CN110738458A - Engineering cost management system and method - Google Patents

Engineering cost management system and method Download PDF

Info

Publication number
CN110738458A
CN110738458A CN201910844982.5A CN201910844982A CN110738458A CN 110738458 A CN110738458 A CN 110738458A CN 201910844982 A CN201910844982 A CN 201910844982A CN 110738458 A CN110738458 A CN 110738458A
Authority
CN
China
Prior art keywords
module
cost
information
project
central processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910844982.5A
Other languages
Chinese (zh)
Inventor
翟雪丽
贾金硕
廖诗雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jian Zhuang Consulting Co Ltd
Original Assignee
Beijing Jian Zhuang Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jian Zhuang Consulting Co Ltd filed Critical Beijing Jian Zhuang Consulting Co Ltd
Priority to CN201910844982.5A priority Critical patent/CN110738458A/en
Publication of CN110738458A publication Critical patent/CN110738458A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an project cost management system and a method, belonging to the technical field of management systems, and the technical scheme is characterized by comprising a mode selection module, an information input module, a data acquisition module, a central processing module and a display module, wherein the mode selection module is used for inputting current pricing mode information, the information input module is used for inputting current project parameters, the data acquisition module is used for acquiring cost data, the central processing module is used for processing the cost data information according to the pricing mode information to generate a cost list and sending the cost list to the display module, and the display module is used for displaying and outputting the cost list.

Description

Engineering cost management system and method
Technical Field
The invention relates to the technical field of management systems, in particular to engineering cost management systems and methods.
Background
The project cost is characterized by comprising the following three elements of quantity, price and expense, wherein defines the project cost to cover the construction project cost (civil engineering and installation major), the highway project cost, the water transportation project cost, the railway project cost, the water conservancy project cost, the electric power project cost, the communication project cost, the aerospace project cost and the like.
The existing engineering cost management system can refer to a Chinese invention patent application document with application publication number CN108921508A, and discloses whole-process engineering cost management systems, which comprise a management platform, a construction unit terminal, a design unit terminal and a construction unit terminal, wherein the management platform comprises a database, a data transmission module, a calculation module and a report generation module, the construction unit terminal, the design unit terminal and the construction unit terminal are respectively connected with the data transmission module through a wired or wireless network to upload information to the database or receive information in the database, when the field condition is inconsistent with the design and the design needs to be changed, the construction unit terminal sends change request information, the design unit formulates design change information according to the change request information, the calculation module calls price information in the database according to the design change information to recalculate the engineering cost, and the report generation module regenerates an engineering cost report and sends the engineering cost report to the database, so that the accuracy of engineering cost calculation is improved.
The existing engineering cost management system only collects and counts project cost data, but does not evaluate the construction mode of engineering construction in the process of statistical calculation, so that the cost evaluation result is not accurate enough and the requirement of project cost evaluation cannot be met.
Disclosure of Invention
of the invention aims to provide project cost management systems, which can carry out accounting on project cost of projects in different modes according to actual conditions of the projects, and enable the project cost to be more accurate and convenient.
The invention aims to realize the technical scheme that the engineering cost management system comprises a mode selection module, an information input module, a data acquisition module, a central processing module and a display module, wherein the mode selection module is used for inputting current pricing mode information and sending the pricing mode information to the central processing module, the information input module is used for inputting current engineering parameters and sending the engineering parameter information to the data acquisition module, the data acquisition module is used for acquiring cost data according to the engineering parameter information sent by the information input module and sending the acquired cost data information to the central processing module, the central processing module is used for processing the cost data information according to the pricing mode information to generate a cost list and sending the cost list to the display module, and the display module is used for displaying and outputting the cost list.
By adopting the technical scheme, a worker inputs a pricing mode for project construction cost of the current project through the mode selection module, the central processing module is used for inputting current project parameters and construction cost data information acquired by the data acquisition module through the information input module, and the construction cost is checked by adopting a model formula of the current pricing mode so as to generate a construction cost list; therefore, the working personnel can carry out accounting in different modes on the project construction cost according to the actual condition of the project, and the construction cost of the project is more accurate and convenient.
The invention further comprises a change input module for inputting project change information and sending the project change information to the central processing module, the central processing module changing the cost list according to the project change information and sending the change information to the data acquisition module, the data acquisition module acquiring the cost data of the change item according to the change information and sending the acquired cost information of the change item to the central processing module, and the central processing module refreshing the cost list according to the cost information of the change item.
By adopting the technical scheme, design change or construction scheme change is often required in the process of engineering cost and project construction, and through the setting of the change item input module, a worker only needs to correct and refresh the generated cost list automatically through the change item input module and the corresponding change item, so that the work load of the worker is reduced, and the change operation is more convenient and faster.
The invention further includes a modification input module including an input unit for inputting engineering modification information and sending the engineering modification information to the central processing module, and a login verification unit for verifying the identity information of the login user and opening the input unit when the login user is a legal login user.
By adopting the technical scheme, the construction scheme of the project is changed, the production plan and the specific construction cost at the later stage of the project are directly influenced, and the project is specifically influenced; therefore, the authority for changing the project can be mastered by only a small part of personnel, and the identity information of the person who uses the input unit for changing the input is verified by the login verification unit, so that the authority of the login person is checked, and the stable operation of the project is further ensured.
The present invention further provides that the login authentication unit employs a face recognition unit storing a face image database of a legitimate login user, the face recognition unit recognizes a facial feature of the login user, and the input unit is turned on when the password authentication is passed and the facial feature of the login user matches a face image stored in the face image database of the face recognition unit.
By adopting the technical scheme, the login verification unit adopts the face recognition unit, and only after the face recognition unit passes through the face recognition, the input operation of the next steps can be performed on the input unit, so that the safety of the system operation is high.
The invention further comprises a short message sending module, wherein the short message sending module stores the information of the address list of the project accountant, when the central processing module receives the engineering change information, the central processing module sends a notification instruction to the short message sending module, and the short message sending module sends a change short message notification to the mobile phone number service terminal in the address list of the project accountant.
By adopting the technical scheme, through the arrangement of the short message sending module, when a designer or a manager carries out design change, the change notice is sent to the relevant responsible person through the short message sending module in time, and then the relevant responsible person can adjust the production plan in time.
The method further comprises a progress orchestration module for inputting the current project progress parameters and generating a project progress report according to the project progress parameters, wherein the progress orchestration module sends the project progress report to a display module, and the display module displays and outputs the project progress report.
Through adopting above-mentioned technical scheme, collect the engineering progress parameter through progress overall planning module in the project work progress, generate the engineering progress statement, and then make things convenient for the staff to know current engineering progress, and then the better engineering cost to steps down calculates the check.
The invention further comprises a stock counting module for counting the stock information of the current raw material and calculating the average of the stock raw material to generate a floating stock list, wherein the stock counting module sends the floating stock list to the display module, and the display module displays and outputs the floating stock list.
By adopting the technical scheme, the inventory information of the current raw materials is counted through the inventory counting module, the average of the raw materials in the inventory is checked, a floating inventory list is generated, and then the working personnel can know the current inventory condition conveniently, so that the working personnel can check the engineering cost more accurately.
The method is further , the central processing module calls the project progress report generated by the progress overall module and the floating inventory list generated by the inventory statistic module, the central processing module evaluates the stage inventory according to the project progress report and the floating inventory list, generates an evaluation report, sends the evaluation report to the display module, and the display module displays and outputs the evaluation report.
By adopting the technical scheme, the central processing module calls the project progress report generated by the progress planning module and the floating inventory list generated by the inventory counting module, and then evaluates the stage inventory according to the project progress report and the floating inventory list to generate an evaluation report, so that a worker can visually observe the time limit of the current inventory which can be maintained and used, further guide the project plan of steps, and conveniently and timely adjust the cost information.
The method is further that the data acquisition module captures the cost data in the set domain by using a web crawler tool, and the data acquisition module sends the captured cost data information to the central processing module.
Through adopting above-mentioned technical scheme, data acquisition module adopts the web crawler instrument to snatch the cost data that set up in the net field, and then can be high-efficient convenient carry out the update of collecting to the cost data, the sample scope of data, and the timeliness of information is good.
Another objective of the present invention is to provide engineering cost management methods, which can perform different accounting on the engineering cost of a project according to the actual situation of the project, so that the project cost is more accurate and convenient.
The invention is realized by the following technical scheme that engineering cost management methods are adopted, the information input module is used for inputting current engineering parameters, and the display module is used for obtaining a cost list.
By adopting the technical scheme, the staff only needs to input the current engineering parameters through the information input module, and then the cost list generated by the engineering cost management system is checked through the display module, so that the operation is convenient and quick.
In conclusion, the beneficial technical effects of the invention are as follows:
1. the method comprises the following steps that a worker inputs a pricing mode of a current project for project cost through a mode selection module, a central processing module is used for inputting current project parameters and cost data information acquired by a data acquisition module through an information input module, a model formula of the current pricing mode is adopted for accounting the project cost, and a cost list is generated; therefore, the working personnel can carry out accounting in different modes on the project construction cost according to the actual condition of the project, and the construction cost of the project is more accurate and convenient;
2. the staff only needs to pass through the corresponding change item through the change item input module, the change item input module comprises an input unit and a login verification unit, and the login verification unit verifies the identity information of the person who uses the input unit to change the input, so that the authority of the person who logs in is checked, and the stable operation of the project is further guaranteed;
3. the engineering progress is collected through the progress overall module, the inventory statistics module is used for counting the inventory, then a floating inventory list generated by the progress overall module and a floating inventory list generated by the inventory statistics module are called through the central processing module, the stage inventory is evaluated according to the engineering progress report and the floating inventory list, an evaluation report is generated, so that a worker can visually observe the time limit of the current inventory to be maintained and used, and then the engineering project plan of steps is guided, and the construction cost information is conveniently and timely adjusted.
Drawings
FIG. 1 is a functional block diagram of a project cost management system;
FIG. 2 is a functional block diagram of a change entry module.
In the figure, 1, a mode selection module; 2. an information input module; 3. a data acquisition module; 4. a central processing module; 5. a change item input module; 51. an input unit; 52. a login verification unit; 6. a display module; 7. a short message sending module; 8. a progress overall module; 9. and an inventory counting module.
Detailed Description
The present invention is further described in detail below with reference to the attached figures.
In the embodiment 1, engineering cost management systems, referring to fig. 1, include a mode selection module 1, an information input module 2, a data acquisition module 3, a central processing module 4 and a display module 6, in the engineering cost, different cost calculation modes are often adopted according to specific engineering conditions, if a project period needs to be urgently processed, the labor cost required by the engineering can be greatly increased, the selection range of corresponding material suppliers can be reduced in consideration of the influence of the project period, and further the raw material cost can float within a fixed range of .
Referring to fig. 1, the mode selection module 1 is configured to input current pricing mode information and send the pricing mode information to the central processing module 4, where the pricing modes are divided into three pricing modes, namely a delay mode, a normal mode and an urgent mode according to the size of the project scale and the distance of the completion date, and the model formulas for calculating labor costs and raw material costs of different pricing modes are different. The information input module 2 is used for inputting current engineering parameters and sending the information of the engineering parameters to the data acquisition module 3. The input information mainly comprises the types of materials and the use amount required by construction. The data acquisition module 3 acquires the cost data according to the engineering parameter information sent by the information input module 2, the data acquisition module 3 adopts a web crawler tool to grab the cost data in the set web domain, and the data acquisition module 3 sends the grabbed cost data information to the central processing module 4. The central processing module 4 processes the cost data information according to the pricing mode information to generate a cost list, and sends the cost list to the display module 6, and the display module 6 displays and outputs the cost list.
Referring to fig. 1, project construction is staged to perform staged construction, a construction plan and a construction progress in an earlier stage directly affect the construction cost in a later stage, in the construction process, a manager and a designer can adjust a design scheme and a construction scheme according to actual construction conditions, and further affect the whole construction cost scheme, the construction cost management system further comprises a change item input module 5 and a short message sending module 7, the change item input module 5 is used for inputting construction change information and sending the construction change information to a central processing module 4, the central processing module 4 changes a construction cost list according to the construction change information and sends the change information to a data acquisition module 3, the data acquisition module 3 acquires construction cost data of a change item according to the change information and sends the acquired change item construction cost information to the central processing module 4, the central processing module 4 refreshes the construction cost list according to the change item construction cost information, through the change item input module 5, when a project is changed, a worker only needs to update a corresponding change item through the change item input module 5, further automatically receives a work cost adjustment list through the change item adjustment by the central processing module 4, the work charge of the change item, the work list is sent to the central processing module 7, the work information is sent to the short message sending module 7, the work information is convenient for sending, the worker can send a short message sending notice to the work report to the project change item, the work information, the work list, the work information sent to the work list, the work information sent to the work management module 7, the work information sent to the work management module 7.
Referring to fig. 1 and 2, the change item input module 5 includes an input unit 51 and a login verification unit 52, and the input unit 51 is used to input engineering change information and transmit the engineering change information to the central processing module 4. The login authentication unit 52 is used to check the identity information of the login user, and when the login user is a legal login user, the input unit 51 is turned on. The login authentication unit 52 employs a face recognition unit that stores a face image database of a legitimate login person, and recognizes the facial features of the login person; when the password authentication is passed and the face feature of the login person coincides with the face image stored in the face image database of the face recognition unit, the input unit 51 is turned on. The engineering is changed, the construction progress and the cost are greatly influenced, and the authority of personnel logging in the change item input module 5 is verified in a face recognition mode, so that the operation safety of the change item input module 5 is improved.
In actual engineering construction, the existing stock condition and the actual construction progress will affect the overall engineering cost. The management system further comprises a progress orchestration module 8 and an inventory statistics module 9. The progress orchestration module 8 is used to input the current project progress parameters and generate a project progress report according to the project progress parameters. The progress overall planning module 8 sends the project progress report to the display module 6, and the display module 6 displays and outputs the project progress report. The inventory counting module 9 is used for counting the inventory information of the current raw materials, and performing average accounting on the inventory raw materials to generate a floating inventory; the inventory counting module 9 sends the floating inventory list to the display module 6, and the display module 6 displays and outputs the floating inventory list. The central processing module 4 calls the project progress report generated by the progress overall module 8 and the floating inventory list generated by the inventory counting module 9; the central processing module 4 evaluates the stage inventory according to the project progress report and the floating inventory list, generates an evaluation report, sends the evaluation report to the display module 6, and the display module 6 displays and outputs the evaluation report. The engineering personnel can evaluate the influence of the current construction progress and the inventory on the construction cost more clearly by looking up the evaluation report, so that the construction cost parameters are adjusted, and the construction cost evaluation is carried out on the engineering project more accurately.
The implementation principle of the embodiment is as follows:
when the construction cost of the engineering project is checked, the current pricing mode is input through the module selection module according to the size of the engineering scale and the distance of the completion date. The information input module 2 is used for inputting the information such as material types and usage amount required by construction, the data acquisition module 3 and the central processing module 4 are used for acquiring and processing data, a cost list is generated, and a worker checks the cost list through the display module 6. The inventory information of the current raw materials is counted through an inventory counting module 9, the current project progress parameters are counted through a progress planning module 8, and then the central processing module 4 generates an evaluation report of the project progress and the influence of the inventory on the project cost. The staff checks the assessment report, so that the cost parameters are adjusted, and the cost assessment is carried out on the engineering project more accurately.
In the embodiment 2, engineering cost management methods are adopted, the engineering cost management system in the embodiment 1 is adopted, information such as material types and usage amount required by construction is input through the information input module 2, a cost list is generated through data acquisition and processing of the data acquisition module 3 and the central processing module 4, inventory information of current raw materials is counted through the inventory counting module 9, current engineering progress parameters are counted through the progress planning module 8, an evaluation report of the engineering progress and the influence of inventory on engineering cost is generated through the central processing module 4, and construction cost is checked by workers through the display module 6.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (10)

  1. The project cost management system is characterized by comprising a mode selection module (1), an information input module (2), a data acquisition module (3), a central processing module (4) and a display module (6), wherein the mode selection module (1) is used for inputting current pricing mode information and sending the pricing mode information to the central processing module (4), the information input module (2) is used for inputting current project parameters and sending the project parameter information to the data acquisition module (3), the data acquisition module (3) acquires cost data according to the project parameter information sent by the information input module (2) and sends the acquired cost data information to the central processing module (4), the central processing module (4) processes the cost data information according to the pricing mode information to generate a cost list and sends the cost list to the display module (6), and the display module (6) displays and outputs the cost list.
  2. 2. The project cost management system according to claim 1, wherein: the system is characterized by further comprising a change item input module (5), wherein the change item input module (5) is used for inputting engineering change information and sending the engineering change information to the central processing module (4), the central processing module (4) changes the cost list according to the engineering change information and sends the change information to the data acquisition module (3), the data acquisition module (3) acquires the cost data of the change item according to the change information and sends the acquired cost information of the change item to the central processing module (4), and the central processing module (4) conducts data refreshing on the cost list according to the cost information of the change item.
  3. 3. The project cost management system according to claim 2, wherein: the change item input module (5) comprises an input unit (51) and a login verification unit (52), wherein the input unit (51) is used for inputting engineering change information and sending the engineering change information to the central processing module (4); the login authentication unit (52) is used for checking the identity information of the login user, and when the login user is a legal login user, the input unit (51) is started.
  4. 4. A construction cost management system according to claim 3, wherein: the login authentication unit (52) adopts a face recognition unit, the face recognition unit stores a face image database of a legal login user, and the face recognition unit recognizes the facial features of the login user; when the password authentication is passed and the face feature of the login person coincides with the face image stored in the face image database of the face recognition unit, the input unit (51) is turned on.
  5. 5. The project cost management system according to claim 2, wherein: the system is characterized by further comprising a short message sending module (7), wherein project accountant address list information is stored in the short message sending module (7), when the central processing module (4) receives project change information, the central processing module (4) sends a notification instruction to the short message sending module (7), and the short message sending module (7) sends a change short message notification to a mobile phone number server side in the project accountant address list.
  6. 6. The project cost management system according to claim 1, wherein: the system also comprises a progress overall module (8), wherein the progress overall module (8) is used for inputting the current project progress parameter and generating a project progress report according to the project progress parameter; the progress overall planning module (8) sends the project progress report to the display module (6), and the display module (6) displays and outputs the project progress report.
  7. 7. The project cost management system according to claim 6, wherein: the system also comprises an inventory counting module (9), wherein the inventory counting module (9) is used for counting the inventory information of the current raw materials, and performing average accounting on the inventory raw materials to generate a floating inventory; the inventory counting module (9) sends the floating inventory list to the display module (6), and the display module (6) displays and outputs the floating inventory list.
  8. 8. The project cost management system according to claim 7, wherein: the central processing module (4) calls the project progress report generated by the progress overall module (8) and the floating inventory list generated by the inventory counting module (9); the central processing module (4) evaluates the stage inventory according to the project progress report and the floating inventory list, generates an evaluation report, sends the evaluation report to the display module (6), and the display module (6) displays and outputs the evaluation report.
  9. 9. The project cost management system according to claim 1, wherein: data acquisition module (3) adopt the web crawler instrument to snatch the cost data that set up in the domain, data acquisition module (3) will snatch cost data information and send central processing module (4).
  10. 10, construction cost management methods, characterized in that, the construction cost management system of any claim 1- is used to input the current construction parameters through the information input module (2), and the construction cost list is obtained through the display module (6).
CN201910844982.5A 2019-09-07 2019-09-07 Engineering cost management system and method Pending CN110738458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910844982.5A CN110738458A (en) 2019-09-07 2019-09-07 Engineering cost management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910844982.5A CN110738458A (en) 2019-09-07 2019-09-07 Engineering cost management system and method

Publications (1)

Publication Number Publication Date
CN110738458A true CN110738458A (en) 2020-01-31

Family

ID=69267521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910844982.5A Pending CN110738458A (en) 2019-09-07 2019-09-07 Engineering cost management system and method

Country Status (1)

Country Link
CN (1) CN110738458A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111553633A (en) * 2020-04-25 2020-08-18 达信建设发展有限公司 Engineering cost management system and method
CN111626788A (en) * 2020-05-30 2020-09-04 阶梯项目咨询有限公司 Engineering cost management system
CN112734392A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 BIM project cost rapid calculation system and method
CN112862244A (en) * 2020-12-31 2021-05-28 大为国际工程咨询有限公司 Building engineering dynamic cost analysis and control system based on big data

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5189606A (en) * 1989-08-30 1993-02-23 The United States Of America As Represented By The Secretary Of The Air Force Totally integrated construction cost estimating, analysis, and reporting system
CN105930931A (en) * 2016-04-22 2016-09-07 国网浙江省电力公司经济技术研究院 Electric power engineering cost management method
CN107392568A (en) * 2017-07-04 2017-11-24 成都正信石油天然气工程造价咨询有限公司 A kind of project cost management system
CN107944703A (en) * 2017-11-24 2018-04-20 国网内蒙古东部电力有限公司 A kind of grid maintenance Analysis of Engineering Construction Cost system
CN107977717A (en) * 2017-11-24 2018-05-01 国网内蒙古东部电力有限公司 A kind of grid maintenance project cost difference automatic adjusting method
CN108229919A (en) * 2018-01-17 2018-06-29 四川同兴达建设咨询有限公司 A kind of project cost manages system
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
CN108921508A (en) * 2018-06-23 2018-11-30 广东人信工程咨询有限公司 Overall process Engineering Cost Management system
CN109064139A (en) * 2018-08-08 2018-12-21 深圳市弘景装饰工程有限公司 A kind of building decoration engineering management system
CN109241773A (en) * 2018-09-08 2019-01-18 中建精诚工程咨询有限公司 construction cost data management system
CN109634964A (en) * 2018-12-13 2019-04-16 深圳市航建工程造价咨询有限公司 Cost Index exponent data base management system
CN109902965A (en) * 2019-03-05 2019-06-18 深圳市国晨工程造价咨询有限公司 A kind of engineering process dynamic cost managing and control system based on BIM technology
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN110083632A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 A kind of project cost listing service system
CN110097247A (en) * 2019-03-14 2019-08-06 深圳市丰浩达工程项目管理有限公司 A kind of cost data gathering system based on Internet technology

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5189606A (en) * 1989-08-30 1993-02-23 The United States Of America As Represented By The Secretary Of The Air Force Totally integrated construction cost estimating, analysis, and reporting system
CN105930931A (en) * 2016-04-22 2016-09-07 国网浙江省电力公司经济技术研究院 Electric power engineering cost management method
CN107392568A (en) * 2017-07-04 2017-11-24 成都正信石油天然气工程造价咨询有限公司 A kind of project cost management system
CN107944703A (en) * 2017-11-24 2018-04-20 国网内蒙古东部电力有限公司 A kind of grid maintenance Analysis of Engineering Construction Cost system
CN107977717A (en) * 2017-11-24 2018-05-01 国网内蒙古东部电力有限公司 A kind of grid maintenance project cost difference automatic adjusting method
CN109902888A (en) * 2017-12-07 2019-06-18 株洲中车时代电气股份有限公司 A kind of project cost method and system
CN108229919A (en) * 2018-01-17 2018-06-29 四川同兴达建设咨询有限公司 A kind of project cost manages system
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
CN108921508A (en) * 2018-06-23 2018-11-30 广东人信工程咨询有限公司 Overall process Engineering Cost Management system
CN109064139A (en) * 2018-08-08 2018-12-21 深圳市弘景装饰工程有限公司 A kind of building decoration engineering management system
CN109241773A (en) * 2018-09-08 2019-01-18 中建精诚工程咨询有限公司 construction cost data management system
CN109634964A (en) * 2018-12-13 2019-04-16 深圳市航建工程造价咨询有限公司 Cost Index exponent data base management system
CN109902965A (en) * 2019-03-05 2019-06-18 深圳市国晨工程造价咨询有限公司 A kind of engineering process dynamic cost managing and control system based on BIM technology
CN110083632A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 A kind of project cost listing service system
CN110097247A (en) * 2019-03-14 2019-08-06 深圳市丰浩达工程项目管理有限公司 A kind of cost data gathering system based on Internet technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
沈园园等: "水电工程项目造价管理系统研究与设计", 《中国水运(下半月)》 *
闫静: "对工程造价管理信息化建设的分析与思考", 《工程造价管理》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111553633A (en) * 2020-04-25 2020-08-18 达信建设发展有限公司 Engineering cost management system and method
CN111626788A (en) * 2020-05-30 2020-09-04 阶梯项目咨询有限公司 Engineering cost management system
CN112862244A (en) * 2020-12-31 2021-05-28 大为国际工程咨询有限公司 Building engineering dynamic cost analysis and control system based on big data
CN112734392A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 BIM project cost rapid calculation system and method
CN112734392B (en) * 2021-01-15 2023-09-01 广州市新誉工程咨询有限公司 BIM engineering project cost rapid calculation system and method

Similar Documents

Publication Publication Date Title
CN110738458A (en) Engineering cost management system and method
CN107464053A (en) A kind of enterprise security hidden danger management system and method
CN110472858B (en) Construction engineering supervision information management method
CN106940839B (en) Power transmission and transformation project quality data management and control system and method
CN109708688A (en) A kind of monitoring of history culture building safety and early warning system and method
CN106873487A (en) With energy equipment energy consumption long distance control system
CN109800250B (en) System architecture for no longer configuring enterprise central server
CN107066500B (en) Power grid mass data quality verification method based on PMS model
CN110648422A (en) Standardized inspection method, system and platform
CN107103410A (en) A kind of supervisory systems and method of construction engineering quality detection
CN113965487B (en) Fault diagnosis system based on network flow data
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN109029573A (en) A kind of pipeline method for inspecting and system
CN107423826A (en) A kind of method for inspecting of multi-reservoir, device and system
CN111553633A (en) Engineering cost management system and method
CN112819374A (en) System and method for risk management of railway bridge constructors
CN112148777A (en) Data acquisition system based on edge calculation
CN109636312A (en) Land control engineering online monitoring and management system
CN110837532A (en) Method for detecting electricity stealing behavior of charging pile based on big data platform
CN114240456B (en) Vehicle quality complaint information collection platform based on mobile phone APP
CN111626788A (en) Engineering cost management system
CN107896159B (en) System and method for evaluating operation and maintenance performance of transformer substation
CN111062679A (en) Overall process intelligent engineering supervision information management and control system
CN103498701A (en) Intelligent safety tour inspection method
CN109379439B (en) Information positioning system based on Internet of things

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200131

RJ01 Rejection of invention patent application after publication