CN109840859A - Cement works construction project intelligent management system - Google Patents
Cement works construction project intelligent management system Download PDFInfo
- Publication number
- CN109840859A CN109840859A CN201910089955.1A CN201910089955A CN109840859A CN 109840859 A CN109840859 A CN 109840859A CN 201910089955 A CN201910089955 A CN 201910089955A CN 109840859 A CN109840859 A CN 109840859A
- Authority
- CN
- China
- Prior art keywords
- project
- information
- construction project
- data
- intelligent management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 92
- 239000004568 cement Substances 0.000 title claims abstract description 54
- 238000000034 method Methods 0.000 claims abstract description 25
- 238000013461 design Methods 0.000 claims abstract description 16
- 238000011835 investigation Methods 0.000 claims abstract description 14
- 238000012549 training Methods 0.000 claims description 28
- 230000002159 abnormal effect Effects 0.000 claims description 26
- 238000011156 evaluation Methods 0.000 claims description 22
- 238000012216 screening Methods 0.000 claims description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 8
- 238000000605 extraction Methods 0.000 claims description 7
- 230000007613 environmental effect Effects 0.000 claims description 6
- 238000009826 distribution Methods 0.000 claims description 4
- 239000000446 fuel Substances 0.000 claims description 4
- 238000001914 filtration Methods 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 239000002994 raw material Substances 0.000 claims description 3
- 238000011084 recovery Methods 0.000 claims description 3
- 239000002918 waste heat Substances 0.000 claims description 3
- 238000003908 quality control method Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 description 17
- 230000005611 electricity Effects 0.000 description 6
- 230000006870 function Effects 0.000 description 5
- 241001269238 Data Species 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002341 toxic gas Substances 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Cement works construction project intelligent management system provided by the invention, information acquisition module implement early period in engineering construction project, receive the essential information of engineering construction project, pre-process to essential information;Also receive the ready message of engineering construction project;Prospective design module receives the investigation information and design scheme of input;Project tracking module receives tracking data in engineering construction project implementation process;After engineering construction project is finished, final acceptance of construction module receives product acceptance data, and generates project completion report of construction work.The system implements early period and prospective design stage in engineering construction project, various data can completely be acquired, it is also used to be tracked in implementation process, the control of real-time perfoming duration and engineering project quality control, project completion report of construction work is generated after finished, and cement works construction project is evaluated.The system can be used in the intelligent management of cement mill project construction project, and Precise control improves working efficiency, realize information sharing.
Description
Technical field
The invention belongs to cement engineering projects to build intelligent management field, and in particular to cement works construction project is intelligently managed
Reason system.
Background technique
Currently, the engineering construction project in cement plant still rests on the artificial control stage, working efficiency is low, and data tracking is not
In time.
However, Internet technology development and application make human society more and become to touch can and it is omnipotent.Currently big
Crowd start an undertaking and millions of people innovation under the new situation, internet+utilization be more convenient for living, improve working environment, improve
Work quality has challenged traditional idea, has overturned old management mode, with simple, timely, accurate, quick, true, vivid and
Intuitive way transmits information, greatly increases working efficiency.
Therefore it is urgent to provide a kind of cement works construction project intelligent management systems, can be used in cement mill project construction item
Purpose intelligent management improves working efficiency, realizes data sharing.
Summary of the invention
For the defects in the prior art, the present invention provides a kind of cement works construction project intelligent management system, can
For the intelligent management of cement mill project construction project, working efficiency is improved, realizes data sharing.
A kind of engineering construction project intelligent management system, comprising:
Information acquisition module: for implementing early period in engineering construction project, the essential information of engineering construction project, root are received
The essential information is pre-processed according to preset cement plant screening rule;It is also used to receive the preparation letter of engineering construction project
Breath;
Prospective design module: investigation information and design scheme for receiving input;The design scheme is believed according to prospecting
Breath, essential information and ready message obtain;
Project tracking module: for receiving tracking data, accurately controlling project work in engineering construction project implementation process
Phase and construction quality;
Final acceptance of construction module: for receiving product acceptance data after engineering construction project is finished, and project completion is generated
Report.
Preferably, the information acquisition module is specifically used for:
Implement early period, receipt of contract information, the project proposal of input and report of feasibility in engineering construction project;
The project proposal and report of feasibility are filtered according to the cement plant screening rule, obtain filtering text
Shelves;
The key message in document is filtered according to preset keyword extraction, to obtain the essential information.
Preferably, the information acquisition module is specifically used for:
Import cement plant information collection template;It include the keyword in the cement plant information collection template;
The keyword in cement plant information collection template is extracted, the key in document is filtered according to the keyword extraction
Information;
The key message is corresponded to and is inserted in the cement plant information collection template, to obtain the essential information.
Preferably, the investigation information includes the one or more combination of following data:
Raw material condition, fuel conditions, power supply and distribution situation, environmental condition, the thermal efficiency index of equipment, equipment heating power refer to
Mark, the outfit data of the recovery utilization rate of system, system, waste heat condition, construction place, electric power, water source, water supply and drainage, safety
Information, environmental protection information, fire information and antidetonation information.
Preferably, the project tracking module is specifically used for:
It is preset with alert if;
When the tracking data meets the alert if, defining the tracking data is abnormal data;
Obtain the preset auditor of the abnormal data;
Alarm flow is generated according to the abnormal data, and sends corresponding auditor for alarm flow.
Preferably, the project tracking module is specifically used for:
Obtain the associated associated data classification of the abnormal data;
Read the data of the associated data classification in the tracking data;
The alarm flow is generated according to the data of the abnormal data, associated data classification.
Preferably, the engineering construction project intelligent management system further include:
Training module: it is sent to pair for inputting training courseware and corresponding start-up, and by the training courseware
The start-up answered;It is also used to record the training progress and the score of the examination of start-up, if the score of the examination of start-up
When not up to standard, process is retrained according to the training courseware bringing, the process of retraining is sent to the start-up.
Preferably, the engineering construction project intelligent management system further include:
Evaluation module: for the project completion report of construction work to be generated multiple evaluation rubrics according to different implementation phases, and
The evaluation rubric is sent to preset appraiser;
Either, for the project completion report of construction work to be generated multiple evaluation rubrics according to different participants, and will
The evaluation rubric is sent to preset appraiser.
As shown from the above technical solution, engineering construction project intelligent management system provided by the invention, in engineering construction item
Mesh implements early period and prospective design stage, can completely acquire various data, be also used to be tracked in implementation process, in real time
Duration control and engineering project quality control are carried out, project completion report of construction work is generated after finished, and build to cement works
Project is evaluated.The system can be used in the intelligent management of cement mill project construction project, and Precise control improves work effect
Rate realizes information sharing.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar element
Or part is generally identified by similar appended drawing reference.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is the module frame chart for the engineering construction project intelligent management system that the embodiment of the present invention one provides.
Specific embodiment
It is described in detail below in conjunction with embodiment of the attached drawing to technical solution of the present invention.Following embodiment is only used for
Clearly illustrate technical solution of the present invention, therefore be only used as example, and cannot be used as a limitation and limit protection model of the invention
It encloses.It should be noted that unless otherwise indicated, technical term or scientific term used in this application are should be belonging to the present invention
The ordinary meaning that field technical staff is understood.
Embodiment one:
A kind of cement works construction project intelligent management system, referring to Fig. 1, comprising:
Information acquisition module: for implementing early period in engineering construction project, the essential information of engineering construction project, root are received
The essential information is pre-processed according to preset cement plant screening rule;It is also used to receive the preparation letter of engineering construction project
Breath;
Specifically, essential information includes the formatted datas such as text, picture, video, document, and information acquisition module is built in engineering
If project implementation early period acquires essential information, the case where completely understanding the engineering construction project comprehensively early period can implemented.
Since collected essential information usually includes many redundant informations, so needing by being carried out according to cement plant screening rule
Pretreatment, filters out redundant information.Ready message includes pre-implementation preparatory work, preparation data, prepares arrangement, personnel placement
Deng whether ready facilitating user to monitor ready message in subsequent implementation.
Prospective design module: investigation information and design scheme for receiving input;The design scheme is believed according to prospecting
Breath, essential information and ready message obtain;
Specifically, the investigation information can be scout and carry out the data obtained after project on-the-spot investigation.The system is also
Investigation information can be collected.Design scheme can be by user according to the essential information and ready message and prospecting acquired early period
Information acquisition, designer can directly inquire essential information, ready message and investigation information by the system, convenient and efficient,
Also achieve the data sharing of different post employees.
Project tracking module: for receiving tracking data in engineering construction project implementation process;
Specifically, which is equipped with project tracking module typing tracking data, and tracking data includes in the project implementation process
Detection data, alert data, operation data etc..User can be monitored in real time by checking the tracking data of project tracking module
Engineering construction project performance.
Final acceptance of construction module: for receiving product acceptance data after engineering construction project is finished, and project completion is generated
Report.
Specifically, final acceptance of construction module generates project completion report of construction work after engineering construction project is finished.Project is completed
Content in report may include essential information, ready message, investigation information, tracking data and product acceptance data.Project, which is completed, to be reported
Accuse the performance for summarizing engineering construction project.The performance of engineering construction project is remembered by project completion report of construction work
Record, can effectively save project implementation data.
The engineering construction project intelligent management system implements early period and prospective design stage in engineering construction project, can
Various data are completely acquired, are also used to be tracked in implementation process, the control of real-time perfoming duration and engineering project quality control
System generates project completion report of construction work after finished, and evaluates cement works construction project.The system can be used in water
The intelligent management of mud factory engineering construction project, Precise control improve working efficiency, realize information sharing.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware
With the interchangeability of software, each exemplary composition and step are generally described according to function in the above description.This
A little functions are implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Specially
Industry technical staff can use different methods to achieve the described function each specific application, but this realization is not
It is considered as beyond the scope of this invention.
In several embodiments provided herein, it should be understood that disclosed system, it can be by others side
Formula is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only one
Kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
It is desirably integrated into another system, or some features can be ignored or not executed.In addition, shown or discussed is mutual
Coupling, direct-coupling or communication connection can be through some interfaces, the indirect coupling or communication connection of device or unit,
It is also possible to electricity, mechanical or other form connections.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.Some or all of unit therein can be selected to realize the embodiment of the present invention according to the actual needs
Purpose.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, is also possible to two or more units and is integrated in one unit.It is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can be personal computer, server or the network equipment etc.) executes the complete of each embodiment the method for the present invention
Portion or part steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store journey
The medium of sequence code.
Embodiment two:
The system that embodiment two provides, increases the following contents on the basis of example 1:
The information acquisition module is specifically used for:
Implement early period, receipt of contract information, the project proposal of input and report of feasibility in engineering construction project;
The project proposal and report of feasibility are filtered according to the cement plant screening rule, obtain filtering text
Shelves;
Specifically, contract information includes having for Party A: original, fuel information, power supply and distribution information, water head site information, product letter
Breath;Party B's information: project quotation completes duration, implementation content etc..Project proposal and report of feasibility by cement plant member
Work input.Engineering investigation designer can be according to formulation project proposal and feasibility report the case where the engineering construction project
It accuses, and is entered into information acquisition module.
Cement plant screening rule is arranged according to cement plant self-condition.Such as: in order to completely acquire essential information, if
Document number of words is very few, it is believed that the information of the document is not complete, does not extract the data of the document at this time.That is cement plant screening rule is set
It is greater than document number of words lower limit value for number of words, is, for example, less than 500 words.Also for example: entire engineering construction project quotation can be filtered out
Too high or too low document, it is believed that the information inaccuracy of the document does not extract the data of the document.
The key message in document is filtered according to preset keyword extraction, to obtain the essential information.
Specifically, keyword root is determined according to cement plant oneself requirement.Keyword can be imported by Microsoft Excel.EXCEL
Table for each keyword reserve a blank cell, information acquisition module be used for according to keyword extraction to key message fill out
Enter in corresponding blank cell.
The present embodiment also provides following keyword managing module.
Keyword managing module includes: tree generating unit, specifying part, search part, display unit, keyword configuration part, keyword
Database and document data bank.
Tree generating unit generates the key tree with the hierarchical structure being made of multiple keywords.Each keyword has place
The pointer of the keyword of Yu Shangyi level.
Keyword of the specifying part by the input of user as retrieval object.Search part is specified according to set conditional information retrieval
The specified keyword in portion.Other than key tree, display unit also shows keyword and search result, the key as needed
Word is the keyword as specified by specifying part in tree, and the search result is retrieved to obtain by search part.
In user when setting keyword, keyword configuration part selects this document setting user referring to key tree
Keyword and the keyword for being located at the keyword more top in tree.
It is related that keyword database and document data bank store the keyword being managed using key tree, setting respectively
The files such as the image file of key word.
Preferably, the information acquisition module is specifically used for:
Import cement plant information collection template;It include the keyword in the cement plant information collection template;
The keyword in cement plant information collection template is extracted, the key in document is filtered according to the keyword extraction
Information;
The key message is corresponded to and is inserted in the cement plant information collection template, to obtain the essential information.
Specifically, information collection template in cement plant can be excel table, or provided according to the format appointed
Document.The corresponding filling frame of each keyword in document, the information acquisition module believe the key message extracted filling cement plant
Acquisition module is ceased, it is simple and quick, it is concise.
System provided by the embodiment of the present invention, to briefly describe, embodiment part does not refer to place, can refer to aforementioned system
Corresponding contents in embodiment of uniting.
Embodiment three:
The system that embodiment three provides, increases the following contents on the basis of other embodiments:
The investigation information includes the one or more combination of following data:
Raw material condition, fuel conditions, power supply and distribution situation, environmental condition, the thermal efficiency index of equipment, equipment heating power refer to
Mark, the outfit data of the recovery utilization rate of system, system, waste heat condition, construction place, electric power, water source, water supply and drainage, safety
Information, environmental protection information, fire information and antidetonation information.
It specifically, is, in order to guarantee the smooth development of entire implementation process, to need pair due to being come into effect in engineering project
The data being related to will be examined on the spot.The data of prospecting have according to the case where cement plant with the case where engineering construction project
Body determines.Above-mentioned data can be obtained according to specific cement plant.
Preferably, the project tracking module is specifically used for:
It is preset with alert if;
Specifically, alert if is determined according to specific engineering construction project.Such as: alert if can be set to electricity consumption
The smokescope upper limit, allowable conecntration etc. in the upper limit, implementation process.
When the tracking data meets the alert if, defining the tracking data is abnormal data;
Specifically, if tracking data meets alert if, there is alert event, need to notify relevant staff into
Row checks or maintenance.
Obtain the preset auditor of the abnormal data;
Alarm flow is generated according to the abnormal data, and sends corresponding auditor for alarm flow.
Specifically, each alert if corresponds at least one auditor.But since the same alarm parameters may
Multiple alert if can be corresponded to, such as smokescope can be divided into trace over standard, middle amount are exceeded, severely exceed etc..It corresponds to not
Same grade needs to assign different auditors.For example, if being trace over standard, explains the situation relatively light, current value can be assigned
The staff of class goes to check.It is exceeded if it is middle amount, explain the situation a little urgent, except when preceding staff on duty with
Outside, it is also necessary to the technician for being responsible for smokescope this part safety be assigned to go to check.If it is severe overweight, explain the situation very
Promptly, it needs that current staff on duty, the technician of responsible smokescope this part safety and manager is assigned to go to check
And it is handled.
Due to different grades of dangerous corresponding different abnormal data, so the project tracking module is sentenced according to abnormal data
Disconnected danger classes, is sent to corresponding auditor.
Preferably, the project tracking module is specifically used for:
Obtain the associated associated data classification of the abnormal data;
Read the data of the associated data classification in the tracking data;
The alarm flow is generated according to the data of the abnormal data, associated data classification.
It specifically,, will in order to enable corresponding auditor to obtain abnormal data as soon as possible when generating alarm flow
Abnormal data is written in alarm flow, and subsequent auditor is allowed to grasp abnormal conditions as soon as possible.Associated data classification is for referring to
Show the classification of abnormal data, such as: multiplexing electric abnormality, toxic gas are abnormal, smog is abnormal etc..Project tracking module is also according to association
Data category obtains the abnormal data of the category in implementation process, alarm flow is written in all abnormal datas of classification, in this way
Auditor can recognize the exception of entire implementation process by all abnormal datas of the category in implementation process, not need
Data, inquiry data are rearranged again, it is convenient and efficient.
System provided by the embodiment of the present invention, to briefly describe, embodiment part does not refer to place, can refer to aforementioned system
Corresponding contents in embodiment of uniting.
Example IV:
The system that example IV provides, increases the following contents on the basis of other embodiments:
Referring to Fig. 1, the engineering construction project intelligent management system further include:
Training module: it is sent to pair for inputting training courseware and corresponding start-up, and by the training courseware
The start-up answered;It is also used to record the training progress and the score of the examination of start-up, if the score of the examination of start-up
When not up to standard, process is retrained according to the training courseware bringing, the process of retraining is sent to the start-up.
Specifically, which also has the function of staffs training.Examination personnel are by training session
Part is sent to corresponding start-up and learns, and start-up can complete to take an examination after having learnt.Training module record training
Instruction progress and the score of the examination automatically generate if the score of the examination is unqualified and retrain process, it is desirable that start-up again into
Row study.
Following modular construction production can be used in training courseware provided in this embodiment.
Training module is equipped with production interface, and the production interface is equipped with toolbar and production window, the toolbar
In be equipped with multiple production modules;User makes training courseware by the following method:
S1: training module receives the drag operation of user, and the production module is dragged in the production window;
S2: training module receives the completion operation of user, according to production modules all in production window generation
Train courseware.
Specifically, multiple production modules are preset in training module, such as: the training that make Electrical Safety can make
It include: electricity consumption rudimentary knowledge, cement plant power supply unit knowledge, Electrical Safety common sense etc. as module, what user trained as needed
The corresponding production module of content selection.Multiple versions, example also can be generated since the content of training is different in the same production module
Such as: electricity consumption rudimentary knowledge 1, electricity consumption rudimentary knowledge 2, electricity consumption rudimentary knowledge 3.
User in the production process, the production module of needs can be dragged in production window, and make mould with others
Block is combined, and final training courseware is formed.The system generates production module, user according to common, general component
Existing production module can be directly selected in toolbar, improve courseware development speed, it is user-friendly.
Preferably, the engineering construction project intelligent management system further include:
Evaluation module: for the project completion report of construction work to be generated multiple evaluation rubrics according to different implementation phases, and
The evaluation rubric is sent to preset appraiser;
Specifically, evaluation system is used to generate evaluation stream automatically according to different implementation phases according to project completion report of construction work
Journey issues appraiser.Such as: implementation phase includes before implementing, in implementation, after implementing.Before evaluation module can extract implementation
The essential information and ready message of acquisition, issue appraiser, to the staff of responsible acquisition essential information and ready message
It is assessed.The evaluation module can be automatically performed evaluation work, convenient and efficient.
Either, for the project completion report of construction work to be generated multiple evaluation rubrics according to different participants, and will
The evaluation rubric is sent to preset appraiser.
Specifically, evaluation module can assess the participant in project completion report of construction work, such as: extract participant
The logging of member A, is assessed according to all working of participant A.
The evaluation module can both work to a certain item and assess, can also be to the overall work of different participants
It is assessed.Cement plant can select assessment mode according to the actual situation.
System provided by the embodiment of the present invention, to briefly describe, embodiment part does not refer to place, can refer to aforementioned system
Corresponding contents in embodiment of uniting.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme should all cover within the scope of the claims and the description of the invention.
Claims (8)
1. a kind of cement works construction project intelligent management system characterized by comprising
Information acquisition module: for implementing early period in engineering construction project, the essential information of engineering construction project is received, according to pre-
If cement plant screening rule the essential information is pre-processed;It is also used to receive the ready message of engineering construction project;
Prospective design module: investigation information and design scheme for receiving input;The design scheme is according to investigation information, base
This information and ready message obtain;
Project tracking module: for receiving tracking data in engineering construction project implementation process;
Final acceptance of construction module: for receiving product acceptance data after engineering construction project is finished, and project completion report is generated
It accuses.
2. cement works construction project intelligent management system according to claim 1, which is characterized in that the information collection mould
Block is specifically used for:
Implement early period, receipt of contract information, the project proposal of input and report of feasibility in engineering construction project;
The project proposal and report of feasibility are filtered according to the cement plant screening rule, obtain filtering document;
The key message in document is filtered according to preset keyword extraction, to obtain the essential information.
3. cement works construction project intelligent management system according to claim 2, which is characterized in that the information collection mould
Block is specifically used for:
Import cement plant information collection template;It include the keyword in the cement plant information collection template;
The keyword in cement plant information collection template is extracted, the crucial letter in document is filtered according to the keyword extraction
Breath;
The key message is corresponded to and is inserted in the cement plant information collection template, to obtain the essential information.
4. cement works construction project intelligent management system according to claim 1, which is characterized in that
The investigation information includes the one or more combination of following data:
Raw material condition fuel conditions, power supply and distribution situation, environmental condition, the thermal efficiency index of equipment, the heating power index of equipment, is
The recovery utilization rate of system, the outfit data of system, waste heat condition, construction place, electric power, water source, water supply and drainage, security information,
Environmental protection information, fire information and antidetonation information.
5. cement works construction project intelligent management system according to claim 1, which is characterized in that the project tracking mould
Block is specifically used for:
It is preset with alert if;
When the tracking data meets the alert if, defining the tracking data is abnormal data;
Obtain the preset auditor of the abnormal data;
Alarm flow is generated according to the abnormal data, and sends corresponding auditor for alarm flow.
6. cement works construction project intelligent management system according to claim 5, which is characterized in that the project tracking mould
Block is specifically used for:
Obtain the associated associated data classification of the abnormal data;
Read the data of the associated data classification in the tracking data;
The alarm flow is generated according to the data of the abnormal data, associated data classification.
7. cement works construction project intelligent management system according to claim 5, which is characterized in that the engineering construction project
Intelligent management system further include:
Training module: for inputting training courseware and corresponding start-up, and the training courseware is sent to corresponding
Start-up;It is also used to record the training progress and the score of the examination of start-up, if the score of the examination of start-up does not reach
When mark, process is retrained according to the training courseware bringing, the process of retraining is sent to the start-up.
8. cement works construction project intelligent management system according to claim 1, which is characterized in that the engineering construction project
Intelligent management system further include:
Evaluation module: for the project completion report of construction work to be generated multiple evaluation rubrics according to different implementation phase, and by institute
It states evaluation rubric and is sent to preset appraiser;
Either, for the project completion report of construction work to be generated multiple evaluation rubrics according to different participants, and will be described
Evaluation rubric is sent to preset appraiser.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910089955.1A CN109840859A (en) | 2019-01-30 | 2019-01-30 | Cement works construction project intelligent management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910089955.1A CN109840859A (en) | 2019-01-30 | 2019-01-30 | Cement works construction project intelligent management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109840859A true CN109840859A (en) | 2019-06-04 |
Family
ID=66884329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910089955.1A Pending CN109840859A (en) | 2019-01-30 | 2019-01-30 | Cement works construction project intelligent management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109840859A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112712330A (en) * | 2020-12-15 | 2021-04-27 | 广东广建项目管理有限公司 | Investigation monitoring and feasibility summarizing system for construction environment |
CN115240361A (en) * | 2022-06-27 | 2022-10-25 | 南京澳博工业智能科技研究院有限公司 | Safety monitoring and early warning management system for cement production line |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1741023A (en) * | 2004-08-23 | 2006-03-01 | 夏普株式会社 | Design supporting device and design supporting method |
CN101283317A (en) * | 2005-02-11 | 2008-10-08 | 伏特资讯科学公司 | Project work change in plan/scope administrative and business information synergy system and method |
CN103177306A (en) * | 2011-12-20 | 2013-06-26 | 中工国际工程股份有限公司 | Workflow control system of project implementation |
CN104008510A (en) * | 2014-05-28 | 2014-08-27 | 国家电网公司 | Power grid project quality control method |
CN104778537A (en) * | 2015-03-19 | 2015-07-15 | 中国石油化工股份有限公司 | Three-simultaneousness managing system of construction projects |
KR20160069008A (en) * | 2014-12-05 | 2016-06-16 | 삼성물산 주식회사 | Project management system based information and communication technology |
CN106522187A (en) * | 2016-11-09 | 2017-03-22 | 南京市测绘勘察研究院有限公司 | Foundation pit monitoring information management system |
CN108647311A (en) * | 2018-05-10 | 2018-10-12 | 厦门海迈科技股份有限公司 | One kind being used for Engineering Construction Management procedure file electronic disposal system and method |
CN108932589A (en) * | 2018-07-05 | 2018-12-04 | 武汉科技大学 | A kind of IT application in enterprises project implementation management system |
-
2019
- 2019-01-30 CN CN201910089955.1A patent/CN109840859A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1741023A (en) * | 2004-08-23 | 2006-03-01 | 夏普株式会社 | Design supporting device and design supporting method |
CN101283317A (en) * | 2005-02-11 | 2008-10-08 | 伏特资讯科学公司 | Project work change in plan/scope administrative and business information synergy system and method |
CN103177306A (en) * | 2011-12-20 | 2013-06-26 | 中工国际工程股份有限公司 | Workflow control system of project implementation |
CN104008510A (en) * | 2014-05-28 | 2014-08-27 | 国家电网公司 | Power grid project quality control method |
KR20160069008A (en) * | 2014-12-05 | 2016-06-16 | 삼성물산 주식회사 | Project management system based information and communication technology |
CN104778537A (en) * | 2015-03-19 | 2015-07-15 | 中国石油化工股份有限公司 | Three-simultaneousness managing system of construction projects |
CN106522187A (en) * | 2016-11-09 | 2017-03-22 | 南京市测绘勘察研究院有限公司 | Foundation pit monitoring information management system |
CN108647311A (en) * | 2018-05-10 | 2018-10-12 | 厦门海迈科技股份有限公司 | One kind being used for Engineering Construction Management procedure file electronic disposal system and method |
CN108932589A (en) * | 2018-07-05 | 2018-12-04 | 武汉科技大学 | A kind of IT application in enterprises project implementation management system |
Non-Patent Citations (1)
Title |
---|
凌彦 主编: "《计算机数据分析技术与应用》", 30 November 2010, 武汉:华中科技大学出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112712330A (en) * | 2020-12-15 | 2021-04-27 | 广东广建项目管理有限公司 | Investigation monitoring and feasibility summarizing system for construction environment |
CN115240361A (en) * | 2022-06-27 | 2022-10-25 | 南京澳博工业智能科技研究院有限公司 | Safety monitoring and early warning management system for cement production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Veefkind et al. | A new EPO classification scheme for climate change mitigation technologies | |
CN110597791B (en) | Knowledge database construction and management method for operation and maintenance of electric power metering equipment | |
CN107689887A (en) | A kind of nuclear power plant's control system controls change online management system temporarily | |
CN104809933B (en) | A kind of power grid is without script emergency drilling system, drilling method and equipment | |
CN114003586A (en) | Construction method of intelligent education big data platform | |
CN105373901A (en) | Grid fault worksheet handling method, apparatus, and system | |
CN103840955B (en) | The operation maintenance system and operation maintenance management method of distributed IT system | |
CN106157167A (en) | A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket | |
CN104657903A (en) | Compressive guarantee system for equipment based on IETM | |
CN107730430A (en) | Production, teaching & research public service system based on big data | |
CN101515346A (en) | Nursing control management controlling system | |
CN102663008B (en) | Government integrated business platform business library and construction method of base library | |
CN107016457A (en) | One kind realizes community's hazardous act pre-warning system and method | |
CN109840859A (en) | Cement works construction project intelligent management system | |
CN101354776A (en) | Method and system for generating emergency scheme based on GIS platform | |
CN112036129A (en) | Power distribution network emergency drilling scheme digital aided design system and method | |
CN115828390A (en) | Four-pre-function implementation method for safety monitoring of hydraulic and hydroelectric engineering | |
CN112786128A (en) | Electronic medical record writing quality inspection system and method | |
CN114398773A (en) | Coal mine dispatching robot system based on artificial intelligence technology | |
Chen et al. | Computer Vision for Dynamic Student Data Management in Higher Education Platform. | |
CN106355489A (en) | Data center system and data processing method for management | |
CN116307570A (en) | Subway vehicle electronic record system based on block chain technology | |
Ni et al. | Rapid generation of emergency response plans for unconventional emergencies | |
CN113837599A (en) | Power transmission line operation risk assessment and control method | |
COYNE et al. | Nuclear Plant Control Room Operator Modeling Within the ADS-IDAC, Version 2, Dynamic PRA Environment: Part 1-General Description and Cognitive Foundations. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220805 Address after: Room 1201, Ganjiakou building, No. 17, Sanlihe Road, Haidian District, Beijing 100044 Applicant after: Sinoma overseas technology development Co.,Ltd. Address before: 100037 floor 12, No.17, Sanlihe Road, Haidian District, Beijing Applicant before: SINOMA OVERSEAS DEVELOPMENT CO.,LTD. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190604 |