CN106557893A - A kind of acidifying profile control measures operation " 5S " quality control system - Google Patents
A kind of acidifying profile control measures operation " 5S " quality control system Download PDFInfo
- Publication number
- CN106557893A CN106557893A CN201710000110.1A CN201710000110A CN106557893A CN 106557893 A CN106557893 A CN 106557893A CN 201710000110 A CN201710000110 A CN 201710000110A CN 106557893 A CN106557893 A CN 106557893A
- Authority
- CN
- China
- Prior art keywords
- quality
- engineer
- quality control
- acidifying
- reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003908 quality control method Methods 0.000 title claims abstract description 33
- 238000013461 design Methods 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims abstract description 31
- 238000011160 research Methods 0.000 claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 20
- 239000000126 substance Substances 0.000 claims abstract description 13
- 238000004458 analytical method Methods 0.000 claims abstract description 11
- 238000005516 engineering process Methods 0.000 claims abstract description 11
- 230000008569 process Effects 0.000 claims abstract description 11
- 230000000694 effects Effects 0.000 claims description 25
- 238000004886 process control Methods 0.000 claims description 6
- 239000003814 drug Substances 0.000 claims description 5
- 230000008520 organization Effects 0.000 claims description 4
- 238000009790 rate-determining step (RDS) Methods 0.000 claims 1
- 238000007726 management method Methods 0.000 abstract description 12
- 238000002347 injection Methods 0.000 description 4
- 239000007924 injection Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000000243 solution Substances 0.000 description 4
- 239000002253 acid Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000005457 optimization Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000000704 physical effect Effects 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000010306 acid treatment Methods 0.000 description 1
- 239000003153 chemical reaction reagent Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000001802 infusion Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Mining & Mineral Resources (AREA)
- Quality & Reliability (AREA)
- Life Sciences & Earth Sciences (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Geology (AREA)
- Marine Sciences & Fisheries (AREA)
- Agronomy & Crop Science (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Animal Husbandry (AREA)
- Data Mining & Analysis (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Health & Medical Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of acidifying profile control measures operation " 5S " quality control system, including reservoir engineer's quality control, technology engineer's quality control, site operation engineer's quality control, Chemical Engineer's quality control, safety (quality) chief inspector for being equipped with sole duty, the quality management of overall process is supported.Reservoir engineer's quality control is by geologic reservoir research, it is ensured that Reservoir Data is accurate;Technology engineer quality control with reservoir engineer's analysis as foundation, Optimized Measures process;Site operation engineer quality control by with oil reservoir, technique, chemistry dock comprehensively, the overall process that control Construction Design Schemes to site tissue are constructed;Chemical Engineer's quality control carries out formula system research for target zone;Affiliated safety (quality) chief inspector for being equipped with sole duty in the project, reaches quality, safe and environment-friendly and healthy comprehensive control.It is practical, it is easy to promote the use of.
Description
Technical field
The present invention relates to the quality management field of profile control measures operation is acidified, a kind of especially acidifying profile control measures operation
" 5S " quality control system.
Background technology
Acidifying profile control measures operation is oilfield producing well, the Main Means of water injection well increasing yield and injection measure, its increasing yield and injection
Operation is related to the control of the Whole Course Managements such as oil reservoir, technique and construction, and which is mainly quality control.Effect validity is related to oil reservoir
Rationally whether, wherein Reservoir Data true and accurate, technology are closed for research, technical study, site operation and injection medicament etc.
Rationality, site operation are normative and reagent combination is studied.
During measure operation is from oil reservoir to site operation, data true and accurate, technology reasonability, site operation standard
Change and data tracking in time etc., be point of penetration from whole process quality control, ensure acidifying profile control effect with job safety environmental protection.
Profile control measures operation quality control main geologic design, engineering design plan (EDP), detail design are acidified at this stage
Clause, and job site operation team safety supervision and Party A's supervision are required in scheme.Geological design scheme, engineering design plan (EDP)
By Party A's design guidance, pipelining clause in Construction Design Schemes, mostly is, it is not tight with actually suiting.There is oil reservoir research, work
Skill research is ignored, it is impossible to from basic research, simply quality in site, safe and environment-friendly construction.Easily there is construction effect to pay no attention to
Think, situations such as live emergency situations are more.
The content of the invention
Existing management system is difficult to the needs for meeting people, and in order to solve above-mentioned problem, the present invention proposes one
Acidifying profile control measures operation " 5S " quality control system is planted, it arranges to be acidified profile control reservoir engineer, technique using company's unification
Technician, site operation engineer, Chemical Engineer, the overall think of of scene full-time safety (quality) chief inspector's quality control
Road, it is ensured that acidifying profile control measures operation effectiveness, while reaching the live pollution-free, generation without security incident, systematicness solves acid
Change profile control measures operation quality control problem.
To realize the management system purpose, the Managed Solution that the present invention is adopted is:A kind of acidifying profile control measures operation " 5S "
Quality control system, including reservoir engineer, technology engineer, site operation engineer, Chemical Engineer, scene sole duty
Safety (quality) chief inspector.It is non-that reservoir engineer is devoted to reservoir rock mechanical characteristics, physical property characteristic, pore structure characteristic, reservoir
Homogenieity, water driving characteristics, wetability, mutually ooze feature and reservoir sensitivity etc. research, examine oil well master data, well history data
It is foundation, it is ensured that Reservoir Data is accurate, pinpoints the problems;Technology engineer is devoted to acidifying and adjusts
Measure technical research is cutd open, the reservoir engineer that combines closely analysis, optimization acid solution consumption, operation pressure, discharge capacity parameter, infusion journey
Sequence, separate layer acid treatment profile control etc., reach this bid section target zone acidifying profile control de-plugging purpose, realize " technical study → design → effect
Tracking → technical study " circulating research thinking, improves constantly the research to oil reservoir treatment process, further analyzes pollution sources to storage
Layer Injury Mechanism and stimulation optimization scheme, and submit to effect analysis to report to Party A;It is existing that site operation engineer is devoted to measure
Field construction service, the overall process that control is constructed from detail design to site tissue are docked comprehensively with oil reservoir, technique, chemistry, constantly
Company service quality is lifted, when key link personnel can not be close, using monitoring unmanned measure, well head and technological process is entered
Row real-time pictures are transmitted, and realize remote monitoring;Chemical Engineer is devoted to reservoir formulating, optimization of C/C composites system, chemical drugs
Product buying strict implement company《Materiel acquisition management system》、《Purchase of goods and materials Quality supervision sampling system purchase of goods and materials》, meet
Manufacturing requirements, putaway stock strict implement《Goods and materials warehousing management system》, to take necessary anti-according to the characteristic of goods
Shield measure, it is ensured that chemicals quality, maintains strict control over liquid process and uses water quality, strict by formula medicine materials and consumption, is configured to
The chemical property and physical property of acid solution can meet construction requirement;Construction is equipped with full-time safety (quality) chief inspector, with reference to live real
Border production environment, job site pressure displacement variation situation.
Compared with existing management system, the invention has the advantages that:Acidifying profile control measures operation " 5S " quality
Control system, the management system that it adopts can fully meet the needs of acidifying profile control measures operation quality management control, system
Property solve that construction teams professional techniques is not enough, the inferior position of quality management shortcoming, based on oil reservoir research, technical study, chemistry
The management system that research combines, by site safety (quality) chief inspector, site operation engineer supervision and commander, reaches and guarantees the quality
Completion.
Description of the drawings
Fig. 1 is the workflow diagram of the present invention;
In reference:1- geological researches, 2- oil reservoir conceptual designs, the tracking of 3- effects, 4- effect analyses, 5- techniques are ground
Study carefully, 6- technological designs, the tracking of 7- spot effects, 8- Construction Schemes, 9- construction organizations, 10- construction technological process control,
11- formulatings, 12- formula designs, the tracking of 13- pharmacy qualities, the allotment tracking of 14- scenes, work progress supervision 15.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on
Embodiment in the present invention, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Figure of description 1 is referred to, in embodiments of the present invention, a kind of acidifying profile control measures operation " 5S " quality control system
System, including geological research 1, the tracking 3, effect analysis 4 of oil reservoir conceptual design 2, effect in reservoir engineer's research;Technology work
Technical study 5, technological design 6, spot effect tracking 7 in Cheng Shi researchs;Conceptual design 8, construction group in site operation engineer
Knit 9, construction technological process control 10;Formulating 11, formula design 12, pharmacy quality tracking 13, scene in Chemical Engineer
Allotment tracking 14;Full-time safety (quality) Supervised Control work progress supervision 15;Basis of the another geological research 1 for technical study 5,
Construction Scheme 8 combines geological research 1, technical study 5, formulating 11.
Present invention acidifying profile control measures operation " 5S " quality control system uses step:
Geological research 1, the tracking 3, effect analysis 4 of oil reservoir conceptual design 2, effect, technical study 5, technological design 6, scene
Effect tracking 7, Construction Scheme 8, construction organization 9, construction technological process control 10, formulating 11, formula design 12, medicine
Agent follow-up of quality 13, scene allotment tracking 14, work progress supervise 15.
1. the geological design scheme for obtaining from Party A and pound sign, Jing reservoir engineer's geological research 1, carry out oil reservoir scheme and set
Meter 2, is checked with the geological design scheme for obtaining, and effect tracking 3, effect analysis 4 is carried out after the measure operation of this well, will effect
Fruit analysis report reports Party A.
2. company's technology engineer based on oil reservoir conceptual design 2 carries out technical study 5, and carries out technique setting
Meter 6, is compared with Party A's process planning, and spot effect tracking is organized after construction, and effect analysis report is reported to first
Side.
3. site operation engineer is docked comprehensively with geological research 1, technical study 5, formulating 11, carries out arrangement and method for construction
Design 8, organizes site operation 9, quality control construction technological process control 10.
4. Chemical Engineer carries out formulating 11 with reference to geological research 1, draws formula design 12, is purchasing, is going out warehouse-in
Pharmacy quality tracking 13 is carried out, accomplishes that scene allotment tracks 14.
5. measure operation overall process arranges full-time safety (quality) chief inspector, meets live actual production, quality, safety, ring
Protect and healthy operation.
The above, only presently preferred embodiments of the present invention, not to limit the present invention, every pipe according to the present invention
Any trickle amendment, equivalent and improvement that reason essence is made to above example, should be included in technical solution of the present invention
Protection domain within.
Claims (7)
1. a kind of acidifying profile control measures operation " 5S " quality control system, including geological research 1, oil reservoir conceptual design 2, effect with
Track 3, effect analysis 4, technical study 5, technological design 6, spot effect tracking 7, Construction Scheme 8, construction organization 9, construction
Technical process control 10, formulating 11, formula design 12, pharmacy quality tracking 13, scene allotment tracking 14, work progress prison
Superintend and direct 15.
It is characterized in that:Reservoir engineer's quality control step geological research 1, oil reservoir conceptual design 2, effect tracking 3, effect
Analysis 4;Technology engineer quality control step technical study 5, technological design 6, the spot effect tracking 7;It is described existing
Field field engineer's quality control step Construction Scheme 8, construction organization 9, construction technological process controls 10;The chemical work
Tracking 14 is allocated in Cheng Shi rate-determining steps formulating 11, formula design 12, pharmacy quality tracking 13, scene;The full-time safety
(quality) Supervised Control work progress supervision 15;Basis of the another geological research 1 for technical study 5, Construction Scheme 8 is in combination
Matter research 1, technical study 5, formulating 11.
2. a kind of acidifying profile control measures operation " 5S " quality control system according to claim 1, is characterized in that:Oil reservoir work
Cheng Shi, technology engineer, site operation engineer, Chemical Engineer, full-time safety (quality) chief inspector carry out acidifying profile control
Measure operating system property amount is controlled.
3. a kind of acidifying profile control measures operation " 5S " quality control system according to claim 1, is characterized in that:Oil reservoir work
Journey Shi Jinhang geologic reservoir research 1, contrast Party A scheme propose company oneself achievement in research, and the data feedback that will have objection is to first
Side;Tracking construction well data, are analyzed to collect and feed back to Party A.
4. a kind of acidifying profile control measures operation " 5S " quality control system according to claim 1, is characterized in that:Technique skill
Art engineer on the basis of geologic reservoir research 1 carries out technical study 5 and contrasts, and the data feedback that will have objection is to Party A.
5. a kind of acidifying profile control measures operation " 5S " quality control system according to claim 1, is characterized in that:Apply at scene
Work engineer on the basis of geologic reservoir research 1, technical study 5 carries out Construction Scheme 8, and is applied according to decision organization
Work 9.
6. a kind of acidifying profile control measures operation " 5S " quality control system according to claim 1, is characterized in that:Chemical work
Cheng Shi carries out formula design 12 on the basis of geologic reservoir research 1, technical study 5, and according to the allotment tracking of design scene
14。
7. a kind of acidifying profile control measures operation " 5S " quality control system according to claim 1, is characterized in that:Construction is matched somebody with somebody
Standby full-time safety (quality) chief inspector, multi-faceted control field process quality 15, live medicament allotment 14.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710000110.1A CN106557893A (en) | 2017-01-01 | 2017-01-01 | A kind of acidifying profile control measures operation " 5S " quality control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710000110.1A CN106557893A (en) | 2017-01-01 | 2017-01-01 | A kind of acidifying profile control measures operation " 5S " quality control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106557893A true CN106557893A (en) | 2017-04-05 |
Family
ID=58445373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710000110.1A Pending CN106557893A (en) | 2017-01-01 | 2017-01-01 | A kind of acidifying profile control measures operation " 5S " quality control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106557893A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2135766C1 (en) * | 1998-05-28 | 1999-08-27 | Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" | Process monitoring exploitation of oil fields |
CN101236257A (en) * | 2007-02-02 | 2008-08-06 | 天津方联科技发展有限公司 | Oil well location determination technical method |
CN104008510A (en) * | 2014-05-28 | 2014-08-27 | 国家电网公司 | Power grid project quality control method |
CN204312052U (en) * | 2014-11-17 | 2015-05-06 | 中国石油天然气股份有限公司 | Water plugging and profile controlling construction parameter online monitoring system |
CN105404972A (en) * | 2015-11-30 | 2016-03-16 | 中国石油天然气股份有限公司 | Reservoir development uncertainty research and risk control method |
-
2017
- 2017-01-01 CN CN201710000110.1A patent/CN106557893A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2135766C1 (en) * | 1998-05-28 | 1999-08-27 | Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" | Process monitoring exploitation of oil fields |
CN101236257A (en) * | 2007-02-02 | 2008-08-06 | 天津方联科技发展有限公司 | Oil well location determination technical method |
CN104008510A (en) * | 2014-05-28 | 2014-08-27 | 国家电网公司 | Power grid project quality control method |
CN204312052U (en) * | 2014-11-17 | 2015-05-06 | 中国石油天然气股份有限公司 | Water plugging and profile controlling construction parameter online monitoring system |
CN105404972A (en) * | 2015-11-30 | 2016-03-16 | 中国石油天然气股份有限公司 | Reservoir development uncertainty research and risk control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104318408A (en) | Multi-target and multi-dimension risk management system for large building engineering construction | |
CN104392300A (en) | Engineering remote integrated management system | |
CN106557893A (en) | A kind of acidifying profile control measures operation " 5S " quality control system | |
Mishenin et al. | Conceptually-innovative directions and organizational mechanism for providing the environmental and economic safety of agrarian nature management | |
Moon et al. | Effect of pay satisfaction on organizational commitment: Mediating effect of organizational trust | |
Gass et al. | An Evaluation of Policy Related Research: Reviews and Critical Discussions of Policy-related Research in the Field of Police Protection | |
Flesher et al. | The missing link in mining-company productivity: People | |
BURAK et al. | The Effect of Organizational Development Interventions on Organizations | |
Villani et al. | Statistical process control applied to intensity modulated radiotherapy pretreatment controls with portal dosimetry | |
Yuhua et al. | The Role of Block Chain Technology Adoption on the Budget Performance Management: Moderating Role of Institutional Support | |
Schaefer | A METHOD FOR ECONOMIC COMPARISON OF EXISTING AND PROPOSED AIRCRAFT | |
Tyzik et al. | Improving the Management of Nationwide Drug and IV Bag Shortages | |
Ivanov et al. | Lunar basin ejecta as the sources of materials within the Luna-Glob landing zone | |
Althaqafi et al. | Integrating Occupational Health and Safety Systems into a Project Management System | |
Yue et al. | Advantages of a Centralized Thyroid Cancer Database for Effective Transitioning of Care from Treatment to Survivorship | |
Rizzato | Nanosized Cancer Polymarker Biochip: Project Management | |
Van Tonder et al. | Of mining accidents and sense-making; traversing well-trodden ground | |
Chu et al. | Volunteers' Service Network in Nonprofit Institutions: A Case Study of Tzu Chi | |
McClenahan et al. | Three Pillars of change–A qualitative governance model to safer inpatient antenatal and postnatal care in a tertiary Sydney hospital | |
Panditha | Contributions of ISO 14001 standard system for improvements in Green suppy chain management: case study of a biscuits manufacturing company | |
Yermagambetov et al. | The role of staff in introducing GMP requirements for the pharmaceutical industry | |
Sidorov et al. | Economic Techniques of Occupational Health and Safety Management | |
Dura et al. | Dima, IC; Vokorokosova, R.; Pachura, P.; Sandu, M.-Integration | |
Korzh | OPERATIONAL MANAGEMENT OF PERSONNEL IN THE AGRICULTURAL COMPLEX | |
Agliardi et al. | DSGSD to rockslide transition at the Saline ridge (Valfurva, Italy) constrained by dating, remote sensing and time-dependent modelling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170405 |