CN110135719A - Cooperative system and method are remotely researched and developed in a kind of internet - Google Patents
Cooperative system and method are remotely researched and developed in a kind of internet Download PDFInfo
- Publication number
- CN110135719A CN110135719A CN201910380749.6A CN201910380749A CN110135719A CN 110135719 A CN110135719 A CN 110135719A CN 201910380749 A CN201910380749 A CN 201910380749A CN 110135719 A CN110135719 A CN 110135719A
- Authority
- CN
- China
- Prior art keywords
- project
- task
- demand
- progress
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to Internet technical field, it is related to a kind of internet and remotely researches and develops cooperative system and method.The system comprises: demand combs module, for establishing Demand Frame using normalized template and Custom Attributes;In frame foundation, detailed requirements are improved in adjustable point, positioning;Demand management module, for being managed collectively for occurring in project for task by way of description to demand, being provided with the time limit, assigning responsible person, setting task priority, association related resource description;Meet product manager, QA Manager, the regulatory requirement of project manager;Project scheduling management module carries out project process control for showing by the data to project overall progress, version progress, stage progress and Task Progress different dimensions;Authority management module carries out protection access to project resource by distributing different roles to program member;Project Manager can add the member of participation project, and distribute different roles, reach priority assignation.
Description
Technical field
The invention belongs to Internet technical fields, and in particular to cooperative system and method are remotely researched and developed in a kind of internet.
Background technique
For outsourcing team and enterprise, how reasonable distribution off-the-shelf item resource, carry out optimal persons' composition pipe
One of the problem of reason, monitoring development progress are their most headaches and consigner (party awarding the contract) most concerned problem.It is rationally real
Project control is applied, the management of entry concurrent development is realized, is capable of the efficiency of research and development of significant increase project, reduces cost, optimization money
Source configuration, to improve the profit margin of outsourcing team and enterprise.
U-Reactor can be monitored the Life cycle of software, and a software project arrives demand from the idea stage
Management, development task distribution, monitoring, code submit, quality assurance, deliver and O&M, all operations all U-Reactor from
It is completed in dynamicization project control platform, while by work output real-time update on platform, to facilitate team to cooperate with.
Duration and quality in order to ensure project, although U-Reactor does not constrain the job site of research staff,
But to immediate feedback, online collaboration and communication, ensure that duration and work quality propose very high requirement.Research staff is in U-
Operation is completed under the R&D mode of Reactor building, the period of project development will be substantially reduced.
Required exploration project is entrusted to U-Reactor project control platform by project side, matches competitive bidding group by platform intelligent
Team simultaneously quickly provides feedback.Wherein, competitive bidding team is provided reliably by the composition of personnel by strictly auditing for Project-developing
Product quality guarantee, while the output efficiency of Project-developing effectively being promoted, is enterprise's effectively save time and financial resources cost.
Summary of the invention
In view of this, the main purpose of the present invention is to provide a kind of internets remotely to research and develop cooperative system and method,
The Life cycle of software can be monitored, a software project arrives demand management, development task point from the idea stage
Hair, monitoring, code are submitted, quality assurance, deliver and O&M, all operations are all flat in the control of U-Reactor automation projects
It is completed on platform.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
Cooperative system is remotely researched and developed in a kind of internet, the system comprises:
Demand combs module, for establishing Demand Frame using normalized template and Custom Attributes;In frame foundation,
Detailed requirements are improved in adjustable point, positioning;
Demand management module, for by description to demand, be provided with that the time limit, to assign responsible person, setting task excellent
First grade, the mode of association related resource description, are managed collectively for occurring in project for task;Meet product manager, surveys
Examination manager, the regulatory requirement of project manager;
Project scheduling management module, for by the way that project overall progress, version progress, stage progress and Task Progress are not
Data with dimension are shown, carry out project process control;
Authority management module carries out protection access to project resource by distributing different roles to program member;Project
Administrator can add the member of participation project, and distribute different roles, reach priority assignation;
Code and resource management module are managed the resources such as item destination code, UI, UE, document, link, log, if
The permission that personnel participate in code engineering is set, guarantees the safety of code.
Further, the demand management module includes: demand management unit and checkpoint administrative unit;The demand pipe
Unit is managed, for task to be described in detail, task priority is set, the deadline in each stage in software project is respectively set
And responsible person, to complete the setting of demand task creation fundamental;The checkpoint administrative unit, to some key nodes
There is special messenger to supervise and guide and complete, avoid the omission of key task, responsible person and deadline are arranged to important node, meanwhile, lead to
The detailed description to the task of inspection is crossed, task priority is arranged in the project stage where marking, and assigns responsible person, adds task
Time limit is to checkpointing.
Further, the project scheduling management module includes: Item panel unit, project process display unit, monitoring
Unit and version progress chasing unit;The Item panel unit, for the project process of checking of the real-time overall situation, and by common
Classification is quickly found out project;The project process display unit is highlighted for showing project process, and to progress early warning;
The monitoring unit is supported for milestone node definition and monitoring, guarantees that phased goal is reached;The version progress chasing
Unit is used for each version progress situation of real time inspection, and supports fine-grained monitoring, analyzing and positioning problem.
Further, the authority management module carries out project resource by distributing different roles to program member
Protection access;Project Manager can add the member of participation project, and distribute different roles, reach priority assignation;It is described
Project permission includes: administrator, rank and file and/or tourist, and different rights include different roles, realizes the power of different scenes
Limit refinement, is convenient for different scenes personal management;The administrator have the project highest authority, can with Maintenance Significant Items member,
Demand task, progress chasing, resource management, engineering management;The rank and file, can with maintenance needs task, check progress with
Track, resource management etc.;The tourist member, the demand task being only capable of in the project of checking check progress chasing, check resource etc.,
It is unable to executive editor and modifies operation.
Further, the code and resource management module include: code management unit, for item destination code engineering
It is managed, and settable personnel participate in the permission of code engineering;UI administrative unit safeguards for the UI figure to project,
And it can be audited, be confirmed online;UE administrative unit for safeguarding to project UE, and can be audited, really online
Recognize;Document management unit is used for the relevant document of Maintenance Significant Items;Url management unit is used for the relevant access of Maintenance Significant Items
Location;Defect management unit, the defect management function for being provided by UReactor platform, examination responsible person can clearly
Test plan is embodied in platform;Log management unit includes version for recording program member to the operation log of each function
This operation note, task operating record, code operation record, defect modification record;Monitoring alarm unit, for being directed to project version
This Task Progress risk management and control alerts, and is notified with platform fine mechanism association by short message mail reminder.
Collaboration method is remotely researched and developed in a kind of internet, and the method executes following steps:
Demand Frame is established using normalized template and Custom Attributes;In frame foundation, adjustable point, positioning improve detailed
Thin demand;
By description to demand, it is provided with the time limit, assigns responsible person, setting task priority, association related resource
The mode of description is managed collectively for occurring in project for task;Meet product manager, QA Manager, project manager's
Regulatory requirement;
It is shown, is carried out by the data to project overall progress, version progress, stage progress and Task Progress different dimensions
Project process control;
By distributing different roles to program member, protection access is carried out to project resource;Project Manager can add
The member of participation project, and different roles is distributed, reach priority assignation;
The resources such as item destination code, UI, UE, document, link, log are managed, designer participates in code engineering
Permission, guarantee the safety of code.
Further, described to establish Demand Frame using normalized template and Custom Attributes;In frame foundation, it can determine
The method that point, positioning improve detailed requirements executes following steps: project name refined, project brief is then summarized, it is then clear
Then product orientation builds Demand Frame, then consummating function module, final optimization pass requirement details
Further, the description by demand, be provided with the time limit, assign responsible person, setting task priority,
It is associated with the mode of related resource description, is managed collectively for occurring in project for task;Meet product manager, test warp
The method of reason, the regulatory requirement of project manager executes following steps: can quickly create task by demand management;It is detailed to task
Thin description, is arranged task priority, the deadline in each stage and responsible person in software project is respectively set, to complete to need
Ask the setting of task creation fundamental;It needs to have special messenger to some key nodes to supervise and guide and complete, avoids the something lost of key task
Leakage is arranged responsible person and deadline to important node, the important process of project is avoided to omit, convenient for project manager to project
Whole control;By the detailed description to the task of inspection, the project stage at place is marked, task priority is set, is assigned negative
People is blamed, addition task completes the time limit to checkpointing.
Cooperative system and method are remotely researched and developed in a kind of internet of the invention, have the following beneficial effects: in traditional skill
Art research and develop market, project from demand determine, to enter research and development each link, all it is easy to appear because operating mode difference,
The lag of project caused by domain sex differernce, technical costs the difference even risk of failure.U-Reactor, which provides a project, to be recognized
Neck, Team, skills training, project management, code evaluation, payment guarantee, are really simultaneously servicing developer and project
The one-stop technical research platform tools of consigner.
Detailed description of the invention
Fig. 1 is the system structure diagram that cooperative system is remotely researched and developed in internet of the invention.
Fig. 2 is the method flow schematic diagram that collaboration method is remotely researched and developed in internet of the invention.
Specific embodiment
With reference to the accompanying drawing and the embodiment of the present invention is described in further detail method of the invention.
Embodiment 1:
As shown in Figure 1, cooperative system is remotely researched and developed in a kind of internet, the system comprises:
Demand combs module, for establishing Demand Frame using normalized template and Custom Attributes;In frame foundation,
Detailed requirements are improved in adjustable point, positioning;
Demand management module, for by description to demand, be provided with that the time limit, to assign responsible person, setting task excellent
First grade, the mode of association related resource description, are managed collectively for occurring in project for task;Meet product manager, surveys
Examination manager, the regulatory requirement of project manager;
Project scheduling management module, for by the way that project overall progress, version progress, stage progress and Task Progress are not
Data with dimension are shown, carry out project process control;
Authority management module carries out protection access to project resource by distributing different roles to program member;Project
Administrator can add the member of participation project, and distribute different roles, reach priority assignation;
Code and resource management module are managed the resources such as item destination code, UI, UE, document, link, log, if
The permission that personnel participate in code engineering is set, guarantees the safety of code.
Further, the demand management module includes: demand management unit and checkpoint administrative unit;The demand pipe
Unit is managed, for task to be described in detail, task priority is set, the deadline in each stage in software project is respectively set
And responsible person, to complete the setting of demand task creation fundamental;The checkpoint administrative unit, to some key nodes
There is special messenger to supervise and guide and complete, avoid the omission of key task, responsible person and deadline are arranged to important node, meanwhile, lead to
The detailed description to the task of inspection is crossed, task priority is arranged in the project stage where marking, and assigns responsible person, adds task
Time limit is to checkpointing.
Further, the project scheduling management module includes: Item panel unit, project process display unit, monitoring
Unit and version progress chasing unit;The Item panel unit, for the project process of checking of the real-time overall situation, and by common
Classification is quickly found out project;The project process display unit is highlighted for showing project process, and to progress early warning;
The monitoring unit is supported for milestone node definition and monitoring, guarantees that phased goal is reached;The version progress chasing
Unit is used for each version progress situation of real time inspection, and supports fine-grained monitoring, analyzing and positioning problem.
Further, the authority management module carries out project resource by distributing different roles to program member
Protection access;Project Manager can add the member of participation project, and distribute different roles, reach priority assignation;It is described
Project permission includes: administrator, rank and file and/or tourist, and different rights include different roles, realizes the power of different scenes
Limit refinement, is convenient for different scenes personal management;The administrator have the project highest authority, can with Maintenance Significant Items member,
Demand task, progress chasing, resource management, engineering management;The rank and file, can with maintenance needs task, check progress with
Track, resource management etc.;The tourist member, the demand task being only capable of in the project of checking check progress chasing, check resource etc.,
It is unable to executive editor and modifies operation.
Further, the code and resource management module include: code management unit, for item destination code engineering
It is managed, and settable personnel participate in the permission of code engineering;UI administrative unit safeguards for the UI figure to project,
And it can be audited, be confirmed online;UE administrative unit for safeguarding to project UE, and can be audited, really online
Recognize;Document management unit is used for the relevant document of Maintenance Significant Items;Url management unit is used for the relevant access of Maintenance Significant Items
Location;Defect management unit, the defect management function for being provided by UReactor platform, examination responsible person can clearly
Test plan is embodied in platform;Log management unit includes version for recording program member to the operation log of each function
This operation note, task operating record, code operation record, defect modification record;Monitoring alarm unit, for being directed to project version
This Task Progress risk management and control alerts, and is notified with platform fine mechanism association by short message mail reminder.
Specifically, demand management, development task distribution, monitoring may be implemented in the present invention, and code is submitted, and quality assurance is handed over
Pay and O&M;Application development frameworks are built using Springboot+dubbo+mybatis+mysql+JDK;Detailed process
It is as follows:
Demand combing
Fast and accurate Demand Frame can be established using standardized module template & Custom Attributes, in frame foundation,
Product manager's adjustable point, accurate positioning it is errorless improve detailed requirements, and feasible system & logically fill a vacancy by leakage detection, reaches
Efficiently, high-quality output function scheme purpose;
1. combing process
It refines project name → general introduction project brief → clear product orientation → and builds Demand Frame → consummating function module
→ optimization requirement details
2. combing thinking: function scheme " syllogism ": helping you to solidify framework, and precise positioning quickly adjusts.
Basic function: basic module such as Login Register, message management, customer center (management), wallet, customer service are quickly cleared
Deng;
Premium Features: according to specific project needs, differentiation, customizing demand are quickly cleared;
Main (business) function: project core business module (operation flow) is quickly implemented;
3. combing core: the sequence importance of modularization (function point)
From [homepage] Banner, classification, screening, retrieval, list → [details page] details, collection, purchase, shopping is added
Vehicle, sharing;
A. in user: information architecture design can be apparent from, filled a vacancy along module thinking leakage detection;
B. it is designed in UI/UE: can accurately obtain service logic, page level mentality of designing etc.;
C. in me: can fast accurate positioning, fixed point adjustment, efficiently combing when function optimization or adjustment;
4. the guideline of function combing: MVP function scheme
The project first edition combs out MVP (minimum feasible product) function scheme to client as far as possible;
All limbic functions only are rejected containing the basic function that can reach expectations of customer purpose;
MVP function scheme, corresponding is exactly least cost early period investment.
Demand management
Demand management is UReator platform to demand, defect, the integration management of checkpoint.By description to demand, set
It sets and completes the time limit, assigns responsible person, setting task priority, the mode of association related resource description, for what is occurred in project
Task is managed collectively.Meet product manager, QA Manager, the regulatory requirement of project manager.
1. demand management
Demand shift is the thing often occurred inside project, is positioned in order to facilitate product manager to the refinement of demand, can
Quickly to create task by demand management.
System carries template, and task is described in detail, and task priority is arranged, each stage in software project is respectively set
Deadline and responsible person, to complete the setting of demand task creation fundamental.
2. checkpoint manages
During project whole implementation, needs to have special messenger to some key nodes to supervise and guide and complete, avoid key task
It omits, responsible person and deadline is arranged to important node, the important process of project is avoided to omit, convenient for project manager to item
Purpose integrally controls.
By the detailed description to the task of inspection, the project stage at place is marked, task priority is set, assigns and is responsible for
People, addition task complete the time limit to checkpointing.
Project scheduling management
Project scheduling management is the core function of UReactor platform, by project overall progress, version progress, stage
The data of the different dimensions such as progress, Task Progress are shown, to reach the target of project process control.
And alarm overdue for progress, we use the displaying of two levels of both macro and micro, to guarantee that progress is delayed
Discovery in time, and quickly location finding micro risks, achieve the purpose that quickly to solve the problems, such as.
In the calculating of progress, we have abandoned traditional mode being manually arranged, by our powerful algorithms come real
Shi Shengcheng, and creative in the monitoring of each task, has carried out the dismantling of phase targets, guarantees accurately and efficiently.
It supports the management of multi version iteration, quickly delivers.
1) by Item panel, can be global in real time check project process, and project is quickly found out by common classification
A) project overall condition is very clear
It is described, quickly can clearly be known by project overall condition, oneself current responsible all items, Mei Gexiang
Purpose current schedules, responsible person, remaining task, residual competence, it is remaining it is pending, participate in number, overdue number,
B) it by classification of the items, quickly positions
By whole, alarm project, I participates in, I is responsible for, the common classification that has terminated, quickly positioning needs to check
Project
2) project process covers all at one glance, and progress early warning is highlighted
In project management process, guarantee that expected progress is core, thus allow project to participate in personnel, especially manage
Member can perceive project expection at the first time and be very important thing, and in system design, participating in member can be in a face
The progress situation of all items is clearly known in plate, guarantee is encountered risk and handled at the first time
3) milestone node definition and monitoring are supported, guarantee that phased goal is reached
The definition for supporting project milestone or critical stage to deliver, to guarantee to find project macro risks in time.
4) Item version progress chasing knows a version progress situation clearly in real time, and supports fine-grained monitoring, analyzing and positioning
Problem
A) multiple versions are shown using multirow, the key message of every guild's version
Version number, release cycle, progress, complete task quantity, extension task quantity at general assignment quantity
B) expansion is clicked, the concrete condition of the different phase version is shown in
Demand analysis stage: plan number of days, period, progress, responsible person, general assignment, completion, extension task quantity statistics
Development phase: plan number of days, period, progress, responsible person, general assignment, completion, extension task quantity statistics
The joint debugging stage: plan number of days, period, progress, responsible person, general assignment, completion, extension task quantity statistics
Test phase: plan number of days, period, progress, responsible person, general assignment, completion, extension task quantity statistics
Rights management
Project rights management carries out protection access by distributing different roles to program member, to project resource.Project
Administrator can add the member of participation project, and distribute different roles, reach priority assignation.
Project permission includes administrator, rank and file, tourist, and different rights include different roles, realizes different scenes
Permission refinement, be convenient for different scenes personal management.
Project Manager has the highest authority of the project, can be with Maintenance Significant Items member, demand task, progress chasing, money
Source control, engineering management etc..
Project rank and file, can with maintenance needs task, check progress chasing, resource management etc..
Project tourist member, the demand task being only capable of in the project of checking check progress chasing, check resource etc., cannot hold
Edlin modification operation.
Code and resource management
1) code administration
Item destination code engineering is managed, and settable personnel participate in the permission of code engineering, guarantee the peace of code
Quan Xing.
The database of environment is developed, is tested in application, is realized that the two environment data base is different, be ensure that between the two environment
The problem of data isolation, generation convenient for positioning varying environment (such as: data problem, procedural problem etc.), formulate different solutions
Certainly scheme.
The database upgrade SQL script of test each version of environment is set, records each edition data alteration, avoids people
For the maloperation that linked database executes, the correctness and safety of data upgrading ensure that.
By each code engineering configuration file of setting test each version of environment, configuration file and code dehind are realized,
It avoids artificially impacting configuration file modification.
2) UI is managed
The UI figure of project is safeguarded, and can be audited, be confirmed online.Facilitate the cooperation and friendship between team
Stream, ensure that UI figure be it is newest, consistent, avoid the research and development result confusion different with UI effect.
UI can be schemed to carry out division module, batch processing can be carried out to UI figure in module, save the operating time, improve
Working efficiency.And the figure of UI required for facilitating other members of team quickly to position.
3) UE is managed
Project UE is safeguarded, and can be audited, be confirmed online.
And the upload function of satisfactory zip compressed file is realized, and automatically generate online browse address.
Program member checks UE online, ensure that UE is newest and is final result.
4) document management
The relevant document of Maintenance Significant Items (such as: meeting summary, project demand etc.), consult and abide by convenient for program member.
5) url management
The relevant access address of Maintenance Significant Items (such as: exploitation environment address, address, the interface document address for testing environment
Deng), it consults and learns convenient for project related personnel.
Defect management
The defect management function provided by UReactor platform, test owner can be clearly by test plans
It is embodied in platform, project related personnel is facilitated independently to check.Test Engineer is by defect management function, and both pictures and texts are excellent for energy accurately
Problem is synchronized to related development personnel automatically by clearly feedback problem, system, it is ensured that defect is not missed, and improves work effect
Rate.
Major function embodies:
Format specification, step are clear: ease for use is stronger, quickly Test Engineer is guided to complete the description to entire bug, increases
The validity for adding defect facilitates developer's orientation problem;
Version can be distinguished, assigned priority specifies corresponding development/testing personnel and setting task deadline: visitor
Sight embodies project and integrally mentions mass metering, repairs defect, effective item controlled progress according to priority;
Defect list can be according to defect state, priority, and bug id and keyword etc. are screened: facilitating project crew
Targetedly carry out Bug Tracking and quality control;
Defect can be added under test phase and verifies relevant test assignment and deadline: being reflected executor's verifying and lacked
Sunken required workload.
Defect is according to priority level, and influence to integral product function is planned repair in different versions respectively
It is multiple.
Defect screening statistics can clearly embody current version difference emergency level defects count and it is to be developed, to
Test defect quantity, as one of project process, quality, the data of risk evaluation.
Log management
Log management has recorded program member to the operation log of each function, includes version operation note, task operating
Record, code operation record, defect modification record etc..
Log management effect is as follows:
1) operating frequency of project is fully understood;
2) it finds the problem in the shortest time;
3) the reason of occurring convenient for tracing problem saves fault-remove time;
4) it finds some from the problem of being unaware that;
8. monitoring alarm system
System can be alerted for Item version Task Progress risk management and control, pass through short message with platform fine mechanism association
Mail reminder notice.
9. alarm triggered condition
1. version is delayed: when the expected progress of version and actual progress gap are more than 15%, it is logical that system issues alarm of delaying
Know;
2. task-delay: being more than not complete the task scheduling time, system issues extension alarm notification, not more than certain time
Processing system will impose a fine automatically.
3. alarm parameter is configurable: alarm parameter can be in rear flexible configuration.
Collaboration method is remotely researched and developed in a kind of internet, and the method executes following steps:
Demand Frame is established using normalized template and Custom Attributes;In frame foundation, adjustable point, positioning improve detailed
Thin demand;
By description to demand, it is provided with the time limit, assigns responsible person, setting task priority, association related resource
The mode of description is managed collectively for occurring in project for task;Meet product manager, QA Manager, project manager's
Regulatory requirement;
It is shown, is carried out by the data to project overall progress, version progress, stage progress and Task Progress different dimensions
Project process control;
By distributing different roles to program member, protection access is carried out to project resource;Project Manager can add
The member of participation project, and different roles is distributed, reach priority assignation;
The resources such as item destination code, UI, UE, document, link, log are managed, designer participates in code engineering
Permission, guarantee the safety of code.
Further, described to establish Demand Frame using normalized template and Custom Attributes;In frame foundation, it can determine
The method that point, positioning improve detailed requirements executes following steps: project name refined, project brief is then summarized, it is then clear
Then product orientation builds Demand Frame, then consummating function module, final optimization pass requirement details
Further, the description by demand, be provided with the time limit, assign responsible person, setting task priority,
It is associated with the mode of related resource description, is managed collectively for occurring in project for task;Meet product manager, test warp
The method of reason, the regulatory requirement of project manager executes following steps: can quickly create task by demand management;It is detailed to task
Thin description, is arranged task priority, the deadline in each stage and responsible person in software project is respectively set, to complete to need
Ask the setting of task creation fundamental;It needs to have special messenger to some key nodes to supervise and guide and complete, avoids the something lost of key task
Leakage is arranged responsible person and deadline to important node, the important process of project is avoided to omit, convenient for project manager to project
Whole control;By the detailed description to the task of inspection, the project stage at place is marked, task priority is set, is assigned negative
People is blamed, addition task completes the time limit to checkpointing.
Person of ordinary skill in the field can be understood that, for convenience and simplicity of description, foregoing description
The specific work process of system and related explanation, can refer to corresponding processes in the foregoing method embodiment, details are not described herein.
It should be noted that system provided by the above embodiment, only illustrate with the division of above-mentioned each functional module
It is bright, in practical applications, it can according to need and complete above-mentioned function distribution by different functional modules, i.e., it will be of the invention
Module or step in embodiment are decomposed or are combined again, for example, the module of above-described embodiment can be merged into a module,
It can also be further split into multiple submodule, to complete all or part of the functions described above.The present invention is implemented
Module, the title of step involved in example, it is only for distinguish modules or step, be not intended as to of the invention improper
It limits.
Person of ordinary skill in the field can be understood that, for convenience and simplicity of description, foregoing description
The specific work process and related explanation of storage device, processing unit, can refer to corresponding processes in the foregoing method embodiment,
Details are not described herein.
Those skilled in the art should be able to recognize that, mould described in conjunction with the examples disclosed in the embodiments of the present disclosure
Block, method and step, can be realized with electronic hardware, computer software, or a combination of the two, software module, method and step pair
The program answered can be placed in random access memory (RAM), memory, read-only memory (ROM), electrically programmable ROM, electric erasable and can compile
Any other form of storage well known in journey ROM, register, hard disk, moveable magnetic disc, CD~ROM or technical field is situated between
In matter.In order to clearly demonstrate the interchangeability of electronic hardware and software, in the above description according to function generally
Describe each exemplary composition and step.These functions are executed actually with electronic hardware or software mode, depend on technology
The specific application and design constraint of scheme.Those skilled in the art can carry out using distinct methods each specific application
Realize described function, but such implementation should not be considered as beyond the scope of the present invention.
Term " first ", " second " etc. are to be used to distinguish similar objects, rather than be used to describe or indicate specific suitable
Sequence or precedence.
Term " includes " or any other like term are intended to cover non-exclusive inclusion, so that including a system
Process, method, article or equipment/device of column element not only includes those elements, but also including being not explicitly listed
Other elements, or further include the intrinsic element of these process, method, article or equipment/devices.
So far, it has been combined preferred embodiment shown in the drawings and describes technical solution of the present invention, still, this field
Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these specific embodiments.Without departing from this
Under the premise of the principle of invention, those skilled in the art can make equivalent change or replacement to the relevant technologies feature, these
Technical solution after change or replacement will fall within the scope of protection of the present invention.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.
Claims (8)
1. cooperative system is remotely researched and developed in a kind of internet, which is characterized in that the system comprises:
Demand combs module, for establishing Demand Frame using normalized template and Custom Attributes;In frame foundation, it can determine
Detailed requirements are improved in point, positioning;
Demand management module, for by description to demand, be provided with the time limit, assign responsible person, setting task priority,
It is associated with the mode of related resource description, is managed collectively for occurring in project for task;Meet product manager, test warp
Reason, the regulatory requirement of project manager;
Project scheduling management module, for by project overall progress, version progress, stage progress and Task Progress different dimensional
The data of degree are shown, carry out project process control;
Authority management module carries out protection access to project resource by distributing different roles to program member;Project management
Member can add the member of participation project, and distribute different roles, reach priority assignation;
Code and resource management module are managed the resources such as item destination code, UI, UE, document, link, log, and people is arranged
Member participates in the permission of code engineering, guarantees the safety of code.
2. cooperative system is remotely researched and developed in internet as described in claim 1, which is characterized in that the demand management module packet
It includes: demand management unit and checkpoint administrative unit;Task is arranged for task to be described in detail in the demand management unit
The deadline in each stage and responsible person in software project is respectively set in priority, so that it is basic to complete demand task creation
The setting of element;The checkpoint administrative unit has special messenger to some key nodes to supervise and guide and complete, avoids the something lost of key task
Responsible person and deadline is arranged to important node in leakage, meanwhile, by the detailed description to the task of inspection, where marking
Task priority is arranged in project stage, assigns responsible person, adds mandatory period to checkpointing.
3. cooperative system is remotely researched and developed in internet as described in claim 1, which is characterized in that the project scheduling management module
It include: Item panel unit, project process display unit, monitoring unit and version progress chasing unit;The Item panel list
Member checks project process for the real-time overall situation, and is quickly found out project by common classification;The project process display is single
Member is highlighted for showing project process, and to progress early warning;The monitoring unit is used for milestone node definition and prison
Control is supported, guarantees that phased goal is reached;The version progress chasing unit is used for each version progress situation of real time inspection,
And support fine-grained monitoring, analyzing and positioning problem.
4. cooperative system is remotely researched and developed in internet as described in claim 1, which is characterized in that the authority management module passes through
Different roles is distributed to program member, and protection access is carried out to project resource;Project Manager can add participation project at
Member, and different roles is distributed, reach priority assignation;The project permission includes: administrator, rank and file and/or tourist,
Different rights include different roles, realize the permission refinement of different scenes, are convenient for different scenes personal management;The administrator
Highest authority with the project, can be with Maintenance Significant Items member, demand task, progress chasing, resource management, engineering management;Institute
State rank and file, can with maintenance needs task, check progress chasing, resource management etc.;The tourist member, is only capable of the project of checking
In demand task, check progress chasing, check resource etc., be unable to executive editor and modify operation.
5. cooperative system is remotely researched and developed in internet as described in claim 1, which is characterized in that the code and resource management mould
Block includes: code management unit, and for being managed to item destination code engineering, and settable personnel participate in the power of code engineering
Limit;UI administrative unit is safeguarded for the UI figure to project, and can be audited, be confirmed online;UE administrative unit is used
It is safeguarded in project UE, and can be audited, be confirmed online;Document management unit is used for the relevant text of Maintenance Significant Items
Shelves;Url management unit is used for the relevant access address of Maintenance Significant Items;Defect management unit, for passing through UReactor platform
Test plan can be embodied in platform clearly by the defect management function of offer, examination responsible person;Log management unit is used
In record program member to the operation log of each function, include version operation note, task operating record, code operation note
Record, defect modification record;Monitoring alarm unit, for being alerted for Item version Task Progress risk management and control, with platform
The association of fine mechanism is notified by short message mail reminder.
6. collaboration method is remotely researched and developed in a kind of internet, which is characterized in that the method executes following steps:
Demand Frame is established using normalized template and Custom Attributes;In frame foundation, adjustable point, positioning, which are improved, in detail need to
It asks;
By description to demand, it is provided with the time limit, assigns responsible person, setting task priority, association related resource description
Mode, be managed collectively for occurring in project for task;Meet product manager, QA Manager, the management of project manager
Demand;
It is shown by the data to project overall progress, version progress, stage progress and Task Progress different dimensions, carries out project
Progress control;
By distributing different roles to program member, protection access is carried out to project resource;Project Manager can add participation
The member of project, and different roles is distributed, reach priority assignation;
The resources such as item destination code, UI, UE, document, link, log are managed, designer participates in the power of code engineering
Limit, guarantees the safety of code.
7. collaboration method is remotely researched and developed in internet as claimed in claim 6, which is characterized in that it is described using normalized template and
Custom Attributes establishes Demand Frame;In frame foundation, the method that adjustable point, positioning improve detailed requirements executes following step
It is rapid: to refine project name, then summarize project brief, then clear product orientation, then build Demand Frame, then improve function
Energy module, final optimization pass requirement details.
8. collaboration method is remotely researched and developed in internet as claimed in claim 7, which is characterized in that described by being retouched to demand
It states, is provided with the time limit, assigns responsible person, setting task priority, the mode of association related resource description, go out in project
Existing task is managed collectively;Meet product manager, QA Manager, the method for the regulatory requirement of project manager executes following step
It is rapid: task can quickly to be created by demand management;Task is described in detail, task priority is set, software item is respectively set
The deadline in each stage and responsible person in mesh, to complete the setting of demand task creation fundamental;It needs to some
Key node has special messenger to supervise and guide and complete, and avoids the omission of key task, and responsible person and deadline is arranged to important node,
It avoids the important process of project from omitting, is controlled convenient for entirety of the project manager to project;By to check task detailed description,
Task priority is arranged in project stage where marking, assigns responsible person, and addition task completes the time limit to checkpointing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910380749.6A CN110135719A (en) | 2019-05-08 | 2019-05-08 | Cooperative system and method are remotely researched and developed in a kind of internet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910380749.6A CN110135719A (en) | 2019-05-08 | 2019-05-08 | Cooperative system and method are remotely researched and developed in a kind of internet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110135719A true CN110135719A (en) | 2019-08-16 |
Family
ID=67576862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910380749.6A Pending CN110135719A (en) | 2019-05-08 | 2019-05-08 | Cooperative system and method are remotely researched and developed in a kind of internet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110135719A (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110648113A (en) * | 2019-09-18 | 2020-01-03 | 广州诣启网络科技有限公司 | Co-creation work flow leveling platform |
CN110675118A (en) * | 2019-09-18 | 2020-01-10 | 广州诣启网络科技有限公司 | Project collaboration method and device based on co-creation workflow platform |
CN110750237A (en) * | 2019-08-31 | 2020-02-04 | 苏州浪潮智能科技有限公司 | Project risk assessment reminding system and method based on cloud computing technology |
CN110969409A (en) * | 2019-11-18 | 2020-04-07 | 广东卓维网络有限公司 | Information management and control system |
CN110991981A (en) * | 2019-10-25 | 2020-04-10 | 中国通信服务股份有限公司 | Application method of research and development cloud platform |
CN111026361A (en) * | 2019-11-26 | 2020-04-17 | 国华鹏源股份有限公司 | Software development method and development system |
CN111160761A (en) * | 2019-12-27 | 2020-05-15 | 中国航空工业集团公司西安飞机设计研究所 | Software development quality control method |
CN111191999A (en) * | 2019-11-14 | 2020-05-22 | 中国平安人寿保险股份有限公司 | Product research and development management method and device, computer equipment and storage medium |
CN111767441A (en) * | 2020-07-03 | 2020-10-13 | 中国农业银行股份有限公司贵州省分行 | Document management and operation and maintenance system |
CN111915214A (en) * | 2020-08-13 | 2020-11-10 | 南京朗赢信息技术有限公司 | Management platform and management client for tasting and evaluating grain products |
CN112000316A (en) * | 2020-08-25 | 2020-11-27 | 橙色云设计有限公司 | Full-factor open type collaborative research and development system and method |
CN112561275A (en) * | 2020-12-08 | 2021-03-26 | 中铁第四勘察设计院集团有限公司 | Method and device for managing whole process of research and development project, computer equipment and readable medium |
CN112766889A (en) * | 2021-01-10 | 2021-05-07 | 武汉乐谷在线科技有限公司 | Work task dynamic classification management method and device |
CN113283866A (en) * | 2021-05-27 | 2021-08-20 | 华腾软件产业有限公司 | Internet sharing software factory platform |
CN113361909A (en) * | 2021-06-03 | 2021-09-07 | 杭州推啊网络科技有限公司 | Internet project management method and system |
CN113378522A (en) * | 2021-05-31 | 2021-09-10 | 五八到家有限公司 | Using method, device and system of online interactive demand management platform |
CN116700771A (en) * | 2023-08-04 | 2023-09-05 | 深圳代码兄弟技术有限公司 | Remote development management method, remote development management apparatus, and readable storage medium |
CN117455414A (en) * | 2023-11-28 | 2024-01-26 | 易方达基金管理有限公司 | Business cooperation management system |
CN117541198A (en) * | 2024-01-09 | 2024-02-09 | 贵州道坦坦科技股份有限公司 | Comprehensive office cooperation management platform |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170132574A1 (en) * | 2015-11-11 | 2017-05-11 | Industrial Technology Research Institute | Apparatus management method, apparatus management device and non-transitory computer readable storage media |
CN108537503A (en) * | 2018-03-26 | 2018-09-14 | 西南电子技术研究所(中国电子科技集团公司第十研究所) | software development management system |
CN108932589A (en) * | 2018-07-05 | 2018-12-04 | 武汉科技大学 | A kind of IT application in enterprises project implementation management system |
CN108960627A (en) * | 2018-07-02 | 2018-12-07 | 王红岩 | A kind of full Schedule monitoring management system and method based on scientific research project |
-
2019
- 2019-05-08 CN CN201910380749.6A patent/CN110135719A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170132574A1 (en) * | 2015-11-11 | 2017-05-11 | Industrial Technology Research Institute | Apparatus management method, apparatus management device and non-transitory computer readable storage media |
CN108537503A (en) * | 2018-03-26 | 2018-09-14 | 西南电子技术研究所(中国电子科技集团公司第十研究所) | software development management system |
CN108960627A (en) * | 2018-07-02 | 2018-12-07 | 王红岩 | A kind of full Schedule monitoring management system and method based on scientific research project |
CN108932589A (en) * | 2018-07-05 | 2018-12-04 | 武汉科技大学 | A kind of IT application in enterprises project implementation management system |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110750237A (en) * | 2019-08-31 | 2020-02-04 | 苏州浪潮智能科技有限公司 | Project risk assessment reminding system and method based on cloud computing technology |
CN110648113A (en) * | 2019-09-18 | 2020-01-03 | 广州诣启网络科技有限公司 | Co-creation work flow leveling platform |
CN110675118A (en) * | 2019-09-18 | 2020-01-10 | 广州诣启网络科技有限公司 | Project collaboration method and device based on co-creation workflow platform |
CN110991981A (en) * | 2019-10-25 | 2020-04-10 | 中国通信服务股份有限公司 | Application method of research and development cloud platform |
CN111191999B (en) * | 2019-11-14 | 2023-07-28 | 中国平安人寿保险股份有限公司 | Product research and development management method, device, computer equipment and storage medium |
CN111191999A (en) * | 2019-11-14 | 2020-05-22 | 中国平安人寿保险股份有限公司 | Product research and development management method and device, computer equipment and storage medium |
CN110969409A (en) * | 2019-11-18 | 2020-04-07 | 广东卓维网络有限公司 | Information management and control system |
CN111026361A (en) * | 2019-11-26 | 2020-04-17 | 国华鹏源股份有限公司 | Software development method and development system |
CN111160761A (en) * | 2019-12-27 | 2020-05-15 | 中国航空工业集团公司西安飞机设计研究所 | Software development quality control method |
CN111767441A (en) * | 2020-07-03 | 2020-10-13 | 中国农业银行股份有限公司贵州省分行 | Document management and operation and maintenance system |
CN111915214A (en) * | 2020-08-13 | 2020-11-10 | 南京朗赢信息技术有限公司 | Management platform and management client for tasting and evaluating grain products |
CN111915214B (en) * | 2020-08-13 | 2021-06-08 | 南京朗赢信息技术有限公司 | Management platform and management client for tasting and evaluating grain products |
CN112000316A (en) * | 2020-08-25 | 2020-11-27 | 橙色云设计有限公司 | Full-factor open type collaborative research and development system and method |
CN112000316B (en) * | 2020-08-25 | 2021-08-27 | 橙色云互联网设计有限公司 | Full-factor open type collaborative research and development system and method |
CN112561275A (en) * | 2020-12-08 | 2021-03-26 | 中铁第四勘察设计院集团有限公司 | Method and device for managing whole process of research and development project, computer equipment and readable medium |
CN112766889A (en) * | 2021-01-10 | 2021-05-07 | 武汉乐谷在线科技有限公司 | Work task dynamic classification management method and device |
CN112766889B (en) * | 2021-01-10 | 2023-06-20 | 武汉乐谷在线科技有限公司 | Dynamic classification management method and device for work tasks |
CN113283866A (en) * | 2021-05-27 | 2021-08-20 | 华腾软件产业有限公司 | Internet sharing software factory platform |
CN113378522A (en) * | 2021-05-31 | 2021-09-10 | 五八到家有限公司 | Using method, device and system of online interactive demand management platform |
CN113361909A (en) * | 2021-06-03 | 2021-09-07 | 杭州推啊网络科技有限公司 | Internet project management method and system |
CN116700771A (en) * | 2023-08-04 | 2023-09-05 | 深圳代码兄弟技术有限公司 | Remote development management method, remote development management apparatus, and readable storage medium |
CN116700771B (en) * | 2023-08-04 | 2023-12-12 | 深圳代码兄弟技术有限公司 | Remote development management method, remote development management apparatus, and readable storage medium |
CN117455414A (en) * | 2023-11-28 | 2024-01-26 | 易方达基金管理有限公司 | Business cooperation management system |
CN117541198A (en) * | 2024-01-09 | 2024-02-09 | 贵州道坦坦科技股份有限公司 | Comprehensive office cooperation management platform |
CN117541198B (en) * | 2024-01-09 | 2024-04-30 | 贵州道坦坦科技股份有限公司 | Comprehensive office cooperation management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110135719A (en) | Cooperative system and method are remotely researched and developed in a kind of internet | |
US20210110347A1 (en) | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods | |
US7337124B2 (en) | Method and system for a quality software management process | |
US20190220936A1 (en) | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods | |
US20220101235A1 (en) | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods | |
WO2014186360A1 (en) | System and method for integrated mission critical ecosystem management | |
Perera et al. | An integrated risk management tool and process | |
Larsson et al. | Revisiting the challenges in aligning RE and V&V: Experiences from the public sector | |
Buizza et al. | The ECMWF research to operations (R2O) process | |
Trancho et al. | TMT systems engineering evolution in the last decade | |
Corneli et al. | A smart contract-based BPMN choreography execution for management of construction processes | |
CN107403277A (en) | A kind of construction project construction project time management method and its management system | |
Hardion et al. | Maturity of the MAX IV Laboratory in Operation and Phase II Development | |
Brown et al. | Qualification of Simulation Software for Safety Assessment of Sodium Cooled Fast Reactors. Requirements and Recommendations | |
Germain et al. | Status report on the development of micro-scheduling software for the advanced outage control center project | |
Gossom | Control of projects, purchasing and materials | |
Cortez et al. | Problem reporting and tracking system: a systems engineering challenge | |
Mora et al. | The Design and Implementation of Online Examination Hall Allocation System for Students in Kaduna Polytechnic, Kaduna | |
Jharko | Some Issues in Using the Model of Determining the User Stories Quality to Reduce Software Development Risks | |
Titone | ICT-4010: Enterprise Architecture Final Paper for Master of Science | |
Oral et al. | Implementation of a Smart City-based Building Asset Inventory Internal Control System at the East Java Public Works and Water Resources Department | |
Istyana et al. | Web-Based Application for Tracking, Listing and Reporting Document Review (Case Study: PT. Xyz) | |
Giyasov et al. | THE USE OF ARTIFICIAL INTELLIGENCE IN CONSTRUCTION PROJECT MANAGEMENT | |
Li et al. | Design and Application of Teaching Quality Platform in Normal Undergraduate Universities | |
LILENG et al. | IT Audit: Issues, Lessons Learnt and Actions for a Successful It System Implementation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190816 |