CN106522187A - Foundation pit monitoring information management system - Google Patents

Foundation pit monitoring information management system Download PDF

Info

Publication number
CN106522187A
CN106522187A CN201610983159.9A CN201610983159A CN106522187A CN 106522187 A CN106522187 A CN 106522187A CN 201610983159 A CN201610983159 A CN 201610983159A CN 106522187 A CN106522187 A CN 106522187A
Authority
CN
China
Prior art keywords
data processing
data
management
project
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610983159.9A
Other languages
Chinese (zh)
Inventor
刘俊生
施卫娟
陈昌师
胡园园
吴凤军
陈涛
许文哲
刘宜洋
李书波
龚小鹏
何合建
张莹超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD
Original Assignee
NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD filed Critical NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD
Priority to CN201610983159.9A priority Critical patent/CN106522187A/en
Publication of CN106522187A publication Critical patent/CN106522187A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of foundation pit monitoring and particularly relates to a foundation pit monitoring information management system. The foundation pit monitoring information management system comprises data processing, project management and system management; the data management comprises horizontal displacement data processing of a ring beam, settlement data processing, deep horizontal displacement (inclination testing) data processing, support axial force data processing, layered settlement data processing, oblique observation data processing, crack observation data processing, water level observation data processing, bottom heave data processing, lateral pressure data processing of an enclosure wall and water pressure data processing; the project management comprises contract management, flow management, instrument management, client feedback management, a map exhibition function and the like. On the basis of a B/S structure, data safety is realize by adopting related technologies such as data encryption transmission at the same time, so that data sharing and cooperative work are achieved; information, for example, geological exploration, design and construction progress and etc of a plurality of foundation pits in a region and related information, for example, information of survey points, monitoring instruments, monitoring data, surrounding buildings and etc are comprehensively collected, and on the basis, storage, analysis, processing, inquiry, achievement display and output automation of information are achieved, and functions such as pre-alarming are realized.

Description

Pit retaining monitoring information management system
Technical field
The present invention relates to pit retaining monitoring technical field, and in particular to pit retaining monitoring information management system.
Background technology
Monitoring information management platform is an important component part of foundation ditch information-aided construction.Current existing pit retaining monitoring Information management platform mainly has the foundation ditch that (1998) such as Xiao Yuemin (1998), Zhong Zhengxiong, the happiness of stone Fructus Pruni etc. (2002) are introduced Monitoring Data Management System;The pit retaining monitoring information management system collection that (calendar year 2001s) such as Hu Youjian etc. (calendar year 2001) Zhang Youliang is introduced Into warning function;Xie Wei etc. (2005) describes the method for designing of the pit retaining monitoring information management system based on web;Wu Zhen Monarch etc.(2008)Develop the distributed pit retaining monitoring information management based on GIS and early warning system;JinYuXi(2012)Point The design of pit retaining monitoring information management system is analysed and has realized.These pit retaining monitoring information management system generally existings are asked as follows Topic:
(1) emphasis is all placed in the realization of the basic functions such as the management of Monitoring Data, inquiry, lack foundation ditch geological mapping, design, The data such as construction speed, lack the integrated management to information such as measuring point information, monitoring instrument, surrounding buildings.Simple monitoring Data, if no specific foundation ditch background is nonsensical.Analytic function is also weaker, and forecast model is little, while also lacking Weary deeper analytic function, the such as association analysiss of Monitoring Data and construction speed etc..
(2) part system realizes the drafting and management of the figures such as monitoring point layout drawing and Adjacent Buildings, but non-base Realize in GIS, it is impossible to the association effectively set up between Monitoring Data and figure.
(3) major part does not solve the problems, such as the output of Monitoring Result.Pit retaining monitoring it is ageing very strong, it is desirable to Monitoring Data Can be processed in time and be analyzed.And the making for monitoring form is very time-consuming laborious work, efficiency is low and error-prone.If Automatization's output of monitoring form can be realized, work efficiency and feedback of the information level will be greatly enhanced.
(4) region pit retaining monitoring integrated information management problem is not solved.It is conceived to the monitoring information management of single foundation ditch, Do not consider that the monitoring information of multiple foundation ditches in region is managed in being integrated in a project, also inconvenience is to similar foundation ditch work Cheng Jinhang analogy analyses.
(5) do not solve Monitoring Data to share and collaborative work problem.The system that Xie Wei etc. (2005) is developed realizes number According to shared, but due to being difficult to ensure that using the safety of B/S structures, Monitoring Data.In addition, pit retaining monitoring is that concertedness is very strong Work, needs many people to participate in.Therefore, develop distributed pit retaining monitoring information platform and consider that safety can meet at present Demand.
The content of the invention
It is present invention aims to the defect and deficiency of prior art, there is provided a kind of simple structure, reasonable in design, make With convenient pit retaining monitoring information management system, it includes:Contract management, instrument management, user management, Role Management, data Process, project management, system administration;The data management includes collar tie beam horizontal displacement data processing, settling data process, deep layer Horizontal displacement(Deviational survey)Data processing, axial force of the supports data processing, delaminating deposition data processing, declivity observation data processing, split Seam observation data processing, water-level observation data processing, bottom heave data processing, enclosure wall soil lateral pressure data processing, water Pressure data process and its warning;The project management include new projects, opening project, deletion project, preservation project, one Project and multinomial item association, basic condition management, Contents for Monitoring management, workflow management, expenses management, personal management, instrument Management, map displaying, data management, inquiry, client feedback management;The system administration includes rights management, operation note pipe Reason, printing, output, system are arranged.
After aforesaid way, the present invention has the beneficial effect that:Pit retaining monitoring information management system of the present invention, it Realize the safety of data on the basis of B/S structures simultaneously using correlation techniques such as Data Encryption Transmissions, realize data sharing And collaborative work, to the data such as the geological mapping of multiple foundation ditches, design, construction speed in region and measuring point information, monitoring instrument, The relevant informations such as Monitoring Data, surrounding building are gathered comprehensively, and realize the storage of information, analysis, place on this basis Reason, inquiry, achievement show, export automatization and possess the functions such as early warning.
Description of the drawings
Accompanying drawing described herein be for providing a further understanding of the present invention, constituting the part of the application, but Inappropriate limitation of the present invention is not constituted, in the accompanying drawings:
Fig. 1 is present system structural representation.
Specific embodiment
Describe the present invention below in conjunction with accompanying drawing and specific embodiment in detail, illustrative examples therein and say It is bright to be only used for explaining the present invention but not as a limitation of the invention.
As shown in figure 1, the pit retaining monitoring information management system described in this specific embodiment, it includes:Contract management, instrument Device management, user management, Role Management;It is characterized in that:It includes data processing, project management, system administration;The data Management includes collar tie beam horizontal displacement data processing, settling data process, deeply mixing cement-soil pile(Deviational survey)Data processing, axial force of the supports Data processing, delaminating deposition data processing, declivity observation data processing, gap observation data processing, water-level observation data processing, Bottom heave data processing, enclosure wall soil lateral pressure data processing, water pressure data processing;The project management includes increasing newly Project, opening project, deletion project, preservation project, mesh in every particular and multinomial item association, basic condition management, Contents for Monitoring Management, workflow management, expenses management, personal management, instrument management, map displaying, data management, inquiry, client feedback management; The system administration includes that rights management, operation note management, printing, output, system are arranged.
Further:The current period that data calculate each monitoring point is observed in the collar tie beam horizontal displacement data processing according to the current period Displacement, and compare with each phase displacement of history, calculate the current period accumulative displacement amount and current period displacement speed of each monitoring point Rate, generates the displacement change curve of each monitoring point.
Further:The settling data is processed observes the current period settling amount that data calculate each monitoring point according to the current period, And compare with each phase settling amount of history, calculate the current period accumulative settling amount and the current period rate of settling of each monitoring point, generate each The displacement change curve of settlement point.
Further:The deeply mixing cement-soil pile(Deviational survey)Data processing is observed data according to the current period and calculates each monitoring point Current period displacement, and compare with each phase displacement of history, calculate current period accumulative displacement amount and the current period position of each monitoring point Speed is moved, the displacement-depth change curve figure of each monitoring point is generated.
Further:The bottom heave data processing input source has two kinds:The observation data of optical level are paper Matter is recorded, and needs to be manually entered in the present system;The observation data of electronic level can be directly output as the text of txt forms Presents, according to the model of electronic level, the form for observing data storage is slightly different.
Further:Described collar tie beam horizontal displacement data processing, settling data process, deeply mixing cement-soil pile(Deviational survey)Number According to process, axial force of the supports data processing, delaminating deposition data processing, declivity observation data processing, gap observation data processing, water The actual measurements such as position observation data processing, bottom heave data processing, enclosure wall soil lateral pressure data processing, water pressure data processing When as a result exceeding the safety value in set point, alarm will be sent in time;Automatic alarm is write as pit retaining monitoring information by soft The software of management system V1.0 is realized.
Further:The map shows includes engineering project border;The essential information of engineering project, Surveillance and its Warning message;Open electronic map interface, it can be seen that the position distribution of all pit retaining monitoring projects, click on electronic chart Pit retaining monitoring project, can show the Monitoring Result and scene photograph with pit retaining monitoring item association, i.e., can provide in system can To import the interface of image data and preserve the data base of picture.This function is write as pit retaining monitoring information management system by soft The software of V1.0 is realized.
Further::While signing several points during the mesh in every particular is a pit retaining monitoring project with multinomial item association Project is corresponding.
Pit retaining monitoring information management system of the present invention, its contract management are entered as supporting item management module The management of row contract essential information.Registration of contracts content includes:1st, the date;2nd, bullets;3rd, project name;4th, Contents for Monitoring (Foundation ditch, sedimentation etc.);5th, contract total price;6th, final accounts valency;7th, contact person;8th, payment node;9th, pay the bill contact person(Another attached PDF is literary Part).Hinge operation flow includes:1st, registration of contracts flow process is:Start → selected project → whether there is(Do not exist, return to Selected project)→ typing contract essential information, and upload electronic material → end;2nd, modification of contract;3rd, contract module is related to Data dictionary.
Pit retaining monitoring information management system of the present invention, its instrument & equipment management include:1st, instrument typing, specifically For:Beginning → typing instrument and equipment, and upload electronic document → examination & verification(If examination & verification does not pass through, typing instrument and equipment is returned, and Upload electronic document)→ instrument and equipment warehouse-in → terminate;2nd, instrument and equipment verification, specially:Start → selected instrument → whether Change(If not changing, selected instrument is returned to)→ typing modification information → end;3rd, instrument & equipment management module is related to Data dictionary.
Pit retaining monitoring information management system of the present invention, its Role Management include:1st, typing role, specially: Beginning → typing role → end;2nd, distribute authority, specially:Start → select role → distribution authority → end.
Pit retaining monitoring information management system of the present invention, its user management include:1st, user's typing, specially: Beginning → input technology personal information → examination & verification(If examination & verification does not pass through, input technology personal information is returned to)→ warehouse-in → knot Beam, system initialization is, for personal information can import data in batches, specially:Beginning → typing customer's personal information → Selected project → end;2nd, distribute role to client, specially:Start → select personnel(Non-customer personnel)→ appointment role → Terminate;3rd, the basic function of user, including deletion, Modify password change content, message board, feedback of the information, customer information feedback Refer to that client is opened after software according to authority, it can be seen that information reminding, it is possible in message board last time multiple corresponding contents, realize Feedback information is managed.
Pit retaining monitoring information management system of the present invention, its collar tie beam horizontal displacement data processing operation flow is: After collar tie beam horizontal displacement monitoring terminates every time, initial data can be all produced.Field operation monitoring method include surveying little horn cupping and axis method, Method of polar coordinates etc., the initial data of generation are slightly different.Initial data may be paper record, need to be manually entered software In, it is also possible to the excel data of same format, can import in software.Initial data import after firstly the need of carrying out The rules such as data check, including data integrity inspection, numerical range inspection.Need according to public affairs after initial data inspection is errorless Formula calculates the displacement of each monitoring point.According to little horn cupping is surveyed, computing formula is as follows:Displacement=the tested point of each monitoring point is inclined Digression X tested point is to instrument distance/206265.During First Observation, can not be calculated, directly will deviate from collimation line distance acquiescence For 0, when observing for second, acquiescence sighting distance is constant, secondary angle value and last time is subtracted each other, then using above-mentioned formula Calculate offset distance.According to axis method, above table form is constant, and simply without filling in observation angle, First Observation gives tacit consent to offset distance For 0mm, observe for the second time and subtracting each other with the last time.Monitoring alarm value is according to the practical situation of engineering project, surrounding enviroment etc. Come what is determined, the alarming value of each project is different, and in project, the alarming value of each monitoring point is likely to difference.Calculating After the displacement of current period each monitoring point, need and alarming value is compared, if transfinited, carry out alert process.Finally export Horizontal displacement observation outcome table.
Pit retaining monitoring information management system of the present invention, its settling data processing business flow process is:Settle every time After field operation terminates, initial data can be all produced, if the data of optical level, then be needed the number of paper list manually According to being entered in software.If the data of electronic level, then needing will be the content of text of txt forms straight by software Connect importing.Firstly the need of data check, including data integrity inspection is carried out after initial data importing, survey station front-and rear-view is away from difference Check, reading is more than rules such as scale full-scale reading inspections.Need to carry out adjustment, error compensation method after initial data inspection is errorless Have various, typically have error adjustment method, indirect adjustment method etc..Select a kind of error compensation method to carry out compensating computation, finally obtain flat Each monitoring point height of after the recovery.Current period settling amount can be calculated by current period elevation and last elevation.By current period elevation and Downpayment elevation can calculate current period accumulative settling amount.Monitoring alarm value is practical situation, the surrounding enviroment according to engineering project Etc. determining, the alarming value of each project is different, and in project, the alarming value of each monitoring point is likely to difference.Calculating After going out the settling amount of current period each monitoring point, need and alarming value is compared, if transfinited, carry out alert process.It is last defeated Go out building(Sedimentation)Observing buoy table.
Pit retaining monitoring information management system of the present invention, its deeply mixing cement-soil pile(Deviational survey)Data processing Business Stream Cheng Wei:After deviational survey observation terminates every time, initial data can be all produced.One foundation ditch project might have multiple deviational survey holes, often Individual deviational survey hole can produce one group of data after individually observing.The observation data in multiple deviational survey holes can be exported to by inclinometer Txt texts, are then imported in software again.Initial data import after firstly the need of carrying out data check, including data are complete Property check, numerical range check etc. rule.Need to calculate deviational survey hole in different depth according to formula after initial data inspection is errorless Displacement.Monitoring alarm value is the report of each project determining according to the practical situation of engineering project, surrounding enviroment etc. Alert value is different, and in project, the alarming value of each monitoring point is likely to difference.After the displacement for calculating current period each monitoring point, Need and alarming value is compared, if transfinited, carry out alert process.Deeply mixing cement-soil pile observing buoy table is exported finally.
Pit retaining monitoring information management system of the present invention, its axial force of the supports data processing operation flow is:Every time After axial force of the supports monitoring terminates, initial data can be all produced.The frequency values that initial data is mainly read from frequency recorder.It is original Data may be paper record, need to be manually entered in software, it is also possible to the excel data of same format, can lead Enter in software.Firstly the need of data check, including data integrity inspection is carried out after initial data importing, numerical range is examined The rule such as look into.Need the axial force of the supports size of each monitoring point is calculated according to formula after initial data inspection is errorless.One monitoring point 4 reinforcing rib meters of correspondence, reinforcing rib meter pressure=COEFFICIENT K ×(Original frequency-cymometer reading), concrete axial force of the supports=reinforcing rib meter Pressure sum × axle power.After calculating the axial force of the supports of current period each monitoring point, in addition it is also necessary to the support of last issue is read from data base Axle power, further calculates the variable quantity of axial force of the supports.Monitoring alarm value is practical situation, the peripheral ring according to engineering project Come what is determined, the alarming value of each project is different, and in project, the alarming value of each monitoring point is likely to difference in border etc..In meter After calculating the axial force of the supports of current period each monitoring point, need and alarming value is compared, if transfinited, carry out alert process.Most Axial force of the supports observing buoy table is exported afterwards.
Pit retaining monitoring information management system of the present invention, its delaminating deposition data processing operation flow is:Every time After soil body deep soil settlement survey terminates, initial data can be all produced.Initial data may be paper record, need to be manually entered To in software, it is also possible to the excel data of same format, can import in software.Initial data is needed after importing first The rules such as data check to be carried out, including data integrity inspection, numerical range inspection.Need after initial data inspection is errorless Calculated according to formula.Each sedimentation pipe has multiple sedimentation rings, and it is heavy apart from L=to pipe top that the high Hj- of sedimentation pipe pipe top mark settles ring The absolute altitude H of drop ring.Pre-buried sedimentation pipe is needed before excavation of foundation pit, the sedimentation ring absolute altitude that first time survey calculation is obtained is heavy for this The initial absolute altitude of drop ring, the sedimentation ring absolute altitude and the difference of initial absolute altitude that each issue survey calculation is obtained later are the sedimentation ring The settling amount of correspondence soil layer.Monitoring alarm value be according to the practical situation of engineering project, surrounding enviroment etc. determining, each Purpose alarming value is different, and in project, the alarming value of each solum settlement ring is likely to difference.Calculating current period solum settlement ring Displacement after, need and alarming value be compared, if transfinited, carry out alert process.Soil body delaminating deposition is exported finally Monitoring Result table.
Pit retaining monitoring information management system of the present invention, its declivity observation data processing operation flow is:Every time After declivity observation terminates, initial data can be all produced.Initial data may be paper record, need to be manually entered in software, It is also likely to be the excel data of same format, can imports in software.Initial data import after firstly the need of carrying out data Check, including rules such as data integrity inspection, numerical range inspections.The formula that declivity observation is calculated is complex, needs root Perpendicularity is calculated according to the side-play amount in initial data.Concrete formula is referring to supplementary notes.Monitoring alarm value is according to engineering item , come what is determined, the alarming value of each project is different for purpose practical situation, surrounding enviroment etc..Calculating hanging down for current period each monitoring point After straight degree, need and alarming value is compared, if transfinited, carry out alert process.Measuring for verticality outcome table is exported finally.
Pit retaining monitoring information management system of the present invention, its gap observation data processing operation flow is:Every time After gap observation terminates, initial data can be all produced.Initial data may be paper record, need to be manually entered in software, It is also likely to be the excel data of same format, can imports in software.Initial data import after firstly the need of carrying out data Check, including rules such as data integrity inspection, numerical range inspections.The initial data of gap observation include crack length, Width, depth, trend etc., it is not necessary to carry out formula calculating.If the fracture strike figure that scene is drawn, it is also desirable to import to soft In part.Gap observation observing buoy table is exported finally.
Pit retaining monitoring information management system of the present invention, its water-level observation data processing operation flow is:Every time After water level settlement monitoring terminates, initial data can be all produced.Initial data may be paper record, need to be manually entered software In, it is also possible to the excel data of same format, can import in software.Initial data import after firstly the need of carrying out The rules such as data check, including data integrity inspection, numerical range inspection.Need to read this after initial data inspection is errorless Each monitoring point water level value of observation, and last water level calculating current period water level variable and rate of change are read from data base, Also need to calculate accumulative variable quantity.Monitoring alarm value is determining, often according to the practical situation of engineering project, surrounding enviroment etc. The alarming value of individual project is different, and in project, the alarming value of each water level monitoring point is likely to difference.After current period water level is calculated, Need and alarming value is compared, if transfinited, carry out alert process.Water-level observation outcome table is exported finally.
Pit retaining monitoring information management system of the present invention, its bottom heave data processing operation flow is:Every time After bottom heave observation field operation terminates, initial data can be all produced, if the data of optical level, then be needed paper manually The data inputting of matter form is in software.If the data of electronic level, then need the text of txt forms by software This content is introduced directly into.Initial data import after firstly the need of carrying out data check, including data integrity inspection, before and after survey station Sighting distance difference checks that reading is more than rules such as scale full-scale reading inspections.Need to carry out adjustment, adjustment after initial data inspection is errorless Method has various, typically has error adjustment method, indirect adjustment method etc..A kind of error compensation method is selected to carry out compensating computation, finally Each monitoring point height to after adjustment.Current period settling amount can be calculated by current period elevation and last elevation.It is high by the current period Journey and downpayment elevation can calculate current period accumulative settling amount.Monitoring alarm value is practical situation, the periphery according to engineering project , come what is determined, the alarming value of each project is different, and in project, the alarming value of each monitoring point is likely to difference for environment etc..In meter After calculating the settling amount of current period each monitoring point, need and alarming value is compared, if transfinited, carry out alert process.Finally Output bottom heave observing buoy table.
Pit retaining monitoring information management system of the present invention, its enclosure wall soil lateral pressure data processing operation flow For:After the monitoring of enclosure wall soil lateral pressure terminates every time, initial data can be all produced.Initial data may be paper record, need It is manually entered in software, it is also possible to the excel data of same format, can imports in software.Initial data is imported Afterwards firstly the need of carrying out data check, including data integrity inspection, the rule such as numerical range is checked.Initial data checks errorless Need afterwards the soil pressure force value of each monitoring point is calculated according to formula.According to soil pressure cell manufacturer provide Force Calculation formula and Calibration coefficient can be calculated tries to achieve corresponding buried depth position soil pressure force value size.Monitoring alarm value is the actual feelings according to engineering project , come what is determined, the alarming value of each project is different, and in project, the alarming value of each monitoring point is likely to not for condition, surrounding enviroment etc. Together.After the soil pressure for calculating current period each monitoring point, need and alarming value is compared, if transfinited, carry out at warning Reason.Pore water pressure observing buoy table is exported finally.
Pit retaining monitoring information management system of the present invention, its water pressure data processing operation flow is:Per secondary aperture After the monitoring of gap water pressure terminates, initial data can be all produced.Initial data may be paper record, need to be manually entered software In, it is also possible to the excel data of same format, can import in software.Initial data import after firstly the need of carrying out The rules such as data check, including data integrity inspection, numerical range inspection.Need according to formula after initial data inspection is errorless Calculate the pore water pressure force value of each monitoring point.The Force Calculation formula provided according to WG manufacturer and calibration coefficient Can calculate and try to achieve corresponding buried depth position pore water pressure value size.For example computing formula is:Pore water pressure force value=it is WG Calibration coefficient X (i-th practical frequency of sensor-sensor installs front original frequency).Monitoring alarm value is according to engineering item , come what is determined, the alarming value of each project is different, the warning of each monitoring point in project for purpose practical situation, surrounding enviroment etc. Value is likely to difference.After the pore water pressure for calculating current period each monitoring point, need and alarming value is compared, if super Limit, then carry out alert process.Pore water pressure observing buoy table is exported finally.
Pit retaining monitoring information management system of the present invention, its tour record data processing business flow process is:Scene Record data is maked an inspection tour if Excel formatted datas or Word formatted datas, are importing directly in software.If Paper record form, needs to select template according to table content, then the content on paper list is input in template.
Pit retaining monitoring information management system of the present invention, its opening project operation flow is:If not first Secondary cuit information, illustrates that project to be opened in bulleted list, can directly open project.Root after opening project According to user right, project or amended record project information are may browse through.
Pit retaining monitoring information management system of the present invention, its new projects operation flow is:If new base Hole monitoring project information needs to be entered in software, it is necessary first to new projects, cuit title, Contract NO, according to conjunction Project uniqueness in software be can ensure that with numbering, project name can not be born the same name;Then increase new in bulleted list Pit retaining monitoring project.
Pit retaining monitoring information management system of the present invention, its deletion project operation flow is:If necessary to by The deletion of items of typing information, it is necessary first to check that the project whether there is;If there is the project, current operation will be also checked The authority of user.Only project leader can just delete project, and the project is created by the project leader.
Pit retaining monitoring information management system of the present invention, its preservation project operation flow is:If the letter of project Breath has change, needs to be saved in data base, needs to check user right before preservation.
Pit retaining monitoring information management system of the present invention, its basic condition management business flow process is:New projects When need entry item purpose essential information, be then saved in data base;During opening project, can show that the project of typing is basic Information;If the essential information of project has altered, project can be first opened, after changing the content of change, be saved in data base.
Pit retaining monitoring information management system of the present invention, its Contents for Monitoring management business flow process is:Increase monitoring Point:The general pit retaining monitoring incipient stage firstly the need of embedded monitoring point, if corresponding monitoring point layout drawing(CAD forms), Can import in software, parse automatically the monitoring point information in CAD figures by software, such as period and positional information, so Supplement the attribute informations such as the embedded situation of the typing point afterwards according to period.Monitoring point layout drawing and monitoring point attribute information are intended to protect It is stored in data base.Change monitoring point:During pit retaining monitoring, as special circumstances need change monitoring point.Now can be with The attribute information of manual setting monitoring point, while replacing original monitoring point layout drawing.Contents for Monitoring is managed:Each issue pit retaining monitoring After end, newly-increased data processing item is needed, corresponding data process subsystem is then gone to and is processed.For having located before Reason terminates previous data, can show initial data and output report.
Pit retaining monitoring information management system of the present invention, its workflow management operation flow is:Foundation pit construction flow process Management:Firstly the need of typing foundation pit construction schedule diagram, then according to the actual progress constructed to construction schedule table It is updated.Pit retaining monitoring workflow management:The monitoring cycle and monitoring frequency of each pit retaining monitoring item is not quite similar, and needs difference Management.With reference to the estimated monitoring total degree of foundation pit construction progress typing, then each issue ED is processed in data process subsystem Afterwards, monitoring number of times is automatically updated, workflow management figure is formed, project progress situation is reflected by node.
Pit retaining monitoring information management system of the present invention, its expenses management operation flow is:From treaty documents Payment nodal information is extracted, then according to construction speed real-time update receivables and payables situation.
Pit retaining monitoring information management system of the present invention, its personal management operation flow is:The basic letter of personnel Breath management:In order to reduce repetition typing personal information, and pit retaining monitoring operation group personnel are relatively stable, can set up personnel's base This information table, name only to personnel, age, sex, educational background, post certificate, certificate number(The scanning of certificate may be included Part)Carry out registration management.Personnel's basic information management of project:Foundation ditch project management department member's table is managed.If It is existing in personnel's Basic Information Table, then it is introduced directly into the essential information of personnel, and and item association;If in personnel's base Do not exist in this information table, then add the essential information of personnel, while being saved in personnel's Basic Information Table.It is related to other lists Position contact personnel information management it is consistent with our unit personnel information management mode.
Pit retaining monitoring information management system of the present invention, its instrument management operation flow is:The basic letter of instrument Breath management:Instrument Basic Information Table is managed, device numbering, device name, label, model including instrument, is dispatched from the factory The item associations such as numbering, initial value unit price, date of acquisition:If instrument by certain operation group used in certain project, by instrument Device and operation group and item association.Instrument calibration:Instrument needed to carry out calibration by professional at interval of a period of time.Need This calibration date and plan calibration date in software to instrument carries out registration management, and needs be close to instrument inspection During the date of school, operation group is reminded.
Pit retaining monitoring information management system of the present invention, its map show that operation flow is:Open electronic chart Interface, it can be seen that the position distribution of all pit retaining monitoring projects.Pit retaining monitoring project, Ke Yixian are clicked on electronic chart Show the description information with the scene photograph and photo of pit retaining monitoring item association.Can provide i.e. in system and can import image data Interface and preserve picture data base.
Pit retaining monitoring information management system of the present invention, its data management operation flow is:Import:Can import Pit retaining monitoring project related data, such as treaty documents, scheme, log etc., support OFFCIE document formats, PDF forms, Conventional picture format, CAD drawing forms etc..Derive:The data having been introduced in project can be derived self-defined catalogue:It is right Catalogue in data management can need self-defining to delete according to project:The data that can be deleted in the project of having been imported into is looked into See:The data that can be checked in the project of having been imported into, support OFFCIE document formats, PDF forms, conventional picture format, CAD drawing forms etc. are checked.CAD map editings:For the data of CAD drawing forms, can preserve after editing.
Pit retaining monitoring information management system of the present invention, its inquiry business flow process is:Input inquiry keyword or Person selects query filter condition, clicks on inquiry and can obtain Query Result.If no Query Result, it is also desirable to be given and clearly carry Show.Query Result needs display number, if number is more, needs paging to show.A certain item in selection Query Result, can To show details.One or more Query Result items can be exported in Excel tables or directly printout. Mesh is inquired about:Can be inquired about according to keywords such as project name, places, the project data checked is needed quickly to navigate to Inquiry:Can be inquired about according to attributes such as the title of data, the affiliated project names of data, be looked into quickly to navigate to needs The data initial data inquiry seen:Can be according to the typing people of initial data, affiliated project name, entry time, certain time period Inquired about Deng attribute, the initial data contact person for checking inquiry is needed quickly to navigate to:Can be according to contact person's surname The attributes such as name, affiliated unit carry out inquiring about instrument inquiry:Can be inquired about according to attributes such as instrument numbering, titles.
Pit retaining monitoring information management system of the present invention, its rights management operation flow is:Only manager is Role, modification role can be created and role is deleted.When creating role or modification role, need to carry out the corresponding authority of role Configuration.Manager, project leader, operation group are the basic roles in this software, it is impossible to deleted.Below a kind of role, correspondence is more Individual user.Manager can be the corresponding role of user configuring.After User logs in software, before carrying out a certain operation, it is necessary first to The examination & verification of functional module level is carried out according to the role of user, if examination & verification passes through, then the examination & verification of interface level is carried out, if examination & verification is logical Cross and access.
Pit retaining monitoring information management system of the present invention, its operation note management business flow process are all of user Operation is all recorded automatically on backstage, and is stored in data base.Manager can according to user name, the operating time, The operation note to user such as action type is inquired about, and with printout or can be exported in excel tables.
Pit retaining monitoring information management system of the present invention, its print service flow process is:Much operate in this software Result output need to be printed as paper document.Information in current window is sent to printer and is printed by acquiescence, is being beaten Before print machine is printed, user can be adjusted to the layout for printing content by page setup function.If can not and printer Communication is set up, needs to point out corresponding error message.
Pit retaining monitoring information management system of the present invention, its outgoing traffic flow process is:If no printer or Person is needed using PDF format files, can with the Content Transformation that will print as PDF format files, PDF format files Outgoing route needs to be specified by user, it is also desirable to provide the outgoing route of acquiescence.If convert failed, need to point out user's phase Pass information.After EOC, acquiescence opens the successful PDF documents of conversion.
Pit retaining monitoring information management system of the present invention, it is added using data on the basis of B/S structures simultaneously The correlation techniques such as close transmission realize the safety of data, realize data sharing and collaborative work, the ground to multiple foundation ditches in region The relevant informations such as data and measuring point information, monitoring instrument, Monitoring Data, surrounding building such as matter prospecting, design, construction speed enter Row is comprehensively gathered, and realizes that the storage of information, analysis, process, inquiry, achievement show, export automatization and tool on this basis The functions such as standby early warning.
The above is only the better embodiment of the present invention, therefore all constructions according to described in present patent application scope, Equivalence changes or modification that feature and principle are done, are included in the range of present patent application.

Claims (8)

1. pit retaining monitoring information management system, it is characterised in that:It includes data processing, project management, system administration;The number Include collar tie beam horizontal displacement data processing, settling data process, deeply mixing cement-soil pile according to management(Deviational survey)Data processing, support shaft Force data process, delaminating deposition data processing, declivity observation data processing, gap observation data processing, at water-level observation data Reason, bottom heave data processing, enclosure wall soil lateral pressure data processing, water pressure data processing;The project management includes New projects, opening project, deletion project, preservation project, mesh in every particular are managed, are monitored with multinomial item association, basic condition Content Management, workflow management, expenses management, personal management, instrument management, map displaying, data management, inquiry, client feedback Management;The system administration includes that rights management, operation note management, printing, output, system are arranged.
2. pit retaining monitoring information management system according to claim 1, it is characterised in that:The collar tie beam horizontal displacement data Process and the current period displacement that data calculate each monitoring point is observed according to the current period, and compare with each phase displacement of history, count The current period accumulative displacement amount and current period rate of displacement of each monitoring point are calculated, the displacement change curve of each monitoring point is generated.
3. pit retaining monitoring information management system according to claim 1, it is characterised in that:The settling data processes basis Current period observation data calculate the current period settling amount of each monitoring point, and compare with each phase settling amount of history, calculate each prison The current period of measuring point accumulative settling amount and the current period rate of settling, generate the displacement change curve of each settlement point.
4. pit retaining monitoring information management system according to claim 1, it is characterised in that:The deeply mixing cement-soil pile(Survey Tiltedly)Data processing is observed data according to the current period and calculates the current period displacement of each monitoring point, and with each phase displacement ratio of history Compared with, the current period accumulative displacement amount and current period rate of displacement of each monitoring point are calculated, the displacement-change in depth for generating each monitoring point is bent Line chart.
5. pit retaining monitoring information management system according to claim 1, it is characterised in that:The bottom heave data processing Input source has two kinds:The observation data of optical level are paper record, need to be manually entered in the present system;Electronic leveler The observation data of instrument can be directly output as the text of txt forms, and according to the model of electronic level, observation data are deposited The form of storage is slightly different.
6. pit retaining monitoring information management system according to claim 1, it is characterised in that:Described collar tie beam horizontal displacement number According to process, settling data process, deeply mixing cement-soil pile(Deviational survey)Data processing, axial force of the supports data processing, delaminating deposition data Process, declivity observation data processing, gap observation data processing, water-level observation data processing, bottom heave data processing, go along with sb. to guard him Wall soil lateral pressure data processing, water pressure data processing send alarm in data are more than set point.
7. pit retaining monitoring information management system according to claim 1, it is characterised in that:The map shows that function includes Engineering project border;The essential information of engineering project, newest Surveillance and warning message.
8. pit retaining monitoring information management system according to claim 1, it is characterised in that:The mesh in every particular and multinomial item Mesh association be a pit retaining monitoring project in while to sign several sub-items corresponding.
CN201610983159.9A 2016-11-09 2016-11-09 Foundation pit monitoring information management system Pending CN106522187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610983159.9A CN106522187A (en) 2016-11-09 2016-11-09 Foundation pit monitoring information management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610983159.9A CN106522187A (en) 2016-11-09 2016-11-09 Foundation pit monitoring information management system

Publications (1)

Publication Number Publication Date
CN106522187A true CN106522187A (en) 2017-03-22

Family

ID=58350094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610983159.9A Pending CN106522187A (en) 2016-11-09 2016-11-09 Foundation pit monitoring information management system

Country Status (1)

Country Link
CN (1) CN106522187A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108534832A (en) * 2018-04-12 2018-09-14 黄河水利职业技术学院 A kind of civil engineering work monitoring system
CN108612137A (en) * 2018-06-19 2018-10-02 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of foundation pit synthesis on-line monitoring cloud platform system based on Internet of Things big data
CN108842746A (en) * 2018-06-29 2018-11-20 重庆水利电力职业技术学院 A kind of method of architectural engineering pit monitoring
CN109840859A (en) * 2019-01-30 2019-06-04 中材海外工程有限公司 Cement works construction project intelligent management system
CN110413678A (en) * 2019-07-30 2019-11-05 陕西昊璇测绘有限公司 Construction survey system
CN115116195A (en) * 2022-08-22 2022-09-27 广州云硕科技发展有限公司 Foundation pit monitoring method and device based on artificial intelligence

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226915A (en) * 2011-05-27 2011-10-26 同济大学 Deep foundation pit engineering dynamic risk information management system
CN103669366A (en) * 2013-01-24 2014-03-26 辽宁工程技术大学 Remote monitoring early warning system for deep foundation pit support structure deformation
CN104616433A (en) * 2015-02-04 2015-05-13 清华大学 Real-time monitoring and early warning system for foundation pit engineering
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof
JP5778815B1 (en) * 2014-03-24 2015-09-16 株式会社野村総合研究所 Infrastructure operation management system and infrastructure operation management method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226915A (en) * 2011-05-27 2011-10-26 同济大学 Deep foundation pit engineering dynamic risk information management system
CN103669366A (en) * 2013-01-24 2014-03-26 辽宁工程技术大学 Remote monitoring early warning system for deep foundation pit support structure deformation
JP5778815B1 (en) * 2014-03-24 2015-09-16 株式会社野村総合研究所 Infrastructure operation management system and infrastructure operation management method
CN104616433A (en) * 2015-02-04 2015-05-13 清华大学 Real-time monitoring and early warning system for foundation pit engineering
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘俊生,施卫娟,毛昆明,薛涛,胡园园,陈昌师: ""基坑监测信息化系统的开发与应用"", 《山西建筑》 *
邢卫民,侯金波,张敏,刘旭春: ""基坑监测信息管理系统的设计与实现"", 《测绘通报》 *
高磊,孙阳阳,濮慧蕾,曾京,王源: ""基坑监测信息管理系统的设计与实现"", 《地下空间与工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108534832A (en) * 2018-04-12 2018-09-14 黄河水利职业技术学院 A kind of civil engineering work monitoring system
CN108612137A (en) * 2018-06-19 2018-10-02 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of foundation pit synthesis on-line monitoring cloud platform system based on Internet of Things big data
CN108842746A (en) * 2018-06-29 2018-11-20 重庆水利电力职业技术学院 A kind of method of architectural engineering pit monitoring
CN109840859A (en) * 2019-01-30 2019-06-04 中材海外工程有限公司 Cement works construction project intelligent management system
CN110413678A (en) * 2019-07-30 2019-11-05 陕西昊璇测绘有限公司 Construction survey system
CN115116195A (en) * 2022-08-22 2022-09-27 广州云硕科技发展有限公司 Foundation pit monitoring method and device based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN106522187A (en) Foundation pit monitoring information management system
US20190361847A1 (en) Spatial Linking Visual Navigation System and Method of Using the Same
Xu et al. Web-based geospatial platform for the analysis and forecasting of sedimentation at culverts
Yang et al. A digital information system for cultural landscapes: The case of Slender West Lake scenic area in Yangzhou, China
CN115617889A (en) GIS-based survey data acquisition and processing method and system
Hatta Antah et al. Perceived usefulness of airborne LiDAR technology in road design and management: A review
Willems H., & Brandt, RW (2004)
CN117436054B (en) Geotechnical engineering big data sharing platform
Guo et al. Implementation of CIM-related technologies within transportation projects
Rogers Automating contour-based route projection for preliminary forest road designs using GIS
Johnson Geographic information systems (GIS) and mapping: practices and standards
João Use of geographic information systems in impact assessment
CN114742526A (en) Standard design process based exploration full-process informatization method and system
Simons et al. GeoSciML: enabling the exchange of geological map data
CN111538732A (en) Natural resource asset liability management system based on big data
Blachut Cadastre for developing countries based on orthophoto techniques
Bardet et al. Spatial modeling of geotechnical information using GML
Quiroga et al. Strategic plan to optimize the management of right-of-way parcel and utility information at FDOT.
Carter Application of geographical information system in underground coal mine to assist operational management
Matthews Documentation and databases
Vileikis Creating information management systems for cultural World Heritage: Experiences from Central Asia
Graettinger et al. Gis-based geotechnical engineering data management: A case study at the alabama dot
Graettinger et al. Alabama Department of Transportation
Tabarro A new WebGIS approach to support ground penetrating radar deployment
Meinel Monitoring of settlement and open space development on the basis of topographical spatial data-concept, realization and first results

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322