CN109978409A - A kind of multiple-project enterprise-level wisdom building site block chain management method - Google Patents

A kind of multiple-project enterprise-level wisdom building site block chain management method Download PDF

Info

Publication number
CN109978409A
CN109978409A CN201910283287.6A CN201910283287A CN109978409A CN 109978409 A CN109978409 A CN 109978409A CN 201910283287 A CN201910283287 A CN 201910283287A CN 109978409 A CN109978409 A CN 109978409A
Authority
CN
China
Prior art keywords
management
wisdom
project
enterprise
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910283287.6A
Other languages
Chinese (zh)
Other versions
CN109978409B (en
Inventor
徐斌
姜维杰
廖玉龙
崔鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Branch of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Construction Branch of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Branch of State Grid Zhejiang Electric Power Co Ltd filed Critical Construction Branch of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201910283287.6A priority Critical patent/CN109978409B/en
Publication of CN109978409A publication Critical patent/CN109978409A/en
Application granted granted Critical
Publication of CN109978409B publication Critical patent/CN109978409B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of multiple-project enterprise-level wisdom building site block chain management methods, the block chain management method uses a kind of wisdom building site platform management system, the block chain management method is the following steps are included: S1, project progress wisdom management: determining each process logical relation line, target schedule is calculated by software, determine that target is completed the duration, actual construction time and target duration carry out tracking comparison.The present invention passes through setting wisdom building site platform management system, use based on the platform sets management method, solves technological deficiency existing for various aspects in existing management method, and it carries out multi-layer Perspective Analysis and shows enterprise's production, management data, layered authorization is carried out, guarantees the safety of data, using AR technological incorporation BIM technology, simple, at low cost, high efficiency is disposed, each alanysis data can be directly shown in video image.

Description

A kind of multiple-project enterprise-level wisdom building site block chain management method
Technical field
The present invention relates to building site block chain management method field more particularly to a kind of multiple-project enterprise-level wisdom building site blocks Chain management method.
Background technique
Wisdom building site refers to information-based means, carries out careful design to engineering project by three dimensional design platform and applies Work simulation, while work progress management is surrounded, establish the project under construction information metaplasia of interconnection collaboration, intelligence production, scientific management State circle realizes the management of engineering construction visual intelligent, to improve project management information level and realize green construction and ecology It builds.
The management of existing building site management method personnel and equipment, the management of construction progress and monitoring of environment etc. are deposited In serious technological deficiency, for example, construction team and mechanical equipment mobility it is big, worker and equipment identities are difficult to verify;Enterprise Production, the unexecuted multi-layer Perspective Analysis of management data are shown, do not carry out layered authorization management, Information Security obtains not To guarantee;And 2 d plane picture or threedimensional model are still used in project level data management, can not be merged with actual scene And modeling cost is high, fixed model can not be with information dynamic change one.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of multiple-project enterprise-level intelligence proposed Intelligent building site block chain management method, by setting wisdom building site platform management system, the use based on the platform sets management Method solves technological deficiency existing for various aspects in existing management method, and carries out multi-layer Perspective Analysis and show enterprise Production, management data carry out layered authorization, guarantee the safety of data, using AR technological incorporation BIM technology, deployment letter Single, at low cost, high efficiency can directly show each alanysis data in video image.
To achieve the goals above, present invention employs following technical solutions:
The embodiment of the present application provides a kind of multiple-project enterprise-level wisdom building site block chain management method, the block chain manager Method use a kind of wisdom building site platform management system, the block chain management method the following steps are included:
S1, project progress wisdom management: determining each process logical relation line, and target schedule is calculated by software, really It sets the goal and completes the duration, actual construction time and target duration carry out tracking comparison, find out the process of influence progress and take in time and arrange It applies, early-warning conditions is set, for milestone process, all process steps carry out early warning, and distinguish risk class;
S2, security monitoring wisdom management: introducing newest Activity recognition system, by the inspection violating the regulations of video monitoring plus scene to work The common act of violating regulations in journey construction site carries out whole process supervision identification, alerts and report superior system, while to site safety The nonstandard scene progress of civilization arrangement is intelligent not, collects evidence and reports superior system;
S3, professional recruitment wisdom management: personnel march into the arena information collection registration, and the personnel of foundation march into the arena account, take system of real name or Hook is provided in APP face attendance management, attendance and wage clearing;
S4, region construction wisdom management: construction wisdom management terminal collector's location information in region takes off band cap information, if The information of shock, if the information such as static for a long time send information to gateway by Internet of Things transmission technology, gateway receives letter Platform is uploaded to by Ethernet after breath, platform is done at corresponding business according to the information of safety cap and the personal information of database Reason and presentation;
S5, environmental analysis wisdom management: it is realized by big data and technology of Internet of things to engineering construction scene overall situation data, micro- Environment weather data are monitored, and whether intellectual analysis site environment meets engineering construction requirement and centering short-term climate carries out in advance Sentence, makes smooth advances for engineering construction and effective support is provided;
S6, all wisdom management are uploaded to multiple-project enterprise-level wisdom building site platform, and multiple-project enterprise-level wisdom building site platform will Each wisdom management data are fitted to all kinds of productions, business indicator analysis chart, are then uploaded to enterprise-level level, see in group All kinds of productions, the business indicator analysis chart that entire group company's project is shown on plate, show this point of public affairs on branch company's billboard Department's project analyzes chart to tired production, business indicator, and hierarchical layered Shou Quan not checked, assuring data security;
S7, multiple-project enterprise-level wisdom building site platform use AR augmented reality, monitor in conjunction with live video, fusion building letter Model B IM is ceased, each data are uploaded to project level level, checks operator, mechanical equipment, production object from project management department visual angle Material, job instruction, production environment and quality restriction six management data greatly, and these management data can be directly in video image It shows.
Optionally, wisdom building site platform management system includes multiple-project enterprise-level wisdom building site platform, the multiplexing Journey enterprise-level wisdom building site platform is electrically connected with project progress wisdom management module, security monitoring wisdom management module, profession and uses Work wisdom management module, environmental analysis wisdom management module, AR(Augmented Reality augmented reality) module, BIM (Building Information Modeling Building Information Model) module and layered authorization see plate module.
Optionally, the project progress wisdom management module is used for real-time monitoring engineering construction progress, compares engineering level-one Network planning, intellectual analysis engineering construction schedule variance, and provide alert.Ensure to plan rigid execution.
Optionally, the security monitoring wisdom management module is used for video monitoring site operation and administrative situation, by right The big data of safety work risk is collected, and carries out intellectual analysis and site safety early warning to site safety operating risk, and in real time Report upper level supervision and management center.
Optionally, the professional recruitment wisdom management module is used for according to different construction stage scene recruitment intellectual analysis pair According to the real-time condition of going on duty in scene, whether intellectual analysis engineering construction progress matches with recruitment demand, and to next stage specialization Recruitment demand proposes prediction.
Optionally, the region construction wisdom management module is managed for realizing the real-time tracking to professional's coordinate, It really realizes specialties area, professional workers, specialized management, carries out the management of Intelligent region wisdom for next step extension project and establish Good basis.
Optionally, the environmental analysis wisdom management module be used to acquire the fugitive dust at acquisition project scene, noise, temperature, The environmental datas such as wind speed, collect the previous microenvironment data in this area, and incorporation engineering builds actual progress, intellectual analysis, judgement Engineering construction security risk and quality management risk, and environmental warning and auxiliary follow-up work environment anticipation are carried out to various risks Management.
Optionally, the AR module be used to construct visualization that construction site outdoor scene integrally merges with Project Management Information, The three-dimensional enterprise chain of command in production, by using project management department construct key area high point monitor video as carrier, with enhancing Perception, isomeric data convergence, space coordinate measuring and calculating, equipment linkage communication, label interaction encapsulation, interface fusion present the methods of, Video live-action map effect is created, realizes and completes enterprise's entry, the production commander of multistage control and pipe under united portal Reason business.
Optionally, the BIM model module is used to help realize the integrated of architecture information, from the design, construction, fortune of building Until building the termination of life cycle management, various information are integrated in a three-dimensional model information database row always, design group The all parties such as team, unit in charge of construction, installation fishery department and owner can be cooperated based on BIM, effectively improve work Efficiency saves resource, reduces cost, to realize sustainable development.
Optionally, the layered authorization sees that plate module shows enterprise's production for realizing multi-layer Perspective Analysis, manages pipe Data are managed, realize data visualization, and use hierarchical empowerment management.
The invention has the following advantages:
1, management method is set based on wisdom building site platform management system, solves such as worker's identity hardly possible in existing management method With technological deficiency existing for the various aspects such as verifying, keeps building-site management more orderly, avoid because of problem of management schedule delays;
2, in enterprise-level level, this management method is from business administration angle, using group's billboard, branch company's billboard, by all kinds of Production, business indicator analyze chart, data, show enterprise's partial data, and hierarchical authorization, assuring data security;
3, in project level level, this management method combines video monitoring, and AR augmented reality merges BIM model, from project management department Six big management data, real time monitoring, real-time early warning, compared to conventional two-dimensional plan view and threedimensional model, Ke Yizhi are checked in visual angle It connects and shows each alanysis data, at low cost, high efficiency in video image.
Detailed description of the invention
Fig. 1 is a kind of flow chart of multiple-project enterprise-level wisdom building site block chain management method provided by the invention;
Fig. 2 is a kind of structural schematic diagram of wisdom building site platform management system provided by the invention;
Fig. 3 is a kind of structural schematic diagram of security monitoring wisdom management module provided by the invention;
Fig. 4 is a kind of structural schematic diagram of professional recruitment wisdom management module provided by the invention;
Fig. 5 is a kind of structural schematic diagram of environmental analysis wisdom management module provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1, a kind of multiple-project enterprise-level wisdom building site block chain management method, block chain management method are used as schemed A kind of wisdom building site platform management system shown in 2, block chain management method the following steps are included:
S1, project progress wisdom management: determining each process logical relation line, and target schedule is calculated by software, really It sets the goal and completes the duration, actual construction time and target duration carry out tracking comparison, find out the process of influence progress and take in time and arrange It applies, early-warning conditions is set, for milestone process, all process steps carry out early warning, and distinguish risk class;
S2, security monitoring wisdom management: introducing newest Activity recognition system, by the inspection violating the regulations of video monitoring plus scene to work The common act of violating regulations in journey construction site carries out whole process supervision identification, alerts and report superior system, while to site safety The nonstandard scene progress of civilization arrangement is intelligent not, collects evidence and reports superior system;
S3, professional recruitment wisdom management: personnel march into the arena information collection registration, and the personnel of foundation march into the arena account, take system of real name or Hook is provided in APP face attendance management, attendance and wage clearing;
S4, region construction wisdom management: construction wisdom management terminal collector's location information in region takes off band cap information, if The information of shock, if the information such as static for a long time send information to gateway by Internet of Things transmission technology, gateway receives letter Platform is uploaded to by Ethernet after breath, platform is done at corresponding business according to the information of safety cap and the personal information of database Reason and presentation;
S5, environmental analysis wisdom management: it is realized by big data and technology of Internet of things to engineering construction scene overall situation data, micro- Environment weather data are monitored, and whether intellectual analysis site environment meets engineering construction requirement and centering short-term climate carries out in advance Sentence, makes smooth advances for engineering construction and effective support is provided;
S6, all wisdom management are uploaded to multiple-project enterprise-level wisdom building site platform, and multiple-project enterprise-level wisdom building site platform will Each wisdom management data are fitted to all kinds of productions, business indicator analysis chart, are then uploaded to enterprise-level level, see in group All kinds of productions, the business indicator analysis chart that entire group company's project is shown on plate, show this point of public affairs on branch company's billboard Department's project analyzes chart to tired production, business indicator, and hierarchical layered Shou Quan not checked, assuring data security;
S7, multiple-project enterprise-level wisdom building site platform use AR augmented reality, monitor in conjunction with live video, merge BIM mould Each data are uploaded to project level level by type, check that operator, mechanical equipment, production material, operation refer to from project management department visual angle Book, production environment and quality restriction six management data greatly are led, and these management data can directly be shown in video image.
The embodiment of the present application also provides a kind of wisdom building site platform management system, wisdom building site platform management system includes Multiple-project enterprise-level wisdom building site platform, multiple-project enterprise-level wisdom building site platform are electrically connected with project progress wisdom management mould Block, security monitoring wisdom management module, professional recruitment wisdom management module, environmental analysis wisdom management module, AR module, BIM Model module and layered authorization see plate module.
Project progress wisdom management module is used for real-time monitoring engineering construction progress, compares the plan of engineering primary network station, intelligence Energy analysis project construction progress deviation, and provide alert.Ensure to plan rigid execution.
Referring to Fig. 3, security monitoring wisdom management module is used for video monitoring site operation and administrative situation, by safety The big data of operating risk is collected, and carries out intellectual analysis and site safety early warning, and real-time report to site safety operating risk Upper level supervision and management center.Security monitoring and include infrared camera, wireless bridge and display screen in wisdom management module.
Referring to Fig. 4, professional recruitment wisdom management module is used to be compareed according to different construction stage scene recruitment intellectual analysis Whether the real-time condition of going on duty in scene, intellectual analysis engineering construction progress match with recruitment demand, and use next stage specialization Work demand proposes prediction.Professional recruitment wisdom management module includes core switch, core switch be electrically connected with sound-box device, Infrared camera, LED display lamp, gate control panel and management PC.
Wisdom management module is constructed for realizing the real-time tracking control to professional's coordinate in region, really realizes profession Region, professional workers, specialized management carry out the management of Intelligent region wisdom for next step extension project and establish good basis.
Referring to Fig. 5, environmental analysis wisdom management module is used to acquire fugitive dust, noise, temperature, the wind speed at acquisition project scene Equal environmental datas collect the previous microenvironment data in this area, and incorporation engineering builds actual progress, and intellectual analysis judges engineering Building security risk and quality management risk, and environmental warning and auxiliary follow-up work environment anticipation pipe are carried out to various risks Reason.Ambient environment analysis wisdom management module includes fugitive dust monitor, and fugitive dust monitor includes wind direction and wind velocity sensor, noise biography Sensor, Moisture/temperaturesensor sensor and particulate matter sensors, fugitive dust monitor are electrically connected with platform software by wireless device.
AR module is used to construct visualization, the life of three-dimensional enterprise that construction site outdoor scene is integrally merged with Project Management Information Command system is produced, by perceiving with enhancing, isomeric data using the high point monitor video of project management department's construction key area as carrier Convergence, space coordinate measuring and calculating, equipment linkage communication, label interaction encapsulation, interface fusion present the methods of, create video outdoor scene Map effect is realized and completes enterprise's entry, the production commander of multistage control and management business under united portal.
BIM module is used to help realize the integrated of architecture information, from the design of building, construction, operation up to building the full longevity The termination in period is ordered, various information are integrated in always in a three-dimensional model information database, and design team, is set unit in charge of construction Applying all parties such as operation department and owner can be cooperated based on BIM, effectively improve working efficiency, save resource, Reduce cost, to realize sustainable development.
Layered authorization sees that plate module shows enterprise's production, management data for realizing multi-layer Perspective Analysis, realizes Data visualization, and use hierarchical empowerment management.
For the present invention by setting wisdom building site platform management system, the use based on the platform sets management method, solves Technological deficiency existing for various aspects in existing management method, and carry out multi-layer Perspective Analysis and show enterprise's production, manage Manage data, carry out layered authorization, guarantee the safety of data, using AR technological incorporation BIM technology, dispose it is simple, at low cost, High efficiency can directly show each alanysis data in video image.
In addition, the application also provides a kind of computer storage medium, wherein the computer storage medium can be stored with journey Sequence, the program may include project progress wisdom management in each embodiment provided by the present application, security monitoring wisdom when executing Management, professional recruitment wisdom management, the management of region recruitment wisdom, region construction wisdom management, the management of environmental analysis wisdom, data Graphic analyses displaying, layered authorization management and AR data exposition or Overall Steps.The storage medium can for magnetic disk, CD, read-only memory ROM or random access memory RAM etc..
In the above-described embodiments, it can be realized fully or partially through software, hardware, firmware or any combination thereof. When implemented in software, it can entirely or partly realize in the form of a computer program product.
It is required that those skilled in the art can be understood that the technology in the embodiment of the present invention can add by software The mode of general hardware platform realize.Based on this understanding, the technical solution in the embodiment of the present invention substantially or Say that the part that contributes to existing technology can be embodied in the form of software products, which can deposit Storage is in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that computer equipment (can be with It is personal computer, server or the network equipment etc.) execute certain part institutes of each embodiment of the present invention or embodiment The method stated.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of multiple-project enterprise-level wisdom building site block chain management method, which is characterized in that the block chain management method makes With a kind of wisdom building site platform management system, the block chain management method the following steps are included:
S1, project progress wisdom management: determining each process logical relation line, and target schedule is calculated by software, really It sets the goal and completes the duration, actual construction time and target duration carry out tracking comparison, find out the process of influence progress and take in time and arrange It applies, early-warning conditions is set, for milestone process, all process steps carry out early warning, and distinguish risk class;
S2, security monitoring wisdom management: introducing newest Activity recognition system, by the inspection violating the regulations of video monitoring plus scene to work The common act of violating regulations in journey construction site carries out whole process supervision identification, alerts and report superior system, while to site safety The nonstandard scene progress of civilization arrangement is intelligent not, collects evidence and reports superior system;
S3, professional recruitment wisdom management: personnel march into the arena information collection registration, and the personnel of foundation march into the arena account, take system of real name or Hook is provided in APP face attendance management, attendance and wage clearing;
S4, region construction wisdom management: construction wisdom management terminal collector's location information in region takes off band cap information, if The information of shock, if the information such as static for a long time send information to gateway by Internet of Things transmission technology, gateway receives letter Platform is uploaded to by Ethernet after breath, platform is done at corresponding business according to the information of safety cap and the personal information of database Reason and presentation;
S5, environmental analysis wisdom management: it is realized by big data and technology of Internet of things to engineering construction scene overall situation data, micro- Environment weather data are monitored, and whether intellectual analysis site environment meets engineering construction requirement and centering short-term climate carries out in advance Sentence, makes smooth advances for engineering construction and effective support is provided;
S6, all wisdom management are uploaded to multiple-project enterprise-level wisdom building site platform, and multiple-project enterprise-level wisdom building site platform will Each wisdom management data are fitted to all kinds of productions, business indicator analysis chart, are then uploaded to enterprise-level level, see in group All kinds of productions, the business indicator analysis chart that entire group company's project is shown on plate, show this point of public affairs on branch company's billboard Department's project analyzes chart to tired production, business indicator, and hierarchical layered Shou Quan not checked, assuring data security;
S7, multiple-project enterprise-level wisdom building site platform use AR augmented reality, monitor in conjunction with live video, fusion building letter Model B IM is ceased, each data are uploaded to project level level, checks operator, mechanical equipment, production object from project management department visual angle Material, job instruction, production environment and quality restriction six management data greatly, and these management data can be directly in video image It shows.
2. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 1, which is characterized in that institute Stating wisdom building site platform management system includes multiple-project enterprise-level wisdom building site platform, and the multiple-project enterprise-level wisdom building site is flat Platform is electrically connected with project progress wisdom management module, security monitoring wisdom management module, professional recruitment wisdom management module, environment Analysis wisdom management module, AR module, BIM module and layered authorization see plate module.
3. according to right want 2 described in a kind of multiple-project enterprise-level wisdom building site block chain management method, which is characterized in that it is described Project progress wisdom management module is used for real-time monitoring engineering construction progress, compares the plan of engineering primary network station, intellectual analysis work Journey construction progress deviation, and provide alert, it is ensured that plan rigidity executes.
4. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that institute Security monitoring wisdom management module is stated for video monitoring site operation and administrative situation, passes through the big number to safety work risk According to collection, intellectual analysis and site safety early warning, and real-time report upper level monitoring management are carried out to site safety operating risk Center.
5. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that institute Professional recruitment wisdom management module is stated for real-time to hilllock feelings according to different construction stage scene recruitment intellectual analysis control scene Whether condition, intellectual analysis engineering construction progress match with recruitment demand, and propose to predict to next stage specialization recruitment demand.
6. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that institute State region construction wisdom management module for realizing to professional's coordinate real-time tracking control, really realize specialties area, Professional workers, specialized management carry out the management of Intelligent region wisdom for next step extension project and establish good basis.
7. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that institute Environmental analysis wisdom management module is stated for acquiring the environmental datas such as fugitive dust, noise, temperature, the wind speed at acquisition project scene, is received Collect this previous microenvironment data in area, incorporation engineering builds actual progress, intellectual analysis, judge engineering construction security risk and Quality management risk, and environmental warning and auxiliary follow-up work environment anticipation management are carried out to various risks.
8. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that institute AR module is stated for constructing the visualization that construction site outdoor scene is integrally merged with Project Management Information, three-dimensional enterprise production commander System, by being converged with enhancing perception, isomeric data using the high point monitor video of project management department's construction key area as carrier, The methods of space coordinate measuring and calculating, equipment linkage communication, label interaction encapsulation, interface fusion presentation, create video live-action map Effect is realized and completes enterprise's entry, the production commander of multistage control and management business under united portal.
9. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that institute It states BIM module to be used to help realize the integrated of architecture information, from the design of building, construction, operation up to building life cycle management Termination, various information are integrated in always in a three-dimensional model information database, design team, unit in charge of construction, installation fishery The all parties such as department and owner can be cooperated based on BIM, effectively improve working efficiency, save resource, reduce at Originally, to realize sustainable development.
10. a kind of multiple-project enterprise-level wisdom building site block chain management method according to claim 2, which is characterized in that The layered authorization sees that plate module shows enterprise's production, management data for realizing multi-layer Perspective Analysis, realizes data Visualization, and use hierarchical empowerment management.
CN201910283287.6A 2019-04-10 2019-04-10 Multi-engineering enterprise-level intelligent construction site block chain management method Expired - Fee Related CN109978409B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910283287.6A CN109978409B (en) 2019-04-10 2019-04-10 Multi-engineering enterprise-level intelligent construction site block chain management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910283287.6A CN109978409B (en) 2019-04-10 2019-04-10 Multi-engineering enterprise-level intelligent construction site block chain management method

Publications (2)

Publication Number Publication Date
CN109978409A true CN109978409A (en) 2019-07-05
CN109978409B CN109978409B (en) 2021-07-13

Family

ID=67083754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910283287.6A Expired - Fee Related CN109978409B (en) 2019-04-10 2019-04-10 Multi-engineering enterprise-level intelligent construction site block chain management method

Country Status (1)

Country Link
CN (1) CN109978409B (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244679A (en) * 2019-07-29 2019-09-17 南京合智信息技术有限公司 A kind of wisdom building site management system and its application method based on SAAS platform
CN110852909A (en) * 2019-09-01 2020-02-28 成都建工第五建筑工程有限公司 Building engineering information management system
CN111126838A (en) * 2019-12-23 2020-05-08 广东电网有限责任公司 Intelligent engineering management system
CN111144783A (en) * 2019-12-31 2020-05-12 重庆西恒工程咨询有限公司 Construction management method applying intelligent construction site system
CN111242574A (en) * 2020-01-08 2020-06-05 中国建筑第二工程局有限公司西南分公司 Intelligent site inspection management system and method based on GPS technology
CN111401853A (en) * 2020-03-24 2020-07-10 上海捷规建筑工程咨询有限公司 Intelligent construction project management system based on BIM
CN111444568A (en) * 2020-03-27 2020-07-24 北京中交京纬公路造价技术有限公司 Engineering monitoring BIM cooperative platform based on Internet of things
CN111507595A (en) * 2020-04-08 2020-08-07 广州高新工程顾问有限公司 Engineering project intelligent dynamic safety supervision system based on BIM
CN111626643A (en) * 2020-06-19 2020-09-04 中交一公局厦门工程有限公司 Intelligent construction site management system and intelligent construction site management innovation application method
CN111898866A (en) * 2020-07-03 2020-11-06 浙江华卫智能科技有限公司 Wisdom building site management platform
CN112419100A (en) * 2020-11-25 2021-02-26 江苏集萃未来城市应用技术研究所有限公司 Wisdom building site supervisory systems based on thing networking and block chain
CN112508417A (en) * 2020-12-11 2021-03-16 民航中南机场设计研究院(广州)有限公司 Civil aviation professional engineering general contract project management system based on BIM technology
CN113177768A (en) * 2020-11-10 2021-07-27 国网青海省电力公司 Intelligent engineering platform based on comprehensive digital management of capital construction whole process
CN113361975A (en) * 2021-07-16 2021-09-07 安徽富煌钢构股份有限公司 BIM + wisdom building site management platform system
CN113672972A (en) * 2021-07-01 2021-11-19 国网浙江省电力有限公司建设分公司 Important asset safety monitoring method based on middleboxes
CN113902258A (en) * 2021-09-14 2022-01-07 杭州大杰智能传动科技有限公司 Intelligent tower crane-based intelligent construction site operation area visual management system and method
CN113947337A (en) * 2021-12-20 2022-01-18 中通服建设有限公司 Method for cooperatively sharing engineering construction resources
CN114827538A (en) * 2022-04-13 2022-07-29 成都棣华盛装饰材料有限公司 Construction progress monitoring method and system for intelligent construction site
CN114862626A (en) * 2022-04-01 2022-08-05 华中科技大学 Construction site environment monitoring method and system based on block chain technology
CN115471111A (en) * 2022-09-28 2022-12-13 数云科际(深圳)技术有限公司 Work order management method based on building information model and intelligent construction site
CN116305797A (en) * 2023-02-07 2023-06-23 广东电网有限责任公司广州供电局 Construction risk assessment system based on BIM and multisource quality information fusion
CN116451979A (en) * 2023-06-15 2023-07-18 河北建工集团有限责任公司 Intelligent construction integrated collaboration platform and method based on artificial intelligence
CN117193132A (en) * 2023-10-10 2023-12-08 海南大学 Engineering monitoring method based on digital twinning
CN117217715A (en) * 2023-11-03 2023-12-12 中招国际招标有限公司 Construction progress monitoring method and system based on engineering electronic map

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764806A (en) * 2018-03-24 2018-11-06 北京工业大学 A kind of labor service real-name management system for wisdom building site
CN108898360A (en) * 2018-06-22 2018-11-27 中国能源建设集团安徽电力建设第工程有限公司 A kind of power engineering wisdom building site integrated control information system
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN109460939A (en) * 2018-11-25 2019-03-12 四川华芯项目管理有限公司 A kind of Municipal Engineering Construction safety control system and method based on 3DGIS+BIM technology
CN109559006A (en) * 2018-09-19 2019-04-02 中建科技有限公司深圳分公司 A kind of monitoring method, device and the terminal device of the construction site based on unmanned plane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764806A (en) * 2018-03-24 2018-11-06 北京工业大学 A kind of labor service real-name management system for wisdom building site
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN108898360A (en) * 2018-06-22 2018-11-27 中国能源建设集团安徽电力建设第工程有限公司 A kind of power engineering wisdom building site integrated control information system
CN109559006A (en) * 2018-09-19 2019-04-02 中建科技有限公司深圳分公司 A kind of monitoring method, device and the terminal device of the construction site based on unmanned plane
CN109460939A (en) * 2018-11-25 2019-03-12 四川华芯项目管理有限公司 A kind of Municipal Engineering Construction safety control system and method based on 3DGIS+BIM technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周永明: ""珠海横琴国际金融中心大厦项目智慧工地集成化应用"", 《土木建筑工程信息技术》 *

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244679B (en) * 2019-07-29 2023-07-04 南京合智信息技术有限公司 Intelligent building site management system based on SAAS platform and application method thereof
CN110244679A (en) * 2019-07-29 2019-09-17 南京合智信息技术有限公司 A kind of wisdom building site management system and its application method based on SAAS platform
CN110852909A (en) * 2019-09-01 2020-02-28 成都建工第五建筑工程有限公司 Building engineering information management system
CN111126838A (en) * 2019-12-23 2020-05-08 广东电网有限责任公司 Intelligent engineering management system
CN111126838B (en) * 2019-12-23 2022-07-12 广东电网有限责任公司 Intelligent engineering management system
CN111144783A (en) * 2019-12-31 2020-05-12 重庆西恒工程咨询有限公司 Construction management method applying intelligent construction site system
CN111242574A (en) * 2020-01-08 2020-06-05 中国建筑第二工程局有限公司西南分公司 Intelligent site inspection management system and method based on GPS technology
CN111401853A (en) * 2020-03-24 2020-07-10 上海捷规建筑工程咨询有限公司 Intelligent construction project management system based on BIM
CN111401853B (en) * 2020-03-24 2024-06-04 上海捷规建筑工程咨询有限公司 Intelligent construction project management system based on BIM
CN111444568A (en) * 2020-03-27 2020-07-24 北京中交京纬公路造价技术有限公司 Engineering monitoring BIM cooperative platform based on Internet of things
CN111507595B (en) * 2020-04-08 2021-02-23 广州高新工程顾问有限公司 Engineering project intelligent dynamic safety supervision system based on BIM
CN111507595A (en) * 2020-04-08 2020-08-07 广州高新工程顾问有限公司 Engineering project intelligent dynamic safety supervision system based on BIM
CN111626643A (en) * 2020-06-19 2020-09-04 中交一公局厦门工程有限公司 Intelligent construction site management system and intelligent construction site management innovation application method
CN111898866A (en) * 2020-07-03 2020-11-06 浙江华卫智能科技有限公司 Wisdom building site management platform
CN113177768A (en) * 2020-11-10 2021-07-27 国网青海省电力公司 Intelligent engineering platform based on comprehensive digital management of capital construction whole process
CN112419100A (en) * 2020-11-25 2021-02-26 江苏集萃未来城市应用技术研究所有限公司 Wisdom building site supervisory systems based on thing networking and block chain
CN112508417A (en) * 2020-12-11 2021-03-16 民航中南机场设计研究院(广州)有限公司 Civil aviation professional engineering general contract project management system based on BIM technology
CN113672972A (en) * 2021-07-01 2021-11-19 国网浙江省电力有限公司建设分公司 Important asset safety monitoring method based on middleboxes
CN113672972B (en) * 2021-07-01 2024-04-05 国网浙江省电力有限公司建设分公司 Important asset safety monitoring method based on middle platform
CN113361975A (en) * 2021-07-16 2021-09-07 安徽富煌钢构股份有限公司 BIM + wisdom building site management platform system
CN113902258A (en) * 2021-09-14 2022-01-07 杭州大杰智能传动科技有限公司 Intelligent tower crane-based intelligent construction site operation area visual management system and method
CN113902258B (en) * 2021-09-14 2023-06-02 杭州大杰智能传动科技有限公司 Intelligent construction site operation area visual management system and method based on intelligent tower crane
CN113947337A (en) * 2021-12-20 2022-01-18 中通服建设有限公司 Method for cooperatively sharing engineering construction resources
CN114862626A (en) * 2022-04-01 2022-08-05 华中科技大学 Construction site environment monitoring method and system based on block chain technology
CN114862626B (en) * 2022-04-01 2022-12-09 华中科技大学 Construction site environment monitoring method and system based on block chain technology
CN114827538A (en) * 2022-04-13 2022-07-29 成都棣华盛装饰材料有限公司 Construction progress monitoring method and system for intelligent construction site
CN114827538B (en) * 2022-04-13 2024-05-10 广州市微柏软件股份有限公司 Construction progress monitoring method and system for intelligent building site
CN115471111A (en) * 2022-09-28 2022-12-13 数云科际(深圳)技术有限公司 Work order management method based on building information model and intelligent construction site
CN116305797A (en) * 2023-02-07 2023-06-23 广东电网有限责任公司广州供电局 Construction risk assessment system based on BIM and multisource quality information fusion
CN116305797B (en) * 2023-02-07 2023-11-14 广东电网有限责任公司广州供电局 Construction risk assessment system based on BIM and multisource quality information fusion
CN116451979B (en) * 2023-06-15 2023-08-18 河北建工集团有限责任公司 Intelligent construction integrated collaboration platform and method based on artificial intelligence
CN116451979A (en) * 2023-06-15 2023-07-18 河北建工集团有限责任公司 Intelligent construction integrated collaboration platform and method based on artificial intelligence
CN117193132A (en) * 2023-10-10 2023-12-08 海南大学 Engineering monitoring method based on digital twinning
CN117217715B (en) * 2023-11-03 2024-02-06 中招国际招标有限公司 Construction progress monitoring method and system based on engineering electronic map
CN117217715A (en) * 2023-11-03 2023-12-12 中招国际招标有限公司 Construction progress monitoring method and system based on engineering electronic map

Also Published As

Publication number Publication date
CN109978409B (en) 2021-07-13

Similar Documents

Publication Publication Date Title
CN109978409A (en) A kind of multiple-project enterprise-level wisdom building site block chain management method
CN110378606B (en) Mobile visual safety management and control system
CN111598734A (en) Intelligent building site integrated management system of BIM and Internet of things
US20210349476A1 (en) Method and apparatus for controlling cruise of unmanned air vehicle based on prefabricated construction platform
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN112163746A (en) Building engineering project management system based on BIM and GIS
CN112149212B (en) Visual construction management platform for engineering project
CN110175368A (en) A kind of rail traffic data display systems based on BIM+GIS
CN112907389A (en) Land, air and space integrated intelligent construction site system and management method
CN111104622A (en) WEBGL-based three-dimensional GIS intelligent monitoring method and device
CN113034311A (en) Building construction supervision system and method based on BIM
CN110137940B (en) Intelligent electric power management and control system based on mobile visualization
CN112988865B (en) Industrial Internet service management system
CN115798265B (en) Digital tower construction method based on digital twin technology and implementation system thereof
CN115248880A (en) Smart city security monitoring system
CN114399265A (en) Electric power engineering construction project overall process management and control system
CN111429583A (en) Space-time situation perception method and system based on three-dimensional geographic information
CN115858651A (en) Support platform is used in integration of wisdom city
CN114092279A (en) Full-service ubiquitous visual intelligent power operation and maintenance system
CN117828866A (en) Virtual barrage construction method based on digital twin and related device
CN113518123A (en) National network digital converter station operation and maintenance system based on augmented reality technology
CN115859689B (en) Panoramic visualization digital twin application method
CN112506155A (en) PC component production simulation and intelligent control system
CN112699451B (en) Community real-time twin system based on combination of community service middlebox and data middlebox with BIM
CN116129068A (en) Visual management platform based on digital twin technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210713

CF01 Termination of patent right due to non-payment of annual fee