CN111553633A - Engineering cost management system and method - Google Patents

Engineering cost management system and method Download PDF

Info

Publication number
CN111553633A
CN111553633A CN202010336034.3A CN202010336034A CN111553633A CN 111553633 A CN111553633 A CN 111553633A CN 202010336034 A CN202010336034 A CN 202010336034A CN 111553633 A CN111553633 A CN 111553633A
Authority
CN
China
Prior art keywords
module
unit
project
construction
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010336034.3A
Other languages
Chinese (zh)
Inventor
蒿保玉
张凯
李立
高印成
侯涛
张磊
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daxin Construction Development Co ltd
Original Assignee
Daxin Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daxin Construction Development Co ltd filed Critical Daxin Construction Development Co ltd
Priority to CN202010336034.3A priority Critical patent/CN111553633A/en
Publication of CN111553633A publication Critical patent/CN111553633A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors

Abstract

The invention discloses a project cost management system, which comprises a management platform, a construction unit terminal, a design unit terminal and a construction unit terminal, wherein the management platform comprises a mode selection module, a sequencing module, an information input module, a central processing module, an information output module, a display module and an information extraction module; the user can carry out accounting in different modes on the construction cost according to the actual condition of the project, and the accounting on the construction cost is more accurate and convenient.

Description

Engineering cost management system and method
Technical Field
The invention relates to the technical field of management systems, in particular to a project cost management system and a project cost management method.
Background
The direct meaning of the construction cost refers to the construction price of the project, the three elements of the construction cost include quantity, price and expense, in a broad sense, the construction cost covers the construction cost (civil engineering major and installation major), road construction cost, water transportation construction cost, railway construction cost, water conservancy construction cost, electric power construction cost, communication construction cost, aerospace construction cost and the like, the construction cost refers to the whole cost spent on certain project construction, the core contents of the construction cost are investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, construction settlement, completion settlement and the like, the main task of the construction cost is to calculate the direct cost (manpower, materials and equipment), enterprise management cost, measure cost, standard cost, profit, tax and the like contained in the project according to drawings, fixed amount and list specifications, in the calculation and statistics process of the construction cost, a large amount of data needs to be counted, the workload is large, and the work is complicated, so that an office system such as ERP (enterprise resource planning) or other customized management systems are usually adopted to assist cost workers in managing various data information for construction cost.
Chinese patent application publication No. CN109064024A discloses a method and system for dynamically managing construction cost in the whole process of a project, which specifically discloses that a cloud server obtains a real-time update list and reads a construction cost list stored in the cloud server, wherein both the update list and the construction cost list store item names and item prices, if the update list and the construction cost list are judged to have the same item name, the item prices of the construction cost list are updated, and if the item prices of the construction cost list are updated, the updated construction cost list is stored in the cloud server.
Although the above patent can achieve the effect of generating new budget and evaluation reports according to the changed land, equipment, technical labor and the price of contractors, the above patent only collects and counts the data of the updated data, does not evaluate the construction mode of the project, and further results in inaccurate evaluation results and fails to meet the evaluation requirements of the construction cost.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a project cost management system and a project cost management method, which are used for solving the problem that the evaluation result is not accurate enough due to the fact that the prior art only collects and counts data of updated data.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides an engineering cost management system, includes management platform, construction unit terminal, design unit terminal and construction unit terminal are respectively through wired or wireless and management platform communication connection, the management platform includes mode selection module, sequencing module, information input module, central processing module, information output module, display module and information extraction module, mode selection module and information input module communication connection, information input module and central processing module communication connection for transmit current mode state information to central processing module through information input module and store, the sequencing module is respectively through wired or wireless and construction unit terminal, design unit terminal and construction unit terminal communication connection, is used for building unit terminal, construction unit terminal, Design unit terminal and construction unit terminal input's relevant engineering cost data are sequenced, the sequencing module still with information input module communication connection, information input module and central processing module communication connection for transmit relevant engineering cost data to central processing module through information input module and classify and add the processing, and generate the cost list, information output module and central processing module communication connection, information output module still with display module communication connection for transmit the cost list to display module through information output module and show, information extraction module and central processing module communication connection for extract the cost list on central processing module.
Through the technical scheme, the construction unit terminal, the design unit terminal and the construction unit terminal transmit the related engineering cost data to the management platform, the transmitted related engineering cost data are sequenced through the sequencing module during transmission, the later query of a user is facilitated, the user defines the construction mode of the engineering through the mode selection module, the current pricing model formula is adopted to carry out the accounting on the engineering cost, the central processing module carries out classified summation processing and generates the cost list, the cost list is transmitted to the display module to be displayed, so that the user can carry out different modes of accounting on the engineering cost according to the actual condition of the engineering, and the accounting on the engineering cost is more accurate and convenient.
The invention is further configured to: and the construction unit terminal, the design unit terminal and the construction unit terminal are in communication connection with the management platform through wireless transmission modules respectively.
Through the technical scheme, the construction unit terminal, the design unit terminal and the construction unit terminal are connected with the management platform through the wireless transmission module, so that the complex use of a transmission line is avoided, and the occupied space is saved.
The invention is further configured to: the mode selection module comprises an emergency processing unit, a normal processing unit and a delay processing unit, the emergency processing unit is used for prompting emergency processing of the project duration, the normal processing unit is used for prompting normal processing of the project duration, and the delay processing unit is used for prompting delay processing of the project duration.
Through the technical scheme, when the construction unit, the design unit and the construction unit negotiate the completion progress of the project, the completion progress of the project is controlled by selecting urgent, normal or delayed in the mode selection module, and the progress of the project construction period is prevented from being influenced by unsmooth communication among the construction unit, the design unit and the construction unit in the subsequent construction process.
The invention is further configured to: the sorting module comprises a date sorting unit, a data capacity sorting unit and a spending amount sorting unit, wherein the date sorting unit is used for sorting according to the issue date of the data, the data capacity sorting unit is used for sorting according to the size of the data capacity, and the spending amount sorting unit is used for sorting according to the total amount displayed on the data.
Through the technical scheme, according to the date sorting unit, the data capacity sorting unit and the amount spending unit in the sorting module, a user can sort the files according to the front and back of the issue date, the size of the data capacity and the amount of the amount spending, so that the required files can be quickly found.
The invention is further configured to: the management platform further comprises a verification module, the verification module is in communication connection with the information input module and used for verifying entering of the management platform, the verification module comprises a password identification unit, a fingerprint identification unit and a face identification unit, the password identification unit is used for manually inputting of the password identification entering of the management platform, the fingerprint identification unit is used for verifying entering of the management platform according to fingerprint information, and the face identification unit is used for verifying entering of the management platform according to face information.
Through the technical scheme, when a user logs in, the user can enter the management platform through any one of the password identification unit, the fingerprint identification unit and the face identification unit in the verification module for verification, so that the illegal user is prevented from entering the management platform to steal information; the three are used for verification at the same time, so that the use safety of the management platform is further improved.
The invention is further configured to: the management platform further comprises a progress overall planning module and an inventory statistics module, the progress overall planning module is in communication connection with the inventory statistics module respectively and is in communication connection with the information input module, the progress overall planning module is used for transmitting current engineering progress information to the central processing module through the information input module and generating an engineering progress report, and the inventory module is used for transmitting inventory condition information of current materials to the central processing module through the information input module and performing accounting on the average of the inventory materials to generate a floating inventory list.
Through the technical scheme, transmit current engineering progress information to central processing module through progress overall planning module, produce engineering progress statement simultaneously, make statistics of the inventory information of current material through the inventory module, and transmit to central processing module, produce unsteady inventory list, engineering progress statement and unsteady inventory list show through display module, therefore, the user is according to engineering progress statement and unsteady inventory list, can be more clear assess current construction progress and the influence of inventory condition to engineering cost, with adjusting engineering cost parameter, so that the assessment result is more accurate.
The invention is further configured to: the management platform still includes engineering change management module, engineering change management module and information input module communication connection for transmit engineering change information to central processing module through the information input module and store, engineering change management module includes engineering change application unit and engineering change auditing unit, engineering change application unit and engineering change auditing unit communication connection, engineering change application unit is used for applying for the engineering change, engineering change auditing unit is used for carrying out engineering change approval according to engineering change application.
Through the technical scheme, when a user changes a project, such as material equipment required by the change of the project, construction personnel required by the change of the project, management personnel required by the change of the project and the like, all the materials can be applied through the project change application unit in the project change management module, and then the project change auditing unit carries out corresponding change approval according to the application information in the project change application unit, so that the project cost of the whole project is not influenced by any one of a construction unit, a design unit and a construction unit due to the fact that information is not communicated in time when the material equipment, the construction personnel or the management personnel are changed in the project.
The invention is further configured to: the management platform further comprises an engineering progress reminding module, the engineering progress reminding module is in communication connection with the information input module and used for reminding the progress condition of the current engineering in real time, the engineering progress reminding module comprises a current progress acquisition unit, an ideal progress setting unit, a comparison unit and an alarm unit, the current progress acquisition unit and the ideal progress setting unit are in communication connection with the comparison unit respectively, the comparison unit is in communication connection with the alarm unit, the current progress acquisition unit is used for acquiring the current construction progress of the engineering in real time, the ideal progress setting unit is used for setting the construction progress under the ideal condition, the comparison unit is used for comparing the current construction progress and the ideal construction progress, and the alarm unit is used for giving an alarm according to the comparison result of the comparison unit.
Through the technical scheme, the construction progress under the ideal condition is set in the ideal progress setting unit, and the ideal construction progress of setting is transmitted to the comparison unit, the current construction progress of project is collected in real time by the current progress collection unit, and the current construction progress of collection is transmitted to the comparison unit, the comparison unit is compared according to the current construction progress and the ideal construction progress, and give an alarm according to the corresponding control alarm unit of comparison result, therefore, the construction progress condition of a construction unit is reminded, and the construction strategy is changed according to the corresponding change of the current construction progress condition, so as to avoid influencing the construction progress of the whole project.
The invention is further configured to: the management platform further comprises a printing module, and the printing module is in communication connection with the central processing module and is used for printing the project cost data file.
Through the technical scheme, the manufacturing cost list, the project progress report form, the floating inventory list and the like in the central processing module can be printed through the printing module, so that a user can conveniently check the manufacturing cost list, the project progress report form, the floating inventory list and the like.
The invention also provides a project cost management method, which adopts the project management system and is characterized by comprising the following steps:
step S1: importing the relevant construction cost data into a central processing module of the management platform through a construction unit terminal, a design unit terminal and a construction unit terminal;
step S2: the central processing module receives information related to the construction cost data and generates a construction cost list;
step S3: the central processing module transmits the project cost list to the display module for display through the information output module.
Through the technical scheme, the construction unit terminal, the design unit terminal and the construction unit terminal transmit the related engineering cost data to the management platform, the transmitted related engineering cost data are sequenced through the sequencing module during transmission, the later query of a user is facilitated, the user defines the construction mode of the engineering through the mode selection module, the current pricing model formula is adopted to carry out the accounting on the engineering cost, the central processing module carries out classified summation processing and generates the cost list, the cost list is transmitted to the display module to be displayed, so that the user can carry out different modes of accounting on the engineering cost according to the actual condition of the engineering, and the accounting on the engineering cost is more accurate and convenient.
In conclusion, the invention has the following beneficial effects:
(1) the construction cost data are transmitted to the management platform through the construction unit terminal, the design unit terminal and the construction unit terminal, during transmission, the transmitted construction cost data are sequenced through the sequencing module, the later query of a user is facilitated, the user defines the construction mode of a project through the mode selection module, the construction cost is accounted by adopting a current pricing model formula, the central processing module performs classified summation processing and generates a cost list, and the cost list is transmitted to the display module to be displayed, so that the user can perform different modes of accounting on the construction cost according to the actual condition of the project, and the accounting on the construction cost is more accurate and convenient;
(2) when the construction unit, the design unit and the construction unit negotiate the completion progress of the project, the completion progress of the project is controlled by selecting urgent, normal or delayed in the mode selection module, so that the progress of the project construction period is prevented from being influenced by unsmooth communication among the construction unit, the design unit and the construction unit in the subsequent construction process;
(3) the method comprises the steps that current engineering progress information is transmitted to a central processing module through a progress planning module, an engineering progress report is generated at the same time, inventory information of current materials is counted through an inventory module and is transmitted to the central processing module, a floating inventory list is generated, and the engineering progress report and the floating inventory list are displayed through a display module, so that a user can more clearly evaluate the influence of the current construction progress and inventory conditions on engineering cost according to the engineering progress report and the floating inventory list, and engineering cost parameters are adjusted to enable an evaluation result to be more accurate;
(4) the construction progress under the ideal condition is set in the ideal progress setting unit, the set ideal construction progress is transmitted to the comparison unit, the current construction progress of the project is collected in real time by the current progress collection unit, the collected current construction progress is transmitted to the comparison unit, the comparison unit is compared according to the current construction progress and the ideal construction progress, the alarm is given according to the corresponding control alarm unit of the comparison result, therefore, the construction progress condition of the construction unit is reminded, the construction strategy is changed according to the corresponding change of the current construction progress condition, and the construction progress of the whole project is prevented from being influenced.
Drawings
FIG. 1 is a schematic overall frame diagram of example 1 of the present invention;
FIG. 2 is a block diagram of a mode selection module according to the present invention;
FIG. 3 is a block diagram of a module framework of the sequencing module of the present invention;
FIG. 4 is a block diagram of a module framework of the verification module of the present invention;
FIG. 5 is a schematic diagram of a connection framework between the progress orchestration module and the inventory statistics module according to the present invention;
FIG. 6 is a block diagram of an engineering change management module according to the present invention;
FIG. 7 is a block diagram of a module framework of the project progress reminder module of the present invention;
FIG. 8 is a schematic view of a connection frame of a print module of the present invention;
FIG. 9 is a flow chart of a method of the present invention.
Reference numerals: 1. a management platform; 11. a mode selection module; 111. an emergency processing unit; 112. a normal processing unit; 113. a suspension processing unit; 12. a sorting module; 121. a date sorting unit; 122. a data capacity sorting unit; 123. a spending amount sorting unit; 13. an information input module; 14. a central processing module; 15. an information output module; 16. a display module; 17. an information extraction module; 18. a verification module; 181. a password identification unit; 182. a fingerprint recognition unit; 183. a face recognition unit; 19. a progress overall module; 20. an inventory statistics module; 21. an engineering change management module; 211. an engineering change application unit; 212. a project change auditing unit; 22. a project progress reminding module; 221. a current progress acquisition unit; 222. an ideal progress setting unit; 223. a comparison unit; 224. an alarm unit; 23. a printing module; 3. building a unit terminal; 4. designing a unit terminal; 5. a construction unit terminal; 6. and a wireless transmission module.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings.
Example 1
Referring to fig. 1, as shown in the figure, the engineering cost management system of the present invention includes a management platform 1, a construction unit terminal 3, a design unit terminal 4 and a construction unit terminal 5, specifically, the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5 are respectively connected to the management platform 1 in a wired communication manner or a wireless communication manner, and preferably, in this embodiment, the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5 are respectively connected to the management platform 1 in a communication manner through a wireless transmission module 6.
If the completion progress of the project is different, the labor cost and the material cost required by the project are different, so that the construction cost can be calculated by adopting the current project pricing model formula aiming at different completion progresses of the project.
More specifically, the management platform 1 comprises a mode selection module 11, a sorting module 12, an information input module 13, a central processing module 14, an information output module 15, a display module 16 and an information extraction module 17, wherein the mode selection module 11 is in communication connection with the information input module 13 and is used for inputting current mode state information, the sorting module 12 is in communication connection with the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5 through a wireless transmission module 6 respectively and is used for sorting the construction cost information input by the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5, the sorting module 12 is also in communication connection with the information input module 13 and is used for sequentially transmitting the sorted construction cost information to the information input module 13 according to the sequence, and the information input module 13 is in communication connection with the central processing module 14, the price information processing module is used for transmitting the price information to the central processing module 14 for classification and summation processing and generating a price list, the central processing module 14 is in communication connection with the information output module 15 and is used for transmitting the price list to the information output module 15, the information output module 15 is in communication connection with the display module 16 and is used for displaying the price list through the display module 16, and the information extraction module 17 is in communication connection with the central processing module 14 and is used for extracting the price list on the central processing module 14 through the information extraction module 17, for example, downloading.
Referring to fig. 2, in the present embodiment, preferably, the mode selection module 11 includes an urgent processing unit 111, a normal processing unit 112 and a delay processing unit 113, specifically, the urgent processing unit 111 is used for prompting urgent processing of the project duration, the normal processing unit 112 is used for prompting normal processing of the project duration, and the delay processing unit 113 is used for prompting delay processing of the project duration, so that when the construction unit, the design unit and the construction unit negotiate the project completion progress, the completion progress of the project is controlled by selecting urgent, normal or delay in the mode selection module 11, and in the subsequent construction process, the construction unit, the design unit and the construction unit are prevented from being unsmooth to communicate with each other and influence the progress of the project duration.
Referring to fig. 3, preferably, in the embodiment, the sorting module 12 includes a date sorting unit 121, a data capacity sorting unit 122, and a spent amount sorting unit 123, specifically, the date sorting unit 121 is configured to sort according to the issue date of the data, the specific sorting manner may be from front to back or from back to front, so as to facilitate a user to quickly find the data file according to the issue date of the data, the data capacity sorting unit 122 is configured to sort according to the capacity size of the data, the specific sorting manner may be from large to small or from small to large, so as to facilitate the user to quickly find the data file with more information or less information according to the capacity size of the data, the spent amount sorting unit 123 is configured to sort according to the total amount displayed on the data, the specific sorting manner may be from large to small, the number of the data files can be reduced from small to large, so that a user can conveniently and quickly find the data files with more or less spending numbers according to the spending numbers, and accordingly, the user can conveniently and quickly find the required data files according to self definition.
Referring to fig. 4, in the present embodiment, preferably, the management platform 1 further includes an authentication module 18, the authentication module 18 is in communication connection with the information input module 13 for authenticating entering the management platform 1, specifically, the authentication module 18 includes a password identification unit 181, a fingerprint identification unit 182, and a face identification unit 183, the password identification unit 181 is used for manually inputting a password for identifying entering the management platform 1, the fingerprint identification unit 182 stores fingerprint information of a legal user, that is, the fingerprint information is identified by the fingerprint identification unit 182 to enter the management platform 1, the face identification unit 183 stores face information of the legal user, that is, the face identification unit 183 identifies the face information to enter the management platform 1, so that when a user logs in, the management platform 1 can be entered by any one of password identification, fingerprint identification, and face identification, in order to prevent an illegal user from entering the management platform 1 to steal information, it is needless to say that in order to further improve the safety of the management platform 1, the user may enter the management platform 1 through the authentication parties of the password identification unit 181, the fingerprint identification unit 182, and the face identification unit 183 when logging in, which is not limited by the present invention.
During specific implementation, construction cost data of the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5 are transmitted to the sorting module 12 through the wireless transmission module 6, the transmitted data are sorted according to self definition through the sorting module 12, wherein a user can quickly find out a required data file in the transmitted data according to the self definition in the sorting module 12 so as to be convenient for the user to check, the sorted data are transmitted to the central processing module 14 through the information input module 13 to be classified and summed, a cost list is generated, and the cost list is transmitted to the display module 16 through the information output module 15 to be displayed so as to be convenient for the user to check.
Therefore, the user inputs the completion progress of the project through the mode selection module 11, the central processing module 14 is used for inputting completion progress information of the project and cost data information through the information input module 13, the model formula of the current pricing mode is adopted for accounting the construction cost, and a cost list is generated, so that the user can perform different modes of accounting on the construction cost according to the actual condition of the project, and the construction cost of the project is more accurate and convenient.
Example 2
Referring to fig. 5, as shown in the figure, in another embodiment of the present invention, in an actual project construction process, both an actual construction progress and an existing inventory condition may affect a construction cost of an entire project, so the present embodiment is different from the previous embodiment in that the management platform 1 further includes a progress orchestration module 19 and an inventory statistics module 20, specifically, the progress orchestration module 19 and the inventory statistics module 20 are respectively connected to the information input module 13 in a communication manner, the progress orchestration module 19 is configured to input current project progress information, transmit the current project progress information to the central processing module 14 through the information input module 13, generate a project progress report, transmit the project progress report to the display module 16 through the information output module 15, and the inventory statistics module 20 is configured to count inventory information of current materials, and, the inventory information of the present material is transmitted to the central processing module 14 through the information input module 13 to average the inventory material, and the floating inventory list is generated, and the floating inventory list is transmitted to the display module 16 through the information output module 15 to be displayed, so that the user can more clearly evaluate the influence of the present construction progress and inventory condition on the construction cost according to the project progress report and the floating inventory list, and adjust the construction cost parameter, and further more accurately evaluate the construction cost.
Example 3
Referring to fig. 6, as shown in the drawings, as another embodiment of the present invention, in an actual engineering construction process, a change of an engineering will also affect the construction cost of the whole engineering, so the difference between this embodiment and the previous embodiment is that the management platform 1 further includes an engineering change management module 21, specifically, the engineering change management module 21 is in communication connection with the information input module 13 for changing the engineering information according to the actual requirement, more specifically, the engineering change management module 21 includes an engineering change application unit 211 and an engineering change auditing unit 212, the engineering change application unit 211 is in communication connection with the engineering change auditing unit 212, the engineering change application unit 211 is used for applying for engineering change, the engineering change auditing unit 212 is used for performing an engineering change approval according to the engineering change application, that is, when a user wants to change the engineering, for example, material equipment required for changing a project, construction personnel required for changing the project, management personnel required for changing the project, and the like all need to be applied through the project change application unit 211 in the project change management module 21, and then the project change auditing unit 212 performs corresponding change approval according to application information in the project change application unit 211, so as to avoid that any one of the construction unit, the design unit, and the construction unit affects the construction cost of the whole project due to the fact that information communication is not in time when the material equipment, the construction personnel, or the management personnel are changed.
Example 4
Referring to fig. 7, as shown in the figure, as another embodiment of the present invention, the present embodiment is different from the previous embodiment in that the management platform 1 further includes a project progress reminding module 22, the project progress reminding module 22 is in communication connection with the central processing module 14 and is used for reminding the progress of the current project in real time, specifically, the project progress reminding module 22 includes a current progress collecting unit 221, an ideal progress setting unit 222, a comparison unit 223 and an alarm unit 224, the current progress collecting unit 221 is in communication connection with the comparison unit 223 and is used for collecting the current construction progress in real time and transmitting the current construction progress information to the comparison unit 223, the ideal progress setting unit 222 is in communication connection with the comparison unit 223 and is used for inputting the construction progress in an ideal situation and transmitting the construction progress in an ideal situation to the comparison unit 223, alarm unit 224 and comparison unit 223 communication connection for compare the result of comparison of current construction progress and ideal construction progress and send out the police dispatch newspaper according to comparison unit 223, it is preferred, be provided with red signal lamp, yellow signal lamp and green signal lamp on alarm unit 224.
In specific implementation, the ideal progress setting unit 222 sets the construction progress under the ideal condition and transmits the set ideal construction progress to the comparison unit 223, the current progress acquisition unit 221 acquires the current construction progress of the project in real time and transmits the acquired current construction progress to the comparison unit 223, the comparison unit 223 compares the current construction progress with the ideal construction progress, the comparison unit 223 broadcasts the comparison information through the alarm unit 224 after the comparison is completed, for example, if the current construction progress is less than the ideal construction progress, a red signal lamp on the alarm unit 224 lights up to indicate the current construction delay, if the current construction progress is equal to the ideal construction progress, a yellow signal lamp on the alarm unit 224 lights up to indicate the current construction is normal, and if the current construction progress is greater than the ideal construction progress, a green signal lamp on the alarm unit 224 lights up, indicating the current construction advance; therefore, the construction condition of the construction unit is reminded in real time through the project progress reminding module 22, and the construction strategy is changed according to the current construction condition.
Example 5
Referring to fig. 8, as shown in the drawing, the embodiment of the present invention is different from the previous embodiment in that the management platform 1 further includes a printing module 23, specifically, the printing module 23 is in communication connection with the central processing module 14 and is used for printing the project cost data file, that is, the printing module 23 can be used for printing the project cost list generated by the central processing module 14, and is convenient and practical.
Example 6
Referring to fig. 9, as shown in the drawings, the present invention further provides a construction cost management method, which is implemented by using the construction cost management system, specifically, the construction cost management method includes: step S1: the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5 are used for importing the relevant construction cost data into the central processing module 14 of the management platform 1; step S2: the central processing module 14 receives the information of the construction cost data and generates a construction cost list; step S3: the central processing module 14 transmits the project cost list to the display module 16 through the information output module 15 for displaying.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the invention may occur to those skilled in the art without departing from the principle of the invention, and are considered to be within the scope of the invention.

Claims (10)

1. A project cost management system comprises a management platform (1), a construction unit terminal (3), a design unit terminal (4) and a construction unit terminal (5), wherein the construction unit terminal (3), the design unit terminal (4) and the construction unit terminal (5) are respectively in communication connection with the management platform (1) through wires or wirelessly, and the project cost management system is characterized in that the management platform (1) comprises a mode selection module (11), a sorting module (12), an information input module (13), a central processing module (14), an information output module (15), a display module (16) and an information extraction module (17), the mode selection module (11) is in communication connection with the information input module (13), the information input module (13) is in communication connection with the central processing module (14) and is used for transmitting current mode state information to the central processing module (14) through the information input module (13) for storage, the sorting module (12) is in communication connection with the construction unit terminal (3), the design unit terminal (4) and the construction unit terminal (5) through wires or wireless respectively, is used for sorting relevant construction cost data input by the construction unit terminal (3), the design unit terminal (4) and the construction unit terminal (5), the sorting module (12) is also in communication connection with the information input module (13), the information input module (13) is in communication connection with the central processing module (14), and is used for transmitting the relevant construction cost data to the central processing module (14) through the information input module (13) for classification and summation processing and generating a cost list, the information output module (15) is in communication connection with the central processing module (14), the information output module (15) is also in communication connection with the display module (16) and is used for transmitting the cost list to the display module (16) through the information output module (15) for display, the information extraction module (17) is in communication connection with the central processing module (14) and is used for extracting the cost list from the central processing module (14).
2. The project cost management system according to claim 1, wherein the construction unit terminal (3), the design unit terminal (4) and the construction unit terminal (5) are respectively connected with the management platform (1) through a wireless transmission module (6) in a communication way.
3. The project cost management system according to claim 1, wherein the mode selection module (11) comprises an urgent processing unit (111), a normal processing unit (112) and a postponement processing unit (113), the urgent processing unit (111) is used for prompting urgent processing in the project period, the normal processing unit (112) is used for prompting normal processing in the project period, and the postponement processing unit (113) is used for prompting postponement processing in the project period.
4. The project cost management system according to claim 1, wherein the sorting module (12) comprises a date sorting unit (121), a material capacity sorting unit (122) and a spending amount sorting unit (123), the date sorting unit (121) is used for sorting according to the issue date of the material, the material capacity sorting unit (122) is used for sorting according to the size of the material capacity, and the spending amount sorting unit (123) is used for sorting according to the total amount displayed on the material.
5. The project cost management system according to claim 1, wherein the management platform (1) further comprises a verification module (18), the verification module (18) is communicatively connected with the information input module (13) for verifying access to the management platform (1), the verification module (18) comprises a password identification unit (181), a fingerprint identification unit (182) and a face identification unit (183), the password identification unit (181) is used for manually inputting a password for recognizing access to the management platform (1), the fingerprint identification unit (182) is used for verifying access to the management platform (1) according to fingerprint information, and the face identification unit (183) is used for verifying access to the management platform (1) according to face information.
6. The project cost management system according to claim 1, wherein the management platform (1) further comprises a progress orchestration module (19) and an inventory statistics module (20), the progress orchestration module (19) and the inventory statistics module (20) are respectively connected with the information input module (13) in a communication manner, the progress orchestration module (19) is used for transmitting the current project progress information to the central processing module (14) through the information input module (13) and generating a project progress report, and the inventory module (20) is used for transmitting the inventory condition information of the current materials to the central processing module (14) through the information input module (13) and calculating the average of the inventory materials to generate a floating inventory.
7. The project cost management system according to claim 1, wherein the management platform (1) further comprises a project change management module (21), the project change management module (21) is in communication connection with the information input module (13) and is used for transmitting project change information to the central processing module (14) through the information input module (13) for storage, the project change management module (21) comprises a project change application unit (211) and a project change auditing unit (212), the project change application unit (211) is in communication connection with the project change auditing unit (212), the project change application unit (211) is used for applying for project change, and the project change auditing unit (212) is used for applying for project change approval according to project change application.
8. The project cost management system according to claim 1, wherein the management platform (1) further comprises a project progress reminding module (22), the project progress reminding module (22) is in communication connection with the information input module (13) and is used for reminding the progress condition of the current project in real time, the project progress reminding module (22) comprises a current progress acquisition unit (221), an ideal progress setting unit (222), a comparison unit (223) and an alarm unit (224), the current progress acquisition unit (221) and the ideal progress setting unit (222) are respectively in communication connection with the comparison unit (223), the comparison unit (223) is in communication connection with the alarm unit (224), the current progress acquisition unit (221) is used for acquiring the current construction progress of the project in real time, the ideal progress setting unit (222) is used for setting the construction progress under the ideal condition, the comparison unit (223) is used for comparing the current construction progress with the ideal construction progress, and the alarm unit (224) is used for giving an alarm according to the comparison result of the comparison unit (223).
9. The project cost management system according to claim 1, wherein the management platform (1) further comprises a printing module (23), the printing module (23) being communicatively connected to the central processing module (14) for printing the project cost profile file.
10. A project cost management method using the project management system of any one of claims 1 to 9, characterized by comprising the steps of:
step S1: a central processing module (14) which leads the relevant construction cost data into the management platform (1) through a construction unit terminal (3), a design unit terminal (4) and a construction unit terminal (5);
step S2: the central processing module (14) receives the information of the relevant construction cost data and generates a construction cost list;
step S3: the central processing module (14) transmits the project cost list to the display module (16) for display through the information output module (15).
CN202010336034.3A 2020-04-25 2020-04-25 Engineering cost management system and method Pending CN111553633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010336034.3A CN111553633A (en) 2020-04-25 2020-04-25 Engineering cost management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010336034.3A CN111553633A (en) 2020-04-25 2020-04-25 Engineering cost management system and method

Publications (1)

Publication Number Publication Date
CN111553633A true CN111553633A (en) 2020-08-18

Family

ID=72003978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010336034.3A Pending CN111553633A (en) 2020-04-25 2020-04-25 Engineering cost management system and method

Country Status (1)

Country Link
CN (1) CN111553633A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112035539A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Power distribution network engineering cost compiling and auditing application system
CN112085523A (en) * 2020-08-26 2020-12-15 河南祥辰工程管理有限公司 BIM engineering information management method and system
CN112288236A (en) * 2020-10-10 2021-01-29 河南方元建筑工程有限公司 Safety protection standardized construction system and method based on BIM technology
CN112734384A (en) * 2021-01-13 2021-04-30 广东普信项目管理有限公司 Engineering cost management method and device, computer equipment and storage medium

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206363377U (en) * 2016-12-30 2017-07-28 江苏苏科建设项目管理有限公司 A kind of engineering progress management system
CN107403393A (en) * 2017-01-04 2017-11-28 辽东学院 A kind of construction costs listing service system based on technology of Internet of things
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
CN108921508A (en) * 2018-06-23 2018-11-30 广东人信工程咨询有限公司 Overall process Engineering Cost Management system
CN109064024A (en) * 2018-08-02 2018-12-21 广东展诚工程咨询有限公司 A kind of engineering Whole Process Cost dynamic management approach and system
CN109241773A (en) * 2018-09-08 2019-01-18 中建精诚工程咨询有限公司 construction cost data management system
CN109657151A (en) * 2018-12-25 2019-04-19 华联世纪工程咨询股份有限公司 A kind of engineering material searching method and device using scene based on user
CN109697188A (en) * 2018-11-30 2019-04-30 广州菲达建筑咨询有限公司 Cost Data management method and system
CN110083632A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 A kind of project cost listing service system
CN110738458A (en) * 2019-09-07 2020-01-31 北京市建壮咨询有限公司 Engineering cost management system and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206363377U (en) * 2016-12-30 2017-07-28 江苏苏科建设项目管理有限公司 A kind of engineering progress management system
CN107403393A (en) * 2017-01-04 2017-11-28 辽东学院 A kind of construction costs listing service system based on technology of Internet of things
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
CN108921508A (en) * 2018-06-23 2018-11-30 广东人信工程咨询有限公司 Overall process Engineering Cost Management system
CN109064024A (en) * 2018-08-02 2018-12-21 广东展诚工程咨询有限公司 A kind of engineering Whole Process Cost dynamic management approach and system
CN109241773A (en) * 2018-09-08 2019-01-18 中建精诚工程咨询有限公司 construction cost data management system
CN109697188A (en) * 2018-11-30 2019-04-30 广州菲达建筑咨询有限公司 Cost Data management method and system
CN109657151A (en) * 2018-12-25 2019-04-19 华联世纪工程咨询股份有限公司 A kind of engineering material searching method and device using scene based on user
CN110083632A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 A kind of project cost listing service system
CN110738458A (en) * 2019-09-07 2020-01-31 北京市建壮咨询有限公司 Engineering cost management system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112035539A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Power distribution network engineering cost compiling and auditing application system
CN112085523A (en) * 2020-08-26 2020-12-15 河南祥辰工程管理有限公司 BIM engineering information management method and system
CN112288236A (en) * 2020-10-10 2021-01-29 河南方元建筑工程有限公司 Safety protection standardized construction system and method based on BIM technology
CN112734384A (en) * 2021-01-13 2021-04-30 广东普信项目管理有限公司 Engineering cost management method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN111553633A (en) Engineering cost management system and method
CN108009758B (en) BIM-based intelligent management method for field construction materials
CN110991875B (en) Platform user quality evaluation system
CN109800250B (en) System architecture for no longer configuring enterprise central server
CN105894359A (en) Order pushing method, device and system
CN101465059B (en) Early-warning system for inspecting and judging urban road traffic safety situation
CN104200341A (en) Metering monitoring management system and implementation method thereof
CN109583806A (en) A kind of vehicle scheduling pickup method and system based on after single weight under adjustment
CN110570113A (en) Work order processing method and system
CN110738458A (en) Engineering cost management system and method
CN105574666A (en) Method and device for evaluating credit level of enterprise based on key data modeling
CN113516313A (en) Gas anomaly detection method based on user portrait
CN111626788A (en) Engineering cost management system
CN115239301A (en) PDCA construction site inspection safety management system based on big data
Júnior et al. Modelling for performance measurement of bus rapid transit systems in Brazil
CN116128413B (en) Intelligent warehouse material statistics system based on Bluetooth communication
KR102353958B1 (en) Junkyard integrated management system
CN104504491A (en) Meter reading control method and system
CN110599245A (en) Engineering project cost data management system
CN114116756B (en) Engineering cost data correction system and method thereof
CN113706015B (en) Data collection system for enterprise asset arrangement based on block chain
CN110910008B (en) One-key cost accounting management system and management method for visual accounting flow
CN114897345A (en) Method and device for automatically generating index scores based on employee data
CN112085523A (en) BIM engineering information management method and system
CN113420960A (en) Method, system and storage medium for dispatching working personnel of highway toll station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination