CN115526523A - Evaluation method for intelligent construction site - Google Patents

Evaluation method for intelligent construction site Download PDF

Info

Publication number
CN115526523A
CN115526523A CN202211254087.6A CN202211254087A CN115526523A CN 115526523 A CN115526523 A CN 115526523A CN 202211254087 A CN202211254087 A CN 202211254087A CN 115526523 A CN115526523 A CN 115526523A
Authority
CN
China
Prior art keywords
points
construction site
site
evaluation score
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211254087.6A
Other languages
Chinese (zh)
Inventor
王立雷
常卫华
路金波
王晓光
杨楚鹏
康艳博
曹伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Building Research CABR
Original Assignee
China Academy of Building Research CABR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Building Research CABR filed Critical China Academy of Building Research CABR
Priority to CN202211254087.6A priority Critical patent/CN115526523A/en
Publication of CN115526523A publication Critical patent/CN115526523A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an evaluation method of an intelligent construction site, which comprises the following steps: (1) establishing an evaluation index of an intelligent construction site of a target construction site; (2) Determining the result of each index of the target construction site according to the evaluation index and the actual condition of the target construction site; and (3) determining an overall evaluation value of the target construction site in combination with results of the evaluation indexes, thereby obtaining a grade of the intelligent construction site. The method establishes an index and weight setting dynamic closed-loop lifting management principle by selecting an evaluation means and determining the weight of each factor, ensures that the evaluation index is typical, the calculation measurement and the method are uniform, simple and clear, the evaluation mode has strong operability, and the integral level of the system can be truly reflected.

Description

Evaluation method for intelligent construction site
Technical Field
The invention relates to the technical field of all-directional safety of construction sites, in particular to an evaluation method of an intelligent construction site.
Background
Currently, safety accidents are severe in the construction process of building sites. The construction industry related to engineering construction is one of the prop industries for national economic development, and the safety level of the construction industry directly affects the economic construction bureau of China. Safety is always a problem that the building industry cannot be avoided, and safety accidents of the building industry are highest in all the industries in developed countries such as Japan and Australia.
In modern society, the internet of things related to the field of engineering construction is rapidly developed as in all trades. The internet of things is an important direction for future scientific and technological development, and under the influence of the emerging information technology changes such as 5G and the like, the times of interconnection of everything and intelligent connection of everything are coming. Through years of development, china initially has a certain foundation in the aspects of Internet of things technology research and development, standard development, industrial cultivation, industrial application and the like.
Meanwhile, in order to adapt to the progress and development of society, the policy also drives the industrial transformation. According to the requirements of a state office of a state department on opinions about promoting the sustainable and healthy development of the construction industry and an urban and rural construction department of housing on an information development outline of the construction industry in 2016-2020, a smart construction site is based on a smart city and the Internet plus, and the construction site informatization integrated management solution of the construction engineering project is constructed by adopting the technical means of cloud computing, big data, the Internet of things and the like according to the information characteristics of the construction engineering project and combining different requirements.
As an important direction of digital transformation in the construction industry, after the wisdom building site is built to bloom and prosper all the time, various definitions, technologies, standards, applications and equipment are developed endlessly, and the purpose is that the wisdom is still in a very primary stage, the following problems mainly exist: the construction of the intelligent construction site is more embodied as a concept, lacks of clear definition and uniform standard, pursues the display effect, and leads the construction of the intelligent construction site to be image engineering; products of different manufacturers, different interfaces, different settings, different degrees of engagement with the actual business process, different information formats, different technical routes, complex integrated interfaces and difficult data interaction; the user side seriously depends on the solution of a manufacturer, the system architecture is tightly coupled, the platform, the application, the service and the operation and maintenance are deeply bound, and the system lacks adaptability and flexibility aiming at project requirements and service changes. In the aspect of the intelligent construction site, corresponding design and guide standards are lacked, and the method is used for effectively solving the construction problems of the intelligent construction site such as decentralized establishment, system erection, no unified standard and the like.
Disclosure of Invention
In view of the above-mentioned current situation in the art, the present invention aims to provide an evaluation method for comprehensively evaluating an intelligent construction site of an engineering building, which is suitable for guiding the construction, evaluation, application and other works of intelligent construction sites of house buildings and municipal infrastructure engineering.
According to the method, an index and weight setting dynamic closed-loop lifting management principle is established by selecting an evaluation means and determining the weight of each factor, so that the evaluation index is typical, the calculation measurement and the method are unified, simple and clear, the evaluation mode has strong operability, and the integral level of the system can be truly reflected.
Specifically, in order to achieve the above object, the present invention provides a method for evaluating an intelligent construction site, the method including: (1) determining an evaluation index of an intelligent construction site; (2) Determining the result of each index of the target construction site according to the evaluation index and the actual condition of the target construction site; and (3) determining an overall evaluation value of the target site in association with results of the respective evaluation indexes, thereby obtaining an intelligent site level of the target site.
Further, the evaluation index of the intelligent construction site comprises: 4-type indexes of intelligence, high efficiency, safety, reliability, environmental protection and controllable quality; each type of index consists of a control item and a scoring item, wherein the control item is an item which must be met and is the most basic requirement for building an intelligent construction site; and the scoring item is evaluated according to the built-up effect.
Wherein the control item is judged to be in accordance or not in accordance with the evaluation result. And if the intelligent construction site does not meet the evaluation result, directly identifying the intelligent construction site as a unqualified intelligent construction site.
Wherein the evaluation result of the scoring item is a score; wherein, the scoring item of the intelligent high-efficiency index is Q 1 The score of the scoring item of the safe and reliable index is Q 2 And the scoring item of the green environmental protection index is Q 3 Scoring item with quality controllable indexIs divided into Q 4 . The actual scores of the scoring items of various indexes are converted into percentage values, so that a score Q is obtained 1 -Q 4
Further, the overall evaluation value Q of the target site is calculated by the following formula (1):
Q=0.19Q 1 +0.38Q 2 +0.24Q 3 +0.19Q 4 (1)
further, when the overall evaluation value Q reaches 60 points (inclusive), 70 points, and 80 points, respectively, the smart site levels are one-star, two-star, and three-star, respectively.
Specifically, in each index, the scoring item is provided with a plurality of the following option items (proposed by the reviewer and confirmed by the expert group), and all the options are generally selected (included) as the scoring items. Meanwhile, the total evaluation score is calculated without adding scores (scores aiming at relevant management documents and technical standards of the country and the location); the scoring term is only considered scoring. Also, some subject worksites have individual items that do not need to be developed, for which a deduction may be made (keeping track of their total score and score), with only a 100-point conversion of the remaining items for evaluation. Score of the score item Q i The specific conversion method comprises the following steps: for example, the total evaluation score of 15 items of the intelligent high-efficiency index excluding two additional items is 105 points, the score is 85 points (including the additional items), and the score Q of the score item of the intelligent high-efficiency index 1 85/105 by 100=81 minutes; however, for example, when it is not appropriate to conduct, for example, unmanned aerial vehicle inspection due to a specific regional policy, this option may be excluded, and thus, when unmanned aerial vehicle inspection is not involved therein (evaluation score of 5 points) and the score is 85 points, the score of the score item Q of the intelligent high-efficiency index is given 1 Is 85/(105-5) = 100=85 minutes. Thus, when all options are included, the safe and reliable total rating score is 210; the total evaluation score of green environmental protection is 135; and a quality controlled total rating score of 105. Score Q of each index 1 -Q 4 And performing conversion of 100 points on the basis of the total evaluation score and the total score.
In the step (1), firstly, gradually establishing indexes to be evaluated on an object construction site, control items of the indexes and grading item options of the indexes; subsequently, in step (2)Determining the control items of each index and the result of the selected score item (score Q) for the actual condition of the target construction site 1 -Q 4 ) (ii) a And finally, (3) eliminating unqualified target construction sites according to the control items of the indexes, calculating the overall evaluation value Q of the target construction sites according to the scores of the scoring items, and obtaining the grades of the target construction sites.
Wherein, the control item of the high-efficient index of intelligence includes: a special construction scheme of an intelligent construction site; checking and accepting records of the infrastructure of the intelligent construction site; an extranet configuration situation; relevant information processing, storage and transmission equipment anti-interference and anti-power-off measures on a construction site; video monitoring basic requirements; and, carrying out electronic management on the construction data of the construction site; wherein each evaluation result is 'fit' or 'not fit'.
The scoring items of the intelligent high-efficiency indexes are divided into two parts of infrastructure management and intelligent cooperative management, and are selected from the following parts:
infrastructure management:
the intelligent construction site informatization management platform is used for evaluating the score to be 20;
setting conditions by the intelligent construction site control center, wherein the evaluation score is 5 points;
preparing qualified trained intelligent construction site professional technicians, and setting the evaluation score to be 5;
monitoring the key area on the site of the construction site in real time, wherein the evaluation score is 5 points;
applying a panoramic video monitoring system on a construction site, and setting the evaluation score to be 5 points;
laying voice public broadcasting equipment on a construction site, wherein the evaluation score is 5 points;
adding a branch term: on site of the construction site, other infrastructure management measures are adopted by combining related management files and technical standards of the country and the location, and the evaluation score is 5 points;
intelligent cooperative management:
a progress management subsystem is built on a construction site, and the evaluation score is 20 points;
carrying out intelligent construction management of a whole industrial chain on the project, wherein the evaluation score is 5;
a BIM model is established for the project, and the evaluation score is 5 points;
carrying out three-dimensional visual intersection, construction simulation and collision inspection on a construction site by applying a BIM technology, wherein one item is 5 points, and the evaluation score is 15 points;
the project provides a three-dimensional visualization model of the building or adopts an oblique photography technology, the model contains use instruction information, and the evaluation score is 5 points;
the construction site is patrolled by adopting two-dimensional codes, and the evaluation score is 5 points;
an unmanned aerial vehicle is adopted for inspection on the construction site, and the evaluation score is 5; and,
adding a branch term: the construction site combines the related management files and technical standards of the country and the location, adopts other intelligent cooperative management measures, and has a rating value of 5 points;
obtaining the score Q of the scoring items of the intelligent high-efficiency indexes by converting the total evaluation score and the total score of the scoring items of the selected intelligent high-efficiency indexes into percentiles 1
Wherein, the control item of safe and reliable index includes: the intelligent construction site can realize the information management function of the safety data; the construction site is provided with non-blind area video monitoring for dangerous areas, key parts and enclosing walls, and has the functions of remote real-time viewing, playback, video summarization and video polling; wherein each evaluation result is 'fit' or 'not fit'.
The grading items of the safe and reliable indexes are divided into three parts of field safety management, personnel safety management and equipment safety management, and are selected from the following parts:
and (4) field safety management:
a safety management subsystem is built on the construction site, and the evaluation score is 20 points;
installing an intelligent monitoring device on a construction site, wherein the evaluation score is 30 points;
an intelligent alarm device is installed on a construction site or a living area, and the evaluation score is 5;
a distribution box safety management system is arranged on the site of the construction site, and the evaluation score is 5 points;
intelligently identifying the problem hidden danger of the construction site, wherein the evaluation score is 10 points;
installing an intelligent alarm device in a closed space or an area with a toxic and harmful gas leakage risk, wherein the evaluation score is 5;
installing a construction vehicle safety monitoring intelligent recognition alarm device on a construction site, wherein the evaluation score is 5 points;
adding a branch term: the construction site combines with the relevant management files and technical standards of the country and the location, adopts other intelligent measures for safety control, and has a rating value of 5 points;
and (3) personnel safety management:
a personnel management subsystem is built on the construction site, and the evaluation score is 20 points;
an intelligent recognition device is installed on the site of a construction site to collect on-duty information of personnel, and the evaluation score is 5 points;
the worker or the special worker entering the dangerous area is provided with the wearable safety intelligent terminal equipment, and the evaluation score is 5;
on-site personnel of the construction site are equipped with personnel positioning devices, and the evaluation score is 5 points;
monitoring the physical signs of the employees on the construction site, wherein the evaluation score is 5 points;
performing safety education on the workers by adopting an information tool on the construction site, wherein the evaluation score is 5 points;
adding a branch term: on site, combining with relevant management files and technical standards of the country and the location, adopting other personnel management intelligent measures, and setting the evaluation score to be 5;
and (4) equipment safety management:
a mechanical equipment management subsystem is built in the project, and the evaluation score is 20 points;
the tower crane adopts intelligent supervision measures, and the evaluation score is 25 points;
the construction elevator adopts intelligent supervision measures, and the evaluation score is 10 points;
the discharge platform is provided with an intelligent monitoring and alarming device, and the evaluation score is 5;
the hanging basket is provided with an intelligent monitoring alarm device, and the evaluation score is 5;
the shield machine is provided with an intelligent monitoring device, and the evaluation score is 5 points;
installing an intelligent monitoring device on the bridge girder erection machine, wherein the evaluation score is 5 points;
intelligent equipment is adopted on the site of the construction site, and the evaluation score is 10 points; and,
adding a branch term: the construction site combines the related management files and technical standards of the country and the location, adopts other intelligent measures for the management of mechanical equipment, and has a rating value of 5 points;
and converting the total evaluation score and the total score of the scoring items based on the selected safe and reliable indexes into a percentile score, thereby obtaining the score Q of the scoring items of the safe and reliable indexes 2
Wherein, the control item of the green environmental protection index comprises: setting a raise dust monitoring point on a construction site; setting a noise monitoring point on a construction site; building rubbish reduction measures should be taken on the site of the construction site; and, the construction site can perform informatization management on the material stock; wherein, each evaluation result is 'conforming' or 'not conforming'; and,
the grading item of the green environmental protection index is divided into two parts of environmental management and resource and energy management, and is selected from the following parts:
and (3) environment management:
an environment monitoring management subsystem is built on a construction site, and the evaluation score is 20 points;
a raise dust monitoring point is additionally arranged on the construction site according to the surrounding environment and the site construction condition, and the evaluation score is 5 points;
the site dust monitoring of the construction site has the site acousto-optic alarm or remote alarm function that the dust exceeds the standard, and the evaluation score is 5 points;
the construction site is provided with a bare-soil AI recognition monitoring device, and the evaluation score is 5 points;
spraying dust-settling measures are adopted on the site of the construction site, and the evaluation score is 10 points;
noise monitoring points are additionally arranged on a construction site according to the surrounding environment and the site construction condition, and the evaluation score is 5 points;
the site noise monitoring of the construction site has the site sound-light alarm or remote alarm function of exceeding the noise standard, and the evaluation score is 5 points;
setting a microclimate meteorological monitoring point on a construction site, wherein the evaluation score is 5 points;
setting a sewage monitoring point on a construction site, wherein the evaluation score is 5 points;
monitoring the cleaning condition of vehicles entering and exiting on the site of the construction site, wherein the evaluation score is 5 points;
adding a branch term: the construction site combines the related management files and technical standards of the country and the location, adopts other intelligent measures for environment monitoring, and has a rating value of 5 points;
resource and energy management:
an energy consumption management subsystem is built on the site of the construction site, and the evaluation score is 20 points;
monitoring the power consumption in real time on the site of the construction site, wherein the evaluation score is 5 points;
monitoring the water consumption in real time on the site of a construction site, wherein the evaluation score is 5 points;
the weight of the weighing material is automatically measured on the site of the construction site, and the evaluation score is 5 points;
automatic counting of the bars is realized on the site of the construction site by adopting an AI (Artificial intelligence) recognition technology, and the evaluation score is 5 points;
adopting an optical character recognition technology on a construction site, accurately recognizing the material name, specification and model number information in the paper document, and judging that the evaluation score is 5 points;
a radio frequency technology or a two-dimensional code labeling technology is adopted on a construction site, the warehousing, the storage and the use management of materials are assisted, and the evaluation score is 5 points;
monitoring carbon emission in a construction stage on a construction site in real time, wherein the evaluation score is 5 points;
an energy-saving low-carbon construction device and process are adopted on the site of a construction site, and the evaluation score is 10 points; and,
adding a branch term: the construction site combines the related management files and technical standards of the country and the location, adopts other resource and energy management and control intelligent measures, and has a rating value of 5 points;
converting the total evaluation score and the total score of the selected grading items of the green environmental protection index into a percentile score, thereby obtaining the score Q of the grading items of the green environmental protection index 3
Wherein, the control items of the quality controllable indexes comprise: the intelligent construction site can realize the data informatization management function of the quality management system; and, concealing key processes and key links of the project and retaining video image data; wherein each evaluation result is 'fit' or 'not fit'.
The scoring item of the quality controllable index is divided into two parts of engineering quality management and material quality management, and is selected from the following parts:
and (3) engineering quality management:
a quality management subsystem is built on the construction site, and the evaluation score is 20 points;
actually measuring the quality of the structural entity on site at a construction site, wherein the evaluation score is 5 points;
remote measurement is carried out on the site of the construction site by using technical equipment, and the evaluation score is 5 points;
monitoring concrete vibration in real time on a construction site, wherein the evaluation score is 5 points;
monitoring the standard curing laboratory in real time on the site of a construction site, wherein the evaluation score is 5 points;
the project of each part adopts handheld equipment to check and accept, and the evaluation score is 5 points;
applying visual equipment on a construction site to assist quality management, wherein the evaluation score is 5 points;
adding a branch term: on-site management files and technical standards related to the country and the location are combined in the construction site, other quality control intelligent measures are adopted, and the evaluation score is 5;
material quality management:
adopting traceable intelligent management on site inspection materials of a construction site, wherein the evaluation score is 10 points;
carrying out informatization management on acceptance of the incoming materials on the site of the construction site, wherein the evaluation score is 5 points;
when the site-entering acceptance of the main materials is unqualified, carrying out alarm prompt and information push, wherein the evaluation score is 5;
the authenticity of a material detection report can be effectively verified on site, the material detection report can be downloaded or checked on site, and the evaluation score is 5 points;
the concrete can be rapidly inspected on site in a construction site, and the evaluation score is 5 points;
the quality monitoring of the structural concrete can be realized on site in a construction site, and the evaluation score is 5 points;
monitoring the temperature data of the mass concrete on the construction site, wherein the evaluation score is 5 points;
intelligent equipment is adopted in a construction site, so that the quality of welding, steel member installation, bolt installation and shear resistant studs in steel structure construction can be intelligently supervised, and the evaluation score is 5;
the intelligent equipment can be adopted to carry out process supervision on the waterproof construction quality on the site, and the evaluation score is 5;
the construction quality of heat preservation and decoration can be monitored in the field by adopting intelligent equipment, and the evaluation score is 5; and,
adding a branch term: on-site management files and technical standards related to the country and the location are combined in the construction site, intelligent measures for quality control of other materials are adopted, and the evaluation score is 5;
converting the total evaluation score and the total score of the selected scoring items of the quality controllable indexes into a percentile score, thereby obtaining the score Q of the scoring items of the quality controllable indexes 4
Detailed Description
The invention aims to be suitable for evaluating intelligent construction sites of house buildings and municipal engineering, and provides an evaluation method for the intelligent construction sites for comprehensively evaluating engineering buildings. The present invention will be described in further detail with reference to specific embodiments.
The specific implementation mode of the invention is as follows:
according to the intelligent construction site evaluation method, an evaluation index system is composed of 4 types of indexes which are intelligent, efficient, safe, reliable, green and environment-friendly and controllable in quality, and each type of index comprises a control item and a scoring item. The evaluation result of the control item is in accordance or not, belongs to an item which must be met, and is the most basic requirement for building an intelligent construction site; the evaluation item is evaluated in terms of the built-up effect(s). Here, data such as various parameters and indexes that need to be provided for the target site unit to be evaluated is subject to item-by-item investigation, determination and scoring of specific matters by an evaluator (with corresponding qualification) as an evaluation subject.
Specifically, aiming at intelligent efficient indexes, the indexes are determined by dividing into a control item and a scoring item according to actual conditions. The basic requirements of intelligent and efficient control items are as follows: wisdom building site is through the application of building site informatization, intelligent construction technique to carry out effective cooperation and data sharing with information and management, improve building site field management and production efficiency, ensure that construction building site field intelligence is high-efficient. Specifically, the intelligent and efficient control items include:
1.1.1 wisdom building site special project construction scheme: before the intelligent construction project of the construction site is implemented, compiling a special construction scheme of the intelligent construction site and configuring adaptive intelligent construction site infrastructure; wherein, wisdom building site special construction scheme includes following content: (1) project profiles; (2) intelligent construction site overall target construction; (3) The main contents and corresponding functional description of intelligent construction site construction; (4) site conditions and preparation measures for intelligent construction site construction; (5) implementing plan and quality control measures; (6) implementing safety management control measures of the process; (7) emergency management measures; (8) system acceptance criteria; (9) dividing the intelligent construction site operation and maintenance organization structure and tasks; (10) related drawings; (11) a device selection list;
the key points are determined: whether the intelligent construction project compiled by the inspection target construction site has 11 contents can be judged to be 'coincidence' or not, and if not, the intelligent construction project is 'non-coincidence'.
1.1.2 wisdom building site infrastructure record of accepting: the intelligent construction site infrastructure is required to be checked and accepted and the checking and accepting record is reserved; wherein, wisdom building site infrastructure includes: hardware equipment facilities such as network infrastructure, information acquisition equipment, storage and transmission equipment and the like, site conditions required to be met by information equipment installation, and a related integrated software technology platform;
the key points are determined: uploading an infrastructure acceptance record; after on-line inspection, the "conformity" or "nonconformity" is determined according to the rule requirements.
1.1.3 extranet configuration case: the following requirements should be met: (1) Providing a network operator to provide wired/wireless network facilities; (2) The network signal should cover all the information acquisition equipment device points; (3) The network should cover the main area of the construction site, and the office area, the living area and the construction area of the construction site should cover more than 90%; (4) The network bandwidth requirement of the application terminal is that the network access bandwidth is above 300Mbps (or above 100Mbps for private line access);
the key points are determined: uploading a network configuration list, a signal coverage map, broadband access and speed measurement proving material; at least one of the following communication networks should be provided in the operation area: 4G or 5G networks, wired networks, wireless hotspots; the object construction site provides pictures of field use communication networks as evidence materials; judging after on-line inspection of the evaluation subject; and manually judging the bandwidth condition after the on-line inspection of the evaluation subject, and manually judging whether the bandwidth condition is 'in line' or 'out of line'.
1.1.4 relevant information processing, storing and transmitting equipment on the construction site should have anti-interference and anti-power-off measures and is separated from strong electricity;
the key points are determined: the construction scheme is required to clarify the setting requirements of relevant measures; uploading photos set by relevant measures on a target construction site; the "compliance" or "non-compliance" is manually determined after on-line inspection by the evaluation subject.
1.1.5 video monitoring basic requirements: the video images can be automatically switched in site video monitoring on a construction site, functions of abnormal events such as playback, video recording and the like are provided, and the storage and storage period of the video images is recommended to be less than one month;
the judgment key points are as follows: the evaluation subject checks the functions of video monitoring such as playback and recording; one piece of the longest video data is extracted and stored, and the data generation time and the evaluation time interval are more than 30 days, so that the condition of 'coincidence' is judged; if the extraction fails or the data interval time is lower than the standard value, the judgment is 'non-conformity'.
1.1.6 carrying out electronic management on construction data of a construction site: network and information safety should be paid attention to the applications of collecting, transmitting, storing, sharing, analyzing, processing and the like of the data information of the intelligent construction site;
the judgment key points are as follows: uploading various records specified in the item; the judgment of "conformity" or "nonconformity" is manually made after the offline inspection of the evaluation subject.
The intelligent and efficient scoring items comprise/are selected from:
1.2.1 when an intelligent construction site of an engineering project is built, an intelligent construction site informatization management platform is built, and the evaluation score is 20 points;
evaluation points are as follows: the evaluation main body logs in an engineering project intelligent construction site platform; and (4) checking the construction condition of the intelligent construction site informatization management platform, wherein 20 points are required to be integrated by 3 or more subsystems, and 0 point is required to be integrated otherwise.
1.2.2 wisdom building site control center sets up the condition: equipment facilities such as a spliced screen or other centralized visual equipment which can present an intelligent construction site management system are arranged in the intelligent construction site management system, and the evaluation score is 5 points;
evaluation points are as follows: providing a control center related picture by an object site unit; the evaluation main body checks whether the intelligent building site control center is independently arranged or not and whether centralized visual equipment is equipped or not, and 5 points are met.
1.2.3, a qualified trained intelligent construction site professional should be equipped, and the professional has definite post responsibility with an evaluation score of 5;
evaluation points are as follows: the object building site unit provides project intelligent building site professional technical personnel certificates, training records, post responsibilities, management systems and the like; the evaluation subject performed a check to meet the score of 5.
1.2.4 monitoring the key area on site in real time at the construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: the evaluation subject checks whether the project video monitoring system monitors key areas (entrances and exits, high points, areas with high risk and critical engineering operation areas) or not, whether the monitoring system monitors in real time or not, and the rating is 5.
1.2.5 applying a panoramic video monitoring system on the construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: the evaluation subject checks whether the project intelligent construction site platform organizes 1 time of detection of the optical zooming, surround view and video dynamic capturing functions of the panoramic video monitoring equipment every week, and whether 2 times of calling failure continuously occurs within two months or not, and the evaluation subject meets the 5-point score.
1.2.6 laying voice public broadcasting equipment on a construction site, realizing an acousto-optic early warning function, and setting an evaluation score to be 5;
evaluation points are as follows: the object building site unit provides pictures of the layout condition of the broadcasting equipment; and the evaluation subject checks whether related equipment is set or not, whether the acousto-optic early warning function is provided or not, and the score is 5 when the rule description is met, and the score is 0 when the rule description is not met.
1.2.7 And (adding items) on the construction site, combining with related management files and technical standards of the country and the location, adopting other infrastructure management measures, adding 5 points after each adding and passing the audit, wherein the full score is 5 points.
5363 a progress management subsystem is built on site at 1.2.8 construction site, and the evaluation score is 20;
evaluation points are as follows: the evaluation main body checks the construction condition of the intelligent construction site progress management subsystem. The platform supports reading BIM information model or progress management software data information; the terminal equipment has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm. The score is 20, otherwise, the score is 0.
1.2.9 implementing the intelligent construction management of the whole industrial chain, establishing an intelligent construction management platform covering at least 1 item of design, production, construction and technical service, and setting the evaluation score to be 5;
evaluation points are as follows: the evaluation subject checks the real-time situation of the intelligent construction management of the whole industrial chain, wherein an intelligent construction management platform covering at least 3 items of design, production, construction and technical service is established, and the score is 5; BIM is applied in the processes of deepening design, processing production, transportation, storage material receiving and construction, and the score is 5.
1.2.10 project building BIM model, evaluation score is 5 points;
evaluation points are as follows: uploading a BIM model which accords with the actual situation of the construction site by the object construction site unit; the evaluation main part can acquire construction stage BIM model with the help of wisdom building site platform, and accords with following condition: the fineness of the model is not less than 300 grades, the light weight, transmission and storage of the BIM are realized, and the data of the BIM meet the national relevant standards and can meet the score of 5.
1.2.11 building site application BIM technology is used for carrying out three-dimensional visual intersection, construction simulation and collision inspection, the total evaluation score is 15 points, and 5 points are obtained when one item is finished;
evaluation points are as follows: uploading or providing three-dimensional visual bottom-crossing records, construction simulation videos and collision inspection records by an object site unit; and the evaluation subject checks whether the project is subjected to virtual construction application such as project technology background crossing, construction simulation and collision check by using the BIM technology, model checking and file management are carried out by using the BIM platform, and the score of one project is 5.
1.2.12 project provides a three-dimensional visualization model of a building or adopts oblique photography technology, the model contains use instruction information, and the evaluation score is 5;
evaluation points are as follows: uploading a project building three-dimensional visualization model and related parameters by an object site unit; the evaluation subject checks whether the model matches the item, whether the instruction information is provided, and the like, and the score of 5 is satisfied.
5363 performing two-dimensional code inspection on a field of a 1.2.13 site, and evaluating the total score to be 5 points;
evaluation points are as follows: the object site unit provides a project inspection two-dimensional code, an inspection record and a two-dimensional code inspection platform; and evaluating whether a main body check project applies a two-dimensional code polling technical platform or not, checking whether a polling page can be opened by scanning the two-dimensional code or not, realizing the functions of filling a polling log in the page, shooting and editing a field picture and the like, and checking whether the field two-dimensional code is effective or not, wherein the score is 5.
5363 the field of construction of 1.2.14 is inspected by an unmanned aerial vehicle, and the evaluation score is 5;
evaluation points are as follows: the object site unit provides unmanned aerial vehicle inspection data and related inspection pictures; and manually judging that the score of the score is 5 when the evaluation subject is in line inspection and the score is 0 when the evaluation subject is not in line inspection.
1.2.15 And (adding items) on the construction site, combining related management files and technical standards of the country and the location, adding 5 points after each adding and passing the audit by adopting other intelligent management measures, wherein the full score is 5 points.
And aiming at the safe and reliable indexes, the indexes are determined by dividing into a control item and a grading item according to the actual conditions. Safe and reliable control items: the intelligent construction site can realize comprehensive intelligent supervision on unsafe behaviors of people, unsafe states of objects and unsafe factors of the environment, and the safety and reliability of the construction site are ensured. The safe and reliable control items comprise:
2.1.1 the intelligent construction site can realize the safety data informatization management function.
The key points are determined: the evaluation subject checks the information management function of the safety data and judges that the safety data are 'in line' or 'out of line'. Wherein,
(1) The management of online entry, examination, release, ledger and the like is realized by coping with the safety scheme, and simultaneously, the record uploading management of the handed-to-the-back files is realized.
(2) The system deals with the real-name management of construction workers, and carries out informationized management on the post certificates, the entrance and the exit of managers and special work and technical personnel and the health files of personnel engaged in and exposed to occupational disease health hazard factors.
(3) The information database of the mechanical equipment is established, which comprises information such as property right of the mechanical equipment, security (dismantling) units, operators, logout records and the like, and information records such as installation, inspection, use, maintenance, disassembly and the like of the mechanical equipment.
2.1.2 the construction site is in charge of setting non-blind area video monitoring for dangerous areas, key parts, enclosing walls and the like, and has the functions of remote real-time viewing, playback, video abstraction, video polling and the like;
the judgment key points are as follows: the evaluation subject checks the video coverage and video functions, and determines that the evaluation subject does not satisfy the requirements as "non-compliant".
The safe and reliable scoring items comprise/are selected from:
2.2.1 a safety management subsystem is built on the construction site, and the evaluation score is 20 points;
evaluation points are as follows: the evaluation main body checks the construction condition of the safety management subsystem of the intelligent construction site. The security management subsystem should fulfill the following functions: the platform realizes comprehensive safety management on site, people and equipment, and has the functions of safety information data, risk level management and control, critical engineering management, abnormal event alarm and the like; and has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm through terminal equipment. The score is 20, otherwise, the score is 0.
2.2.2 install wisdom monitoring devices on the scene of building site, and effective use, appraise total score and be 30. And respectively scoring and accumulating according to the following rules: (1) Installing a foundation pit intelligent monitoring device, wherein the evaluation score is 10 points; (2) Installing a concrete formwork support system intelligent monitoring device, wherein the evaluation score is 10 points; (3) Installing an attached lifting scaffold intelligent monitoring device, wherein the evaluation score is 10 points;
evaluation points are as follows: an object building site unit uploads real-time monitoring data and related monitoring equipment pictures of key safety control areas such as a foundation pit, a template support system, an attached lifting scaffold and the like; manually judging that the evaluation subject accords with the rule description after offline inspection, wherein each item is given a score of 10, and the score of 0 is given when the evaluation subject does not accord with the rule description;
foundation ditch wisdom monitoring range: carrying out intelligent monitoring and pre-alarming on peripheral building settlement, building inclination, water level and recharging well, supporting shaft force, column settlement, pipelines, support piles, anchor cable stress, horizontal settlement of the slope top of the foundation pit, settlement monitoring of roads around the foundation pit and change of surrounding environment conditions;
the intelligent monitoring range of the template support system is as follows: the monitoring targets of real-time monitoring, overrun early warning and danger warning can be realized by monitoring and pre-warning the template settlement, support deformation, vertical rod axial force, vertical rod inclination, vertical rod horizontal displacement and the like of the high template supporting system in real time;
attached lifting scaffold wisdom monitoring range: and the attached lifting scaffold is subjected to gravity monitoring, falling protector working state monitoring, wind speed monitoring, top bracing monitoring and the like.
2.2.3 installing an intelligent alarm device on the site of a construction site or a living area, wherein the evaluation score is 5;
evaluation points are as follows: the object building site unit uploads data of systems such as a smoke sensing alarm device, a temperature sensing alarm device and an automatic spraying system, and related equipment pictures and working videos; and manually judging that the score is 5 after the evaluation subject is checked off-line, and the score is 0 when the evaluation subject is not in accordance with the rule description.
2.2.4 setting a distribution box safety management system on the site of a construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: the object site unit provides introduction, a composition list and pictures of the distribution box safety management system; the evaluation main body checks, and the distribution box safety management system can meet the following functions: real-time operation monitoring, fault alarming and automatic exception handling, equipment installation exception alarming, equipment full-life management and the like, and the requirement is met by 5 points.
2.2.5, intelligently identifying the problem hidden danger of the construction site, wherein the evaluation score is 10 points;
evaluation points are as follows: the object site unit uploads site problem and hidden danger identification records and provides related pictures and monitoring videos; whether the main body inspection platform can automatically identify at least four hidden troubles, such as safety helmets, safety belts and reflective protective clothing, when a person enters a dangerous area, on-site naked fire, smoking of the person, loss of protection of a side opening and the like, is evaluated, and the score of 10 is met.
2.2.6 installing an intelligent alarm device in a closed space or an area with a toxic and harmful gas leakage risk, wherein the evaluation score is 5;
evaluation points are as follows: the object building site unit uploads toxic and harmful gas monitoring data and equipment pictures; and manually judging that the score of the score is 5 when the evaluation subject is in line inspection and the score is 0 when the evaluation subject is not in line inspection.
2.2.7 installing a construction vehicle safety monitoring intelligent recognition alarm device on the construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: the object building site unit uploads related data and monitoring videos; and manually judging that the score is 5 after the evaluation subject is checked off-line, and the score is 0 when the evaluation subject is not in accordance with the rule description.
2.2.8 And (adding items) on the construction site, combining with related management files and technical standards of the country and the location, adopting other intelligent measures for safety control, and adding 5 points after each additional item passes the verification, wherein the full score is 5 points.
5363 a staff management subsystem is built on site at 2.2.9, and the evaluation score is 20 points;
evaluation points are as follows: and evaluating the construction condition of the management subsystem of the main inspector. The personnel management subsystem should fulfill the following functions: the system can realize the functions of real-name control of personnel, in-site personnel access management, in-site personnel distribution management, personnel positioning, instant alarming of illegal behaviors such as overtime and overtime, epidemic prevention control, health management, personnel attendance management and the like; the terminal equipment has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm. The score is 20, otherwise, the score is 0.
2.2.10 installing an intelligent recognition device on the site of a construction site to collect the on-duty information of personnel, wherein the evaluation score is 5;
evaluation points are as follows: the object construction site unit provides a function list and collected data of the intelligent identification device; the evaluation main body checks whether the intelligent recognition device adopts an identification technology such as iris recognition, dynamic face recognition, fingerprint recognition, video shooting and the like to identify the field personnel and automatically count and display the on-duty information of the personnel on the spot, so that the score of 5 is met.
2.2.11 operating personnel or special operating personnel in the dangerous area are equipped with wearable safety intelligent terminal equipment, and the evaluation score is 5 points;
evaluation points are as follows: the intelligent construction scheme of the construction site embodies the division standard of dangerous areas, the functions of wearable safety intelligent terminal equipment and the requirements for use and management; uploading a relevant picture using the wearable safety intelligent terminal equipment by the project user; and manually judging after the evaluation subject checks, and if the evaluation subject meets the requirement, obtaining a score of 5, otherwise, obtaining a score of 0.
2.2.12 site personnel allocation personnel positioning device, and the evaluation score is 5;
evaluation points are as follows: uploading personnel positioning and associated data in real time by the object construction site unit; whether the evaluation main body checks and positions the device can display and analyze the personnel distribution, personnel density, personnel behaviors and the like on the site of the construction site or not is achieved, and the score of 5 is met.
2.2.13 monitoring the physical signs of high-risk workers on site by adopting intelligent equipment, wherein the physical signs include but are not limited to heart rate, blood pressure, body temperature and the like of the workers, and the evaluation score is 5;
evaluation points are as follows: the high-risk worker division standard is embodied in the intelligent construction site construction scheme; the data of body temperature measurement, blood pressure measurement, heart rate measurement, alcohol test and the like are recorded or uploaded by a target building site unit through a data interface; and (5) manually judging after the evaluation subject checks, and if not, obtaining 0.
2.2.14 performing safety education on the practitioner on the site by adopting an information tool, wherein the evaluation score is 5 points;
evaluation points are as follows: the object building site unit provides information such as safety education information tool lists, training pictures, training videos, hour records, examination records and the like for the employees; the evaluation subject examination informatization tool is at least 1 tool of a virtual reality technology (VR) device, a mixed reality technology (MR) device, an augmented reality technology (AR) device and a multimedia safety training toolbox, and whether the training related information meets the requirement or not is checked, and the requirement is met by 5 points.
2.2.15 And (adding items) on the construction site, combining related management files and technical standards of the country and the location, adopting other personnel management intelligent measures, and adding 5 points after each additional item passes the verification, wherein the full score is 5 points.
5363 a mechanical equipment management subsystem is built on site of 2.2.16 on the construction site, and the evaluation score is 20;
evaluation points are as follows: and the evaluation subject checks the construction condition of the mechanical equipment management subsystem. The mechanical equipment management subsystem should fulfill the following functions: the system should establish a unified information database of the mechanical equipment, which contains information such as the property right of the mechanical equipment, an installation (dismantling) unit, an operator, a record cancellation and the like; the system has the information recording functions of installation, inspection, use, maintenance, disassembly and the like of mechanical equipment; the terminal equipment has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm. The score is 20, otherwise, the score is 0.
The 2.2.17 tower crane adopts intelligent supervision measures, the total evaluation score is 25, and the evaluation score is calculated according to the following rules: (1) Installing a safety monitoring alarm device, wherein the evaluation score is 5 points; (2) Installing an anti-interference intelligent leakage protection device, and judging that the evaluation score is 5 points; (3) A hook visual monitoring system is used, and the evaluation score is 5 points; (4) Installing an anti-collision system and a tower group operation early warning system, and setting the evaluation score to be 5; (5) An installer climbs the intelligent monitoring device of the tower crane, and the evaluation score is 5.
The 2.2.18 construction elevator adopts intelligent supervision measures, the total evaluation score is 10, and the evaluation score is calculated and accumulated according to the following rules: (1) The construction elevator is provided with intelligent safety monitoring equipment, has early warning functions such as driver face recognition and personnel load limitation, and has an evaluation score of 5 points; (2) The construction elevator which is intelligently controlled is used, a safety worker (a driver) is equipped according to the requirement, the intelligent alarm function is achieved, and the evaluation score is 5.
2.2.19 unloading platform is provided with an intelligent monitoring alarm device, and the evaluation score is 5;
evaluation points are as follows: the object construction site unit provides relevant monitoring data and a chart of the unloading platform; the evaluation main body checks whether the monitoring and alarming device of the unloading platform can realize real-time monitoring on the tension, the load capacity, the inclination and the like of the steel wire rope and carry out on-site and remote early warning during overload, and intelligent monitoring functions such as data statistical analysis and the like are met by 5 points.
2.2.20 hanging basket is provided with an intelligent monitoring alarm device, and the evaluation score is 5;
evaluation points are as follows: providing monitoring data and device pictures by an object construction site unit; the evaluation main part inspects whether the intelligent monitoring alarm device for the hanging basket can realize the real-time monitoring on the tension, the pressure, the inclination angle and the wind speed, and the intelligent monitoring functions of data statistical analysis and the like can meet the requirement of 5 points.
2.2.21 shield tunneling machine is provided with an intelligent monitoring device, and the evaluation score is 5;
evaluation points are as follows: providing monitoring data and device pictures by an object site unit; the evaluation subject checks whether the intelligent monitoring device of the shield tunneling machine can realize the real-time monitoring of the tunneling speed, the tunneling mileage, the rotating speed, the penetration degree, the thrust, the single-blade thrust, the angle, the total torque, the compressive strength of rock mass and the integrity, and the intelligent detection functions of data statistical analysis and the like can meet the requirement of 5 points.
5363 installing an intelligent monitoring device on a 2.2.22 bridge girder erection machine, wherein the evaluation score is 5;
evaluation points are as follows: providing monitoring data and device pictures by an object construction site unit; the evaluation main body checks whether the intelligent monitoring device of the bridge girder erection machine can realize the real-time monitoring of the braking device, the transverse movement, the longitudinal movement, the height, the weight, the wind speed and the levelness, and the monitoring functions of data statistical analysis and the like are met by 5 points.
2.2.23 on-site lofting, steel structure welding, automatic reinforcing steel bar processing, plastering, carrying, concrete calendaring and other links adopt intelligent equipment to replace manual operation, and the total evaluation score is 10 when one score is 5;
evaluation points are as follows: the object construction site unit provides data such as lists, pictures, effect evaluation and the like related to 'mechanical person changing, robot operation and automatic person reduction'; the evaluation subject performs manual judgment after examination, and the score of 1 item is 5, and the total score is 10.
2.2.24 The (point adding) construction site combines the related management files and technical standards of the country and the location, adopts other intelligent measures for mechanical equipment management, and the point adding is 5 points after each additional item passes the verification, and the full point is 5 points.
Aiming at the green environmental protection index, the index is determined by dividing into a control item and a scoring item according to the actual condition. Green environmental control items: the wisdom building site should support the realization to the comprehensive intelligent supervision of "building site environment, resource and energy", furthest resources are saved and the reduction is to the environment negative effect, ensures that construction building site scene green. The green environmental control items comprise:
3.1.1 setting a raise dust monitoring point on a construction site, and monitoring particulate matters of PM2.5 and PM10 in real time;
judging the key points: the object building site unit provides a dust monitoring point picture and real-time monitoring data; the subjects were evaluated for "compliance" or "non-compliance" as determined manually. The dust emission monitoring points are set to meet the following requirements: at least 1 monitoring point is respectively arranged at an entrance and an exit of a construction site and an unloading area; when the construction site is a municipal road and bridge project, at least 1 monitoring point is arranged every 2 km; each subway station of the urban rail transit engineering is at least provided with 1 monitoring point; the dust particle sampling port is arranged at a position 3.5m +/-0.5 m away from the ground, and the periphery of the dust particle sampling port is not shielded.
3.1.2 setting noise monitoring points on the site of the construction site, and monitoring equivalent continuous A sound level in real time;
judging the key points: the object site unit provides a noise monitoring point picture and real-time monitoring data; the subject was evaluated for "compliance" or "non-compliance" as determined manually. The noise monitoring point setting should meet the following requirements: setting at least 1 monitoring point at the position of a main noise source on a construction site; when the construction site is a municipal road or bridge project, at least 1 monitoring point is arranged every 1 km; each subway station of the urban rail transit engineering is at least provided with 1 monitoring point; the monitoring points are set to be higher than the enclosing wall by more than 0.5m and are positioned in the sound irradiation area affected by construction noise.
3.1.3 construction site should take construction waste reduction measures;
judging the key points: providing a project construction waste reduction specific scheme by an object construction site unit; the "compliance" or "non-compliance" is manually determined after the evaluation of the subject's offline inspection. The project needs to effectively reduce the generation and the discharge of construction wastes at the construction site according to the requirements that the discharge amount of the construction wastes at the construction site of a new building is not higher than 300 tons per ten thousand square meters and the discharge amount of the construction wastes at the assembly type building is not higher than 200 tons per ten thousand square meters.
3.1.4 the site can perform informatization management on material inventory;
judging the key points: and after the evaluation subject checks the construction condition of the material inventory informatization management platform, the manual judgment of 'conformity' or 'nonconformity' is carried out. The material management objects include but are not limited to steel bars, concrete, assembled components and the like, the warehouse entry and exit information includes related contents such as quality standard, green building materials, quantity, price, brand, warehouse entry time, article category, model, registrant, retriever, retrieval time, retrieval quantity and the like, and the related contents are classified according to material identification.
The green environmental scoring items include/are selected from:
3.2.1 an environment monitoring management subsystem is built on the construction site, the total evaluation score is 20, and the total evaluation score is respectively evaluated and accumulated according to the following rules: (1) The environment monitoring subsystem is suitable for having the functions of dust monitoring, noise monitoring, meteorological monitoring and the like, monitoring two or more objects, and evaluating the value by 10 points; (2) The environmental monitoring management subsystem is provided with a terminal APP, and has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm through terminal equipment, and the evaluation score is 10.
3.2.2 adding raise dust monitoring points according to the surrounding environment and the site construction condition on the site, and evaluating the total score to be 5 points;
evaluation points are as follows: an object building site unit reasonably formulates a construction scheme according to the construction site condition, and the raise dust detection points are dynamically increased; whether the main body inspection site setting and construction scheme meet the following standards is evaluated: (1) A monitoring point is additionally arranged at an air inlet under the boundary of the construction site according to the local climate and wind direction on the construction site; (2) According to different construction stages, monitoring points are additionally arranged at positions where flying dust is easy to generate; (3) When residents, businesses, offices, medical treatment, schools and other areas sensitive to dust exist around the construction site, dust monitoring points are additionally arranged at the junction of the construction site and the relevant areas. When one is satisfied, 5 points can be obtained. .
3.2.3 the site raise dust monitoring has the site acousto-optic alarm or remote alarm function that the raise dust exceeds the standard, and the evaluation score is 5 points;
evaluation points are as follows: providing dust exceeding data and videos and pictures when equipment gives an alarm by an object site unit; and after the evaluation subject checks, manually judging whether the evaluation subject meets the requirements, wherein the satisfaction score is 5. .
3.2.4 the construction site is provided with a bare-soil AI recognition monitoring device, and the evaluation score is 5 points;
evaluation points are as follows: providing monitoring data and images by a subject site unit; and the evaluation subject performs inspection, and the exposed soil AI identification monitoring equipment is required to be provided.
5363 spraying dust-settling measures are taken on site at 3.2.5, the total evaluation score is 10, and the total evaluation score is respectively scored and accumulated according to the following rules: (1) The peripheral enclosure is suitable for being provided with a dust control facility for atomization spraying, and has an intelligent control function linked with a dust monitoring system, and the evaluation score is 5; (2) And (3) configuring fog gun facilities on the site of the construction site, and performing linkage control on key areas where the raise dust is generated according to the raise dust monitoring condition, wherein the evaluation score is 5.
3.2.6 adding noise monitoring points on the construction site according to the surrounding environment and the site construction condition, wherein the evaluation score is 5 points;
evaluation points are as follows: an object building site unit reasonably formulates a construction scheme according to the construction site condition, and dynamically increases noise detection points; whether the main body inspection site setting and construction scheme meets the following standards is evaluated: (1) When residents, businesses, offices, medical treatment, schools and other areas sensitive to noise exist around the construction site, noise monitoring points are preferably additionally arranged at the adjacent positions of the construction site and the relevant areas; (2) Noise monitoring points are preferably additionally arranged on the site of the construction site in the material processing and main equipment noise source areas. One score of 5 was satisfied.
3.2.7 the site noise monitoring of the construction site has the site acousto-optic alarm or remote alarm function of noise exceeding standard, and the evaluation score is 5 points;
evaluation points are as follows: providing noise standard exceeding data and video and pictures when equipment gives an alarm by an object building site unit; and the evaluation subject manually judges whether the requirements are met after checking, and the requirements are given 5 points.
5363 setting a microclimate weather monitoring point on the site of the construction site at 3.2.8, and setting an evaluation score of 5;
evaluation points are as follows: the method comprises the following steps that an object site unit provides meteorological monitoring data and detection pictures within one month; the main evaluation body carries out inspection, meteorological data comprise parameters such as temperature, humidity, wind direction, wind speed, ambient air quality and direct solar radiation, and the equipment has the functions of site acousto-optic alarm, remote alarm and equipment fault alarm for meteorological monitoring standard exceeding judgment, and the requirement is 5.
5363 setting sewage monitoring points on the construction site of 3.2.9, and monitoring in real time, wherein the evaluation score is 5 points;
evaluation points are as follows: providing a sewage monitoring point distribution map and monitoring data by an object construction site unit; the evaluation main body checks, and the sewage monitoring point is used for realizing automatic sampling, flow online detection, main pollution factor online monitoring and water quality detection after sewage treatment of on-site wastewater and domestic area sewage; the sewage discharge condition and the total pollutant discharge amount are mastered in real time, the sewage is prevented from being directly discharged without treatment, and the score of 5 is met.
3.2.10 site monitors the cleaning condition of the vehicles entering and exiting the building site, and the evaluation score is 5;
evaluation points are as follows: providing a vehicle cleaning monitoring photo by the object site unit; the evaluation main part is examined, and vehicle washes monitoring system can take a candid photograph the vehicle automatically, accomplishes that intelligent recognition vehicle does not wash leave, wash when not enough, wash violation of rules and regulations such as not enough, satisfy and receive 5 points.
3.2.11 And (adding items) on the construction site, combining with related management files and technical standards of the country and the location, adopting other intelligent measures for environment monitoring, wherein 5 points are added after one point is added and approved, and the full score is 5 points.
5363 an energy consumption management subsystem is built on site at 3.2.12, and the evaluation score is 20 points;
evaluation points are as follows: the evaluation main body checks the construction condition of the intelligent construction site environment monitoring management subsystem: the platform can realize functions of on-line energy utilization monitoring, electric charge assessment, building unit consumption total consumption analysis, real-time hydropower analysis and the like; and the terminal equipment has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm. The score is 20, otherwise, the score is 0.
3.2.13 site monitors the electricity consumption of construction areas, living areas and office areas in real time respectively, and the evaluation score is 5;
evaluation points are as follows: the object construction site unit provides power consumption monitoring data; the evaluation main body is used for checking, and the power consumption real-time monitoring system can realize the functions of real-time power consumption parameter monitoring, power consumption condition statistics, overrun alarming, data statistics, analysis and the like in areas such as construction areas, living areas, office areas and the like, and the power consumption real-time monitoring system can meet the score of 5.
3.2.14 on-site monitoring water consumption of a construction area, a living area and an office area in real time respectively, wherein the evaluation score is 5;
evaluation points are as follows: providing water consumption monitoring data by a target site unit; the evaluation main body inspects, and the water consumption real-time monitoring system can realize the water consumption data monitoring in areas such as construction district, living quarter, office district, etc., and according to each time quantum water consumption analysis building site water consumption peak period, average water consumption, reports to the police to problems such as leaking, malicious water, carries out functions such as data statistics, analysis, and the like, satisfies to receive 5 minutes. .
5363 monitoring carbon emission in a construction stage on site of a 3.2.15 site in real time, and evaluating the value of 5 points;
evaluation points are as follows: the object construction site unit provides carbon emission monitoring data of a construction stage; the evaluation subject checks, and the carbon emission monitoring system can realize the calculation of greenhouse gas emission related to activities such as building and building material production and transportation, construction and demolition, operation and the like, and the carbon emission monitoring system can meet the requirement of 5 points.
5363 the field automatic weighing of heavy materials is achieved 3.2.16. The evaluation score was 5 points;
evaluation points are as follows: providing monitoring data by a subject site unit; the evaluation main body checks, the weighing material automatic metering system realizes unified scheduling and weighing of incoming vehicles, automatic metering of the weight of the weighing material is realized by integrating the weighbridge and the instrument, and the weighing material automatic metering system has the functions of on-line weight data statistics, storage, analysis and the like, and can meet the requirement of 5 points.
3.2.17 bar materials are automatically counted on site by adopting an AI identification technology, and the evaluation score is 5;
evaluation points are as follows: providing bar acceptance identification data and pictures by an object construction site unit; the evaluation main body is used for checking, and the automatic bar counting system can realize the functions of end face photographing, automatic counting and acceptance, automatic correction and the like, and the score of 5 is met.
3.2.18 adopts an optical character recognition technology on site, accurately recognizes information such as material names, specification models and quantities in paper documents, realizes functions such as automatic acquisition, uploading and storage of the information, and has an evaluation score of 5;
evaluation points are as follows: uploading an optical character recognition list and a picture by an object construction site unit; the evaluation main body is used for checking, the optical character recognition technology can accurately recognize information such as material names, specification models and quantity in paper documents, the automatic collection, uploading and storage functions of the information are realized, and the score of 5 is met.
3.2.19 adopts a radio frequency technology or a two-dimensional code label technology on site, assists material warehousing, inventory and use management, and the evaluation score is 5.
3.2.20 construction site adopts an energy-saving low-carbon construction device and process, more than three types are adopted to obtain 10 points, and the total evaluation value is 10 points;
evaluation points are as follows: and the object construction site unit provides a list and pictures of the energy-saving low-carbon construction device and process. The subject of the evaluation is checked, and the device and the process are adopted to meet one of the following conditions: (1) preferentially using low energy consumption equipment; (2) The mobile machine monitoring system has the functions of mechanical equipment state management, position feedback, resource allocation, energy consumption statistics and the like; (3) The device for intelligently monitoring the oil consumption is installed on mechanical equipment which adopts fuel oil as power, and the installation proportion is not lower than 50 percent; and (4) selecting a green building material, wherein the application proportion is not less than 30%. More than three can be used to obtain 10 points.
3.2.21 And (adding items) on-site construction sites, combining related management files and technical standards of countries and locations, and adding 5 points which are approved by auditing when adding one intelligent measure for controlling other resources and energy sources, wherein the full score is 5 points.
And aiming at the quality controllable indexes, determining the indexes by dividing the indexes into a control item and a grading item according to the actual conditions. Quality-controllable control item: the intelligent construction site can support the realization of comprehensive intelligent supervision of 'quality supervision of structural entities and quality of process key nodes and building materials', and the controllability of the field quality of the construction site is ensured. The quality controllable control items comprise:
4.1.1 the intelligent construction site should realize the data information management function of the quality management system.
The judgment key points are as follows: the evaluation subject checks the information management function of the quality management system data and judges whether the data are 'in line' or 'out of line'. The safety data informatization management should satisfy the following functions: the construction organization design and various construction schemes and quality control schemes realize the functions of online submission, examination, online editing, presentation and ledger, and meanwhile realize technical background of transaction; the inspection and acceptance of important nodes of the branch project of the construction project are realized by adopting an informatization technology for file data such as construction records, hidden project records, related tables and the like.
4.1.2 video image data are retained in key processes and key links of hidden projects such as concrete pouring, sample taking and sending, earthwork backfilling, waterproofing and heat preservation projects and the like;
the key points are determined: the target site unit provides key processes and key links of hidden projects such as concrete pouring, sampling and sample sending, earthwork backfilling, waterproofing and heat preservation projects and the like, and video image data are retained in the key links; the subjects were evaluated for examination and judged "in compliance" or "not in compliance". .
The quality-controllable scoring items comprise/are selected from:
4.2.1 a quality management subsystem is built on the construction site, and the evaluation score is 20 points;
evaluation points are as follows: the evaluation main body checks the construction condition of the intelligent construction site environment monitoring management subsystem: the platform should satisfy functions such as daily quality is patrolled and examined, the process is accepted, actual measurement, quality analysis: and the terminal equipment has the functions of real-time acquisition, transmission, display, storage, statistical analysis, prompt or alarm. The score is 20, otherwise, the score is 0.
4.2.2 actually measuring the quality of the structural entity on site by adopting intelligent equipment, wherein the evaluation score is 5 points;
evaluation points are as follows: providing actually measured actual quantity data and related pictures by an object construction site unit; the evaluation main body is used for checking, and at least one of an intelligent guiding rule, an intelligent angle square, an intelligent resilience detector, an intelligent level gauge and the like is adopted as an actual measurement tool. The score of 5 was satisfied.
4.2.3 performing remote scanning and modeling on the appearance of the entity by using technical equipment such as a three-dimensional laser scanner on a construction site, comparing the scanning model with the BIM model, and comparing the entity with the dimensional deviation of the construction drawing, wherein the evaluation score is 5 points;
evaluation points are as follows: providing a field laser scanning result report by a target building site unit; the object site unit provides a report of the comparison of the scan model and the BIM model. 3. The subjects were evaluated for examination and the score of 5 was satisfied.
4.2.4 monitoring the concrete vibration in real time on the construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: providing a concrete vibration monitoring video by an object building site unit; the evaluation main body checks, and the concrete vibration monitoring system needs to perform real-time digital acquisition and analysis on key indexes which influence the concrete vibration construction quality, such as vibration position, time, depth, speed, track and the like. The score of 5 was satisfied.
4.2.5 monitoring the standard curing laboratory in real time on the site of a construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: providing a standard maintenance laboratory monitoring video by an object building site unit; the evaluation main body checks, the standard maintenance laboratory monitoring system can meet the requirement of monitoring the temperature and humidity change of the standard maintenance room in real time, alarm prompt can be carried out according to specific threshold values, daily monitoring data and alarm data are automatically stored, and digital management is achieved. The score of 5 was satisfied.
5363 the branch project of 4.2.6 adopts mobile intelligent equipment for acceptance inspection, and the evaluation score is 5 points;
evaluation points are as follows: the object building site unit provides a mobile intelligent equipment list, acceptance data and operation pictures; the evaluation subject checks, and the mobile intelligent equipment has the functions of acceptance data input, acceptance site picture shooting and uploading, and the score of 5 is met.
4.2.7 visual equipment (VR, MR, AR, high definition camera and the like) is applied on site on a construction site to assist quality management, and the evaluation score is 5;
evaluation points are as follows: providing a quality management visual equipment list, an identification picture and acquisition data by an object construction site unit; and (4) inspecting by an evaluation subject, wherein the visualization equipment is provided with automatic statistics of the entering bars.
4.2.8 And (adding items) on the construction site, combining with related management files and technical standards of the country and the location, adopting other quality control intelligent measures, and adding 5 points after each adding and passing the audit, wherein the full score is 5 points.
5363 traceability intelligent management is adopted for field inspection materials of 4.2.9, and the evaluation score is 10 points;
evaluation points are as follows: the object construction site unit provides a source tracing technical report and a picture of the inspection material; the evaluation main body is checked, at least 3 types of materials such as waterproof materials, heat-insulating materials, building blocks, concrete, mortar and steel bars of the engineering which influence the structure safety or mainly use the functions are subjected to inspection by adopting technologies such as two-dimensional codes or radio frequency chips, the whole process positioning supervision of the materials subjected to inspection can be realized, and the requirement is met by 10 points.
4.2.10 carrying out informatization management on acceptance of main materials entering the field on the construction site, wherein the evaluation score is 5 points;
evaluation points are as follows: providing an entrance material informatization management list by an object construction site unit; the evaluation subject checks, and the entrance material management system has the functions of intelligent weighing, automatic material information input, statistics and analysis report generation, and automatic material cost accounting and adjusting, and the evaluation subject can meet the requirement of 5 points. .
4.2.11 when the main materials on the site of the construction site enter the site and are not qualified, carrying out alarm prompt and information push, wherein the evaluation score is 5 points;
evaluation points are as follows: the object building site unit provides acceptance reports, alarm prompts and information push pictures; and the evaluation subject performs inspection, and when the incoming materials are not qualified, the system automatically alarms and timely informs the construction unit, the construction unit and the supervision unit of related responsibility personnel and engineering quality supervision and management departments, so that the score of 5 is met.
4.2.12 the site of the construction site can effectively verify the authenticity of the material detection report, can be downloaded or checked immediately, and has the evaluation score of 5 points;
evaluation points are as follows: the object construction site unit provides a material detection report authenticity verification method; and the evaluation subject checks, verifies the inspection scheme, and checks whether the download and check of the detection report can be carried out or not, wherein the requirement is given 5 points.
5363 quick test can be carried out on the concrete on site at 4.2.13 construction site, and the evaluation score is 5;
evaluation points are as follows: the evaluation subject provides a site concrete rapid inspection report; and the evaluation main body is used for checking, the rapid inspection is required to meet the requirement of on-site sampling of concrete of each strength grade, the quality tracking is realized according to the requirement of one standard and one code, and the requirement of 5 points is met.
5363 monitoring the quality of the structural concrete on site at 4.2.14 construction sites, and the evaluation score is 5;
evaluation points are as follows: providing a structural concrete quality monitoring report and data by an object construction site unit; the evaluation subject checks that the concrete quality monitoring should include monitoring of the elevation, strength, verticality, flatness of the structural concrete and the presence or absence of honeycombs, pitted surfaces, exposed ribs, holes, undesirable cracks, and the like.
5363 monitoring the temperature data of the mass concrete on site at 4.2.15 site, and the evaluation score is 5;
evaluation points are as follows: providing concrete temperature monitoring data by an object construction site unit; the evaluation main part is examined, and concrete temperature monitoring system should possess the inside and outside temperature variation of real-time supervision concrete, when construction point position temperature, difference in temperature, cooling rate surpassed early warning temperature difference value, can report to the police functions such as automatically, satisfied score 5.
5363 intelligent equipment is adopted on site of 4.2.16 to intelligently monitor the quality of welding, steel member installation, bolt installation and shear resistant stud in steel structure construction, and the evaluation score is 5;
evaluation points are as follows: the object site unit provides an intelligent supervision equipment list, function introduction and process supervision data; the evaluation subject performs inspection to monitor the elements such as the strength and the stress of the component, and the evaluation subject is required to meet the requirement of 5 points.
5363 the field of construction site 4.2.17 can adopt intelligent equipment to carry out process supervision on the waterproof construction quality, and the evaluation score is 5;
evaluation points are as follows: the object building site unit provides an intelligent supervision equipment list, function introduction and process supervision data; and (5) inspecting the evaluation subject to realize the monitoring of the waterproof performance and the construction process, wherein the evaluation subject can meet the requirement of 5 points.
5363 the site of 4.2.18 can adopt intelligent equipment to monitor the construction quality of heat preservation, decoration and the like, and the evaluation score is 5;
evaluation points are as follows: the object building site unit provides an intelligent supervision equipment list, function introduction and process supervision data; and (5) inspecting by an evaluation subject to realize monitoring of factors such as heat insulation performance, construction process and the like, wherein the evaluation subject is required to meet the rating of 5.
4.2.19 And (adding items) on the construction site, combining with related management files and technical standards of the country and the location, adopting other material quality control intelligent measures, and adding 5 points after each adding and passing the audit, wherein the full score is 5 points.
A step of performing the determination of the indexes of the target construction site and the specific evaluation options thereof in step (1) based on the above-mentioned options, and then determining the results of the respective indexes of the target construction site according to the selected evaluation indexes and the actual conditions of the target construction site; wherein, the scoring item of the intelligent high-efficiency index is Q 1 The score item of the safe and reliable index is Q 2 And the scoring item of the green environmental protection index is Q 3 The scoring item of the quality controllable index is Q 4 The weight of each index is assigned according to the total evaluation score of each index score item (the index excluded due to situational factors does not affect the assignment of the following weights, that is, the weight is not changed in the present method), and the overall evaluation value Q of the target construction site thus obtained is calculated by the following formula (1):
Q=0.19Q 1 +0.38Q 2 +0.24Q 3 +0.19Q 4 (1)
and the overall evaluation value Q reaches 60 points, 70 points and 80 points, and the intelligent construction site level of the object construction site is a one-star level, a two-star level and a three-star level respectively.
The above-mentioned embodiments are merely descriptions of the preferred embodiments of the present invention, and do not limit the concept and scope of the present invention, and various modifications and improvements made to the technical solutions of the present invention by those skilled in the art without departing from the design solutions of the present invention are all the protection scope of the present invention, and the technical contents of the present invention as claimed are described in the claims.

Claims (8)

1. A method of evaluating an intelligent worksite, the method comprising: (1) establishing an evaluation index of an intelligent construction site of a target construction site; (2) Determining the result of each index of the object construction site according to the evaluation index and the actual condition of the object construction site; and (3) determining an overall evaluation value of the target construction site in combination with results of the evaluation indexes, thereby obtaining a grade of the intelligent construction site.
2. The evaluation method of an intelligent construction site according to claim 1, wherein the evaluation index includes: the intelligent, efficient, safe and reliable, green and environment-friendly effects are achieved, and the quality is controllable; each type of evaluation index is divided into a control item and a grading item, wherein the control item is an item which must be met and is the most basic requirement for building an intelligent construction site; the evaluation item is evaluated in terms of the build effect.
3. The method according to claim 2, wherein the evaluation result of the scoring item is a score; wherein, the scoring item of the intelligent high-efficiency index is Q 1 The score of the scoring item of the safe and reliable index is Q 2 And the scoring item of the green environmental protection index is Q 3 The scoring item of the quality controllable index is Q 4 The overall evaluation value Q of the target site is calculated by the following formula (1):
Q=0.19Q 1 +0.38Q 2 +0.24Q 3 +0.19Q 4 (1)
4. the method as claimed in any one of claims 1 to 3, wherein the overall evaluation value Q is 60 points, 70 points and 80 points, and the intelligent construction site is classified into one-star class, two-star class and three-star class.
5. The method of any one of claims 2 to 4, wherein the control of the intelligent performance indicators comprises: a special construction scheme of an intelligent construction site; checking and accepting records of the infrastructure of the intelligent construction site; an extranet configuration scenario;
relevant information processing, storage and transmission equipment anti-interference and anti-power-off measures on a construction site; video monitoring basic requirements;
and, carrying out electronic management on the construction data of the construction site; wherein each evaluation result is 'in line' or 'out of line'; and,
the scoring items of the intelligent high-efficiency indexes are selected from:
the intelligent construction site informatization management platform is used for evaluating the score to be 20;
setting conditions by the intelligent construction site control center, wherein the evaluation score is 5 points;
preparing qualified trained intelligent construction site professional technicians, and setting the evaluation score to be 5;
monitoring the key area on the site of the construction site in real time, wherein the evaluation score is 5 points;
applying a panoramic video monitoring system on a construction site, wherein the evaluation score is 5 points;
laying voice public broadcasting equipment on a construction site, wherein the evaluation score is 5 points;
adding a branch term: on site, the other infrastructure management measures are adopted by combining the relevant management files and technical standards of the country and the location, and the evaluation score is 5 points;
a progress management subsystem is built on a construction site, and the evaluation score is 20 points;
carrying out intelligent construction management of a whole industrial chain on the project, wherein the evaluation score is 5;
a BIM model is established for the project, and the evaluation score is 5 points;
carrying out three-dimensional visual intersection, construction simulation and collision inspection on a construction site by applying a BIM technology, wherein one item is 5 points, and the evaluation score is 15 points;
the project provides a three-dimensional visualization model of the building or adopts an oblique photography technology, the model contains use instruction information, and the evaluation score is 5 points;
the construction site is patrolled by adopting two-dimensional codes, and the evaluation score is 5 points;
the construction site is patrolled by an unmanned aerial vehicle, and the evaluation score is 5 points; and,
adding a branch term: the construction site combines the related management files and technical standards of the country and the location, adopts other intelligent cooperative management measures, and has a rating value of 5 points;
and converting the total evaluation score and the total score of the selected scoring items of the intelligent high-efficiency index into a percentile score, thereby obtaining a score Q of the scoring items of the intelligent high-efficiency index 1
6. The method of evaluating an intelligent worksite according to any one of claims 2 to 4, wherein the control items of the safety and reliability indicators include: the intelligent construction site can realize the safety data informatization management function; and, setting non-blind area video monitoring for dangerous areas, key positions and enclosing walls in a construction site, and having remote real-time viewing, playback, video abstraction and video polling functions; wherein, each evaluation result is 'conforming' or 'not conforming'; and,
the scoring item of the safe and reliable index is selected from:
a safety management subsystem is built on the construction site, and the evaluation score is 20 points;
installing an intelligent monitoring device on a construction site, wherein the evaluation score is 30 points;
an intelligent alarm device is installed on a construction site or a living area, and the evaluation score is 5;
a distribution box safety management system is arranged on the site of the construction site, and the evaluation score is 5 points;
intelligently identifying the problem hidden danger of the construction site, wherein the evaluation score is 10 points;
installing an intelligent alarm device in a closed space or an area with a toxic and harmful gas leakage risk, wherein the evaluation score is 5; installing a construction vehicle safety monitoring intelligent recognition alarm device on a construction site, wherein the evaluation score is 5 points;
adding a branch term: the construction site combines with the relevant management files and technical standards of the country and the location, adopts other intelligent measures for safety control, and has a rating value of 5 points;
a personnel management subsystem is built on the construction site, and the evaluation score is 20 points;
an intelligent recognition device is installed on the site of a construction site to collect on-duty information of personnel, and the evaluation score is 5 points;
the worker or the special worker entering the dangerous area is provided with the wearable safety intelligent terminal equipment, and the evaluation score is 5; on-site personnel of the construction site are equipped with personnel positioning devices, and the evaluation score is 5 points;
monitoring the physical signs of the workers on the construction site, wherein the evaluation score is 5 points;
safety education is carried out on the employees on the construction site by adopting an informatization tool, and the evaluation score is 5;
adding a branch term: on site, combining with relevant management files and technical standards of the country and the location, adopting other personnel management intelligent measures, and setting the evaluation score to be 5;
a mechanical equipment management subsystem is built in the project, and the evaluation score is 20 points;
the tower crane adopts intelligent supervision measures, and the evaluation score is 25 points;
the construction elevator adopts intelligent supervision measures, and the evaluation score is 10 points;
the discharge platform is provided with an intelligent monitoring and alarming device, and the evaluation score is 5;
the hanging basket is provided with an intelligent monitoring alarm device, and the evaluation score is 5;
the shield machine is provided with an intelligent monitoring device, and the evaluation score is 5 points;
installing an intelligent monitoring device on the bridge girder erection machine, wherein the evaluation score is 5 points;
intelligent equipment is adopted on the construction site, and the evaluation score is 10 points; and,
adding a branch term: the construction site combines the related management files and technical standards of the country and the location, adopts other intelligent measures for the management of mechanical equipment, and has a rating value of 5 points;
and converting the total evaluation score and the total score of the selected scoring items of the safe and reliable index into a percentile score, thereby obtaining the score Q of the scoring items of the safe and reliable index 2
7. The method of any one of claims 2 to 4, wherein the control of the green environmental indicators comprises: setting a raise dust monitoring point on a construction site; setting a noise monitoring point on a construction site; and, construction waste reduction measures should be taken on the site of the construction site; the material stock can be subjected to informatization management on the construction site; wherein each evaluation result is 'in line' or 'out of line'; and,
the scoring item of the green environmental protection index is selected from:
an environment monitoring management subsystem is built on a construction site, and the evaluation score is 20 points;
a raise dust monitoring point is additionally arranged on the construction site according to the surrounding environment and the site construction condition, and the evaluation score is 5 points;
the site dust monitoring of the construction site has the site sound-light alarm or remote alarm function that dust exceeds standard, and the evaluation score is 5 points;
the construction site is provided with a bare-soil AI recognition monitoring device, and the evaluation score is 5 points;
spraying dust-settling measures are adopted on the site of the construction site, and the evaluation score is 10 points;
noise monitoring points are additionally arranged on a construction site according to the surrounding environment and the site construction condition, and the evaluation score is 5 points;
the site noise monitoring of the construction site has the site sound-light alarm or remote alarm function of exceeding the noise standard, and the evaluation score is 5 points;
setting a microclimate meteorological monitoring point on a construction site, wherein the evaluation score is 5 points;
setting a sewage monitoring point on a construction site, wherein the evaluation score is 5 points;
monitoring the cleaning condition of vehicles entering and exiting on the construction site, wherein the evaluation score is 5 points;
adding a branch term: on site, combining with relevant management files and technical standards of the country and the location, adopting other intelligent measures for environment monitoring, and setting the evaluation score to be 5;
an energy consumption management subsystem is built on the site of the construction site, and the evaluation score is 20 points;
monitoring the power consumption in real time on the site of the construction site, wherein the evaluation score is 5 points;
monitoring the water consumption in real time on the construction site, wherein the evaluation score is 5 points;
the weight of the weighing material is automatically measured on the site of the construction site, and the evaluation score is 5 points;
automatic counting of the bars is realized on the construction site by adopting an AI (Artificial intelligence) recognition technology, and the evaluation score is 5;
adopting an optical character recognition technology on a construction site, accurately recognizing the material name, specification and model number information in the paper document, and judging that the evaluation score is 5 points;
a radio frequency technology or a two-dimensional code labeling technology is adopted on a construction site, the warehousing, the storage and the use management of materials are assisted, and the evaluation score is 5 points;
monitoring carbon emission in a construction stage on a construction site in real time, wherein the evaluation score is 5 points;
an energy-saving low-carbon construction device and process are adopted on the site of a construction site, and the evaluation score is 10 points; and (c) and (d),
adding a branch term: on-site management files and technical standards related to the country and the location are combined in the construction site, intelligent measures for controlling other resources and energy are adopted, and the evaluation score is 5;
and converting the total evaluation score and the total score of the selected grading items of the green environmental protection index into a percentile score, thereby obtaining a score Q of the grading items of the green environmental protection index 3
8. The method of any of claims 2 to 4, wherein the control of the quality-controllable metric comprises: the intelligent construction site can realize the data informatization management function of the quality management system; and, concealing key processes and key links of the project and retaining video image data; wherein each evaluation result is 'in line' or 'out of line'; and,
the scoring items of the quality controllable indexes are selected from:
a quality management subsystem is built on the construction site, and the evaluation score is 20 points;
actually measuring the quality of the structural entity on site at a construction site, wherein the evaluation score is 5 points;
remote measurement is carried out on a construction site by using technical equipment, and the evaluation score is 5;
monitoring concrete vibration in real time on a construction site, wherein the evaluation score is 5 points;
monitoring the standard culture laboratory in real time on the construction site, wherein the evaluation score is 5 points;
the project of each part adopts handheld equipment to check and accept, and the evaluation score is 5 points;
applying visual equipment on a construction site to assist quality management, wherein the evaluation score is 5 points;
adding a branch term: the construction site combines with the relevant management files and technical standards of the country and the location, adopts other quality control intelligent measures, and has a rating score of 5;
adopting traceable intelligent management on site inspection materials of a construction site, wherein the evaluation score is 10 points;
carrying out informatization management on acceptance of the incoming materials on the site of the construction site, wherein the evaluation score is 5 points;
when the main materials enter the site and are not qualified for inspection, carrying out alarm prompt and information push, wherein the evaluation score is 5 points;
the authenticity of a material detection report can be effectively verified on site, the material detection report can be downloaded or checked on site, and the evaluation score is 5 points;
the concrete can be rapidly inspected on site in a construction site, and the evaluation score is 5 points;
the quality monitoring of the structural concrete can be realized on site in a construction site, and the evaluation score is 5 points;
monitoring the temperature data of the mass concrete on the construction site, wherein the evaluation score is 5 points;
intelligent equipment is adopted in a construction site, so that the quality of welding, steel member installation, bolt installation and shear resistant studs in steel structure construction can be intelligently supervised, and the evaluation score is 5;
the intelligent equipment can be adopted to carry out process supervision on the waterproof construction quality on the site, and the evaluation score is 5;
the construction quality of heat preservation and decoration can be monitored in the field by adopting intelligent equipment, and the evaluation score is 5;
and,
adding a branch term: on-site management files and technical standards related to the country and the location are combined in the construction site, intelligent measures for quality control of other materials are adopted, and the evaluation score is 5;
and converting the total evaluation score and the total score of the selected scoring items of the quality controllable indexes into a percentage score, thereby obtaining the score Q of the scoring items of the quality controllable indexes 4
CN202211254087.6A 2022-10-13 2022-10-13 Evaluation method for intelligent construction site Pending CN115526523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211254087.6A CN115526523A (en) 2022-10-13 2022-10-13 Evaluation method for intelligent construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211254087.6A CN115526523A (en) 2022-10-13 2022-10-13 Evaluation method for intelligent construction site

Publications (1)

Publication Number Publication Date
CN115526523A true CN115526523A (en) 2022-12-27

Family

ID=84701956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211254087.6A Pending CN115526523A (en) 2022-10-13 2022-10-13 Evaluation method for intelligent construction site

Country Status (1)

Country Link
CN (1) CN115526523A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116090705A (en) * 2023-03-06 2023-05-09 广东新视野信息科技股份有限公司 Data processing method and system based on intelligent building site and cloud platform
CN116957374A (en) * 2023-04-11 2023-10-27 中国建筑第二工程局有限公司 Building quality inspection management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116090705A (en) * 2023-03-06 2023-05-09 广东新视野信息科技股份有限公司 Data processing method and system based on intelligent building site and cloud platform
CN116957374A (en) * 2023-04-11 2023-10-27 中国建筑第二工程局有限公司 Building quality inspection management system

Similar Documents

Publication Publication Date Title
CN111126838B (en) Intelligent engineering management system
CN108915771B (en) Cloud control mine comprehensive management system
CN115526523A (en) Evaluation method for intelligent construction site
CN113706355A (en) Method for building intelligent emergency system of chemical industry park
CN111401746A (en) Intelligent construction site informatization management system
CN115278543A (en) Intelligent building site system based on BIM
CN111860960A (en) Prediction pre-control cloud smart supervision sharing platform based on big data internet and block chain
CN111144783A (en) Construction management method applying intelligent construction site system
CN110137940B (en) Intelligent electric power management and control system based on mobile visualization
CN109264522A (en) System for reporting life cycle, maintenance and measurement audit condition of building equipment
CN115496329A (en) Highway construction project management system and method applying BIM + GIS technology
CN111369220A (en) Teacher's cloud platform is built to wisdom
CN115936599A (en) Engineering management system based on BIM automatic release
CN113503912A (en) Urban rail transit civil engineering facility health status real-time monitoring system
CN114186650A (en) Maritime personnel emergency management system and management method
CN109801416A (en) A kind of total dimension computer lab management method of building together based on big data analysis
CN114399265A (en) Electric power engineering construction project overall process management and control system
CN115271623A (en) Building site construction safety and quality supervision method based on block chain
CN112347540B (en) Intelligent detection modeling system for building
CN205105339U (en) Construction project quality safety remote monitering system
CN116611616A (en) Chemical safety intelligent management and control platform
CN114493137A (en) Management and control platform is built to wisdom based on BIM technique
Fang et al. Design and Development of Industrial Safety APPs
Hu et al. Intelligent Engineering Construction Management: On-Site Construction Management
Rongrong et al. Application of intelligent safety supervision based on artificial intelligence technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination