CN104008510A - Power grid project quality control method - Google Patents
Power grid project quality control method Download PDFInfo
- Publication number
- CN104008510A CN104008510A CN201410230025.0A CN201410230025A CN104008510A CN 104008510 A CN104008510 A CN 104008510A CN 201410230025 A CN201410230025 A CN 201410230025A CN 104008510 A CN104008510 A CN 104008510A
- Authority
- CN
- China
- Prior art keywords
- quality
- management
- stage
- evaluation
- electricity power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003908 quality control method Methods 0.000 title claims abstract description 18
- 238000011156 evaluation Methods 0.000 claims abstract description 38
- 238000013461 design Methods 0.000 claims abstract description 9
- 238000012544 monitoring process Methods 0.000 claims abstract description 8
- 230000005611 electricity Effects 0.000 claims description 34
- 238000010276 construction Methods 0.000 claims description 21
- 238000012407 engineering method Methods 0.000 claims description 14
- 239000000463 material Substances 0.000 claims description 10
- 238000001303 quality assessment method Methods 0.000 claims description 6
- 238000012360 testing method Methods 0.000 claims description 6
- 238000009430 construction management Methods 0.000 claims description 5
- 238000013480 data collection Methods 0.000 claims description 3
- 238000011157 data evaluation Methods 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 20
- 238000000034 method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001915 proofreading effect Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
Abstract
The invention discloses a power grid project quality control method. The power grid project quality control method performs comparison and evaluation on relevant data and evaluation criterion of project quality in all stages by establishing a quality supervision analysis system and utilizing the quality supervision analysis system and performs quality monitoring according to an evaluation result. The quality supervision analysis system performs 1 project decision and feasibility study stage management, 2 preliminary design and bid invitation purchasing stage management, 3 building construction stage management and 4 completion acceptance stage management. The power grid project quality control method is simple and easy to operate, facilitates inquiry of project quality supervision evaluation results of participation units and ensures project quality.
Description
Technical field
The present invention relates to a kind of electricity power engineering method of quality control.
Background technology
At present, along with power grid construction strengthens gradually, electricity power engineering construction task is on the increase, and strengthens implementing of quality management and control measure, further improve engineering construction quality and technological level and become the most important thing of building sturdy power grid, thereby the quality supervision of electricity power engineering is had higher requirement.
Existing electricity power engineering quality management is carried out mostly stage by stage, can not understand in real time in time Quality situation, and checks and accepts by artificial, wastes time and energy, also inconvenient successive projects compare of analysis.
Summary of the invention
To the object of the invention is the defect existing in prior art in order solving, a kind of method that can automatically monitor electricity power engineering quality to be provided.
In order to achieve the above object, the invention provides a kind of electricity power engineering method of quality control, this electricity power engineering method of quality control is by setting up quality supervision analytic system, utilize quality supervision analytic system that the related data of each stage construction quality and evaluation criterion contrast are evaluated, according to evaluation result, carry out quality monitoring;
Above-mentioned quality supervision analytic system comprises: the first, and project decision and application for developing management; The second, primary design and bid and purchase stage management; The 3rd, construction stage management; The 4th, acceptance stage management.
Wherein, project decision and application for developing management comprise each special assessment management, and this each special assessment management comprises that project environment affects evaluation, Assessment of Geological Hazard, earthquake assessment, water and soil conservation assessment management.Primary design comprises prospective design unit mass behavior supervision and management with bid and purchase stage management, according to the regulation of concerned countries corporate specification, its quality behavior is set up to evaluation criterion.The quality supervision information management in construction stage comprises engineering site and material supervision, by evaluation criterion is set up to according to national corporate specification in each checkpoint and inspection item.Final acceptance of construction management, sets up test assessment of bids standards of different according to country and enterprises ' industry standard to all kinds of engineerings by engineering type.
Electricity power engineering method of quality control of the present invention, comprises the following steps:
1) set up the preparatory stage of quality supervision analytic system: set up and take quality monitoring center as core, take the long distance control system that each quality responsibility main body host computer system is control point; According to country and enterprises ' industry standard, set up a series of evaluation criterions of electricity power engineering quality assessment, and be input in the storer at described quality monitoring center and store;
2) each quality data collection, upload the stage: in each stage of electricity power engineering project, by each quality responsibility main body, quality behavior is separately sent to quality monitoring center by corresponding host computer system; And in the construction stage of electricity power engineering project, by unit in charge of construction, the related data that relates to engineering site and quality of materials is sent to quality monitoring center by its host computer system;
3) analyze the data evaluation quality monitoring stage: the corresponding time before the acceptance stage of electricity power engineering project, the data that quality monitoring center receives previous step according to the evaluation criterion of setting up are in advance evaluated, and by the evaluation result of quality behavior evaluation, engineering site quality assessment and quality of materials evaluation is listed in " outstanding, pass, fail " Three Estate, when all evaluation results are after qualified above grade, can carry out acceptance stage;
4) final acceptance of construction management phase: quality monitoring center is carried out final acceptance of construction supervision according to the assessment of bids standard of testing of dissimilar engineering to every engineering, all qualified the and backward mechanism that puts on record that meets the requirements submits engineering quality supervision report to.
The present invention has the following advantages compared to existing technology: utilize quality supervision analytic system referring to the qualification of unit, to carry out automatic Proofreading audit to engineering, quality responsible party's quality behavior, engineering site quality, quality of materials are evaluated, more effectively, fast, and complete record quality supervision whole process, for later electricity power engineering quality monitoring provides control reference.The present invention adopts Surveillance center to carry out real-time oversight to electricity power engineering quality, has improved electricity power engineering quality management level.Electricity power engineering method of quality control of the present invention is simple to operation, is convenient to each unit of taking part in building and inquires about this engineering quality supervision evaluation result, and guaranteed construction quality perfect.
Embodiment
Below electricity power engineering method of quality control of the present invention is elaborated.
Electricity power engineering control method of the present invention, by setting up quality supervision analytic system, utilizes quality supervision analytic system that the related data of each stage construction quality and evaluation criterion contrast are evaluated, and according to evaluation result, carries out quality monitoring;
Wherein, quality supervision analytic system comprises:
The first, project decision and application for developing management; By each special assessment is managed, as project environment affects evaluation, Assessment of Geological Hazard, earthquake assessment, water and soil conservation assessment management etc., and by each assessment report Put on file.
The second, primary design and bid and purchase stage management; Comprise prospective design unit mass behavior supervision and management, according to the regulation of concerned countries corporate specification, its quality behavior is set up to evaluation criterion.
The 3rd, construction stage management; Comprise engineering site and material supervision, by evaluation criterion is set up to according to national corporate specification in each checkpoint and inspection item.
The 4th, acceptance stage management, sets up test assessment of bids standards of different according to country and enterprises ' industry standard to all kinds of engineerings by engineering type.。
Specifically comprise the following steps:
1) set up the preparatory stage of quality supervision analytic system: set up and take quality monitoring center as core, take the long distance control system that each quality responsibility main body host computer system is control point; According to country and enterprises ' industry standard, set up a series of evaluation criterions of electricity power engineering quality assessment, and be input in the storer at described quality monitoring center and store;
2) each quality data collection, upload the stage: in each stage of electricity power engineering project, by each quality responsibility main body, quality behavior is separately sent to quality monitoring center by corresponding host computer system; And in the construction stage of electricity power engineering project, by unit in charge of construction, the related data that relates to engineering site and quality of materials is sent to quality monitoring center by its host computer system;
3) analyze the data evaluation quality monitoring stage: the corresponding time before the acceptance stage of electricity power engineering project, the data that quality monitoring center receives previous step according to the evaluation criterion of setting up are in advance evaluated, and by the evaluation result of quality behavior evaluation, engineering site quality assessment and quality of materials evaluation is listed in " outstanding, pass, fail " Three Estate, when all evaluation results are after qualified above grade, can carry out acceptance stage;
4) final acceptance of construction management phase: quality monitoring center is carried out final acceptance of construction supervision according to the assessment of bids standard of testing of dissimilar engineering to every engineering, all qualified the and backward mechanism that puts on record that meets the requirements submits engineering quality supervision report to.
Claims (6)
1. an electricity power engineering method of quality control, it is characterized in that: this electricity power engineering method of quality control is by setting up quality supervision analytic system, utilize quality supervision analytic system that the related data of each stage construction quality and evaluation criterion contrast are evaluated, according to evaluation result, carry out quality monitoring;
Described quality supervision analytic system comprises: the first, and project decision and application for developing management; The second, primary design and bid and purchase stage management; The 3rd, construction stage management; The 4th, acceptance stage management.
2. electricity power engineering method of quality control according to claim 1, is characterized in that: described project decision and application for developing management comprise each special assessment management; Described each special assessment management comprises that project environment affects evaluation, Assessment of Geological Hazard, earthquake assessment, water and soil conservation assessment management.
3. electricity power engineering method of quality control according to claim 1, it is characterized in that: described primary design comprises prospective design unit mass behavior supervision and management with bid and purchase stage management, according to the regulation of concerned countries corporate specification, its quality behavior is set up to evaluation criterion.
4. electricity power engineering method of quality control according to claim 1, it is characterized in that: the quality supervision information management in described construction stage comprises engineering site and material supervision, by evaluation criterion is set up to according to national corporate specification in each checkpoint and inspection item.
5. electricity power engineering method of quality control according to claim 1, is characterized in that: described final acceptance of construction management, by engineering type, according to country and enterprises ' industry standard, all kinds of engineerings are set up to the different assessment of bids standards of testing.
6. electricity power engineering method of quality control according to claim 1, is characterized in that: comprise the following steps:
1) set up the preparatory stage of quality supervision analytic system: set up and take quality monitoring center as core, take the long distance control system that each quality responsibility main body host computer system is control point; According to country and enterprises ' industry standard, set up a series of evaluation criterions of electricity power engineering quality assessment, and be input in the storer at described quality monitoring center and store;
2) each quality data collection, upload the stage: in each stage of electricity power engineering project, by each quality responsibility main body, quality behavior is separately sent to quality monitoring center by corresponding host computer system; And in the construction stage of electricity power engineering project, by unit in charge of construction, the related data that relates to engineering site and quality of materials is sent to quality monitoring center by its host computer system;
3) analyze the data evaluation quality monitoring stage: the corresponding time before the acceptance stage of electricity power engineering project, the data that quality monitoring center receives previous step according to the evaluation criterion of setting up are in advance evaluated, and by the evaluation result of quality behavior evaluation, engineering site quality assessment and quality of materials evaluation is listed in " outstanding, pass, fail " Three Estate, when all evaluation results are after qualified above grade, can carry out acceptance stage;
4) final acceptance of construction management phase: quality monitoring center is carried out final acceptance of construction supervision according to the assessment of bids standard of testing of dissimilar engineering to every engineering, all qualified the and backward mechanism that puts on record that meets the requirements submits engineering quality supervision report to.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410230025.0A CN104008510A (en) | 2014-05-28 | 2014-05-28 | Power grid project quality control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410230025.0A CN104008510A (en) | 2014-05-28 | 2014-05-28 | Power grid project quality control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104008510A true CN104008510A (en) | 2014-08-27 |
Family
ID=51369154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410230025.0A Pending CN104008510A (en) | 2014-05-28 | 2014-05-28 | Power grid project quality control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104008510A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104809591A (en) * | 2015-05-11 | 2015-07-29 | 东北电力大学 | Electric power construction engineering supervision mechanism based on big data |
CN106067101A (en) * | 2016-08-02 | 2016-11-02 | 杭州凯达电力建设有限公司 | A kind of distribution power engineering acceptance method and system |
CN106557893A (en) * | 2017-01-01 | 2017-04-05 | 陕西海山能源发展有限公司 | A kind of acidifying profile control measures operation " 5S " quality control system |
CN106940839A (en) * | 2017-03-13 | 2017-07-11 | 中国南方电网有限责任公司超高压输电公司 | A kind of project of transmitting and converting electricity qualitative data managing and control system and method |
CN107368951A (en) * | 2017-06-28 | 2017-11-21 | 国网江苏省电力公司检修分公司 | A kind of power grid enterprises' technological transformation Overhaul Quality management and control honesty Warning System and its operation method |
CN109146235A (en) * | 2018-07-05 | 2019-01-04 | 国网内蒙古东部电力有限公司经济技术研究院 | A kind of the influence factor appraisal procedure and calculating equipment of substation project cost |
CN109840859A (en) * | 2019-01-30 | 2019-06-04 | 中材海外工程有限公司 | Cement works construction project intelligent management system |
CN110110963A (en) * | 2019-04-02 | 2019-08-09 | 国网江西省电力有限公司电力科学研究院 | A kind of distribution network engineering overall process management-control method of data-driven |
CN110580584A (en) * | 2019-09-10 | 2019-12-17 | 国网山东省电力公司东营供电公司 | transformer substation engineering construction quality supervision and analysis system |
CN111062550A (en) * | 2018-10-17 | 2020-04-24 | 中电建生态环境集团有限公司 | Environment management method, environment management device and server |
CN111539868A (en) * | 2020-05-19 | 2020-08-14 | 广州市水电建设工程有限公司 | Municipal sewage pipeline recommendation method and system |
-
2014
- 2014-05-28 CN CN201410230025.0A patent/CN104008510A/en active Pending
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104809591A (en) * | 2015-05-11 | 2015-07-29 | 东北电力大学 | Electric power construction engineering supervision mechanism based on big data |
CN106067101A (en) * | 2016-08-02 | 2016-11-02 | 杭州凯达电力建设有限公司 | A kind of distribution power engineering acceptance method and system |
CN106557893A (en) * | 2017-01-01 | 2017-04-05 | 陕西海山能源发展有限公司 | A kind of acidifying profile control measures operation " 5S " quality control system |
CN106940839A (en) * | 2017-03-13 | 2017-07-11 | 中国南方电网有限责任公司超高压输电公司 | A kind of project of transmitting and converting electricity qualitative data managing and control system and method |
CN107368951A (en) * | 2017-06-28 | 2017-11-21 | 国网江苏省电力公司检修分公司 | A kind of power grid enterprises' technological transformation Overhaul Quality management and control honesty Warning System and its operation method |
CN109146235A (en) * | 2018-07-05 | 2019-01-04 | 国网内蒙古东部电力有限公司经济技术研究院 | A kind of the influence factor appraisal procedure and calculating equipment of substation project cost |
CN111062550A (en) * | 2018-10-17 | 2020-04-24 | 中电建生态环境集团有限公司 | Environment management method, environment management device and server |
CN109840859A (en) * | 2019-01-30 | 2019-06-04 | 中材海外工程有限公司 | Cement works construction project intelligent management system |
CN110110963A (en) * | 2019-04-02 | 2019-08-09 | 国网江西省电力有限公司电力科学研究院 | A kind of distribution network engineering overall process management-control method of data-driven |
CN110580584A (en) * | 2019-09-10 | 2019-12-17 | 国网山东省电力公司东营供电公司 | transformer substation engineering construction quality supervision and analysis system |
CN111539868A (en) * | 2020-05-19 | 2020-08-14 | 广州市水电建设工程有限公司 | Municipal sewage pipeline recommendation method and system |
CN111539868B (en) * | 2020-05-19 | 2023-09-19 | 广州市水电建设工程有限公司 | Municipal sewage pipeline recommendation method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104008510A (en) | Power grid project quality control method | |
CN103279832B (en) | Substation project construction quality supervises analysis system | |
CN106940839B (en) | Power transmission and transformation project quality data management and control system and method | |
Alwan | BIM performance framework for the maintenance and refurbishment of housing stock | |
CN103257918A (en) | Project test procedure management method based on software testing and evaluation platform | |
TW200426630A (en) | CAD-based CAV system and method | |
CN107507649A (en) | A kind of full-automatic test system and its method suitable for solid state hard disc | |
Muladi et al. | The readiness self-assessment model for green IT implementation in organizations | |
CN111241660B (en) | Civil engineering experiment detection system and method based on cloud computing technology | |
CN104933468A (en) | Real-time online monitoring and predicating method for three-dimensional settlement of domestic garbage dump | |
CN112184180A (en) | Building life cycle management equipment based on BIM | |
Van der Merwe et al. | Strategies to revive DSM mine pumping projects under the new ESCo model | |
Kenley et al. | Greening procurement: a research agenda for optimizing mass-haul during linear infrastructure construction | |
CN103761673A (en) | Regression method and system for judging index abnormity | |
CN105573288A (en) | AGC controller performance detection method and device | |
CN111454750B (en) | Method and system for determining process type of coal for gasification | |
Zhang | BIM-Based Strategies for Construction Quality Control in Building Engineering | |
CN205228697U (en) | Continuous memory storage of moment of torsion | |
Zhang et al. | A dynamic model of construction project risk measurement based on the process | |
Canares et al. | India’s ESMI | |
Prizmic et al. | Methods of Capital Campaigns for the Cathedral of St. Helena | |
Niu et al. | Power grid construction project cost risk factors analysis based on the fishbone diagram theory | |
Tiggelman et al. | Geotechnical engineering in contracts for civil projects | |
CN113793033A (en) | Statistical method for pipeline engineering construction progress | |
Zheng et al. | Project management for the construction of a large scale modified UNITANK wastewater treatment plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140827 |
|
WD01 | Invention patent application deemed withdrawn after publication |