CN110097247A - A kind of cost data gathering system based on Internet technology - Google Patents
A kind of cost data gathering system based on Internet technology Download PDFInfo
- Publication number
- CN110097247A CN110097247A CN201910195162.8A CN201910195162A CN110097247A CN 110097247 A CN110097247 A CN 110097247A CN 201910195162 A CN201910195162 A CN 201910195162A CN 110097247 A CN110097247 A CN 110097247A
- Authority
- CN
- China
- Prior art keywords
- module
- cost data
- cost
- statistician
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Finance (AREA)
- Game Theory and Decision Science (AREA)
- Accounting & Taxation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The cost data gathering system based on Internet technology that the present invention relates to a kind of, belong to project cost systems technology field, the main points of its technical scheme are that including login module, management module and display module, administrator module includes parameter input unit, specification computing unit and task allocation unit;Parameter input unit is used to input the specifications parameter of current engineering project;Specification computing unit is used to calculate the cost data collection amount of current project;The cost that task allocation unit is used to input current project collects personnel, the cost data collection amount of current project is evenly distributed at random, and the task of distribution is sent to corresponding statistician's account, statistician's module is used to input the cost data of current registrant and calculates current collection progress;It solves and distributes uneven problem using being artificially allocated to cost data task;Good coordination matching can be carried out to cost Data Collection task and collection personnel.
Description
Technical field
The present invention relates to project cost systems technology fields, more particularly, to a kind of cost data based on Internet technology
Collection system.
Background technique
Currently, project cost can be made to the engineering accepted before bid by being responsible for the enterprise of bid, mainly rely on
Calculating is collected and summarized manually, needs to be collected a large amount of data during collecting analysis of prices basic data, unite
The processing such as meter, calculating analysis.These information data amounts are huge, data structure is complicated, acquisition arrange and amount of calculation it is big, when
Between short, task it is tight in the case where, data statistics work occupies company technical economy personnel most working time and energy, simultaneously
Manual calculation be easy to cause analysis of prices result inaccurate, influences analysis of prices data accuracy, influences cost horizontal analysis
Fairness and science.Therefore, modern enterprise carry out project cost data during collection, by using calculating
Machine software or other smart machines ancillary staff carry out cost data collection and calculating.
It is existing to can refer to the Chinese invention patent that application publication number is CN106327086A to cost data gathering system
Application documents, the cost data gathering system based on Internet technology that it discloses a kind of, including it is controller, input unit, defeated
Enter unit to connect with controller, input unit inputs completed cost process;Storage unit, storage unit and control
Device connection, for storing data relevant to project cost progress;Time quantum is connect with controller, is used for storage control
Real-time time;Comparison unit is connect with controller, and storage unit, the data of time quantum are compared;Display unit,
It is connect with controller, for showing the comparing result of current schedules and comparison unit, and shows the title of next progress and complete
At time;Reading unit is connect with controller, and the signal input part of reading unit and the reading signal output end of controller connect
It connects.
The data of project cost generally collect different directions by each engineer during collection respectively,
And then the data information of collection is summarized.During the practical collection of Construction Cost Data, generally by chief engineer couple
Data Collection task is allocated, and then is collected by collection task of each engineer to distribution.Due to different engineerings
The task of teacher's distribution is different, and the working method of each engineer is different, therefore often since individual engineers can not be timely completed
Task carries out and then influences the cost data collection progress of whole project.
Summary of the invention
The cost data gathering system based on Internet technology that the object of the present invention is to provide a kind of, can be good right
Cost Data Collection task and collection personnel carry out coordination matching.
Foregoing invention purpose of the invention has the technical scheme that a kind of based on Internet technology
Cost data gathering system, including login module, management module and display module, it is characterised in that: the management module packet
Include administrator module and statistician's module;The login module is used to carry out login mode selection selection, and is used to input
Login account and login password start corresponding management module when login account is consistent with login password;
The administrator module includes parameter input unit, specification computing unit and task allocation unit;The parameter input
Unit is used to input the specifications parameter of current engineering project;The specification computing unit is joined according to parameter input unit input specification
Number, calculates the cost data collection amount of current project;The task allocation unit is used to input the cost of current project
Collection personnel evenly distribute the cost data collection amount of current project at random, and the task of distribution is sent to pair
Answer statistician's account;
Statistician's module is used to input the cost data of current registrant and calculates current collection progress;Institute
It states statistician's module and the cost data of input is sent to administrator module;
The display module is used to carry out display output to the management module content of current login.
By using above-mentioned technical proposal, manager logs in management module by login module, and then is inputted by parameter
The current item argument for carrying out cost data of unit input, by specification computing unit to the construction volume and project cost number of project
Task amount according to statistics is calculated, and is received to distribute to each cost to cost Data Collection task by task allocation unit
Collection personnel so as to good coordination collection task and collect personnel.
The present invention is further arranged to: the administrator module further includes planning as a whole unit, and the pool unit is to statistician
The cost data of the transmission of the different logon accounts of module are planned as a whole, and cost inventory is generated, and the display module is clear to cost
Singly it is called display output.
By using above-mentioned technical proposal, administrator module further includes planning as a whole unit, plans as a whole unit to statistician's module
The cost data of the transmission of different logon accounts are planned as a whole, and cost inventory is generated, and display module is called cost inventory
Display output, and then whole, office automation conveniently can be carried out to the cost data that each statistician is collected
Degree is high, convenient to read to data.
The present invention is further arranged to: the administrator module further includes image conversion unit, described image converting unit
Statistical picture is converted into the cost inventory that unit generates is planned as a whole;The statistical picture that the display module generates converting unit into
Row calls display output.
By using above-mentioned technical proposal, administrator module further includes image conversion unit, and image conversion unit is to pool
The cost inventory that unit generates is converted into statistical picture, and then is shown by display module, to facilitate cost inventory number
According to various statistical results intuitively read and analyzed.
The present invention is further arranged to: the statistical picture includes histogram, cake chart and line chart.
By using above-mentioned technical proposal, statistical picture includes histogram, cake chart and line chart, and then by different
Statistical picture data statistics result and relationship different in clearing up cost are shown, facilitate staff from multiple angles pair
Cost data are analyzed.
The present invention is further arranged to: it further include local data base and network data base, after statistician's module starting,
The display module is provided with the local hyperlink and link to network data base that local data base content is linked
Network hyperlink.
By using above-mentioned technical proposal, the cost data gathering system based on Internet technology further includes local data base
And network data base, after the starting of statistician's module, display module is provided with the local hyperlink that local data base content is linked
It connects and to the network hyperlink that network data base is linked, and then cost data collection personnel are logging in statistician's module
Afterwards, local data base is consulted by local hyperlink, network data base is consulted by network hyperlink, thus
It is convenient that the relevant information data of project cost is collected.
The present invention is further arranged to: the display module be provided with to current registrant collect progress shown into
Spend item.
By using above-mentioned technical proposal, the current registrant of team is provided with by display module and collects what progress was shown
Progress bar, and then after the personnel of collection log in statistician's account, it is intuitively looked by collection progress of the progress bar to oneself
It sees.
The present invention is further arranged to: the progress bar includes time schedule tune item based on time shaft and based on collecting
The Task Progress tune item of amount.
By using above-mentioned technical proposal, progress bar includes time schedule tune item based on time shaft and based on collecting amount
Task Progress tune item, so as to intuitively intuitively observe current project used time and task performance.
The present invention is further arranged to: further including cue module, the task of statistician is completed percentage by the cue module
It is described to mention when ratio is less than setting value than and ratio and setting value being compared divided by consumption task time percentage
Show that module sends prompt information to corresponding statistician's account.
By using above-mentioned technical proposal, by the setting of cue module, and then the appointing statistician by cue module
Percent Complete be engaged in divided by consumption task time percentage, and ratio and setting value are compared, thus to statistician's
Schedule is judged, so that prompt information is sent to statistician's account in the case where statistician's task is completed to lag, from
And statistician is prompted.
The present invention is further arranged to: further including SMS transmission module, the SMS transmission module is stored with statistician's
Phone number, when ratio is less than setting value, the cue module is issued to SMS transmission module sends notice, the short message hair
The transmission notice for sending module to receive and respond to SMS transmission module sending issues prompt to the phone number of corresponding statistician
Short message.
By using above-mentioned technical proposal, by the setting of SMS transmission module, SMS transmission module is stored with statistician
Phone number, when ratio be less than setting value when, cue module to SMS transmission module issue send notice, SMS transmission module
The transmission notice for receiving and responding to SMS transmission module sending issues SMS Tip to the phone number of corresponding statistician,
And then when cost data collection personnel's schedule is poor, statistician is notified in time by short message form, Jin Erdu
Promote statistician and carries out cost data collection in time.
In conclusion advantageous effects of the invention are as follows:
1. manager logs in management module by login module, and then inputs current progress cost data by parameter input unit
Item argument, calculated by task amount of the specification computing unit to the construction volume and Construction Cost Data of project statistics,
Personnel are collected to distribute to each cost to cost Data Collection task by task allocation unit, so as to good association
It adjusts collection task and collects personnel;
2. display module is provided with the current registrant of team and collects the progress bar that progress is shown, progress bar includes being based on time shaft
Time schedule tune item and Task Progress tune item based on collecting amount, and then after the personnel of collection log in statistician's account, energy
It is enough that intuitively current project used time and task performance are intuitively observed;
3. by the setting of cue module and SMS transmission module, when the collection progress of the personnel of collection lag, cue module to
Corresponding statistician's account sends prompt information, and the phone number sending by SMS transmission module to corresponding statistician mentions
Show short message, to remind gatherer to carry out progress adjusting in time.
Detailed description of the invention
Fig. 1 is a kind of functional block diagram of cost data gathering system based on Internet technology;
Fig. 2 is the functional block diagram for embodying management module internal processes.
In figure, 1, login module;2, management module;21, administrator module;211, parameter input unit;212, specification meter
Calculate unit;213, task allocation unit;214, plan as a whole unit;215, image conversion unit;22, statistician's module;3, mould is prompted
Block;4, SMS transmission module;5, local data base;6, network data base;7, display module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of cost data gathering system based on Internet technology, referring to Fig.1, including login module 1, management module 2,
Cue module 3, SMS transmission module 4, local data base 5, network data base 6 and display module 7.Local data base 5 is arranged
On the local memory device of smart machine, for storing the previous total price project of this building group internal and making for inside
Valence data information.Network data base 6 facilitates work people by network hyperlink using cost website common on network server
Member accesses.
Referring to Figures 1 and 2, management module 2 includes administrator module 21 and statistician's module 22, and statistician's module 22 is used for
The data collection personnel of project cost are facilitated to carry out upload management to the data of collection, administrator module 21 is used for project cost item
The managers such as purpose chief engineer carry out pool arrangement to the cost data of collection.Login module 1 is used to carry out login mode
Selection selection, and be used to input login account and login password, when login account is consistent with login password, start corresponding
Management module 2.The manager or data collection personnel of project cost project input the login account of oneself by login module 1
And login password, and then corresponding management module 2 is logged in.
Referring to Figures 1 and 2, administrator module 21 includes parameter input unit 211, specification computing unit 212 and task
Allocation unit 213.Parameter input unit 211 is used to input the specifications parameter of current engineering project;212 basis of specification computing unit
211 input specification parameter of parameter input unit calculates the cost data collection amount of current project;Task allocation unit
213 collect personnel for inputting the cost of current project, are evenly distributed at random to the cost data collection amount of current project,
And the task of distribution is sent to corresponding statistician's account.It needs to carry out project cost project initiation in construction project project verification
When, manager logs in administrator module 21 by login module 1, and manager inputs current building by parameter input unit 211
The specifications parameter of project, such as occupied area, construction area, building codes, green coverage equal-specification parameter, and then specification calculate single
Member 212 is counted according to the task amount of the project cost of current construction project, to pass through 213 pairs of task allocation unit calculating
Expected cost Data Collection task is allocated out.The task amount for making data collection is carried out by specification computing unit 212
It calculates, to keep the statistics to data task collecting amount more careful, and carries out random uniform point by task allocation unit 213
Match, it is uneven so as to avoid data collection amount distribution caused by the calculation of first approximation and artificial main pass factor, so as to more preferable
Coordination data collect task and collect personnel.
Referring to Figures 1 and 2, statistician's module 22 is used to input the cost data of current registrant and to current collection
Progress is calculated;The cost data of input are sent to administrator module 21 by statistician's module 22, and display module 7 is used to working as
2 content of management module of preceding login carries out display output.After completing interim collection task in the personnel of collection, statistics is logged in
Statistician's account of member's module 22, the cost data of collection are uploaded.After statistician's module 22 starts, display module 7 is set
Be equipped with and the progress bar that is shown of progress collected to current registrant, progress bar include the time schedule tune item based on time shaft with
And the Task Progress tune item based on collecting amount.After collection personnel log in oneself statistician's account, so can by the time into
Degree item and Task Progress adjusting directly understand the performance of oneself cost Data Collection task.Display module 7 is set
It is equipped with the local hyperlink and the network hyperlink linked to network data base 6 that 5 content of local data base is linked.
And then collection personnel are facilitated to access local data base 5 and network data base 6, and then examine to relevant cost information
Rope inquiry, improves working efficiency.
Referring to Figures 1 and 2, administrator module 21 further includes planning as a whole unit 214 and image conversion unit 215.Plan as a whole unit
The cost data of the transmission of the different logon accounts of 214 pairs of statistician's modules 22 are planned as a whole, and cost inventory is generated.Image conversion
Plan as a whole the cost inventory that unit 214 generates for 215 pairs of unit and is converted into the statistical pictures such as histogram, cake chart, line chart;Show mould
Block 7 is called display output to cost inventory and statistical picture.Pass through the statistical pictures pair such as cake chart, histogram and line chart
The data relationship of cost inventory carries out conclusion and shows, and then conveniently carries out to the intuitive relationship between data of every cost
It is intuitive to read, facilitate staff to read and analyze the cost data of statistics.
Referring to Figures 1 and 2, cue module 3 by the task Percent Complete of statistician divided by consumption task time percentage,
And ratio and setting value are compared, when ratio is less than setting value, cue module 3 is sent to corresponding statistician's account
Prompt information.And then when gatherer logs in online, the Task Progress of oneself is understood, the Task Progress for prompting gatherer current is stagnant
Afterwards.
Referring to Figures 1 and 2, SMS transmission module 4 is stored with the phone number of statistician, when ratio is less than setting value,
Cue module 3 issues to SMS transmission module 4 and sends notice, and SMS transmission module 4 receives and responds to SMS transmission module 4
The transmission of sending notifies, issues SMS Tip to the phone number of corresponding statistician.And then when gatherer is not logged on oneself
Statistician's account can in time prompt current task lag information gatherer by short message form.
The implementation principle of the present embodiment are as follows:
After project cost is approved and initiate a project, administrative staff log in administrator module 21 by login module 1, and then defeated by parameter
Enter the specifications parameter that unit 211 inputs current construction project, specification computing unit 212 is according to the project cost of current construction project
Task amount counted, to be divided by task allocation unit 213 expected cost Data Collection task is calculated
Match.Cost data collection personnel log in statistician's account of statistician's module 22 oneself by login module 1, and then to received
One's own collection task is checked.Collection personnel are collected the cost data belonging to oneself according to the task of collection,
And the cost data of collection are uploaded by statistician's module 22 and are sent to administrator module 21.It is online in the personnel of collection
When, by the progress bar of display module 7, collection personnel can the collection progress to oneself check, and then in time to oneself
Cost data collection rate be adjusted.Administrator module 21 further includes planning as a whole unit 214 and image conversion unit 215.System
The cost data for raising transmission of the unit 214 to the different logon accounts of statistician's module 22 are planned as a whole, and cost inventory is generated.Figure
The cost inventory for planning as a whole the generation of unit 214 as 215 pairs of converting unit is converted into the statistical pictures such as histogram, cake chart, line chart,
And then the convenient cost data to collection carry out review and analysis.When collect personnel collection progress lag when, cue module 3 to
Corresponding statistician's account sends prompt information, and is issued by SMS transmission module 4 to the phone number of corresponding statistician
SMS Tip.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (9)
1. a kind of cost data gathering system based on Internet technology, including login module (1), management module (2) and aobvious
Show module (7), it is characterised in that: the management module (2) includes administrator module (21) and statistician's module (22);It is described to step on
Record module (1) is used to carry out login mode selection selection, and is used to input login account and login password, works as login account
When consistent with login password, start corresponding management module (2);
The administrator module (21) includes parameter input unit (211), specification computing unit (212) and task allocation unit
(213);The parameter input unit (211) is used to input the specifications parameter of current engineering project;The specification computing unit
(212) according to parameter input unit (211) input specification parameter, the cost data collection amount of current project is calculated;Institute
It states task allocation unit (213) and collects personnel for inputting the cost of current project, to the cost data collection amount of current project
It is evenly distributed at random, and the task of distribution is sent to corresponding statistician's account;
Statistician's module (22) is used to input the cost data of current registrant and counts to current collection progress
It calculates;The cost data of input are sent to administrator module (21) by statistician's module (22);
The display module (7) is used to carry out display output to management module (2) content of current login.
2. a kind of cost data gathering system based on Internet technology according to claim 1, it is characterised in that: described
Administrator module (21) further includes planning as a whole unit (214), and plan as a whole unit (214) log in the difference of statistician's module (22)
The cost data of the transmission of account are planned as a whole, and generate cost inventory, the display module (7) is called cost inventory aobvious
Show output.
3. a kind of cost data gathering system based on Internet technology according to claim 2, it is characterised in that: described
Administrator module (21) further includes image conversion unit (215), and described image converting unit (215) is raw to unit (214) are planned as a whole
At cost inventory be converted into statistical picture;The statistical picture that the display module (7) generates image conversion unit (215) into
Row calls display output.
4. a kind of cost data gathering system based on Internet technology according to claim 3, it is characterised in that: described
Statistical picture includes histogram, cake chart and line chart.
5. a kind of cost data gathering system based on Internet technology according to claim 1, it is characterised in that: also wrap
Local data base (5) and network data base (6) are included, after statistician's module (22) starting, the display module (7) is provided with
The local hyperlink that local data base (5) content is linked and the network hyperlink that network data base (6) is linked.
6. a kind of cost data gathering system based on Internet technology according to claim 3, it is characterised in that: described
Display module (7), which is provided with, collects the progress bar that progress is shown to current registrant.
7. a kind of cost data gathering system based on Internet technology according to claim 5, it is characterised in that: described
Progress bar includes the time schedule tune item based on time shaft and the Task Progress tune item based on collecting amount.
8. a kind of cost data gathering system based on Internet technology according to claim 2, it is characterised in that: also wrap
Include cue module (3), the cue module (3) by the task Percent Complete of statistician divided by consumption task time percentage,
And ratio and setting value are compared, when ratio is less than setting value, the cue module (3) is to corresponding statistician's account
Family sends prompt information.
9. a kind of cost data gathering system based on Internet technology according to claim 8, it is characterised in that: also wrap
It includes SMS transmission module (4), the SMS transmission module (4) is stored with the phone number of statistician, when ratio is less than setting value
When, the cue module (3) issues to SMS transmission module (4) sends notice, and the SMS transmission module (4) receives and rings
SMS Tip should be issued to the phone number of corresponding statistician in the transmission notice that SMS transmission module (4) issue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910195162.8A CN110097247A (en) | 2019-03-14 | 2019-03-14 | A kind of cost data gathering system based on Internet technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910195162.8A CN110097247A (en) | 2019-03-14 | 2019-03-14 | A kind of cost data gathering system based on Internet technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110097247A true CN110097247A (en) | 2019-08-06 |
Family
ID=67444029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910195162.8A Pending CN110097247A (en) | 2019-03-14 | 2019-03-14 | A kind of cost data gathering system based on Internet technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110097247A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110738458A (en) * | 2019-09-07 | 2020-01-31 | 北京市建壮咨询有限公司 | Engineering cost management system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106296037A (en) * | 2016-08-26 | 2017-01-04 | 成都晨越造价咨询有限公司 | Cost method of data capture based on big data technique |
CN106327086A (en) * | 2016-08-26 | 2017-01-11 | 成都晨越造价咨询有限公司 | Cost data collection system based on internet technology |
CN107403393A (en) * | 2017-01-04 | 2017-11-28 | 辽东学院 | A kind of construction costs listing service system based on technology of Internet of things |
CN108335080A (en) * | 2018-01-25 | 2018-07-27 | 广州建衡工程咨询有限公司 | A kind of Construction Audit system and implementation method |
CN109241773A (en) * | 2018-09-08 | 2019-01-18 | 中建精诚工程咨询有限公司 | construction cost data management system |
-
2019
- 2019-03-14 CN CN201910195162.8A patent/CN110097247A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106296037A (en) * | 2016-08-26 | 2017-01-04 | 成都晨越造价咨询有限公司 | Cost method of data capture based on big data technique |
CN106327086A (en) * | 2016-08-26 | 2017-01-11 | 成都晨越造价咨询有限公司 | Cost data collection system based on internet technology |
CN107403393A (en) * | 2017-01-04 | 2017-11-28 | 辽东学院 | A kind of construction costs listing service system based on technology of Internet of things |
CN108335080A (en) * | 2018-01-25 | 2018-07-27 | 广州建衡工程咨询有限公司 | A kind of Construction Audit system and implementation method |
CN109241773A (en) * | 2018-09-08 | 2019-01-18 | 中建精诚工程咨询有限公司 | construction cost data management system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110738458A (en) * | 2019-09-07 | 2020-01-31 | 北京市建壮咨询有限公司 | Engineering cost management system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106815709B (en) | Service quick response center support system and method | |
CN110717784B (en) | Electric power marketing system and method based on intelligent management platform | |
CN109658067A (en) | A kind of power engineering project control platform and system | |
CN104361445B (en) | Labour's real-time management system and management method | |
CN110599007A (en) | Project progress management system | |
CN111600296B (en) | Power load prediction system based on edge calculation and prediction method thereof | |
CN105761010A (en) | Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition | |
CN109800250B (en) | System architecture for no longer configuring enterprise central server | |
CN110400040A (en) | A kind of quick transmission system of management and running information based on mobile Internet | |
CN112465468A (en) | Office task management system and management method | |
CN110399363A (en) | A kind of problem data Life cycle data quality management method and system | |
CN110335102A (en) | A kind of system that service platform configures order to clothes processing factory | |
CN110097247A (en) | A kind of cost data gathering system based on Internet technology | |
CN108875975A (en) | A kind of excellent dress system of wisdom precisely informed based on client's outage information | |
CN109190947A (en) | A kind of traffic control evaluation system | |
CN206236144U (en) | Electronics report work system based on intelligent terminal | |
CN117474238A (en) | System and method for managing and controlling construction progress based on WEB terminal | |
CN110599245A (en) | Engineering project cost data management system | |
CN113052417A (en) | Resource allocation method and device | |
CN110619456A (en) | Sensory evaluation data acquisition method and system based on mobile terminal | |
KR101913343B1 (en) | Smart factory mobile application management system using KPI | |
CN115577971A (en) | Staff ability dynamic value evaluation system based on algorithm model | |
CN114880534A (en) | Load aggregation information display method and device, electronic equipment and storage medium | |
CN111125234B (en) | Information monitoring device based on scheduling operation early reporting system | |
CN112147962A (en) | Communication system and communication method between intelligent casting system and equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190806 |