CN109902965A - A kind of engineering process dynamic cost managing and control system based on BIM technology - Google Patents

A kind of engineering process dynamic cost managing and control system based on BIM technology Download PDF

Info

Publication number
CN109902965A
CN109902965A CN201910164803.3A CN201910164803A CN109902965A CN 109902965 A CN109902965 A CN 109902965A CN 201910164803 A CN201910164803 A CN 201910164803A CN 109902965 A CN109902965 A CN 109902965A
Authority
CN
China
Prior art keywords
building
building materials
price
control system
bim technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910164803.3A
Other languages
Chinese (zh)
Inventor
刁杰幸
张塨
王静珂
常建位
宇宙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guochen Engineering Cost Consulting Co Ltd
Original Assignee
Shenzhen Guochen Engineering Cost Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guochen Engineering Cost Consulting Co Ltd filed Critical Shenzhen Guochen Engineering Cost Consulting Co Ltd
Priority to CN201910164803.3A priority Critical patent/CN109902965A/en
Publication of CN109902965A publication Critical patent/CN109902965A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of engineering process dynamic cost managing and control system based on BIM technology, it is related to Building Information Model field, solve project cost cost have it is very big most depend on cost of building materials itself, and the cost of building materials itself can change at any time, seriously affect the problem of reasonably managing to building material cost comprising building materials forecast price computing module, sequencing selection module and the building price historical data base for being stored with building materials historical price.The present invention is conducive to the effect of cost control with the building price minimum period can be predicted the building price during future and selected based on data before.

Description

A kind of engineering process dynamic cost managing and control system based on BIM technology
Technical field
The present invention relates to a kind of Building Information Model fields, dynamic more particularly, to a kind of engineering process based on BIM technology State cost control system.
Background technique
With economic fast development, the quantity and scale of engineering construction project are increasingly increased, and it is low how to improve construction industry The management condition of effect, reduction mistake bring loss have become the problem of every country is paid attention to.
For building cost field, in engineering project, cost can be effectively reduced by implementing project cost control, will Actual cost controls within objective cost, to obtain more profits.Forecasting of cost is the starting point of cost management.
It has been realized in the automation to project amount currently based on QC and the CM system of BIM to calculate and apply, in certain journey Facilitate the calculating of cost on degree, but cost have it is very big most depend on cost of building materials itself, and building materials The cost of itself can change at any time, seriously affect and reasonably manage to building material cost, there is room for improvement.
Summary of the invention
The object of the present invention is to provide a kind of with being predicted based on data before the building price during future And select the building price minimum period, be conducive to cost control effect based on BIM technology engineering process dynamic at This managing and control system.
Foregoing invention purpose of the invention has the technical scheme that
Engineering process dynamic cost managing and control system based on BIM technology, including central processing unit, the engineering mistake based on BIM technology Journey dynamic cost managing and control system further includes building materials forecast price computing module, sequencing selection module and is stored with building materials history The building price historical data base of price further includes the building price historical data base for being stored with building materials historical price, described to build Material forecast price computing module the first building price predicted value calculated is obtained based on following formula:
Ft=w1At-1+w2At-2+w3At-3+…+wnAt-n;
W1 --- the weight of t-1 phase building price;
W2 --- the weight of t-2 phase building price;
Wn --- the weight of t-n phase building price;
Ft --- to the predicted value of next phase;
The period number of n --- rolling average;
At-1 --- previous phase actual value;
At-2, At-3 and At-n respectively indicate the actual value of preceding two phase, first three phase up to the preceding n phase ,+wn=1 w1+w2+ ...;
The definition project initiation time is t, and building materials enabling time is t+n;
The building materials forecast price computing module is based on above-mentioned formula and transfers out At-1~At-n from building price historical data base Numerical value to obtain the numerical value of Ft~Ft+n one by one;
The numerical value of the sequencing selection module calls Ft~Ft+n from large to small carries out the first building price predicted value with numerical value Sequence from top to bottom, and select the period corresponding to the smallest numerical value for the time of buying building materials.
By using above-mentioned technical proposal, pass through central processing unit, building materials forecast price computing module, sequencing selection module Setting can predict building price minimum month, and purchase opportunity for building price minimum month as building materials.
The present invention is further arranged to: the engineering process dynamic cost managing and control system based on BIM technology further includes being stored with The construction building supplies database of time is provided needed for building materials needed for construction part, corresponding construction part and corresponding building materials, with And it is stored with construction part responsible person's cell-phone number database, the short massage notice device of construction part responsible person cell-phone number;
Central processing unit is query object needed for construction building supplies data base querying goes out corresponding construction part with part of constructing Building materials and corresponding building supplies time, center is using the building supplies time as deadline, using current time as when opening Between, the predicted value of the building price before deadline is obtained by building materials forecast price computing module, and pass through sequence mould Block select the period corresponding to wherein the smallest numerical value be purchase building materials time, while transfer construction part responsible person mobile phone The cell-phone number of construction part responsible person is notified by short massage notice device in number library.
By using above-mentioned technical proposal, pass through construction building supplies database, construction part responsible person mobile phone number The setting in library, short massage notice device can tentatively consider the building supplies time, determine choosing the right moment for building price.
The present invention is further arranged to: the engineering process dynamic cost managing and control system based on BIM technology further includes being stored with Building materials and the building materials storage location database of corresponding building materials storage position, the construction part for being stored with construction part position Position database, path planning apparatus;
Central processing unit inquires building materials storehouse in building materials storage location database to construct building materials needed for part as query object Storage space is set as starting point, while going out construction portion in construction part position data base querying using construction part as query object As terminal, passage path device for planning cooks up shortest path for point position, central processing unit using path length as Dividend, transport detection average speed of driving a vehicle calculate building materials and transport construction part required time, in advance simultaneously as divisor Part required time is constructed in the building supplies time as new deadline, is obtained again through building materials forecast price computing module When taking the predicted value of the building price before deadline, and being selected corresponding to wherein the smallest numerical value by sorting module Between section be purchase building materials time.
By using above-mentioned technical proposal, pass through building materials storage location database, construction part position database, road The combination setting of diameter device for planning, central processing unit, be effectively ensured to the reasonable arrangement of building materials buying hour and accordingly at This control.
The present invention is further arranged to: the identical situation of the minimum value of the predicted value of building price if it exists, then with opposite Time of the period rearward as buying building materials.
By using above-mentioned technical proposal, can be convenient purchased building materials can use as early as possible, rather than also need to look for Place is stored, in order to subsequent use.
The present invention is further arranged to: the engineering process dynamic cost managing and control system based on BIM technology further includes that voice is logical Know device;
While short massage notice device notice, synchronous central processing unit starting voice notification device is notified.
By using above-mentioned technical proposal, can not notified in short massage notice device by the setting of voice notification device When in place, notice arrives corresponding responsible person in time.
The present invention is further arranged to: the voice notification device is phonetic alarm.
By using above-mentioned technical proposal, since voice notification device is phonetic alarm, it can guarantee verbal announcement While effect, its use cost is reduced.
The present invention is further arranged to: the short massage notice device is Short message alarm.
By using above-mentioned technical proposal, since short massage notice device is Short message alarm, it can guarantee that its own is short While letter reminds effect, its use cost is reduced.
In conclusion advantageous effects of the invention are as follows: pass through building materials forecast price computing module, sequencing selection mould The setting of block, building price historical data base, central processing unit can determine how to select best purchase building materials opportunity.
Detailed description of the invention
Fig. 1 is the system block diagram one of the engineering process dynamic cost managing and control system the present invention is based on BIM technology.
Fig. 2 is the system block diagram two of the engineering process dynamic cost managing and control system the present invention is based on BIM technology.
In figure, 1, building materials forecast price computing module;2, sequencing selection module;3, building price historical data base;4, it applies Work building supplies database;5, construction part responsible person cell-phone number database;6, short massage notice device;7, building materials storage positional number According to library;8, construction part position database;9, path planning apparatus;10, voice notification device;11, central processing unit.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of engineering process dynamic cost managing and control system based on BIM technology disclosed by the invention, including Central processing unit 11, the engineering process dynamic cost managing and control system based on BIM technology further include building materials forecast price computing module 1, sequencing selection module 2 and it is stored with the building price historical data base 3 of building materials historical price.
The building materials forecast price computing module 3 first building price predicted value calculated is obtained based on following formula: Ft=w1At-1+w2At-2+w3At-3+…+wnAt-n;W1 --- the weight of t-1 phase building price;W2 --- the t-2 phase builds The weight of material price;Wn --- the weight of t-n phase building price;Ft --- to the predicted value of next phase;N --- rolling average Period number;At-1 --- previous phase actual value;At-2, At-3 and At-n respectively indicate preceding two phase, first three phase until the preceding n phase Actual value ,+wn=1 w1+w2+ ...;The definition project initiation time is t, and building materials enabling time is t+n;The building materials forecast price Computing module 1 transfers out the numerical value of At-1~At-n from building price historical data base 3 based on above-mentioned formula to obtain Ft one by one The numerical value of~Ft+n.
The sequencing selection module 2 transfers the numerical value of Ft~Ft+n with numerical value from large to small to the first building price predicted value Sequence from top to bottom is carried out, and selects the period corresponding to the smallest numerical value for the time of buying building materials.
In view of often there is its preset deadline in part of constructing in actual application, it is therefore desirable to end The time of best buying building materials is made before time, to achieve the purpose that cost control, the engineering process based on BIM technology is dynamic State cost control system further includes when providing needed for building materials and corresponding building materials needed for being stored with construction part, corresponding construction part Between construction building supplies database 4, and, be stored with construction part responsible person cell-phone number construction part responsible person's cell-phone number Database 5, short massage notice device 6, short massage notice device 6 are Short message alarm.
As shown in Fig. 2, central processing unit 11 is that query object is inquired in construction building supplies database 4 with part of constructing Building materials needed for corresponding construction part and corresponding building supplies time, center is using the building supplies time as deadline, to work as The preceding time obtains the pre- of the building price before deadline as the opening time, by building materials forecast price computing module 1 Measured value, and the time that the period corresponding to wherein the smallest numerical value is buying building materials is selected by sorting module, it transfers simultaneously The cell-phone number of construction part responsible person passes through short massage notice device 6 and notifies in construction part responsible person cell-phone number database 5.
The time for needing that construction part location is transported in view of building materials in actual application is further contemplated, from And the purchase of schedule ahead building materials is needed, the engineering process dynamic cost managing and control system based on BIM technology further includes being stored with to build Material and the building materials storage location database 7 of corresponding building materials storage position, the construction part for being stored with construction part position Position database 8, path planning apparatus 9, path planning apparatus 9 are preferably trip planner.
Central processing unit 11 is inquired using constructing building materials needed for part as query object in building materials storage location database 7 Building materials store in a warehouse position as starting point, while being inquired using construction part as query object in construction part position database 8 Construction part position is as terminal out, and passage path device for planning 9 cooks up shortest path, and central processing unit 11 is with road For electrical path length as dividend, driving transport detection average speed is used as divisor, calculates building materials and transports construction and is partially taken Between, while part required time is constructed as new deadline in the building supplies time in advance, valence is predicted again through building materials Lattice computing module 1 obtains the predicted value of building price before deadline, and is selected by sorting module wherein the smallest Period corresponding to numerical value is the time for purchasing building materials.
In addition, the identical situation of the minimum value of the predicted value of building price if it exists, then made with the period relatively rearward For the time for purchasing building materials.
To guarantee to notify the engineering process dynamic cost control to construction part responsible person, based on BIM technology in time System further includes voice notification device 10, and voice notification device 10 is preferably phonetic alarm, is notified in short massage notice device 6 Meanwhile synchronous central processing unit 11 starts voice notification device 10 and is notified.
The implementation principle of the present embodiment are as follows:
Pass through building materials forecast price computing module 1, sequencing selection module 2, building price historical data base 3, central processing first Device 11 determines the best purchase scheme of building materials.
And by construction building supplies database 4, construction part responsible person cell-phone number database 5, short massage notice device 6, The setting of building materials storage location database 7, construct part position database 8, path planning apparatus 9 can determine Building Material House The deadline that need to be provided, to obtain properly it needs to be determined that the building materials specifically best purchase opportunity that gets off.
And when notice constructs responsible person, it can guarantee it in conjunction with short massage notice device 6, voice notification device 10 The validity of information notice.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (7)

1. a kind of engineering process dynamic cost managing and control system based on BIM technology, including central processing unit (11), it is characterized in that: Engineering process dynamic cost managing and control system based on BIM technology further includes building materials forecast price computing module (1), sequencing selection mould Block (2) and the building price historical data base (3) for being stored with building materials historical price, the building materials forecast price computing module (1) the first building price predicted value calculated is obtained based on following formula:
Ft=w1At-1+w2At-2+w3At-3+…+wnAt-n;
W1 --- the weight of t-1 phase building price;
W2 --- the weight of t-2 phase building price;
Wn --- the weight of t-n phase building price;
Ft --- to the predicted value of next phase;
The period number of n --- rolling average;
At-1 --- previous phase actual value;
At-2, At-3 and At-n respectively indicate the actual value of preceding two phase, first three phase up to the preceding n phase ,+wn=1 w1+w2+ ...;
The definition project initiation time is t, and building materials enabling time is t+n;
The building materials forecast price computing module (1) is based on above-mentioned formula and transfers out At-1 from building price historical data base (3) The numerical value of~At-n to obtain the numerical value of Ft~Ft+n one by one;
The sequencing selection module (2) transfer the numerical value of Ft~Ft+n with numerical value from large to small to the first building price predicted value into The sequence of row from top to bottom, and select the period corresponding to the smallest numerical value for the time of buying building materials.
2. the engineering process dynamic cost managing and control system according to claim 1 based on BIM technology, it is characterised in that: base Building materials needed for further including being stored with construction part, corresponding construction part in the engineering process dynamic cost managing and control system of BIM technology And the construction building supplies database (4) of time is provided needed for corresponding building materials, and, it is stored with construction part responsible person mobile phone Number construction part responsible person's cell-phone number database (5), short massage notice device (6);
Central processing unit (11) is that query object inquires corresponding construction portion in construction building supplies database (4) with part of constructing Building materials needed for point and corresponding building supplies time, center using the building supplies time as deadline, using current time as Opening time, the predicted value of the building price before deadline is obtained by building materials forecast price computing module (1), and lead to Crossing sorting module and selecting the period corresponding to wherein the smallest numerical value is the time for purchasing building materials, while it is negative to transfer construction part The cell-phone number for blaming construction part responsible person in manpower machine number library (5) is notified by short massage notice device (6).
3. the engineering process dynamic cost managing and control system according to claim 2 based on BIM technology, it is characterised in that: base In the engineering process dynamic cost managing and control system of BIM technology further include the building materials for being stored with building materials and corresponding building materials storage position Storage location database (7), construction part position database (8), the path planning for being stored with construction part position Device (9);
Central processing unit (11) is inquired using constructing building materials needed for part as query object in building materials storage location database (7) Building materials store in a warehouse position as starting point, while looking into using construction part as query object in construction part position database (8) Construction part position is ask out as terminal, passage path device for planning (9) cooks up shortest path, central processing unit (11) using path length as dividend, driving transport detection average speed calculates building materials and transports construction portion as divisor The time required to point, while as new deadline the time required to part of constructing in advance in the building supplies time, again through building Material forecast price computing module (1) obtains the predicted value of the building price before deadline, and is selected by sorting module Wherein the period corresponding to the smallest numerical value is the time for purchasing building materials.
4. the engineering process dynamic cost managing and control system according to claim 3 based on BIM technology, it is characterised in that: if There is a situation where that the minimum value of the predicted value of building price is identical, then using the period relatively rearward as buying building materials when Between.
5. the engineering process dynamic cost managing and control system according to claim 4 based on BIM technology, it is characterised in that: base In the engineering process dynamic cost managing and control system of BIM technology further include voice notification device (10);
While short massage notice device (6) notify, synchronous central processing unit (11) starting voice notification device (10) is led to Know.
6. the engineering process dynamic cost managing and control system according to claim 5 based on BIM technology, it is characterised in that: institute Stating voice notification device (10) is phonetic alarm.
7. the engineering process dynamic cost managing and control system according to claim 6 based on BIM technology, it is characterised in that: institute Stating short massage notice device (6) is Short message alarm.
CN201910164803.3A 2019-03-05 2019-03-05 A kind of engineering process dynamic cost managing and control system based on BIM technology Pending CN109902965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910164803.3A CN109902965A (en) 2019-03-05 2019-03-05 A kind of engineering process dynamic cost managing and control system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910164803.3A CN109902965A (en) 2019-03-05 2019-03-05 A kind of engineering process dynamic cost managing and control system based on BIM technology

Publications (1)

Publication Number Publication Date
CN109902965A true CN109902965A (en) 2019-06-18

Family

ID=66946374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910164803.3A Pending CN109902965A (en) 2019-03-05 2019-03-05 A kind of engineering process dynamic cost managing and control system based on BIM technology

Country Status (1)

Country Link
CN (1) CN109902965A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110599258A (en) * 2019-09-20 2019-12-20 中国银行股份有限公司 Method and device for prompting influence information of regular events on product price change
CN110737932A (en) * 2019-08-29 2020-01-31 中建一局集团第二建筑有限公司 method for analyzing engineering temporary facility cost by using BIM model
CN110738458A (en) * 2019-09-07 2020-01-31 北京市建壮咨询有限公司 Engineering cost management system and method
CN110955700A (en) * 2019-11-25 2020-04-03 国网江苏省电力工程咨询有限公司 4D mode-based engineering cost lean control method and system
CN111242378A (en) * 2020-01-15 2020-06-05 湖南日升工程咨询有限公司 Engineering process dynamic cost control method based on BIM technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140379423A1 (en) * 2013-06-25 2014-12-25 Sap Ag Market Price based Raw Material Procurement
CN107609289A (en) * 2017-09-21 2018-01-19 杭州弼木建筑科技有限公司 The building material cost management-control method and system of structural fortification based on BIM models
CN108428036A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collaborative management method of assembled plant, apparatus and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140379423A1 (en) * 2013-06-25 2014-12-25 Sap Ag Market Price based Raw Material Procurement
CN108428036A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collaborative management method of assembled plant, apparatus and system
CN107609289A (en) * 2017-09-21 2018-01-19 杭州弼木建筑科技有限公司 The building material cost management-control method and system of structural fortification based on BIM models

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110737932A (en) * 2019-08-29 2020-01-31 中建一局集团第二建筑有限公司 method for analyzing engineering temporary facility cost by using BIM model
CN110738458A (en) * 2019-09-07 2020-01-31 北京市建壮咨询有限公司 Engineering cost management system and method
CN110599258A (en) * 2019-09-20 2019-12-20 中国银行股份有限公司 Method and device for prompting influence information of regular events on product price change
CN110955700A (en) * 2019-11-25 2020-04-03 国网江苏省电力工程咨询有限公司 4D mode-based engineering cost lean control method and system
CN111242378A (en) * 2020-01-15 2020-06-05 湖南日升工程咨询有限公司 Engineering process dynamic cost control method based on BIM technology
CN111242378B (en) * 2020-01-15 2023-09-15 正茂日升工程咨询有限公司 Engineering process dynamic cost management and control method based on BIM technology

Similar Documents

Publication Publication Date Title
CN109902965A (en) A kind of engineering process dynamic cost managing and control system based on BIM technology
US10796357B2 (en) Systems to fulfill a picked sales order and related methods therefor
Giannikas et al. An interventionist strategy for warehouse order picking: Evidence from two case studies
Belobaba OR practice—application of a probabilistic decision model to airline seat inventory control
Ursavas A decision support system for quayside operations in a container terminal
CN106910034B (en) Commodity object calling method and device
CA2823402C (en) Method, system and apparatus for managing inventory
CN109492894B (en) Method and device for monitoring vehicle delivery and server
US11429927B1 (en) System and method to predict service level failure in supply chains
US20180121875A1 (en) Delivery prediction automation and risk mitigation
CN110414731A (en) Method, apparatus, computer readable storage medium and the electronic equipment of Order splitting
US20150142610A1 (en) Providing Lowest Trip Prices
CN110405756B (en) Task scheduling method, device and system, electronic equipment and storage medium
KR101947736B1 (en) Device, method, and computer program for grouping products bundle
Jemai et al. Inventory routing problems in a context of vendor-managed inventory system with consignment stock and transshipment
Shnits et al. Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system
CN106485334A (en) Automatic vending method, automatic vending machine and automatically vending system
CN110400012A (en) A kind of method and device of determining Distribution path
Li et al. Simulation-based solution for a dynamic multi-crane-scheduling problem in a steelmaking shop
Low et al. Integration of production scheduling and delivery in two echelon supply chain
CN109445466A (en) Robot follow-up control method, system, equipment and computer readable storage medium
CN103297623A (en) Telephone traffic predicting method and device
CN109445884A (en) A kind of functional label methods of exhibiting and terminal device
KR101931342B1 (en) Device, method, and computer program for grouping products bundle
CN113191713A (en) Warehouse out-of-stock transferring method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618

RJ01 Rejection of invention patent application after publication