enterprise informatization project implementation management system - Google Patents

Enterprise informatization project implementation management system Download PDF

Info

Publication number
CN108932589B
CN108932589B CN201810729887.6A CN201810729887A CN108932589B CN 108932589 B CN108932589 B CN 108932589B CN 201810729887 A CN201810729887 A CN 201810729887A CN 108932589 B CN108932589 B CN 108932589B
Authority
CN
China
Prior art keywords
submodule
module
project
management
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810729887.6A
Other languages
Chinese (zh)
Other versions
CN108932589A (en
Inventor
苏梅月
周敏
高强
雷成名
王丹妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201810729887.6A priority Critical patent/CN108932589B/en
Publication of CN108932589A publication Critical patent/CN108932589A/en
Application granted granted Critical
Publication of CN108932589B publication Critical patent/CN108932589B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an enterprise information project implementation management system which comprises a project coding module, a project training module, a feasibility analysis module, a demand analysis module, a project organization module, a conference recording module, an implementation planning module, a service investigation module, a scheme design module, a system research and development module, a data management module, a system switching module, a system evaluation module, a continuous improvement module, a contract management module, a purchase management module, a knowledge management module, a document management module, a project management and control module and a project experience module; the information project implementation management system provided by the invention can realize project management and control, comprehensive overall planning and intelligent decision and can improve the service level.

Description

Enterprise informatization project implementation management system
Technical Field
The invention belongs to the technical field of informatization, and relates to an implementation and management system surrounding the full life cycle of an informatization project.
Background
Since the 21 st century, informatization is taken as an important factor influencing the development of the global economic society, but the problems of unclear demand, lack of planning and management, unreasonable personnel configuration and the like also appear in the implementation process of an informatization project, so that project failure is caused, and huge loss is caused to enterprises.
As an important production factor, the development of social economy is severely restricted by the informatization process, and the effectiveness, high quality, low cost and short period of implementing the informatization project are problems to be solved at present, so that a system capable of managing and controlling the implementation process of the informatization project is developed, the implementation quality of the informatization project can be improved, and the implementation of the informatization project can be continuously developed and advanced.
Disclosure of Invention
The invention aims to solve the problems in the information-based implementation industry, and provides an information-based project implementation management system capable of realizing project management and control, comprehensive overall planning and intelligent decision-making.
The technical scheme adopted by the invention is as follows: an enterprise information project implementation management system, characterized in that: the system comprises a project coding module, a project training module, a feasibility analysis module, a demand analysis module, a project organization module, a conference recording module, an implementation plan module, a service investigation module, a scheme design module, a system research and development module, a data management module, a system switching module, a system evaluation module, a continuous improvement module, a contract management module, a purchase management module, a knowledge management module, a document management module, a project management and control module and a project experience module;
the project coding module is used for naming the project codes, so that the tracking and management of the projects are facilitated;
the project training module comprises an early training submodule and a later training submodule; the early-stage training module is used for training enterprise staff to know the informatization significance and describe the requirements of the enterprise staff, and comprises the steps of storing training data, training setting, training record, setting an online training classroom and consulting services; the later training module is used for training staff to switch between a new system and an old system, accurately describing the feeling of using the system during the on-line period of the system and accurately feeding back the requirement;
the feasibility analysis module comprises an enterprise informatization status submodule, an enterprise management status submodule, an investment benefit analysis submodule, an economic feasibility analysis submodule, a technical feasibility analysis submodule and a social feasibility analysis submodule; the enterprise informatization status submodule is used for carrying out sorting, statistical analysis on the existing informatization of the enterprise according to the function type, the existing function, the configuration parameter performance and the use opinion, and knowing the requirements and the working process of the enterprise; the enterprise management status submodule is used for analyzing, optimizing and even recombining the existing organization framework, business process and responsibility division of an enterprise, providing a solution for problems occurring in the enterprise management process, and avoiding problems which do not occur possibly in advance so as to estimate the workload of enterprise informatization implementation projects; the investment benefit analysis submodule analyzes the expected benefit of the investment informatization project from the enterprise perspective, and sets the indexes of an investment recovery period, an investment return rate, a financial internal income rate and a financial net present value to evaluate and predict the investment benefit; the economic feasibility analysis submodule is used for analyzing the funds required to be consumed when the requirements of the customers are met, further analyzing the economic feasibility of the project, formulating a reasonable charging interval and providing quoted prices for the customers according to the reasonable charging interval; the technical feasibility submodule is mainly used for analyzing the difficulty and time of the technical scheme by technical personnel according to the requirements of customers so as to judge the technical feasibility of the project; the social feasibility analysis submodule is responsible for analyzing organization relations, functions, benefits and leadership support of internal groups of the enterprise and determining the difficulty degree of project implementation process propulsion.
The requirement analysis module comprises an industry requirement submodule, a business requirement submodule, a report requirement submodule, an interface requirement submodule, a maintenance requirement submodule and a requirement report submodule; the industry requirement submodule takes the basic situation of an informatization system of the industry as a data analysis basis and comprises functions, processes, frames, cost and benefits; the business requirement submodule is used for communicating with the requirements of the customers and recording the requirements of the customers, the standardized requirement description and the requirement change record; the report requirement submodule is used for arranging reports required by customers; the interface requirement module is used for recording the requirements of customers on the interfaces of each module of the system, analyzing the interface position setting and recording the interface setting file; the maintenance requirement submodule is used for recording system maintenance records and setting on-time maintenance reminding; the requirement report submodule is used for recording a requirement report file;
the project organization module comprises a responsibility division submodule and an authority division submodule; the responsibility division submodule is used for recording the responsibility of each post worker in detail, and coding and grouping various responsibilities; the authority division submodule is used for recording the authority possessed by each employee, and encoding and grouping the authority blocks;
the conference recording module is used for recording conference contents and participants, and is convenient for daily work management;
the implementation plan module comprises a project range sub-module, a work result sub-module, a time plan sub-module, a cost budget sub-module, a human budget sub-module and a risk estimation sub-module; the item range submodule is used for recording the content of the items required by the client and strictly limiting the item range so as to prevent the items from failing to implement due to continuous expansion of the range, and the part is associated with the contract management module; the work result submodule is used for recording the result of the delivery required by the project, and the part is associated with the contract management module; the time planning submodule is used for determining the time required to finish each stage of the project, and allocating human and material resources according to the time required to finish each stage of the project; the cost budget submodule is used for predicting expenditure required by each stage of the project and laying a foundation for product pricing and later-stage cost control; the manpower budget submodule is used for predicting the manpower required by each project implementation stage, providing reference for project cost estimation in the project sale stage and inputting a manpower demand plan in the project starting process, so that the phenomenon of insufficient manpower of an enterprise caused by synchronous implementation of a plurality of projects is avoided; the risk estimation submodule is used for predicting the risk possibly encountered in the project starting stage, so that the risk is avoided in time, a countermeasure is prepared in advance, or measures are taken to reduce the risk;
the business investigation module comprises a business process submodule, a data report submodule and an authority setting submodule; the business process submodule is used for recording business processes of an enterprise, and performing business process setting and business process optimization at the later stage; the data report submodule is used for arranging and collecting report templates required and generated by all links of an enterprise, so that the report design is facilitated to be optimized, and a report input program is simplified; the authority setting submodule is used for setting authority groups according to the department, the level and the personal responsibility of the enterprise personnel;
the scheme design module comprises a system model selection submodule, a process design submodule, a function design submodule, an authority design submodule and an interface design submodule; the system type selection submodule is used for performing comparative analysis on various system configuration types according to the type, the scale and the requirement of an enterprise; the flow design submodule is used for optimizing and simulating a flow; the functional design submodule is used for dividing, analyzing and optimizing the system functional module according to enterprise requirements; the authority design submodule is used for analyzing the reasonability of authority setting of different classes of posts and optimizing the authority setting by combining with a service flow; the interface design submodule is used for carrying out preliminary interface design before system coding is carried out;
the system development module comprises a system development submodule and a system test submodule; the system development submodule is used for storing a system development platform and system versions of all projects; the system testing submodule is responsible for system testing and collecting and sorting testing problems;
the data management module comprises a data acquisition sub-module, a data checking sub-module, a data sorting sub-module and a data importing sub-module; the data acquisition sub-module is used for collecting original enterprise information; the data checking submodule is used for processing the original data and checking, checking and correcting the data; the data sorting submodule is used for sorting the data and processing the data into a format file which can be imported; the data import submodule imports data by adopting a professional data import formula, so that database data errors caused by improper operation are avoided;
the system switching module comprises a data backup maintenance sub-module and a simulation operation sub-module; the data backup maintenance submodule is used for carrying out backup protection on the system, and the disorder of the system caused by misoperation is avoided; the simulation operation sub-module is used for performing trial operation on the system of each link to ensure the safety and stability of the system used by the client;
the system evaluation module comprises a fluency evaluation submodule, an usability evaluation submodule, a safety evaluation submodule and an implementation evaluation submodule; the fluency evaluation module is used for evaluating fluency of each developed system, and comprises judgment data of a simulation operation sub-module on the system reaction speed, fluency evaluation of internal staff on the system and evaluation data of clients on the system stability; the usability evaluation module is used for evaluating the usability of the developed system, and comprises judgment data of the simulation operation sub-module on the operation speed, the operation frequency and the operation time of a user, usability evaluation of internal staff on the system and evaluation data of the usability of the system by a client; the security evaluation module is used for evaluating the security of the developed system, and comprises hacker attack simulation data, judgment of internal staff on the security of the system and evaluation data of a client on the security of the system; the implementation evaluation submodule is used for evaluating the capability of a project team, and comprises information records of each link of project implementation on a platform, evaluation of a client on the project team and satisfaction of the client on a system;
the continuous improvement module comprises an opinion feedback sub-module and a system maintenance sub-module; the opinion feedback sub-module is used for collecting and improving opinions fed back by a user in the process of using the system and is connected with a client system, the client submits the opinions in the opinion feedback module of the client system, and the opinion feedback sub-module can receive the feedback; the system maintenance submodule is used for collecting problems or faults of a client in the system using process, so that the problems or faults can be solved in time, and the service level is improved;
the contract management module comprises a contract signing submodule and a contract changing submodule; the contract signing submodule is used for helping the staff judge the validity reasonability of the contract, is associated with the cost prediction submodule and the like, and can recommend proper pricing or service standards; the contract change submodule is used for recording each version of the contract change;
the purchasing management module comprises a supplier management submodule, a purchasing price comparison submodule and a purchasing contract submodule; the supplier management submodule is used for managing suppliers, including basic information, product quality, delivery date records and business transaction records, and has a supplier evaluation function; the purchasing price comparison submodule is used for objectively comparing prices during purchasing so as to select a proper supplier; the purchasing contract submodule is used for assisting the employee to record and verify the contract;
the intellectual management module comprises a property right registration submodule and a property right protection submodule; the property right registration submodule is used for recording intellectual property files of a company; the property right protection submodule protects the property right of the company and prevents other units from embezzlement of the property right of the company;
the document management module comprises a data file submodule and a contract file submodule; the data file submodule is used for storing files of various versions of the system and daily office files; the contract file submodule is used for carrying out classified management on the contracts;
the project management and control module comprises a cost management submodule, a progress management submodule and a risk management submodule; the cost management submodule is used for managing project cost and monitoring cost and has a reminding function; the progress management submodule is used for monitoring the progress of the project, predicting the completion degree of the project and giving prompt in time; the risk management submodule is used for managing and controlling the risk which is convenient for the project and possibly occurs, and embedding various suggestions for avoiding or reducing the risk;
the project experience module comprises a system module submodule, an implementation module submodule and a management module submodule; the system module submodule is used for collecting and organizing discovered thoughtful experience formed in the process of project development; the implementation module submodule is used for recording how to solve the communication problem with the client in the implementation process; and the management module submodule is used for recording the solution of problems in the overall scheduling and supervision in the project management process.
The information project implementation management system provided by the invention can realize project management and control, comprehensive overall planning and intelligent decision and can improve the service level.
Drawings
FIG. 1 is a schematic block diagram of a system according to an embodiment of the present invention;
FIG. 2 is a schematic block diagram of a neural network algorithm according to an embodiment of the present invention;
Detailed Description
In order to facilitate the understanding and implementation of the present invention for those of ordinary skill in the art, the present invention is further described in detail with reference to the accompanying drawings and examples, it is to be understood that the embodiments described herein are merely illustrative and explanatory of the present invention and are not restrictive thereof.
Referring to fig. 1, the present invention provides an enterprise informatization project implementation management system, which includes a project coding module, a project training module, a feasibility analysis module, a demand analysis module, a project organization module, a meeting record module, an implementation planning module, a business investigation module, a project design module, a system research and development module, a data management module, a system switching module, a system evaluation module, a continuous improvement module, a contract management module, a purchase management module, a knowledge management module, a document management module, a project management and control module, and a project experience module;
the project coding module is used for naming the project codes, so that the tracking and management of the projects are facilitated;
the system comprises a project training module, a post-training module and a training module, wherein the pre-training module is mainly used for training enterprise staff to know the informatization significance and describe the requirements (work flow, work content, personal responsibility and the like) of the enterprise staff, and comprises the steps of storing training data, training setting (division of the training content and setting of training time according to the hierarchical level of departments), training record, setting of an online training classroom, consultation service and the like; the later training module is mainly responsible for training how employees switch between new and old systems, how to use the systems and how to accurately describe the feelings of using the systems during the online period of the systems, so that the accurate feedback requirement is met;
the feasibility analysis module comprises an enterprise informatization status submodule, an enterprise management status submodule, an investment benefit analysis submodule, an economic feasibility analysis submodule, a technical feasibility analysis submodule and a social feasibility analysis submodule, wherein the enterprise informatization status submodule is mainly used for carrying out functional classification, existing functions, configuration parameter performance, use opinions and the like on the existing informatization of an enterprise to carry out arrangement statistical analysis, so that requirements, working flows and the like of the enterprise can be better known, and a preliminary investigation can be carried out on the feasibility evaluation of enterprise informatization projects, and a foundation is laid for the later system switching; the enterprise management status submodule is mainly responsible for analyzing, optimizing and even recombining the existing organizational framework, business process and responsibility division of an enterprise, providing a solution for problems occurring in the enterprise management process, and avoiding problems which do not occur possibly in advance so as to estimate the workload of enterprise informatization implementation projects; the investment benefit analysis submodule analyzes expected benefits of investment informatization projects from an enterprise perspective and also lays a foundation for better product sales of informatization enterprises and communication with customers, and the investment benefit analysis submodule mainly adopts a data envelope analysis method, a Taylor model algorithm, a probability analysis method, a total cost of ownership TCO, an economic added value EVA, a total economic impact TEI, a balance scorecard BSC and other methods and sets indexes such as an investment recovery period, an investment return rate, a financial internal earning rate, a financial net present value and the like to evaluate and predict the investment benefits; the economic feasibility analysis submodule is used for analyzing the capital required to be consumed when the requirements of customers are met, further analyzing the economic feasibility of the project, formulating a reasonable charging interval, providing quoted prices for the customers according to the economic feasibility analysis submodule, facilitating product sales and achieving project orders, and mainly adopting linear regression, genetic algorithm and the like to carry out economic feasibility analysis on the project from the aspects of net present value, investment recovery period and the like; the technical feasibility submodule is mainly used for analyzing the difficulty and time of the technical scheme by technical personnel according to the requirements of customers so as to judge the technical feasibility of the project; the social feasibility analysis submodule is responsible for analyzing the organization relation, functions, benefits, leadership support degree and the like of the internal groups of the enterprise and determining the difficulty degree of the project implementation process propulsion.
The demand analysis module comprises an industry demand submodule, a business demand submodule, a report demand submodule, an interface demand submodule, a maintenance demand submodule and a demand report submodule; the industry requirement submodule is mainly used for mastering the requirement characteristics of an informatization system in the enterprise direction, the basic condition of the informatization system of the industry is used as a data analysis basis, and the data analysis basis comprises functions, processes, frames, cost, income and the like, so that the familiarity time of the enterprise processes and the like can be shortened, the development period of system products is prolonged, and the targeted product sale of a sales department is facilitated; the business requirement submodule is used for communicating requirements with customers, recording customer requirements, standardizing requirement description, changing records of requirements and the like; the report requirement submodule is mainly used for arranging reports required by customers; the interface requirement module is used for recording the requirements of customers on the interfaces of each module of the system, analyzing the interface position setting and recording an interface setting file; the maintenance requirement submodule is used for recording system maintenance records and setting on-time maintenance reminding; the requirement report submodule is used for recording a requirement report file.
The project organization module comprises a responsibility division submodule and an authority division submodule; the responsibility division submodule is used for recording the responsibility of each post worker in detail, and encoding and grouping various responsibilities; the authority division submodule is used for recording the authority possessed by each employee, encoding and grouping the authority sub-modules, and the duty division submodule and the authority division submodule are mutually connected and independent.
The conference recording module is used for recording the conference content and the participants, so that the daily work management is facilitated;
the implementation planning module comprises a project range sub-module, a work result sub-module, a time planning sub-module, a cost budget sub-module, a human budget sub-module and a risk estimation sub-module; the project scope sub-module is used for recording the content contained in the project required by the client and strictly limiting the project scope so as to prevent the project from failing to be implemented due to continuous expansion of the scope, and the part is associated with the contract management module; the work result submodule is used for recording the result of the delivery required by the project, and the part is associated with the contract management module; the time planning submodule is used for determining the time required to be completed in each stage of the project, and allocating resources such as manpower, material resources and the like according to the time; the cost budget submodule is used for predicting expenditure required by each stage of the project and laying a foundation for product pricing and later-stage cost control; the manpower budget sub-module is used for predicting the manpower required by each project implementation stage, providing reference for project cost estimation in the project sale stage and inputting a manpower demand plan in the project starting process, so that the phenomenon of insufficient manpower of an enterprise caused by synchronous implementation of a plurality of projects is avoided; the risk estimation submodule is used for predicting the risks possibly encountered in the project starting stage, so that the risks are avoided in time, countermeasures are prepared in advance, or measures are taken to reduce the risks.
The business investigation module comprises a business process submodule, a data report submodule and an authority setting submodule; the business process submodule is used for recording business processes of an enterprise so as to analyze the reasonability of the enterprise processes and carry out business process setting and business process optimization at the later stage; the data report submodule is used for arranging and collecting report templates required and generated in all links of an enterprise, so that the report design can be optimized, and a report input program and the like can be simplified; the authority setting submodule sets authority groups according to the enterprise personnel department, the level and the personal responsibility, and is beneficial to the definition of authority and information protection and the like.
The scheme design module comprises a system model selection submodule, a process design submodule, a function design submodule, an authority design submodule and an interface design submodule; the system model selection submodule is mainly used for carrying out comparative analysis on various system configuration models according to enterprise types, scales, requirements and the like; the flow design submodule is used for optimizing and simulating the flow (recombining the business flow); the functional design submodule is mainly used for dividing, analyzing and optimizing the system functional module according to enterprise requirements; the authority design submodule is used for analyzing the reasonability of authority setting of different classes of posts and optimizing the authority setting by combining with a service flow; the interface design submodule is used for carrying out preliminary interface design before system coding is carried out, and the problems of later reworking and the like are avoided.
The system development module comprises a system development submodule and a system test submodule; the system development submodule is mainly a system development platform and system version storage of each project; and the system test submodule is responsible for system test and collection and arrangement of test problems.
The data management module comprises a data acquisition sub-module, a data checking sub-module, a data sorting sub-module and a data import sub-module; the data acquisition sub-module is used for collecting the original information of the enterprise; the data checking submodule is used for processing the original data and checking, checking and correcting the data; the data sorting submodule is used for sorting the data and processing the data into a format file which can be imported; the data import submodule imports data by adopting a professional data import formula, and the problems of database data errors and the like caused by improper operation are avoided.
The system switching module comprises a data backup maintenance submodule and a simulation operation submodule; the data backup maintenance submodule is used for carrying out backup protection on the system, and the problems of system disorder and the like caused by misoperation are avoided; the simulation operation sub-module is used for performing trial operation on the system of each link, and the safety and stability of the system used by a client are ensured.
The system evaluation module comprises a fluency evaluation submodule, an usability evaluation submodule, a safety evaluation submodule and an implementation evaluation submodule; the fluency evaluation module is used for evaluating fluency of each developed system, and comprises judgment data of a simulation operation sub-module on the system reaction speed, fluency evaluation of internal staff on the system and evaluation data of clients on the system stability; the usability evaluation module is used for evaluating the usability of the developed system, and comprises judgment data of the simulation operation sub-module on the operation speed, the operation frequency and the operation time of a user, usability evaluation of internal staff on the system and evaluation data of the usability of the system by a client; the security evaluation module is used for evaluating the security of the developed system, and comprises hacker attack simulation data, judgment of internal staff on the security of the system and evaluation data of a client on the security of the system; the implementation evaluation submodule is used for evaluating the capability of a project team and comprises information records (record integrity, progress and cost) of each link implemented on the platform for the project, evaluation of a client for the project team and satisfaction of the client for the system.
The continuous improvement module comprises an opinion feedback sub-module and a system maintenance sub-module; the opinion feedback sub-module is used for collecting and improving the opinions fed back by the user in the process of using the system, and is connected with the system of the client, the client submits the opinions in the opinion feedback module of the client system, and the opinion feedback sub-module can receive the feedback (the corresponding system version, the client information and the feedback opinions); the system maintenance submodule is used for collecting problems or faults of the client in the system using process, so that timely solution is achieved, and the service level is improved.
The contract management module comprises a contract signing submodule and a contract changing submodule; the contract signing submodule is used for helping the staff judge the validity reasonability of the contract, is associated with the cost prediction submodule and the like, and can recommend proper pricing or service standards and the like; and the contract change submodule is used for recording each version of the contract change.
The purchasing management module comprises a supplier management submodule, a purchasing price comparison submodule and a purchasing contract submodule; the supplier management submodule is used for managing suppliers, including records of basic information, product quality, delivery date and the like and business transaction records, and has a supplier evaluation function; the purchase price comparison submodule is used for objectively comparing prices during purchase so as to select a proper supplier; and the purchasing contract submodule is used for assisting the employee to record and verify the contract.
The intellectual management module comprises a property right registration submodule and a property right protection submodule; the property right registration submodule is used for recording intellectual property files of a company; the property right protection submodule protects the property right of the company and prevents other units from embezzlement of the property right of the company.
The document management module comprises a data file submodule and a contract file submodule; the data file submodule is used for storing files of various versions of the system, daily office files and the like; and the contract file submodule is used for carrying out classified management on the contracts.
The project management and control module comprises a cost management submodule, a progress management submodule and a risk management submodule; the cost management submodule is used for managing project cost and monitoring the cost and has a reminding function; the progress management submodule is used for monitoring the project progress, predicting the project completion degree and prompting in time; the risk management submodule is used for managing and controlling the risk which is convenient for the project and possibly occurs, and various suggestions for avoiding or reducing the risk are embedded.
The project experience module comprises a system module submodule, an implementation module submodule and a management module submodule; the system module submodule collects and arranges the discovered experience formed in the process of project development; the implementation module submodule records how to solve the communication problem with the client and the like in the implementation process; and the management module submodule is used for recording the solution of problems in the overall scheduling and supervision in the project management process and the like.
The economic feasibility analysis submodule of the embodiment is used for analyzing the capital required to be consumed in meeting the customer requirements, further analyzing the economic feasibility of the project, and performing economic feasibility analysis on the project from the aspects of net present value and investment recovery period by adopting linear regression or a neural network.
Please refer to fig. 2, the neural network algorithm adopts an improved genetic algorithm to predict project expected income and the like; the input end is enterprise scale, industry type, company architecture, enterprise requirement complexity, technical difficulty and the output end is expected income;
wherein, the company architecture can be divided according to types, such as flat, linear, function, linear-function, affairs department, matrix, etc.;
the enterprise demand complexity is determined according to the number of departments, data traffic between the departments, workload and the like which are required to be included by the project demand;
the technical difficulty is determined according to the system configuration level, the system hierarchy division, the data precision, the accuracy, the timeliness and the like; for example, the system configuration level can be divided into various types of combination and collocation such as a Server (Windows 2008 Server) + a client (Windows XP), a Server (above Windows 2008 Server) + a client (above Windows XP), and the like; the system level comprises a workpiece layer, a process layer, an inter-vehicle layer, a factory layer, an enterprise cooperation layer and the like, so different items have different level selections for the item system level division; the data precision, for example, the statistical precision of the product reject rate is 0.0001 or 0.00001; accuracy, which requires specific system analysis, for example, some systems can display or predict failure rate and qualification rate, and the accuracy here is based on the accuracy that can be realized on average; the timeliness refers to the processing speed of the system, for example, the time for the system to perform the reflection is measured in minutes or hours when the quality of the workshop product is abnormal, and similarly, the timeliness is determined based on the average achievable reflection time.
The method specifically comprises the following steps:
step 1: establishing an attribute matrix;
acquiring influence factors of events so as to establish an attribute matrix comprising year, enterprise scale, industry type, company architecture, enterprise demand complexity, technical difficulty and expected income;
step 2: acquiring data;
the method comprises the steps of processing original data, classifying each factor and standardizing the data to obtain training data and test data;
and step 3: establishing an algorithm model;
establishing a functional relationship between the project factors and the project benefits, and constructing a fitness function by using the difference between the function fitting value and the true value;
the specific implementation comprises the following substeps:
step 3.1: initializing algorithm model weights (namely weights occupied by all input parameters during fitting), threshold values, normalizing data, and acquiring original weights according to training data;
step 3.2: testing output and comparing results;
step 3.3: calculating new weight and threshold value, and calculating the weight and threshold value of each factor according to the weight iterative correction rule of the neural network;
step 3.4: and (5) error judgment and iteration, selecting the next input mode pair, returning to the step 3.2, and repeatedly training until the output error of the network is required to finish training.
And 4, step 4: solving;
and inputting new project parameters and predicting possible project gains after the precision of the algorithm model meets the requirement and the iteration is stopped.
The project profit prediction method comprises a plurality of algorithms, particularly a BP neural network model, and is applied to project profit prediction, so that project profits can be predicted more accurately.
The invention can realize the functions of synchronous tracking, classified management, comprehensive planning, project analysis, intelligent decision and the like of the informationized project, thereby solving the technical problem in the background technology.
It should be understood that parts of the specification not set forth in detail are well within the prior art.
It should be understood that the above description of the preferred embodiments is given for clarity and not for any purpose of limitation, and that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (5)

1. An enterprise information project implementation management system, characterized in that: the system comprises a project coding module, a project training module, a feasibility analysis module, a demand analysis module, a project organization module, a conference recording module, an implementation plan module, a service investigation module, a scheme design module, a system research and development module, a data management module, a system switching module, a system evaluation module, a continuous improvement module, a contract management module, a purchase management module, a knowledge management module, a document management module, a project management and control module and a project experience module;
the project coding module is used for naming the project codes, so that the tracking and management of the projects are facilitated;
the project training module comprises an early training submodule and a later training submodule; the early-stage training module is used for training enterprise staff to know the informatization significance and describe the requirements of the enterprise staff, and comprises the steps of storing training data, training setting, training record, setting an online training classroom and consulting services; the later training module is used for training staff to switch between a new system and an old system, accurately describing the feeling of using the system during the on-line period of the system and accurately feeding back the requirement;
the feasibility analysis module comprises an enterprise informatization status submodule, an enterprise management status submodule, an investment benefit analysis submodule, an economic feasibility analysis submodule, a technical feasibility analysis submodule and a social feasibility analysis submodule; the enterprise informatization status submodule is used for carrying out sorting, statistical analysis on the existing informatization of the enterprise according to the function type, the existing function, the configuration parameter performance and the use opinion, and knowing the requirements and the working process of the enterprise; the enterprise management status submodule is used for analyzing, optimizing and even recombining the existing organization framework, business process and responsibility division of an enterprise, providing a solution for problems occurring in the enterprise management process, and avoiding problems which do not occur possibly in advance so as to estimate the workload of enterprise informatization implementation projects; the investment benefit analysis submodule analyzes the expected benefit of the investment informatization project from the enterprise perspective, and sets the indexes of an investment recovery period, an investment return rate, a financial internal income rate and a financial net present value to evaluate and predict the investment benefit; the economic feasibility analysis submodule is used for analyzing the funds required to be consumed when the requirements of the customers are met, further analyzing the economic feasibility of the project, formulating a reasonable charging interval and providing quoted prices for the customers according to the reasonable charging interval; the technical feasibility submodule is mainly used for analyzing the difficulty and time of the technical scheme by technical personnel according to the requirements of customers so as to judge the technical feasibility of the project; the social feasibility analysis submodule is responsible for analyzing organization relations, functions, benefits and leadership support of internal groups of the enterprise and determining the difficulty degree of project implementation process propulsion;
the requirement analysis module comprises an industry requirement submodule, a business requirement submodule, a report requirement submodule, an interface requirement submodule, a maintenance requirement submodule and a requirement report submodule; the industry requirement submodule takes the basic situation of an informatization system of the industry as a data analysis basis and comprises functions, processes, frames, cost and benefits; the business requirement submodule is used for communicating with the requirements of the customers and recording the requirements of the customers, the standardized requirement description and the requirement change record; the report requirement submodule is used for arranging reports required by customers; the interface requirement module is used for recording the requirements of customers on the interfaces of each module of the system, analyzing the interface position setting and recording the interface setting file; the maintenance requirement submodule is used for recording system maintenance records and setting on-time maintenance reminding; the requirement report submodule is used for recording a requirement report file;
the project organization module comprises a responsibility division submodule and an authority division submodule; the responsibility division submodule is used for recording the responsibility of each post worker in detail, and coding and grouping various responsibilities; the authority division submodule is used for recording the authority possessed by each employee, and encoding and grouping the authority blocks;
the conference recording module is used for recording conference contents and participants, and is convenient for daily work management;
the implementation plan module comprises a project range sub-module, a work result sub-module, a time plan sub-module, a cost budget sub-module, a human budget sub-module and a risk estimation sub-module; the item range submodule is used for recording the content of the items required by the client and strictly limiting the item range so as to prevent the items from failing to implement due to continuous expansion of the range, and the part is associated with the contract management module; the work result submodule is used for recording the result of the delivery required by the project, and the part is associated with the contract management module; the time planning submodule is used for determining the time required to finish each stage of the project, and allocating human and material resources according to the time required to finish each stage of the project; the cost budget submodule is used for predicting expenditure required by each stage of the project and laying a foundation for product pricing and later-stage cost control; the manpower budget submodule is used for predicting the manpower required by each project implementation stage, providing reference for project cost estimation in the project sale stage and inputting a manpower demand plan in the project starting process, so that the phenomenon of insufficient manpower of an enterprise caused by synchronous implementation of a plurality of projects is avoided; the risk estimation submodule is used for predicting the risk possibly encountered in the project starting stage, so that the risk is avoided in time, a countermeasure is prepared in advance, or measures are taken to reduce the risk;
the business investigation module comprises a business process submodule, a data report submodule and an authority setting submodule; the business process submodule is used for recording business processes of an enterprise, and performing business process setting and business process optimization at the later stage; the data report submodule is used for arranging and collecting report templates required and generated by all links of an enterprise, so that the report design is facilitated to be optimized, and a report input program is simplified; the permission setting submodule is used for setting permission groups according to the department to which the enterprise personnel belong, the level of the department and the personal responsibility;
the scheme design module comprises a system model selection submodule, a process design submodule, a function design submodule, an authority design submodule and an interface design submodule; the system type selection submodule is used for performing comparative analysis on various system configuration types according to the type, the scale and the requirement of an enterprise; the flow design submodule is used for optimizing and simulating a flow; the functional design submodule is used for dividing, analyzing and optimizing the system functional module according to enterprise requirements; the authority design submodule is used for analyzing the reasonability of authority setting of different classes of posts and optimizing the authority setting by combining with a service flow; the interface design submodule is used for carrying out preliminary interface design before system coding is carried out;
the system development module comprises a system development submodule and a system test submodule; the system development submodule is used for storing a system development platform and system versions of all projects; the system testing submodule is responsible for system testing and collecting and sorting testing problems;
the data management module comprises a data acquisition sub-module, a data checking sub-module, a data sorting sub-module and a data importing sub-module; the data acquisition sub-module is used for collecting original enterprise information; the data checking submodule is used for processing the original data and checking, checking and correcting the data; the data sorting submodule is used for sorting the data and processing the data into a format file which can be imported; the data import submodule imports data by adopting a professional data import formula, so that database data errors caused by improper operation are avoided;
the system switching module comprises a data backup maintenance sub-module and a simulation operation sub-module; the data backup maintenance submodule is used for carrying out backup protection on the system, and the disorder of the system caused by misoperation is avoided; the simulation operation sub-module is used for performing trial operation on the system of each link to ensure the safety and stability of the system used by the client;
the system evaluation module comprises a fluency evaluation submodule, an usability evaluation submodule, a safety evaluation submodule and an implementation evaluation submodule; the fluency evaluation module is used for evaluating fluency of each developed system, and comprises judgment data of a simulation operation sub-module on the system reaction speed, fluency evaluation of internal staff on the system and evaluation data of clients on the system stability; the usability evaluation module is used for evaluating the usability of the developed system, and comprises judgment data of the simulation operation sub-module on the operation speed, the operation frequency and the operation time of a user, usability evaluation of internal staff on the system and evaluation data of the usability of the system by a client; the security evaluation module is used for evaluating the security of the developed system, and comprises hacker attack simulation data, judgment of internal staff on the security of the system and evaluation data of a client on the security of the system; the implementation evaluation submodule is used for evaluating the capability of a project team, and comprises information records of each link of project implementation on a platform, evaluation of a client on the project team and satisfaction of the client on a system;
the continuous improvement module comprises an opinion feedback sub-module and a system maintenance sub-module; the opinion feedback sub-module is used for collecting and improving opinions fed back by a user in the process of using the system and is connected with a client system, the client submits the opinions in the opinion feedback module of the client system, and the opinion feedback sub-module can receive the feedback; the system maintenance submodule is used for collecting problems or faults of a client in the system using process, so that the problems or faults can be solved in time, and the service level is improved;
the contract management module comprises a contract signing submodule and a contract changing submodule; the contract signing submodule is used for helping the staff judge the validity reasonability of the contract, is associated with the cost prediction submodule and the like, and can recommend proper pricing or service standards; the contract change submodule is used for recording each version of the contract change;
the purchasing management module comprises a supplier management submodule, a purchasing price comparison submodule and a purchasing contract submodule; the supplier management submodule is used for managing suppliers, including basic information, product quality, delivery date records and business transaction records, and has a supplier evaluation function; the purchasing price comparison submodule is used for objectively comparing prices during purchasing so as to select a proper supplier; the purchasing contract submodule is used for assisting the employee to record and verify the contract;
the intellectual management module comprises a property right registration submodule and a property right protection submodule; the property right registration submodule is used for recording intellectual property files of a company; the property right protection submodule protects the property right of the company and prevents other units from embezzlement of the property right of the company;
the document management module comprises a data file submodule and a contract file submodule; the data file submodule is used for storing files of various versions of the system and daily office files; the contract file submodule is used for carrying out classified management on the contracts;
the project management and control module comprises a cost management submodule, a progress management submodule and a risk management submodule; the cost management submodule is used for managing project cost and monitoring cost and has a reminding function; the progress management submodule is used for monitoring the progress of the project, predicting the completion degree of the project and giving prompt in time; the risk management submodule is used for managing and controlling the risk which is convenient for the project and possibly occurs, and embedding various suggestions for avoiding or reducing the risk;
the project experience module comprises a system module submodule, an implementation module submodule and a management module submodule; the system module submodule is used for collecting and organizing discovered thoughtful experience formed in the process of project development; the implementation module submodule is used for recording how to solve the communication problem with the client in the implementation process; and the management module submodule is used for recording the solution of problems in the overall scheduling and supervision in the project management process.
2. The system for enterprise informational project fulfillment management as claimed in claim 1 further comprising: the investment benefit analysis submodule analyzes the expected benefit of the investment informatization project from the enterprise perspective, and analyzes the expected benefit of the investment informatization project by adopting a data envelope analysis method, a Taylor model algorithm, a probability analysis method, a total cost of ownership TCO, an economic added value EVA, a total economic impact TEI or a balance scorecard BSC.
3. The system for enterprise informational project fulfillment management as claimed in claim 1 further comprising: the economic feasibility analysis submodule is used for analyzing the capital required to be consumed for meeting the customer requirements, further analyzing the economic feasibility of the project, and performing economic feasibility analysis on the project from the aspects of net present value and investment recovery period by adopting linear regression or a neural network.
4. The system for enterprise informational project fulfillment management as claimed in claim 3 further comprising: the neural network algorithm adopts an improved genetic algorithm to predict project expected income and the like; the input end is enterprise scale, industry type, company architecture, enterprise requirement complexity, technical difficulty and the output end is expected income;
the method specifically comprises the following steps:
step 1: establishing an attribute matrix;
acquiring influence factors of events so as to establish an attribute matrix comprising year, enterprise scale, industry type, company architecture, enterprise demand complexity, technical difficulty and expected income;
step 2: acquiring data;
the method comprises the steps of processing original data, classifying each factor and standardizing the data to obtain training data and test data;
and step 3: establishing an algorithm model;
establishing a functional relationship between the project factors and the project benefits, and constructing a fitness function by using the difference between the function fitting value and the true value;
and 4, step 4: solving;
and inputting new project parameters and predicting possible project gains after the precision of the algorithm model meets the requirement and the iteration is stopped.
5. The system for enterprise informational project fulfillment management as claimed in claim 4 further comprising: the specific implementation of the step 3 comprises the following substeps:
step 3.1: initializing the weight and threshold value occupied by each input parameter during fitting, normalizing data, and acquiring the original weight according to training data;
step 3.2: testing output and comparing results;
step 3.3: calculating new weight and threshold value, and calculating the weight and threshold value of each factor according to the weight iterative correction rule of the neural network;
step 3.4: and (5) error judgment and iteration, selecting the next input mode pair, returning to the step 3.2, and repeatedly training until the output error of the network side meets the requirement, and finishing the training.
CN201810729887.6A 2018-07-05 2018-07-05 Enterprise informatization project implementation management system Expired - Fee Related CN108932589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810729887.6A CN108932589B (en) 2018-07-05 2018-07-05 Enterprise informatization project implementation management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810729887.6A CN108932589B (en) 2018-07-05 2018-07-05 Enterprise informatization project implementation management system

Publications (2)

Publication Number Publication Date
CN108932589A CN108932589A (en) 2018-12-04
CN108932589B true CN108932589B (en) 2021-06-04

Family

ID=64447078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810729887.6A Expired - Fee Related CN108932589B (en) 2018-07-05 2018-07-05 Enterprise informatization project implementation management system

Country Status (1)

Country Link
CN (1) CN108932589B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109657958B (en) * 2018-12-12 2022-12-09 上汽通用汽车有限公司 Modeling method of digital information system and digital information system
CN109636349A (en) * 2018-12-17 2019-04-16 深圳市中源盛科技有限公司 A kind of Corporation R & D management method and system
CN109840859A (en) * 2019-01-30 2019-06-04 中材海外工程有限公司 Cement works construction project intelligent management system
CN109978375B (en) * 2019-03-28 2023-01-03 江苏利柏特股份有限公司 Intelligent management system for pipeline prefabrication production line
CN110109425B (en) * 2019-04-03 2022-05-13 清华大学天津高端装备研究院 Intelligent control platform driven by process digital model based on expert knowledge base
CN110046829A (en) * 2019-04-24 2019-07-23 王君 A kind of wind-powered electricity generation industry overall planning management system
CN110135719A (en) * 2019-05-08 2019-08-16 重庆八戒电子商务有限公司 Cooperative system and method are remotely researched and developed in a kind of internet
CN112396442A (en) * 2019-08-15 2021-02-23 国网能源研究院有限公司 Novel electric power service product design system
CN111191871A (en) * 2019-11-21 2020-05-22 深圳壹账通智能科技有限公司 Project baseline data generation method and device, computer equipment and storage medium
CN110888626A (en) * 2019-11-25 2020-03-17 大连东软信息学院 Software integration project matrix type process management system
CN112669005B (en) * 2020-12-25 2024-03-05 中铁大桥局集团有限公司 Intelligent collaborative management system and method applicable to engineering project whole life cycle
CN113657866A (en) * 2021-08-27 2021-11-16 上海镁信健康科技有限公司 Project management system based on urban insurance standardization process
CN113723713B (en) * 2021-11-01 2022-01-28 商运(江苏)科创发展有限公司 Micro-service green manufacturing customer management system and method
CN115310766B (en) * 2022-07-06 2023-06-20 南京邮电大学 Enterprise management system based on big data analysis
CN117764536B (en) * 2024-01-12 2024-07-30 四川大学 Innovative entrepreneur project auxiliary management system based on artificial intelligence

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456168A (en) * 2010-10-18 2012-05-16 捷达世软件(深圳)有限公司 Software project management system and method
CN102646224A (en) * 2012-02-21 2012-08-22 山东电力集团公司 Management integrating system of enterprise standardization
CN104102967A (en) * 2013-04-15 2014-10-15 苏州苏恒网络科技有限公司 Project management system
CN105160463A (en) * 2015-08-19 2015-12-16 武汉海王新能源工程技术有限公司 Enterprise management system on basis of project management

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130211866A1 (en) * 2011-07-20 2013-08-15 Bank Of America Corporation Project checklist and table of changes for project management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456168A (en) * 2010-10-18 2012-05-16 捷达世软件(深圳)有限公司 Software project management system and method
CN102646224A (en) * 2012-02-21 2012-08-22 山东电力集团公司 Management integrating system of enterprise standardization
CN104102967A (en) * 2013-04-15 2014-10-15 苏州苏恒网络科技有限公司 Project management system
CN105160463A (en) * 2015-08-19 2015-12-16 武汉海王新能源工程技术有限公司 Enterprise management system on basis of project management

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于 J2EE 的企业项目管理系统的设计与实现;郑晓北;《中国优秀硕士学位论文全文数据库工程科技辑》;20130515;全文 *

Also Published As

Publication number Publication date
CN108932589A (en) 2018-12-04

Similar Documents

Publication Publication Date Title
CN108932589B (en) Enterprise informatization project implementation management system
Abran et al. Measurement of the maintenance process from a demand‐based perspective
Robinson General concepts of quality for discrete-event simulation
GB2380835A (en) Monitoring the profitability of a manufacturing plant
CN105574592B (en) Aeroengine maintenance engineering management tool
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
Chakravorty Prioritizing improvement projects: Benefit & effort (B&E) analysis
Fazlollahtabar Supply chain management models: forward, reverse, uncertain, and intelligent foundations with case studies
CN113127538A (en) High-precision spare part demand prediction method
CN117130652A (en) Software project management system and method based on rapid development model
CN116976948A (en) Method and system for generating dynamic feedback flow diagram of full value chain of manufacturing enterprise
Zhou et al. The analytic supporting tools for business reengineering with system integration design
Vitezić et al. Production Controlling in the Digital Age
Sharma et al. Interpretive structural modelling of enablers for improving the performance of automobile service centre
CN113592611A (en) Integrated management system for centralized acquisition and supervision of garbage incineration enterprises
English Total quality data management (TQdM)
El-Wafi Siemens: process mining for operational efficiency in Purchase2Pay
Hamilton Cost management
Anham et al. Implementation of Lean Supply Chain Management on Maintenance Repair and Overhaul using SCOR
Gil-Goyzueta et al. Process Improvement Proposal Storage to Increase the Service Level Using Lean Warehousing in Commerce Companies
Ye et al. 4PL suppliers evaluating indicator system based on Grey Correlation Model
Saputra et al. An Effective Open ERP System for Automation in Financial Reporting for SMEs based on Service Oriented Architecture
Sukhareva et al. Organizational and economic mechanism for creating a digital environment in the energy sector
Behúnová et al. An Effective Tool for Increasing the Company’s Production Process–Application of Innovative Planning Methods
TWI550531B (en) Enterprise resource planning performance evaluation system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant