CN116700771B - Remote development management method, remote development management apparatus, and readable storage medium - Google Patents

Remote development management method, remote development management apparatus, and readable storage medium Download PDF

Info

Publication number
CN116700771B
CN116700771B CN202310975807.6A CN202310975807A CN116700771B CN 116700771 B CN116700771 B CN 116700771B CN 202310975807 A CN202310975807 A CN 202310975807A CN 116700771 B CN116700771 B CN 116700771B
Authority
CN
China
Prior art keywords
development
target
remote
receiving
developer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310975807.6A
Other languages
Chinese (zh)
Other versions
CN116700771A (en
Inventor
邹纪根
赖旭军
曹骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Code Brothers Technology Co ltd
Original Assignee
Shenzhen Code Brothers Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Code Brothers Technology Co ltd filed Critical Shenzhen Code Brothers Technology Co ltd
Priority to CN202310975807.6A priority Critical patent/CN116700771B/en
Publication of CN116700771A publication Critical patent/CN116700771A/en
Application granted granted Critical
Publication of CN116700771B publication Critical patent/CN116700771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/10Requirements analysis; Specification techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/71Version control; Configuration management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention relates to the field of digital data processing technologies, and in particular, to a remote development management method, a remote development management device, and a readable storage medium. The remote development management method is characterized by receiving a thinking guide chart, a demand document and project stage demands uploaded by a demand person through a demand management module; distributing the mind map, the demand document and the project stage demands to a target development end corresponding to the project stage demands according to the project stage demands; receiving a development file and a combined control mode generated by a developer based on a thinking guide diagram, a demand document and project stage demands through a target development end; based on the combined control mode, combining the development files, generating a target system, and generating a version number corresponding to the target system; and associating and releasing the target system and the version number. When remote development is carried out, the integrated management of design scheme, development system and system operation and maintenance can be realized.

Description

Remote development management method, remote development management apparatus, and readable storage medium
Technical Field
The present invention relates to the field of digital data processing technologies, and in particular, to a remote development management method, a remote development management device, and a readable storage medium.
Background
In the current development team remote development management system, the design scheme, the development system and the system operation and maintenance are all independently managed.
Under the condition that the design scheme, the development system and the system operation and maintenance of the remote development management system of the development team are all independently managed, communication and communication among team members of the remote development team are difficult, so that misunderstanding and information inequality problems are easy to occur, and further the project development efficiency of the team is negatively affected.
The foregoing is provided merely for the purpose of facilitating understanding of the technical solutions of the present invention and is not intended to represent an admission that the foregoing is prior art.
Disclosure of Invention
The invention mainly aims to provide a remote development management method, which aims to solve the problem that in a development team remote development management system, a design scheme, a development system and system operation and maintenance are all independently managed.
In order to achieve the above object, the present invention provides a remote development management method, which includes the following steps:
receiving a thinking guide chart, a demand document and project stage demands uploaded by a demand person through a demand management module;
distributing the mind map, the requirement document and the project stage requirement to a target development end corresponding to the project stage requirement according to the project stage requirement;
Receiving a development file and a combined control mode generated by a developer based on the thought guide graph, the requirement document and the project stage requirement through the target development end;
based on the combined control mode, combining the development files to generate a target system and generate a version number corresponding to the target system;
and associating and issuing the target system and the version number.
Optionally, after the step of combining the development files based on the combined control manner to generate a target system and generate a version number corresponding to the target system, the method further includes:
the target system is sent to a testing end;
receiving a system problem sent by a tester through the testing end;
determining a developer related to the system problem according to the system problem;
the system problems are sent to a development end corresponding to the developer;
and receiving a correction development file and/or a correction combination control mode uploaded by the developer through the development terminal, and regenerating the target system.
Optionally, before the step of uploading the development file and the combined control mode generated based on the mind map, the requirement document and the project stage requirement by the receiving developer through the target development terminal, the method further includes:
Receiving a development problem uploaded by the developer through the target development terminal;
determining a problem type corresponding to the development problem according to a preset problem classification rule;
determining a target problem handler according to the problem type, and sending the development problem to a problem processing end corresponding to the target problem handler;
and receiving a question answer uploaded by the target question handler through the question processing end, and sending the question answer to a target development end for uploading the development questions.
Optionally, before the step of uploading the development file and the combined control mode generated based on the mind map, the requirement document and the project stage requirement by the receiving developer through the target development terminal, the method further includes:
receiving a prototype graph and an effect graph uploaded by a prototype designer through a prototype design end;
sending the prototype graph and the effect graph to a flow design end;
and receiving a development flow uploaded by a flow designer through the flow designer, and sending the development flow to the target development end.
Optionally, after the step of receiving the corrected development file and/or corrected combination control manner uploaded by the developer through the development end and regenerating the target system, the method further includes:
Receiving a system problem solving method sent by the developer through the target development end;
and associating the system problem with the system problem solving method to generate a system problem solving file.
Optionally, the step of determining a target problem handler according to the problem type and sending the development problem to a problem processing end corresponding to the target problem handler includes:
if the problem type is a service type, determining that the target problem processing is a service person, and sending the development problem to a service processing end corresponding to the service person;
if the problem type is technical, determining that the target problem processing is a technician, and sending the development problem to a technical processing end corresponding to the technician.
Optionally, before the step of uploading the development file and the combined control mode generated based on the mind map, the requirement document and the project stage requirement by the receiving developer through the target development terminal, the method further includes:
receiving the work progress uploaded by the developer through the target development terminal;
and generating a project schedule according to the work progress so as to track the project schedule.
Optionally, after the step of generating the project schedule according to the work progress, the method further includes:
acquiring predicted completion time and residual workload according to the project schedule;
and sending the predicted completion time and the residual workload to a management end.
In addition, in order to achieve the above object, the present invention also provides a remote development management apparatus including a memory, a processor, and a remote development management program stored on the memory and executable on the processor, the remote development management program implementing the steps of the remote development management method as described above when executed by the processor.
In addition, in order to achieve the above object, the present invention also provides a computer-readable storage medium having stored thereon a remote development management program which, when executed by a processor, implements the steps of the remote development management method as described above.
The embodiment of the invention provides a remote development management method, remote development management equipment and a readable storage medium. Through distributing the thinking guide chart, the demand document and the project stage demands uploaded by the demand personnel to the corresponding target development ends, the development team can be ensured to comprehensively understand the project demands, and the unclear demand transmission can be avoided. The developer receives the thinking guide graph, the requirement document and the project stage requirement through the development end, and uses the development end to carry out development work, so that the developers can cooperate with each other, the labor division is clear, and the development task is completed; by uploading the development file and the combined control mode by the development terminal, the developer can immediately deliver and update the system function. And a version number is generated for each target system, so that the version management can be carried out on the system, and the operation and maintenance processes of the system are simplified. Therefore, through analyzing project stage requirements, the thought guide graph, the requirement document and the project stage requirements are distributed to the target development end, and development files and combination control modes which are uploaded by developers and used for generating target systems are received, and a version number is generated for each target system, so that integrated management of design schemes, development systems and system operation and maintenance can be realized when remote development is carried out.
Drawings
FIG. 1 is a schematic architecture diagram of a hardware operating environment of a remote development management apparatus according to an embodiment of the present application;
FIG. 2 is a flow chart of a remote development management method according to a first embodiment of the present application;
FIG. 3 is a flow chart of a second embodiment of the remote development management method of the present application;
FIG. 4 is a flow chart of a third embodiment of a remote development management method according to the present application;
FIG. 5 is a flowchart of a remote development management method according to a fourth embodiment of the present application;
fig. 6 is a flowchart of a remote development management method according to a fifth embodiment of the present application.
The achievement of the objects, functional features and advantages of the present application will be further described with reference to the accompanying drawings, in conjunction with the embodiments.
Detailed Description
According to the remote development management method, through analyzing project stage requirements, the thought guide graph, the requirement document and the project stage requirements are distributed to the target development end, development files and combination control modes which are uploaded by developers and used for generating target systems are received, and a version number is generated for each target system, so that integrated management of design schemes, development systems and system operation and maintenance can be realized when remote development is carried out.
In order to better understand the above technical solution, exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
As an implementation scheme, fig. 1 is a schematic architecture diagram of a hardware running environment of a remote development management device according to an embodiment of the present invention.
As shown in fig. 1, the remote development management apparatus may include: a processor 101, such as a central processing unit (Central Processing Unit, CPU), a memory 102, a communication bus 103. The Memory 102 may be a high-speed random access Memory (Random Access Memory, RAM) Memory or a stable nonvolatile Memory (NVM), such as a disk Memory. The memory 102 may alternatively be a storage device separate from the aforementioned processor 101. The communication bus 103 is used to enable connected communication among the components.
Those skilled in the art will appreciate that the architecture shown in fig. 1 is not limiting of the remote development management apparatus, and may include more or fewer components than shown, or may combine certain components, or a different arrangement of components.
As shown in fig. 1, an operating system, a data storage module, a network communication module, a user interface module, and a remote development management program may be included in the memory 102, which is one type of computer-readable storage medium.
In the remote development management apparatus shown in fig. 1, the processor 101, the memory 102 may be provided in the remote development management apparatus, which calls a remote development management program stored in the memory 102 through the processor 101, and performs the following operations:
distributing the mind map, the requirement document and the project stage requirement to a target development end corresponding to the project stage requirement according to the project stage requirement;
receiving a development file and a combined control mode generated by a developer based on the thought guide graph, the requirement document and the project stage requirement through the target development end;
based on the combined control mode, combining the development files to generate a target system and generate a version number corresponding to the target system;
And associating and issuing the target system and the version number.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
the target system is sent to a testing end;
receiving a system problem sent by a tester through the testing end;
determining a developer related to the system problem according to the system problem;
the system problems are sent to a development end corresponding to the developer;
and receiving a correction development file and/or a correction combination control mode uploaded by the developer through the development terminal, and regenerating the target system.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
receiving a development problem uploaded by the developer through the target development terminal;
determining a problem type corresponding to the development problem according to a preset problem classification rule;
determining a target problem handler according to the problem type, and sending the development problem to a problem processing end corresponding to the target problem handler;
and receiving a question answer uploaded by the target question handler through the question processing end, and sending the question answer to a target development end for uploading the development questions.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
receiving a prototype graph and an effect graph uploaded by a prototype designer through a prototype design end;
sending the prototype graph and the effect graph to a flow design end;
and receiving a development flow uploaded by a flow designer through the flow designer, and sending the development flow to the target development end.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
receiving a system problem solving method sent by the developer through the target development end;
and associating the system problem with the system problem solving method to generate a system problem solving file.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
if the problem type is a service type, determining that the target problem processing is a service person, and sending the development problem to a service processing end corresponding to the service person;
if the problem type is technical, determining that the target problem processing is a technician, and sending the development problem to a technical processing end corresponding to the technician.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
receiving the work progress uploaded by the developer through the target development terminal;
and generating a project schedule according to the work progress so as to track the project schedule.
In one embodiment, the processor 101 may be configured to invoke a remote development manager stored in the memory 102 and perform the following operations:
acquiring predicted completion time and residual workload according to the project schedule;
and sending the predicted completion time and the residual workload to a management end.
Based on the hardware architecture of the remote development management device, the embodiment of the remote development management method is provided.
Referring to fig. 2, in a first embodiment, the remote development management method includes the steps of:
step S100: and receiving the mind map, the demand document and the project stage demand uploaded by the demand personnel through the demand management module.
In this embodiment, the demand management module provides the functions of uploading mind map, demand document, project stage demand, etc. for the demand personnel. It should be noted that the demand management module establishes a secure and reliable data uploading channel between the demand personnel and the remote development management system.
In this embodiment, the project participants can learn about the whole project through the mind map uploaded by the demander. The requirements document is used to define and record the requirements of the target system.
Wherein the requirements document includes, but is not limited to, project summaries for summarizing information of basic functions, major stakeholders, and user characteristics of the target system; functional requirements detailing system functions; defining non-functional requirements of system performance requirements, security requirements, reliability requirements, availability requirements, compatibility requirements, and the like; user interface design requirements describing user interfaces such as interface layout, interactive design, and visual design; functional tests, performance tests, user acceptance tests, etc., are defined, defining how to verify whether the system meets the acceptance criteria of the requirements.
Step S200: and distributing the mind map, the requirement document and the project stage requirement to a target development end corresponding to the project stage requirement according to the project stage requirement.
In this embodiment, the different project phase requirements are analyzed first to determine the required phase tasks in the different project phase requirements, then the different phase tasks of the different project phase requirements are analyzed to determine the target developers involved in the different phase tasks, and then the different phase tasks are correspondingly distributed to the target development terminals used by the different target developers.
The project stage needs stage task requirements, stage target requirements, target developer requirements for completing the stage tasks and the like.
In an embodiment, different stage tasks required by different project stages are analyzed, the stage tasks are classified according to task types, and the stage tasks are distributed to target development ends used by different target developers according to the types of the stage tasks, so that the stage tasks of different types are processed in a targeted manner.
Different target development ends have different development functions, and different developers use different development ends to complete development work through the received files required by development work such as the requirement documents, the thinking guide diagrams, project stage requirements and the like.
Illustratively, suppose that the developer includes a software engineer, a database manager, and a network engineer, wherein the development side used by the software engineer is used to design and write code for a target system to achieve target system functions and requirements; the development end used by the database manager is used for designing and managing the database so as to ensure the safety and the integrity of the target system data and meet the storage, management and access requirements of the data; the development end used by the network engineer is used for designing and implementing the network framework of the target system so as to ensure the stability and the safety of the network of the target system.
In another embodiment, tasks of different stages required by different project stages are analyzed first, and the difficulty level of the tasks of different stages is determined according to the difficulty level of the tasks. And then determining target developers corresponding to the stage tasks with different difficulty levels according to the professional level of different developers.
In yet another embodiment, different stage tasks required by different project stages are analyzed to determine whether the stage task is a front-end development task or a back-end development task; if the target developer is the front-end development task, determining the target developer as the front-end developer; and if the target developer is the back-end development task, determining the target developer as the back-end developer.
Step S300: and receiving a development file and a combined control mode which are generated based on the thought guide graph, the requirement document and the project stage requirement by a developer through the target development terminal.
In this embodiment, a developer performs development work based on a thought map, a demand document and project phase demands received by a target development end, generates a development file and a combination control mode, and uploads the development file and the combination control mode to a remote development management system through the target development end.
In this embodiment, the development files are used to implement specific functions and features of the target system. Alternatively, the development files may include source code, configuration files, database scripts, and the like, that are relevant to implementing the specific functions and features of the target system.
The combined control mode is used for combining the development files into a target system which can realize specific functions and characteristics. Optionally, the combination control mode may include steps of deployment, connection, etc. to ensure that the development files are combined together in a predetermined manner to generate the target system.
Optionally, when receiving the development file and the combined control mode, the file format of the development file and the combined control mode is checked to ensure that the uploaded file meets the requirements.
Step S400: and based on the combined control mode, combining the development files, generating a target system, and generating a version number corresponding to the target system.
Step S500: and associating and issuing the target system and the version number.
In this embodiment, the manner of generating the target system may be to integrate, compile, construct or aggregate the development files based on the combination control manner, so as to generate the target system.
In this embodiment, one target system corresponds to one version number. The version number may be used to mark, manage, track, restore, and update the target system. And, for different versions of the same target system, the version number can be increased according to the release sequence of the target system.
Illustratively, chat systems with version numbers of 1.0 and 2.0 were developed successively; when the user wants to use the chat system with the version number of 1.0 after upgrading the chat system with the version number of 1.0 to the chat system with the version number of 2.0, the user can restore the chat system with the version number of 2.0 into the chat system with the version number of 1.0 in a restoring mode. Specifically, the system is restored by determining the updating mode when the chat system with the version number of 1.0 is updated to the chat system with the version number of 2.0.
In an embodiment, the development files are integrated, compiled, built or summarized based on the combined control mode to generate the executable file. The executable file is used to install the target system in the operating system.
The executable file may be a binary file executed in a Windows operating system, for example, an ". Exe" file; an APK (Android application package ) file executed in the Android operating system; may be an IPA (iPhone Application ) file executing on the IOS operating system. It should be noted that, in addition to the executable files of the above type, the executable files may be executable files under other specific platforms or development technologies.
Illustratively, assume that an online e-commerce platform is developed using a remote development management method.
The demand personnel upload the first project stage demand and the second project demand through the demand management module, wherein the demand personnel comprise a thinking guide diagram of basic functions, user demands and interaction flows of an online E-commerce platform, and a demand document comprising project summaries, function demands, non-function demands, user interface design demands and acceptance standards.
And determining a stage task to be completed in the first project stage requirement as a front-end development task according to the first project stage requirement uploaded by the requirement personnel. The mind map, the requirements document, and the first project stage requirements are distributed to front-end developers. And determining a stage task to be completed in the second project stage requirement as a back-end development task according to the second project stage requirement uploaded by the requirement personnel. The mind map, the requirements document and the second project stage requirements are distributed to backend developers.
Front-end developers use the front-end development ends to design web pages and write front-end codes according to the first project stage requirements, the mind map and the requirement documents, generate development files and a combination control mode and upload the development files and the combination control mode; and the back-end developer writes server-end codes according to the second project stage requirements, the mind map and the requirement document, generates a development file and a combined control mode and uploads the development file and the combined control mode.
And integrating and compiling the development files uploaded by the front-end developer and the back-end developer based on a combined control mode uploaded by the front-end developer and the back-end developer to generate the online E-commerce platform with the version number of 1.0. And publishing the online E-commerce platform with the version number of 1.0 to the online platform for downloading, installing and using by a user.
In the technical scheme provided by the embodiment, through distributing the mind map, the demand document and the project stage demands uploaded by the demand personnel to the corresponding target development ends, the development team can be ensured to comprehensively understand the project demands, and the unclear demand transmission can be avoided. The developer receives the thinking guide graph, the requirement document and the project stage requirement through the development end, and uses the development end to carry out development work, so that the developers can cooperate with each other, the labor division is clear, and the development task is completed; by uploading the development file and the combined control mode by the development terminal, the developer can immediately deliver and update the system function. And a version number is generated for each target system, so that the version management can be carried out on the system, and the operation and maintenance processes of the system are simplified. Therefore, through analyzing project stage requirements, the thought guide graph, the requirement document and the project stage requirements are distributed to the target development end, and development files and combination control modes which are uploaded by developers and used for generating target systems are received, and a version number is generated for each target system, so that integrated management of design schemes, development systems and system operation and maintenance can be realized when remote development is carried out.
Referring to fig. 3, in a second embodiment, after the steps of generating a target system by combining the development files based on the combination control method and generating a version number corresponding to the target system, the method further includes:
step S610: the target system is sent to a testing end;
step S620: receiving a system problem sent by a tester through the testing end;
step S630: determining a developer related to the system problem according to the system problem;
step S640: sending the system questions to the developer's development end;
step S650: and receiving a correction development file and/or a correction combination control mode uploaded by the developer through the development terminal, and regenerating the target system.
In this embodiment, the target system is sent to the testing end for the tester to test the target system. When a tester finds that a system problem such as a system error and/or a system defect occurs in the target system, the system problem is uploaded through the testing end. Analyzing the system problems by a remote development management system, classifying the system problems, and then sending the system problems of different categories to corresponding developers; and a developer repairs, improves and perfects the system, so that the system problem is solved. After the developer solves the system problem, the corrected development file and/or the corrected combination control mode are uploaded for the remote development management system to regenerate the corrected target system.
In this embodiment, the test terminal is used to test the target system. The test content may include code quality issues, normalization issues, performance issues, and/or security issues, among others. The test mode may include concurrent test, load test, safety test, etc. The test end is provided with an environment for running the target system and a test tool for executing test tasks and generating a test report.
Alternatively, the test end may be a software test platform and/or a test server. When the testing end is a software testing platform, the target system is deployed on the testing platform for testing; when the test end is a test server, the target system is deployed on the test server so that a tester can perform a test by accessing the server.
In the technical scheme provided by the embodiment, by determining the corresponding developer according to the system problem and sending the system problem to the corresponding development terminal, the developer can quickly respond and provide a corrected development file and/or a combined control mode for regenerating the target system, so that the efficiency of solving the system problem is improved; the remote development management system is connected with the testing end and the development end, so that the cooperation flow is simplified, and the working efficiency is improved. Therefore, the tester receives and tests the target system by using the test terminal, and uploads the system problems found during the test, so that the remote development management system distributes different system problems to different developers for repairing, the target system is perfected, the development process can be effectively coordinated and managed, the communication cost and the delivery period are reduced, the efficient cooperation between the development and the test is further realized, the system problem solving speed is accelerated, and the development and test efficiency is improved.
Further, based on the above embodiment, in an embodiment, after receiving the corrected development file and/or corrected combination control manner uploaded by the developer through the development end and regenerating the target system, the system problem solving method sent by the developer through the target development end may also be received, and the system problem solving method may be associated, so as to generate the system problem solving file.
The system problem solving file can be used for referring to and consulting corresponding solutions of different system problems when a developer develops later so as to improve the efficiency of development work. In addition, the system problem solving document can be used for the new developer of the development team to learn, so that the efficiency of learning and mastering the system development skills is improved.
In the technical scheme provided by the embodiment, the system problem solving method sent by the developer through the target development end is received, the problem and the solving method are associated, and the system problem solving file is generated. The system problem solving process can be recorded and managed better, convenience is provided for subsequent reference and reference, and the system development efficiency of developers is further improved.
Referring to fig. 4, in a third embodiment, before the step of uploading the development file and the combined control manner generated based on the mind map, the requirement document and the project phase requirement by the receiving developer through the target development terminal, the method further includes:
Step S710: receiving a development problem uploaded by the developer through the target development terminal;
step S720: determining a problem type corresponding to the development problem according to a preset problem classification rule;
step S730: determining a target problem handler according to the problem type, and sending the development problem to a problem processing end corresponding to the target problem handler;
step S740: and receiving a question answer uploaded by the target question handler through the question processing end, and sending the question answer to a target development end for uploading the development questions.
In this embodiment, the remote development management system receives the development problem uploaded by the developer through the target development terminal. Development problems may be vulnerabilities, errors, doubts, or other problems associated with development tasks encountered during the development process.
The remote development management system determines the type of the uploaded development problem according to a preset problem classification rule and classifies the problem. The classification of the problem may be determined based on the nature of the problem, the degree of urgency, or other specific criteria, providing a basis for problem handling and distribution.
And determining a target problem handler according to the type of the development problem. The target problem handler may be an expert in a specific field or a developer in charge of a specific module. Then, the development question is sent to a question processing end used by the target question handler to process the development question.
In one embodiment, the question types include a business class and a technology class. Specifically, if the problem type is a service class, determining that target problem processing is a service person, and sending a development problem to a service processing end corresponding to the service person; if the problem type is technical, determining that the target problem processing is a technician, and sending the development problem to a technical processing end corresponding to the technician.
After the target problem handler receives the development problem through the problem handler, the development problem is researched and analyzed, and the development problem is replied and solved. The problem processing end can provide a problem tracking and recording function. The target question handler uploads the question answer through the question processing end and sends the question answer to the development end uploading the development question, so that the developer can continue to develop according to the question answer.
In the technical scheme provided by the embodiment, the development problems can be better distributed to corresponding target problem processing personnel through classification problems, so that error processing is avoided, development progress is delayed, and the development problems are rapidly solved. And the target question processing personnel receives the questions through the question processing end, performs necessary research and analysis, and timely gives out question answers so as to improve the efficiency of question processing. And the remote development management system is used for transmitting and replying development problems, so that effective communication and cooperation between developers and management staff are improved. Therefore, through presetting a problem classification rule, the development problem uploaded by the developer is sent to a problem processing end corresponding to the target problem handler according to the problem type, and a response of the problem processing end to the development problem is received. Timely transmission and processing of development problems can be ensured, efficiency and accuracy of solving development end problems are improved, and communication and cooperation efficiency between developers and management staff is further realized.
Referring to fig. 5, in a fourth embodiment, before the step of uploading the development file and the combined control mode generated based on the mind map, the requirement document and the project phase requirement by the receiving developer through the target development terminal, the method further includes:
step S810: receiving a prototype graph and an effect graph uploaded by a prototype designer through a prototype design end;
step S820: sending the prototype graph and the effect graph to a flow design end;
step S830: and receiving a development flow uploaded by a flow designer through the flow designer, and sending the development flow to the target development end.
In this embodiment, before a developer develops a target system, a prototype designer needs to design a prototype graph and an effect graph of the target system through a prototype design end. Prototype diagrams and effect diagrams of the target system are used for showing an operation interface and a user interaction mode of the target system, so that developers can be helped to better understand requirements and designs. Wherein the prototyping end may be a prototyping tool.
The remote development management system sends the received prototype graph and effect graph to a flow design end used by a flow designer. And a flow designer creates a specific flow and steps of the development target system according to the images to form a development flow. And uploading the formulated development flow to a flow design end of the system by a flow designer. The remote development management system receives and stores the development flows and sends the development flows to the corresponding target development ends.
The development flow describes specific development steps, resource allocation, progress plans and other information of the target system, and helps developers to better organize and manage development work.
In the technical scheme provided by the embodiment, a mode of sending a prototype graph and an effect graph uploaded by a prototype designer through a prototype design end to a flow design end, receiving a development flow uploaded by the flow designer through the flow design end, and then sending the development flow to a target development end is adopted. The prototype design and the flow design are incorporated into a remote development management system, so that a developer can fully understand the requirements and the designs before development and work according to a specified development flow, and further development efficiency and collaborative work effect of a development team are improved.
Referring to fig. 6, in a fifth embodiment, before the step of uploading the development file and the combined control mode generated based on the mind map, the requirement document and the project phase requirement by the receiving developer through the target development terminal, the method further includes:
step S910: receiving the work progress uploaded by the developer through the target development terminal;
Step S920: and generating a project schedule according to the work progress so as to track the project schedule.
In this embodiment, in the process of performing system development, a developer updates work progress through a target development end, and receives and saves the work progress by a remote development management system. Optionally, the work progress includes, but is not limited to, completed tasks, incomplete tasks, task deadlines, overrun tasks, and task projected completion times.
Optionally, the project schedule is generated by parsing, integrating, classifying, archiving the work progress uploaded by all developers. The project schedule is used for displaying information such as tasks, time schedule, progress state and the like of the project, so that a project responsible person and related personnel can track and monitor the progress of the project, and the development project is ensured to be completed on time.
Further, in one embodiment, the predicted completion time and the remaining workload may be obtained according to a project schedule; and sending the predicted completion time and the residual workload to a management end.
In this embodiment, the project schedule records the predicted completion time and the remaining workload of each task. And a manager at the management end can acquire the predicted completion time and the residual workload of each task in the project schedule from the remote development management system, and monitor the overall progress condition of the project. When the delay problem occurs in the development project, the delay problem can be found and solved in time, so that the development of the target system can be further ensured to be completed on time.
In the technical scheme provided by the embodiment, the project schedule is generated to track the project by collecting and sorting the work progress of the developer. The project manager and related personnel can monitor the progress of the development project, so that the development of the target system is ensured to be completed on time.
Furthermore, it will be appreciated by those of ordinary skill in the art that implementing all or part of the processes in the methods of the above embodiments may be accomplished by computer programs to instruct related hardware. The computer program comprises program instructions, and the computer program may be stored in a storage medium, which is a computer readable storage medium. The program instructions are executed by at least one processor in the remote development management apparatus to implement the flow steps of the embodiments of the method described above.
Accordingly, the present invention also provides a computer-readable storage medium storing a remote development management program which, when executed by a processor, implements the steps of the remote development management method described in the above embodiments.
The computer readable storage medium may be a usb disk, a removable hard disk, a Read-Only Memory (ROM), a magnetic disk, or an optical disk, etc. which may store the program code.
It should be noted that, because the storage medium provided in the embodiments of the present application is a storage medium used for implementing the method in the embodiments of the present application, based on the method described in the embodiments of the present application, a person skilled in the art can understand the specific structure and the modification of the storage medium, and therefore, the description thereof is omitted herein. All storage media adopted by the method of the embodiment of the application belong to the scope of protection of the application.
It will be appreciated by those skilled in the art that embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
It should be noted that in the claims, any reference signs placed between parentheses shall not be construed as limiting the claim. The word "comprising" does not exclude the presence of elements or steps not listed in a claim. The word "a" or "an" preceding an element does not exclude the presence of a plurality of such elements. The invention may be implemented by means of hardware comprising several distinct elements, and by means of a suitably programmed computer. In the unit claims enumerating several means, several of these means may be embodied by one and the same item of hardware. The use of the words first, second and third, et cetera do not indicate any ordering. These words may be interpreted as names.
While preferred embodiments of the present invention have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. It is therefore intended that the following claims be interpreted as including the preferred embodiments and all such alterations and modifications as fall within the scope of the invention.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present invention without departing from the spirit or scope of the invention. Thus, it is intended that the present invention also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.

Claims (8)

1. A remote development management method, the remote development management method comprising:
receiving a thinking guide chart, a demand document and project stage demands uploaded by a demand person through a demand management module;
distributing the mind map, the requirement document and the project stage requirement to a target development end corresponding to the project stage requirement according to the project stage requirement;
receiving a development file and a combined control mode generated by a developer based on the thought guide graph, the requirement document and the project stage requirement through the target development end;
Based on the combined control mode, combining the development files to generate a target system and generate a version number corresponding to the target system;
and associating and issuing the target system and the version number.
The step of uploading the development file and the combined control mode generated based on the thought guide graph, the requirement document and the project stage requirement by the receiving developer through the target development terminal further comprises the following steps:
receiving a development problem uploaded by the developer through the target development terminal;
determining a problem type corresponding to the development problem according to a preset problem classification rule;
determining a target problem handler according to the problem type, and sending the development problem to a problem processing end corresponding to the target problem handler;
receiving a question answer uploaded by the target question handler through the question processing end, and sending the question answer to a target development end for uploading the development questions;
the step of determining a target problem handler according to the problem type and sending the development problem to a problem processing end corresponding to the target problem handler comprises the following steps:
If the problem type is a service type, determining that the target problem processing is a service person, and sending the development problem to a service processing end corresponding to the service person;
if the problem type is technical, determining that the target problem processing is a technician, and sending the development problem to a technical processing end corresponding to the technician.
2. The remote development management method according to claim 1, wherein after the steps of combining the development files based on the combination control method, generating a target system, and generating a version number corresponding to the target system, further comprising:
the target system is sent to a testing end;
receiving a system problem sent by a tester through the testing end;
determining a developer related to the system problem according to the system problem;
the system problems are sent to a development end corresponding to the developer;
and receiving a correction development file and/or a correction combination control mode uploaded by the developer through the development terminal, and regenerating the target system.
3. The remote development management method according to claim 1, wherein the step of receiving the development document and the combined control scheme generated based on the mind map, the requirement document, and the project-stage requirement is preceded by the step of receiving the development document and the combined control scheme by the developer through the target development terminal, further comprising:
Receiving a prototype graph and an effect graph uploaded by a prototype designer through a prototype design end;
sending the prototype graph and the effect graph to a flow design end;
and receiving a development flow uploaded by a flow designer through the flow designer, and sending the development flow to the target development end.
4. The remote development management method according to claim 2, wherein after the step of receiving the corrected development file and/or the corrected combination control manner uploaded by the developer through the development terminal and regenerating the target system, the method further comprises:
receiving a system problem solving method sent by the developer through the target development end;
and associating the system problem with the system problem solving method to generate a system problem solving file.
5. The remote development management method according to claim 1, wherein the step of receiving the development document and the combined control scheme generated based on the mind map, the requirement document, and the project-stage requirement is preceded by the step of receiving the development document and the combined control scheme by the developer through the target development terminal, further comprising:
receiving the work progress uploaded by the developer through the target development terminal;
And generating a project schedule according to the work progress so as to track the project schedule.
6. The remote development management method according to claim 5, wherein after the step of generating a project schedule according to the work progress, further comprising:
acquiring predicted completion time and residual workload according to the project schedule;
and sending the predicted completion time and the residual workload to a management end.
7. A remote development management apparatus, characterized in that the remote development management apparatus comprises: a memory, a processor, and a remote development management program stored on the memory and executable on the processor, the remote development management program configured to implement the steps of the remote development management method of any one of claims 1 to 6.
8. A readable storage medium, wherein a remote development management program is stored on the readable storage medium, and the remote development management program, when executed by a processor, implements the steps of the remote development management method according to any one of claims 1 to 6.
CN202310975807.6A 2023-08-04 2023-08-04 Remote development management method, remote development management apparatus, and readable storage medium Active CN116700771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310975807.6A CN116700771B (en) 2023-08-04 2023-08-04 Remote development management method, remote development management apparatus, and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310975807.6A CN116700771B (en) 2023-08-04 2023-08-04 Remote development management method, remote development management apparatus, and readable storage medium

Publications (2)

Publication Number Publication Date
CN116700771A CN116700771A (en) 2023-09-05
CN116700771B true CN116700771B (en) 2023-12-12

Family

ID=87841733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310975807.6A Active CN116700771B (en) 2023-08-04 2023-08-04 Remote development management method, remote development management apparatus, and readable storage medium

Country Status (1)

Country Link
CN (1) CN116700771B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001025910A1 (en) * 1999-10-05 2001-04-12 Asynchrony.Com, Inc. System and method for collaborative product development
CN108595338A (en) * 2018-05-08 2018-09-28 平安普惠企业管理有限公司 Test case write method, device, computer equipment and storage medium
CN110135719A (en) * 2019-05-08 2019-08-16 重庆八戒电子商务有限公司 Cooperative system and method are remotely researched and developed in a kind of internet
CN114115899A (en) * 2021-11-24 2022-03-01 北京百度网讯科技有限公司 Project development method and device, electronic equipment and storage medium
CN114663070A (en) * 2022-04-14 2022-06-24 北京自如信息科技有限公司 Project flow management method and device, computer equipment and storage medium
CN115049255A (en) * 2022-06-14 2022-09-13 平安普惠企业管理有限公司 Engineering project development and distribution method and device, computer equipment and storage medium

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11860995B2 (en) * 2021-08-13 2024-01-02 The United States Of America As Represented By The Secretary Of The Navy Method to implement traceability and provability in software development

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001025910A1 (en) * 1999-10-05 2001-04-12 Asynchrony.Com, Inc. System and method for collaborative product development
CN108595338A (en) * 2018-05-08 2018-09-28 平安普惠企业管理有限公司 Test case write method, device, computer equipment and storage medium
CN110135719A (en) * 2019-05-08 2019-08-16 重庆八戒电子商务有限公司 Cooperative system and method are remotely researched and developed in a kind of internet
CN114115899A (en) * 2021-11-24 2022-03-01 北京百度网讯科技有限公司 Project development method and device, electronic equipment and storage medium
CN114663070A (en) * 2022-04-14 2022-06-24 北京自如信息科技有限公司 Project flow management method and device, computer equipment and storage medium
CN115049255A (en) * 2022-06-14 2022-09-13 平安普惠企业管理有限公司 Engineering project development and distribution method and device, computer equipment and storage medium

Also Published As

Publication number Publication date
CN116700771A (en) 2023-09-05

Similar Documents

Publication Publication Date Title
Berger et al. The state of adoption and the challenges of systematic variability management in industry
Kellner et al. Software process modeling example problem
US20150020059A1 (en) Migration services for systems
CN111158674B (en) Component management method, system, device and storage medium
US20080120602A1 (en) Test Automation for Business Applications
US20130013784A1 (en) Automated digital asset management in network environment
CN104090776A (en) Software development method and system
US20050137839A1 (en) Methods, apparatus and programs for system development
CN114595058A (en) Model training method and device based on GPU (graphics processing Unit) resources, electronic equipment and storage medium
Zampetti et al. Continuous integration and delivery practices for cyber-physical systems: An interview-based study
EP2913757A1 (en) Method, system, and computer software product for test automation
Reza et al. Toward model-based requirement engineering tool support
Alonso et al. DECIDE: an extended devops framework for multi-cloud applications
CN112612681B (en) Automatic management method for deep learning model test evaluation full process based on container
CN116700771B (en) Remote development management method, remote development management apparatus, and readable storage medium
L’erario et al. Software residence application in the versions of a software product line
CN110674024A (en) Electronic equipment integration test system and method thereof
Song et al. Lessons from developing nonfunctional requirements for a software platform
Rosenberg et al. The parallel agile process: Applying parallel processing techniques to software engineering
JP7444805B2 (en) Data preparation system, data preparation method
US20230385056A1 (en) Removing inactive code to facilitate code generation
Huang et al. Tailor the value-based software quality achievement process to project business cases
Franca et al. LinkDoc: An Automated Process in the Delivery of Documentation in a Global Software Development Environment
Sakharov Workflow optimisation in unity engine
Biswas et al. Development of a Project Tracking Information System using Agile Methodology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant