CN111126838A - Intelligent engineering management system - Google Patents

Intelligent engineering management system Download PDF

Info

Publication number
CN111126838A
CN111126838A CN201911338879.XA CN201911338879A CN111126838A CN 111126838 A CN111126838 A CN 111126838A CN 201911338879 A CN201911338879 A CN 201911338879A CN 111126838 A CN111126838 A CN 111126838A
Authority
CN
China
Prior art keywords
module
management system
monitoring
data
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911338879.XA
Other languages
Chinese (zh)
Other versions
CN111126838B (en
Inventor
李窕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Chaozhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Chaozhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Chaozhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201911338879.XA priority Critical patent/CN111126838B/en
Publication of CN111126838A publication Critical patent/CN111126838A/en
Application granted granted Critical
Publication of CN111126838B publication Critical patent/CN111126838B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses an intelligent engineering management system, and belongs to an engineering management system. An intelligent engineering management system, comprising: the system comprises a comprehensive management system, a safety management system, a quality management system, a progress management system, a technical management system and a purchase management system; the integrated management system comprises a communication module, a central processing module and a display module; the safety management system is used for monitoring construction site data, the quality management system is used for monitoring construction site quality data, the progress management system is used for monitoring construction site progress data, the technical management system is used for monitoring construction technical data, and the purchasing system is used for monitoring material and equipment data. The system monitors and analyzes data of safety, quality, progress, technology and purchase of the project, the comprehensive management system displays monitoring conditions and data analysis of each system, and engineering management personnel can conveniently master the whole project.

Description

Intelligent engineering management system
Technical Field
The invention relates to the field of engineering management systems, in particular to an intelligent engineering management system.
Background
With the rapid development of national economy in China, the power consumption demand is higher and higher, and the construction projects of the power engineering are increased day by day. The electric power engineering project relates to a plurality of factors such as personnel, machines, materials and environment, has high management difficulty and frequently generates electric power construction operation accidents.
The currently developed 4A platform integrates all business systems, but no association or low association degree exists among all business systems, a complete system is not formed, the requirements of appreciable, measurable and controllable lean management and control on the whole process of project safety, quality, progress and the like cannot be met, and engineering managers cannot control the whole condition of a project easily.
Disclosure of Invention
The invention aims to provide an intelligent engineering management system to solve the problem that engineering managers are difficult to master personnel, machines, materials and environmental factors in the whole engineering situation due to the relevance of each system.
In order to achieve the purpose, the invention adopts the following technical scheme:
an intelligent engineering management system, comprising: the system comprises a comprehensive management system, a safety management system, a quality management system, a progress management system, a technical management system and a purchase management system;
the comprehensive management system comprises a communication module, a central processing module and a display module, wherein the safety management system, the quality management system, the progress management system, the technical management system and the purchase management system are respectively connected with the communication module, the communication module is connected with the central processing module, the central processing module is used for processing data transmitted by the communication module, and the display module is used for displaying a data processing result of the central processing module;
the safety management system is used for monitoring construction site data and performing data analysis, the quality management system is used for monitoring site construction quality data and performing data analysis, the progress management system is used for monitoring site construction progress data and performing data analysis, and the technical management system is used for monitoring construction technical data and performing data analysis.
Optionally, the display module includes an electronic display screen and an integrated display screen, the large-screen integrated module is configured to display video data information, and the electronic display screen is configured to display data analysis processed by the central processing module.
Optionally, the integrated management system further includes a mobile terminal, the mobile terminal is connected to the central processing module, and the mobile terminal is configured to display data analysis processed by the central processing module.
Optionally, the safety management system includes monitoring module and monitoring facilities, monitoring module includes meteorological monitoring module, material information monitoring module, personnel information monitoring module and equipment state monitoring module, equipment state monitoring module is including the sensor that is used for the monitoring facilities state, material information monitoring module includes first camera, personnel information monitoring module includes the second camera and is used for monitoring personnel information's sensing device, meteorological monitoring module includes raise dust noise monitoring module, sewage monitoring module, smoke detection monitoring module, rainfall monitoring module, sewage monitoring module is including the sewage measuring apparatu that is used for sewage monitoring, smoke detection monitoring module is including the smoke detection probe that is used for smoke monitoring.
Optionally, the safety management system still includes alarm module, alarm module includes alarm indicator and warning loudspeaker, alarm module respectively with meteorological monitoring module material information monitoring module personnel information monitoring module with equipment state monitoring module data connection, alarm module is used for handling detection information and sending the warning.
Optionally, the quality management module includes the BIM module, mixes earth and pours the module, removes end measuring module, mixes earth and pours the module and be used for carrying out the temperature measurement and pouring the warning to the concrete construction.
Optionally, the BIM module includes a BIM modeling module, a BIM lofting module, and a three-dimensional laser calibration module; the BIM modeling module is used for building a three-dimensional model for substation electromechanical equipment, buildings and line towers, the BIM lofting module is used for performing construction lofting through the three-dimensional model, and the three-dimensional laser checking module is used for performing three-dimensional scanning on site construction and comparing with the three-dimensional model to check errors of a structure.
Optionally, the progress management system includes a zebra progress management module and a BIM5D progress management module, and the progress management system is in data connection with the BIM module.
Optionally, the technical management system comprises a model design module, an artificial intelligence evaluation module, a mechanized construction module, and an intelligent delivery and flight module, wherein the model design module is in data connection with the BIM module.
Optionally, the purchase management system includes a two-dimensional code application subsystem module, and the two-dimensional code application subsystem module is used for uniformly and electronically managing the material information.
Compared with the prior art, the invention has the following beneficial effects: the system confirms the specific requirements of the management of the electric power engineering project in the aspects of synthesis, safety, quality, progress, technology and purchase, monitors and analyzes the safety, quality, progress, technology and purchase of the project, relates to the information of personnel, machines, materials and environmental factors in construction, analyzes and displays the monitoring condition and the data of each system to a manager by the comprehensive management system, allocates the personnel, the machines, the materials and the environment of the whole construction according to the observed data by the manager, feeds back the allocation information to each system, and adjusts the working condition of each system according to the fed-back allocation information, so that the manager can master and control the construction condition of the whole project.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
The structure, proportion, size and the like shown in the drawings are only used for matching with the content disclosed in the specification, so that the person skilled in the art can understand and read the description, and the description is not used for limiting the limit condition of the implementation of the invention, so the method has no technical essence, and any structural modification, proportion relation change or size adjustment still falls within the scope of the technical content disclosed by the invention without affecting the effect and the achievable purpose of the invention.
FIG. 1 is a schematic diagram of an intelligent project management system.
Illustration of the drawings: the system comprises a comprehensive management system 1, a safety management system 2, a quality management system 3, a progress management system 4, a technical management system 5, a purchase management system 6, a communication module 11, a central processing module 12, a display module 13 and a mobile terminal 14.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention. It should be noted that when one component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present.
The technical scheme of the invention is further explained by the specific implementation mode in combination with the attached drawings.
The embodiment of the invention provides an intelligent engineering management system, which comprises: the system comprises a comprehensive management system 1, a safety management system 2, a quality management system 3, a progress management system 4, a technical management system 5 and a purchase management system 6;
the comprehensive management system comprises a communication module 11, a central processing module 12 and a display module 13, wherein a safety management system 2, a quality management system 3, a progress management system 4, a technical management system 5 and a purchase management system 6 are respectively connected with the communication module 11, the communication module 11 is connected with the central processing module 12, the central processing module 12 is used for integrating and processing data transmitted by the communication module 11, the display module 13 is used for displaying a data processing result of the central processing module 12, and the communication module 11 comprises wireless network communication and wired data communication;
the safety management system 2 is used for monitoring construction site data and performing data analysis, the quality management system 3 is used for monitoring the construction site quality data and performing data analysis, the progress management system 4 is used for monitoring the construction site progress data and performing data analysis, the technical management system 5 is used for monitoring construction technical data and performing data analysis, and the purchasing system 6 is used for monitoring material and equipment data and performing data analysis.
Optionally, the display module 13 includes an electronic display screen and an integrated display screen, the large-screen integrated module is used for displaying video data information, and the electronic display screen is used for displaying data analysis processed by the central processing module 12.
Optionally, the integrated management system 1 further includes a mobile terminal 14, the mobile terminal 14 is connected to the central processing module 12, the mobile terminal 14 is configured to display data analysis processed by the central processing module 12, the mobile terminal 14 can directly click to check monitoring states and data analysis of each device, and the mobile terminal 14 is a mobile phone App, which is convenient for mobile operation.
Optionally, the safety management system 2 comprises an intelligent behavior analysis module, a monitoring module and monitoring equipment, wherein the monitoring module comprises a meteorological monitoring module, a material information monitoring module, a personnel information monitoring module and an equipment state monitoring module, and the meteorological monitoring module comprises a dust raising noise monitoring module, a dust falling spraying system module, a sewage monitoring module, a smoke sensing monitoring module and a flood prevention monitoring module;
the material information monitoring module comprises a material placing module; the equipment state monitoring module comprises a vibration bracelet subsystem equipment module, a special equipment monitoring module, a deep foundation pit supporting monitoring module, a high formwork monitoring module, a scaffold monitoring module, an electric box monitoring module and a construction intelligent power utilization management module; personnel information monitoring module includes intelligent video monitoring module, face identification module, intelligent safety helmet orientation module, dresses identification module, healthy real-time supervision module, fence perimeter protection module, portable fence perimeter protection module, infrared curtain fence module, infrared enclosure module, vehicle management module.
The intelligent video monitoring module is used for project construction, quality, safety, civilized construction management and other aspects, and managers can master construction dynamics in time and supervise construction difficulties and key points in time. The monitoring range covers the heavy point parts such as the site entrance, the site exit, the construction area, the processing area, the office area, the main body construction operation surface and the like.
VR training module, VR training module experience through VR and carry out safety education and training, including the simulation of electrocuteeing, face immersive such as limit simulation, conflagration simulation, the simulation of collapsing of tower crane, more the true sensation that the danger of experience brought directly perceived.
And the face recognition module is used for carrying out face recognition on personnel entering and exiting the transformer substation to acquire real-time photos, comparing the real-time photos with the photos in the system, recognizing that the personnel not in the white list send out early warning, and simultaneously recording the attendance of workers. Through data integration analysis, can carry out overall management to personnel's quantity, work kind etc. of business turn over, further promote original entrance guard's security, attendance system accuracy.
The intelligent safety helmet positioning module is based on a real-name system of workers, takes the Internet of things and intelligent hardware as means, and realizes automatic data collection, uploading and voice safety prompting by wearing a safety helmet loaded with an intelligent chip by the workers and installing base station data collection and transmission on site, so that the site distribution of the workers, the alarm of a forbidden area, personal attendance data and the like can be clearly known.
Wearing identification module, utilizing image recognition technology, in by the monitoring area, whether dynamic identification pedestrian and pedestrian wear safety helmet or work clothes, the record is grabbed and is joined in marriage the image of not wearing personnel, uploads cloud platform, carries out statistical analysis and reports an emergency and asks for help or increased vigilance suggestion.
Health real-time supervision module through wearing intelligent bracelet for the site operation personnel, realizes physiological index such as real-time supervision operation personnel's rhythm of the heart, blood pressure to send out the warning when operation personnel health takes place to be unusual.
Vibrations bracelet subsystem equipment module to mobile devices such as excavator, crane, operating personnel is because can't see the blind area around to the potential safety hazard appears, adopts vibrations bracelet subsystem, and is close more when leaving the object, and vibration frequency is higher, thereby supplementary operating personnel perception blind area object reduces unnecessary loss.
The electronic fence perimeter protection module analyzes perimeter intrusion, cross-line detection, retention wandering, article leaving and other abnormal behaviors in real time and automatically triggers alarm through autonomously setting a perimeter area by a user, and automatic on-duty acousto-optic intelligent alarm is realized.
Portable fence perimeter protection module, four mouths, five face the limit on the engineering job site, if: the reserved hole, the elevator well mouth, the passage opening, the stair opening, the damaged guardrail and the like are prone to causing safety accidents such as falling of personnel. The portable perimeter protection subsystem can detect personnel in time in the dangerous areas and warn the personnel to pay attention to safety, thereby playing a role of safety protection.
Infrared curtain electronic fence module, engineering construction space or vertical space danger area, such as: the unloader vertically lifts the vertical space, and safety accidents such as moving objects, barriers and the like are avoided during the operation of the equipment. The infrared curtain electronic fence subsystem can detect people in the dangerous areas in time and warn the people to pay attention to safety, and the safety protection effect is achieved.
And the infrared enclosure module and the infrared intrusion alarm subsystem adopt an infrared detector technology to detect the intrusion condition of the enclosure around the construction site in real time. The method can effectively detect the behaviors of climbing the enclosing wall to enter and exit the construction site and illegal outward transportation of construction materials, and assists construction enterprises in strengthening engineering field management.
The special equipment monitoring module comprises a tower crane, a lifter, a discharging platform and the like, the platform acquires the operation data of the tower crane, the lifter, the discharging platform and the like in real time through a sensor, and when the monitoring equipment performs early warning and alarming when illegal operation occurs at present, dangerous actions of the equipment are automatically stopped, so that safety accidents are effectively avoided and reduced; meanwhile, the data are uploaded to a cloud server through a network, and the platform carries out remote monitoring and management.
The deep foundation pit supporting monitoring module monitors the stable conditions of surrounding adjacent buildings and auxiliary facilities in the foundation pit excavation stage, the supporting construction stage, the underground building construction stage and after completion in real time through intelligent sensing equipment such as a soil pressure cell, an anchor rod stress meter, a pore water pressure meter and the like, bears the responsibility of collecting, rechecking, summarizing, arranging, analyzing and transmitting field monitoring data, alarms the super-warning data and provides reliable data support for design and construction.
And the high formwork monitoring module monitors the number and positions of the measuring points, and comprehensively considers the monitoring purpose, the monitoring object, the monitoring method and the monitoring cost. The target object is monitored according to an economic monitoring means and reasonable point location arrangement.
Scaffold monitoring module, gravity real-time supervision module, early warning control module, unusual alarm module and construction scheme adjustment module etc. monitor scaffold frame body's pressure change, inclination change, the unusual change such as displacement change at any time through wireless network deployment and pressure sensor device. Once abnormal change occurs, the system can automatically give an alarm to prompt a responsible person to adjust the construction scheme.
And the electric box monitoring module adopts an infrared sensor, the electric box is opened illegally, and the system receives warning information in time.
And the vehicle management module records information such as license plates, vehicle quantity and color of the vehicles through the camera, and the construction site comprehensively applies dynamic and static management to the vehicles.
Construction intelligence power consumption management module, project manager can set up lighting cycle according to construction cycle, carries out the remote switch operation to the interim power consumption to the whole power consumption condition in statistics project building site.
The material placement module is used for identifying the placement area specification of the intelligent video monitoring material: the method comprises the steps of dividing and identifying the material placing areas of field site cloth, setting specific material placing areas according to categories aiming at large materials such as reinforcing steel bars, cement and cables which are easy to identify, not allowing mixed placing, and giving an alarm if mixed placing occurs through an intelligent video monitoring system, so that the construction field is standardized, and the effect of civilized field cloth is achieved.
The dust noise monitoring system is based on dust noise monitoring equipment and can monitor air and noise of the construction site area environment in real time, and the outdoor environment monitoring equipment can accurately measure and display various environmental parameter factors such as noise, particulate matter concentration (PM2.5 and PM10), wind direction, wind speed, humidity, temperature and atmospheric pressure on site in all weather and in real time through an LED screen.
And after particulate matters in the field air exceed the standard, a manager can perform field spraying operation in an automatic and timed mode, and the construction environment of a construction site is improved. Can be connected with various spraying devices such as fog gun spraying, tower crane spraying, wall spraying and the like, and supports the remote control of the platform.
The sewage monitoring subsystem consists of an analyzer, a flow detector, a PH measuring instrument, a wireless data transmission module and back-end control software. The system can automatically sample the waste water of a using site and the sewage of a living area and detect the flow on line, thereby providing another angle of monitoring for the green construction implementation condition of a construction enterprise.
The smoke detection monitoring module monitors the online and alarm states of the smoke detection probes in real time and reminds the smoke detection probes in the modes of telephone, message and the like.
The flood prevention monitoring module is provided with a rainfall sensor, monitors precipitation amount, precipitation intensity and precipitation start-stop time in real time, and uploads monitoring information to the cloud platform. Once the precipitation exceeds the set value, the alarm gives an alarm automatically.
The building site broadcasting module is an information transmission channel between the project management part and workers, can transmit signals (such as alarm) to be announced to the workers without hindrance, and is not influenced by the initiative of the workers.
The intelligent behavior analysis module accurately and efficiently extracts and analyzes key information in videos based on video monitoring, advanced computer vision, artificial intelligence and parallel processing technology, and realizes omnibearing video intelligent analysis such as real-time behavior analysis and alarm, video structured information extraction, historical video rapid analysis and the like, such as: and identifying abnormal break-in, crossing a fence and climbing behaviors, and automatically capturing on-site smoking or fire.
Optionally, the quality management module includes a BIM module, a concrete pouring module, a mobile patrol subsystem module, and a mobile terminal measurement module, and the BIM module includes a BIM modeling module, a BIM three-dimensional lofting module, and a three-dimensional laser scanning technology and BIM model scheme verification module. (BIM English is Building Information Modeling, Chinese translation is: Building Information model, Building model is established based on various related Information data of construction project, and real Information of Building is simulated through digital Information simulation)
The BIM modeling module is installed through BIM technology simulation, carries out three-dimensional BIM modeling aiming at important electromechanical equipment of a transformer substation, buildings, a line group tower and the like, is used for technical bottom crossing of a construction site, and can carry out visual training aiming at risk points.
The BIM three-dimensional lofting module is characterized in that after BIM design is completed, the BIM lofting robot system carries out effective construction lofting on a BIM model, the construction lofting refers to finding out the geometric relation of positions between each part of feature points and control points of a building according to the building design size of the BIM three-dimensional model, lofting data such as distance, angle, elevation, coordinates and the like are calculated, then the feature points of the building are determined on the spot by using the control points, actual engineering construction is carried out, the construction is accurate and rapid, and labor and time costs are saved.
And the three-dimensional laser scanning technology and BIM model scheme verification module compares the result obtained by the three-dimensional laser scanning technology with the BIM structural model, checks the structural construction error, and performs corresponding adjustment on the BIM model to achieve accurate construction of local and important areas.
The concrete pouring module and the mass concrete temperature measurement subsystem can effectively detect the temperature between different inner and outer layers of concrete, provide real temperature values after concrete pouring for a construction team, help to improve the concrete pouring quality, guarantee the overall construction quality of a project, and the concrete curing pouring reminding module is used for project pouring concrete by adopting commercial concrete, standard curing of concrete test blocks is carried out by a commercial concrete station, and the project part only needs to reserve the concrete test blocks cured under the same condition, and needs to remind that the concrete test blocks are due.
The mobile patrol subsystem module is used for helping a construction manager to solve a plurality of problems that a construction operation mode is difficult to effectively supervise quality and evaluate performance, information feedback is lagged and difficult to share to related managers, patrol results are difficult to analyze and the like, and can record and analyze patrol conditions.
The mobile terminal measuring module and the system mobile phone terminal provide actual measurement capacity functions, field inspection personnel can conveniently record measurement information in time, and the system background automatically collects measurement results according to engineering categories. The field management work is recorded in the whole process, and the working efficiency of front-line workers is improved.
Optionally, the schedule management system 4 includes a zebra schedule management module and a BIM5D schedule management module, and the schedule management system 4 is in data connection with the BIM module.
The zebra progress management module gets through the intelligent construction site platform and the BIM construction platform, interconnection and intercommunication and data application of the intelligent construction site and the BIM construction are achieved, and progress advance targets are gradually achieved through project progress management and control, personnel management and field visual management. And the target execution condition, the network plan, the image progress, the production value progress and the like of project production progress management are dynamically updated in real time, so that project production management personnel are assisted to carry out scientific decision analysis.
And the BIM5D progress management module associates the BIM model with the progress information, so that the progress information of each part of the project, including planning time, actual completion time, construction daily report forms, on-site progress pictures and the like, can be acquired. The construction animation simulation provided by BIM5D selects any time period in the construction process to carry out construction simulation according to actual needs. For the advance or delay of the construction progress, the software can be displayed in different colors, different view ports are set, meanwhile, the project is subjected to multi-angle progress simulation, and reference is provided for progress control of the project.
Optionally, the technical management system 5 includes a model design module, an artificial intelligence review module, a mechanized construction module, a visual ledger handover and operation and maintenance roaming module, and a carrying module, the model design module is in data connection with the BIM module, and the model design module includes a digital design module, an optimized design module, and a three-dimensional virtual roaming space verification module.
The digital design module generates an orthophoto map, a digital ground model and a three-dimensional landscape map with a stereogram effect from various image data by means of high-tech means such as satellites, airplanes, system positioning and the like through a high-precision scanner and a computer information processing system, and provides accurate judgment and intelligent quick decision for project implementation.
The optimization design module is used for BIM cooperation, realizes data model sharing among professions by means of a digital design model, mutually quotes and refers, optimizes a pipeline arrangement scheme, quickly builds a model, intelligently adjusts, standardizes inspection, forms images in batches, accurately counts and reduces design change; design and construction scheme collision check, space optimization and construction process dynamic simulation are developed, risks are avoided as much as possible, construction changes are reduced, and the purposes of shortening the construction period, controlling the cost and improving the quality are achieved; meanwhile, the attribute information of the component can be checked, the complex process of browsing documents at multiple positions is avoided, the model is combined for drawing review, construction bottom-meeting and the like, the image is visual, constructors can easily understand the process, and the construction quality is improved.
The three-dimensional virtual roaming space checking module performs virtual roaming according to the full-field model, can dynamically check the three-dimensional model at any visual angle, can check the detailed structure at any position and visually display the built effect. The three-dimensional virtual roaming simulation personnel patrol in the virtual building and check the reasonability of spatial arrangement to meet the requirements of an operation and maintenance stage as a starting point, whether a key detection maintenance channel is unblocked, whether equipment maintenance space is enough, whether objects such as a valve switch are convenient to operate or not, whether accident working condition personnel withdraw from the periphery of a path and confirm that no major hazard source exists, and found problems can remind a construction unit to solve the problems in time.
The artificial intelligent review module creates a design review platform based on the building information model, imports standard design information and a discrimination algorithm, realizes the functions of intelligent review management, information intelligent analysis, expert collaborative consultation review and the like, optimizes a design scheme, reduces design change and improves design quality.
The visualized standing book handover and operation and maintenance roaming module collects models, data and documents generated by digital design and digital construction management in the engineering construction period, combines various service codes or classifications by taking equipment as a core, realizes organic association of various information and promotes the overall digital handover of a project. After the engineering construction transfer is completed, the construction and equipment composition conditions are checked through entity model roaming, and multidimensional information of equipment is checked through selecting specific equipment, so that a visual platform is provided for operation and maintenance.
Mechanized construction module, the mode of reform construction operation through construction technologies such as programming, assembled, 3D printing, realizes changing into intelligent machinery supplementary construction from traditional manual work construction, and repeatability, high strength, dangerous construction operation are implemented by mechanical automation industrial equipment, realize reducing the human cost, promote work efficiency's target.
The delivery module realizes that intelligent automatic control of delivery vehicles such as heavy material transport vehicle, small-size transport machinery, unmanned aerial vehicle uses based on technologies such as on-vehicle perception, thing networking, promotes engineering implementation, checks and accepts efficiency.
Optionally, the purchase management system 6 includes a two-dimensional code application subsystem module, and the two-dimensional code application subsystem module is used for unifying electronic management material information.
The two-dimension code application subsystem module adopts a two-dimension code and internet cloud technology, a power-assisted project manager realizes information transformation such as personnel management and control, equipment maintenance, equipment arrival, construction process management and the like, the purposes of information sharing, flow standardization, construction efficiency improvement and management enhancement are achieved, and all related information of material and material is uniformly electronically managed through the two-dimension code technology.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. An intelligent engineering management system, comprising: the system comprises a comprehensive management system, a safety management system, a quality management system, a progress management system, a technical management system and a purchase management system;
the comprehensive management system comprises a communication module, a central processing module and a display module, wherein the safety management system, the quality management system, the progress management system, the technical management system and the purchase management system are respectively connected with the communication module, the communication module is connected with the central processing module, the central processing module is used for processing data transmitted by the communication module, and the display module is used for displaying a data processing result of the central processing module;
the safety management system is used for monitoring data of construction site personnel, materials, equipment and environment and carrying out data analysis, the quality management system is used for monitoring the quality data of site operation and carrying out data analysis, the progress management system is used for monitoring the progress data of site operation and carrying out data analysis, the technical management system is used for monitoring the technical data of construction and carrying out data analysis, the purchasing system is used for monitoring the materials and the equipment data and carrying out data analysis.
2. The intelligent engineering management system of claim 1, wherein the display module comprises an electronic display screen and an integrated display screen, the large-screen integrated module is used for displaying video data information, and the electronic display screen is used for displaying data analysis results processed by the central processing module.
3. The intelligent engineering management system according to claim 1, further comprising a mobile terminal connected to the central processing module, wherein the mobile terminal is configured to display the data analysis result processed by the central processing module.
4. The intelligent engineering management system of claim 1, wherein the safety management system comprises monitoring modules including a weather monitoring module, a material information monitoring module, a personnel information monitoring module, and an equipment status monitoring module;
the equipment state monitoring module is including the sensor that is used for monitoring the equipment state, material information monitoring module includes first camera, personnel information monitoring module includes the second camera and is used for monitoring personnel information's induction system, meteorological monitoring module includes raise dust noise monitoring module, sewage monitoring module, smoke and feels monitoring module, rainfall monitoring module, sewage monitoring module is including the sewage measuring apparatu that is used for sewage monitoring, smoke and feels monitoring module is including the smoke and feels the probe that is used for smoke monitoring.
5. The intelligent engineering management system of claim 4, wherein the safety management system further comprises an alarm module, the alarm module comprises an alarm indicator and an alarm horn, and the alarm module is respectively in data connection with the weather monitoring module, the material information monitoring module, the personnel information monitoring module and the equipment state monitoring module.
6. The intelligent project management system of claim 1, wherein the quality management module comprises a BIM module, a concrete pouring module and a mobile end measurement module, and the concrete pouring module is used for temperature measurement and pouring reminding of concrete construction.
7. The intelligent engineering management system of claim 6, wherein the BIM module comprises a BIM modeling module, a BIM lofting module, a three-dimensional laser calibration module; the BIM modeling module is used for establishing a three-dimensional model for substation electromechanical equipment, buildings and line towers, the BIM lofting module is used for comparing actual construction conditions with the three-dimensional model, and the three-dimensional laser checking module is used for carrying out three-dimensional scanning on site construction and comparing with the three-dimensional model to check errors of a structure.
8. The intelligent project management system of claim 6, wherein the progress management system comprises a zebra progress management module and a BIM5D progress management module, and the progress management system is in data connection with the BIM module.
9. The intelligent project management system of claim 6, wherein the technical management system comprises a model design module, an artificial intelligence review module, a mechanized construction module, an intelligent delivery and flight module, the model design module being in data connection with the BIM module.
10. The intelligent engineering management system of claim 1, wherein the procurement management system comprises a two-dimensional code application subsystem module, and the two-dimensional code application subsystem module is used for unified electronic management of material information.
CN201911338879.XA 2019-12-23 2019-12-23 Intelligent engineering management system Active CN111126838B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911338879.XA CN111126838B (en) 2019-12-23 2019-12-23 Intelligent engineering management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911338879.XA CN111126838B (en) 2019-12-23 2019-12-23 Intelligent engineering management system

Publications (2)

Publication Number Publication Date
CN111126838A true CN111126838A (en) 2020-05-08
CN111126838B CN111126838B (en) 2022-07-12

Family

ID=70501214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911338879.XA Active CN111126838B (en) 2019-12-23 2019-12-23 Intelligent engineering management system

Country Status (1)

Country Link
CN (1) CN111126838B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111597666A (en) * 2020-05-20 2020-08-28 佛山电力设计院有限公司 Method for applying BIM to transformer substation construction process
CN111797522A (en) * 2020-06-29 2020-10-20 中建二局第一建筑工程有限公司 Automatic measurement system for building engineering
CN111932819A (en) * 2020-08-27 2020-11-13 宝武集团鄂城钢铁有限公司 Visual identification system based on intelligent factory platform iPlat
CN112001284A (en) * 2020-08-14 2020-11-27 中建海峡建设发展有限公司 Labor service real-name system management system based on artificial intelligence
CN112163765A (en) * 2020-09-28 2021-01-01 成都集致生活科技有限公司 Building site integrated management system
CN112176866A (en) * 2020-08-28 2021-01-05 中铁九局集团第七工程有限公司 Rectangular steel cable tower construction system and method for large-span asymmetric swivel cable-stayed bridge
CN112308510A (en) * 2020-10-22 2021-02-02 河南正兴工程管理有限公司 Green and environment-friendly building construction management system and method
CN113128961A (en) * 2021-04-16 2021-07-16 深圳市艾赛克科技有限公司 Wisdom building site management cloud platform
CN113283753A (en) * 2021-05-27 2021-08-20 中铁建工集团有限公司 Safety management system for personnel on construction site
CN113315838A (en) * 2021-05-28 2021-08-27 鲁能集团有限公司 Intelligent building site comprehensive safe operation informatization supervision platform
CN113433914A (en) * 2021-07-06 2021-09-24 山东电力工程咨询院有限公司 Intelligent construction site management and control platform and monitoring method thereof
CN113573019A (en) * 2021-07-13 2021-10-29 广东晋华建设工程有限公司 Safety management and control system for construction based on constructional engineering
CN113837505A (en) * 2020-06-08 2021-12-24 中合智腾建设有限公司 Electromechanical engineering information management system
CN114023048A (en) * 2021-11-27 2022-02-08 安徽博达项目管理咨询有限公司 Engineering supervision system based on artificial intelligence data processing and visual analysis
CN114900614A (en) * 2022-05-18 2022-08-12 深圳市润鹏华通创新科技有限公司 Construction intelligent security system based on internet
CN115860296A (en) * 2022-11-26 2023-03-28 宝钢工程技术集团有限公司 Remote inspection method and system based on 3D road network planning
CN116704722A (en) * 2023-08-08 2023-09-05 成都信息工程大学 Building engineering safety precaution system
CN116704387A (en) * 2023-08-04 2023-09-05 众芯汉创(江苏)科技有限公司 Power line channel inspection system and method based on video structuring
CN116912781A (en) * 2023-09-13 2023-10-20 通号信息产业有限公司 BIM model building monitoring management system and method
CN116911770A (en) * 2023-06-19 2023-10-20 国网江苏省电力有限公司南通供电分公司 Intelligent supervision platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070143356A1 (en) * 2005-12-15 2007-06-21 Kleinsmith Richard A Enforcing workflow for implementing unique identification
CN107103078A (en) * 2017-04-25 2017-08-29 国网上海市电力公司 Transformer substation construction complete period digitlization managing and control system based on BIM
CN108985714A (en) * 2018-07-04 2018-12-11 江苏南通三建集团股份有限公司 A kind of construction site wisdom control integrated system
CN109978409A (en) * 2019-04-10 2019-07-05 国网浙江省电力有限公司建设分公司 A kind of multiple-project enterprise-level wisdom building site block chain management method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070143356A1 (en) * 2005-12-15 2007-06-21 Kleinsmith Richard A Enforcing workflow for implementing unique identification
CN107103078A (en) * 2017-04-25 2017-08-29 国网上海市电力公司 Transformer substation construction complete period digitlization managing and control system based on BIM
CN108985714A (en) * 2018-07-04 2018-12-11 江苏南通三建集团股份有限公司 A kind of construction site wisdom control integrated system
CN109978409A (en) * 2019-04-10 2019-07-05 国网浙江省电力有限公司建设分公司 A kind of multiple-project enterprise-level wisdom building site block chain management method

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111597666B (en) * 2020-05-20 2021-01-26 佛山电力设计院有限公司 Method for applying BIM to transformer substation construction process
CN111597666A (en) * 2020-05-20 2020-08-28 佛山电力设计院有限公司 Method for applying BIM to transformer substation construction process
CN113837505A (en) * 2020-06-08 2021-12-24 中合智腾建设有限公司 Electromechanical engineering information management system
CN111797522A (en) * 2020-06-29 2020-10-20 中建二局第一建筑工程有限公司 Automatic measurement system for building engineering
CN112001284A (en) * 2020-08-14 2020-11-27 中建海峡建设发展有限公司 Labor service real-name system management system based on artificial intelligence
CN111932819A (en) * 2020-08-27 2020-11-13 宝武集团鄂城钢铁有限公司 Visual identification system based on intelligent factory platform iPlat
CN112176866A (en) * 2020-08-28 2021-01-05 中铁九局集团第七工程有限公司 Rectangular steel cable tower construction system and method for large-span asymmetric swivel cable-stayed bridge
CN112163765A (en) * 2020-09-28 2021-01-01 成都集致生活科技有限公司 Building site integrated management system
CN112308510A (en) * 2020-10-22 2021-02-02 河南正兴工程管理有限公司 Green and environment-friendly building construction management system and method
CN113128961A (en) * 2021-04-16 2021-07-16 深圳市艾赛克科技有限公司 Wisdom building site management cloud platform
CN113128961B (en) * 2021-04-16 2022-03-11 深圳市艾赛克科技有限公司 Wisdom building site management cloud platform system
CN113283753A (en) * 2021-05-27 2021-08-20 中铁建工集团有限公司 Safety management system for personnel on construction site
CN113315838A (en) * 2021-05-28 2021-08-27 鲁能集团有限公司 Intelligent building site comprehensive safe operation informatization supervision platform
CN113433914A (en) * 2021-07-06 2021-09-24 山东电力工程咨询院有限公司 Intelligent construction site management and control platform and monitoring method thereof
CN113573019A (en) * 2021-07-13 2021-10-29 广东晋华建设工程有限公司 Safety management and control system for construction based on constructional engineering
CN114023048A (en) * 2021-11-27 2022-02-08 安徽博达项目管理咨询有限公司 Engineering supervision system based on artificial intelligence data processing and visual analysis
CN114900614A (en) * 2022-05-18 2022-08-12 深圳市润鹏华通创新科技有限公司 Construction intelligent security system based on internet
CN115860296A (en) * 2022-11-26 2023-03-28 宝钢工程技术集团有限公司 Remote inspection method and system based on 3D road network planning
CN116911770A (en) * 2023-06-19 2023-10-20 国网江苏省电力有限公司南通供电分公司 Intelligent supervision platform
CN116704387A (en) * 2023-08-04 2023-09-05 众芯汉创(江苏)科技有限公司 Power line channel inspection system and method based on video structuring
CN116704387B (en) * 2023-08-04 2023-10-13 众芯汉创(江苏)科技有限公司 Power line channel inspection system and method based on video structuring
CN116704722A (en) * 2023-08-08 2023-09-05 成都信息工程大学 Building engineering safety precaution system
CN116704722B (en) * 2023-08-08 2023-11-03 成都信息工程大学 Building engineering safety precaution system
CN116912781A (en) * 2023-09-13 2023-10-20 通号信息产业有限公司 BIM model building monitoring management system and method
CN116912781B (en) * 2023-09-13 2023-12-08 通号信息产业有限公司 BIM model building monitoring management system and method

Also Published As

Publication number Publication date
CN111126838B (en) 2022-07-12

Similar Documents

Publication Publication Date Title
CN111126838B (en) Intelligent engineering management system
CN108681781B (en) Subway operation and maintenance management information system and method based on three-dimensional Internet of things technology
CN108520342B (en) BIM-based Internet of things platform management method and system
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN111552216A (en) Construction site intelligent supervision system based on 5G
CN113804598B (en) Construction environment monitoring system and monitoring method based on big data
CN106779447A (en) Builder's intelligent management system and method for a kind of RFID of fusion BIM
CN109447480A (en) A kind of road and bridge engineering equipment safety monitoring system and method based on BIM+GIS modeling
CN109614697A (en) A kind of bridge management system based on BIM
US20210349476A1 (en) Method and apparatus for controlling cruise of unmanned air vehicle based on prefabricated construction platform
CN107544326A (en) Ensure the multifunction monitoring system of construction site security
CN113298444A (en) Private cloud-based intelligent power safety control platform
CN103700261A (en) Video-based road traffic flow feature parameter monitoring and traffic comprehensive information service system
CN209231777U (en) Wisdom building site management system
CN111080260A (en) Wisdom building site management platform
CN113706355A (en) Method for building intelligent emergency system of chemical industry park
CN108446889A (en) A kind of exchange method of construction site and construction speed platform
CN108985714A (en) A kind of construction site wisdom control integrated system
CN113177768A (en) Intelligent engineering platform based on comprehensive digital management of capital construction whole process
CN113034311A (en) Building construction supervision system and method based on BIM
CN107272634A (en) A kind of virtual coal mining Exercise Control system based on three-dimensional VR and data server
CN111144783A (en) Construction management method applying intelligent construction site system
CN103871129A (en) Mine wellhead unattended security control system
CN107861446A (en) A kind of monitoring system and its application method for protecting building
CN115526523A (en) Evaluation method for intelligent construction site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant